ENERGOPROJEKT APRIL-JUNE 2019

PERIODIC REPORT ON BUSINESS OPERATIONS OF THE ENERGOPROJEKT GROUP FOR THE FIRST QUARTER OF 2019 ADOPTED

CONTRACTED EXECUTION OF WORKS RELATED TO ASPHALTING OF STREETS AND THE CONSTRUCTION OF A NEW TECHNICAL ROAD STATION IN ZEMUN, WHILE WORKS ON „GREEN BOULEVARD“ ROADS HAVE ALREADY BEGUN

TRAM TRACKS ACROSS THE ADA BRIDGE COMPLETED BUSY SUMMER ON THE „HOME FIELD“ ContentsContents At the beginning of May this year, the periodic report on business oper- BUSY SUMMER ON THE „HOME FIELD“ ...... 2 ations of the Energoprojekt Group for 68 YEARS OF ENERGOPROJEKT ...... 4 the first quarter of 2019 was adopted. PERIODIC REPORT ON BUSINESS OPERATIONS OF THE ENERGOPROJEKT GROUP In the structure of total revenue, home FOR THE FIRST QUARTER OF 2019 ADOPTED ...... 6 operations participated with 65% while REPORT FROM THE 50TH REGULAR ANNUAL GENERAL MEETING OF ENERGOPROJEKT HOLDING PLC . . . . 6 companies abroad with 35%. The fact ENERGOPROJEKT HOLDING PLC ANNUAL BUSINESS REPORT AND ENERGOPROJEKT HOLDING PLC ANNUAL CONSOLIDATED REPORT FOR 2018 ADOPTED ...... 7 that we have recently contracted three RESOLUTION ON DISTRIBUTION OF RETAINED EARNINGS ...... 7 important contracts on the execution THE NEW MEMBER OF THE SUPERVISORY BOARD APPOINTED ...... 7 of works in the Serbian capital shows INFORMATION ON VOTING IN ABSENTIA ...... 8 that we became more active on „home THE NEW CHIEF FINANCIAL OFFICER APPOINTED ...... 8 field“. Moreover, speaking in favour of CHANGE IN THE BOARD OF DIRECTORS ...... 8 the said before, the reconstruction of NEW PROJECTS IN ...... 8 Karađorđeva Street in Belgrade is con- WORKS ON „GREEN BOULEVARD“ STARTED ...... 8 siderably progressing, we have recently 50% OF APARTMENTS SOLD IN "PARK 11" ...... 9 finished the tram tracks over the Ada CONSTRUCTION OF TPP-HP “PANČEVO” PROJECT REALIZATION CONTINUES ...... 9 Bridge, and the construction of Chinese ADAPTATION OF PRODUCTION AND BUSINESS PREMISES IN THE EXISTING ENERGOPET OBJECT . . . . . 10 cultural centre was completed at the RECONSTRUCTION OF KARAĐORĐEVA STREET ...... 10 beginning of June. At the same time, we REALIZATION OF THE PROJECT FOR SETTING THE FLAGPOLE 80 METERS HIGH put a lot of effort into the development WITH THE FLAG OF THE REPUBLIC OF SERBIA ...... 11 of our own investments in Belgrade. EXPANSION OF PRODUCTION CAPACITY IN THE EXISTING ENERGOPET PRODUCTION AND STORAGE FACILITIES . 11 The urban design project for the con- CONTRACTED WORK OF "FIDIC" ENGINEERS FOR CONSTRUCTION OF WIND POWER PLANT "KOSTOLAC" . 12 struction of a residential and business TRAM TRACKS ACROSS THE ADA BRIDGE COMPLETED ...... 12 complex in Block 26, we are planning to REALIZATION OF "FEDAN" CONTRACT IN JORDAN ...... 13 construct, received in May the approval CONSTRUCTION OF CHINESE CULTURAL CENTER COMPLETED ...... 13 from the Sector for spatial and urban URBAN DESIGN PROJECT FOR BLOCK 26 OBTAINED AN APPROVAL FROM THE MINISTRY ...... 14 planning of the Ministry of Construction, PARTICIPATION IN DRAFTING OF URBAN DESIGN PROJECT FOR BUSINESS RESIDENTIAL BUILDINGS 1, 2 AND 3 IN BLOCK 26 ...... 17 Transport and Infrastructure. The said LICENSE FOR DESIGNING SPECIAL SYSTEMS AND MEASURES OF FIREFIGHTING PROTECTION ...... 17 residential and business complex will REALIZATION OF THE "DJEDRA" DAM PROJECT ...... 17 represent the new essential part of IN THE NEXT PERIOD, THE FULL EMPLOYMENT WILL BE MADE POSSIBLE, the central part of with ALONG WITH THE IMPROVEMENT OF OVERALL WORKING CONDITIONS AND SALARY INCREASE . . . . . 20 a great significance for the city. Also, INTRODUCTION OF DOCUMENT MANAGEMENT SYSTEM TO ENERGOPROJEKT GROUP SUBSIDIARIES . . 23 when it comes to our own investments, NOTICEABLE PARTICIPATION IN THE CONFERENCE "INFOTECH 2019" ...... 23 we can boast of the fact that we have NOTICEABLE PRESENTATION OF ENERGOPROJEKT AT THE 49th CONFERENCE already sold more than 50% of the apart- "WASTEWATER, MUNICIPAL SOLID WASTE AND HAZARDOUS WASTE" ...... 24 ments from the building PARK 11, the ANOTHER SUCCESSFUL "DAY OF ENERGY - SERBIA 2019" ...... 25 object we are building in the vicinity of BUSINESS EXCELLENCE IN THE FIELDS OF ENERGY AND ECOLOGY ...... 26 our business building. THE RECERTIFICATION AUDIT OF IMS ...... 26 Finally, we remind you that on A NEW, MODERN DESIGN SOLUTION FOR ENERGOPROJEKT NEWSPAPER ...... 26 July 11 we are celebrating another INCREASED NUMBER OF VOLUNTARY BLOOD DONORS ...... 28 significant jubilee –the 68th anni- LET'S COLLECT TOGETHER ...... 29 TRADITIONAL REUNION OF THE OLDEST MEMBERS OF ENERGOPROJEKT ...... 29 versary of Energoprojekt. GOOD ORGANIZATION AND RESPECTING ONE'S OWN TIME AND THAT OF OTHER PERSONS ...... 30 BELGRADE BUSINESS RUN ...... 31 A BOOK AS A REWARD ...... 31

Editorial Board Bogdan Uzelac (President of the Information Board and Editorial Board), Marijana Vasić, Radmila Jovićević, Irena Žunić, Andrijana Maksimović, Biljana Svičević (representative of the United Association of Unions) Editorial Editor in Chief: Dragan Aleksić, M.S. Deputy Chief Editor: Borjana Vićentijević Collaborators: year LVI M.S. Dragan Aleksic, MSci, Nada Bojovic, Borjana Vicentijevic, Srđan Vujadinovic, Irena Žunic, Vera Zoric, Živko Janeski, Biljana Kaplarevic, Branimir Peric, D.Sc Sanja Petrovic Becirovic, Marica Petronijevic Boškovic, D.Sc Radoslav Rakovic, Jovan Ranđelovic, Snežana Timotic, Slavka Ćosic, Gorana Čankovic Translation: Marijana Maksimović Berković Photo: Vladimir Jablanov, Vitomir Rakočević, Energoprojekt archives Design and prepress: Energoprojekt Energodata, Plc Published quarterly, circulation: 1500 Newsroom phone number: +381 (0)11310-1020 Publisher: Energoprojekt Holding a.d. Print: DONAT GRAF doo

2 | ENERGOPROJEKT April-June 2019 Contents highlights ContentsContents

06 PERIODIC REPORT ON BUSINESS OPERATIONS OF THE ENERGOPROJEKT GROUP FOR THE FIRST QUARTER OF 2019 ADOPTED In the first quarter of 2019, the Energoprojekt Group realized consol- idated revenue of EUR 46.1 million and a gross profit of EUR 937.000. Realized consolidated operating result of the Energoprojekt Group in the reported period is on the level of the quarterly plan for this year

08 NEW PROJECTS IN SERBIA In the previous period, the companies from Energoprojekt Group contracted three new projects in Belgrade - execution of works related to asphalting of Belgrade streets, works on the arrangement of the roads of so-called „Green Boulevard" and the construction of a new technical road station in Zemun

14 URBAN DESIGN PROJECT FOR BLOCK 26 OBTAINED AN APPROVAL FROM THE MINISTRY The Detailed Regulation Plan, adopted in 2016, stipulated the construction of five buildings in Block 26, of the total gross area of approximately 384,000 m2 of overhead space and 153,000 m2 of underground space

20 INTERVIEW – BRATISLAV STIŠOVIĆ, Director of Energoprojekt Hidroinženjering The overall annual results over the past few years show a positive trend. Last year, the realized profit was 16% above the planned, and operating profit amounted to 10.4% in relation to operating revenue, with stable business operations 23 INTRODUCTION OF DOCUMENT MANAGEMENT SYSTEM TO THE ENERGOPROJEKT GROUP SUBSIDIARIES The introduction of DMS will enable, through the unambiguous definition of information flows, optimization of processing time, data protection, archiving of documents, reduction of paper documentation costs, as well as improvement of business operations and preservation of business continuity

April-June 2019 ENERGOPROJEKT | 3 Energoprojekt newsnews Stojan Čolakov, Chief Executive Officer - on the occasion of the jubilee of our company 68 YEARS OF ENERGOPROJEKT n July 11, 2019, the Energoprojekt consolidation of Energoprojekt Group is O Group will mark an important jubilee close to its final stage . Previously, the said - the anniversary of the establishment processes were finished in Energoprojekt of Energoprojekt and the 68th birthday of our Visokogradnja Plc, Energoprojekt Niskogradnja company . Plc, Energoprojekt Hidroinženjering Plc, In that sense, we welcome all our investors, Energoprojekt Urbanizam i arhitektura Plc business partners, shareholders, employees and Energoprojekt Energodata Plc . This year, and the investment public . At the same time, we have fully completed the mentioned pro- we would like to inform you about the current cess in Energoprojekt Oprema Plc . As for the business situation, trends and prospects of the Energoprojekt Industrija Plc, the implementa- operations of Energoprojekt Group . tion of the Decision on the compulsory acqui- Energoprojekt Holding Plc recently held sition of shares of the remaining shareholders the 50th regular Session of the Shareholders is underway, while in Energoprojekt Entel Plc Assembly and adopted all the decisions envis- the realization of the take-over bid of shares aged by the agenda . Among other things, of the minority shareholders by Energoprojekt the participants also approved appropriate Holding Plc is ongoing . To achieve stabilization decisions regarding the adoption of annual of overall business and viable development, single and consolidated financial statements we simultaneously carry out the adequate (along with the opinion of an external auditor) business and financial consolidation, aim- for 2018 . ing at the reduction of indebtedness of the The total realized consolidated reve- Energoprojekt Group . • Projects within the city of Belgrade nue of the Energoprojekt Group (in the One of the significant events that is worth jurisdiction (the execution of works on the country and overseas) in 2018 amounted mentioning is that Court of Arbitration in arranging of the roads on the following streets to RSD 25 .270 .501,000 (approx . EUR 213,7 Stockholm passed the arbitration award on - Kraljice Marije, 27 Marta, Džordža Vašingtona million) . The total consolidated gross profit April 24, 2019, in favour of Energoprojekt and Cara Dušana in Belgrade; construction of a of the Energoprojekt Group (in the coun- Oprema Plc in the arbitration proceeding tram tracks across the Ada Bridge in Belgrade; try and abroad) for 2018 amounts to RSD conducted with "Gazprom Transgaz" Belarus . design and construction of a new landfill in 1 .014 .753,000 (approx . EUR 8 .6 million) According. to the arbitration award mentioned Vinča, Belgrade, and revamping of the existing Energoprojekt Holding Plc (parent compa- before, Energoprojekt Oprema Plc has the landfill, the execution of works on the recon- ny) in 2018 generated total income of RSD right to appropriate compensation of more struction of Karađorđeva Street and Savski 1 .247 .232,000 (approx . EUR 10 .5 million) and than USD 30 million . quay in Belgrade, etc .) gross profit (before taxes) of RSD 810,194 thou- Energoprojekt Group conducts its busi- • Execution of electromechanical and sand (about EUR 6 .9 million) . Other relevant ness operations on the following markets: construction tasks, delivery of materials and business parameters that should be noted in Serbia, the Middle East region (Qatar, UAE, equipment related to the Kolubara project - 2018 include the total value of contracted new Oman, Jordan, Bahrain), the region of Africa New coal landfill, package C2 Infrastructure projects of Energoprojekt (in the country and (Uganda, Ghana, Algeria, Nigeria, Zambia, • Execution of the electromechanical abroad) which amounted to EUR 186 .1 million . Rwanda, Zimbabwe and Guinea), the region works at the "Ada Mall" in Belgrade The mentioned value relates to contracting in of Russia and Eurasia (Russia, Kazakhstan and • Joint engagement and realization Serbia in the total amount of EUR 126 .2 million Belarus), the region of South America (Peru), of projects with other companies of the (68%) and abroad EUR 59,9 million (32%) . At and former SFRY countries . Energoprojekt Group . the end of 2018, in the Energoprojekt Group, The most significant projects of The most important projects of the remained approximately EUR 351 .1 million the Energoprojekt Group subsidiar- design and consulting companies from the of contracted projects yet to be realized ( in ies (Energoprojekt Visokogradnja Plc, Energoprojekt Group (Energoprojekt Industrija Serbia - EUR 221 million, and overseas - EUR Energoprojekt Niskogradnja Plc and Plc, Energoprojekt Urbanizam i arhitektura 130,1 million) . Energoprojekt Oprema Plc) that are currently Plc, Energoprojekt Hidroinženjering Plc and In line with the Business Plan for 2019, underway are as follows: Energoprojekt Entel Plc), which are in the the projected consolidated revenue of the • Construction of the Chinese Cultural phase of realization are as follows: Energoprojekt Group (at home and abroad) Center in New Belgrade • Design and consulting services for inves- amounts to EUR 249 million, gross profit of • Construction of the business facility tors at Nikola Tesla Airport ("Vinci Airports EUR 7,8 million and the contracting of new "Navigator Business Center 2" in New Belgrade Serbia" and "Vinci Terna") and Serbia and projects in the total amount of EUR 273 million . • Execution of works on the development Montenegro air traffic services-SMATSA Llc In the first quarter of 2019, the of residential and business facility "Park 11" in • Pharmaceutical Factory in Ghana Energoprojekt Group realized consolidated New Belgrade • Consulting services, design and supervi- revenue of EUR 46 .1 million, a gross profit of • Construction of the E763 Lajkovac - Ljig sion over projects "Belgrade waterfront" EUR 937 .000 and the total worth of signed highway • Preparation of project documentation new projects amounts to EUR 34,5 million in • Construction of a new technical road for football stadiums in Serbia the same period . This result is better concern- station in Zemun • Consulting services, design and control ing the planned parameters for the reporting • Execution of works on reconstruction for almost all the most important hydropower period, i .e . the achieved results in the same of the section "Straževica Tunnel (entrance) - projects in Serbia and Montenegro period of the previous year . Jajinci - Small Krsna" and railway station "Mala • Creation of preliminary designs and The process of the ownership structure Krsna" tender documentation as well as the super-

4 | ENERGOPROJEKT April-June 2019 newsEnergoprojekt news vision over the construction of several dams future engagement in some other countries to both sides, based on the "design, build and in Algeria (Uzbekistan, Kenya, Tanzania, Mozambique, finance" principle . In that sense, we recently • Activities related to consulting services Bolivia, Bangladesh, Lebanon, India, etc .) . sent to the City of Belgrade a joint Letter of for the construction of a new cogeneration Having in mind the investment plans Intent, in which we have shown the interest plant of NIS in Pančevo announced (in the amount of several billion of our two companies for active participation • Consulting services connected to the euros) in the Republic of Serbia in the future in the realization of the five most important construction of a new block of TPP Kostolac years, Energoprojekt intends to actively par- planned infrastructure projects in the City of B3 of the total power of 350 MW, TS Rudnik 5 ticipate in the planned projects with all its Belgrade, with participation in their financing . 110 / 6kV and 110kV power transmission line available resources . In the present complicated and spe- • Consulting services for the expansion of Moreover, we would like to emphasize that cific business conditions, Energoprojekt the electric power system of the Katar - Phases our company became increasingly engaged Management will strive to jointly undertake 11, 12 and 13 in the implementation of significant infra- appropriate business activities, as to be able • Consulting services for numerous pro- structure projects for the City of Belgrade . We to further improve the business, sustainable jects in the United Arab Emirates, Oman and express our readiness to continue this fruitful growth, development and social responsibility Qatar cooperation . of our company . • Joint execution of works and realization It is noteworthy that Energoprojekt signed of projects with other companies belonging a "Business Cooperation Protocol" with the "NV to Energoprojekt Group . BESIX S .A" company based in Brussels, Belgium . Aside from the active presence of The Protocol expresses the intention of the Energopriject on the traditional markets in two parties to cooperate on the execution of the country and worldwide, we are also con- projects and providing of services for various Stojan Čolakov sidering the other potential opportunities for projects in the Republic of Serbia, of interest Chief Executive Officer 1951 2019

April-June 2019 ENERGOPROJEKT | 5 Energoprojekt newsnews

The business operations of the Energoprojekt Group in the first quarter of 2019 was at the level of the planned parameters PERIODIC REPORT ON BUSINESS OPERATIONS OF THE ENERGOPROJEKT GROUP FOR THE FIRST QUARTER OF 2019 ADOPTED t the beginning of May abroad) for 2019 amounts to EUR and abroad) in 2019 amounts to In the first quarter of A this year, the Executive 249 million. Projected consolidat- EUR 7,8 million. For the first quarter Board of Energoprojekt ed revenue of the Energoprojekt of 2019, the planned consolidated 2019, the Energoprojekt Holding, Plc considered and Group for the first quarter of 2019 loss of the Energoprojekt Group (at Group realized con- adopted the periodic report on (at home and overseas) is EUR home and abroad) is EUR 615.000. business operations of the 47,9 million. Realized consolidat- Realized consolidated revenue in solidated revenue of Energoprojekt Group for the first ed revenue in the reporting peri- the reporting period amounts to quarter of 2019. od is according to the plan and EUR 937.000, which is better than EUR 46.1 million and In the first quarter of 2019, amounts to EUR 46,1 million. planned. a gross profit of EUR the Energoprojekt Group realized In the structure of total reve- • Signing new con- consolidated revenue of EUR 46.1 nue, home operations participated tracts – New contracts of the 937.000. million and a gross profit of EUR with 65% while companies abroad Energoprojekt Group scheduled 937.000. Realized consolidated rev- with 35%. In the structure of oper- for 2019 at home and abroad operations in the future. enue of the Energoprojekt Group ating revenue, active jobs (con- amounted to EUR 273,1 million, as Following the legal regu- in the reported period is on the tracts signed until December 31, follows: EUR 143,1 million in Serbia lations, the Executive Board of level of the quarterly plan for this 2018) are dominating with 97%, (52%) and EUR 130 million abroad Energoprojekt Holding Plc in the year. A similar conclusion can be while new projects (contracts (48%). In the first quarter of 2019, first half of May this year adopt- made in comparison with the signed in 2019) participated with the total worth of signed new jobs ed and published the unaudited achieved parameters of operations 3%. The most significant market amounts to EUR 34,5 million: EUR Quarterly report on the operations in the same period of the previous share in total revenue had the 13,3 million (39%) at home and of the Energoprojekt Group for the year. It is important to note that Serbian region with 64,6%, the EUR 21,2million (61%) abroad. first quarter of 2019. (due to well-known characteris- Middle East region (Qatar, UAE, • The remaining projects In the first quarter of 2019, tics of the construction industry) Oman, Jordan, Bahrain) with to be realized - On the last day parent company Energoprojekt business operation of construction 18,5%, African region (Uganda, of the reporting period, the Holding Plc realized total revenue companies from the Energoprojekt Rwanda, Nigeria, Ghana, Zambia, Energoprojekt Group has approx- of RSD 107,8 million (EUR 911.000) Group has been traditionally diffi- Algeria, Zimbabwe, Guinea ) with imately EUR346,2 million worth and net profit of RSD 9,6 million cult in the first quarter. 12,5%, Russian and Eurasian region of signed contracts yet to be (EUR 81.000). Following is the brief over- (Kazakhstan, Russia, Belarus) with achieved (home projects EUR On May 15 of the current year, view of business operations of 2.2%, South American region 205million; foreign units EUR50,8 the Reports mentioned above the Energoprojekt Group in the (Peru) with 1,7%, and other with million and foreign companies were published entirely on the reported period: 0.5%. EUR 90,4 million). The stated val- websites of the Company, the • Total revenue - Projected • Gross profit – The planned ue of the remaining projects for Belgrade Stock Exchange and consolidated revenue of the consolidated gross profit of the realization is a significant business the Securities Commission of the Energoprojekt Group (at home and Energoprojekt Group (at home potential which ensures stable Republic of Serbia.

Adopted Decisions REPORT FROM THE 50TH REGULAR ANNUAL GENERAL MEETING OF ENERGOPROJEKT HOLDING PLC he 50th regular Annual General BUSINESS REPORT FOR 2018 (Energoprojekt RETAINED EARNINGS T Meeting of Energoprojekt Holding Plc Holding Plc Financial Statement for 2018, Auditor’s 4. THE DECISION ON ADOPTION OF THE was held in the projection room in report for 2018 and Annual Business Report) ENERGOPROJEKT HOLDING PLC SUPERVISORY the office building on June 28, 2019. President 2. THE DECISION ON ADOPTION OF BOARD’S REPORT was Dragoljub Milovanović, Secretary Sanja THE ENERGOPROJEKT GROUP ANNUAL 5. THE DECISION ON THE APPOINTMENT OF Božović and the Voting Committee President CONSOLIDATED STATEMENT FOR 2018 (the THE COMPANY AUDITOR AND APPROVAL OF THE Pavle Zović. Following the agenda, the follow- Energoprojekt Holding Plc Consolidated Financial AUDITOR’S SERVICE FEE ing decisions were adopted at the meeting: Statements for 2018; Auditor’s Report for 2018 6. THE DECISION ON THE APPOINTMENT 1. THE DECISION ON ADOPTION OF and Annual Business Report) OF THE ENERGOPROJEKT HOLDING PLC ENERGOPROJEKT HOLDING PLC ANNUAL 3. THE DECISION ON THE DISTRIBUTION OF SUPERVISORY BOARD MEMBER.

6 | ENERGOPROJEKT April-June 2019 newsEnergoprojekt news

Dragan Ugrčić was appointed the mem- General Meeting of Energoprojekt Holding Plc Company website www.energoprojekt.rs ber of the Supervisory Board of Energoprojekt as well as the adopted Decisions and voting (Section Investor Relations, General Meeting Holding Plc results on all items of the agenda deliberated submenu). The minutes from the 50th regular Annual by the shareholders are all available on the

At the 50th regular Session of the Shareholders Assembly of Energoprojekt Holding ENERGOPROJEKT HOLDING PLC ANNUAL BUSINESS REPORT AND ENERGOPROJEKT HOLDING PLC ANNUAL CONSOLIDATED REPORT FOR 2018 ADOPTED t the 50th regular Session • ENERGOPROJEKT HOLDING The total realized con- (approx. EUR 6,9 million). A of the Shareholders PLC ANNUAL CONSOLIDATED solidated gross profit of the Annual Report of Energoprojekt Assembly of REPORT FOR 2018 (Energoprojekt Energoprojekt Group (at home Holding Plc for 2018 and Annual Energoprojekt Holding Plc held on Holding Plc consolidated finan- and abroad) in 2018 amounts to Consolidated Report of the June 28, 2019, the following cial statements for 2018; Auditor’s RSD 1.014.753.000. approx. EUR Energoprojekt Holding Plc for 2018 reports were approved: Report for 2018 and Annual 8,6million). were published entirely meeting • ENERGOPROJEKT HOLDING Business Report). Energoprojekt Holding Plc the legal deadlines (the end of April PLC ANNUAL BUSINESS REPORT In 2018, the Energoprojekt (the parent company) in 2018 of the current year) on the web- FOR 2018 (Energoprojekt Holding Group realized total consolidated realized the total revenue of RSD sites of Energoprojekt Holding Plc, Plc financial statements for 2018; revenue (domestic and abroad) of 1.247.232.000 (approx. EUR 10,5 mil- the Belgrade Stock Exchange and Auditor’s Report for 2018 and RSD 25.270.501.000 (approx. EUR lion) and gross profit (before tax) the Securities Commission of the Annual Business Report). 213,7 million). in the amount of RSD810.194.000 Republic of Serbia.

At the 50th regular Session of the Shareholders Assembly of Energoprojekt Holding RESOLUTION ON DISTRIBUTION OF RETAINED EARNINGS ealized net profit of Energoprojekt Retained earnings of the Company from shall remain undistributed so that the retained R Holding Plc (hereinafter: the previous years amount to RSD 256.753.670,61. earnings of the Company amount to RSD Company) for 2018 amounts to RSD Realized net profit of the Company for 1.020.227.196,68 in total. 763.473.526,07. 2018, in the amount of RSD 763.473.526,07

According to the decision of the Assembly of Shareholders THE NEW MEMBER OF THE SUPERVISORY BOARD APPOINTED ccording to the decision of the ies. He gained his first work experience in the Ministry of Economy and the Government of the A Assembly of Shareholders of private sector. Since 2008 he has been engaged Republic of Serbia in the Agency for licensing Energoprojekt Holding, Dragan Ugrčić in the Privatization Agency and the state author- the bankruptcy administrators. He has signifi- was appointed a member of the Supervisory ities on matters of privatization and bankruptcy, cant experience in privatization and bankrupt- Board. from the project manager to the Director. He cy, managing activities related to investment DRAGAN UGRČIĆ was born in 1981 in has been engaged as the acting Director of the opportunities, as well as negotiations with Knin, Republic of Croatia. He graduated from Privatization Agency since November 2015, and potential strategic investors and international the Faculty of Economics at the University of in February 2016 he was appointed the Director financial institutions. He is fluent in English. He Belgrade, where he completed his master stud- of the Department for Coordination with the lives in Belgrade, married, with two children.

April-June 2019 ENERGOPROJEKT | 7 Energoprojekt newsnews At the 50th regular Session of the Shareholders Assembly of Energoprojekt Holding Plc INFORMATION ON VOTING IN ABSENTIA ccording to the Law and Article 47 of the Statute Energoprojekt Holding Plc (from 54th meeting held on 18, 2019 - the dividend day) regardless of the number A of Energoprojekt Holding Plc, the shareholders May 28, 2019), the verification of the voting form and the of shares owned (shareholders could vote with a single had the right to vote at the 50th regular Session process of absentee voting was carried out in the hall 10 share). of the Shareholders Assembly of Energoprojekt Holding of the Energoprojekt office building on June 26, 2019. Shareholders who have exercised their right to vote Plc in absentia only by verifying the shareholder’s signature It is especially important to underline that the right in absentia were considered to be participants at the on the absentee voting form (without additional cost). to vote had all the shareholders of Energoprojekt Holding session and in the decision-making process on all items Following the decision of the Supervisory Board of Plc (registered in the Central Securities Depository on June of the agenda. HOLDING PLC – the change of the management THE NEW CHIEF FINANCIAL OFFICER APPOINTED s of July 1, 2019, the Supervisory Board Financial Officer (Executive Director of Finance, will be published in the next issue of Energoprojekt A of Energoprojekt Holding appointed Accounting and Plan). newspaper. Siniša Tekić for the new Chief * The professional biography of Siniša Tekić

INDUSTRIJA PLC – the change of the management CHANGE IN THE BOARD OF DIRECTORS t the 32nd regular session of the Board of Directors of Energoprojekt Industrija: Mirjana Knežević (non-executive and inde- A Assembly of Energoprojekt Industrija, Mirjana Janjić (executive director and director pendent director), Gorana Čanković (non-ex- held on June 24, 2019, the following of the Company), Milan Mamula (non-executive ecutive director - representative of minority persons were appointed the members of the director), Vitomir Perić (non-executive director), shareholders).

NISKOGRADNJA PLC - Three new contracts signed NEW PROJECTS IN SERBIA n the previous period, of Belgrade streets. The value of the con- works on the arranging of the roads Energoprojekt Niskogradnja, I Energoprojekt Niskogradnja tract is RSD110.4 million (excluding VAT), on the following streets - Kraljice Marije, Energoprojekt Oprema Plc and "Colas executed three new con- while the deadline for the realization of 27 Marta, Džordža Vašingtona and Cara Railways" from France have executed a tracts in Serbia. the agreement is 120 days. Dušana in Belgrade (the so-called contract worth EUR 50.8 million on the The Consortium of companies A much more significant contract "Green Boulevard"). The value of the construction of a new technical road Energoprojekt Niskogradnja and was executed between Niskogradnja contract amounts to RSD 2.37 billion station in Zemun. The investor in this "Renaissance N77" has executed a con- Plc in a consortium with the French (excluding VAT), and the deadline for business is the state joint-stock compa- tract with the investor PE Putevi on the company "Colas Rail“ and the investor the realization of this contract is 200 ny "Srbija Voz", and the deadline for the execution of works related to asphalting City of Belgrade on the execution of days. realization of the contract is 800 days.

NISKOGRADNJA PLC - execution of works in Belgrade WORKS ON „GREEN BOULEVARD“ STARTED the plan, all the works should be executed by the end of the year. From the intersection of Ruzveltova and Kraljice Marije Streets up to the end of the streets of Cara Dušana and Tadeuša Košćuška, the projected traffic profile consists of: • road surface 9.0 m wide, with three traffic lanes 3.0 m wide, out of which one side lane (locat- ed next to mixed traffic lanes) is designed for each direction. The middle lane will be located between the two intersections and will be shaped by the lane changing niches and edged with the stone curb. It will serve for the left turn from both directions. he Consortium of the French company for the execution of this work is 200 days. • mixed traffic lanes (including public transport T "Colas Rail" and Niskogradnja Plc execut- The works began in mid-June, more precisely vehicles) each 3.50 m wide, placed sideways by ed a contract with the City Administration on June 15, 2019. The whole project is divided into the carriageway of the City of Belgrade, Secretariat for Investments six sections. It is planned that the works on the first • oblique and parallel parking, situated on the on the reconstruction of city roads Kraljice Marije, two sections - from Ruzveltova to Takovska Street, outer sides of the tramway gardens, between the 27 Marta, Džordža Vašingtona and Cara Dušana. start on June 15, 2019, the other two from Takovska trees of the existing avenue(of trees) The total value of the contracted works to Francuska Street from July 15, 2019, and the last • sidewalk surfaces of total width from 1.70 m amounts to RSD 2.365.005.561,27 excluding VAT two sections from Francuska to Tadeuša Košćuška to 5.50 m between the parking space and existing (approx.EUR 20 million, excluding VAT). The deadline Street start from September 2019. According to buildings.

8 | ENERGOPROJEKT April-June 2019 newsEnergoprojekt news Joint realization of the luxurious residential-business complex 50% OF APARTMENTS SOLD IN "PARK 11" n front of the employees primarily in the trust of customers I in our building, the new in Energoprojekt brand. The excel- building PARK 11 is rising. lent result of the sale was espe- Companies from Energoprojekt cially influenced by the realized Group jointly realize this project. functionality and modern design The deadline for completion of the of the apartments adapted to the building and moving in of the new current trends and expectations of occupants is May 1, 2020. The build- the customers, which was especially ing has 134 apartments, 18 shops considered during the designing. and 208 garage places, and for now, Great attention was paid to the the realization is running according selection of materials and equip- to the planned deadlines. ment of the building, as well as Energoprojekt Holding, as individual flats- the project aimed the Investor is directly selling the to construct a building that meets apartments, shops and garages. high criteria based on quality and The sale started in October 2018. aesthetic architectural values. So far, nearly 50% of all real estate In addition to the Sales has been sold. Department, a "showroom" was set Interest in Park 11 was high up in our building, where samples even before the start of the sale, of selected materials and apartment which is expected given the attrac- equipment were exhibited, and tiveness of the site itself. The pre- customers can choose ceramics for condition for such a good sales their apartments and according to result, in phase one year before selected items, plan the arrange- the completion of the building, is ment of their housing units.

ENTEL PLC – successful cooperation with partners from China CONSTRUCTION OF TPP-HP “PANČEVO” PROJECT REALIZATION CONTINUES he Contract between Energoprojekt a gas turbine plant, two heat recovery boilers, • Connection pipelines and cables that T Entel and “Shanghai Electric Europa” Ltd two chimneys, an administrative building, a enable the connection between TPP-HP and as the EPC Contractor responsible for compressor station and other accompanying Oil Refinery "Pančevo". construction of TPP-HP Pančevo, provides for the facilities and plants During the period from December 2018 to drafting of all levels of project documentation, • TPP-HP Functional unit 2, which includes March 2019, the building permits for the first from the Preliminary Design to the As-Built steam-turbine plant with accompanying facilities three phases of the project were obtained, and Design, as well as the services of "permitting", i.e. and plants (a cooling system, a system for the the drafting of the Project for the implementation obtaining the necessary requirements, approvals chemical preparation of water and other smaller of these three phases is in progress. and permits. plants) The drafting of the Design for Building Permit The design of TPP-HP “Pančevo” is divided • Gas-measuring station for Connection switchgear plant 220 kV (GIS) into five phases: • Connection switchgear plant 220 kV (GIS- is in progress, while the Conceptual Design for • TPP-HP Functional unit 1, which includes Gas Insulated Switchgear) the Connection pipelines and cables unit is also underway. In accordance with the provisions of the Agreement, the Chinese partner "SDEPCI" will prepare projects of electromechanical installa- tions and equipment, while Entel Plc will execute the „nostrification" of these projects (checking, modification or finishing, translation and the like), all for adapting projects to the legal regulations of the Republic of Serbia. Entel Plc will also draft architectural – construction projects and the pro- jects of corresponding installations (firefighting, telecommunication, water control installation, grounding, lighting, thermo-technical and other). For the project coordination, Chinese part- ners have appointed several experts who are staying at the Energoprojekt Entel premises to be in daily communication with the designers of 3D model of future TPP-HP Pančevo our Company. Although cooperation sometimes

April-June 2019 ENERGOPROJEKT | 9 Energoprojekt newsnews requires lengthy clarifications, which are further hindered by the language barrier, as well as the different ways of implementing projects in China and Serbia, it has been shown that the presence of the representatives of the "SDEPCI" Company is of great importance because it contributes to the accelerated dynamics of project realization. Another feature of the mentioned project is a very short period from the contract execution to the obtaining of building permits for the first three phases. The first permit was obtained only nine months after the contract execution, which can be considered a considerable success bearing in mind all the activities that had to be carried out at the very beginning of the project. Namely, obtaining all necessary input data from Chinese partners, drafting all the essential project phases and obtaining the requirements and approvals. During January 2019, simultaneously with The present situation at the construction site TPP-HP Pančevo the Design for Execution, the EPC Contractor canals and other parts of the construction below the dynamics of the realization of the project. The started performing works on the construction the ground level are underway too. Company's full attention is focused on making site, such as excavating the terrain, piling and pile The agility of the end investor, that is, the quick decisions and creating conditions in the testing. Works on the construction of foundations company "Gazprom Energoholding Serbia TPP-HP local environment so that the administrative bar- of buildings, foundations of equipment, pedestals, Pančevo", Ltd. made a significant contribution to riers can be resolved in an accelerated procedure.

INDUSTRIJA PLC – the new contract for technical documentation drafting, consulting services and professional supervision during the execution of works ADAPTATION OF PRODUCTION AND BUSINESS PREMISES IN THE EXISTING ENERGOPET OBJECT roduction and storage To improve its business opera- energy and telecommunication and in the obtaining process of all neces- P complex EnergoPET, Ltd. tions, the Purchaser expressed the signalling installations. The design sary approvals and permits, as well as Krnješevci, for PET pre- desire to carry out the alteration of specification also includes construc- professional supervision during the forms production, is located on production and business premises tion and craft works on the facade, execution of the adaptation works. cadastral parcel no.1873/2 C.O. in the existing building. such as replacement of locksmith Technical documentation draft- Krnješevci. The production and busi- Office space and cloakroom windows, facade panels, repair of ing will include preparation of the ness building includes the part with will be redesigned with particular the roof cover. Preliminary Design for obtaining the administrative buildings, the pro- emphasis on functionality improve- By signing the contract, Decision on the approval for con- duction facility - a factory, a ware- ment. The revamping will include Energoprojekt Industries took upon struction, the Design for Execution, house facility and a silo located replacement of all floor coverings, itself to provide services which the Energy Efficiency Survey, Fire along the south facade of the pro- suspended ceilings, heating and include the drafting of Technical Protection Survey and the Main Fire duction plant. ventilation installations, as well as the Documentation, consulting services Protection Project.

NISKOGRADNJA PLC - arranging the quay RECONSTRUCTION OF KARAĐORĐEVA STREET econstruction of Karađorđeva Street entire supporting infrastructure of tramway R and Sava quay alongside Karađorđeva tracks will be completely renovated- plumb- Street is an infrastructure project ing and sewage system installations and tel- worth RSD 711,967,146.38 excluding VAT. Its ecommunications networks, while special realization is planned for the period from attention will be paid to the landscaping of November 21, 2018, to January 20, 2020. the section. The projected arrangement of The reconstruction includes the traffic the Sava Quay is based on the formation of profile of the street, the width of 13.5m, con- four green oases, decorated with low and sisting of a traffic lane for the public passenger middle vegetation, separated by pedestrian transport, of the total width 7.0 m (2x3.50 m) approach surfaces and plateaus with links to in the middle of the road, and one traffic lane Karađorđeva Street. in each direction, width 3.25 m with sidewalks The promenade will be paved with granite of the variable width on both sides, spreading plates of bright, dark and grey shades accord- from Branko's bridge up to Pariska Street. ing to the established scheme, as to remind of In the stretch mentioned above, aside the river flow. It will be equipped with modern from works on the pavement structure, the street furniture.

10 | ENERGOPROJEKT April-June 2019 newsEnergoprojekt news URBANIZAM I ARHITEKTURA PLC - technical documentation as a donation REALIZATION OF THE PROJECT FOR SETTING THE FLAGPOLE 80 METERS HIGH WITH THE FLAG OF THE REPUBLIC OF SERBIA installation of 80 m high steel pole, as well as lighting of the pole and installation of the device for lifting and lowering the flag. The national flag of proportional dimensions will be placed on the flagpole. According to the Law on the appearance and use of the coat of arms, flag and anthem of the Republic of Serbia (Official Gazette of RS 36/09) the flag proportion ratio is 3:2 (length to height). The exact position of the flagpole is deter- mined based on the Survey on geotechnical conditions for construction and the landscaping will be arranged through synchronization of paving and ground greenery. Within the plateau, it is planned to pave the strips of green surfaces with granite plates. Green surfaces will consist of a combination of grass and flower beds, low vegetation and high trees, which will satisfy the he Government of the Republic of is the confluence of the Sava and rivers. general social goals: T Serbia transferred all the investment The City of Belgrade addressed Energoprojekt • achieving the identity of the space, having rights for the realization of the Project Plc with the request to, as a socially responsible in mind that the height of the flagpole with the for setting the flagpole 80 meters high with the company, draft the Technical Documentation flag of the Republic of Serbia will become a dom- flag of the Republic of Serbia to the City as a donation: the Preliminary Design, the inant landmark in this attractive area near the Administration of the City of Belgrade. At the Conceptual Design and the Feasibility Study. two rivers. Thus it will represent the recognizable initiative of the City Administration of the City Accordingly, Energoprojekt Urbanism and symbol of the capital and the whole of Serbia; of Belgrade Energoprojekt Urbanizam i arhitek- Architecture is preparing the listed projects. They • landscaping and creation of the modern tura Plc has completed the Preliminary Design will be completed after obtaining the location environment, which will fit into the concept of of the flagpole with the flag of the Republic of requirements. the existing and future park ambience dom- Serbia, as well as that of the landscaping. The The technical documentation defines the inated by greenery in the most efficient way; said above took place immediately after the arrangement of the part of the land plot of • preservation and improvement of public adoption of detailed regulation of multifunc- the total area of 5.549 m². Apart from the hard green surfaces, as the spaces of public interest, tional sports and cultural content in the area of landscaping of this surface, the installation of and the "Friendship Park" located at Ušće. The loca- the flagpole is planned. The project implies the • utility infrastructure and high-quality tion designed for this purpose by the urban plan construction of a concrete foundation and the lighting.

INDUSTRIJA PLC – another contract with Energopet EXPANSION OF PRODUCTION CAPACITY IN THE EXISTING ENERGOPET PRODUCTION AND STORAGE FACILITIES nergoPET Company spe- In this way, the warehouse of fin- distribution system support, new newly-formed production hall no.3. E cializes in manufacturing ished products will be transformed lighting with LED lamps. In addi- According to the request of the of PET preforms, which into another production hall all tion to all this, power supply of Purchaser and based on the accept- are used for bottling of mineral within the scope of the existing technological consumers- three ed offer of Energoprojekt Industrija, water, soft drinks, beer, milk, chem- facility. The reconstruction shall new machines, as well as mechan- the Contract includes drafting of ical products etc. PET (Polyethylene include foundation design for four ical installations for heating and the Technical Documentation- Terephthalate) is a thermoplastic new raw material silos, the part of ventilation systems, distribution of the Conceptual Design used to polymer resin of the polyester fam- obtain location requirements, the ily. PET is commonly used in chem- Design for Building Permit, the ical, textile and food industries, as Design for Execution, the Energy a basic raw material for the pro- Efficiency Survey, Fire Protection duction of PET packaging. Survey, Danger Zones Survey and The Investor intends to expand the Main Fire Protection Project. the production capacities in con- Apart from all this, the Contract tinuation of the existing produc- also includes consulting services tion halls where the existing ware- the steel construction of the roof, cooling water from the cooling sta- in the obtaining process of all nec- house of finished products is. The replacement of the part of the roof tion to the lines in the production essary approvals and permits and expansion includes the addition of cover, adding lanterns for natural hall, and compressed air distribu- professional supervision during the three more production machines. lighting, development of the pipe tion installation to the lines in the execution of works.

April-June 2019 ENERGOPROJEKT | 11 Energoprojekt newsnews ENTEL PLC - projects of renewable sources of electricity CONTRACTED WORK OF "FIDIC" ENGINEERS FOR CONSTRUCTION OF WIND POWER PLANT "KOSTOLAC" add to its thermal and hydro capacities the first in the phase of preparation of tender documen- production capacity that uses the wind energy. tation and bid evaluation, and a significant part In a consortium with the German consulting of the engagement is related to the stage of company "Fichtner", Energoprojekt Entel execut- supervision over the execution of works, testing ed a contract with Elektroprivreda Srbije on pro- and commissioning of the wind power plant. viding services of "FIDIC" engineers during the When it comes to the drafting of Project construction of the wind power plant in Kostolac. documentation related to the field of renewa- The contracted services include the drafting of ble energy sources, and especially wind power tender documentation and supervision during plants, Energoprojekt Entel has been occupying PP “Kostolac“ represents the first wind the construction and commissioning of this a significant place on the Serbian market for W power plant Elektroprivreda Srbije is facility. "Kostolac" wind power plant includes many years. In this field, it won the trust of the planning to build. Although 317 MW 20 wind turbines with the total installed power Contractors and practically made a brand out of of energy capacities based on wind power uti- of 66 MW, medium voltage cable network with the project related to wind turbine foundations lization has already been built in Serbia, transformer station 35/110 kV, access roads and execution. Through the activities of "FIDIC" engi- Elektroprivreda has not invested in the men- handling plateaus, as well as connection to the neers, Energoprojekt Entel will sum the scope of tioned sources of energy so far. It is expected electricity system, i.e. connection switchgear and services it provides in the cycle- from the initial that the installed power of wind power plants 110 kV transmission line service cable. The whole idea to the commissioning of a wind power that will be built in Serbia by 2030 will amount project is financed by a loan from the German plant. In this way, it will gain the ability to par- to 700 MW. Wind power plant „Kostolac" will be Development Bank ("KfW"). The participation of ticipate independently or with a much better constructed on tailing dumps and landfills of Entel Plc in the total value of consulting servic- initial position in projects financed by donations "Drmno" and "Klenovnik" pit mines, located at es is about 33%. The complete duration of the or loans from foreign or international investment Kostolac. By building WPP „Kostolac“, EPS will contract is 40 months. Entel Plc will be engaged funds and banks.

NISKOGRADNJA PLC – works performed within the scheduled deadline TRAM TRACKS ACROSS THE ADA BRIDGE COMPLETED he City Administration of sentatives of Investors, Supervisors, the reconstruction of about 1 km the three-way intersection with a T the City of Belgrade, the Contractors, End Users, Media and long existing tramway network. full connection program and cross- Secretariat for Communal Officials of the City of Belgrade. The width of the line is 1.000 mm, ings controlled by traffic lights. The and Housing affairs and the The tramway started the drive and the spacing of the lines is line continues further below the Directorate for Building Land of from the depot in New Belgrade, minimal 3.80 m – when poles of Ada Bridge, over the newly built the city of Belgrade have executed then crossed the main structure of overhead contact system are in the bridge on Topčider River and a contract with the Consortium the Ada Bridge and Topčider River middle, i.e. minimal 3.30 m- when Vojvoda Mišić Boulevard overpass, consisting of Energoprojekt Bridge, and after turning over near overhead contact is placed on por- where four supporting walls were Niskogradnja and "Colas Rail S.A.S." Gospodarska mehana, it went back tals. On this trace, there are two built. The line ends by joining to for the execution of a tram line to the depot the same way. During pairs of tram stops: “Block 42” on the line - the centre across the Ada Bridge on March the next month, the test trials will New Belgrade side, and “Radnička and the center-Rakovica line. It is 20, 2018. The works began on April continue on the route, and the loop”, right after the main span of now the three-way intersection 20, 2019, and have been complet- regular traffic of the trams number Ada Bridge. with full connection program and ed within the set deadline, i.e. on 11 and 13 will start on July 5, 2019. A tram system was built from controlled by traffic lights. This June 4, 2019. The new two-track line with Djordje Stanojevic Street in New solution will enable tramway traf- The first tram test drive was connections to the existing tram Belgrade over the existing bridge fic in all directions between Novi successfully carried out on June network has a total length of about constructions, to the crossing with Beograd, Rakovica, Banovo brdo 5, 2019, in the presence of repre- 2.700 m. This project also encloses tram line Banovo Brdo - Center. It is and the city centre.

12 | ENERGOPROJEKT April-June 2019 newsEnergoprojekt news HIDROINŽENJERING PLC – business on the market of Jordan REALIZATION OF "FEDAN" CONTRACT IN JORDAN he construction site of the (“JWA”), which owns and operates the upstream toe of the embank- ysis of the existing design documen- T "Fedan" dam is located in most dams in this country. ment, a diversion tunnel, a steel tation ("Final Design") before the start the desert part of the The dam is constructed on the pipeline with valves located inside of the project implementation, 2) Arabian Valley ("Wadi Araba"), 70 km periodic desert watercourse of the a tunnel, the chute spillway on the supervision during the construction south of the Dead Sea and 140 km same name „Wadi Al Fedan“. It will downstream slope of the dam with period. Besides, Hidroinženjering Plc north of the Aqaba harbour. This be the rock-fill dam, made from concrete absorption basin, access takes part in the supervision with two dam is intended for the formation stone material with the upstream road of total length of 10 km and a executors: the Head of Supervision of an impounding reservoir volume concrete face (CFRD). The structur- building for staff accommodation and the Grouting Engineer, while of 3,4 million m3 and its water will be al height of the dam is 30 m, and during the exploitation of the facility. the Jordanian partner provides the used for the water supply of house- the length of the crest is 340 m. The When it comes to the con- remaining control staff. holds and irrigation of agricultural volume of the built-in stone material sulting services, Energoprojekt The contracted construction land, while the priority of water use in the embankment will be about Hidroinženjering is engaged in the period of this dam is 36 months. The will be for agriculture. The Investor 400 000 m3. Aside from dam con- realization of this project together works officially started in May 2017, of the project is „Ministry for Waters struction, this project also includes with the Jordanian partner "Engicon" and after 25 months, the Contractor of the Kingdom of Jordan”, that is its construction of the following objects: Company. The scope of the services realized 45% of the intended volume agency “Jordan Valley Authority” a concrete diaphragm wall beneath includes: 1) a review and critical anal- of work.

VISOKOGRADNJA PLC – won Investor's praise CONSTRUCTION OF CHINESE CULTURAL CENTER COMPLETED n June 14, 2019, the construction of the O Chinese cultural centre was successfully completed in the required quality. The completion of works was marked by an appropri- ate event held on the construction site, which officials of the Chinese Embassy, representatives of the Investor and management of the contrac- tor all attended. At this occasion, the time capsule containing the friendship messages prepared by the representatives of the Investor and the Constructor was placed into the finishing element of the construction. The well-chosen speeches of present guests accompanied this moment. The construction works were completed according to the scheduled deadline, due to which the Contractor Visokogradnja Plc received praise. It made the realization and completion of further crafts and installation work possible. The handover of the building is expected in May next year.

President of Superviosory Board Dobroslav Bojović, CEO Stojan Čolakov, and Chief Operating Officer Bogdan Uzelac The time capsule containing friendship messages was placed into the finishing element of the construction

April-June 2019 ENERGOPROJEKT | 13 Energoprojekt newsnews HOLDING PLC - development of its own investments URBAN DESIGN PROJECT FOR BLOCK 26 OBTAINED AN APPROVAL FROM THE MINISTRY he urban design project for Belgrade Arena, two buildings which T the construction of a residen- in the cultural, historical and function- tial and business complex in al sense have a great significance for Block 26 received in May the approval the city. from the Sector for spatial and urban This project is a result of excel- planning of the Ministry of lent cooperation between the three Construction, Transport and authors' team whose work was coor- Infrastructure. dinated at the Energoprojekt Holding The Detailed Regulation Plan, location development department: adopted in 2016, stipulated the con- Studio LFG, which includes archi- struction of five buildings in Block 26, tects Jovan Mitrović and Dejan Miljković of the total gross area of approximate- (according to whose tender solution a ly 384,000 m2 of overhead space and Detailed Regulation Plan for Blocks 25 153,000 m2 of underground space. and 26 was drafted) - are the authors Block 26, being an essential part of of Building 1. Architect Žarko Ćajić, the central part of New Belgrade, due employed in Energoprojekt Urbanism to its location demands the highest and Architecture is the author of standards of design and construction, Building 2. And architect Marija Ibrajter, as to provide the highest standard for who works at the Energoprojekt the future users of this space. Apart Holding location development depart- from quality business space and lux- ment, is the author of Building 3. urious apartments, this complex will Construction of Building 4 and provide its users with a large park in Building 5 was planned alongside the central zone, kindergartens in two Zoran Đinđić Boulevard in a form of out of three buildings, as well as an the business towers up to 120 meters infirmary. high. Since these facilities were not Free and green areas are shaped in subject to the full development of the the form of a park with central zones. Urban Design Project, their Preliminary They integrate micro-ambient that Designs have not yet been drafted. is formed aside each of the planned Building 1 is located next to facilities. The square involves the church Bulevar Mihaila Pupina, and empha- complex as well, thus creating a unique sizes the beginning of the pedestrian space available to all users of the block. link between the Palace "Srbija" and the The construction and the configuration Belgrade Arena. Its architecture, as well of the central plateau, emphasizes the as the functional division, distinguishes north-south axis and the pedestrian the business part of the building, which connection of the Palace "Serbia" - the is 31.5 m high, number of floors ground

BUILDING 1 • 27,535 m2 of residential space • 17,280 m2 of space for commercial activities • the building has 168 residential units • 659 parking places in the underground garage • 64.5 m is the height of the highest part of the building • the floor number is 2 cellars + ground floor + 17

14 | ENERGOPROJEKT April-June 2019 newsEnergoprojekt news floor+7 and the residential part of the letter "P" so that the inner courtyard building, which is 64.5 m high, number forms a separate micro-ambient of floors ground floor+17. The above- towards the central block plateau. ground gross construction area of this This building has a predominantly building is 44.815 m2. residential purpose, with four kinder- Building 2 is located alongside gartens located on the ground floor Španskih boraca Street. The shape of and a small number of shops, also on the building is in the form of a Cyrillic the ground floor. The kindergartens are

BUILDING 3 • 20,097 m2 of residential space • 14,565 m2 of space for commercial activities • there are 143 residential units in the building • 373 parking places in the underground garage • infirmary and kindergarten on the ground floor • 52 m is the height of the highest part of the building • the number of floors is 2 cellars + ground floor + 13

located at the level of the basement part of 32 m, the number of floors GF + and the second ground floor and are 7 is designed for business purpose. On organized so that the children's rooms the ground floor of this part, there will have direct access to the park located be an infirmary and a kindergarten. The in the "inner courtyard". The above- above-ground gross construction area ground gross construction area of this of this building is 35.932 m2. building is 62,692 m2. The new quality, standard for Building 3 will be located along all the buildings, is the formation of the Antifašističke borbe street. It forms a garden on the roofs of the lower the Cyrillic letter "G". The building con- parts of buildings, at the level of 32 m. sists of two parts with different heights Moreover, large parts of the ground and functions. The high wing of 52 m, floor of the buildings are intended to the number of floors GF+13 is intended be open spaces, which will make this for residential purpose, while the lower block more passable. BUILDING 2 • 44,848 m2 of residential space • 3,901 m2 of space for commercial activities • the building has 432 residential units • 630 parking places in the underground garage • 60 outdoor parking places intended for kindergarten • 4 kindergartens on the ground floor • 57.6 m is the height of the highest part of the building • the number of floors is cellar + basement + ground floor + 15

April-June 2019 ENERGOPROJEKT | 15 VAŠ POUZDAN PARTNER VAŠ POUZDANNA SVIM MERIDIJANIM PARTNERA EnergoprojektVA newsŠ POUZDANnewsNA SVIM MERIDIJANIM PARTNERA YOUR RELIABLENA SVIM MERIDIJANIM PARTNERA YVAOURŠ POUZDAN RELIABLEON ALL PARTNE MERIDIANRS YVAOVAURŠŠ POUZDAN RELIABLEPOUZDANNA SVIMON ALLMERIDIJANIM PARTNE PARTNEMERIDIANRRAS YVAOURŠ POUZDAN RELIABLENANA S SVIMOVIMN ALLMERIDIJANIM MERIDIJANIM PARTNE MERIDIANRAAS YYOOURUR RELIABLE RELIABLENA SVIMON ALLMERIDIJANIM PARTNE PARTNEMERIDIANRRAS YOUR RELIABLEOONN ALL ALL PARTNE MERIDIAN MERIDIANRSS ON ALL MERIDIANS

12, Mihailo Pupin Boulevard 11070 Belgrade, Serbia 12,Tel: Mihailo(+381 11) Pupin 310 Boulevard 11 11 [email protected] Belgrade, Serbia Tel:www.energoprojekt.rs (+381 11) 310 11 11 [email protected] 12,www.energoprojekt.rs Mihailo Pupin Boulevard 11070 Belgrade, Serbia Tel: (+381 11) 310 11 11 [email protected] 12,www.energoprojekt.rs Mihailo Pupin Boulevard 11070 Belgrade, Serbia Tel: (+381 11) 310 11 11 [email protected] 12, Mihailo Pupin Boulevard www.energoprojekt.rs 12, Mihailo11070 PupinBelgrade, Boulevard Serbia 11070Tel: Belgrade, (+381 11) Serbia 310 11 11 Tel: ([email protected] 11) 310 11 11 [email protected] www.energoprojekt.rs12, Mihailo Pupin Boulevard 11070 Belgrade, Serbia Tel: (+381 11) 310 11 11 [email protected] www.energoprojekt.rs VAŠ POUZDAN PARTNER VAŠ POUZDANNA SVIM MERIDIJANIM PARTNERA VAŠ POUZDANNA SVIM MERIDIJANIM PARTNERA newsEnergoprojekt news YOUR RELIABLE PARTNER URBANIZAM I ARHITEKTURA PLC – Block 26 VAŠ POUZDANNA SVIM MERIDIJANIM PARTNERA PARTICIPATION IN DRAFTING OF URBAN DESIGN PROJECT FOR YOUR RELIABLEON ALL PARTNE MERIDIANRS BUSINESS RESIDENTIAL BUILDINGS 1, 2 AND 3 IN BLOCK 26 ithin its Contract for participation in engaged in: • Drafting the urban plan solution for NA SVIM MERIDIJANIMA W the drafting of the Urban Design • Modification of architect Žarko Ćajić's installations - connections to an external ON ALL MERIDIANS Project for business and residential Preliminary Design for Building 2 with the infrastructure network and development of a YVAOURŠ POUZDAN RELIABLE PARTNER buildings 1, 2 and 3 in the Block 26 located at associated external arrangement, in line with traffic solution for all three building plots and NA SVIM MERIDIJANIMA New Belgrade, Urbanizam i Arhitektura Plc was urban requirements. buildings 1, 2 and 3 in Block 26. YVAOURŠ POUZDAN RELIABLEON ALL PARTNE MERIDIANRS INDUSTRIJA PLC - increased independence and competitiveness NA SVIM MERIDIJANIMA LICENSE FOR DESIGNING SPECIAL SYSTEMS ON ALL MERIDIANS AND MEASURES OF FIREFIGHTING PROTECTION s it is known, the main activity of Emergency management sector on April 11, 4. Drafting the projects of electrical instal- YOUR RELIABLE PARTNER A Energoprojekt Industry is designing 2019. This Decision authorizes Energoprojekt lations and devices for sites endangered by the industrial facilities and plants, Industry to design special systems and meas- explosive atmospheres (flammable gases, through its specialized design offices and with ures of fire fighting protection, such as: flammable liquids and explosive dust) and ON ALL MERIDIANS the engagement of specific external consult- 1. Drafting the projects of stable fire alarm explosives; YOUR RELIABLE PARTNER ants. Planning of business activities also systems; 5. Drafting the projects of smoke and heat requires constant improvement of all employ- 2. Drafting the projects of stable systems exhaust systems. ees within their specialization field. Training of for detection of explosive gases and vapours; By obtaining this Decision, a wide range ON ALL MERIDIANS electrical and mechanical engineers, which 3. Drafting the analysis related to danger of activities of our designers in the field of fire- lasted for several years, by designing objects zones and determination of these zones at fighting protection increases, as well as the for specific purposes, contributed to the sites which are endangered by the formation independence, competitiveness and room achievement of the Decision 09/4 no. 217- of explosive mixtures of flammable gases; steam for manoeuvre of Industrija Plc in the current 567/19, issued by the Ministry of Interior - of combustible liquids and explosive substances; business environment.

HIDROINŽENJERING PLC - business on the North African market 12, Mihailo Pupin Boulevard 11070 Belgrade, Serbia REALIZATION OF THE "DJEDRA" DAM PROJECT 12,Tel: Mihailo(+381 11) Pupin 310 Boulevard 11 11 The Djedra dam is one of the four ongo- lowing facilities: • diversion galleries: reinforced concrete [email protected] Belgrade, Serbia ing dam construction projects in Algeria. • rock-fil dam with reinforced-concrete construction about 200 m long, which con- Tel:www.energoprojekt.rs (+381 11) 310 11 11 Energoprojekt Hidroinženjering provides objects: Djedra dam is located at the conflu- nects the water intake tower and shaft spillway the drafting of implementation projects and ence the Hamam and the Akiba rivers, which with absorption basin in the downstream toe [email protected] As-built Drawings, and offers technical assis- form the Djedra river, 2 km from the town of the embankment. The cross-section of a 12,www.energoprojekt.rs Mihailo Pupin Boulevard tance during the period of execution of works, of Souk Ahras, the centre of the wilayah of tunnel is circular with a diameter of 7 m and 11070 Belgrade, Serbia both in the field and in the design office. the same name. The impounding reservoir thickness of 60 and 70 cm, with thickening on Supervision of the implementation of works of about 35 million m³ is formed by building 175 cm in the zone of the foundation plate. Tel: (+381 11) 310 11 11 is carried out in cooperation with the Algerian a 65 m high rock-fill dam with an upstream During the construction period, the facility will [email protected] partner "CTH", who provides the engineers concrete face. The crest of the dam 10 m wide be used as a diversion tunnel, while during 12,www.energoprojekt.rs Mihailo Pupin Boulevard in the supervision team, while the Head of and 430 m long is formed at crest elevation the exploitation period it will be used as the Supervision is an employee of Energoprojekt. 560. The crest elevation of normal backwater outlet of the excess water scooped by the 11070 Belgrade, Serbia Implementation of the Contract conclud- is 555 m.a.s.l., while the maximal water level vertical utility hole and water passed through Tel: (+381 11) 310 11 11 ed between the ANBT (National Agency for in the impounding reservoir is 558.20 m.a.s.l. the bottom outlet. In the foundation plate of [email protected] Dams and Transfers) of the Ministry of Water The upstream face of the dam includes the the tunnel, two steel pipes were surrounded 12,www.energoprojekt.rs Mihailo Pupin Boulevard of Algeria and Hidroinženjering Plc started at following objects: screen of variable thickness by concrete. They are used for transport of the end of 2012. The total value of the Contract (30-45 cm), 3 m wide and 3.5 m high grout- the scooped water to the downstream valve 11070 Belgrade, Serbia along with its annexes amounts to approx. EUR ing-deformation monitoring gallery placed chamber. Tel: (+381 11) 310 11 11 2 million, while the total value, the part belong- on the edge of the upstream face of the dam • absorption basin: stilling pool in the con- [email protected] ing to “CTH” partners included, amounts to EUR and the mole situated at the crest of the dam. tinuation of the headwater system gallery, www.energoprojekt.rs12, Mihailo Pupin Boulevard 4,8 million. The Contractor is a Consortium of • shaft spillway with water intake tower: 60 m in length and with a variable width of 11070 Belgrade, Serbia companies "Kosider" and "Hadad", two large the unique technical solution, a multipur- 6 to 30 m. Tel: (+381 11) 310 11 11 local construction companies. The supplier of pose building of height of about 70 m, which • access footbridge: the steel bridge con- [email protected] mechanical and hydro-mechanical equipment includes excess water outlet system during the struction 87 m long, on three fields, which rest is the local company "Alieko", while the sup- exploitation period (an inspection chamber) upon two reinforced concrete pillars with a www.energoprojekt.rs plier of deformation monitoring equipment of diameter 22 m, three-level water intake height of 27 and 57 m, providing access from is a French company "Glotzl". and bottom outlet. During the construction the plateau to the water intake tower. The Djedra dam impounding reservoir period, the tower will represent an integral • appurtenant structures which enable system includes the construction of the fol- part of the headwater system. the management, functioning and control

April-June 2019 ENERGOPROJEKT | 17 Energoprojekt newsnews of system operation: upstream and down- internal dimensions of the "box" 15x15m, the this moment, the designers of Energoprojekt stream valve chambers, control room and extremely unfavourable geological parameters Hidroinženjering drafted about 75% of the access roads. of the soil, the massive lateral pressure of the necessary project documentation, and the The Main project for this dam was drafted landslide and the occurrence of the ground completion of this activity is expected in the by the Russian company "Зарубежбодстрој" swelling, the piles have been supported with first quarter of 2020, which will in no way slow in 2003. As part of the contractual obligations, 3 steel frames of a total weight of 300 tonnes. down the progress of works. Hidroinženjering Plc was obliged to carry out a The mentioned frames are disassembled suc- Construction of the particular objects: critical analysis of project solutions, to amend cessively along with the progress of works on • shaft spillway with intake structure: all them and complete the calculations, and then the final reinforced concrete structure. Upon the piles and the entrance structure have get down to the development of the project. completion of the said works, "piercing" of already been realized. The construction of Several problems were identified during the 12 piles is envisaged to open the flow profile. the foundation plate is in progress. analysis of the main project, arising from the • Carrying out remedial measures and complex and unfavourable geological struc- stabilization of landslides on the left and right ture of the terrain. These problems were not banks in the downstream zone of the toe of accompanied by the selection of adequate the embankment: although identified, this technical solutions and full development problem has not been solved in the main pro- of the main project. As a result, additional ject. The stabilization of this part of the terrain extensive geological surveys, which lasted was accomplished by removing the running until mid-2015, were carried out. As to enable and unstable part of the terrain (7-10 m the execution of works and ensure the stability depth), piling of about 300 piles of diameter and load capacity of the facilities, the signifi- 1.2 and 1.5 m of depth 20-30 m, forming the cant changes of almost all facilities designed gabion embankments and surface protection by the Main project were performed: of slopes (sprayed concrete, reticulation and • shaft spillway with intake structure: anchors, drainage channels, subhorizontal Realization of water intake tower piles foundation engineering performed on the drains, cellular confinement system - geocells, foundation plate with the diameter of 34 m greening and afforestation). and thickness of 4m supported by 82 piles of • watertight works: in order to ensure 1.55 m in diameter and 27 m depth, arranged water tightness (impermeability) of the in two annular forms. The soil beneath the impounding reservoir (both dams and banks), plate has been replaced up to the depth of and prevent flushing of materials and raising 9 m. the level of groundwater that could lead to • access footbridge: foundation engineer- loss of stability and collapse, it is foreseen ing of the pillars on the slope was solved by to perform a three-row grout curtain with introducing a massive foundation plate and a depth of 60 m and a total length of about a large number of anchors – the higher pillar 900 m. is founded on the plate of dimensions 10x All of the abovementioned represents 10m, a thickness of 4 m and the use of the a significant additional work on the project, Replacement of material inside the driven piles and piles 64 anchors ∅40mm, of the length of 12 m. which was recognized by the Investor. Thus, Through change executed on the cross-sec- the value of the Contract for the develop- tion of the steel construction, savings of about ment of the project, as well as the value of 40% were made. the Contract signed with the Contractor were • Diversion tunnel: the support for the increased by 80% compared to the initial cost. protection of excavation during the execution Due to these unplanned activities, the invest- of works was introduced, in the first half by ment value of the facility exceeded EUR 100 using the steel centres, and in the second million, and the deadline increased from the by using tubular shield through which the contracted 48 months to 114 months. grouting of the surrounding soil is done, as to So far significant engagement on this pro- enable the excavation and support by centres. ject had the engineers: Vladislav Skoko and • Exit construction of the derivational gal- Jovan Ranđelović - building constructions, lery: this structure is located at the landslide Nemanja Babović and Mihailo Kurela - geol- Entrance building with piles for foundation zone, and directly next to the downstream toe ogists, Ivan Živković and Natasa Vorotović plate of the water intake tower of the embankment. Before the execution of Konstantinović – soil mechanics, Jelena works, it was necessary to ensure the stability Cucujkić and Rade Grmuša - hydromechan- of the whole slope. We achieved the stability ics equipment, Dalibor Drašković - hydro-en- by removing the unstable part of the soil, by gineering constructions, Dragan Aleksić - putting the piles with a diameter of 1.5 m in topographer, Mirjana Jovanov - deformation the depth of 20-30 m and with surface protec- monitoring equipment. At present, the project tion of the terrain (sprayed concrete, reticula- manager is Jovan Zarić, the deputy/coordina- tion and anchors). Considering the technology tor of the project is Jovan Randjelovic, and the and capabilities of the contractor, the designer leading engineer is Vladislav Skoko. decided to perform a vertical excavation in Progress on the field Reinforcing the upper half of the founda- a "box" formed by the piling, and then after The works on this facility are progressing tion plate achieving the projected depth, the execution considerably slower due to the extensive cam- • access footbridge: reinforced concrete of the reinforced concrete structure from the paign of additional geological explorations, a pillars of the bridge have been completed. foundation to the top. Bearing in mind that large number of changes to the Main Project Preparation for development of the steel con- a depth of around 20 meters is needed, the and the introduction of new work items. At struction of the bridge is underway.

18 | ENERGOPROJEKT April-June 2019 newsEnergoprojekt news

• The exit structure: the inner concrete con- struction and piling have been performed. The piles have been pierced through.

The excavation of the absorption basin downstream from the exit construction Pillar bridge

Exit construction - preparation for the instal- lation of the steel support on the third level

Absorption basin – reinforcing of the four Pillar tunnel liners, the left half • diversion galleries: the works on excava- • Landslides: almost all projected works have tion are completed, as well as the supporting. been completed on the right bank - excavation, The realization of the foundation plate of the gabion embankment, piling and sub-horizontal tunnel is in progress, which is preceded by the drains. However, the slow realization of the project installation of water intake penstock. and noncompliance of the envisaged measures lead to the exposure of the terrain to weathering forces and additional degradation of the soil start- ing from the surface down to the depth, which Dismantling of the steel support and phase causes local instability of the ground. Works on performance of the internal AB structure the landslides on the left bank have not begun yet.

Transition section - the top half of the excavation

The right bank landslide

Piercing of the piles of the exit construction

The excavation with the tubular shield Reactivation of the landslide during the works • Dam with the appurtenant facilities: the realization of the test field and preparation of the ground for the partial filling of the dam on the left bank is in progress. The excavation for the plinth on the left bank was completed. Unavailability of the copper sealing coupling on the Algerian market and the overcoming of administrative problems Exit construction- view from the down- has ceased the works on these facilities. Execution of foundation plate stream side, the exit and wing walls of piles • grout curtain: realization of the grout curtain • Stilling pool: construction of the left on the banks of the impounding reservoir is ongo- half of the tunnel liners 3 and 4 is underway ing. The realization of the curtain in the dam zone (out of 5 in total). During the excavation in will begin after the river flow is diverted. this zone, the well of extremely aggressive In the next period, it is expected to achieve water emerged, with a constant flow of 3 l/s. significant acceleration of works on facilities that Therefore, the work on this position is addition- form the diversion system. Thus it is necessary to ally slowed down and performed with great divert a river flow into the diversion tunnel by the caution, with daily monitoring of the well (well middle of next year, which would enable more Installation of the water intake penstock yield, physicochemical analysis of water). extensive scope of works in the dam zone.

April-June 2019 ENERGOPROJEKT | 19 Energoprojekt inin focus focus

Interview BRATISLAV STIŠOVIĆ Director of Energoprojekt Hidroinženjering IN THE NEXT PERIOD, THE FULL EMPLOYMENT WILL BE MADE POSSIBLE, ALONG WITH THE IMPROVEMENT OF OVERALL WORKING CONDITIONS AND SALARY INCREASE tries? Can we expect some new significant acquisition in those regions? In the period from 2011 to 2013, when the contracting of significant operations in Algeria started, the business operations of Energoprojekt Hidroinženjering were dominantly based on this market, in some moments, it occupied up to 70% of total business operations. We were aware of the fact that, apart from the positive effects of the execution of a large number of contracts, basing the business operations on only one market can represent a potential problem. Bearing this in mind, we have tried to increase our engagement in other foreign markets, primarily in Jordan and Peru, but also in the rest of the world. After a period of "silence" on the market of Peru, last year we contracted and successfully implemented a project for the construction of the “Poechos” Dam superelevation in the north of the country. The Chinese „Sinohydro“, one of the world's largest Contractors, successfully executed the works according to our project. As usiness and financial results of all operations of our Company. Participation a result of the initiative from the end of the last B Energoprojekt Hydroengineering of domestic market in our business operation and the beginning of this year, we also contract- have a positive trend lately and increased from 32% in 2016 to 36% in 2017 and ed another project in Peru, in cooperation with are significantly better in comparison with 44% in the previous year, and respectively 54% Spanish and two Peruvian firms. Its realization previous years. How do you evaluate the in the first five months of this year. We talk about has recently started. current business situation of the Company a large number of newly contracted, relatively At the beginning of April, as a result of and the results achieved in the past year small and medium-sized projects, whose realiza- long-term preparations, we signed the contract and the first months of this year? tion, in organizational and technological terms, and started our engagement in Uganda in the The overall annual results over the past few represents a challenge. Increase of participation capacity of "Owner's Engineer" on the project years show a growth trend. Last year, the real- of the domestic market in the overall business of the Karuma hydroelectric power plant. We ized profit was 16% above the planned, and of the Company is a consequence of the real- hope to increase the involvement of our staff operating profit amounted to 10.4% in relation ization of the previously planned approach to in this project. to operating income. Despite the fact that in local investors, multi-level initiatives, as well as Since it gained independence, we have the past few years, political crisis and the crisis adequate offer policies. The most significant been engaged permanently in Algeria. Some on the new jobs market is ongoing in two of Investor is still Elektroprivreda Srbije, but the of the projects we participated in were mostly our significant foreign markets - Algeria and engagement in projects for Srbijavode and the realized, and aside from drafting the various Peru, we managed to maintain stable business Directorate for Water has significantly increased phases of project documentation for new dams, operations. In the prior period, we repaid a sub- compared to the previous period. We also mon- water transfers, flood protection and irrigation, stantial amount of loans taken in previous years itor the development and reconstruction plans we also provide consulting services during (46%). The positive business trend continued in of water management and hydropower facili- their construction. Over the last ten years, we the current year. ties. Over the past period, we were especially provided supervision, technical assistance and active in connection with the Decision of the development of execution plans for the con- What are the current projects of two Electricity power industries that of Serbia struction of five high dams, which have been Hidroinzenjering Plc in Serbia? Can we and the Republic of Srpska, on the realization expect to get some new significant project of dam construction projects with hydroelectric Participation of the domestic in the country shortly? What measures power plants in Gornja Drina, Buk Bijela, Foča market in our business oper- are taken to improve the market posi- and Paunci. tion of the Company in the country and ations increased from 32% strengthen its competitiveness? Apart from Serbia, you are domi- in 2016 to 36% in 2017 and Bearing in mind the significant dependence nantly present on the markets of Algeria, of the operations of Hydroinženjering from the Jordan and Peru. Are you satisfied with 44% in the previous year, and Algerian market, over the past couple of years, the realization and fee collection pace an initiative has been launched to increase the of the contracted projects? What are the respectively 54% in the first five participation of the Serbian market in the over- relations like with investors in these coun- months of this year

20 | ENERGOPROJEKT April-June 2019 in focusEnergoprojekt in focus completed or are in the final phase of construc- The set long-term aim of Hidroinženjering is to re-enter some tion. Moreover, we have implemented several strategic studies on this market. They cover most of the markets in Africa, Asia, South America, in which it was of the national territory and are used to plan the involved before development and exploitation of water resourc- es - the key to the overall balanced develop- where it is possible to maintain a permanent the harmonization of our attitudes with those of ment of this country. The drafting of the Study presence and engagement in the field of activity Elektroprivreda Srbije during this year, resulting of Water Protection is in the final phase. The of Hidroinženjering, as well as to achieve con- in engagement in projects in Upper Drina. said Study includes management of all dams venient business results. In the field of dams and hydroelectric power and reservoirs in the territory of Algeria and plants, we were engaged in Macedonia and based on it, further development of the dams, Can you describe the current develop- Croatia in the previous period, and we are also water transfers and water management will be ments on the market of Peru? actively monitoring the possibilities for the planned in an optimal way. Having in mind the In each of the countries in which we are continuation of engagement in these markets. mentioned facts, we have gained considerable engaged, political instability, including periods confidence in this country, and we hope that we before and after the election, inevitably results What are the marketing activities in will be able to continue contracting new capital in a decline in activities related to the field of the focus of your Company currently? Are projects, after the expected stabilization of the planning new infrastructure projects. The politi- there any plans concerning the involve- present situation. Unfortunately, the delicate cal crisis in Peru lasting more than a year has had ment in new markets? political situation of the country in the last few a significant impact on the reduction of business Aside from monitoring and active involve- years had an adverse impact on the payment activity on this market. Apart from the political ment in the traditional markets (Serbia and conditions. However, at the end of the previous turmoil, this is caused by a scandal involving region, Algeria, Peru, Jordan), we aim to inten- and the beginning of this year, a significant part the engagement of the Constructors in that sify the marketing research of other markets, of our claims was settled. country. However, in spite of all said before, we independently and through the cooperation We have a similar situation in Jordan, where had success in the bidding announced at the with large international consulting companies, the building we projected during exploitation beginning of the year. The preparation of a bid as well as by using the network of Foreign period proved to be a success. Over a decade for participation in a new project in the North Representative Offices of other Companies of ago, this enabled us to return to this market of Peru is underway. Energoprojekt Group. The set long-term aim and continue to exist on it up to this day. From of Hidroinženjering is to re-enter some of the 2008, through the realization of the Kufranja You are also active in Montenegro and markets in Africa, Asia, South America, in which dam project, we re-established good cooper- the territory of other republics of the for- it was involved before (Ethiopia, Zambia, Kenya, ation with the traditional client "JVA" ("Jordan mer SFRY… Valley Authority"). The positive experience with In Montenegro, Hidroinženjering partici- this project, through the phase of drafting the pates in modernization and revitalization pro- Preliminary and the Main project, and then in jects of the capital hydropower plants, HPP Piva providing the supervision, opened the way for and HPP Perućica, in the capacity of a consult- the realization of new projects, such as the pro- ant. The realization of these projects includes ject of the Wala dam superelevation, consulting the application of measures necessary for the services for the construction of the Karak dam increase of the overall reliability of equipment, and the supervision over the construction of buildings and plants, up to the extent that could the Fedan dam. be able to eliminate the risks of operation una- Otherwise, we realize the business opera- vailability, damage and failure, and secure the tions on the Jordanian market in cooperation prolongation of the economic permanence and with a local partner with whom we maintain life-span of power plants. Dam „Poechos“, Peru the excellent relations, both on the realization It should be noted that due to the quality of the business operations, as well as in acqui- of the delivered services, the Investor addressed Guinea, Togo, Bolivia, Nepal, Iran). The above- sitions and bidding activities. Although in the our Company with the Request for submission mentioned also relates to the markets of Iran last two years, the trend of business conditions of the Bid for the provision of consulting services and Lybia, when the political situation allows it. worsening in Jordan is noticeable, primarily as in the next phase of the reconstruction and At the same time, through cooperation with a consequence of the political and economic modernization project of HPP Perućica. Its imple- partners from Western Europe and Russia, we situation, this country continues to be a market mentation is planned for the next five years. submitted the Bids for providing consulting Besides, Hidroinženjering participates in the services on significant hydropower projects preparation of the Preliminary Design with the within new markets such as Uganda, Argentina, Feasibility Study and the Environmental Impact Honduras and Pakistan. This year, one of the Assessment Report of the HPP Komarnica. The Bids resulted in the conclusion of a contract said documents will represent the basis for mak- for the supervision over construction of HPP ing an investment decision on the construction Karuma in Uganda. of a power plant. It should be pointed out that the Spatial planning of Montenegro stipulates What is the current situation in the the development of HPP Komarnica, which is field of personnel policy, and what is the being recognized as a state facility of the public current employment situation? Is the per- interest. sonnel structure in line with the needs of Over the past period, we were engaged the development of crucial activities of in the dam and hydropower plants projects „ Energoprojekt Hidroinženjering? Gornji horizonti“ in the Republic of Srpska. This In the domain of personnel policy, we con- engagement continues by signing the new con- tinuously adapt the structure of employees to Dam „Walla“, Jordan tract with Energoprivreda. We expect to achieve the expected, planned and present needs of

April-June 2019 ENERGOPROJEKT | 21 Energoprojekt inin focus focus

Hydro Power Plant „Perućica“, Montenegro the business, as well as the current situation on the market. The tendency of reducing the number of employees has slowed down over the past couple of years. The moderate labour Dam „Seklafa“, Algeria turnover is acceptable, and is due primarily to real needs according to contracted projects, In the process of gaining access to new markets, we will and is related mostly to the engagement in international supervision projects. Since we have give priority to the ones on which other companies from a large number of contracts and current tasks, Energoprojekt Group are operating. With the participation of employment is at the highest level. However, one of the main internal business conditions is the leading global consultants, we will intensify the initiative for the lack of personnel in certain narrowly spe- cooperation on the extensive international projects cialized professions, as well as the insufficiency of the staff having the long-standing experience of operations on existing markets and gaining The business operations of Hidroinženjering and appropriate references, mainly for large access to new ones, where we will give priority are steady, marked with realization and international projects. Given that the potential to the markets on which other companies from exceeding of the planned results and a pos- of the enterprise lies in its employees, one of the Energoprojekt Group are operating. Besides, with itive trend of growth. All of the mentioned priorities of the management is definitely the the participation of the leading global consult- above guarantees that we will enable full improvement of the overall working conditions. ants, the initiative for cooperation in the large employment in the coming period, with the international project will be intensified. The initi- improvement of overall working conditions Where do you see Energoprojekt ative with the aim of participation in the realiza- and pay-rise. Under the current plans, we Hidroinženjering in the upcoming period, tion of projects connected to the rehabilitation expect to be able to continue execution of and where do you see room for further of hydropower facilities in the country and the contracts on quality projects, and also to begin progress and development? surrounding countries in cooperation with well- providing services where higher profitability is In the upcoming period, we expect the con- known equipment manufacturers is underway. possible. Having all this in mind, we will pay tinuation of stable business, mainly through maximum attention to the employees, since engagement in the field of the core business, And finally, what message would you they represent the crucial resource of design as well as the preservation and development send to the employees in your company? and consulting companies.

Hydro Power Plant „Bajina Bašta“, Serbia Hydro Power Plant „Potpeć“, Serbia

22 | ENERGOPROJEKT April-June 2019 Energoprojekt mosaic

DMS Project INTRODUCTION OF DOCUMENT MANAGEMENT SYSTEM TO ENERGOPROJEKT GROUP SUBSIDIARIES t the end of November ments, through the selection of sibility of further development of In the past two months, 13 A 2018, in order to perform software solutions, the selection software for commercialization, i.e. workshops were held, and since a digital transformation of of the best supplier, procurement engagement of the Energoprojekt the beginning of the year, the part of the business operations of and installation of the necessary Energodata Plc subsidiary). Marg Implementation Board held 22 Energoprojekt Group, the technical equipment - hardware, to Engineering Ltd. has been selected meetings. A large number of Supervisory Board of Energoprojekt implementation, testing and com- as the best of the three bidders. employees from Energoprojekt Holding Plc at its 38th session missioning of solutions as well as New and adequate necessary Group are involved in the imple- decided to establish the project for user training). The demanding goal equipment has also been chosen, mentation of the DMS project. Introduction of Document was set - to complete the whole and it should be fully delivered and "It is not simple and easy, but Management System – „DMS" to project by the end of 2019, and functional by the end of June. there is a great desire as well as all the subsidiaries. from the beginning of 2020, to At the beginning of April, the the effort of people involved in DMS represents a software manage all the documents with- contract execution with Marg the project, to make it live. I am solution according to the needs of in the mentioned process/module Engineering Ltd started. Despite delighted with the work of col- enterprises of Energoprojekt Group, which, initially, includes Document/ Processes Management System through 4 modules: e-Archives, e-Procurement, e-Contracts and HR – human resources. The intro- duction of DMS to processes men- tioned above will enable, through the unambiguous definition of information flows, optimization of processing time, data protection, storage / archiving of documents, reduction of paper documentation costs, as well as improvement of business operations and preserva- tion of business continuity. DMS represents a software solution according to the needs of enterprises of Energoprojekt Group A Board for the Implementation digitally (scanning, coding, for- the ten-day collective holiday leagues from Energoprojekt and of the Integrated DMS was formed. warding, processing, approving, for May holidays, the planned associates from Marg Engineering It consists of representatives of all archiving, etc.) deadlines for the realization of Company. With the great support companies of the Energoprojekt In the first quarter of this year, particular phases of the project of the Supervisory and Executive Group, and Nada Bojović was the supplier selection process was are being respected. On May 15, Board of Eneroprojekt Holding appointed the leader of the pro- conducted, which had to meet the testing was conducted in two and all the directors of subsidiary ject and the chairman of the Board. other criteria besides its price Energoprojekt Group subsidiaries companies, I expect the project By the end of February 2019, (experience in similar projects, (Holding and Niskogradnja), and to be completed within the set the Board defined project assign- the efficiency of the offered DMS the pilot project in these two deadline and become functional, ment, the plan of activities (from system, high level of data protec- companies started on June 4 and to the satisfaction of all users, "said the preparation of tender docu- tion concerning privacy, the pos- 5 this year. Nada Bojović, the project manager.

ENERGODATA PLC – doing business with post offices since 1983 NOTICEABLE PARTICIPATION IN THE CONFERENCE "INFOTECH 2019" nfotech 2019" conference was held have basic business processes always support- uled deadline, the hall remained filled with „I on June 5 and 6, in the heart of ed by modern IT solutions, based on the best listeners. This fact additionally motivated Rakić Šumadija, in hotel „Izvor". As the invit- concepts and methodologies, which are always to present this topic in his characteristic way, ed lecturer, the Director Miomir Rakić held the up to date and proven in practice. Although obviously interesting to the listeners, since they lecture, representing the company before that, a round table discussion was held stayed even after such a long previous round Energoprojekt Energodata. The topic of the in the same hall on how to adapt the ICT sys- table to listen to him. speech was how Energodata succeeds for more tem of state administration to the needs of After the introductory slide which pre- than thirty-five years to enable postal admin- citizens and IT companies, which lasted for sented his company, Energodata Plc Director istrations, despite their figurative inertia, to more than twenty minutes more than sched- emphasized in his picturesque speech that,

April-June 2019 ENERGOPROJEKT | 23 Energoprojekt mosaic

since the beginning of the postal business, the scope of their business. In this way, they made, with the application of new technolo- when so-called „Tatars" delivered mail all across could shift the focus of their business into the gies in new postal services. Energodata readily Serbian roads, to this day, in the postal industry, sphere that does not seem to belong to the welcomed this decision. The first spine of the in particular in crucial postal processes, noth- post office. And precisely in those non- postal postal business information system in Bosnia ing has substantially changed. The only thing services, Energodata saw its chance to show its and Herzegovina is expected to be put into that has changed was technology, and postal inventiveness, originality and the ability to keep operation soon, projected and developed from officers' work has been humanized. To survive up with modern technologies and IT solutions. the beginning through up-to-date technolo- in an increasingly competitive environment, Moreover, resisting the innovation for the long gies, and after that in Montenegro, in which the which first included basic postal services, and time, that is - the replacement of the old appli- traditional and new postal services and other mainly the transfer of postal items which was cations in their core business, which has, main- services are unified through new technological put to the forefront through online shopping tained by Energoprojekt Energodata, continued settings. Energodata, Plc has been in business and the delivery of purchased goods directly perfectly to perform what they were intended with post offices since 1983, when its first coun- to customers home, post offices had to wan- for, they have accepted a fundamental change ter-application was released in Kruševac, for gle and include various non-postal services in of the basic information system finally to be former SOUR PTT Serbia.

OPREMA PLC, HIDROINŽENJERING PLC, INDUSTRIJA PLC AND ENTEL PLC – the work on improving the quality of wastewater treatment and environmental protection PRESENTATION OF ENERGOPROJEKT AT THE 49th CONFERENCE "WASTEWATER, MUNICIPAL SOLID WASTE AND HAZARDOUS WASTE" ssociation for Water as representatives of manufacturers of wastewater collection and processing the Municipal hydraulic engineer- A Technology and Sanitary equipment, materials and accessories. in Kragujevac. Slavka Ćosić actively ing, water treatment and environ- Engineering, together with At the initiative of our experi- participated in the construction of mental protection department of the Association of Water and enced engineer Slavka Ćosić, the this facility as the chief engineer, Hidroinženjering Plc. The performance Sewerage of Serbia, Institute of chairman of the Board of Directors along with many other experts of shows the attitude of Energoprojekt in Chemistry, Technology and of Energoprojekt Oprema, the Energoprojekt from that area. Works connection with the current state of Metallurgy, in cooperation with the Energoprojekt Group decided to be on the plant started in the 1980s. They wastewater in Serbia and the ways of Chamber of Commerce of Serbia, the more actively involved in contem- were carried out by Oprema Plc who resolving this problem in the best way. city of Kragujevac and Waterworks porary developments related to the was responsible for design, construc- Aside from Energoprojekt and sewerage Public Utility Company collection and processing of waste- tion and commissioning in 1990. At Oprema, Energoprojekt Hidroinže- jointly organized the 49th “Conference water and environmental protection. that time, it was the most modern njering, Energoprojekt Industrija and on the wastewater, municipal solid Our company had a very noticeable plant in this part of the Balkans. The Energoprojekt Entel also presented waste and hazardous waste". The con- stand at this conference, on which it visit to the plant was organized as a their young engineers at the confer- ference took place at Šumarice hotel ence. Besides, Zoran Marinković, chief in Kragujevac from April 2 to 4, 2019. engineer in the Municipal hydraulic The aim of the meeting was the engineering, water treatment and exchange of knowledge and experi- environmental protection depart- ence in three thematic areas (waste- ment of Hidroinženjering Plc present- water, municipal solid waste and ed his scientific paper "Overview of hazardous waste), as well as the appli- the previous project activities related cation of regulations and standards to the EPC contract on construction of leading to the improvement of the a new and rehabilitation of the exist- environmental situation. ing Vinča landfill in Belgrade ". The conference has traditionally One of the primary goals gathered all profiles of experts from of Energoprojekt is to provide a the region in the field of integrated more significant contribution to wastewater, waste, as well as hazard- Energoprojekt representatives from Oprema Plc, Hidroinženjering Plc, the improvement of the quality of Industrija Plc and Entel Plc ous waste management and the par- environmental protection, as well as ticular flows of the trash and impacts presented its business achievements part of the conference. To this day, wastewater collection and treatment. on human health. The results of this in the field of industrial wastewater, the plant remained in the excellent The Company has already shown work were presented by representa- municipal wastewater, municipal condition and still achieves good desirable results in this field. On the tives of universities, state administra- solid waste and hazardous waste results. Our colleague M.S. Dušan other hand, it tends at the same time tion, researchers, experts in all areas treatment. On that occasion, a pres- Krstić prepared the presentation of to use the high business potentials of system and plant operating and entation was prepared as well as a Energoprojekt Company. The men- offered by the European Union with upkeep, designers, contractors, as well film about the "Cvetojevac" plant for tioned colleague is the Head of its IPA funds for such projects.

24 | ENERGOPROJEKT April-June 2019 Energoprojekt mosaic

ENTEL PLC – Shaping the energy future of Europe ANOTHER SUCCESSFUL "DAY OF ENERGY - SERBIA 2019" he European Week of of activity, directly influence the T Sustainable Energy, as the shaping of Serbia's energy policy, most significant and by doing so direct its transi- European event dedicated to tion towards sustainable energy. renewable sources and efficient Representatives of the Delegation use of energy, will be held from of the European Union in Serbia, June 17-21 this year under the as well as representatives of the slogan „Shaping the energy future Ministry of Mining and Energy of of Europe". the Republic of Serbia, addressed To ensure that this mentioned the participants, referring to above, very important event is the current situation in Serbia's adequately marked in Serbia, negotiations on its path to join- Energoprojekt Entel, in coopera- ing the European Union. The said tion with the Society of Thermal before mainly involves the issue Session 1: Invited lectures Engineers of Serbia, is tradition- of Chapter 15 concerning energy, ally organizing the Energy Day in the area to which Europe devotes Serbia. This year, the said event the most considerable attention. was held on June 18 in the busi- Dejan Popović, President of the ness building of Energoprojekt in Energy Agency Council of the Belgrade. Republic of Serbia, presented the This year, as to adequate- topic of security of energy sup- ly go through the topic of this ply, as one of the key issues, that is year's event, the organizers invit- inevitable when it comes to ener- ed representatives of influential gy sustainability at the national organizations and institutions. level. As the legal and economic The mentioned organizations issues present an unavoidable seg- and institutions, each in its field ment of analysis of the complex Session 2: Panel discussion energy mosaic, Branislava Lepotić professional staff, who engag- Kovačević from the Serbian Energy es in mentioned issues, Society Law Association addressed the of Thermal Engineers of Serbia, participants. She gave an overview continuing its previous practice, of the role of autonomous energy awarded the best master's thesis producers in the security of energy drafted at the Technical faculties supply, and Ljubo Maćić from the in Serbia, during the last year. Institute of Economics in Belgrade This year, the prize was award- presented the topic of economic ed to Dušica Drašković from the aspects of the energy transition. Faculty of Electrical Engineering, In the panel discussion organ- , for her ized after the introductory pres- master's thesis titled „Optimal entations, the participants were use of solar and wind potential able to hear the opinions of Milan for electricity and thermal energy Day of energy - Serbia 2019 opening Jakovljević, representative of the supply to micro-networks in the Electric Power Industry of Serbia. Banat region". He spoke of the role of coal as the The significant attendance of energy source, in the light of the the event indicates to the organ- growing challenges connected izers the fact that the event was to regulatory requirements from successfully realized and that the the environmental protection area attendees expressed the interest and efficient operation of thermal in the topics discussed at the con- power plants. This year, the event ference. Entel Plc will continue to was complemented by the partic- support the European Week of ipation of Branimir Jovanović rep- Sustainable Energy in future, as resentative of Nikola Tesla Museum well as similar events, bringing in Belgrade. together the most important par- Since the sustainability also ticipants of the transition process Day of energy - Serbia 2019 participants includes the renewal of the of Serbia's energy sector.

April-June 2019 ENERGOPROJEKT | 25 Energoprojekt mosaic

ENTEL PLC - the public discussion "Quality - Energy – Ecology“ held BUSINESS EXCELLENCE IN THE FIELDS OF ENERGY AND ECOLOGY n June 26, 2019, The mentioned organizations were • Energy management in HIP- could ask questions and express O Energoprojekt hosted the selected from the group of those Petrohemija, Pančevo (presenter: their comments and observations. public discussion on the who achieved excellent results in Biljana Suslov, energy manager, HIP- Apart from Entel, who hosted and topic "QUALITY - ENERGY – the „Oscar-quality competition“ over Petrohemija, Pančevo) co-organized the event, the repre- ECOLOGY“in its premises. The organ- the recent years. The following topics More than 30 participants from sentatives of Energoprojekt Holding, izers of the event were the Foundation were considered: more than 20 organizations from Energoprojekt Hidroinženjering and for Culture of Quality and Excellence • Energy management (present- Šabac, Kruševac, Užice, Požarevac, Energoprojekt Oprema also attended ("FQCE") and Energoprojekt Entel er D. Sc. Miloš Jelic, President of the Pančevo and Belgrade attended the the event. Company, a member of the "FQCE“ Expert Council ) gathering. Mladen Simović, Director All participants agreed that the Foundation, in line with the decisions • Circular economy (present- of Energoprojekt Entel and President public discussion has fulfilled the of the "FQCE" Program Committee er: Siniša Mitrovic, Advisor to the of the Program Committee of "FQCE" expectations and that it will repre- from March 2019. The public discus- President of the Serbian Chamber and Vladimir Trajković, President of the sent a valuable contribution to future sion was intended for partner organ- of Commerce) Foundation, opened the event. After activities of „FQCE“members in the izations of "FQCE", and the main idea • Practical application of envi- each presentation, the participants energy and ecology sector. was to consider, through examples ronmental protection and energy of good practice, the possibilities of management in the practice of EP applying the "FQCE" model of busi- ENTEL (presenter: D. Sc. Radoslav ness excellence in significant areas Rakovićи, the member of the „FQCE“ such as energy and environmental Expert Council and Head of the IMS protection. department of Entel Plc) The public discussion consisted • Overview of Energy of two parts. In the first part, two and Environmental Protection introductory papers were present- Management in Prvi partizan, Užice ed, and in the second one, practi- (presenter: Slobodan Šekaric, chief cal experiences of three particular engineer of quality management, Prvi organizations were introduced. partizan, Užice) Participants attentively attend the discussion

HOLDING PLC - certificate extension THE RECERTIFICATION AUDIT OF IMS n June this year, Energoprojekt Holding 90001: 2015 Quality Management, ISO 14001: company performed two-day external inspec- I finished recertification of the three 2015 Environmental Management and OHSAS tion and completed it on June 20, 2019. They established management systems in 18001: 2007 Occupational Health & Safety. extended the certificate for three years. accordance with the following standards: ISO "Lloyd's Register", the well-known auditing

HOLDING PLC - in line with modern trends A NEW, MODERN DESIGN SOLUTION FOR ENERGOPROJEKT NEWSPAPER

he Department for Public Relations of Енергопројект • година XLVIII • ЈУЛ-СЕПТЕМБАР 2011.

А

Х ЈУЛ-СЕПТЕМБАР 2013.

Е П

Energoprojekt Holding has launched С

У ЕНЕРГОПРОЈЕКТ А Н T И ISSN 2406-3185 // АПРИЛ-ЈУН 2019. and realized the modernization pro- ГОД УСВО ЈЕН ПЕРИ­ О ДИЧ НИ ИЗВЕ ШТАЈ ject of the Energoprojekt newspaper, which О ПОСЛО ВА ЊУ СИСТЕ МА ЕНЕ Р ГО­ ПР О ЈЕКТ ЗА ПРВИ КВА Р ТАЛ 2019. was published for the first time in 1962. The ГОДИ НЕ

УГО ВО РЕ НО ИЗВО ЂЕ­ newspaper was redesigned in mid-2013 for ЊЕ РАДОВА НА АСФАЛ­ ТИ РА ЊУ БЕОГРАД СКИХ УЛИ ЦА И ИЗГРАДЊА НОВЕ ТЕХНИЧ КО ПУТНЕ the last time. Now, six years later, a new, mod- СТА НИ ЦЕ У ЗЕМУНУ, А ВЕЋ ЗАПОЧЕ ЛО ИЗВО ЂЕ­ ЊЕ РАДОВА НА УРЕЂЕ­ ГОДИНА ЊУ САОБРА ЋАЈ НИ ЦА НА ern design solution was selected in line with ЛИСТА „ЗЕЛЕ НОМ БУЛЕВА РУ“ ЕНЕРГОПРОЈЕКТ ЗАВР ШЕ НА ТРАМ­ ВАЈ СКА ПРУ ГА ПРЕ КО contemporary trends in publishing. The project МОСТА НА АДИ for the development of the new solution was realized in cooperation with colleagues from ХОТЕЛ АКТАУ Energoprojekt Energodata. 2011 2013 2019

26 | ENERGOPROJEKT April-June 2019 Apartments of all structures from 28 m2 to 170 m2 Energoprojekt mosaic Office/retail units from 422 m to 94 m2 Garage parking place

APARTMANT SALES IN VIŠNJIČKA BANJA Sales: Energoprojekt Office Building Modern residential and business complex 12 Mihaila Pupina Boulevard, 11070 Novi Beograd with a view on the Danube and cityscape Phone number +381 11 220 3444, +381 62 240 665 +381 62 240 824, +381 63 479 154, +381 63 479 149 [email protected] www.energoprojektsunnyville.rs

Partner bank: SUNNYVILLE Energoprojekt spirit

Spring action INCREASED NUMBER OF VOLUNTARY BLOOD DONORS n Energoprojekt's spring action of lungs check up findings, pharyngs without etc. should also be avoided. У voluntary blood donation, held on inflammation, underarm, throat and spleen The whole process from the arrival of May 29, 2019, 60 potential donors lymph nodes should not be enlarged, hae- the donor to the point when the donor participated, which is for 46% more than moglobin above 135 g/L (Hct = 0.38) in leaves the service lasts around 30 minutes, the previous time. Unfortunately, 9 poten- men, haemoglobin above 125 g/L (Hct = and it consists of the following: filling blood tial donors have been rejected for medical 0.4) in women, interval between donations: donors questionnaire, registration, haemo- reasons. Fifty-one donors gave blood this 3 months (12 weeks) for men and 4 months globin level determination, medical check time - of which 16 were women, while 8 (16 weeks) for women. up by a physician, blood donation from the persons donated the blood for the first Blood donor selection is made in elbow vein and refreshment. Information time. The next action was planned for accordance with standardized, exclusive- about blood donation process are summa- September 25, 2019. ly medical criteria for temporary or per- World Blood Donor Day is a day ded- manent donor deferral due to the inade- icated to voluntary blood donation, and quacy for blood donation, because blood is celebrated on June 14 - on the day donation might endager potential donor the Austrian biologist and physician Karl or recipient of donated blood. Selection Landsteiner (1868-1943) was born. He of donors must not be affected by gen- distinguished the main blood types in der, religion, nationality, sexual orientation, humans, for which he received the Nobel political affiliation, occupation, social status Prize in 1930. or some other similar reasons. (Considering the use of most drugs, elapse of 5 half lives VOLUNTARY BLOOD DONOR of drug elimination from the body is required Continuous, timely and efficient supply in order to eliminate over 90% of drug from of health care establishments with safe blood. The same time interval is needed from blood and blood products (components cessation of drug use till blood donation, if a and derivatives) is the most significant pre- person is able to abstain from drug treatment Distribution od blood types in popula- tion of blood donors in National Blood condiiton of the functioning of each coun- for health condition reasons during that peri- Transfusion Institute according to data for try`s health care system. It implies that the od (e.g. antihypertesive drugs). More detailed period 2000-2015 on speciment of 468.923 number of voluntary blood donors (VBDs) is information about reasons for postponing blood donors the issue of the utmost public interest and blood donation can be obtained from doctors provision of sufficient quantities of blood during physical check up.) rized in the written Instructions for Blood and medications derived from blood is the Special preparations for blood donai- Donors that each donor gets at the arrival. countriy`s national treasure. tons are not necessary, as well as no special Your blood will be thoroughly inves- he need for blood and blood products regime after blood donation, however, in tigated for the presence of diseases that depends on the number of inhabitants, order to feel better in the course of blood can be transmitted by transfusion of blood: number of hospital beds and types of medi- donaiton, especially during the first blood AIDS, hepatitis B, hepatitis C and syphilis cal services provided in the country. Plan of donation, certain pieces of advice could These analyses are free of charge and the actual requirements for blood is made be useful. We recommend a person to be they are performed using blood samples according to the annual consumption of well rested, to have slept sufficiently (usual taken from blood donors following each blood in the previous period. sleeping habits), have had a light meal and blood donation. The requirements in Serbia are approx- a certain amount of liquid / preferably 4 When filling the donors` questionnaire, imately 40 blood donors per 1000 inhabit- glasses of water 1 to 2 hours before blood consisting of a series of questions, given ants (4%), whereas the actual percentage of donation. answers must be true since the purpose of blood donors has been around 3% for years. After blood donation process, bandage these questionnaires is to provide health Blood donors can be all healthy adult on the elbow (venepuncture site) should care and protection of both persons individuals, age 18 to 65, eligible for blood not be taken off for the next two hours. One wanting to donate blood and potential donaiton according to the physical check should consume more liquid than usually blood recipient, which is confirmed con- up findings and blood count (haemoglobin (up to 3 to 4 glasses of water more than scientiously and with full responsibility by level) examination, stipulating that nei- otherwise). Hard physical work and exercise donors` signature. Blood donation should ther they nor the blood recipients will be such as heavy objects lifting and pushing not only be the result of a desire to help harmed with donated, i.e. received blood. and body building should be avoided for others, but also of a consciousness that The followiing criteria should be consid- at least 4 hours after blood donation. Rush administration of donated blood might ered: blood donors should be healthy indi- and smoking should be avoided for at least carry potential risks. Person who wants to viduals, feeling generally well, over 50 kg two hours, alcohol for at least 8 hours, as help someone by donating blood must be of body weight, body temperature below well as longterm standing, staying in over- certain that by this act a person he/she 37°C, puls ranging from 50 - 100/min, heated rooms. On that day, drivers should wants to help will not be endangered. This blood pressure: not above 24/14 kPa and not go to long and strenuous journey, risky kind of safety can be achieved by education not below 13,3/8,66 kPa, good heart and jobs needing climbing, work on heights, and self exclusion in case there is some kind

28 | ENERGOPROJEKT April-June 2019 Energoprojekt spirit

of risky situation or behaviour, as well as by products are prepared by processing of of regular voluntary blood donors. Blood sincere answers to questions during phys- the liquid part of blood, i.e. plasma, and transfusion set is sterile and disposable. ical examination by the medical doctor. they are extremely valuable drugs with Needle puncture is felt but it cannot be Collected blood is processed by centrif- the shelf life of up to several years. They considered as painful. The very process ugation procedure in the closed blood bag include albumin, immunoglobulins (spe- of blood donation lasts 5 to 10 minutes system, in order to be separated in to blood cific and nonspecific), various coagulation and it is not painful. Our body very quickly components (plasma, erythrocytes, plate- factors, etc. compensates the drawn quantity of blood. lets, leukocytes), followed by decanting HOW IS BLOOD DONATION BENEFICIAL? Plasma is replaced by 48 hours, leukocytes procedure for the separation of each blood • Blood donation is beneficial not only by a couple of hours that same day, plate- component. Separated blood component, for the patients receiving blood transfu- lets are replaced by 3 to 5 days, red blood after mandatory testing, are administered sion, but also for blood donors themselves, cells by 4 weeks, whereas iron content in to patients according to their actual needs, because of the feeling of satisfaction that red blood cells is substituted by around 8 i.e. each patients gets the component he most often even three or more persons` weeks. Haemoglobin level is reduced by needs. Mandatory testing of each blood lives have been saved or whose quality around 10g/L. Along with the adequate unit implies: ABO and Rh (D) system deter- of life has been improved, since donated nutrition, haemoglobin value is restituted mination, investigation to determine the blood unit is processed into red blood cells, by around 8 weeks. Blood donation is abso- presence of irregular antibodies, tests for plasma and platelets used in those in need lutely safe for blood donors, since every the detection of the presence of transfusion of a particular blood component. healthy person has a blood reserve which is transmissible diseases markers (hepatitis B, • Medical check up offers control of not necessary for the normal functioning of C, AIDS, syphilis). a health condition and blood count is the body and performance of daily, routine If blood unit is kept as a whole blood determined activities. Quantity of donated blood is only unit, without the application of the blood • Bone marrow is stimulated to pro- one part of the blood reserve (10%) which component separation process, it can be duce new, young blood cells cannot endanger the donor`s health nor stored for 21-35 days in refrigirators at 4°C. • Blood circulation is improved and decrease the ability of donor`s normal daily Separated red blood cells can be stored risk of heart attack is reduced in men who activities. Unfavourable reactions can occur up to 42 days also at 4°C, while platelet donate blood 2 to 3 times a year, as well extremely seldom, some of them worth concentrates are stored on room temper- as in menopausal women. mentioning such as bruises and feeling of ature up to 5 days at the most. Plasma is Habit in terms of addictioin does not weakness. stored at temperatures below -25°C up to occcur. Feeling of satisfaction because of * Downloaded from the web site of Blood Transfusion 24 months . Those are labile blood prod- belonging end being useful to the society Institute of Serbia: ucts / blood components. Stable blood is the cornerstone of creating population http://www.nbti.org.rs/Institut-za-transfuziju-krvi-Srbije/

Cooperation with "Čepom do osmeha" Association LET'S COLLECT TOGETHER ver the first six months of 2019, dur- caps to recycling centres for the purchase of O ing environmental charity initiative wheelchairs necessary for children with disa- "Let's collect together", we collected bilities. 254 kilograms of plastic bottle caps, which In the joint action "Čepom do osmeha" vehicle which allows Association to freely will be timely forwarded to "Čepom do osme- Association and its partners, including our collect plastic bottle caps on the territory of ha" association. Our cooperation with "Čepom Company, collected together 220 tons of Belgrade, as well as participation in building do osmeha" Association began in 2016. They plastic bottle caps. In this way, we provided the first playground on Štrand, in , for use the funds from the sale of plastic bottle aid for 31 kids throughout Serbia, the new children with and without disabilities.

Visit of pensioners TRADITIONAL REUNION OF THE OLDEST MEMBERS OF ENERGOPROJEKT s in previous years, on first Friday of to continue marking this important date for A June, precisely on June 7, 2019, former employees. Energoprojekt Pensioners' Association Around 150 pensioners attended the gath- in agreement with Energoprojekt Holding, ering. The General Director Stojan Čolakov invited its members to visit the business build- addressed the pensioners, while the President ing and attend the festive cocktail reception. of the Association invited them to become its The Supervisory Board and the General Director members. The meeting passed in a cheerful of the Holding, regardless of the change in the mood, and the pensioners were contentedly ownership structure of the company, agreed renewing old memories.

April-June 2019 ENERGOPROJEKT | 29 Energoprojekt spirit

Tijana Vuković – the vice-champion of Europe and the world in French boxing GOOD ORGANIZATION AND RESPECTING ONE'S OWN TIME AND THAT OF OTHER PERSONS nergoprojekt can boast of having the could compete. After first sparring, I realized E lady who can literally "beat" anyone that I really like the sports, being similar to standing in her way. Namely, our col- the chess game –you have to plan the whole league Tijana Vuković, Master in Civil combination, to create a point, score points Engineering, who has been working as an while avoiding opponent’s blows. What has also associate designer in the construction bureau attracted me pretty much was the excellent in Energoprojekt Industry since 2017, won atmosphere in the club. When I enter the hall, several state championships - both in kickbox- I enter into my own world. I forget everything ing and in French boxing (savate). She is a that happened that day, which made me double champion of the Balkans in kickboxing, nervous or affected me in a bad way. Before I was a champion of the Balkans in the French started practising kickboxing, I imagined that boxing, and also a vice-champion of Europe kickboxers are being dangerous guys, trained and the world in the same sport, she won an and mostly frowned, and I thought that there international tournament in kickboxing, and was no place for girls in it. After the first training, in 2017 she was elected the best competitor I realized that these were all prejudices "says of the Kickboxing Association of Belgrade. Tijana Vuković. All her life, colleague Tijana practised var- Tijana trains four times a week in her club ious sports and sports activities like dancing, (conditional sparring drill, hitting the punch- swimming and skiing, but six years ago she ing bag and training different combinations began to practice kickboxing at "Pobednik" of blows), and when they start preparing for club with coach Marko Simić. some big competitions, then they train every "During the final years of my civil engineer- day with a compulsory running included. She colleague. "This sport completely changed ing study, I only wanted to activate myself and says that the injuries in this sport are much me. I got to know myself better, I also met expel excess energy from my body. At that less common, and it usually happens only to some wonderful people, my self-confidence moment, it didn't even cross my mind that I competitors during some championships. At boosted, and I exceeded some of my limits. I the end of June, Tijana is likely to participate in look at the world with different eyes. I learned the Balkan kickboxing championship, while at that defeat is an integral part of every sport the end of September the finals of the Balkans and life as well. Of course, it can be challeng- and World Savate Boxing Championship is ing when you're preparing for something, expected. and you sacrifice all your time and effort, and "It sounds like a phrase, but indeed, prepa- then lose, but after a while, you realize that ration for competition involves a lot of sacri- every work on oneself is worth it. You may not fices." see the results instantly, but they are surely I know exactly how my every day is going present. Sooner or later, they emerge on the to be like, what I am going to do during the surface. Maybe the most important thing I training, when I am going to sleep, what I am have learned is that you can win the match allowed to eat, and what I cannot even look at. you were sure to lose, and lose one you lead But somehow I got used to it all; I spent all my and in which you were dominant. Simply, it is life in practising sports; I love it so that I do not not over until you hear the "gong", and until mind. But what is most difficult for me is losing the referee marks the end of the final round, weight before the match. Sometimes I have to everything is possible. Same as in life …says lose 5 kilograms in three days, which can be our vice-champion. very exhausting, "said our colleague Vuković. Our colleague from Industry Plc manages French boxing, i.e. savate, is similar to kick- to harmonize training, work and private life boxing but is practised in tricot and shoes through good organization and respect of her similar to ones used in boxing, and that is own time, and that of other persons. why the kicks are more dangerous than in Sometimes, due to numerous obligations, kickboxing. From the technical point of view, I literally "do unexpected things". It happened this discipline is more demanding, where the to me that I got dressed for work, and went athletes have to watch even more in what out carrying the bag with training equipment. way they are striking a blow since there are At such times I go through the crisis, and I no shin blows, but only the punches with ask myself what for am I doing all this, but the instep. It also demands more movement. fortunately, it doesn't last long- admitted our

30 | ENERGOPROJEKT April-June 2019 Energoprojekt spirit

ENTEL PLC – participating in "Belgrade Business Run 2019" BELGRADE BUSINESS RUN erbian Business Run" rep- follows: Dušan Marjanović (22:49 "S resents a kind of modern- minutes), Luka Šćepanović (23:49 ization of former worker- minutes) and Bojan Bilen (24:31 sports games, in which all the minutes). companies wanting to promote The motto of Belgrade business health and team spirit of their race was: "You know you can do employees can take part. Running it", and therefore everyone who (the best way of recreation for all reached the finishing line was a win- the employed people), and social- ner, it was important to participate, izing after work, always on Thursday, promote the active lifestyle and brings together 5,000 employees teamwork strengthening. A dinner from more than 500 most respon- with refreshments was organized sible companies operating in Serbia. after the race, and so-called "After "Business Run" is the largest run" party, known for good enter- sports-business and team build- tainment and music, because the ing event that has been organized victory should be celebrated with for the fourth time in Belgrade and rewards, dancing and socializing to defend the colours of their com- with colleagues. pany and gain a new experience. On Friday, after the race, the The 5 km long race started at Director of Energoprojekt Entel 8 p.m. with 4200 runners total. The Mladen Simović hosted the par- starting package for each runner ticipants of the competition, and included a medal, a quality running he didn't hide his enthusiasm for jersey and a start number with a the good results achieved by the chip for the electronic measurement team. He thanked the employees of the results. Entel Plc team mem- who were racing for our company bers were: Dušan Marjanović, Luka and once again confirmed the team Šćepanović, Bojan Bilen, Branislav spirit, the perseverance and the Kostić, Dusko Jajić, Ognjen Nikolić, result that Entel Plc cultivates. He Nemanja Vujić, Anđela Grujić, also emphasized that supporting Antonija Fantovski, Nevena Anđelić, the employees to practise sports is Novi Sad, and this year the races Energoprojekt Entel employees Miloš Radovanović, Damjan Stančić one of the ways the company takes will be held in Kragujevac, Niš and registered "Entel" team for this year's and Jovan Zakić. Despite the high care of them, with the aim of health Subotica. Belgrade race. With the support of temperature and high humidity, as and fitness improvement. Race participants run or walk for the company's management, all well as the fact that team members In the end, the participants of 5 kilometres. The right to participate the preparations connected to race were not intensely training for the Belgrade business race pointed have all the employees from com- registration fee payment and equip- race, in "Construction" category, in out that they applied for such a panies, associations, public institu- ment procurement were timely exe- which 24 teams participated, Entel manifestation out of pure curiosity tions, media, schools, faculties and cuted. On Thursday, June 13 after Plc team won the 4th place, while and with the desire to try to push other organizations, with at least 3 work, the members of the "Entel" they were placed 71st in the overall beyond their limits and run out the members, without limits regarding team gathered at . placing, out of 352 teams. The best race the best they can. And they the maximal number of participants. They were in a good mood, ready overall times in Entel team are as did it!

Olivera Šestakov - A new collection of poems A BOOK AS A REWARD t the beginning of June, our colleague Anthology of Contemporary Serbian Poetry and A Olivera Šestakov published a new, fifth Contemporary Haiku Poetry published in 2018 collection of poems titled "Up to the by this publisher, our colleague was declared Untold". Olivera Šestakov, a bachelor of science the best author. in civil engineering (B.Sc.C.E.), is employed in Besides, our colleague Šestakov has received Energoprojekt Holding, in the location devel- a significant literary award for her previous book opment department. Publishing house Creative "Poem I flow like a river and other poems "– it Workshop Balkan from Belgrade published this was proclaimed the best collection of poetry book as a prize awarded to our colleague. In published in Serbia in 2017, according to the line with the vote of the poets - authors of selection of Literary Community of Yugoslavia.

April-June 2019 ENERGOPROJEKT | 31 YOUR APARTEMENT IN NEW BELGRADE!