Air Carrier Capital Outlay Federal Item Airport Project Description Funds State Match Local/Other Total Funds
1 LAFAYETTE REGIONAL AIRPORT Relocate Runway Threshold & Safety Area Improvements $3,789,473.00 $421,053.00 $0.00 $4,210,526.00 with EMAS - Phase IV
2 LAFAYETTE REGIONAL AIRPORT Relocate Runway Threshold & Safety Area Improvements $3,789,473.00 $421,053.00 $0.00 $4,210,526.00 with EMAS - Phase V
3 BATON ROUGE METROPOLITAN ARFF Vehicle $617,975.00 $68,664.00 $0.00 $686,639.00 AIRPORT
4 LAKE CHARLES REGIONAL Purchase ARFF Equipment $50,000.00 $2,632.00 $0.00 $52,632.00 AIRPORT
5 ALEXANDRIA INTERNATIONAL Runway 18 Obstacle Removal $95,356.00 $10,595.00 $0.00 $105,951.00 AIRPORT
6 ALEXANDRIA INTERNATIONAL Runway 14 Obstacle Removal - Phase II $88,762.00 $9,862.00 $0.00 $98,624.00 AIRPORT
7 ALEXANDRIA INTERNATIONAL ARFF Vehicle $665,000.00 $73,889.00 $0.00 $738,889.00 AIRPORT
8 BATON ROUGE METROPOLITAN Construct Hangar $0.00 $455,556.00 $4,100,000.00 $4,555,556.00 AIRPORT
9 BATON ROUGE METROPOLITAN Box Culvert Landside $0.00 $518,889.00 $4,670,000.00 $5,188,889.00 AIRPORT
10 SHREVEPORT REGIONAL Construct Cargo Facility $0.00 $1,100,000.00 $9,900,000.00 $11,000,000.00 AIRPORT
11 LAKE CHARLES REGIONAL Extend Runway 15/33 (Design) $0.00 $450,000.00 $0.00 $450,000.00 AIRPORT
Friday, March 20, 2009 Air Carrier Capital Outlay Page 1 of 10 Aviation Priority Program 2009-2010
Air Carrier Capital Outlay Federal Item Airport Project Description Funds State Match Local/Other Total Funds
12 BATON ROUGE METROPOLITAN Runway 4R/22L Runway Reconstruction $7,738,500.00 $859,833.00 $0.00 $8,598,333.00 AIRPORT
13 SHREVEPORT REGIONAL Rehabilitate Runway 14/32 & Taxiway A South $6,650,000.00 $350,000.00 $0.00 $7,000,000.00 AIRPORT
14 BATON ROUGE METROPOLITAN Complete Airfield Drainage Improvements $5,016,000.00 $557,333.00 $0.00 $5,573,333.00 AIRPORT
15 BATON ROUGE METROPOLITAN Reconstruct Runway 13/31 Phase III - (LOI Projects as $7,400,000.00 $389,474.00 $0.00 $7,789,474.00 AIRPORT Approved by the FAA) Payment 2 for 2009
16 BATON ROUGE METROPOLITAN North General Aviation Development - Rehabilitate $0.00 $2,403,000.00 $0.00 $2,403,000.00 AIRPORT Taxiway "M" Phase I
17 BATON ROUGE METROPOLITAN ARFF Building Renovations and Expansion $2,849,050.00 $316,561.00 $0.00 $3,165,611.00 AIRPORT
18 SHREVEPORT REGIONAL Rehabilitate Taxiway "A" Lighting - Phase I (Design) $85,500.00 $9,500.00 $0.00 $95,000.00 AIRPORT
19 BATON ROUGE METROPOLITAN Construct Runway 22R & 4L Safety Area and Perimeter $3,230,000.00 $170,000.00 $0.00 $3,400,000.00 AIRPORT Road
20 LAFAYETTE REGIONAL AIRPORT North General Aviation Apron - Phase I $3,156,348.00 $350,705.00 $0.00 $3,507,053.00
21 BATON ROUGE METROPOLITAN Acquire 2 Runway Sweepers $0.00 $247,000.00 $0.00 $247,000.00 AIRPORT
22 LAFAYETTE REGIONAL AIRPORT Terminal Modifications to Accommodate Bulk EDS $0.00 $2,000,000.00 $0.00 $2,000,000.00 Equipment
Friday, March 20, 2009 Air Carrier Capital Outlay Page 2 of 10 Aviation Priority Program 2009-2010
Air Carrier Capital Outlay Federal Item Airport Project Description Funds State Match Local/Other Total Funds
23 ALEXANDRIA INTERNATIONAL Extend Runway 14/32 - Phase I $0.00 $3,000,000.00 $0.00 $3,000,000.00 AIRPORT
24 LAKE CHARLES REGIONAL Terminal Access Road $570,000.00 $74,444.00 $400,000.00 $1,044,444.00 AIRPORT
25 MONROE REGIONAL AIRPORT Terminal Building (Construction) - Phase III $5,000,000.00 $263,158.00 $0.00 $5,263,158.00
26 ALEXANDRIA INTERNATIONAL ATC Tower Emergency Transceiver $18,770.00 $2,086.00 $0.00 $20,856.00 AIRPORT
27 SHREVEPORT REGIONAL Construct Taxiway "E" $3,040,000.00 $337,778.00 $0.00 $3,377,778.00 AIRPORT
28 LAKE CHARLES REGIONAL Construct South GA Apron/Ramp $0.00 $1,500,000.00 $0.00 $1,500,000.00 AIRPORT
29 ALEXANDRIA INTERNATIONAL Part 150 Noise Mitigation Program - Phase II $6,000,000.00 $315,789.00 $0.00 $6,315,789.00 AIRPORT
30 BATON ROUGE METROPOLITAN Construct Air Cargo Building $0.00 $466,667.00 $4,200,000.00 $4,666,667.00 AIRPORT
31 SHREVEPORT REGIONAL Acquire Land for Noise Compatibility $3,000,000.00 $157,895.00 $0.00 $3,157,895.00 AIRPORT
32 SHREVEPORT REGIONAL Update Airport Master Plan $570,000.00 $63,333.00 $0.00 $633,333.00 AIRPORT
33 BATON ROUGE METROPOLITAN Reconstruct Access Road to East General Aviation Area $0.00 $350,000.00 $0.00 $350,000.00 AIRPORT
Friday, March 20, 2009 Air Carrier Capital Outlay Page 3 of 10 Aviation Priority Program 2009-2010
Air Carrier Capital Outlay Federal Item Airport Project Description Funds State Match Local/Other Total Funds
34 ALEXANDRIA INTERNATIONAL Runway Sweeper $128,393.00 $14,266.00 $0.00 $142,659.00 AIRPORT
35 ALEXANDRIA INTERNATIONAL Relocate Fuel Farm $5,500,000.00 $611,111.00 $0.00 $6,111,111.00 AIRPORT
Air Carrier Capital Outlay Totals $69,048,600.00 $18,342,126.00 $23,270,000.00 $110,660,726.00
Friday, March 20, 2009 Air Carrier Capital Outlay Page 4 of 10 Aviation Priority Program 2009-2010
General Aviation Capital Outlay Federal Item Airport Project Description Funds State Match Local/Other Total Funds
1 SHREVEPORT DOWNTOWN Improve End of Runway 23 Safety Area $190,000.00 $21,111.00 $0.00 $211,111.00 AIRPORT
2 SLIDELL AIRPORT Overlay Runway 18/36 $1,425,000.00 $75,000.00 $0.00 $1,500,000.00
3 GEORGE R. CARR MEMORIAL Runway 18 Safety Area - Phase IV and Land Acquisition $2,200,000.00 $244,444.00 $0.00 $2,444,444.00 AIRPORT for Parallel Taxiway
4 CHENNAULT INTERNATIONAL Construct Emergency Vehicle Access Road $0.00 $237,500.00 $0.00 $237,500.00 AIRPORT
5 RUSTON REGIONAL AIRPORT Lower/Reconstruct Parish Road and Reclaim Displaced $506,676.00 $26,667.00 $0.00 $533,343.00 Threshold
6 ACADIANA REGIONAL AIRPORT Purchase New ARFF Vehicle $0.00 $722,264.00 $0.00 $722,264.00
7 ABBEVILLE CHRIS CRUSTA Acquire Land - Taxiway Re-alignment $0.00 $369,444.00 $0.00 $369,444.00 MEMORIAL AIRPORT
8 RUSTON REGIONAL AIRPORT Lower/Reconstruct Parish Road and Reclaim Displaced $850,000.00 $94,444.00 $0.00 $944,444.00 Threshold - Phase II
9 CHENNAULT INTERNATIONAL Acquire Property for RPZ for Runway 15 $0.00 $527,778.00 $0.00 $527,778.00 AIRPORT
10 VIVIAN AIRPORT Improve Runway Safety Area, Remove Obstructions, $315,000.00 $16,579.00 $0.00 $331,579.00 Fencing
11 JONESBORO AIRPORT Phase II Lighting Construction $500,000.00 $26,316.00 $0.00 $526,316.00
Friday, March 20, 2009 General Aviation Capital Outlay Page 5 of 10 Aviation Priority Program 2009-2010
General Aviation Capital Outlay Federal Item Airport Project Description Funds State Match Local/Other Total Funds
12 SHREVEPORT DOWNTOWN Overlay Runway 5/23 (Design) $75,000.00 $8,333.00 $0.00 $83,333.00 AIRPORT
13 HOUMA-TERREBONNE AIRPORT Reconstruct Taxiway B - Phase II $0.00 $345,400.00 $0.00 $345,400.00
14 SHREVEPORT DOWNTOWN Taxiway "F" Lighting $950,000.00 $50,000.00 $0.00 $1,000,000.00 AIRPORT
15 ALLEN PARISH AIRPORT Runway 18 Drainage Improvements (Design) $0.00 $100,000.00 $0.00 $100,000.00
16 HOUMA-TERREBONNE AIRPORT Re-Cable Runway 12/30 and Associated Taxiway Lighting $1,150,728.00 $127,859.00 $0.00 $1,278,587.00
17 HARRY P. WILLIAMS MEMORIAL Taxiway Lighting Rehabilitation & Install Guidance $760,000.00 $84,444.00 $0.00 $844,444.00 AIRPORT Signs - Phase II
18 HARRY P. WILLIAMS MEMORIAL Rehabilitate South GA Apron - Phase II (Design of $0.00 $105,000.00 $0.00 $105,000.00 AIRPORT Remaining Area)
19 ST. JOHN THE BAPTIST PARISH Rehabilitate Lighting System (Runway, PAPIs, REILs & $666,690.00 $35,089.00 $0.00 $701,779.00 AIRPORT New Electrical Vault)
20 LEESVILLE AIRPORT Runway Safety Area Improvements - Phase I (South of $180,000.00 $9,474.00 $0.00 $189,474.00 Apron, West of Runway)
21 MARKSVILLE MUNICIPAL Airfield Lighting Improvements - Design Only $39,347.00 $2,071.00 $0.00 $41,418.00 AIRPORT
22 ACADIANA REGIONAL AIRPORT Perimeter Fencing - Phase V of VI $289,144.00 $32,127.00 $0.00 $321,271.00
23 ACADIANA REGIONAL AIRPORT Perimeter Fencing - Phase VI of VI $175,000.00 $19,444.00 $0.00 $194,444.00
Friday, March 20, 2009 General Aviation Capital Outlay Page 6 of 10 Aviation Priority Program 2009-2010
General Aviation Capital Outlay Federal Item Airport Project Description Funds State Match Local/Other Total Funds
24 JENNINGS AIRPORT Seal Coat and Remark Runway 8/26 and 13/31 $347,105.00 $18,269.00 $0.00 $365,374.00
25 NEW ORLEANS LAKEFRONT Update/Rehabilitate ARFF Station $0.00 $650,000.00 $0.00 $650,000.00 AIRPORT
26 HAMMOND NORTHSHORE Runway 18/36 Pavement Rehab $522,482.00 $27,499.00 $0.00 $549,981.00 REGIONAL AIRPORT
27 HAMMOND NORTHSHORE Taxiway Pavement Rehab $255,378.00 $13,441.00 $0.00 $268,819.00 REGIONAL AIRPORT
28 CHENNAULT INTERNATIONAL Airfield Lighting Rehabilitation - Phase I (Design) $47,500.00 $2,500.00 $0.00 $50,000.00 AIRPORT
29 CONCORDIA PARISH AIRPORT Runway, Taxiway and Apron Seal Coat Rejuvinator and $150,000.00 $7,895.00 $0.00 $157,895.00 crack Sealing
30 UNION PARISH AIRPORT Rehab Airfield Lighting and Windcone $475,000.00 $52,778.00 $0.00 $527,778.00
31 NEW ORLEANS LAKEFRONT Seal Coat and Crack Seal Taxiway "B" $446,211.00 $49,579.00 $0.00 $495,790.00 AIRPORT
32 MARKSVILLE MUNICIPAL Construct Partial Parallel Taxiway - Phase III $660,000.00 $34,737.00 $0.00 $694,737.00 AIRPORT
33 JENA AIRPORT Rehabilitate Apron, PHASE I $250,000.00 $27,778.00 $0.00 $277,778.00
34 BEAUREGARD REGIONAL Install Glideslope and DME for ILS 36 $427,500.00 $47,500.00 $0.00 $475,000.00 AIRPORT
Friday, March 20, 2009 General Aviation Capital Outlay Page 7 of 10 Aviation Priority Program 2009-2010
General Aviation Capital Outlay Federal Item Airport Project Description Funds State Match Local/Other Total Funds
35 DE QUINCY INDUSTRIAL Rehabilitate Parallel Taxiway, Connector Taxiways and $315,400.00 $35,044.00 $0.00 $350,444.00 AIRPARK South Apron
36 JONESVILLE MUNICIPAL Engineering Taxiway/Apron Rehab $45,000.00 $2,368.00 $0.00 $47,368.00 AIRPORT
37 FALSE RIVER REGIONAL Construct T-Hangars and Corporate Hangar $450,000.00 $23,684.00 $0.00 $473,684.00 AIRPORT
38 ABBEVILLE CHRIS CRUSTA Improve Airfield Drainage $356,250.00 $18,750.00 $0.00 $375,000.00 MEMORIAL AIRPORT
39 JOHN H.HOOKS JR. MEMORIAL Install Perimeter Fencing $420,000.00 $22,105.00 $0.00 $442,105.00
40 JONESBORO AIRPORT Perimeter Fence $0.00 $450,000.00 $0.00 $450,000.00
41 ABBEVILLE CHRIS CRUSTA Install Security/Perimeter Fencing $356,250.00 $18,750.00 $0.00 $375,000.00 MEMORIAL AIRPORT
42 MOREHOUSE MEMORIAL Install Perimeter Fencing $356,333.00 $18,754.00 $0.00 $375,087.00 AIRPORT
43 MINDEN AIRPORT Engineering Services for Phase II, Aircraft Parking Apron $623,250.00 $32,803.00 $0.00 $656,053.00 and connector Taxiway, DBE update, Phase I enviromental Assesment Update, Topo, Appraisal(s) update and Perimeter Fencing of Aquired Land, Aquire Land
44 ALLEN PARISH AIRPORT Construct South Parallel Taxiway - Phase I $150,000.00 $7,895.00 $0.00 $157,895.00
45 LOUISIANA REGIONAL AIRPORT Land Acquisition for Future Terminal Area Expansion $0.00 $704,000.00 $0.00 $704,000.00
Friday, March 20, 2009 General Aviation Capital Outlay Page 8 of 10 Aviation Priority Program 2009-2010
General Aviation Capital Outlay Federal Item Airport Project Description Funds State Match Local/Other Total Funds
46 SPRINGHILL AIRPORT Update Exhibit "A", ALP, and Narrative $65,550.00 $3,450.00 $0.00 $69,000.00
47 MOREHOUSE MEMORIAL Update ALP with Narrative $50,000.00 $5,556.00 $0.00 $55,556.00 AIRPORT
48 DE QUINCY INDUSTRIAL Overlay Midfield Apron $171,000.00 $19,000.00 $0.00 $190,000.00 AIRPARK
49 EUNICE AIRPORT Update Airport Layout Plan $40,500.00 $4,500.00 $0.00 $45,000.00
50 HAMMOND NORTHSHORE Rehab Runway 13/31- Phase II $530,000.00 $58,889.00 $0.00 $588,889.00 REGIONAL AIRPORT
51 CONCORDIA PARISH AIRPORT South Apron Rehabilitate (Design Only) $60,000.00 $6,667.00 $0.00 $66,667.00
52 JENA AIRPORT Runway Lighting Rehabilitation & Stationary Type $0.00 $500,000.00 $0.00 $500,000.00 Emergency Generator
53 SPRINGHILL AIRPORT Install Perimeter Fence $444,379.00 $49,375.00 $0.00 $493,754.00
54 VIVIAN AIRPORT Rehabilitate Runway 9-27 Design Only $76,000.00 $8,444.00 $0.00 $84,444.00
55 JONESVILLE MUNICIPAL Runway Lighting Rehabilitation & Stationary Type $0.00 $500,000.00 $0.00 $500,000.00 AIRPORT Emergency Generator
General Aviation Capital Outlay Totals $18,363,673.00 $6,702,798.00 $0.00 $25,066,471.00
Friday, March 20, 2009 General Aviation Capital Outlay Page 9 of 10 Aviation Priority Program 2009-2010
General Aviation Capital Outlay Federal Item Airport Project Description Funds State Match Local/Other Total Funds
Total AC / GA Funded $ 25,044,924 NAVAIDS Program $ 975,000 Obstruction Removal Safety Program $ 400,000 Statewide Sealcoat Program $ 200,000 Discretionary Program $ 150,000 Planning Program $ 50,000 GA Maintenance Reimbursement Program $ 300,000 GA Economic Development Program $ 900,000 AC Maintenance Reimbursement Program $ 300,000 FAA Future Obligations $ 170,789
2009-2010 AVIATION PRIORITY PROGRAM TOTAL $ 28,490,713
Friday, March 20, 2009 General Aviation Capital Outlay Page 10 of 10 Aviation Requested Program FY 2010-2014
Air Carrier Capital Outlay Federal Item Airport Project Description Funds State Match Local/Other Total Funds 1 LAFAYETTE REGIONAL AIRPORT Relocate Runway Threshold & Safety Area Improvements $3,789,473.00 $421,053.00 $0.00 $4,210,526.00 with EMAS - Phase VI
2 BATON ROUGE METROPOLITAN Entergy Transmission Tower Relocation - Obstruction $8,550,000.00 $950,000.00 $0.00 $9,500,000.00 AIRPORT Removal
3 LAKE CHARLES REGIONAL AIRPORT Runway 5 Land Acquisition and Obstruction Removal $1,000,000.00 $111,111.00 $0.00 $1,111,111.00
4 BATON ROUGE METROPOLITAN Taxiway A Reconstruction - (LOI) $7,400,000.00 $822,222.00 $0.00 $8,222,222.00 AIRPORT
5 BATON ROUGE METROPOLITAN Reconstruct Taxiway "B" - (LOI) $9,000,000.00 $1,000,000.00 $0.00 $10,000,000.00 AIRPORT
6 BATON ROUGE METROPOLITAN Reconstruct Taxiway G and Portion of Taxiway E - (LOI) $2,790,000.00 $310,000.00 $0.00 $3,100,000.00 AIRPORT
7 BATON ROUGE METROPOLITAN Taxiway L Reconstruction - (LOI) $6,400,000.00 $711,111.00 $0.00 $7,111,111.00 AIRPORT
8 BATON ROUGE METROPOLITAN Taxiway "F" Extension from Taxiway "A" to Runway 13 $10,450,000.00 $550,000.00 $0.00 $11,000,000.00 AIRPORT End
9 BATON ROUGE METROPOLITAN Taxiway "F" Reconstruction & Extension $15,494,500.00 $1,721,611.00 $0.00 $17,216,111.00 AIRPORT
10 LAFAYETTE REGIONAL AIRPORT Cargo Apron - Phase II $7,850,000.00 $1,050,000.00 $4,600,000.00 $13,500,000.00
11 ALEXANDRIA INTERNATIONAL Runway Rubber Removal and Striping $630,000.00 $70,000.00 $0.00 $700,000.00 AIRPORT
12 BATON ROUGE METROPOLITAN Runway 4L Drainage & Perimeter Road Improvements $4,200,000.00 $466,667.00 $0.00 $4,666,667.00 AIRPORT
13 ALEXANDRIA INTERNATIONAL Rehabilitate Overrun Area Runway 14/32 $190,000.00 $21,111.00 $0.00 $211,111.00 AIRPORT
14 ALEXANDRIA INTERNATIONAL Land Acquisition for Runway 14 RPZ-Phase II $200,000.00 $22,222.00 $0.00 $222,222.00 AIRPORT
15 ALEXANDRIA INTERNATIONAL Rehabilitate South Ramp $1,900,000.00 $211,111.00 $0.00 $2,111,111.00 AIRPORT
16 ALEXANDRIA INTERNATIONAL North Ramp Rehabilitation $2,200,000.00 $244,444.00 $0.00 $2,444,444.00 AIRPORT Friday, March 20, 2009 Air Carrier Capital Outlay Page 1 of 15 Aviation Requested Program FY 2010-2014
Air Carrier Capital Outlay Federal Item Airport Project Description Funds State Match Local/Other Total Funds 17 ALEXANDRIA INTERNATIONAL Southeast Ramp Rehabilitation $2,375,000.00 $263,889.00 $0.00 $2,638,889.00 AIRPORT
18 SHREVEPORT REGIONAL AIRPORT Rehabilitate Taxiway "A" Lighting - Phase II $294,500.00 $32,722.00 $0.00 $327,222.00
19 ALEXANDRIA INTERNATIONAL Rehabilitate Runway 18/36 $1,425,000.00 $158,333.00 $0.00 $1,583,333.00 AIRPORT
20 ALEXANDRIA INTERNATIONAL Rehabilitate Runway Edge Lights and Cable $450,000.00 $50,000.00 $0.00 $500,000.00 AIRPORT
21 ALEXANDRIA INTERNATIONAL Rehabilitate Overrun Area Runway 18/36 $190,000.00 $21,111.00 $0.00 $211,111.00 AIRPORT
22 LAFAYETTE REGIONAL AIRPORT Rehabilitate Runway 4L/22R $1,638,000.00 $182,000.00 $0.00 $1,820,000.00
23 SHREVEPORT REGIONAL AIRPORT Rehabilitate Runway 5/23 $2,565,000.00 $285,000.00 $0.00 $2,850,000.00
24 BATON ROUGE METROPOLITAN EA for Blount Road Relocation and Runways 4L, 22R, 13, $135,000.00 $15,000.00 $0.00 $150,000.00 AIRPORT and 3
25 ALEXANDRIA INTERNATIONAL Rehabilitate Taxiway "F" $1,092,500.00 $121,389.00 $0.00 $1,213,889.00 AIRPORT
26 LAKE CHARLES REGIONAL AIRPORT Rehabilitate Runway 15/33 - Phase I $500,000.00 $55,556.00 $0.00 $555,556.00
27 ALEXANDRIA INTERNATIONAL Extend Runway 14/32 - Phase II $13,500,000.00 $1,500,000.00 $0.00 $15,000,000.00 AIRPORT
28 LAKE CHARLES REGIONAL AIRPORT Rehabilitate Runway 15/33 - Phase II $1,000,000.00 $111,111.00 $0.00 $1,111,111.00
29 ALEXANDRIA INTERNATIONAL New Aircraft Parking Apron $3,325,000.00 $369,444.00 $0.00 $3,694,444.00 AIRPORT
30 ALEXANDRIA INTERNATIONAL Construct Holding Bay at Runway 36 End $1,900,000.00 $211,111.00 $0.00 $2,111,111.00 AIRPORT
31 LAKE CHARLES REGIONAL AIRPORT Storm Drainage System Rehabilitation (Lincoln Road) $500,000.00 $55,556.00 $0.00 $555,556.00
32 LAFAYETTE REGIONAL AIRPORT Extend Taxiway J (4R/22L) $998,992.00 $110,999.00 $0.00 $1,109,991.00
33 LAKE CHARLES REGIONAL AIRPORT Perimiter Drainage Improvements (Gauthier Road) $500,000.00 $52,778.00 $0.00 $527,778.00
34 ALEXANDRIA INTERNATIONAL Part 150 Noise Mitigation Program - Phase III $4,000,000.00 $444,444.00 $0.00 $4,444,444.00 AIRPORT Friday, March 20, 2009 Air Carrier Capital Outlay Page 2 of 15 Aviation Requested Program FY 2010-2014
Air Carrier Capital Outlay Federal Item Airport Project Description Funds State Match Local/Other Total Funds 35 SHREVEPORT REGIONAL AIRPORT Acquire Land for Noise Compatibility $3,000,000.00 $333,333.00 $0.00 $3,333,333.00
36 SHREVEPORT REGIONAL AIRPORT Acquire Land for Noise Compatibility $3,000,000.00 $333,333.00 $0.00 $3,333,333.00
37 ALEXANDRIA INTERNATIONAL Part 150 Noise Mitigation Program - Phase IV $4,000,000.00 $444,444.00 $0.00 $4,444,444.00 AIRPORT
38 SHREVEPORT REGIONAL AIRPORT Acquire Land for Noise Compatibility $3,000,000.00 $333,333.00 $0.00 $3,333,333.00
39 SHREVEPORT REGIONAL AIRPORT Acquire Land for Noise Compatibility $3,000,000.00 $333,333.00 $0.00 $3,333,333.00
40 LAFAYETTE REGIONAL AIRPORT Realign Perimerter Road (4R/22L) $46,636.00 $5,182.00 $0.00 $51,818.00
41 SHREVEPORT REGIONAL AIRPORT Construct Perimeter Road $2,565,000.00 $285,000.00 $0.00 $2,850,000.00
42 SHREVEPORT REGIONAL AIRPORT Security Enhancements (Design) $190,000.00 $21,111.00 $0.00 $211,111.00
43 SHREVEPORT REGIONAL AIRPORT Security Enhancements - Phase II $1,710,000.00 $190,000.00 $0.00 $1,900,000.00
44 LAKE CHARLES REGIONAL AIRPORT Acquire Runway Sweeper $250,000.00 $27,778.00 $0.00 $277,778.00
45 LAKE CHARLES REGIONAL AIRPORT Sewer System Rehabilitation $500,000.00 $55,556.00 $0.00 $555,556.00
46 LAKE CHARLES REGIONAL AIRPORT Expand Terminal Parking Facility $947,369.00 $105,263.00 $0.00 $1,052,632.00 Air Carrier Capital Outlay Totals - Projects 46 $140,641,970.00 $15,190,772.00 $4,600,000.00 $160,407,742.00
Friday, March 20, 2009 Air Carrier Capital Outlay Page 3 of 15 Aviation Requested Program FY 2010-2014
General Aviation Capital Outlay Federal Item Airport Project Description Funds State Match Local/Other Total Funds 1 LEESVILLE AIRPORT Runway Safety Area - Phase II (South of Apron, West of $378,956.00 $42,106.00 $0.00 $421,062.00 Runway)
2 SLIDELL AIRPORT Relocate Power Lines of Rwy 18 - Phase 2 $2,042,545.00 $226,949.00 $0.00 $2,269,494.00
3 SLIDELL AIRPORT Relocate Power Line - Environmental Assesment $190,000.00 $21,111.00 $0.00 $211,111.00
4 SLIDELL AIRPORT Land Acquisition and Clearing for Powerline Relocation - $2,070,000.00 $230,000.00 $0.00 $2,300,000.00 Phase 1
5 HOUMA-TERREBONNE AIRPORT Reconstruct Taxiway B - Phase III (Construction) $2,000,000.00 $222,222.00 $0.00 $2,222,222.00
6 GEORGE R. CARR MEMORIAL Land Acquistion - North End (Runway Safety Area $990,000.00 $110,000.00 $0.00 $1,100,000.00 AIRPORT Improvements)
7 CHENNAULT INTERNATIONAL Airfield Lighting Rehabilitation - Phase II $474,973.00 $52,775.00 $0.00 $527,748.00 AIRPORT
8 LEESVILLE AIRPORT Rehabilitate Runway 18/36 Part 77 Surfaces - Phase III $974,295.00 $108,255.00 $0.00 $1,082,550.00 (North of Apron, West of Runway)
9 HARRY P. WILLIAMS MEMORIAL Rehabilitate South GA Apron - Phase III (Construction) $0.00 $750,000.00 $0.00 $750,000.00 AIRPORT
10 HAMMOND NORTHSHORE REGIONAL Rehab Runway 13/31- Phase III $994,707.00 $110,523.00 $0.00 $1,105,230.00 AIRPORT
11 HOUMA-TERREBONNE AIRPORT Construct and Extend East Aircraft Parking Apron - Phase I $6,176,016.00 $686,224.00 $0.00 $6,862,240.00
12 SLIDELL AIRPORT Seal Coat Taxiways and Apron $166,500.00 $18,500.00 $0.00 $185,000.00
13 HOUMA-TERREBONNE AIRPORT Security Fencing and Access Gates - Phase I $95,000.00 $5,000.00 $0.00 $100,000.00
14 ST. JOHN THE BAPTIST PARISH Relocate Levee $1,021,725.00 $113,525.00 $0.00 $1,135,250.00 AIRPORT
15 HAMMOND NORTHSHORE REGIONAL Drainage Improvements $1,080,000.00 $120,000.00 $0.00 $1,200,000.00 AIRPORT
16 ST. JOHN THE BAPTIST PARISH Widen Runway $494,912.00 $54,990.00 $0.00 $549,902.00 AIRPORT
17 ST. JOHN THE BAPTIST PARISH Land Acquisition for Runway Extension $1,085,375.00 $120,597.00 $0.00 $1,205,972.00 AIRPORT
Friday, March 20, 2009 General Aviation Capital Outlay Page 4 of 15 Aviation Requested Program FY 2010-2014
General Aviation Capital Outlay Federal Item Airport Project Description Funds State Match Local/Other Total Funds 18 ST. LANDRY PARISH-AHART FIELD Joint Sealing and Pavement Repairs on Runway 18/36 $710,000.00 $78,889.00 $0.00 $788,889.00
19 ST. JOHN THE BAPTIST PARISH Extend Runway $881,719.00 $97,969.00 $0.00 $979,688.00 AIRPORT
20 HAMMOND NORTHSHORE REGIONAL Taxiway A Rehab $830,835.00 $92,315.00 $0.00 $923,150.00 AIRPORT
21 ST. JOHN THE BAPTIST PARISH Extend Parallel Taxiway to the North $457,940.00 $50,882.00 $0.00 $508,822.00 AIRPORT
22 HAMMOND NORTHSHORE REGIONAL Rehab of Runway 36 Stub Taxiways $138,600.00 $15,400.00 $0.00 $154,000.00 AIRPORT
23 ST. JOHN THE BAPTIST PARISH Extend Parallel Taxiway to the South $520,724.00 $57,858.00 $0.00 $578,582.00 AIRPORT
24 NEW ORLEANS LAKEFRONT AIRPORT Reconstruct West Seawall - Phase I $4,750,000.00 $527,778.00 $0.00 $5,277,778.00
25 NEW ORLEANS LAKEFRONT AIRPORT Reconstruct North Seawall - Phase I $5,700,000.00 $633,333.00 $0.00 $6,333,333.00
26 HOUMA-TERREBONNE AIRPORT Security Lighting - Taxiway F $0.00 $130,000.00 $0.00 $130,000.00
27 HAMMOND NORTHSHORE REGIONAL Reseal of SW Public Apron $208,800.00 $23,200.00 $0.00 $232,000.00 AIRPORT
28 HAMMOND NORTHSHORE REGIONAL Reseal Joints for Terminal Apron $119,700.00 $13,300.00 $0.00 $133,000.00 AIRPORT
29 HAMMOND NORTHSHORE REGIONAL West Apron Rehab; Stripe; Reset Tiedown Cables $1,026,000.00 $114,000.00 $0.00 $1,140,000.00 AIRPORT
30 NEW ORLEANS LAKEFRONT AIRPORT Rehabilitate Taxiway A (Including Edge Lights) $932,105.00 $103,567.00 $0.00 $1,035,672.00
31 ST. JOHN THE BAPTIST PARISH Construct South Aircraft Parking Apron $427,282.00 $47,476.00 $0.00 $474,758.00 AIRPORT
32 NATCHITOCHES REGIONAL AIRPORT Main Ramp patching and rehabilitation $450,000.00 $50,000.00 $0.00 $500,000.00
33 LOUISIANA REGIONAL AIRPORT Extend Runway 17/35 - Phase II $2,092,105.00 $232,456.00 $0.00 $2,324,561.00
34 LOUISIANA REGIONAL AIRPORT Land Acquisition for Runway Extension $332,500.00 $17,500.00 $0.00 $350,000.00
35 SOUTH LAFOURCHE LEONARD Construct Parallel Taxiway - Phase III $2,850,000.00 $316,667.00 $0.00 $3,166,667.00 MILLER, JR. AIRPORT
Friday, March 20, 2009 General Aviation Capital Outlay Page 5 of 15 Aviation Requested Program FY 2010-2014
General Aviation Capital Outlay Federal Item Airport Project Description Funds State Match Local/Other Total Funds 36 CHENNAULT INTERNATIONAL Construct New (Crosswind) Runway - Phase II $17,100,000.00 $1,900,000.00 $0.00 $19,000,000.00 AIRPORT
37 CHENNAULT INTERNATIONAL Construct New (Crosswind) Runway - Phase I (Design) $3,325,000.00 $369,444.00 $0.00 $3,694,444.00 AIRPORT
38 ESLER REGIONAL AIRPORT Seal Coat and Markings Runway 14/32 $300,000.00 $33,333.00 $0.00 $333,333.00
39 HAMMOND NORTHSHORE REGIONAL Rehab MITL $243,000.00 $27,000.00 $0.00 $270,000.00 AIRPORT
40 HAMMOND NORTHSHORE REGIONAL Construct Parallel Taxiway for Runway 13/31 $1,184,202.00 $131,578.00 $0.00 $1,315,780.00 AIRPORT
41 JONESVILLE MUNICIPAL AIRPORT Taxiway, Apron Rehab with associated Drainage $600,000.00 $66,667.00 $0.00 $666,667.00 Imrpovements Phase II Construction
42 HAMMOND NORTHSHORE REGIONAL Overlay Stub Taxiway E $51,300.00 $5,700.00 $0.00 $57,000.00 AIRPORT
43 SLIDELL AIRPORT Reconstruct South Apron $763,200.00 $84,800.00 $0.00 $848,000.00
44 SLIDELL AIRPORT Terminal Apron Expansion and Overlay $815,000.00 $90,556.00 $0.00 $905,556.00
45 SHREVEPORT DOWNTOWN AIRPORT Extend Perimeter Road $675,000.00 $75,000.00 $0.00 $750,000.00
46 ESLER REGIONAL AIRPORT Resurface Main Terminal Ramp/Taxiway A East Side $500,000.00 $55,556.00 $0.00 $555,556.00 Runway 14/32
47 ST. JOHN THE BAPTIST PARISH Construct Taxilanes & Apron for #3 T-Hangar $366,700.00 $40,744.00 $0.00 $407,444.00 AIRPORT Development
48 FALSE RIVER REGIONAL AIRPORT Drainage: Install Culverts Located on South End $0.00 $180,000.00 $0.00 $180,000.00
49 JENNINGS AIRPORT Land Acquisition for Runway 13/31 $225,000.00 $25,000.00 $0.00 $250,000.00
50 FALSE RIVER REGIONAL AIRPORT Seal Coat for Airside Surfaces $225,000.00 $25,000.00 $0.00 $250,000.00
51 NATCHITOCHES REGIONAL AIRPORT Construct Taxiway A Connector to Runway 25 - Phase II $403,750.00 $44,861.00 $0.00 $448,611.00
52 CHENNAULT INTERNATIONAL Reconstruct Blast Pad for Runway 33 $285,000.00 $31,667.00 $0.00 $316,667.00 AIRPORT
53 NATCHITOCHES REGIONAL AIRPORT Extend Parallel Taxiway B and Lighting $300,000.00 $33,333.00 $0.00 $333,333.00
Friday, March 20, 2009 General Aviation Capital Outlay Page 6 of 15 Aviation Requested Program FY 2010-2014
General Aviation Capital Outlay Federal Item Airport Project Description Funds State Match Local/Other Total Funds 54 NATCHITOCHES REGIONAL AIRPORT Engineering only connect taxiway A to runway 25 $60,000.00 $6,667.00 $0.00 $66,667.00
55 CHENNAULT INTERNATIONAL Install Split Lense Runway/Taxiway Lights at Intersections $28,500.00 $3,167.00 $0.00 $31,667.00 AIRPORT
56 SOUTH LAFOURCHE LEONARD Construct Parallel Taxiway - Phase IV $1,900,000.00 $211,111.00 $0.00 $2,111,111.00 MILLER, JR. AIRPORT
57 ST. LANDRY PARISH-AHART FIELD Overlay Asphalt Portion of 18/36 $360,000.00 $40,000.00 $0.00 $400,000.00
58 HAMMOND NORTHSHORE REGIONAL Expand East Ramp Area and T-Hangar Ramps $708,597.00 $78,733.00 $0.00 $787,330.00 AIRPORT
59 ACADIANA REGIONAL AIRPORT Rehabilitate Taxiway A-9 $47,500.00 $2,500.00 $0.00 $50,000.00
60 ST. LANDRY PARISH-AHART FIELD Rehab Asphalt Portion of Runway 18/36 $354,429.00 $39,381.00 $0.00 $393,810.00
61 CHENNAULT INTERNATIONAL Construct Stub Taxiway and Apron with Associated $1,352,502.00 $150,278.00 $0.00 $1,502,780.00 AIRPORT Lighting
62 JENNINGS AIRPORT Approach Lights for Runway 8/26 (ODALS) $242,105.00 $26,901.00 $0.00 $269,006.00
63 CHENNAULT INTERNATIONAL Install Apron Lighting $635,664.00 $70,629.00 $0.00 $706,293.00 AIRPORT
64 JENNINGS AIRPORT Purchase and Install AWOS $292,105.00 $32,456.00 $0.00 $324,561.00
65 HARRY P. WILLIAMS MEMORIAL Seal Cracks on North Apron $47,500.00 $5,278.00 $0.00 $52,778.00 AIRPORT
66 SLIDELL AIRPORT Construct T-Hangar Access Road $306,000.00 $34,000.00 $0.00 $340,000.00
67 FALSE RIVER REGIONAL AIRPORT Construct New Runway $3,600,000.00 $400,000.00 $0.00 $4,000,000.00
68 SLIDELL AIRPORT Construct T-Hangar Taxilanes $596,700.00 $66,300.00 $0.00 $663,000.00
69 SLIDELL AIRPORT Construct T-Hangars $149,994.00 $16,666.00 $0.00 $166,660.00
70 NATCHITOCHES REGIONAL AIRPORT Construct T-hangar taxiways $327,275.00 $36,364.00 $0.00 $363,639.00
71 ST. JOHN THE BAPTIST PARISH Expand Auto Parking $464,540.00 $51,616.00 $0.00 $516,156.00 AIRPORT
72 LOUISIANA REGIONAL AIRPORT Rehabilitate Airfield Lighting System $662,105.00 $73,567.00 $0.00 $735,672.00
Friday, March 20, 2009 General Aviation Capital Outlay Page 7 of 15 Aviation Requested Program FY 2010-2014
General Aviation Capital Outlay Federal Item Airport Project Description Funds State Match Local/Other Total Funds 73 LOUISIANA REGIONAL AIRPORT Install Medium Intensity Approach Lighting with Runway $118,750.00 $13,194.00 $0.00 $131,944.00 Alignment Indicator Lights (MALSR with RAILs)
74 NEW ORLEANS LAKEFRONT AIRPORT Extend Runway 18L/36R $1,492,105.00 $165,789.00 $0.00 $1,657,894.00
75 C.E. (RUSTY) WILLIAMS AIRPORT Rehab Runway (Design) $60,000.00 $6,667.00 $0.00 $66,667.00
76 RUSTON REGIONAL AIRPORT Extend Runway Safety Area $652,500.00 $72,500.00 $0.00 $725,000.00
77 GEORGE R. CARR MEMORIAL Overlay Runway 18/36 $720,000.00 $80,000.00 $0.00 $800,000.00 AIRPORT
78 SLIDELL AIRPORT Land Acquisition $405,000.00 $45,000.00 $0.00 $450,000.00
79 CHENNAULT INTERNATIONAL Install Taxilane G Edge Lighting $260,091.00 $28,899.00 $0.00 $288,990.00 AIRPORT
80 SOUTHLAND FIELD Rehabilitate Fuel Farm $171,000.00 $19,000.00 $0.00 $190,000.00
81 C.E. (RUSTY) WILLIAMS AIRPORT Rehab Taxiway "A" $171,000.00 $19,000.00 $0.00 $190,000.00
82 FALSE RIVER REGIONAL AIRPORT Installation of Lighting for New Taxilanes and Taxiway for $90,000.00 $10,000.00 $0.00 $100,000.00 new THangar Complex
83 LOUISIANA REGIONAL AIRPORT Extend Parallel Taxiway $1,492,105.00 $165,789.00 $0.00 $1,657,894.00
84 FALSE RIVER REGIONAL AIRPORT Perimeter Fencing of Runway 18 RPZ (5.0 acres) and $150,000.00 $16,667.00 $0.00 $166,667.00 Install Culvert for Runway 36 RPZ
85 ABBEVILLE CHRIS CRUSTA Rehabilitate Runway, Taxiways and Aprons $235,000.00 $26,111.00 $0.00 $261,111.00 MEMORIAL AIRPORT
86 NATCHITOCHES REGIONAL AIRPORT Construct T-Hangars $600,000.00 $66,667.00 $0.00 $666,667.00
87 SPRINGHILL AIRPORT Extend Runway and Taxiway 800 Feet $778,500.00 $86,500.00 $0.00 $865,000.00
88 MOREHOUSE MEMORIAL AIRPORT Airfield Pavement Rehabilitation $650,000.00 $72,222.00 $0.00 $722,222.00
89 MINDEN AIRPORT Construct Partial Parallel Taxiway with Lighting $2,280,438.00 $253,382.00 $0.00 $2,533,820.00
90 RED RIVER PARISH AIRPORT Apron Expansion $600,000.00 $66,667.00 $0.00 $666,667.00
91 VICKSBURG-TALLULAH REGIONAL Construct T-Hangar Taxiway $502,407.00 $55,823.00 $0.00 $558,230.00 AIRPORT Friday, March 20, 2009 General Aviation Capital Outlay Page 8 of 15 Aviation Requested Program FY 2010-2014
General Aviation Capital Outlay Federal Item Airport Project Description Funds State Match Local/Other Total Funds 92 LE GROS MEMORIAL AIRPORT Rehabilitate Airfield Drainage $1,080,000.00 $120,000.00 $0.00 $1,200,000.00
93 HARRY P. WILLIAMS MEMORIAL Perimeter Fencing $104,500.00 $11,611.00 $0.00 $116,111.00 AIRPORT
94 NEW ORLEANS LAKEFRONT AIRPORT Construct Perimeter Road (around Runway 27 ) with AOA $187,105.00 $20,789.00 $0.00 $207,894.00 Fence Relocation
95 MOREHOUSE MEMORIAL AIRPORT Rehab Taxiway Lighting $300,000.00 $33,333.00 $0.00 $333,333.00
96 UNION PARISH AIRPORT Extend and Widen Runway $800,000.00 $88,889.00 $0.00 $888,889.00
97 CHENNAULT INTERNATIONAL Upgrade Electrical Vault Equipment $475,000.00 $52,778.00 $0.00 $527,778.00 AIRPORT
98 LOUISIANA REGIONAL AIRPORT Extend Runway 17/35 - Phase I (Environmental $172,105.00 $19,123.00 $0.00 $191,228.00 Assessment)
99 BEAUREGARD REGIONAL AIRPORT Construct T-Hangar Taxilanes $1,352,502.00 $150,278.00 $0.00 $1,502,780.00
100 CONCORDIA PARISH AIRPORT Rehabilitate Southeast Apron/Taxiway for Existing $350,000.00 $38,889.00 $0.00 $388,889.00 Hangars - Construction
101 HAMMOND NORTHSHORE REGIONAL Installation of Aircraft Wash Rack $56,250.00 $6,250.00 $0.00 $62,500.00 AIRPORT
102 PINEVILLE MUNICIPAL AIRPORT Parallel Taxiway extension $0.00 $1,000,000.00 $0.00 $1,000,000.00
103 SOUTHLAND FIELD Construct New T-Hangars $578,930.00 $64,326.00 $0.00 $643,256.00
104 CHENNAULT INTERNATIONAL Access Road Extension $176,890.00 $19,654.00 $0.00 $196,544.00 AIRPORT
105 RUSTON REGIONAL AIRPORT T-Hangar Taxiway for Hangars 5 and 6 $199,500.00 $22,167.00 $0.00 $221,667.00
106 RED RIVER PARISH AIRPORT Construct Parallel Taxiway - Phase I $1,000,000.00 $111,111.00 $0.00 $1,111,111.00
107 DAVID G. JOYCE AIRPORT Conduct Environmental Assesment to Extend Runway $47,500.00 $5,278.00 $0.00 $52,778.00
108 JENNINGS AIRPORT Construct New T-Hangars $150,000.00 $38,012.00 $192,105.00 $380,117.00
109 LOUISIANA REGIONAL AIRPORT Expand Aircraft Parking Apron $1,235,000.00 $137,222.00 $0.00 $1,372,222.00
Friday, March 20, 2009 General Aviation Capital Outlay Page 9 of 15 Aviation Requested Program FY 2010-2014
General Aviation Capital Outlay Federal Item Airport Project Description Funds State Match Local/Other Total Funds 110 GEORGE R. CARR MEMORIAL Construct Parallel Taxiway $990,000.00 $110,000.00 $0.00 $1,100,000.00 AIRPORT
111 VICKSBURG-TALLULAH REGIONAL Land Acquisition $428,400.00 $47,600.00 $0.00 $476,000.00 AIRPORT
112 WINNSBORO MUNICIPAL AIRPORT "Design Only" Expand Existing Apron $60,000.00 $6,667.00 $0.00 $66,667.00
113 LOUISIANA REGIONAL AIRPORT Perimeter Fencing $360,000.00 $40,000.00 $0.00 $400,000.00
114 HARRY P. WILLIAMS MEMORIAL Construct Agricultural Operation Facility $95,000.00 $10,556.00 $0.00 $105,556.00 AIRPORT
115 GEORGE R. CARR MEMORIAL Apron Rehab and Expansion $630,000.00 $70,000.00 $0.00 $700,000.00 AIRPORT
116 MINDEN AIRPORT Construct T-Hangar Taxilane $378,945.00 $42,105.00 $0.00 $421,050.00
117 WEST CARROLL / KELLY-DUMAS Apron Expansion $405,000.00 $45,000.00 $0.00 $450,000.00
118 HARRY P. WILLIAMS MEMORIAL Construct Washdown Area (Agriculture) $95,000.00 $10,556.00 $0.00 $105,556.00 AIRPORT
119 FALSE RIVER REGIONAL AIRPORT Relocation of Terminal Facilities $1,504,800.00 $167,200.00 $0.00 $1,672,000.00
120 ABBEVILLE CHRIS CRUSTA Rehabilitate Airfield Lighting and Signage - Phase II $332,500.00 $36,944.00 $0.00 $369,444.00 MEMORIAL AIRPORT (Taxiway)
121 MINDEN AIRPORT Relocate Terminal Apron- Design $243,000.00 $27,000.00 $0.00 $270,000.00
122 C.E. (RUSTY) WILLIAMS AIRPORT Install Deer Fence $450,000.00 $50,000.00 $0.00 $500,000.00
123 GEORGE R. CARR MEMORIAL Install Additional Fencing $171,000.00 $19,000.00 $0.00 $190,000.00 AIRPORT
124 RUSTON REGIONAL AIRPORT Construct/Relocate Public and Service Roads $2,205,000.00 $245,000.00 $0.00 $2,450,000.00
125 RUSTON REGIONAL AIRPORT Construct T-Hangars 5 and 6 $798,000.00 $42,000.00 $0.00 $840,000.00
126 JONESBORO AIRPORT Construct Hangar Access Road and Taxilane to Hangars $150,000.00 $16,667.00 $0.00 $166,667.00
127 ABBEVILLE CHRIS CRUSTA Re-Align Parallel Taxiway $593,750.00 $65,972.00 $0.00 $659,722.00 MEMORIAL AIRPORT
Friday, March 20, 2009 General Aviation Capital Outlay Page 10 of 15 Aviation Requested Program FY 2010-2014
General Aviation Capital Outlay Federal Item Airport Project Description Funds State Match Local/Other Total Funds 128 MOREHOUSE MEMORIAL AIRPORT 1000 Foot Runway Extension $1,000,000.00 $111,111.00 $0.00 $1,111,111.00
129 ALLEN PARISH AIRPORT Construct T-Hangar Taxilanes and T-Hangars $405,000.00 $45,000.00 $0.00 $450,000.00
130 SOUTH LAFOURCHE LEONARD Construct T-Hangar Taxilanes and Ramps $485,225.00 $53,914.00 $0.00 $539,139.00 MILLER, JR. AIRPORT
131 HARRY P. WILLIAMS MEMORIAL Terminal Area Improvements $142,500.00 $15,833.00 $0.00 $158,333.00 AIRPORT
132 HARRY P. WILLIAMS MEMORIAL Construct Tow Lanes at Heliport and Fill Low Areas $114,000.00 $12,667.00 $0.00 $126,667.00 AIRPORT
133 C.E. (RUSTY) WILLIAMS AIRPORT Rehabilitate Runway 18/36 $700,000.00 $77,778.00 $0.00 $777,778.00
134 DAVID G. JOYCE AIRPORT Rejuvenate and sealcoat Runway PHASE II $675,152.00 $75,017.00 $0.00 $750,169.00
135 HART AIRPORT Acquire Right-of-Way to Relocate Access Road, Utility $155,500.00 $19,444.00 $8,184.00 $194,444.00 Relocation
136 FALSE RIVER REGIONAL AIRPORT Install 20 Space Vehicle Parking Area $180,000.00 $20,000.00 $0.00 $200,000.00
137 EUNICE AIRPORT Overlay Runway, Taxiway, and Apron $540,000.00 $60,000.00 $0.00 $600,000.00
138 HOMER MUNICIPAL AIRPORT Rehabilitate Runway Lighting (Design Only) $75,000.00 $3,947.00 $0.00 $78,947.00
139 CONCORDIA PARISH AIRPORT Construct Perimeter Fence $175,000.00 $19,444.00 $0.00 $194,444.00
140 WEST CARROLL / KELLY-DUMAS Complete T-hangar Apron and Associated Lighting $360,000.00 $40,000.00 $0.00 $400,000.00
141 ALLEN PARISH AIRPORT Construct South Parallel Taxiway - Phase II $2,260,000.00 $251,111.00 $0.00 $2,511,111.00
142 PINEVILLE MUNICIPAL AIRPORT Sea plane ramp and access drive to maintenance hangar/fuel $0.00 $150,000.00 $0.00 $150,000.00
143 FALSE RIVER REGIONAL AIRPORT Update Existing Electronic Gate $45,000.00 $5,000.00 $0.00 $50,000.00
144 CONCORDIA PARISH AIRPORT 8 Hangars $300,000.00 $38,012.00 $200,000.00 $538,012.00
145 MINDEN AIRPORT Construct Access Road $378,945.00 $42,105.00 $0.00 $421,050.00
146 CONCORDIA PARISH AIRPORT Engineering/Surveying/Administration Obstruction $160,000.00 $17,778.00 $0.00 $177,778.00 Lighting (4 acre Obstruction Removal, 44 Acre Aviation Easement
Friday, March 20, 2009 General Aviation Capital Outlay Page 11 of 15 Aviation Requested Program FY 2010-2014
General Aviation Capital Outlay Federal Item Airport Project Description Funds State Match Local/Other Total Funds 147 ST. TAMMANY REGIONAL AIRPORT Runway/Taxiway/Lighting and Signage $521,046.00 $57,894.00 $0.00 $578,940.00
148 EUNICE AIRPORT Sealcoat GA Apron $135,000.00 $15,000.00 $0.00 $150,000.00
149 ST. TAMMANY REGIONAL AIRPORT Design/Construction Pavement for Apron Runup Area Dirt $568,413.00 $63,157.00 $0.00 $631,570.00 Work for Runway
150 VIVIAN AIRPORT Overlay Runway 9-27 $576,000.00 $64,000.00 $0.00 $640,000.00
151 LE GROS MEMORIAL AIRPORT Install Runway 13/31 MIRL $473,685.00 $52,632.00 $0.00 $526,317.00
152 ST. TAMMANY REGIONAL AIRPORT Landing Area Improvements $225,000.00 $25,000.00 $0.00 $250,000.00
153 MINDEN AIRPORT Construct Auto Parking $284,202.00 $31,578.00 $0.00 $315,780.00
154 MARKSVILLE MUNICIPAL AIRPORT Seal Coat Runway and Terminal Apron $135,000.00 $15,000.00 $0.00 $150,000.00
155 MARKSVILLE MUNICIPAL AIRPORT Airfield Lighting Improvments $603,000.00 $67,000.00 $0.00 $670,000.00
156 WEST CARROLL / KELLY-DUMAS Construct T-Hangars $315,000.00 $35,000.00 $0.00 $350,000.00
157 UNION PARISH AIRPORT Overlay Access Road and Auto Parking $225,000.00 $25,000.00 $0.00 $250,000.00
158 MINDEN AIRPORT Construct T-Hangars $784,323.00 $87,147.00 $0.00 $871,470.00
159 ABBEVILLE CHRIS CRUSTA Construct Agriculture Apron & Access Road $162,735.00 $18,082.00 $0.00 $180,817.00 MEMORIAL AIRPORT
160 ALLEN PARISH AIRPORT Runway Extension $1,048,500.00 $116,500.00 $0.00 $1,165,000.00
161 LE GROS MEMORIAL AIRPORT Construct T-Hangar Taxiway and Ramps $128,250.00 $14,250.00 $0.00 $142,500.00
162 GEORGE R. CARR MEMORIAL Construct Perimeter Road $855,000.00 $95,000.00 $0.00 $950,000.00 AIRPORT
163 LOUISIANA REGIONAL AIRPORT Auto Parking $166,250.00 $18,472.00 $0.00 $184,722.00
164 JOHN H.HOOKS JR. MEMORIAL Land Acquisition $180,000.00 $20,000.00 $0.00 $200,000.00
165 VIVIAN AIRPORT Perimeter Fencing $300,000.00 $33,333.00 $0.00 $333,333.00
166 EUNICE AIRPORT Taxiway Extension (South) with Associated Lighting and $540,000.00 $60,000.00 $0.00 $600,000.00 Signage
Friday, March 20, 2009 General Aviation Capital Outlay Page 12 of 15 Aviation Requested Program FY 2010-2014
General Aviation Capital Outlay Federal Item Airport Project Description Funds State Match Local/Other Total Funds 167 GEORGE R. CARR MEMORIAL Pave Auto Parking Lot $135,000.00 $15,000.00 $0.00 $150,000.00 AIRPORT
168 MOREHOUSE MEMORIAL AIRPORT Ten T-Hangars $300,000.00 $33,333.00 $0.00 $333,333.00
169 ALLEN PARISH AIRPORT Install Perimeter Fence $374,400.00 $41,600.00 $0.00 $416,000.00
170 ST. LANDRY PARISH-AHART FIELD Rehab Taxiway Lighting and Install Taxiway Signage: $346,500.00 $38,500.00 $0.00 $385,000.00 Phase II
171 VIVIAN AIRPORT Extend Runway 1000 Feet $2,250,000.00 $250,000.00 $0.00 $2,500,000.00
172 JENA AIRPORT Perimeter Fencing Construction, Phase II $400,100.00 $44,456.00 $0.00 $444,556.00
173 ST. TAMMANY REGIONAL AIRPORT Design of Runway 18/36 Extension and Northern $225,000.00 $25,000.00 $0.00 $250,000.00 Threshold Relocation
174 C.E. (RUSTY) WILLIAMS AIRPORT Install Security Gate and Lights $67,500.00 $7,500.00 $0.00 $75,000.00
175 LE GROS MEMORIAL AIRPORT Extend Runway 13/31 1,000ft $450,000.00 $50,000.00 $0.00 $500,000.00
176 MINDEN AIRPORT Construct Corporate Apron $1,170,000.00 $130,000.00 $0.00 $1,300,000.00
177 ST. TAMMANY REGIONAL AIRPORT Design and Construct Parallel Taxiway $2,250,000.00 $250,000.00 $0.00 $2,500,000.00
178 RED RIVER PARISH AIRPORT Construct Terminal Building $400,000.00 $44,444.00 $0.00 $444,444.00
179 EUNICE AIRPORT Relocate Perimeter Fence on East Property Line $54,000.00 $6,000.00 $0.00 $60,000.00
180 HART AIRPORT Construct 4 Hangars $310,000.00 $34,444.00 $0.00 $344,444.00
181 DE QUINCY INDUSTRIAL AIRPARK Construct Six T-Hangars with Taxilane $397,100.00 $20,900.00 $0.00 $418,000.00
182 LE GROS MEMORIAL AIRPORT Expand Turnaround Ramp at Northwest Corner of Runway $150,000.00 $16,667.00 $0.00 $166,667.00 13/31 Taxiway and Ramp to Large Hangar
183 ST. TAMMANY REGIONAL AIRPORT Construction of Perimeter Fence $570,000.00 $63,333.00 $0.00 $633,333.00
184 HART AIRPORT Construction Access Road $840,750.00 $93,417.00 $0.00 $934,167.00
185 BUNKIE MUNICIPAL AIRPORT Airfield Lighting Improvements $0.00 $220,000.00 $0.00 $220,000.00
186 BUNKIE MUNICIPAL AIRPORT Runway Overlay $0.00 $700,000.00 $0.00 $700,000.00
Friday, March 20, 2009 General Aviation Capital Outlay Page 13 of 15 Aviation Requested Program FY 2010-2014
General Aviation Capital Outlay Federal Item Airport Project Description Funds State Match Local/Other Total Funds 187 LE GROS MEMORIAL AIRPORT Construct 3 New Hangars $187,150.00 $20,794.00 $0.00 $207,944.00
188 EUNICE AIRPORT Construct Ag Loading Area with Access Road $284,202.00 $31,578.00 $0.00 $315,780.00
189 EUNICE AIRPORT Construct Maintenance Hangar $270,000.00 $30,000.00 $0.00 $300,000.00
190 EUNICE AIRPORT Relocate Terminal Building $190,000.00 $21,111.00 $0.00 $211,111.00
191 SCOTT AIRPORT Rehab (Sealcoat) Runway $0.00 $100,000.00 $0.00 $100,000.00
192 MARKSVILLE MUNICIPAL AIRPORT Runway 4/22 Extension and Overlay $1,717,812.00 $190,868.00 $0.00 $1,908,680.00
193 EUNICE AIRPORT Land Acquisition (48 Acres East Side of Airport) $630,000.00 $70,000.00 $0.00 $700,000.00
194 EUNICE AIRPORT Land Acquistion (23 Acres Avigation Easements) - West $328,500.00 $36,500.00 $0.00 $365,000.00 Side of Airport/ Obstruction Removal
195 DE QUINCY INDUSTRIAL AIRPARK Construct North Parallel Taxiway $1,298,700.00 $144,300.00 $0.00 $1,443,000.00
196 SPRINGHILL AIRPORT 6 Unit T-Hangar and Expand Apron $698,000.00 $77,556.00 $0.00 $775,556.00
197 MARKSVILLE MUNICIPAL AIRPORT Aircraft Parking Apron Extension $732,654.00 $81,406.00 $0.00 $814,060.00
198 PINEVILLE MUNICIPAL AIRPORT "Engineering Only" Expand Ramp with tiedowns $0.00 $50,000.00 $0.00 $50,000.00
199 LEESVILLE AIRPORT Extend Runway 18/36 $3,492,000.00 $388,000.00 $0.00 $3,880,000.00
200 MARKSVILLE MUNICIPAL AIRPORT Install Localizer $382,500.00 $42,500.00 $0.00 $425,000.00
201 LEESVILLE AIRPORT Construct Parallel Taxiway - Phase I $508,050.00 $56,450.00 $0.00 $564,500.00
202 GEORGE R. CARR MEMORIAL Land Acquistion - West Side of Runway $1,260,000.00 $140,000.00 $0.00 $1,400,000.00 AIRPORT
203 HOMER MUNICIPAL AIRPORT Rehabilitate Runway Lighting,Phase II Construction $550,000.00 $61,111.00 $0.00 $611,111.00
204 LEESVILLE AIRPORT Install Perimeter Fence $600,000.00 $66,667.00 $0.00 $666,667.00
205 VIVIAN AIRPORT 6 Unit T-Hangar $342,000.00 $38,000.00 $0.00 $380,000.00
206 VIVIAN AIRPORT Land Acquisition for Runway Extension $585,000.00 $65,000.00 $0.00 $650,000.00
207 MARKSVILLE MUNICIPAL AIRPORT Relocate T-Hangars $150,000.00 $16,667.00 $0.00 $166,667.00
Friday, March 20, 2009 General Aviation Capital Outlay Page 14 of 15 Aviation Requested Program FY 2010-2014
General Aviation Capital Outlay Federal Item Airport Project Description Funds State Match Local/Other Total Funds 208 HOMER MUNICIPAL AIRPORT Rehab Runway and Apron $755,000.00 $83,889.00 $0.00 $838,889.00
209 BUNKIE MUNICIPAL AIRPORT Land Acquistion $0.00 $110,250.00 $0.00 $110,250.00
210 OLLA AIRPORT Fencing/gate $0.00 $150,000.00 $0.00 $150,000.00
211 BYERLEY AIRPORT Rehab Airfield Lighting with PAPIs and REILs $426,312.00 $47,368.00 $0.00 $473,680.00
212 BUNKIE MUNICIPAL AIRPORT Airport Access Road and Apron Improvements $0.00 $50,000.00 $0.00 $50,000.00
213 LEESVILLE AIRPORT Auto Parking $57,000.00 $6,333.00 $0.00 $63,333.00
214 BYERLEY AIRPORT Rehab Aprons $477,000.00 $53,000.00 $0.00 $530,000.00
215 HOMER MUNICIPAL AIRPORT Construct Parallel and Stub Taxiway $780,000.00 $86,667.00 $0.00 $866,667.00
216 HOMER MUNICIPAL AIRPORT Install Deer Fence $179,494.00 $19,944.00 $0.00 $199,438.00
217 HOMER MUNICIPAL AIRPORT Land Acquisition $100,000.00 $11,111.00 $0.00 $111,111.00
218 C.E. (RUSTY) WILLIAMS AIRPORT Rehab Auto Parking and Access Road $188,910.00 $20,990.00 $0.00 $209,900.00
219 WINNSBORO MUNICIPAL AIRPORT EA and Master Plan for new Airport $150,000.00 $16,667.00 $0.00 $166,667.00 General Aviation Capital Outlay Totals - Projects 219 $156,133,915.00 $20,864,601.00 $400,289.00 $177,410,121.00
Friday, March 20, 2009 General Aviation Capital Outlay Page 15 of 15 PROJECTS TO BE CANCELLED
Listed below are projects in the Aviation Priority Program for the Fiscal Years indicated. These projects are either idle or outdated and their scopes of work are no longer valid. Therefore, we recommend approval of the sponsor’s request to withdraw the following projects from the Aviation Priority Program:
Fiscal Year 2009-2013 Unfunded List
10AC – Baton Rouge Metropolitan Airport – Runway Incursion Device 16AC – Baton Rouge Metropolitan Airport – Seal Coat Runway 4R/22L 28AC – Baton Rouge Metropolitan Airport – Noise Mitigation 29AC – Baton Rouge Metropolitan Airport – Acquire Easements Runway 13 End 30AC – Baton Rouge Metropolitan Airport – Noise Mitigation 32AC – Baton Rouge Metropolitan Airport – Seal Coat Runway 13/31 34AC – Baton Rouge Metropolitan Airport – Update Security Access Control System 36AC – Alexandria International Airport – Construct Taxiway Connectors A-1, A-2, A-3 and Remove Old Taxiway D 46AC – Alexandria International Airport – New Air Traffic Control Tower 48AC – Alexandria International Airport – Terminal Access Roadway and Parking
16GA – Slidell Airport – Slurry Seal Runway
Fiscal Year 2007 – 2008 Funded List
32GA – Woodworth Airport – Improve Runway Safety Area
Fiscal Year 2006-2007 Funded List
18AC – Shreveport Regional Airport – Install Instrument Approach Aid 14/32 Phase I, Cat II ILS – Phase I of Cat II ILS
Fiscal Year 2005-2006 Funded List
11GA – Harry P. Williams Memorial Airport – Sealcoat Runway 6/24
Fiscal Year 2005-2009 Unfunded List
03AC – Lafayette Regional Airport – Airfield Electrical Signage Upgrade/Rehabilitation
Additional Comments to the Aviation Program Funded 2009-2010 and Unfunded 2010-2014
With the pending changes to the Federal Aviation Administration (FAA) funding authorization, which could change the FAA required match from 95-5 to 90-10, all of the funding information provided in these reports is based on cost estimates and anticipated respective required matches. The actual project cost, on a project by project basis, may be below or above the estimate. However, the total amount approved for the Aviation Priority Program, for fiscal year 2009-2010, will not be exceeded.
In accordance with Act 451, 1989 regular Session, paragraph 803 (B), which states “…if governing authority of an airport authority, district, parish or of any local unit of government obtains ninety percent or more funding for an airport, or for an airport project, from federal sources or from sources other than state funds, the legislature shall give priority to funding the remaining amount necessary for the airport or for the airport project, even if the project is not on the priority list of projects.” The legislature does further authorize LA DOTD to provide matching funds for any project during the Fiscal Year 2009-2010, which does not specifically appear on the list of projects developed in compliance with the Louisiana Airport Needs and Priority Development Program, but which has received a commitment of ninety percent or more funding.
The available funds will be distributed in the following order:
1) Projects in the FY 2009-2010 Aviation Program are funded directly from the Transportation Trust Fund that is allocated in FY 2009-2010 to the Aviation Program.
2) Any other project or eligible enhancements to previously approved projects which receives 90% funding from any source, other than another State source, but which has not been processed and prioritized and is not in either the FY 2009-2010 funded or the FY 2010-2014 unfunded portion of the Aviation Program.
3) The General Aviation and Reliever Airports Maintenance Grant Program shall be funded in accordance with the conditions specified in Chapter 8 of Title 2 of the Louisiana Revised Statues.
4) In the event that additional funds become available, through special appropriations, underruns, project cancellations, or otherwise, certain unfunded, state only projects required for safety or infrastructure preservation at airports not eligible for Federal Aviation Administration (FAA) Airport Improvement Program (AIP) funding may be moved from the unfunded FY 2010-2014 Aviation Program (unfunded list) to the FY 2009-2010 Aviation Program (funded list).
5) Any project which receives no federal or other non-state funding and is eligible for State only funding may be programmed for an amount not to exceed three million dollars for a commercial service airport and seven hundred fifty thousand for a general aviation airport in state funding through the Aviation Priority Program per fiscal year.
6) Aviation Trust Funds will not be used as a match for new projects funded with Passenger Facility Charges (PFC) as PFCs can be approved by the FAA at 100% of the project cost.
GLOSSARY
AC (Air Carrier): Airports or aircraft providing service to fare paying passengers
Apron: Parking area for aircraft
ARFF (Aircraft Rescue & Firefighting): Trucks and equipment for fighting aircraft fires
ATC (Air Traffic Control): A service operated by appropriate authority to promote the safe, orderly, and expeditious flow of air traffic.
AWOS (Automated Weather Observation System): Automated system that transmits weather data to aircraft
Blast Pad: Concrete extension at the end of a runway to prevent erosion caused by jet blast
Construct: Build a new system
DME (Distance Measuring Equipment): A transponder-based radio navigation technology that measures distance by timing the propagation delay of radio signals
DNL (Average Day/Night Noise Level): Noise levels measured in the vicinity of an airport
EDS (Explosive Detection System): Electronic equipment for screening luggage
EMAS (Engineered Mechanical Arresting System): An area at the end of a runway paved with special, soft concrete to stop aircraft in an emergency
FBO (Fixed Base Operator): A commercial operator of aviation services on an airport that provides fuel, maintenance, aircraft rental, etc.
GA (General Aviation): All aviation except air carriers and military
GLS (GNSS Landing System)
GNSS (Global Navigation Satellite System)
Grooving: Longitudinal grooves cut into runways to promote drainage and prevent hydroplaning
Holding Bay: Paved pull-off area for temporary aircraft parking near the runway end
Incursion Device: Detects aircraft or vehicles that go onto a runway without approval
Joints: Space between concrete slabs
LNAV: Lateral navigation instrument approach procedure
LNAV/VNAV: Lateral Navigation/Vertical Navigation instrument approach procedure
Localizer: The component of an instrument landing system that provides course guidance to the runway centerline.
LOI: (Letter of Intent) The FAA’s intent to obligate AIP discretionary and entitlement funds from future budgetary authority in an amount not greater than the Federal Government’s share of allowable costs for that project.
LPV: Localizer performance with vertical guidance instrument approach procedure
MALSR (Medium Intensity Approach Lighting System with Runway Alignment Indicator Lights): Lighting system used to align landing aircraft with the runway
Marking: Numbers, letters, and symbols painted on runways and taxiways
Master Plan: A plan for airport growth during a 20-25 year period
MIRL (Medium Intensity Runway Lights): Lights that mark the edge of a runway
MITL (Medium Intensity Taxiway Lights): Lights that mark the edge of a taxiway
Noise Compatibility: FAA program to assist homeowners near airports
Obstruction Removal: A planned program to remove obstructions (trees, buildings, ditches, etc) from an RPZ or safety areas
Overlay: A layer of asphalt placed on top of an existing asphalt surface
Overrun: Area beyond the end of a runway used for aircraft unable to stop on the runway
PAPI (Precision Approach Path Indicator): A visual landing aid that provides landing information by the use of colored lights
Parallel Taxiway: A taxiway paralleling a runway
Passenger Loading Bridge: Enclosed movable hallway connecting a passenger aircraft to the terminal
RAIL (Runway Alignment Indicator Lights): Sequence flashing lights used as part of an approach lighting system
Ramp: Parking area for aircraft
Reconstruct: Rebuild an existing system
Rehabilitate: Major repairs to an existing system
REIL (Runway End Identifier Lights): Flashing lights that identify the runway end
Rejuvenator: An additive that replaces lost oils in asphalt
RPZ (Runway Protection Zone): Area which must be free of vertical obstacles
Runway: A strip of concrete, asphalt, or turf used for the landing and takeoff of aircraft
Safety Area: Land immediately adjacent to runways and taxiways
Sealcoat: Protective surface applied to asphalt pavements (sometimes called a slurry seal)
Seaway: Landing area for seaplanes (airplanes on floats)
Segmented Circle: A system of visual indicators designed to provide traffic pattern information to aircraft
Sound Mitigation: FAA program to assist homeowners near airports
SSALR (Simplified Short Approach Light System with RAIL): Lighting system used to align landing aircraft with the runway
Striping: White or yellow lines painted on runways and taxiways
Stub Taxiway: Small taxiway connecting a runway to a parallel taxiway, apron or ramp
Taxilane: Small taxiway leading to hangars
Taxiway: Strip of concrete, asphalt, or turf used to move aircraft to and from the runway
Terminal: Building used by pilots and passengers for creature comfort and flight planning. Also adjacent aircraft parking
T-hangar: Hangars shaped like a “T” designed for storing airplanes tail to tail
Tie Down: A ring set in an apron for anchoring small aircraft
UHF (Ultra High Frequency): Radio signals primarily used by military aircraft
Vault: Building that houses electrical equipment for an airport
Wind Cone: Device for detecting and displaying wind direction (also called wind sock)
Wind Tee: Device for detecting and displaying wind direction