Presentation

Presentation

GAZPROM IN EASTERN RUSSIA PRESS CONFERENCE JUNE 18, 2012 Far East Section of Unified Gas Supply System General Development Scheme Yakutsk Yakutsk Sakhalin center Оkha center Komsomolsk- Yuzhno- on-Amur Tynda Sakhalinsk Skovorodino Khabarovsk Sovgavan Blagoveshchensk Chita Zabaikalsk Nakhodka Ulan-Ude Vladivostok MONGOLIA CHINA Ulaanbaatar JAPAN Tokyo DEMOCRATIC PEOPLE’S REPUBLIC OF KOREA Pyongyang REPUBLIC OF KOREA Seoul Beijing Gas production centers Existing gas pipelines LNG/CNG plant and export terminal Gas pipelines being designed and under construction Projected gas processing plants 2 Kamchatka Territory Gas Supply Project Commissioned in September 2010 Gas pipeline length – 392 km BERING SEA Gas pipeline diameter – 530 mm Pressure – 6.37 MPa Annual throughput – 750 million m3/yr First gas supplied to consumers in 2010 Kamchatka Peninsula Zapadno- Kamchatsky licensed block Kshukskoye Nizhne- Kvakchikskoye Sobolevo Yelizovo AGDS Severnye Koryaki AGDS SEA OF Yuzhnye Koryaki AGDS Razdolny AGDS Nachinki AGDS AGDS 2 OKHOTSK Kavalerovskoye AGDS AGDS 1 Apacha AGDS Petropavlovsk- Kamchatsky PACIFIC OCEAN 3 Zapadno-Kamchatsky Licensed Block Hydrocarbon resources of Zapadno-Kamchatsky licensed block 1,800 1,600 1,400 1,621.4 1,200 1,000 Kamchatka 800 Territory 600 400 523.3 200 0 Gas, billion m3 Oil, million t Sredne-Kunzhinskoye field Kshukskoye field Nizhne-Kvakchikskoye field Severo-Kolpakovskoye field Hydrocarbon traps Gas and condensate fields Zapadno-Kamchatsky licensed block 4 First Startup Complex of Sakhalin – Khabarovsk – Vladivostok Gas Transmission System Commissioned in September 2011 Length of first startup complex within gas trunkline – 1,350 km, Sakhalin III GULF OF SAKHALIN Vostochno- Odoptinsky including: Okha block Sakhalin I •Submerged crossing under the Nevelsky Strait – Nikolaevsk- Chaivo field on-Amur Sakhalin II 2 strings with 1,000 mm diameter and 23 km length each Piltun- RUSSIA CS -1 Astokhskoye field MCS, Nogliki •Gas lateral running to Vladivostok gas distribution station – 0 km Sakhalin III Ayashsky block 116 km CS -2 Sakhalin III CS -3 Kirinskoye Komsomolsk- Alexandrov- field on-Amur Sakhalinsky CS -4 Sakhalin II Gas pipeline diameter – 1,220 mm, lateral diameter – 1,020/720 mm Lunskoye field Pressure – 9.8 MPa, lateral pressure – 7.4 MPa CS -5 Khabarovsk SEA OF CS -6 Sakhalin main compressor station – 2 gas pumping units, 32 MW OKHOTSK CS -7 Yuzhno- Vladivostok gas distribution station – 265,000 m3/hr CHINA Sakhalinsk CS-8 Korsakov CS -9 CS -10 CS -11 CS -12 Fields within Sakhalin I project CS -13 SEA OF JAPAN Fields within Sakhalin II project Vladivostok Vladivostok GDS Main compressor station (MCS) at Sakhalin – Khabarovsk – Vladivostok gas transmission system; o km RUSSKY Okha – Komsomolsk-on-Amur existing gas pipeline ISLAND First startup complex at Sakhalin – Khabarovsk – Vladivostok gas transmission system Komsomolsk-on-Amur existing gas pipeline 5 Construction of Submerged Crossing under Eastern Bosphorus Strait 6 Kirinskoye Field Pre-Development Project. Kirinskoye Field OPF – Sakhalin MCS Gas Pipeline Project Gas pipeline parameters: • Diameter – 1,020х19 mm • Operating pressure – 9.8 MPa • Length – 137 km • Throughput – 19 billion m3/yr 7 Raw Hydrocarbon Reserves and Resources in Republic of Sakha АВС1 С2 С3 Republic of Sakha gas, billion m3 1,313.80 1,223.30 233.000 condensate, million t 33.50 20.00 oil, million t 245.50 189.00 191.0 00 GAZPROM / Chayandinskoye field gas, billion m3 631.10 694.30 condensate, million t 9.40 10.20 oil, million t 50.20 9.70 Incremental growth through geological exploration in 2011, billion m3 С1 – 178.2 8 Measures of State Support for Projects in Eastern Russia (I) Income tax Severance tax • Reducing the income tax rate • Removing social contributions from salary increments for • Reimbursing 50% of the paid income tax in case of staff members employed in the Extreme North or similar reinvesting the income received from projects territories implementation in Siberia and the Far East • Applying 0% severance tax rate to newly discovered hydrocarbon fields located in Yakutia and the Shelf Federal target programs • Financing part of expenses on investment projects for Property tax gasification of Russian regions through targeted • Applying 0% property tax rate until completion of an allocation of funds to regional budgets for inter- investment project being executed in Siberia and the Far settlement and intra-settlement gas pipelines East construction • Creating power supply, power generation and transport infrastructure in a prioritized manner Social fees • Reducing employer’s social contribution rates on the gross wage fund for the employees from other Russian regions during the first three years of employment 9 Measures of State Support for Projects in Eastern Russia (II) Pricing • Creating the pricing mechanisms that promote a wider use of natural gas by consumers due to its environmental and technological advantages Gas processing and gas chemicals • Providing tax benefits to gas chemical facilities • Creating helium concentrate storage facilities and strategic helium reserves funded by the state • Boosting creation of the national vehicle fleet designed for helium transportation • Applying 0% import duties to the process equipment used in the oil and gas sector and having no analogs in Russia – during the project payback period 10 .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    10 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us