I



S

Slipper launchers, involved The  bridges. process. tinuously specializes the the In revolving of and well The   during

  works. L order      company

 Company palm

Company construction versed E FACTORY  Ͳ erection.

Mould,

    The I The to in   

 all

oil around     steel  these in supply in     aspects mills, Company  Company’s 

   has

 Autocad the has 1 has  S  Segmental  

All mould  

 infrastructure    D  of implemented fabrication   design also also piping the 

employees 

 of infrastructure N      

products  techniques believes ventured quality placed

fabrication  main .  

works

and  Mould 



of     fabrication B customers its control. are     projects.  that  its for  on

heavy into 

  utmost and H  to  trained     Quality land such time  projects  in 

provide fabrication

  D  guard  To order steel    

reclamation 

 to as   are . importance  this

 of to

 Policy  the  M        design structures such to practice rails, all the 

Ͳ end,

Mould,    customers maintain  types  of   pre and   as etc.  the  was steel and  projects Ͳ     stressing safety on   highways, Procedures   I Company of   All Ͳ incorporated  and Mould,   accurate  safety structures  high steel   satisfaction these   procedures installation  and   standards,   contractors  structures, in  Calvert   has steel    elevated drawings mining  in the   in for   all  a 2001     factory fabrication  dedicated and  concrete Ͳ   levels in Mould,  projects. equipment.   it  with   their    form  roads, for and stringent has ABOUT     of and its shop      respective  civil Parapet to   batching  business travelers, the technical    The   works fly improve at   fabrication.   contractors   fabrication Ͳ standards, work  over,  Company US    activities Mould, are  plants    areas   team   steel sites con and  for Ͳ               FACTORY BOARD NAME  WORKSHOP COMPANY        TRACK    COMPANY DATE  AUTHORISED PAID Ͳ   2 UP INCORPORATED    OF RECORDS  OF  CAPITAL  COMPANY    ADDRESS ACTIVITIES DIRECTORS    CAPITAL    COOPERATE       : : : : : : : : :          RM Ms. Mr. SLEI Factory No. No. Kawasan 31550 Kawasan 31550 Perak Factory 10TH Please Steel projects RM  INFORMATION        500,000.00 1,000,000.00 Plot Plot Lim Kok SDN.   Fabrication AUGUST     Darul Darul  Pusing Pusing refer    1 2     Loon Mei 83, 83, completed      Perindustrian Perindustrian BHD.      Jln Jln Rizuan Rizuan to  Lin    Hock   2001     brief Johan Johan    and       summary    Erection 1/2, 1/2,   Pengkalan Pengkalan      of  SLEI SDN. BHD.    I  2  I  FACTORYFACILITIES I4I

FACTORY 1 - FACILITIES FACTORY 2 - FACILITIES   Thefactoryissituatedinalandareaofapproximately150,000sq.ft.withabuiltͲupareaof Thefactoryissituatedinalandareaofapproximately100,000sq.ft.withabuiltͲupareaof approximately100,000sq.ft.forfabricationworkandoffice. approximately30,000sq.ft.formachiningworkandoffice.   Thefactoryfacilitiesincludesanelectricoverheadtravelingcrane,shearingmachines,bendͲ The factory facilities includes an electric overhead traveling crane, CNC Machining Centre, ing machines, metal cutters, rolling machines, various welding and other auxiliary equipͲ CNCLatheMachine,PrecisionBoring&MillingMachineandotherManualMachiningMaͲ ments. chine.

I3I SLEI SDN. BHD. FACTORYFACILITIES I6I MACHINE & EQUIPMENT LIST FACTORY 1 1.HACOPPM30150PRESSBRAKEͲ1 UNIT 2.LVDPPBL40/20PRESSBRAKEͲ1 UNIT 3.6MMX8FTSSHEARINGMACHINE(CHINA) Ͳ 1 UNIT 4.HACOHSLX3013SHEARINGMACHINE Ͳ 1 UNIT 5.ROLLINGMACHINE(LOCAL)Ͳ1 UNIT 6.PUNCHINGMACHINE(CHINA)Ͳ1 UNIT 7.KINGSLAND55XSIRONWORKER65T  Ͳ 1 UNIT 8.HACOCOMB1220/8NOTCHINGM/CͲ1 UNIT 9.TIGWELDING(SANREX)Ͳ3 UNITS 10.INVERTERTIGWELDING(SANREX)Ͳ3 UNITS PlasmaCNCProfilingCuttingMachine 11.MIGWELDING500AMP&350AMP(KEMPPT) Ͳ 30 UNITS 500tonsPressBrake 12.INVERTERTIGSTICKWELDͲ1 UNIT Capacity:MSPlateThickness1mm~12mm@3000mmLG 13.PLASMACUTTINGM/CͲ4 UNITS 14.AIRCOMPRESSOR2H.PͲ3 UNITS 15.AIRCOMPRESSOR7.5H.PͲ2 UNITS 16.AIRCOMPRESSOR10H.PͲ1 UNIT 17.WIMWELDINGͲ10 UNITS 18.DRILLINGMACHINE(ENGLAND)Ͳ1 UNIT 19.DRILLINGMACHINE(CHINA)Ͳ5 UNITS 20.HOBARTMIG(Co2)MACHINE500AM Ͳ 2 UNITS 21.HYDRAULICJACK150TONͲ1 UNIT 22.JARMAPUNCHINGMACHINE200TON Ͳ 1 UNIT 23.SECTIONALBENDING(ROUNDO–R4)  Ͳ 1 UNIT 24.WELDINGSET300AMPͲ15 UNITS 25.WELDINGSET500AMPͲ5 UNITS 26.360MMKALTENBACHCIRCULARBENDSAW  Ͳ 2 UNITS HACOHSLX3013ShearingMachine 27.HYDRAULICJACK60TONͲ1 UNIT Capacity:MSPlateThickness4.5mm~10mm 28.HYDRAULICJACK30TONͲ1 UNIT 360MMKALTENBACHCIRCULARBENDSAW 29.EVERISINGFULLYAUTOMATICSͲ250HA Ͳ 1 UNIT (DEGREETYPE) 30.COUGHINGMACHINE600(DC)Ͳ4 UNITS 31.AUTOCUTTERͲ10 UNITS 32.JETBROACHMACHINEͲ3 UNITS 33.MAGNETICDRILLͲ3 UNITS 34.FORKLIFTTOYOTA3TONͲ3 UNITS 35.FORKLIFTTOYOTA6TONͲ1 UNIT 36.OVERHEADCRANEABUS10TONͲ1 UNIT 37.OVERHEADCRANELIFTECH10TONͲ1 UNIT 38.OVERHEADCRANELIFTECH3TONͲ2 UNITS 39.OVERHEADCRANELIFTECH5TONͲ5 UNITS 40.OVERHEADCRANE(OUTDOOR)LIFTTECH5TONS Ͳ 1 UNIT 41.ARGONMACHINEͲ1 UNIT 42.HACO3HBR220ROLLINGMACHINEͲ1 UNIT HacoRollingMachine 43.AKYAPAKAPKͲ100ROLLINGMACHINE Ͳ 1 UNIT Capacity:MSPlateThickness1mm~20mm 44.HACOROLLINGMACHINEͲ1 UNIT 41.KH600SEMIAUTOMIGWELDINGMACHINE Ͳ 1 UNIT HACO3HBR220RollingMachine 42.MACHAUTOCX500MIGWELDINGMACHINE Ͳ 1 UNIT Capacity:MSPlateThickness1mm~12mm 43.MACHAUTOCX350MIGWELDINGMACHINE Ͳ 2 UNITS 44.PLASMACNCPROFILINGCUTTINGMACHINE Ͳ 1 UNIT  FACTORY 2 1.CNCPRECISIONBORING&MILINGCENTRE Ͳ 1 UNIT 2.CNCVERTICALTURRETLATHEMACHINE  Ͳ 1 UNIT 3.CNCDOUBLECOLUMNMACHININGCENTRE Ͳ 2 UNITS 4.CNCLATHESLANTBEDMACHINEͲ6 UNITS 5.CNCVERTICALMACHININGCENTREͲ4 UNITS 6.MANUALVERTICALTUNINGMACHINE Ͳ2 UNITS 7.MANUALTURRETMILLINGMACHINEͲ3 UNITS 8.MANUALUNIVERSALLATHEMACHINE Ͳ 2 UNITS 9.AIRCOMPRESSOR50HP(SCREWTYPE)  Ͳ 1 UNIT 10.FORKLIFTTOYOTA3TONͲ1 UNIT 11.OVERHEADCRANE1TONͲ1 UNIT KomatsuPlasmaCNCProfilingCuttingmachine 12.OVERHEADCRANE10TONͲ1 UNIT Size2000mmX6000mm AkyapakAPKͲ100 13.OVERHEADCRANELIFTECH3TONͲ1 UNIT Capacity:MildSteel50mmthk/StainlessSteel30mmthk 14.OVERHEADCRANELIFTECH5TONͲ2 UNITS   I5I SLEI SDN. BHD. CNCMACHININGCENTER I8I

IMACHININGCENTREFACTORYPHOTOSI IPRECISIONBORING&MILLINGI

MACHINEMODEL :PBMͲ135A/B SLEISDN.BHD.establishaSourcingCentreformachiningpartsfrom8metersinlengthtosmall WORKINGSURFACE :1400X1600 partsandthisisinlinewithgrowingglobalsourcingneedswhichcaterforcompanywhichin MAXTABLELOAD :7TONS needofsuchservice. TRAVELXAXIS  :3000mm TRAVELYAXIS :2000mm TRAVELZAXIS :1500mm  ADVANTAGE Boringcenteraccuracy:0.02mm Positioningaccuracy:within0.01mm Innerholesurfaceroughness:3.2um Tablerotationpositionaccuracy:+/Ͳ15" Repeatibility:+/Ͳ8"

MACHINEMODEL :REXERͲ20 WORKINGSURFACE :DIA2000mm MAXTABLELOAD :8TONS MAXTURNINGDIA :DIA2500mm MAXTURNINGHEIGHT :698.5mm TRAVELXAXIS  :1555mm

I7I SLEI SDN. BHD. CNCMACHININGCENTER I10I IMULTIͲSURFACEDOUBLECOLUMNMACHINGCENTERI

ADVANTAGE ͲWithMultiplefunctionB/Caxismillingheadtoreplaceseveralsinglepurposemilling head,achievingmultipurposemachiningdemands. ͲZͲaxisemploys4linearguideways,increasecuttingrigidity. ͲCentersupportonYaxisballscrewstopreventmovingvibrationduringrapidfeed. ͲOilmistcoolingonBChead,thespindlespeedreachesto4000rpm. MachineArborAccessories 

MACHINEMODEL :DBCͲH8260H WORKINGSURFACE :8000X2040 MAXTABLELOAD :18TONS TRAVELXAXIS  :8050mm TRAVELYAXIS :3400mm TRAVELZAXIS :1000mm

MACHINEMODEL :PROͲ2150 WORKINGSURFACE :4100X1450 MAXTABLELOAD :7TONS TRAVELXAXIS  :2060mm TRAVELYAXIS :1560mm TRAVELZAXIS :780mm  ADVANTAGE HeavycuttingDoubleColumnMachiningCenter—BoxGuideWay ͲHeavyCutting(atonetime)Dia.76mm,100mmdrillingdepth Ͳ6,000rpmStd. Ͳ10,000rpmDDSͲ

I9I SLEI SDN. BHD. CNCMACHININGCENTER I12I

ICNCLATHESLANTBEDI

MACHINEMODEL :SMECPL15 TURNINGCAPACITY :DIA300mm TURNINGLENGTH :300mm XAXISSTROKE :180mm ZAXISSTROKE :330mm

MACHINEMODEL :SMECPL60LM TURNINGCAPACITY :DIA800mm TURNINGLENGTH :3200mm XAXISSTROKE :470mm ZAXISSTROKE :3270mm 

MACHINEMODEL :SMECPL25L TURNINGCAPACITY :DIA380mm TURNINGLENGTH :1030mm XAXISSTROKE :220mm ZAXISSTROKE :1090mm

MACHINEMODEL :SMECPL45L MACHINEMODEL :SMECLCV50XLB TURNINGCAPACITY :DIA690mm TURNINGCAPACITY :DIA550mm TURNINGLENGTH :2255mm TURNINGLENGTH :4600mm XAXISSTROKE :350mm XAXISSTROKE :4000mm ZAXISSTROKE :2330mm YAXISSTROKE :510mm  ZAXISSTROKE :550mm

I11I SLEI SDN. BHD. CNCMACHININGCENTER I14I IVERTICALMACHININGCENTERI IMANUALMACHININGCENTREI

ADVANTAGE MACHINEMODEL :F1LGͲ1000  WORKINGSURFACE :1150X510 Vertical Machining Center with MAXTABLELOAD :0.7TONS LinearGuideWay TRAVELXAXIS  :1000mm HighEfficiency/HighSpeedVMC. TRAVELYAXIS :510mm Increase Machining Quality with TRAVELZAXIS :630mm lessMachiningTime.

VerticalTuningMachine TurretMillingMachine 

UniversalLatheMachine IMachiningFinishProductI

ADVANTAGE  VerticalMachiningCenterwithBoxGuideWay HeavyCuttingMachiningcenter.Yaxis4guidewaydesigned. 8000rpmgearZFdirectdriveoption. 10,000rpmDDSoption.

MACHINEMODEL :HCMCͲ1892 WORKINGSURFACE :1950X920 MAXTABLELOAD :3TONS TRAVELXAXIS  :1800mm TRAVELYAXIS :920mm TRAVELZAXIS :820mm I13I SLEI SDN. BHD. QUALITYASSURANCE OURCAPABILITIES I16I

CoatingThicknessCheck. Piping MSTank

Specialize in the fabrication and installation of the following steel structures fortheconstructionofbridges,flyͲover,elevatedroads,etc x MͲMould,IͲMould,CalvertMould,ParapetMould,U–Mould x FormTravellers QUALITYisaprimaryobjectiveinSLEI.Stringent x SteelLaunchers quality controls are exercised throughout the fabricaͲ x RoofTrusses tion&weldingprocess.AllcriticaldimensionsarereguͲ x GalvanizedHandRail(MildSteelandCastIron) BucketElevator larlygaugedandcheckedoutbyourQualityAssurance x MildSteelCasingPipe Personnel. Like Visual Inspection, Coating Thickness x SteelFabricator(MildSteelandStainlessSteel) Check, Dye Penetration (InͲhouse), UT—Test & MPI x PrecisionMachinedSteelComponents (ThirdParty). x PalmOilIndustryEquipment/FiberProductionLine  VisualInspection&Dimension By Using this approach, our respective customers can Check. remainconfidentthatweareomittedtoprovidethem with exactly what they are reͲ quired. Every of our delivery shall bearecommendationforourconͲ tinuedorfuturebusiness.

SpiralStaicase AntiVandalismTube SteelTruss

UTTestInProgressonButtWeld.

ParapetSteelMould ColumnSteelMould DeͲstressingDevice

MagneticParticleInspection(MPI)Test InProgressonFilletWeld. DyePenetrationTestinProgress OnFilletWeld. SteelPlatform SegmentLifter SegmentalMould

I15I SLEI SDN. BHD. TRACKRECORDS I18I COMPLETED PROJECT COMPLETED PROJECT TRACK RECORDS TRACK RECORDS ITEM CLIENTS YEAR BRIEFDESCRIPTION ITEM CLIENTS YEAR BRIEFDESCRIPTION 1 JEKSENGINEERING 2001 ContractSum: RM457,517.36 23 PROJALMASDN.BHD. 2004 ContractSum: RM8,000.00    Scope:LekirBulkTerminalͲConcreteSleepersSteelMould.    Scope:Supply&fabricationSegmentalSteelMouldͲNKVELink,JalanMeruInterͲ 2 LEIGHTONCONTRACTORS 2001 ContractSum: RM207,672.00 24 PROJALMASDN.BHD. 2004 ContractSum: RM6,556.00 Supply&fabricationSegmentalSteelMouldͲSetiaAlamInterchangeandToll  ()SDN.BHD.  Scope:FabricationofPilesShoe&DeliverytoPPIFactory.    Scope: Plaze. 3 IJMCONSTRUCTIONSDN.BHD. 2001 ContractSum: RM130,420.00 25 VSLENGINEERS(M)SDN.BHD. 2004 ContractSum: RM440,000.00    Scope:Supply,fabrication&deliveryofConcreteColumnSteelMould.    Scope:Supply&fabricationTemporaryPropsͲNKVEandEMKAYInterchange. 4 BALLASTNEDAMGROUPN.V 2002 ContractSum: RM1,037,917.99  26 MUDAJAYACONSTRUCTION 2004 ContractSum: RM3,610.00  (MALAYSIA)SDN.BHD.  Scope:FabricationofSteelMouldforPrecastConcreteElements.    Scope:Supply&fabricationBeamSteelMould. 5 GAMUDABERHAD 2002 ContractSum: RM993,937.50 27 PROJALMASDN.BHD. 2004 ContractSum: RM120,000.00 Supply&fabricationSegmentalSteelMouldͲSprintWesternKLDispersal/    Scope:    Scope:K.L.WesternTrafficDispersalScheme(PackageC)ͲMetalRailing(HotͲdipGalv.) Interchange. 6 ROADBUILDER(M)SDN.BHD. 2002 ContractSum: RM232,000.00 28 G.W.ENGINEERINGSDN.BHD. 2004 ContractSum: RM82,000.00    Scope:Supply&fabricationREWallSteelMould    Scope:NewPantaiHighwayͲSteelMouldforPrecastSegmentCrossheadforBridge 29 PROJALMASDN.BHD. 2004 ContractSum: RM4,000.00    Scope:Supply&fabricationSegmentalSteelMouldͲMiddleRingRoad,Seremban. 7 VSLENGINEERS(M)SDN.BHD. 2002 ContractSum: RM1,420,020.19  30 ROADBUILDER(M)SDN.BHD. 2004 ContractSum: RM40,000.00    Scope:TravellingFormworkͲSg.PahangChenorBridge.    Scope:Supply&fabricationColumnSteelMouldͲJalanBalakong,LebuhRayaSg.Besi. 8 GAMUDABERHAD 2002 ContractSum: RM521,334.90 31 MMCͲGAMUDAJOINTVENTURE 2005 ContractSum: RM136,000.00    Scope:Supply&DeliveryofM.S.Grating.    Scope:Supply&fabricationParapetSteelMouldͲS.M.A.R.TProject,KL 9 ROADBUILDER(M)SDN.BHD. 2002 ContractSum: RM538,510.00 32 FREYSSINETͲAPTOJOINTVENTURE 2005 ContractSum: RM297,000.00 Supply&fabricationCableStayAntivandalismTubeandCableClampsfor    Scope:NewPantaiHighwayͲModificationandfabricationofSegmentalSteelMould.    Scope: BridgeMaintenance. 10 VSLSINGAPOREPTE.LTD. 2003 ContractSum: RM114,587.44 33 VSLENGINEERS(M)SDN.BHD. 2005 ContractSum: RM113,000.00    Scope:MetroLine4,SantiagoDeChileͲFabricationofULRSFrame&CraneWheels.    Scope:Supply&fabricationTemporaryPropsͲMiddleRingRoad,Seremban. 34 VSLENGINEERS(M)SDN.BHD. 2005 ContractSum: RM175,000.00 11 VSLHONGKONGLIMITED 2003 ContractSum: RM127,135.58 Supply&fabricationTemporaryPropsandShearBlocksͲNKVELink,JalanMeru    Scope:    Scope:Supply&fabricationofcranewheelsforDeepBayLink. Interchange. 12 VSLENGINEERS(M)SDN.BHD. 2003 ContractSum: RM820,039.86 35 MUDAJAYACONTRUCTION 2005 ContractSum: RM62,000.00    Scope:ModificationworksͲIͲBeamSteelMould    Scope:FabricationanderectionofLaunchingNoseͲBridgeOverBatangKemena, 36 VSLENGINEERS(M)SDN.BHD. 2005 ContractSum: RM71,000.00 13 HASRATSEDAYASDN.BHD. 2003 ContractSum: RM542,909.51    Scope:Supply&fabricationShearBlock&BearingPlatesͲMiddleRingRoad,SeremͲ    Scope:TravellingFormworkͲBridgeOverTasikRaban,,Perak. 37 IRAMADUTASDN.BHD. 2005 ContractSum: RM120,000.00 14 VSLENGINEERS(M)SDN.BHD. 2003 ContractSum: RM416,680.29    Scope:Supply&FabricationStructuralSteelWorksͲSg.BulohTollPlaza.    Scope:Supply,fabrication&deliveryofLaunchingTrussͲJalanGopeng,. 38 MMCͲGAMUDAJOINTVENTURE 2005 ContractSum: RM450,000.00    Scope:FabricationStructuralSteelWorksͲS.M.A.R.T.Project,KL. 15 VSLENGINEERS(M)SDN.BHD. 2003 ContractSum: RM226,816.60 39 VSLENGINEERS(M)SDN.BHD. 2005 ContractSum: RM292,000.00    Scope:Supply,fabrication&deliveryofRampTemporaryPropsͲBayanBaru,Penang.    Scope:Supply&fabricationSegmentLifterͲMiddleRingRoad,Seremban. 16 PROJALMACONSTRUCTION 2003 ContractSum: RM327,027.76 40 PROJALMASDN.BHD. 2005 ContractSum: RM1,000,000.00 /2006 Supply&fabricationSegmentalSteelMould&AccessoriesͲSubangKelanaLink  SDN.BHD.  Scope:Supply,fabrication&deliveryofSegmentLifterͲJalanGopeng,Ipoh.   Scope: Project. 17 CONCRETEEMPIRESDN.BHD. 2003 ContractSum: RM181,596.00 41 PROJALMASDN.BHD. 2006 ContractSum: RM150,000.00 Supply&fabricationSegmentalSteelMouldͲInterchange/ThomsonRoad/    Scope:ModificationofU11PrestressedConcreteBeamSteelMouldtoPostͲTenͲ    Scope: LornieRoad,Singapore. 18 VSLENGINEERS(M)SDN.BHD. 2003 ContractSum: RM648,800.00 42 STRETCHMARKSASIASDN.BHD. 2006 ContractSum: RM114,000.00 Fabrication,delivery&commissioning2pairsofFormTravellerͲKualaKurau    Scope:Supply,fabriction&ErectionClimbingStructureͲExtremePark,ShahAlam.    Scope: Bridge,Perak. 43 VSLSINGAPOREPTE.LTD. 2006 ContractSum: RM160,000.00 Supply,fabricationLiftingStructure&PermanetPylonStructureͲBridgeto 19 SERIBONGͲKONBINAͲHAZAMA 2003 ContractSum: RM766,706.00    Scope: KeppelIsland,Singapore. CONSORTIUM /2004  Scope:Supply,fabricate&erectioncement/flyashsilos,conveyorandmonitoring 44 FREYSSINETPSCͲFREYSSINETAPTO 2006 ContractSum: RM1,028,000.00 JOINTVENTURE Supply&fabricationNewPartforDubaiSpecialGantryandModificationof 20 LEIGHTONCONTRACTORS 2004 ContractSum: RM261,100.00   Scope: ExistingGantry. (M)SDN.BHD.   Scope:Supply&fabricationofColumnSteelMouldͲPutrajayaHighway,KL. 45 VSLENGINEERS(M)SDN.BHD. 2006 ContractSum: RM594,000.00 /2009 Supply&fabricationWorkingPlatform&SteelStructureforSubangKelanaLink 21 FREYSSINETͲAPTOJOINTVENTURE 2004 ContractSum: RM972,000.00   Scope: Project.    Scope:FabricationSegmentCarriage&SegmentSpreaderBeamͲBridgeOverSg.Prai,

22 HASRATSEDAYASDN.BHD. 2004 ContractSum: RM260,000.00 Modification&AdditionalWorksforFormworkTravellerͲBridgeOverTasik    Scope: Raban,Lenggong,Perak.

I17I SLEI SDN. BHD. TRACKRECORDS I20I COMPLETED PROJECT COMPLETED PROJECT TRACK RECORDS TRACK RECORDS ITEM CLIENTS YEAR BRIEFDESCRIPTION ITEM CLIENTS YEAR BRIEFDESCRIPTION 46 STRETCHMARKSASIASDN.BHD. 2007 ContractSum: RM270,000.00 69 STRETCHMARKSASIASDN.BHD. 2009 ContractSum: RM20,000.00    Scope:Supply,fabrication&erectionClimbingSteelStructureͲChallengePark,Putrajaya    Scope:Supply&fabricationClimbingSteelStructureͲOutwardBound,Lumut,Perak. 47 MAXCOMENGINEERINGSDN.BHD. 2007 ContractSum: RM110,000.00 70 STRETCHMARKSASIASDN.BHD. 2009 ContractSum: RM6,000.00  Supply,fabrication&erectionHCLBunkerforInfineonTechnologies(Kulim)Sdn.    Scope:    Scope:Supply&fabricationSkateParkObstaclesͲChallengePark,Putrajaya. Bhd. 48 FREYSSINETPSCͲFREYSSINETAPTO 2007 ContractSum: RM1,378,000.00  71 GAMUDABERHAD(BAHRAIN) 2009 ContractSum: RM550,000.00 JOINTVENTURE Supply&fabricationAdditionalWingFormworkͲTheReplacementofSitra   Scope:Supply&fabricationSteelStructure&AccessoriesͲPenangBridgeReplacment    Scope: Bridge,Bahrain 49 FREYSSINETPSCͲFREYSSINETAPTO 2007 ContractSum: RM300,000.00 72 PROJALMASDN.BHD. 2009 ContractSum: RM455,000.00 JOINTVENTURE /2008  Scope:Supply&fabricationPylonLiftingStructureͲPenangBridgeReplacementStay. Supply&fabricationSegmentalSteelMouldͲGerbangSelatanBersepaduanͲMid    Scope: TermLink,Johor. 50 FREYSSINETPSCͲFREYSSINETAPTO 2007 ContractSum: RM380,000.00 JOINTVENTURE /2008 73 SIMLEISURECONSULTANTSSDN.BHD. 2009 ContractSum: RM102,000.00  Scope:Supply&fabricationPylonWorkingPlatformͲPenangBridgeReplacementStay.    Scope:Supply&fabricationSteelStructureͲUniversalStudioSingapore. 51 GAMUDABERHAD(BAHRAIN) 2007 ContractSum: RM3,350,000.00  74 MDCPRECASTINDUSTRIESSDN.BHD. 2009 ContractSum: RM400,000.00 /2008   Scope:Supply&fabricationWingFormworkͲTheReplacementofSitraBridge,Bahrain    Scope:Supply&fabricationUMMould,TMould&MMould. 75 MDCPRECASTINDUSTRIESSDN.BHD. 2009 ContractSum: RM300,000.00 52 PROJALMASDN.BHD. 2007 ContractSum: RM670,000.00    Scope:Supply&fabricationReactionBeam. /2008   Scope:Supply&fabricationSegmentalSteelMouldͲDewanBahasaHangTuahProject, 76 VSLENGINEERS(M)SDN.BHD. 2008 ContractSum: RM1,160,000.00  53 PROJALMASDN.BHD. 2007 ContractSum: RM1,155,000.00    /2009 Scope:Supply&fabricationInnerDiaphragm&SteelworksͲSgJohorBridge. /2008 Supply&fabricationSegmentalSteelMouldͲGerbangSelatanBersepaduanProͲ 77 STRIKERCRUSHING&SCREENING 2009 ContractSum: RM1,018,197.00    Scope: ject,Johor. SDN.BHD. Supply,fabrication&delivery1112Chassis,ImpactorBody&Recyclerkit.   Scope: 54 PROJALMASDN.BHD. 2007 ContractSum: RM537,000.00 (MobileCrusher) /2008 Supply&fabricationSegmentalSteelMouldͲMiddleRingRoadFasa2Project,   Scope: 78 STRIKERCRUSHING&SCREENING 2009 ContractSum: RM568,139.00 Seremban. SDN.BHD. 55 VSLENGINEERS(M)SDN.BHD. 2007 ContractSum: RM370,000.00   Scope:Supply,fabrication&delivery12M,18M,20M,24M&30MRadiarStacker. /2008 79 LINATEXRUBBERPRODUCTSSDN.BHD. 2009 ContractSum: RM357,544.00   Scope:Supply&fabricationSteelStructureͲGerbangSelatanBersepaduanProject,Johor.    Scope:Supply,fabrication&deliveryGenesisCyclone&MISCParts. 56 VSLENGINEERS(M)SDN.BHD. 2007 ContractSum: RM1,325,000.00  80 LINATEXRUBBERPRODUCTSSDN.BHD. 2009 ContractSum: RM998,400.00 /2008   Scope:Supply&fabricationSegmentLifter&SteelStructureͲDewanBahasaHangTuah Supply,fabrication&deliveryVariousSizesImpellerParts&VariousSizesGrindͲ    Scope: ingDisc. 57 VSLENGINEERS(M)SDN.BHD. 2007 ContractSum: RM650,000.00 81 LINATEXRUBBERPRODUCTSSDN.BHD. 2009 ContractSum: RM109,000.00 /2008   Scope:Supply&fabricationSteelStructureͲMiddleRingRoadFasa2Project,Seremban. Supply,fabrication&deliveryVariousSizesVibrationScreen&VariousSizePinch    Scope: 58 VSLENGINEERS(M)SDN.BHD. 2007 ContractSum: RM1,160,000.00  Valve. /2009 82 SIMLEISURECONSULTANTSSDN.BHD. 2010 ContractSum: RM150,000.00   Scope:Supply&fabricationInnerDiaphragm&SteelworksͲSgJohorBridge    Scope:Supply,fabrication&Steelparts&StructuralworksforUniversalStudio,SingaͲ 59 VSLSINGAPOREPTE.LTD. 2008 ContractSum: RM196,000.00 Supply&fabricationSteelStructureͲExtensionofBartleyRoadtoAirportRoad, 83 SINARSELASEHSDN.BHD. 2010 ContractSum: RM2,200,000.00     Scope: Singapore. Supply,fabrication&erectionofwarehousesteelstructure.ͲIkeaHandelSdn.    Scope: 60 SIMLEISURECONSULTANTS 2008 ContractSum: RM215,000.00 Bhd. SDN.BHD. Supply,fabrication&erectionSteelWaterPlayStructure(HotͲDipGalv.)ͲSunway   Scope: 84 AHMADZAKISDN.BHD. 2010 ContractSum: RM390,000.00 lagoon,KL Supply,fabrication&erectionofsegmentalsteelmouldatPersysSdn.Bhd. 61 STRIKERCRUSHING&SCREENING 2008 ContractSum: RM144,500.00    Scope: BatangKaliCastingYard. SDN.BHD.   Scope:Supply,fabrication&erectionCraneRailandSteelStructureatSCSWareHouse. 85 PERSYSSDN.BHD. 2010 ContractSum: RM98,000.00 62 STRIKERCRUSHING&SCREENING 2008 ContractSum: RM1,164,399.00     Scope:Supply,fabrication&deliveryofpierwingformworkͲJalanDutaProject. SDN.BHD.   Scope:Supply,fabrication&delivery1112Chassis,ImpactorBody&Recyclerkit.(Mobile 86 FREYSSINETINTERNATIONAL&CIE 2010 ContractSum: RM1,544,000.00  63 STRIKERCRUSHING&SCREENING 2008 ContractSum: RM815,622.00    Scope:Supply,fabrication&deliverySteelStructure,StatiumBCPLACE,Canada. SDN.BHD.   Scope:Supply,fabrication&delivery15M,18M&24MRadiarStacker. 87 STRIKERCRUSHING&SCREENING 2010 ContractSum: RM3,400,000.00  SDN.BHD. Supply,fabrication&deliveryRadiarStacker,1112Chassis,ImpactorBody,RecyͲ 64 LINATEXRUBBERPRODUCTSSDN.BHD. 2008 ContractSum: RM440,000.00   Scope: clerkitandspareparts.    Scope:Supply,fabrication&deliveryGenesisCyclone&MISCParts. 88 LINATEXRUBBERPRODUCTSSDN.BHD. 2010 ContractSum: RM2,500,000.00  65 LINATEXRUBBERPRODUCTSSDN.BHD. 2008 ContractSum: RM34,400.00 Supply,fabrication&deliveryVibrationScreen,PinchValve,GrindingDisc,GeneͲ    Scope:    Scope:Supply,fabrication&deliveryVariousSizesImpellerParts sisCyloneandMiscparts. 66 LINATEXRUBBERPRODUCTSSDN.BHD. 2008 ContractSum: RM758,500.00 89 VSLENGINEERS(M)SDN.BHD. 2010 ContractSum: RM3,500,000.00     Scope:Supply,fabrication&deliveryVariousSizesGrindingDisc /2011 Supply,fabrication,delivery&installationof8setsFormworkTraveller,Coastal 67 LINATEXRUBBERPRODUCTSSDN.BHD. 2008 ContractSum: RM928,400.00   Scope: HighwayJohortoNusajaya,Johor.    Scope:Supply,fabrication&deliveryVariousSizesVibrationScreen. 90 SYNNPALMOILSDN.BHD. 2010 ContractSum: RM3,000,000.00  68 STRETCHMARKSASIASDN.BHD. 2009 ContractSum: RM40,000.00 /2011 Supply,fabrication&erectionfiberplantequipment,conveyorandstructural   Scope:    Scope:Supply&fabricationClimbingSteelStructureͲ360Mall,Kuwait works.

I19I SLEI SDN. BHD. TRACKRECORDS I22I COMPLETED PROJECT COMPLETED PROJECT TRACK RECORDS ITEM CLIENTS YEAR BRIEFDESCRIPTION TRACK RECORDS 91 PROJALMASDN.BHD. 2011 ContractSum: RM1,800,000.00 ITEM CLIENTS YEAR BRIEFDESCRIPTION Supply,fabrication&deliverysegmentalsteelmould.DedRuasJlnLayangAntaͲ    Scope: sari,Indonesia. 117 ENGLEEENGINEERINGPTE.LTD. 2013 ContractSum: RM158,000.00 92 KAYANGANKEMASSDN.BHD. 2011 ContractSum: RM2,400,000.00  Supply,fabricateanddeliverycolumnsteelmould.Project:MRTTuasExtenͲ    Scope:Supply,fabrication&erectionofwarehousesteelstructure.ͲDeautoSdn.Bhd.   Scope: sion,Contract1688,Singapore 93 ADVENTUREROPESDN.BHD. 2011 ContractSum: RM55,000.00 Supply,fabrication&deliverySteelSupportandComponenetsforassemblychilͲ 118 VSLSINGAPOREPTE.LTD. 2013 ContractSum: RM280,000.00    Scope:  drenplayground. Supply,fabricateanddeliveryliftingstructure.Project:PedestrianBridgeat   Scope: 94 FREYSSINETINETRNATIONAL&CIE 2011 ContractSum: RM150,214.00 MarinaBay.    Scope:SupplyandfabricationGuideTubeforPortmann,CanadaProject. 95 FREYSSINETINETRNATIONAL&CIE 2011 ContractSum: RM120,000.00 119 VSLSINGAPOREPTE.LTD. 2013 ContractSum: RM75,000.00     Scope:SupplyandfabricationGuideTubeforGoldernHorn,RussiaProject. Supply,fabricateanddeliveryliftingstructure.Project:ArdmoreParkCondoͲ   Scope: 96 PROJALMASDN.BHD. 2011 ContractSum: RM750,000.00 minium,Singapore Supply,fabrication&deliverysegmentalsteelmouldforLRTKelanaJayaLine    Scope: 120 PROJALMASDN.BHD. 2013 ContractSum: RM53,000.00 ExtensionProject,KualaLumpur.  Supply,fabricateanddelivery1setpiermould.Project:MarinaBayPedesͲ 97 VSLINDIAPVTLTD 2011 ContractSum: RM900,000.00   Scope:    Scope:Supply,fabrication&deliverysegmentalsteelmouldforGangaBridge,India. trianBridge,Singapore 98 MSAINTERNATIONALSDN.BHD. 2011 ContractSum: RM180,000.00 121 VSLENGINEERS(M)SDN.BHD. 2013 ContractSum: RM5,600,000.00     Scope:SupplyandfabricationShakeourLumpbreakerandSandCoolerClassifier. 99 ARANINTERNATIONALSDN.BHD. 2011 ContractSum: RM150,000.00   /2014 Scope:Supply,fabricateanddeliveryVSLGantry.(6units)(GANTRYͲVG7~VG8)    Scope:SupplyandfabricationSteelpartsfortheKittilaPastePlant. 122 VSLSINGAPOREPTE.LTD. 2013 ContractSum: RM620,000.00 100 ARANINTERNATIONALSDN.BHD. 2011 ContractSum: RM80,000.00   /2014 Scope:Supply,fabricateanddeliveryliftingstructure,platform&etc.    Scope:SupplyandfabricationSteelpartsfortheLasMercedesMine. 101 STRIKERCRUSHING&SCREENING 2011 ContractSum: RM739,000.00 123 STRETCHMARKSASIASDN.BHD. 2014 ContractSum: RM155,000.00 SDN.BHD. Supply,fabrication&deliveryRadiarStacker,1112Chassis,ImpactorBody,RecyͲ  Supply,fabricateanddeliverysteelstructureforDistrict21,IOICityMall,PuͲ   Scope:   Scope: clerkitandspareparts. trajaya. 102 LINATEXRUBBERPRODUCTSSDN.BHD. 2011 ContractSum: RM890,000.00 124 ADVENTUREROPESSDNBHD 2014 ContractSum: RM150,000.00 Supply,fabrication&deliveryVibrationScreen,PinchValve,GrindingDisc,Genesis  Supply,fabricateanddeliverywalkwaystructure&ballustradeforDesaPark    Scope:   Scope: CyloneandMiscparts. City. 103 VSLENGINEERS(M)SDN.BHD. 2012 ContractSum: RM3,200,000.00 125 ADVENTUREROPESSDNBHD 2014 ContractSum: RM62,000.00    Scope:Fabricate,deliveryandcommissioningof4pairsofFormworkTraveller.  Supply,fabricateanddeliverysteelstructureforDistrict21,IOICityMall,PuͲ   Scope: 104 VSLENGINEERS(M)SDN.BHD. 2012 ContractSum: RM1,600,000.00 trajaya.    Scope:FabricateanddeliverSteelStructuresandSteelComponent. 126 ADVENTUREROPESSDNBHD 2014 ContractSum: RM150,000.00 105 FREYSSINETINETRNATIONAL&CIE 2012 ContractSum: RM873,000.00   /2015 Scope:Supply,fabricateanddeliverysteelplatform,CommonwealthPark    Scope:Fabricate,deliverytemporarysteelstructureforBCPLACESTATIUM,CANADA. 127 VSLENGINEERS(M)SDN.BHD. 2014 ContractSum: RM1,725,000.00  106 FREYSSINETINETRNATIONAL&CIE 2012 ContractSum: RM153,000.00 Supply,fabrication&deliveryCableBridgeHardware,PORTMANBRIDGE,CANͲ    Scope:Supply,fabricateanddeliveryFormTravellerforMRTV8package.    Scope: ADA. 128 VSLENGINEERS(M)SDN.BHD. 2014 ContractSum: RM840,000.00 107 FREYSSINETINETRNATIONAL&CIE 2012 ContractSum: RM122,000.00  Supply,fabrication&deliveryCableBridgeHardware,GOLDENHORNBRIDGE,   Scope:Supply,fabricateanddeliverySteelSturtureforMRTV1ͲUnslungGantry.    Scope: RUSSIA. 129 STRIKERTHEMING&LEISURESDN.BHD. 2014 ContractSum: RM70,000.00 108 EASTERNPRETECH(MALAYSIA)SDN.BHD. 2012 ContractSum: RM1,220,000.00  Supply,fabrication,deliveryandcommisioing4setssegmentalsteelmouldfor   Scope:Supply,fabricateanddeliverysteelstructure.Project:Sg.KarangResort.    Scope: KLANGVALLEYMRTPROJECT. 130 STRIKERTHEMING&LEISURESDN.BHD. 2014 ContractSum: RM55,000.00 109 UNTANGJAYASDN.BHD. 2012 ContractSum: RM1,897,000.00     Scope:Supply,fabrication&delivery3setsIͲGirderSteelBridge,Kapit,Sarawak.   Scope:Supply,fabricateanddeliverysteelstructure.Project:BukitMerakWaterPark. 110 FREYSSINETINETRNATIONAL&CIE 2012 ContractSum: RM3,070,000.00 131 VSLENGINEERS(M)SDN.BHD. 2014 ContractSum: RM450,000.00 /2013 Supply,fabrication&deliveryBridgeSteelStructureforWingTipBridge,West    Scope:   Scope:Supply,fabricateanddeliveryFormTravellerforSubangSkyParkProject Virgina,USA. 111 FREYSSINETINETRNATIONAL&CIE 2012 ContractSum: RM2,770,000.00 132 IKHMASJAYASDN.BHD. 2014 ContractSum: RM1,500,000.00  /2013 RefurbishGantryMainElementsandFabricateSteelStructuresandSteelCompoͲ /2015 Supply,fabricate,modificationanddelivery6pairFormTravellerforSubang   Scope:   Scope: nent,Project:DAMMAN SkyParkProject. 112 VSLENGINEERS(M)SDN.BHD. 2012 ContractSum: RM16,800,000.00  133 KumpulanEdoraSetiaSdn.Bhd. 2015 ContractSum: RM1,300,000.00    /2013 Scope:Supply,fabricateanddeliveryVSLGantry.(6units)(GANTRYͲVG1~VG6)  113 DEAUTOINDUSTRIESSDN.BHD. 2013 ContractSum: RM120,000.00   Scope:Supply,fabricateanddeliverySteelFacedeforbridgeatTmnMetropolitan,KL.    Scope:Supply,fabricateanddelivery3unitsconcretemixerdrumandbodychassis 114 STRIKERTHEMING&LEISURESDN.BHD. 2013 ContractSum: RM220,000.00    Scope:Supply,fabricateanddeliverysteelstructure.Project:LegolandWaterPark 115 PROJALMASDN.BHD. 2013 ContractSum: RM375,000.00  Supply,fabricateanddelivery2setsspecialcrossingsegmentalsteelmould.ProͲ   Scope: ject:VEHICULARBRIDGEACROSSBUKITPANJANGROAD,SINGAPORE 116 PROJALMASDN.BHD. 2013 ContractSum: RM280,000.00  Supply,fabricateanddelivery2setsspecialcrossingsegmentalsteelmould.ProͲ   Scope: ject:A56ͲPUNGGOLEAST,SINGAPORE I21I SLEI SDN. BHD. COMPLETEDPROJECTPHOTOS I24I

ViewofSg.KintaDam

AirSlideͲInhousefabricationandsiteinstallation

DischargeHopper

InhousefabricationofBlowPodforDensePhaseConveyorSystem

ICEMENT&FLYASHSILOSICONVEYINGSYSTEMI

Inletpipingofthesilos Project : GreaterIpohWaterSupplySchemellConstructionofSg.KintaDam Client  : SERIBONGͲKONBINAͲHAZAMACONSORTIUM Scopeofwork: Fabricationanderection100tons,200tonssilosandconveyor   systemsuchasAirSlide,ScrewConveyorandDensePhase  System

Airslidesystem

ScrewConveyorͲSiteinstallation

Pneumaticparts&Electricaldeviceforthedensephasesystem.

I23I SLEI SDN. BHD. COMPLETEDPROJECTPHOTOS I26I

InnerCoreForm

SiteTrialAssembly Trolley,InnerCore Wingform&Inner temporarystockyard. coreform.

IPRECASTSEGMENTALSTEELMOULDI

Project : SUBANGKELANALINK(SKL)FLYͲOVER Client  : PROJALMASDN.BHD. Scopeofwork: FabricationprecastsegmentsteelmouldsuchasBulkhead,   WingForm,InnerCore,Trolley,StructureSupportand RebarJig WingForm&Support  Accessories

InͲhousefabricationWingFormSupportandInnerCoreForm Loading 20 meter length Bulkhead at our ware house

I25I SLEI SDN. BHD. COMPLETEDPROJECTPHOTOS I28I

IPRECASTSEGMENTALSTEELMOULDI

Project : InterchangeatBraddellRoad/ThomsonRoad/LornieRoad,Singapore Client  : PROJALMASDN.BHD. Scopeofwork: FabricationprecastsegmentsteelmouldsuchasBulkhead,   WingForm,InnerCoreandAccessories.  ModificationworksforInnerCoreArm,WingFormSupportandBulkheadSupport. SteelForm Work.

BulkheadinͲhousefabricationand FormworkMisc trialassemblywithwingform. SteelParts

Fit up Inner Core Arm and Wing Form.

Launching Nose

Loadingonepairofwingform atourwarehouse.

InnerCoreForm.

Project : BridgeOverBatangKemena,BintuluSarawak Client  : VSLENGINEERS(M)SDN.BHD. Scopeofwork: FabricationSteelFormWorkandrepairexistingLaunchingNose.

IINCREMENTALLYLAUNCHINGMETHOD(ILM)FORMWORKI

InnerCoreWebConvertAttachmentandRecessBox.

I27I SLEI SDN. BHD. COMPLETEDPROJECTPHOTOS I30I

Site Erection

3DModel.

SLUSledgePartsc/wmachiningroller.

InhouseFitting&welding worksinprogress.

Project : SerembanFlyOver Client  : VSLENGINEERS(M)SDN.BHD. Scopeofwork: FabricationSegmentLifterandAccessories

ISEGMENTLIFTERI

MachiningComponents.

SegmentLifter.

I29I SLEI SDN. BHD. COMPLETEDPROJECTPHOTOS I32I

PaintingWorks

HoldingDownBolts Installation.

LoadingatourWarehouse. JigTable

FitͲuprooftruss ITOLLPLAZASTEELSTRUCTUREANDPEDESTRIANBRIDGEI

Dye Penetration. Project : STORMWATERMANAGEMENTANDROADTUNNEL(S.M.A.R.T.) Client  : M.M.C.—GAMUDAJOINTVENTURE Scopeofwork: FabricationanderectionofTollPlazaSteelStructureand PedestrianBridge.

 ISTEELROOFSTRUSSI

Project : SUNGAIBULOHTOLPLAZA HoldingDownBolt Client  : IRAMADUTASDN.BHD. Installation. Scopeofwork: Fabricationanderectionofsteel BuggyLaneCanopy. SpiralStaircase. rooftrussofHighwayTollPlaza.

Pedestrian Bridge

SpiralStaircase. ArcCanopy. I31I SLEI SDN. BHD. COMPLETEDPROJECTPHOTOS I34I IFORMTRAVELLERI

Project : KualaKurauBridge,KrianDistrictPerak Client  : VSLENGINEERS(M)SDN.BHD. Scopeofwork: Fabrication,deliveryandcommissioningtwopairsofFormWorkTraveller.

Project : BridgeOverTasikRaban.Lenggong,Perak Client  : HASRATSEDAYASDN.BHD. Scopeofwork: FabricationandRepairofFormworkTraveller.

IFORMTRAVELLERI

Siteinstallationof FormTraveller.

FormWorkTraveller,Site TemporaryStoreYard

I33I SLEI SDN. BHD. COMPLETEDPROJECTPHOTOS I36I

Site Erection Fabricationinprogress andJigtable.

IFORMTRAVELLERI

Project : Sg.PahangChenorBridge Client  : VSLENGINEERING(M)SDN.BHD. Scopeofwork: Fabrication,ErectionandCommissioningFormTraveller.

Site Erection

ICOLUMNSTEELMOULDI

Project : KualaLumpur,PutrajayaHighway Client  : LEIGHTONCONTRACTORS(M)SDN.BHD. Scopeofwork: Fabrication&deliveryofColumnSteelMould.

I35I SLEI SDN. BHD. COMPLETEDPROJECTPHOTOS I38I IULRSFRAME&CRANEWHEELSI

Project : MetroLine4,SantiagoDeChile Client  : VSLSINGAPOREPTELTD Scopeofwork: FabricationULRSSteelFrameandCraneWheels.

Antivandalism Tube

Project : BridgeOverSg.Prai Client  : FREYSSINET—APTOJOINTVENTURE Scopeofwork: FabricationSegmentCarriage,RailBeamandAntivandalismTube.

ISEGMENTCARRIAGE&RAILBEAMI

NewRail

SegmentCarriage

Fitting and welding in progress.

I37I SLEI SDN. BHD. COMPLETEDPROJECTPHOTOS I40I IDEͲSTRESSINGDEVICEDECKANCHORAGEUPPERCROSSBEAMI

Project : SW9StayReplacement,PenangBridge Client  : PSCͲFREYSSINETͲFREYSSINETAPTOJOINTVENTURE Scopeofwork: FabricationDeͲStressingDevice,DeckAnchorageUpperCrossBeam,   DeckLowerReactionCrossbeam,AntivandalismTube.

AntivandalismTube DeckAnchorageUpperCrossBeam PaintingInprogress.

Project : SunwayLagoon,PlayStructure Client  : SimLeisureConsultantsSdn.Bhd. Scopeofwork: FabricationanderectionMildSteelPlayStructureandInstallation OfPlayElements

IPLAYSTRUCTUREIPLAYELEMENTSI

DeͲStressingDevice I39I SLEI SDN. BHD. COMPLETEDPROJECTPHOTOS I42I ICLIMBINGTOWERSTEELSTRUCTUREI

In house Project : ShahAlamExtremePark fabrication. Client  : StretchmarkAsiaSdn.Bhd. Scopeofwork: FabricationandErectionofClimbingSteel.   Structure&Roofing.

Structure cover with Panel

Structureoverview.

Site Erection.

Project : BridgetoKeppelIsland,Singapore Client  : VSLSingaporePte.Ltd. Scopeofwork: FabricationSegmentLiftingSystem,Pylon&GuidePipe.

ISEGMENTLIFTINGSYSTEMI Loadingontraileratwarehouse. I41I SLEI SDN. BHD. COMPLETEDPROJECTPHOTOS I44I

Project : DubaiSpecialGantry Client  : FREYSSINET—APTOJOINTVENTURE Scopeofwork: FabricationNewRail&Accessories,ModificationofGantryElements.

IDUBAISPECIALGANTRYI

I43I SLEI SDN. BHD. COMPLETEDPROJECTPHOTOS I46I

MPITestonPier Bracket&InternalStrut.

InternalStrut

StressingGondola,AtSite ISTEELSTRUCTUREFORS.K.LI

Project : SubangKelanaLink Client  : VSLEngineers(M)Sdn.Bhd. Scopeofwork: FabricationSteelStructuresuchas StressingGondola,WorkingPlatform, PierBracket,InternalStrut. StressingGondola

PierBracket

PortableStair

SLEI SDN. BHD. I45I WorkingPlatform LoadingAtOurStorageYard. COMPLETEDPROJECTPHOTOS I48I

IMININGEQUIPMENTI

Project : MonthlyProduction Client  : LinatexRubberProductSdn.Bhd. Scopeof : Fabrication&manufacturingsteelpartsas Work  miningequipment&spareparts.

Vibrationscreen—varioussizes.

GenesisCyclone—varioussizes.

Classifier SplitSump

I47I SLEI SDN. BHD. COMPLETEDPROJECTPHOTOS I50I

IMOBILECRUSHERCHASSIS&RADIARSTACKERI

Project : MonthlyProduction Client  : StrikerCrushing&ScreeningSdn.Bhd. Scopeofwork: Fabrication&manufacturingsteelpartsforMobile Crusher&RadiarStacker

MobileCrusherTrialAssembly.

Impactor

RecyclingScreen. RadiarStacker—15M,18Mand24M.

I49I SLEI SDN. BHD. COMPLETEDPROJECTPHOTOS I52I

IPRECASTSEGMENTALSTEELMOULDI

Project : FlyoverDewanBandarayaHangTuah(DBHT) Client  : PROJALMASDN.BHD. Scopeofwork: FabricationprecastsegmentsteelmouldsuchasBulkhead,   WingForm,InnerCore,Trolley,StructureSupportand  Accessories.

Project : GerbangSelatanBersepaduan,Johor Client  : PROJALMASDN.BHD. Scopeofwork: FabricationprecastsegmentsteelmouldsuchasBulkhead,   WingForm,InnerCore,Trolley,StructureSupportand  Accessories.

IPRECASTSEGMENTALSTEELMOULDI

Precast Column Mould I51I SLEI SDN. BHD. COMPLETEDPROJECTPHOTOS I54I ILIFTINGSTRUCTUREIRAILBEAMIWORKINGPLATFORMI

Lifting Structure

Project : PenangBridgeReplacementStay Client  : FREYSSINETPSC—FREYSSINETAPTOJOINTVENTURE Scopeofwork: FabricationLiftingStructure,RailBeam,andWorkingPlatform.

Trolley Frame

Working Platform Install on Bridge Pylon. I53I Coring Pipes. Coring Machine Clamp Frame SLEI SDN. BHD. COMPLETEDPROJECTPHOTOS I56I Trussesfittedtothe ICLIMBINGSTRUCTUREI wallbyChemical AnchorBolts. Project : Putrajaya,ChallengePark Client  : STRETCHMARKASIASDN.BHD. Scopeofwork: FabricationandErectionofClimbingSteelStructure.

Completedclimbing walloverview.

QualityInspection.

I55I SLEI SDN. BHD. COMPLETEDPROJECTPHOTOS I58I ICLIMBINGTOWERSTEELSTRUCTUREI ISKATEPARKOBSTACLES—STEELFRAMEWORKI

In house Project : OutwardBound,Lumut,Perak. fabrication. Project : ChallengePark,Putrajaya Client  : StretchmarkAsiaSdn.Bhd. Client  : StretchmarkAsiaSdn.Bhd. Scopeofwork: FabricationandErectionofIndoorClimbing Scopeofwork: Fabrication and delivery Skate Park steel Steelstructure. framework.

Structure cover with Panel

SteelStructurefabricationinprogress.

Project : BorderX,Singapore Client  : StretchmarkAsiaSdn.Bhd. Scopeofwork: FabricationanddeliverySteelStaircase&Platform.

ISTAIRCASE&PLATFORMI Indoor—siteinstallation I57I SLEI SDN. BHD. COMPLETEDPROJECTPHOTOS I60I

Siteinstallationworksinprogress.

Project : TheReplacementofSitraBridge,Bahrain Client  : GAMUDABERHAD(BAHRAIN) Scopeofwork: Fabrication&deliveryWingFormworkandaccessories.

IEXTERNALFORMWORKI

Packingintocontainer. Fabricationworks. TrialAssemblyatworkshop.

I59I SLEI SDN. BHD. COMPLETEDPROJECTPHOTOS I6 I

IUMMOULDITMOULDIMMOULDIREACTIONBEAMI

Pro ect  o b e rack   recast ar  ient   MDCPRECASTINDUSTRIESSDN.BHD. co eo work    abrication tee  o    eaction ea . Pro ect  ni ersa  t io  inga ore ient   SIMLEISURECONSULTANTSSDN.BHD. co eo work    abrication tee  arts  str ct ra  works.

ISTEELWORKS&STRUCTUREI

eaction ea 

I6 I SLEI SDN. BHD. Ͳ o  COMPLETEDPROJECTPHOTOS I6 I

Project : IkeaHandelWareHouse Client  : SINARSELASEHSDN.BHD. Scopeof : Supply, fabrication & Erection of Ware HouseSteelStructure. 

FabricationIn rogress.

 ISTEELSTRUCTUREI

ite rectionworks.

on s inkgro t. I6 I SLEI SDN. BHD. COMPLETEDPROJECTPHOTOS I66I IHEATINGTANKIQUENCHTANKISTRUCTURESTEELI IOFFSHORECONTROLVANCONTAINERICABLEWINCHI

Project : TIGERCASTINGFOUNDRY Project : OffshoreEquipment Client  : TigerCastingSolutionSdn.Bhd. Client  : SearieSdn.Bhd. Scopeofwork: FabricationandInstallationofStructure Scopeofwork: FabricationanddeliveryOffshoreEquipment Steel,tankandequipmentforcastingIndus trial.

Mezzanine Floor ControlVanContainer

HoldingTank

Heating Tank with swing door HydraulicBoom QuenchTank

SwingArmGrinder

Heating Tank with slide door Winch I65I SLEI SDN. BHD. COMPLETEDPROJECTPHOTOS I68I IRDDamperCap

GuidePipe

Loadinginprogress

SafeLineSwitcher

SafetyTrolley Project : PortmannBridge,Canada ISTEELPART&EQUIPMENTFORHIGHROPECOURSEI Client  : FreyssinetCanadaLimitee Scopeofwork: SupplyandFabricationhardwareforcablestaybridge. Project : HighRopeCourseandPlayGround Client  : AdventureRopeSdn.Bhd. IIRDGUIDETUBEI Scopeofwork: Fabrication&deliverySteelParts.

Project : GoldenHornBridge,Russia ISTEELPART&BRACKETFORADVENTUREPLAYGROUNDI Client  : FreyssinetInternational&CIE Scopeofwork: SupplyandFabricationhardwareforcablestaybridge.

Packingin Progress. SeeSawBracket DrumPipe

BalanceBeam Fabricationin progress

Hot—DipGalvanizedBracket

StainlessSteelTunnel

StainlessSteelSlide Loadingin I67I progress SLEI SDN. BHD. COMPLETEDPROJECTPHOTOS I70I

ISTEELSTRUCTUREI

Project : BCPlaceStatium,VancouverCanada Client  : FreyssinetCanadaLimitee Scopeofwork: Supply & fabrication temporary steel structure for the stadiumretractableroofinstallation.

NDTtestinprogress

Partsfabricationinprogress

Loadinginprogress I69I SLEI SDN. BHD. COMPLETEDPROJECTPHOTOS I72I

Fabricationinprogress.

 IFORMTRAVELLERI

SitePhotos.

SitePhotos

PartsforFormTraveller.

Project : MembinaLebuhrayaPesisirPantaiDariJohorBahruKeNusajaya RiverBridgeNo.2—Sg.Skudai/Sg.Danga Client  : VSLENGINEERS(M)SDN.BHD. Scopeofwork: Supply,fabrication&Commisioning4pairsofFormworkTraveller. 

I71I SLEI SDN. BHD. COMPLETEDPROJECTPHOTOS I74I

ISTEELSTRUCTUREI

CompletionPhotos.

Fabricationinprogress

Project : DeautoIndustriesWareHouse. Client  : KAYANGANKEMASSDN.BHD. Scopeofwork: Supply,fabricationandInstallationSteelStructure Building.

SiteInstallation.

I73I SLEI SDN. BHD. COMPLETEDPROJECTPHOTOS I76I

IPRECASTSEGMENTMOULDI

Project : GreenfieldBridgeAcrossTheRiverGanges,India. Client  : VSLINDIAPVT.LTD. Scopeofwork: Supply,fabrication&deliveryPrecastSegmentMouldTypePier.

TrialAssembly.

I75I SLEI SDN. BHD. COMPLETEDPROJECTPHOTOS I78I ISTRUCTURESTEELI

Project : THECONSOLENERGYWINGTIPBRIDGE,USA Client  : FREYSSINETINTERNATIONAL&CIE Scopeofwork: FabricationandtrialassemblyofStructure SteelforTheConsolEnergyWingTipBridge.

Trialassemblyinprogress. Siteerectioncompletephotos.

SandBlasting&Painting.

Packing&Loading.

MachiningInProgress.

FabricationInProgress. I77I SLEI SDN. BHD. COMPLETEDPROJECTPHOTOS I80I

MachiningItems.

FrontSupportSubͲFrameTrialAssembly.

IGANTRYBOXGIRDERI

Project : BridgeAlongKingFaisalRoad,Dammam Client  : FreyssinetInternational&CIE Scopeofwork: ModifyandfabricationGantryParts.

FinishingandPacking.

Modificationworksandtrialassemblyallthesplicejoint.

I79I SLEI SDN. BHD. COMPLETEDPROJECTPHOTOS I82I

ILAUNCHINGGANTRYI

Project : KLANGVALLEYMRTPROJECT,MALAYSIA Client  : VSLENGINEERS(M)SDN.BHD. Scopeofwork: Supply,fabricationanddeliveryLaunchingGantry(8sets)

Fabricationinprogress.

MachiningItems. I81I SLEI SDN. BHD. COMPLETEDPROJECTPHOTOS I84I ISEGMENTALBOXGIRDER(SBG)STEELMOULDI

Innercorearm&hydraulicoperationtrialtestatfactory.

Bulkheadshearkey.

FabricationInProgress.

Project : MASSRAPIDTRANSIT(MRT)KLANGVALLEY(SG.BULOH~KAJANG) Client  : EASTERNPRETECH(MALAYSIA)SDN.BHD. Scopeofwork: Fabrication,deliver&commissioning4setsSBGsteelmouldinclude hydraulicsystem.

MechanicalpartsͲTurnbuckle Onsitesetup.

50tonssingleactingjackmachininginprogress.

Innerform&hydraulicoperationonSitesetup.

RebarJigonSitesetup. I83I SLEI SDN. BHD. COMPLETEDPROJECTPHOTOS I86I

Casingpipeforsitepilingworks.

StudweldingonIGirderBeam.

Fabricationinprogress.

  ISTEELGIRDERBRIDGEI

Project : Construction3nosofBridges,Kapit,Sarawak Client  : UNTANGJAYASDN.BHD. Scopeofwork: Construction&Completion3nosofBridgesAlongThe ProposedRumahKuta/UgaptoSKRantauPanjaiRoad ProjectCrossingatSg.Entajum,Sg.Sebunut&Sg.Plak, Kapit,Sarawak.

Siteinstallationworks

Sandblast&paintingInprogress.

I85I SLEI SDN. BHD. COMPLETEDPROJECTPHOTOS I88I

ICONCRETEMIXERI

Project : CONCRETEMIXER Client  : DEAUTOINDUSTRIESSDN.BHD. Scopeofwork: Supply,fabricationanddelivery12M³ConcreteMixer

Hydraulicpartsinstallationinprogress.

Assemblyinprogress.

Fabricationinprogress.

Paintinginprogress.

Loadingontrailerfordelivery. I87I SLEI SDN. BHD. COMPLETEDPROJECTPHOTOS I90I ISTEELSTRUCTUREFORFAÇADEI

Project : LEGOLANDWATERTHEMEPARK Client  : STRIKETHEMING&LEISURE Scopeofwork: Design,fabrication,delivery&installationfortheback supportstructureforfaçade,entryarchandcanopyin FabricationinProgress LegolandWaterThemepark.

TrialAssembly.

Project : LEGOLANDTHEMEPARK Client  : SIMLEISURECONSULTANTSSDN.BHD. Scopeofwork: Design,fabrication,deliveryforthebacksupport structureforPlazaEntryFeatureinLegolandThemepark. 

Fabricationworksinprogress.

SiteInstallationworks. TheEntryFeaureofLegolandMalaysia TheEntryFeaureofLandofAdventure I89I SLEI SDN. BHD. COMPLETEDPROJECTPHOTOS I92I

Project : DESAPARK Client  : ADVENTUREROPESDN.BHD. Scopeofwork: Design,fabricationanddeliverysteelpartsfor RecreationParkwalkwayandbalustrades.

IRECREATIONPARKI ICANOPYTOUR/CLIFFWALKI

Project : SUNWAYLAGOONEXTENSION Client  : ADVENTUREROPESDN.BHD. Scopeofwork: Design,fabricationanddeliverysteelpartsfor walkwayandbalustrades.

Trialassembly.

StainlessSteelBracket.

Fabricationinprogress. I91I SLEI SDN. BHD.

Fabricationinprogress. COMPLETEDPROJECTPHOTOS I94I

IMRTSTATIONCOLUMNMOULDI

Project : MRTTUASWESTEXTENSION,SINGAPORE Client  : ENGLEEENGINEERINGPTE.LTD. Scopeofwork: Supply,fabricationanddeliveryMRTstationcolumnmould.

Tapershapecolumnmould.

IINͲSITUPIERMOULDI

Fabricationinprogress. Project : KLANGVALLEYMRTPROJECTV1,MALAYSIA Client  : GABUNGANSTRATEGIKSDN.BHD. Typicalcolumnmould. Scopeofwork: Supply,fabricationanddeliveryMD4piermould.

I93I SLEI SDN. BHD. COMPLETEDPROJECTPHOTOS I96I ISTRUCTURALSTEELWORKI

Project : StructuralSteelWorks,CanopyandMetalCladding WorksforProposedNewWarehouse.Kuching,Sarawak. Client  : INFOREKASDN.BHD. Scopeofwork: Fabrication, delivery and installation steel structure & metalroofingwork.

KK3MainBuilding.

Project : KlinikKesihatan3(KK3)&Kuaters,SibuJaya,Sibu,Sarawak Client  : JKRSarawak Scopeofwork: Turnkeyconstructioncivilstructure&building.

IBUILDINGCONSTRUCTIONI

KK35storeyskuarters.

I95I SLEI SDN. BHD. COMPLETEDPROJECTPHOTOS I98I

Fabricationinprogress. GiantRobotsupportstructure. Project : IOICITYMALL,DISTRICT21 Client  : STRETCHMARKSASIASDN.BHD. Scopeofwork: Design, fabrication and delivery artistic steel work&structure. Project : IOICITYMALL,DISTRICT21 Client  : ADVENTUREROPESDN.BHD. Scopeofwork: Design,fabricationanddeliverysteelpartsfor IARTISTICSTEELWORKI SkyTrail&ColumnPlatform.

Birdcage FishCage Landing&Support

SkyTrail&Obstacle.

I97I SLEI SDN. BHD. COMPLETEDPROJECTPHOTOS I100I

IPRECASTSEGMENTALSTEELMOULDI

Project : M41PEKERJAANDEDRUASJALANLAYANGANTASARIͲBLOCKM,INDONESIA Client  : PROJALMASDN.BHD. Scopeofwork: Supply,fabrication,deliveryprecastsegmentalsteelmould.

STEELMOULDTRIALASSEMBLY LEFT/RIGHTTRZTHREADFORTURNBUCKLE

STEELMOULDTRIALASSEMBLY SINGLEACTINGJACK

REBARJIGTRIALASSEMBLY REBARJIGTRIALASSEMBLY

I99I SLEI SDN. BHD. SLEI SDN. BHD. No. Plot 83 Jalan Johan 1/2 Kws Perindustrian Pengkalan II 31550 Pusing Perak Darul Ridzuan Malaysia

Tel : 605 - 365 4988 605 - 365 4989 Fax : 605 - 365 4990

E-mail : [email protected] Web : www.slei.com.my