Sungai Pulai Bridge 565 60% 147 CHEC 56.3
Total Page:16
File Type:pdf, Size:1020Kb
MMC CORPORATION BERHAD 1Q FY2021 ANALYST BRIEFING PRESENTATION 27th MAY 2021 TABLE OF CONTENTS Group Financial Performance Overview Ports & Logistics Energy & Utilities Engineering Corporate & Others Group Outlook Industrial Development’s Business Updates MMC CORPORATION BERHAD P A G E 2 GROUP FINANCIAL PERFORMANCE OVERVIEW QUARTERLY GROUP FINANCIAL PERFORMANCE Revenue PBT PATMI (RM million) (RM million) (RM million) 5% YoY 93% YoY 115% YoY 221.0 114.8 124.7 1,086.8 1,143.7 57.9 Q1FY2020 Q1FY2021 Revenue • 5% YoY increase was due to:- ➢ Higher volume handled at Pelabuhan Tanjung Pelepas Sdn Bhd (“PTP”) and Northport Malaysia Berhad (“NMB”) and contribution from Graphite project and Langat Sewerage project by Engineering division. ➢ Offset by lower work progress from KVMRT-SSP Line, lower passenger and cargo volumes at Senai Airport, and lower volume handled at Penang Port Sdn Bhd (“PPSB”). PBT • 93% YoY increase was due to:- ➢ Higher volume handled at PTP and NMB, and strict cost management at all our ports ➢ Higher contribution from Langat Sewerage project ➢ Gain on sublease of land at PTP. ➢ Lower finance cost. ➢ However, offset by lower contribution from KVMRT-SSP Line, Senai Airport and PPSB. MMC CORPORATION BERHAD P A G E 4 Q1FY2021 KEY FINANCIAL HIGHLIGHTS Ports & Logistics Engineering Energy & Utilities Others REVENUE REVENUE REVENUE REVENUE 5% YoY 12.86% 13.33% <1% 69.03% Revenue PBT PBT PBT LBT RM1,143.7 mil 93.38% 18.26% 19.74% 9.99% • Higher volume • Lower work progress • Lower revenue from • Lower passengers handled at from KVMRT-SSP Aliran Ihsan Resources and cargo volume 93% YoY Pelabuhan Tanjung Line due to Berhad (“AIRB”) due handled at Senai Pelepas (“PTP”) and completion of lesser water project, Airport due to the Profit Before Tax Northport (Malaysia) tunnelling works and however, cushioned by COVID-19 (“PBT”) Berhad (“NMB”). impact of COVID-19. increase in treated pandemic. RM221.0 mil water production. • Gain on sublease of • Offset by higher • Offset by lower land at PTP. revenue and • Lower contribution from operating costs and contribution from Malakoff due to lower finance costs due to • Offset by lower Graphite project & contribution from its lower interest rate. 115% YoY volume handled at Langat Sewerage coal plants (TBP & Penang Port Sdn project. TBE) given the decline in applicable coal price. Profit After Tax And Bhd (“PPSB”). Minority Interest • Offset by higher (“PATMI”) contribution from Gas RM124.7 mil Malaysia Berhad (”GMB”) from higher gas volume. MMC CORPORATION BERHAD P A G E 5 BALANCE SHEET AS AT 31 MARCH 2021 Total Assets Total Equity Total Liabilities RM25.79 B RM10.49 B RM15.30 B FY2020: RM26.10 B FY2020: RM10.30 B FY2020: RM15.80 B Deposits, Bank & Total Borrowings Current Ratio Cash Balances and Other Investments RM9.65 B 1.07x RM2.63 B FY2020: RM9.77 B FY2020: 1.09x FY2020: RM2.80 B Net Assets Per Share Gross Gearing Ratio Net Gearing Ratio RM3.18 0.92x 0.89x FY2020: RM3.12 FY2020: 0.95x FY2020: 0.90x MMC CORPORATION BERHAD P A G E 6 PORTS & LOGISTICS PORTS & LOGISTICS : FINANCIAL PERFORMANCE FY2020 vs Q1FY2021 Q1FY21 QUARTERLY Revenue PBT Revenue PBT (RM million) (RM million) (RM million) (RM million) 13% YoY 93% YoY 27.8% 38.9% < 1% QoQ -6% QoQ 3,248 901 904 801 610 904 237 251 237 123 MMC CORPORATION BERHAD P A G E 8 PORTS & LOGISTICS : FINANCIAL PERFORMANCE Operational Statistics Revenue (RM million) PBT (RM million) PATMI (RM million) Port of Tanjung Pelepas Throughput 1Q 2021 Growth (YoY) 13% YoY 93% YoY >100% YoY Container (in mil. TEUs) 2.78 16% Johor Port Berhad 801 904 123 237 67 145 Throughput (in mil. FWT) 1Q 2021 Growth (YoY) Liquid bulk 3.46 12% Dry bulk 5 0.92 -9% Break bulk 93 0.18 6% Total Conventional 6 4.56 7% Container (in mil. TEUs) 0.25 -1% 107 Northport (M) Bhd 228 Throughput (in mil. FWT) 1Q 2021 Growth (YoY) 1 Liquid bulk 0.65 17% 173 Dry bulk 0.64 5% 3 4 Break bulk 0.72 12% 44 153 RORO 0.20 -10% Total Conventional 2.21 9% 153 1 Container (in mil. TEUs) 0.81 26% 37 2 3 Penang Port Sdn Bhd 1 33 14 Throughput (in mil. FWT) 1Q 2021 Growth (YoY) 4 Liquid 0.42 -13% 26 425 40 Dry bulk 0.51 -17% 362 148 10 Break bulk 0.27 -9% 1 Total Conventional 1.20 -14% 26 80 66 Container (in mil. TEUs) 0.34 -7% 32 Tanjung Bruas Port (2) (2) Throughput 1Q 2021 Growth (YoY) Conventional (in mil. FWT) 0.21 -20% Q1FY20 Q1FY21 Q1FY20 Q1FY21 Q1FY20 Q1FY21 Container (in ‘000 TEUs) 4.09 >100% Red Sea Gateway Terminal PTP JPB NCB RSGT PPSB TBP Throughput 1Q 2021 Growth (YoY) Container (in mil. TEUs) 0.76 66% MMC CORPORATION BERHAD P A G E 9 ENERGY & UTILITIES ENERGY & UTILITIES : FINANCIAL PERFORMANCE Revenue PATMI Revenue PATMI (RM million) (RM million) (RM million) (RM million) -24% YoY -33% YoY -28% YoY 17% YoY 1,774 1,606 1,351 1,153 89 60 56 48 Q1FY20 Q1FY21 Q1FY20 Q1FY21 Q1FY20 Q1FY21 Q1FY20 Q1FY21 Revenue PATMI Revenue PATMI Malakoff Gas Malaysia (RM million) (RM million) (RM million) (RM million) YTD 31 March 2020 2021 2020 2021 YTD 31 March 2020 2021 2020 2021 MCB level 1,774 1,351 89 60 GMB level 1,606 1,153 48 56 MMC Portion (37.6%) N/A 27^ 17^ MMC Portion (30.9%) N/A 14 17 ^ After deducting PERPS interest MMC CORPORATION BERHAD P A G E 11 ENERGY & UTILITIES : FINANCIAL PERFORMANCE Q1FY21 YoY Growth Revenue (RM mil) 6.2 <1% PBT (RM mil) 0.5 46.2% Treated water volume: • Water treatment 15.0 2.4% plants (million m3) • Recycling plants 0.6 78.5% (million m3) Operational / Financials / Financials Operational ▪ Venturing into commercial and industrial business segment of water reclamation/ recycling wastewater. ▪ Entry into Non-Revenue Water (NRW) projects - Project in Johor Port has showcased AIRB’s Key Focus Key capabilities and expertise in successfully delivering NRW projects. MMC CORPORATION BERHAD P A G E 12 ENGINEERING ENGINEERING : FINANCIAL PERFORMANCE FY2020 vs Q1FY21 Q1FY21 QUARTERLY Revenue PBT Revenue PBT (RM million) (RM million) (RM million) (RM million) 20% 16% -13% YoY -18% YoY -35% QoQ -66% QoQ 1,146 350 229 319 264 229 146 50 61 50 MMC CORPORATION BERHAD P A G E 14 ENGINEERING : ORDER BOOK Outstanding Order book of RM2.26 Billion as at 31 March 2021 Calendar Year Total MMC’s 2021 2022 2023 Contract MMC’s Outstanding JV Overall # Project Value Portion Order Book Partner Progress (RM mil) (RM mil) Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 MRT Line 2 : Sg. Buloh - Serdang - Putrajaya (38.7km) - 1 17,420 50% 946 Gamuda 88.7% Overall (Elevated, Underground & System) MRT Line 2 : Sg. Buloh - 2 Serdang – Putrajaya (13.5 km) 13,110 50% 895 Gamuda 85.9% - Underground Works Langat Sewerage Project 3 1,505 100% 107 - 93.8% (MMC PLSB) 4 Sungai Pulai Bridge 565 60% 147 CHEC 56.3 5 PGU-I Gas Pipeline 131 100% 80 - 35% Langat 2 Water Treatment 6 994 50% 23 Salcon 100% Plant* 7 Other projects 151 100% 59 - - TOTAL 33,876 2,257 We are here 6) Completed on August 2020, currently pending for EOT,CPC and final claims. 7) Other projects: Rehabilitation works of Container Terminal Yard and ancillary works at Johor Port Berhad, Development of New Container Yard for the purpose of laden & empty containers at JPB, Design & Build contractor for the proposed arrival hall expansion and construction of new passenger holding lounge for Senai International Airport and Proposed Development of 3 Single-Storey Warehouse at NDSB 2 Logistics Hub for Northport (M) Berhad, Design and Build for the Proposed 50 meter extension jetty and associated works at Tanjung Bruas Port, Redevelopment Project of Swettenham Pier Cruise Terminal. MMC CORPORATION BERHAD P A G E 15 ENGINEERING : COMPLETED PROJECTS Undeterred Commitment in Delivering Value to Client Completed Project 13 August 2020 Langat 2 Water Treatment Plant MMC CORPORATION BERHAD P A G E 16 ENGINEERING : COMPLETED PROJECT (cont’d) Undeterred Commitment in Delivering Value to Client Completed Project 28 October 2020 North Butterworth Container Terminal MMC CORPORATION BERHAD P A G E 17 ENGINEERING : ON-TRACK PROJECT Ongoing Project Target Completion by 2021 Langat Sewerage Project MMC CORPORATION BERHAD P A G E 18 ENGINEERING Ongoing Projects Package Phase 1(A) I - Design And Build For The Proposed Bridge Crossing Sungai Pulai And Link Proposed 50 Meter Extension Jetty And Associated Road from Pelabuhan Tanjung Pelepas To Tanjung Works At Tanjung Bruas Port, Melaka Bin, Mukim Air Masin And Sungai Karang, Progress : 36.51% Progress : 59.07% Sequence 1 - Installation of rebar Piling work for raker pile in progress. Bridge 3 Pier 25 crosshead is in Bridge 3 overall river side (Pier for pile plug. progress. 14 until Pier 27). The Proposed Arrival Hall Expansion and Engineering, Procurement, Construction and Construction of New Passenger Holding Lounge Commissioning (EPCC) Of PGU-1 Gas Pipeline for Senai International Airport (SATEXP) Replacement Project (GRAPHITE) Progress : 53.88% Progress : 39.63% Jacking Pit Construction Pipe Welding 1st Layer External Plaster Final Layer External Plaster MMC CORPORATION BERHAD P A G E 19 CORPORATE & OTHERS CORPORATE & OTHERS : FINANCIAL PERFORMANCE FY2020 vs Q1FY21 Q1FY21 QUARTERLY Revenue LBT Revenue LBT (RM million) (RM million) (RM million) (RM million) 7% 23% -69.0% YoY 9.9% YoY 74 -86.1% QoQ 33.8% QoQ 36 16 5 5 -111 -100 -100 -151 -437 Lower Revenue and lower LBT due to: • Lower passengers and cargo volume handled at Senai Airport due to the COVID-19 pandemic.