Aviation Priority Program 2009-2010

Aviation Priority Program 2009-2010

Aviation Priority Program 2009-2010 Air Carrier Capital Outlay Federal Item Airport Project Description Funds State Match Local/Other Total Funds 1 LAFAYETTE REGIONAL AIRPORT Relocate Runway Threshold & Safety Area Improvements $3,789,473.00 $421,053.00 $0.00 $4,210,526.00 with EMAS - Phase IV 2 LAFAYETTE REGIONAL AIRPORT Relocate Runway Threshold & Safety Area Improvements $3,789,473.00 $421,053.00 $0.00 $4,210,526.00 with EMAS - Phase V 3 BATON ROUGE METROPOLITAN ARFF Vehicle $617,975.00 $68,664.00 $0.00 $686,639.00 AIRPORT 4 LAKE CHARLES REGIONAL Purchase ARFF Equipment $50,000.00 $2,632.00 $0.00 $52,632.00 AIRPORT 5 ALEXANDRIA INTERNATIONAL Runway 18 Obstacle Removal $95,356.00 $10,595.00 $0.00 $105,951.00 AIRPORT 6 ALEXANDRIA INTERNATIONAL Runway 14 Obstacle Removal - Phase II $88,762.00 $9,862.00 $0.00 $98,624.00 AIRPORT 7 ALEXANDRIA INTERNATIONAL ARFF Vehicle $665,000.00 $73,889.00 $0.00 $738,889.00 AIRPORT 8 BATON ROUGE METROPOLITAN Construct Hangar $0.00 $455,556.00 $4,100,000.00 $4,555,556.00 AIRPORT 9 BATON ROUGE METROPOLITAN Box Culvert Landside $0.00 $518,889.00 $4,670,000.00 $5,188,889.00 AIRPORT 10 SHREVEPORT REGIONAL Construct Cargo Facility $0.00 $1,100,000.00 $9,900,000.00 $11,000,000.00 AIRPORT 11 LAKE CHARLES REGIONAL Extend Runway 15/33 (Design) $0.00 $450,000.00 $0.00 $450,000.00 AIRPORT Friday, March 20, 2009 Air Carrier Capital Outlay Page 1 of 10 Aviation Priority Program 2009-2010 Air Carrier Capital Outlay Federal Item Airport Project Description Funds State Match Local/Other Total Funds 12 BATON ROUGE METROPOLITAN Runway 4R/22L Runway Reconstruction $7,738,500.00 $859,833.00 $0.00 $8,598,333.00 AIRPORT 13 SHREVEPORT REGIONAL Rehabilitate Runway 14/32 & Taxiway A South $6,650,000.00 $350,000.00 $0.00 $7,000,000.00 AIRPORT 14 BATON ROUGE METROPOLITAN Complete Airfield Drainage Improvements $5,016,000.00 $557,333.00 $0.00 $5,573,333.00 AIRPORT 15 BATON ROUGE METROPOLITAN Reconstruct Runway 13/31 Phase III - (LOI Projects as $7,400,000.00 $389,474.00 $0.00 $7,789,474.00 AIRPORT Approved by the FAA) Payment 2 for 2009 16 BATON ROUGE METROPOLITAN North General Aviation Development - Rehabilitate $0.00 $2,403,000.00 $0.00 $2,403,000.00 AIRPORT Taxiway "M" Phase I 17 BATON ROUGE METROPOLITAN ARFF Building Renovations and Expansion $2,849,050.00 $316,561.00 $0.00 $3,165,611.00 AIRPORT 18 SHREVEPORT REGIONAL Rehabilitate Taxiway "A" Lighting - Phase I (Design) $85,500.00 $9,500.00 $0.00 $95,000.00 AIRPORT 19 BATON ROUGE METROPOLITAN Construct Runway 22R & 4L Safety Area and Perimeter $3,230,000.00 $170,000.00 $0.00 $3,400,000.00 AIRPORT Road 20 LAFAYETTE REGIONAL AIRPORT North General Aviation Apron - Phase I $3,156,348.00 $350,705.00 $0.00 $3,507,053.00 21 BATON ROUGE METROPOLITAN Acquire 2 Runway Sweepers $0.00 $247,000.00 $0.00 $247,000.00 AIRPORT 22 LAFAYETTE REGIONAL AIRPORT Terminal Modifications to Accommodate Bulk EDS $0.00 $2,000,000.00 $0.00 $2,000,000.00 Equipment Friday, March 20, 2009 Air Carrier Capital Outlay Page 2 of 10 Aviation Priority Program 2009-2010 Air Carrier Capital Outlay Federal Item Airport Project Description Funds State Match Local/Other Total Funds 23 ALEXANDRIA INTERNATIONAL Extend Runway 14/32 - Phase I $0.00 $3,000,000.00 $0.00 $3,000,000.00 AIRPORT 24 LAKE CHARLES REGIONAL Terminal Access Road $570,000.00 $74,444.00 $400,000.00 $1,044,444.00 AIRPORT 25 MONROE REGIONAL AIRPORT Terminal Building (Construction) - Phase III $5,000,000.00 $263,158.00 $0.00 $5,263,158.00 26 ALEXANDRIA INTERNATIONAL ATC Tower Emergency Transceiver $18,770.00 $2,086.00 $0.00 $20,856.00 AIRPORT 27 SHREVEPORT REGIONAL Construct Taxiway "E" $3,040,000.00 $337,778.00 $0.00 $3,377,778.00 AIRPORT 28 LAKE CHARLES REGIONAL Construct South GA Apron/Ramp $0.00 $1,500,000.00 $0.00 $1,500,000.00 AIRPORT 29 ALEXANDRIA INTERNATIONAL Part 150 Noise Mitigation Program - Phase II $6,000,000.00 $315,789.00 $0.00 $6,315,789.00 AIRPORT 30 BATON ROUGE METROPOLITAN Construct Air Cargo Building $0.00 $466,667.00 $4,200,000.00 $4,666,667.00 AIRPORT 31 SHREVEPORT REGIONAL Acquire Land for Noise Compatibility $3,000,000.00 $157,895.00 $0.00 $3,157,895.00 AIRPORT 32 SHREVEPORT REGIONAL Update Airport Master Plan $570,000.00 $63,333.00 $0.00 $633,333.00 AIRPORT 33 BATON ROUGE METROPOLITAN Reconstruct Access Road to East General Aviation Area $0.00 $350,000.00 $0.00 $350,000.00 AIRPORT Friday, March 20, 2009 Air Carrier Capital Outlay Page 3 of 10 Aviation Priority Program 2009-2010 Air Carrier Capital Outlay Federal Item Airport Project Description Funds State Match Local/Other Total Funds 34 ALEXANDRIA INTERNATIONAL Runway Sweeper $128,393.00 $14,266.00 $0.00 $142,659.00 AIRPORT 35 ALEXANDRIA INTERNATIONAL Relocate Fuel Farm $5,500,000.00 $611,111.00 $0.00 $6,111,111.00 AIRPORT Air Carrier Capital Outlay Totals $69,048,600.00 $18,342,126.00 $23,270,000.00 $110,660,726.00 Friday, March 20, 2009 Air Carrier Capital Outlay Page 4 of 10 Aviation Priority Program 2009-2010 General Aviation Capital Outlay Federal Item Airport Project Description Funds State Match Local/Other Total Funds 1 SHREVEPORT DOWNTOWN Improve End of Runway 23 Safety Area $190,000.00 $21,111.00 $0.00 $211,111.00 AIRPORT 2 SLIDELL AIRPORT Overlay Runway 18/36 $1,425,000.00 $75,000.00 $0.00 $1,500,000.00 3 GEORGE R. CARR MEMORIAL Runway 18 Safety Area - Phase IV and Land Acquisition $2,200,000.00 $244,444.00 $0.00 $2,444,444.00 AIRPORT for Parallel Taxiway 4 CHENNAULT INTERNATIONAL Construct Emergency Vehicle Access Road $0.00 $237,500.00 $0.00 $237,500.00 AIRPORT 5 RUSTON REGIONAL AIRPORT Lower/Reconstruct Parish Road and Reclaim Displaced $506,676.00 $26,667.00 $0.00 $533,343.00 Threshold 6 ACADIANA REGIONAL AIRPORT Purchase New ARFF Vehicle $0.00 $722,264.00 $0.00 $722,264.00 7 ABBEVILLE CHRIS CRUSTA Acquire Land - Taxiway Re-alignment $0.00 $369,444.00 $0.00 $369,444.00 MEMORIAL AIRPORT 8 RUSTON REGIONAL AIRPORT Lower/Reconstruct Parish Road and Reclaim Displaced $850,000.00 $94,444.00 $0.00 $944,444.00 Threshold - Phase II 9 CHENNAULT INTERNATIONAL Acquire Property for RPZ for Runway 15 $0.00 $527,778.00 $0.00 $527,778.00 AIRPORT 10 VIVIAN AIRPORT Improve Runway Safety Area, Remove Obstructions, $315,000.00 $16,579.00 $0.00 $331,579.00 Fencing 11 JONESBORO AIRPORT Phase II Lighting Construction $500,000.00 $26,316.00 $0.00 $526,316.00 Friday, March 20, 2009 General Aviation Capital Outlay Page 5 of 10 Aviation Priority Program 2009-2010 General Aviation Capital Outlay Federal Item Airport Project Description Funds State Match Local/Other Total Funds 12 SHREVEPORT DOWNTOWN Overlay Runway 5/23 (Design) $75,000.00 $8,333.00 $0.00 $83,333.00 AIRPORT 13 HOUMA-TERREBONNE AIRPORT Reconstruct Taxiway B - Phase II $0.00 $345,400.00 $0.00 $345,400.00 14 SHREVEPORT DOWNTOWN Taxiway "F" Lighting $950,000.00 $50,000.00 $0.00 $1,000,000.00 AIRPORT 15 ALLEN PARISH AIRPORT Runway 18 Drainage Improvements (Design) $0.00 $100,000.00 $0.00 $100,000.00 16 HOUMA-TERREBONNE AIRPORT Re-Cable Runway 12/30 and Associated Taxiway Lighting $1,150,728.00 $127,859.00 $0.00 $1,278,587.00 17 HARRY P. WILLIAMS MEMORIAL Taxiway Lighting Rehabilitation & Install Guidance $760,000.00 $84,444.00 $0.00 $844,444.00 AIRPORT Signs - Phase II 18 HARRY P. WILLIAMS MEMORIAL Rehabilitate South GA Apron - Phase II (Design of $0.00 $105,000.00 $0.00 $105,000.00 AIRPORT Remaining Area) 19 ST. JOHN THE BAPTIST PARISH Rehabilitate Lighting System (Runway, PAPIs, REILs & $666,690.00 $35,089.00 $0.00 $701,779.00 AIRPORT New Electrical Vault) 20 LEESVILLE AIRPORT Runway Safety Area Improvements - Phase I (South of $180,000.00 $9,474.00 $0.00 $189,474.00 Apron, West of Runway) 21 MARKSVILLE MUNICIPAL Airfield Lighting Improvements - Design Only $39,347.00 $2,071.00 $0.00 $41,418.00 AIRPORT 22 ACADIANA REGIONAL AIRPORT Perimeter Fencing - Phase V of VI $289,144.00 $32,127.00 $0.00 $321,271.00 23 ACADIANA REGIONAL AIRPORT Perimeter Fencing - Phase VI of VI $175,000.00 $19,444.00 $0.00 $194,444.00 Friday, March 20, 2009 General Aviation Capital Outlay Page 6 of 10 Aviation Priority Program 2009-2010 General Aviation Capital Outlay Federal Item Airport Project Description Funds State Match Local/Other Total Funds 24 JENNINGS AIRPORT Seal Coat and Remark Runway 8/26 and 13/31 $347,105.00 $18,269.00 $0.00 $365,374.00 25 NEW ORLEANS LAKEFRONT Update/Rehabilitate ARFF Station $0.00 $650,000.00 $0.00 $650,000.00 AIRPORT 26 HAMMOND NORTHSHORE Runway 18/36 Pavement Rehab $522,482.00 $27,499.00 $0.00 $549,981.00 REGIONAL AIRPORT 27 HAMMOND NORTHSHORE Taxiway Pavement Rehab $255,378.00 $13,441.00 $0.00 $268,819.00 REGIONAL AIRPORT 28 CHENNAULT INTERNATIONAL Airfield Lighting Rehabilitation - Phase I (Design) $47,500.00 $2,500.00 $0.00 $50,000.00 AIRPORT 29 CONCORDIA PARISH AIRPORT Runway, Taxiway and Apron Seal Coat Rejuvinator and $150,000.00 $7,895.00 $0.00 $157,895.00 crack Sealing 30 UNION PARISH AIRPORT Rehab Airfield Lighting and Windcone $475,000.00 $52,778.00 $0.00 $527,778.00 31 NEW ORLEANS LAKEFRONT Seal Coat and Crack Seal Taxiway "B" $446,211.00 $49,579.00 $0.00 $495,790.00 AIRPORT 32 MARKSVILLE MUNICIPAL Construct Partial Parallel Taxiway - Phase III $660,000.00 $34,737.00 $0.00 $694,737.00 AIRPORT 33 JENA AIRPORT Rehabilitate Apron, PHASE I $250,000.00 $27,778.00 $0.00 $277,778.00 34 BEAUREGARD REGIONAL Install Glideslope and DME for ILS 36 $427,500.00 $47,500.00 $0.00 $475,000.00 AIRPORT Friday, March 20, 2009 General Aviation Capital Outlay Page 7 of 10 Aviation Priority Program 2009-2010 General Aviation Capital Outlay Federal Item Airport Project Description Funds State Match Local/Other Total Funds 35 DE QUINCY INDUSTRIAL Rehabilitate Parallel Taxiway, Connector Taxiways and $315,400.00 $35,044.00 $0.00 $350,444.00 AIRPARK South Apron 36 JONESVILLE MUNICIPAL Engineering Taxiway/Apron Rehab $45,000.00 $2,368.00 $0.00 $47,368.00 AIRPORT 37 FALSE RIVER REGIONAL Construct T-Hangars and Corporate Hangar $450,000.00 $23,684.00 $0.00 $473,684.00 AIRPORT 38 ABBEVILLE CHRIS CRUSTA Improve Airfield Drainage $356,250.00 $18,750.00 $0.00 $375,000.00 MEMORIAL AIRPORT 39 JOHN H.HOOKS JR.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    30 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us