LOUISIANA CONSTRUCTION AND DEVELOPMENT PRIORITY PROGRAM FISCAL YEAR 2016-2017

Aviation System Overview

$ billion 1.8 Annual Payroll

3.6 Million visitors utilize the 69 to travel to

Commercial Airports General Aviation Airports

11.1 Million 1.49 Million Passengers Served Annual Operations Calendar Year 2013 Calendar Year 2013

93% Populationwithin a thirty-minute drive Served of a public-use airport

Data Source: Draft Louisiana State Aviation System Plan

Air Carrier Funded 2016-2017 Airport Construction and Development Priority Program 2016-2017

Air Carrier Capital Outlay Federal Item Airport Project Description Funds State Match Local/Other Total Funds

1 LAFAYETTE REGIONAL AIRPORT Taxiway F Safety Improvements - Southend $0.00 $2,885,000.00 $20,000.00 $2,905,000.00

2 LAKE CHARLES REGIONAL AIRPORT Protection Zone - Land Acquisition - Phase II $0.00 $250,000.00 $0.00 $250,000.00

3 ALEXANDRIA INTERNATIONAL AIRPORT Property Acquisition for Obstruction Removal to $0.00 $169,146.00 $0.00 $169,146.00 Approaches for Runway 14 & 18 - Phase I

4 BATON ROUGE METROPOLITAN AIRPORT Taxiway F Reconstruction and Extension - Phase II $6,000,000.00 $3,033,472.00 $20,000.00 $9,053,472.00 (Construction)

5 NEW ORLEANS LOUIS ARMSTRONG Terminal Construction Project - Phase III $18,960,000.00 $5,528,000.00 $3,792,000.00 $28,280,000.00 INTERNATIONAL AIRPORT

6 LAKE CHARLES REGIONAL AIRPORT Wildlife Hazard Mitigation - Perimeter Fencing Phase $0.00 $1,250,000.00 $20,000.00 $1,270,000.00 III

7 LAKE CHARLES REGIONAL AIRPORT Rehabilitate ARFF Vehicle $0.00 $500,000.00 $0.00 $500,000.00

8 LAFAYETTE REGIONAL AIRPORT Runway 11/29 Safety Area Improvements - Phase II $13,498,662.00 $1,499,851.00 $0.00 $14,998,513.00

9 SHREVEPORT REGIONAL AIRPORT Airfield Drainage Rehabilitation - Southeast Airfield $0.00 $514,899.00 $0.00 $514,899.00

10 LAKE CHARLES REGIONAL AIRPORT Rehabilitate Airfield Lighting - Phase II $1,732,500.00 $192,500.00 $0.00 $1,925,000.00

11 ALEXANDRIA INTERNATIONAL AIRPORT Airfield Electrical Rehabilitation - Phase IV $355,000.00 $39,444.00 $0.00 $394,444.00

12 ALEXANDRIA INTERNATIONAL AIRPORT Rehabilitate Runway 14/32 - Phase II $180,000.00 $20,000.00 $0.00 $200,000.00

Wednesday, January 13, 2016 Air Carrier Capital Outlay Page 1 of 7 Airport Construction and Development Priority Program 2016-2017

Air Carrier Capital Outlay Federal Item Airport Project Description Funds State Match Local/Other Total Funds

13 ALEXANDRIA INTERNATIONAL AIRPORT Airfield Electrical Rehabilitation - Phase IV $0.00 $600,000.00 $0.00 $600,000.00

14 ALEXANDRIA INTERNATIONAL AIRPORT North Ramp Rehabilitation - Phase IA $4,343,184.00 $482,576.00 $0.00 $4,825,760.00

15 ALEXANDRIA INTERNATIONAL AIRPORT Taxiway B Rehabilitation - Engineering for Phase II $36,000.00 $4,000.00 $0.00 $40,000.00

16 MONROE REGIONAL AIRPORT Airfield Drainage Rehabilitation (Design and $1,080,000.00 $120,000.00 $0.00 $1,200,000.00 Construction)

17 SHREVEPORT REGIONAL AIRPORT Extend Runway 6 & Taxiway C - Environmental Study $315,000.00 $35,000.00 $0.00 $350,000.00

18 ALEXANDRIA INTERNATIONAL AIRPORT Part 150 Noise Mitigation Program $6,000,000.00 $666,667.00 $0.00 $6,666,667.00

19 SHREVEPORT REGIONAL AIRPORT Taxiway K Relocation - Design and Environmental $540,000.00 $60,000.00 $0.00 $600,000.00

20 SHREVEPORT REGIONAL AIRPORT Action Plan Update $225,000.00 $25,000.00 $0.00 $250,000.00

Air Carrier Capital Outlay Totals $53,265,346.00 $17,875,555.00 $3,852,000.00 $74,992,901.00

Wednesday, January 13, 2016 Air Carrier Capital Outlay Page 2 of 7

General Aviation Funded 2016-2017 Airport Construction and Development Priority Program 2016-2017

General Aviation Capital Outlay Federal Item Airport Project Description Funds State Match Local/Other Total Funds

1 SHREVEPORT DOWNTOWN AIRPORT Obstruction Removal and Mitigation $0.00 $75,000.00 $0.00 $75,000.00

2 RUSTON REGIONAL AIRPORT Obstruction Removal - Phase III $0.00 $250,000.00 $0.00 $250,000.00

3 EUNICE AIRPORT Mitigate Obstructions - Phase II (Construction) $0.00 $350,000.00 $0.00 $350,000.00

4 LOUISIANA REGIONAL AIRPORT South Apron Expansion - Phase I $0.00 $675,000.00 $20,000.00 $695,000.00 (Environmental/Design/Mitigation)

5 ST TAMMANY REGIONAL AIRPORT Mitigate Obstructions - West Transitional Phase II $0.00 $660,000.00 $0.00 $660,000.00

6 GEORGE R. CARR MEMORIAL AIRPORT Obstruction Clearing - North $468,000.00 $52,000.00 $0.00 $520,000.00

7 RED RIVER PARISH AIRPORT Removal of Obstructions on East Side of Airfield $0.00 $150,000.00 $0.00 $150,000.00

8 SHREVEPORT DOWNTOWN AIRPORT Rehabilitate Taxiways A, J, Q, M, D - Phase II $1,890,000.00 $210,000.00 $0.00 $2,100,000.00 (Construction)

9 SHREVEPORT DOWNTOWN AIRPORT South T-Hangar and Shadeport Taxilane and Apron $0.00 $430,000.00 $0.00 $430,000.00 Rehabilitation

10 JENA AIRPORT Obstruction Removal - Phase II $0.00 $175,000.00 $0.00 $175,000.00

11 HAMMOND NORTHSHORE REGIONAL Airfield Drainage Improvements - Phase III $0.00 $725,000.00 $0.00 $725,000.00 AIRPORT (Construction)

12 ST LANDRY PARISH-AHART FIELD Obstruction Removal (Runway 18) - Phase I $0.00 $50,556.00 $0.00 $50,556.00

Wednesday, January 13, 2016 General Aviation Capital Outlay Page 3 of 7 Airport Construction and Development Priority Program 2016-2017

General Aviation Capital Outlay Federal Item Airport Project Description Funds State Match Local/Other Total Funds

13 HAMMOND NORTHSHORE REGIONAL Rehabilitate Runway 18/36 & 13/31 - Phase III $4,950,000.00 $550,000.00 $0.00 $5,500,000.00 AIRPORT (Construction)

14 SOUTH LAFOURCHE LEONARD MILLER, JR. Obstruction Removal - Runway 18 Approach Phase I $0.00 $60,000.00 $0.00 $60,000.00 AIRPORT (Acquisition)

15 EUNICE AIRPORT Obstruction Removal (Approach and RSA) - Phase I $0.00 $55,000.00 $0.00 $55,000.00

16 NEW ORLEANS LAKEFRONT AIRPORT Upgrade Lighting Vault - Phase II (Construction) $0.00 $1,000,000.00 $0.00 $1,000,000.00

17 SPRINGHILL AIRPORT Obstruction Removal - Phase II $0.00 $300,000.00 $0.00 $300,000.00

18 MARKSVILLE MUNICIPAL AIRPORT Runway Reconstruction - Phase II (Design) $121,500.00 $13,500.00 $0.00 $135,000.00

19 WINNSBORO MUNICIPAL AIRPORT Obstruction Removal - Phase III $90,000.00 $10,000.00 $0.00 $100,000.00

20 GEORGE R. CARR MEMORIAL AIRPORT Obstruction Removal North End - Land Acquisition $0.00 $140,000.00 $0.00 $140,000.00 Phase I (Environmental)

21 ESLER REGIONAL AIRPORT Obstruction Removal $45,041.00 $5,005.00 $0.00 $50,046.00

22 NEW ORLEANS LAKEFRONT AIRPORT Rehabilitate Runway 18R/36L - Phase I $270,000.00 $30,000.00 $0.00 $300,000.00

23 CHENNAULT INTERNATIONAL AIRPORT Airfield Lighting Rehabilitation - Phase I (Runway) $0.00 $1,000,000.00 $700,000.00 $1,700,000.00

24 LOUISIANA REGIONAL AIRPORT Taxiway Connector - Phase II (Construction) $0.00 $325,000.00 $0.00 $325,000.00

Wednesday, January 13, 2016 General Aviation Capital Outlay Page 4 of 7 Airport Construction and Development Priority Program 2016-2017

General Aviation Capital Outlay Federal Item Airport Project Description Funds State Match Local/Other Total Funds

25 ACADIANA REGIONAL AIRPORT Apron Rehabilitation - Phase II $0.00 $82,000.00 $0.00 $82,000.00

26 ST LANDRY PARISH-AHART FIELD Runway 18-36 Rehabilitation - PCC $745,706.00 $82,856.00 $0.00 $828,562.00

27 CHENNAULT INTERNATIONAL AIRPORT Runway 15/33 Rehabilitation - Phase II (Design & $5,850,000.00 $650,000.00 $0.00 $6,500,000.00 Construction)

28 HOUMA-TERREBONNE AIRPORT Partial Parallel Taxiway - Phase II (Construction) $305,766.00 $33,974.00 $0.00 $339,740.00

29 CHENNAULT INTERNATIONAL AIRPORT Taxiway Widening - Phase IV (cont.) $1,470,960.00 $163,440.00 $0.00 $1,634,400.00

30 GEORGE R. CARR MEMORIAL AIRPORT Partial Parallel Taxiway - Phase II Final Design $110,250.00 $12,250.00 $0.00 $122,500.00

31 ACADIANA REGIONAL AIRPORT Taxiway A Improvements - Phase I (Design) $90,000.00 $10,000.00 $0.00 $100,000.00

32 JENNINGS AIRPORT Rehabilitate Runway 13/31 - Phase I (Design) $76,500.00 $8,500.00 $0.00 $85,000.00

33 VICKSBURG-TALLULAH REGIONAL AIRPORT Perimeter Fence & Security Upgrades - Phase II $405,000.00 $45,000.00 $0.00 $450,000.00

34 ST JOHN THE BAPTIST PARISH AIRPORT Taxiway and Drainage Improvements - Design $0.00 $91,000.00 $0.00 $91,000.00

35 SOUTH LAFOURCHE LEONARD MILLER, JR. Taxiway Lighting - Phase I (Design) $128,160.00 $14,240.00 $0.00 $142,400.00 AIRPORT

36 ABBEVILLE CHRIS CRUSTA MEMORIAL Construct T-Hangar Taxilane (Phase I - Design) $19,350.00 $2,150.00 $0.00 $21,500.00 AIRPORT

Wednesday, January 13, 2016 General Aviation Capital Outlay Page 5 of 7 Airport Construction and Development Priority Program 2016-2017

General Aviation Capital Outlay Federal Item Airport Project Description Funds State Match Local/Other Total Funds

37 THIBODAUX MUNICIPAL AIRPORT Obstruction Removal and Perimeter Fencing - Phase I $150,000.00 $16,667.00 $0.00 $166,667.00 (Design and Environmental)

38 FALSE RIVER REGIONAL AIRPORT Small Scale Master Plan Update $202,500.00 $22,500.00 $0.00 $225,000.00

39 UNION PARISH AIRPORT Construct Taxiway Reconfiguration/Safety Area $540,000.00 $60,000.00 $0.00 $600,000.00 Improvements - Phase II

40 VICKSBURG-TALLULAH REGIONAL AIRPORT Design to Construct Access Road Rehabilitation $45,000.00 $5,000.00 $0.00 $50,000.00

41 JOHN H.HOOKS JR. MEMORIAL Design and Construction of Runway Rehabilitation $450,000.00 $50,000.00 $0.00 $500,000.00

General Aviation Capital Outlay Totals $18,423,733.00 $8,640,638.00 $720,000.00 $27,784,371.00

Wednesday, January 13, 2016 General Aviation Capital Outlay Page 6 of 7 Airport Construction and Development Priority Program 2016-2017

General Aviation Capital Outlay Federal Item Airport Project Description Funds State Match Local/Other Total Funds

Total AC / GA Funded $ 26,516,193 NAVAIDS Program $ 975,000 GA Maintenance Reimbursement Program $ 300,000 AC Maintenance Reimbursement Program $ 700,000

Total GA Program $ 9,915,638 Total AC Program $ 18,575,555

2016-2017 AVIATION PRIORITY PROGRAM TOTAL $ 28,491,193

Wednesday, January 13, 2016 General Aviation Capital Outlay Page 7 of 7

Air Carrier Unfunded 2017-2018

Air Carrier Capital Outlay Federal Item Airport Project Description Funds State Match Local Other Total Funds

1 ALEXANDRIA INTERNATIONAL Airfield Electrical Rehabilitation - Phase V $0.00 $1,200,000.00 $0.00 $1,200,000.00 AIRPORT

2 ALEXANDRIA INTERNATIONAL Property Acq. for Obstruction Removal to Approaches $0.00 $70,729.00 $0.00 $70,729.00 AIRPORT for Runway 14 & 18 - Phase II

3 ALEXANDRIA INTERNATIONAL Wildlife Hazard Removal - Phase V $0.00 $396,574.00 $0.00 $396,574.00 AIRPORT

4 NEW ORLEANS LOUIS ARMSTRONG Terminal Construction Project - Phase IV $23,790,000.00 $6,172,000.00 $4,758,000.00 $34,720,000.00 INTERNATIONAL AIRPORT

5 SHREVEPORT REGIONAL AIRPORT Improve Runway 32 RPZ $0.00 $400,000.00 $0.00 $400,000.00

6 SHREVEPORT REGIONAL AIRPORT Airfield Lighting Rehabilitation - Phase IV $0.00 $1,200,000.00 $0.00 $1,200,000.00

7 ALEXANDRIA INTERNATIONAL Wildlife Mitigation Approach to Runway 18 $0.00 $225,000.00 $0.00 $225,000.00 AIRPORT

8 BATON ROUGE METROPOLITAN Relocate South Portion of Plank Road $11,000,000.00 $4,202,222.00 $20,000.00 $15,222,222.00 AIRPORT

9 SHREVEPORT REGIONAL AIRPORT Runway 14/32 Pavement Preservation - Design & $0.00 $1,500,000.00 $0.00 $1,500,000.00 Construction

10 ALEXANDRIA INTERNATIONAL North Ramp Rehabilitation- Phase II $2,700,000.00 $300,000.00 $0.00 $3,000,000.00 AIRPORT

11 LAFAYETTE REGIONAL AIRPORT Terminal Infrastructure - Design - Phase II $6,579,356.00 $731,040.00 $0.00 $7,310,396.00 (Schematic/Functional)

12 ALEXANDRIA INTERNATIONAL Taxiway B Rehabilitation - Construction for Phase II $360,000.00 $40,000.00 $0.00 $400,000.00 AIRPORT

13 MONROE REGIONAL AIRPORT Rehabilitate Runway 4/22 Blast Pads $117,000.00 $13,000.00 $0.00 $130,000.00

14 LAKE CHARLES REGIONAL AIRPORT Wildlife Hazard Mitigation - Perimeter Fencing Phase IV $0.00 $750,000.00 $0.00 $750,000.00

Wednesday, January 13, 2016 Air Carrier Capital Outlay Page 1 of 16

Air Carrier Capital Outlay Federal Item Airport Project Description Funds State Match Local Other Total Funds

15 MONROE REGIONAL AIRPORT Rehabilitate Taxiway A $81,000.00 $19,000.00 $0.00 $100,000.00

16 MONROE REGIONAL AIRPORT Rehabilitate Runway 14/32 Markings $0.00 $308,730.00 $0.00 $308,730.00

17 SHREVEPORT REGIONAL AIRPORT Extend Runway 6 & Taxiway C - Design $0.00 $640,000.00 $0.00 $640,000.00

18 LAKE CHARLES REGIONAL AIRPORT South Apron Expansion - Phase I (Design) $0.00 $150,000.00 $0.00 $150,000.00

19 LAFAYETTE REGIONAL AIRPORT Terminal Infrastructure - Airside - Phase I & II $8,723,695.00 $3,000,000.00 $0.00 $11,723,695.00

20 MONROE REGIONAL AIRPORT Upgrade Airfield Lighting Controls $180,000.00 $20,000.00 $0.00 $200,000.00

21 ALEXANDRIA INTERNATIONAL Rehabilitate Runway 14/32 & 18/36 Safety Areas - $808,775.00 $89,864.00 $0.00 $898,639.00 AIRPORT Phase I

22 ALEXANDRIA INTERNATIONAL Master Drainage Rehabilitation - Phase II $346,500.00 $653,500.00 $0.00 $1,000,000.00 AIRPORT

23 ALEXANDRIA INTERNATIONAL Rehabilitation of Runway 32 and Taxiway A Safety Area $0.00 $160,000.00 $0.00 $160,000.00 AIRPORT

24 ALEXANDRIA INTERNATIONAL Master Drainage Rehabilitation - Phase I $699,275.00 $77,697.00 $0.00 $776,972.00 AIRPORT

25 LAKE CHARLES REGIONAL AIRPORT Wildlife Mitigation - Sanitary Sewer Connection $1,000,000.00 $111,111.00 $0.00 $1,111,111.00

26 SHREVEPORT REGIONAL AIRPORT Security Rennovations - Phase II $0.00 $200,000.00 $0.00 $200,000.00

27 ALEXANDRIA INTERNATIONAL Rehabilitation of Taxiway E & Terminal Ramp - Phase I $495,000.00 $55,000.00 $0.00 $550,000.00 AIRPORT

28 ALEXANDRIA INTERNATIONAL Rehabilitate Runway 36 $250,000.00 $1,527,778.00 $0.00 $1,777,778.00 AIRPORT

29 MONROE REGIONAL AIRPORT Upgrade Windcone to LED $0.00 $38,000.00 $0.00 $38,000.00

Wednesday, January 13, 2016 Air Carrier Capital Outlay Page 2 of 16

Air Carrier Capital Outlay Federal Item Airport Project Description Funds State Match Local Other Total Funds

30 LAFAYETTE REGIONAL AIRPORT Terminal Infrastructure Design - Phase I - (EA & $3,699,356.00 $411,040.00 $3,000,000.00 $7,110,396.00 Conceptual)

31 LAKE CHARLES REGIONAL AIRPORT Bury Utility Lines - Phase I (Design) $0.00 $150,000.00 $0.00 $150,000.00

32 LAKE CHARLES REGIONAL AIRPORT ATCT Study $0.00 $250,000.00 $0.00 $250,000.00

33 MONROE REGIONAL AIRPORT Improve Perimeter Road - Phase I $720,000.00 $80,000.00 $0.00 $800,000.00

34 ALEXANDRIA INTERNATIONAL Wildlife Hazard Safety Mitigation - Fence Rehabilitation $906,188.00 $100,688.00 $0.00 $1,006,876.00 AIRPORT

35 MONROE REGIONAL AIRPORT Acquire ARFF Vehicle $0.00 $775,000.00 $0.00 $775,000.00

36 MONROE REGIONAL AIRPORT Acquire Runway Sweeper $0.00 $225,000.00 $0.00 $225,000.00

37 ALEXANDRIA INTERNATIONAL Emergency Response Vehicle $0.00 $300,000.00 $0.00 $300,000.00 AIRPORT

38 ALEXANDRIA INTERNATIONAL GIS Development - Phase II $0.00 $500,000.00 $0.00 $500,000.00 AIRPORT

39 MONROE REGIONAL AIRPORT Acquire Mass Casualty Vehicle $0.00 $550,000.00 $0.00 $550,000.00

40 MONROE REGIONAL AIRPORT Upgrade Taxiway Lighting, Signs, and REILS to LED $2,340,000.00 $260,000.00 $0.00 $2,600,000.00

Air Carrier Capital Outlay Totals $64,796,145.00 $27,852,973.00 $7,778,000.00$100,427,118.00

Wednesday, January 13, 2016 Air Carrier Capital Outlay Page 3 of 16

General Aviation Unfunded 2017-2018

General Aviation Capital Outlay Federal Item Airport Project Description Funds State Match Local Other Total Funds

1 SOUTH LAFOURCHE LEONARD Obstruction Removal - Runway 18 Approach Phase II $0.00 $100,000.00 $0.00 $100,000.00 MILLER, JR. AIRPORT (Construction)

2 ST LANDRY PARISH-AHART FIELD Obstruction Removal (Runway 18-36) - Phase II $0.00 $108,884.00 $0.00 $108,884.00

3 ALLEN PARISH AIRPORT Obstruction Removal - Phase II (Mitigation of $0.00 $400,000.00 $0.00 $400,000.00 Obstructions)

4 MINDEN AIRPORT Remove Transitional Surface Obstructions $0.00 $150,000.00 $0.00 $150,000.00

5 ST TAMMANY REGIONAL AIRPORT Mitigate Obstructions Phase V - Relocate Airport Access $0.00 $142,000.00 $0.00 $142,000.00 Road (Design)

6 NEW ORLEANS LAKEFRONT AIRPORT Rehabilitation of Drainage - Phase II (Design) $315,000.00 $35,000.00 $0.00 $350,000.00

7 THIBODAUX MUNICIPAL AIRPORT Obstruction Removal - Runway 8 and 26 $100,000.00 $11,111.00 $0.00 $111,111.00

8 MARKSVILLE MUNICIPAL AIRPORT Obstruction Removal Runway 22 Approach - Phase II $0.00 $113,000.00 $0.00 $113,000.00

9 NEW ORLEANS LAKEFRONT AIRPORT Rehabilitate Runway 18R/36L - Phase II (Construction) $2,610,000.00 $290,000.00 $0.00 $2,900,000.00

10 CONCORDIA PARISH AIRPORT Obstruction Removal $0.00 $100,000.00 $0.00 $100,000.00

11 SLIDELL AIRPORT Runway 18 Threshold Recovery - Phase II (Obstruction $270,000.00 $30,000.00 $0.00 $300,000.00 Mitigation)

12 FRANKLINTON AIRPORT Obstruction Removal - Phase II $0.00 $75,000.00 $0.00 $75,000.00

13 MARKSVILLE MUNICIPAL AIRPORT Runway Reconstruction - Phase III (Construction) $1,890,000.00 $210,000.00 $0.00 $2,100,000.00

14 GEORGE R. CARR MEMORIAL AIRPORT Land Acquisition - Northwest Runway 18 $0.00 $350,000.00 $0.00 $350,000.00

15 LEESVILLE AIRPORT Obstruction Removal - RSA East $0.00 $25,000.00 $0.00 $25,000.00

16 COLUMBIA AIRPORT Obstruction Removal - Phase I $0.00 $100,000.00 $0.00 $100,000.00

Wednesday, January 13, 2016 General Aviation Capital Outlay Page 4 of 16

General Aviation Capital Outlay Federal Item Airport Project Description Funds State Match Local Other Total Funds

17 ALLEN PARISH AIRPORT Obstruction Removal - Phase I (Environmental & $0.00 $520,000.00 $0.00 $520,000.00 Mitigation Credits)

18 LE MAIRE MEMORIAL AIRPORT Obstruction Removal - Phase II $0.00 $150,000.00 $0.00 $150,000.00

19 DE QUINCY INDUSTRIAL AIRPARK Obstruction Removal $180,000.00 $20,000.00 $0.00 $200,000.00

20 SHREVEPORT DOWNTOWN AIRPORT Design Northwest Ramp Rehabilitation $0.00 $100,000.00 $0.00 $100,000.00

21 NEW ORLEANS LAKEFRONT AIRPORT Rehabilitate Runway 9/27 $0.00 $200,000.00 $0.00 $200,000.00

22 LOUISIANA REGIONAL AIRPORT South Apron Expansion - Phase II (Construction) $0.00 $920,000.00 $0.00 $920,000.00

23 SHREVEPORT DOWNTOWN AIRPORT Design New Taxiway Edge Lighting $0.00 $86,000.00 $0.00 $86,000.00

24 ST LANDRY PARISH-AHART FIELD Runway 18-36 Rehabilitation - Asphalt $0.00 $461,265.00 $0.00 $461,265.00

25 ESLER REGIONAL AIRPORT Rehabilitate Runway 9/27 (Construction) $1,659,510.00 $184,390.00 $0.00 $1,843,900.00

26 HOUMA-TERREBONNE AIRPORT Construct Partial Parallel Taxiway - Phase III $900,000.00 $100,000.00 $0.00 $1,000,000.00 (Construction)

27 NATCHITOCHES REGIONAL AIRPORT Construct Drainage Improvements $0.00 $225,000.00 $0.00 $225,000.00

28 JENNINGS AIRPORT Construct Runway 8-26 Exit Taxiway $0.00 $582,000.00 $20,000.00 $602,000.00

29 NATCHITOCHES REGIONAL AIRPORT Rehabilitate Drainage - Phase II (Design) $0.00 $50,000.00 $0.00 $50,000.00

30 SHREVEPORT DOWNTOWN AIRPORT Security Fencing Upgrades $0.00 $100,000.00 $0.00 $100,000.00

31 C.E. (RUSTY) WILLIAMS AIRPORT Obstruction Removal (North End Parallel Taxiway) $0.00 $100,000.00 $0.00 $100,000.00

32 MARKSVILLE MUNICIPAL AIRPORT Runway 22 Obstruction removal $0.00 $155,000.00 $0.00 $155,000.00

Wednesday, January 13, 2016 General Aviation Capital Outlay Page 5 of 16

General Aviation Capital Outlay Federal Item Airport Project Description Funds State Match Local Other Total Funds

33 JENNINGS AIRPORT Rehabilitate Runway 13/31 - Phase II (Construction) $729,000.00 $81,000.00 $0.00 $810,000.00

34 ACADIANA REGIONAL AIRPORT Taxiway A Improvements - Phase II (Construction) $900,000.00 $100,000.00 $0.00 $1,000,000.00

35 SLIDELL AIRPORT Runway 18 Threshold Recovery - Phase I (Survey and $105,300.00 $11,700.00 $0.00 $117,000.00 Design)

36 ST TAMMANY REGIONAL AIRPORT Airfield Lighting and NAVAIDS Improvements - Phase II $709,335.00 $78,815.00 $0.00 $788,150.00 (Construction)

37 SHREVEPORT DOWNTOWN AIRPORT Runway 5/23 Extension/Shift- EA and Feasibility Study $0.00 $150,000.00 $0.00 $150,000.00

38 ESLER REGIONAL AIRPORT Rehabilitate Runway 9/27 (Design) $0.00 $156,100.00 $0.00 $156,100.00

39 SHREVEPORT DOWNTOWN AIRPORT Runway 5/23 Extension/Shift- Design $180,000.00 $20,000.00 $0.00 $200,000.00

40 LE GROS MEMORIAL AIRPORT Rehabilitate Airfield Drainage Phase II - Design $0.00 $56,000.00 $0.00 $56,000.00

41 JENA AIRPORT Obstruction Removal $0.00 $20,000.00 $0.00 $20,000.00

42 HAMMOND NORTHSHORE REGIONAL Drainage Improvements Phase IV $0.00 $550,000.00 $0.00 $550,000.00 AIRPORT

43 LEESVILLE AIRPORT RSA Improvements South - Phase II (Construction) $567,000.00 $63,000.00 $0.00 $630,000.00

44 HOUMA-TERREBONNE AIRPORT Runway and Taxiway Marking $0.00 $750,000.00 $0.00 $750,000.00

45 SLIDELL AIRPORT Apron Expansion - Phase I $0.00 $480,000.00 $0.00 $480,000.00

46 HARRY P. WILLIAMS MEMORIAL Rehabilitate Pump Station - Phase II $0.00 $300,000.00 $0.00 $300,000.00 AIRPORT

47 SHREVEPORT DOWNTOWN AIRPORT Design New Taxiways $0.00 $100,000.00 $0.00 $100,000.00

48 LE GROS MEMORIAL AIRPORT Terminal Apron Overlay - Phase II (Construction) $360,810.00 $40,090.00 $0.00 $400,900.00

Wednesday, January 13, 2016 General Aviation Capital Outlay Page 6 of 16

General Aviation Capital Outlay Federal Item Airport Project Description Funds State Match Local Other Total Funds

49 BUNKIE MUNICIPAL AIRPORT Airport Lighting & Navaid Rehabilitation - Phase II $0.00 $253,411.00 $0.00 $253,411.00

50 ABBEVILLE CHRIS CRUSTA MEMORIAL Rehabilitate Main Hangar $0.00 $275,000.00 $50,000.00 $325,000.00 AIRPORT

51 HART AIRPORT Reconstruct Runway Phase II (Construction) $0.00 $700,000.00 $0.00 $700,000.00

52 LE MAIRE MEMORIAL AIRPORT Obstruction Removal - Phase III $0.00 $100,000.00 $0.00 $100,000.00

53 ST JOHN THE BAPTIST PARISH Drainage Improvements - Phase I $0.00 $78,000.00 $10,000.00 $88,000.00 AIRPORT

54 C.E. (RUSTY) WILLIAMS AIRPORT Construct Runway Rehabilitation $0.00 $350,000.00 $100,000.00 $450,000.00

55 LOUISIANA REGIONAL AIRPORT Runway and Taxiway Overlay - Phase I (Design) $135,000.00 $15,000.00 $0.00 $150,000.00

56 SOUTH LAFOURCHE LEONARD Taxiway Lighting - Phase II (Construction) $712,800.00 $79,200.00 $0.00 $792,000.00 MILLER, JR. AIRPORT

57 SOUTH LAFOURCHE LEONARD Terminal Design $0.00 $150,000.00 $50,000.00 $200,000.00 MILLER, JR. AIRPORT

58 VIVIAN AIRPORT Construct Teacup Taxiways $990,000.00 $110,000.00 $0.00 $1,100,000.00

59 HOUMA-TERREBONNE AIRPORT West Apron Fill $0.00 $1,000,000.00 $0.00 $1,000,000.00

60 GEORGE R. CARR MEMORIAL AIRPORT Construct Parallel Taxiway - Phase II $2,009,700.00 $223,300.00 $0.00 $2,233,000.00

61 MINDEN AIRPORT Construct Parallel Taxiway from Apron to Runway 36 $867,600.00 $96,400.00 $0.00 $964,000.00 Approach

62 RUSTON REGIONAL AIRPORT Obstruction Removal - Phase II $0.00 $250,000.00 $0.00 $250,000.00

63 TENSAS PARISH AIRPORT Lighting Rehabilitation (Phase II - Construction) $0.00 $500,000.00 $0.00 $500,000.00

Wednesday, January 13, 2016 General Aviation Capital Outlay Page 7 of 16

General Aviation Capital Outlay Federal Item Airport Project Description Funds State Match Local Other Total Funds

64 FALSE RIVER REGIONAL AIRPORT 7 Row T-Hangars $0.00 $430,000.00 $20,000.00 $450,000.00

65 BYERLEY AIRPORT Obstruction Removal Phase III $0.00 $250,000.00 $0.00 $250,000.00

66 CONCORDIA PARISH AIRPORT Construct 5-Box Hangars $0.00 $300,000.00 $20,000.00 $320,000.00

67 RUSTON REGIONAL AIRPORT Rehabilitate Runway & Taxiways $0.00 $500,000.00 $0.00 $500,000.00

68 WELSH AIRPORT Obstruction Removal/Avigation Easements $0.00 $150,000.00 $0.00 $150,000.00

69 CHENNAULT INTERNATIONAL AIRPORT Reconstruct Blast Pad for Runway 33 $360,000.00 $40,000.00 $0.00 $400,000.00

70 RED RIVER PARISH AIRPORT Construct East Airfield Perimeter Fence Replacement $0.00 $350,000.00 $0.00 $350,000.00

71 ST JOHN THE BAPTIST PARISH Runway 17 Threshold Recovery/Runway $155,700.00 $17,300.00 $0.00 $173,000.00 AIRPORT Widening/Runway Overlay - Phase I (Design)

72 BYERLEY AIRPORT Rehabilitate Runway 17/35 $0.00 $130,000.00 $0.00 $130,000.00

73 TENSAS PARISH AIRPORT Fuel Farm $0.00 $100,000.00 $20,000.00 $120,000.00

74 ESLER REGIONAL AIRPORT Rehabilitate Taxiways (Design) $0.00 $39,700.00 $0.00 $39,700.00

75 JENNINGS AIRPORT Construct Entrance Taxiway - Runway 13 $0.00 $276,000.00 $10,000.00 $286,000.00

76 C.E. (RUSTY) WILLIAMS AIRPORT Design Airfield Lighting Improvements and Construct $0.00 $500,000.00 $500,000.00 $1,000,000.00 New Vault

77 ACADIANA REGIONAL AIRPORT Construct Blast Pad $0.00 $350,000.00 $0.00 $350,000.00

78 SOUTHLAND FIELD Fuel Farm- Phase II $0.00 $225,000.00 $50,000.00 $275,000.00

79 EUNICE AIRPORT Sealcoat GA Apron - Phase I (Design) $45,000.00 $5,000.00 $0.00 $50,000.00

Wednesday, January 13, 2016 General Aviation Capital Outlay Page 8 of 16

General Aviation Capital Outlay Federal Item Airport Project Description Funds State Match Local Other Total Funds

80 NATCHITOCHES REGIONAL AIRPORT Rehabilitate Lighting on Runway 17/35 $0.00 $100,000.00 $0.00 $100,000.00

81 SOUTHLAND FIELD Rehabilitate Parallel Taxiway $150,000.00 $16,667.00 $0.00 $166,667.00

82 JOHN H.HOOKS JR. MEMORIAL Construct Hangar Access Taxiway Phase II $540,000.00 $60,000.00 $0.00 $600,000.00

83 ESLER REGIONAL AIRPORT Drainage Rehabilitation of Safety Areas and Midfield $0.00 $361,777.00 $0.00 $361,777.00

84 SLIDELL AIRPORT Taxilane Widening and Overlay $0.00 $168,000.00 $0.00 $168,000.00

85 ST JOHN THE BAPTIST PARISH Obstruction Mitigation - Runway 17 Phase I $0.00 $250,000.00 $0.00 $250,000.00 AIRPORT (Environmental/Design)

86 SOUTHLAND FIELD Rehabilitate Apron $150,000.00 $16,667.00 $0.00 $166,667.00

87 GEORGE R. CARR MEMORIAL AIRPORT Localized Runway Repairs $0.00 $120,000.00 $0.00 $120,000.00

88 LEESVILLE AIRPORT Rehabilitate Runway $0.00 $350,673.00 $0.00 $350,673.00

89 BEAUREGARD REGIONAL AIRPORT Rehabilitate Taxiway Pavement - Sealcoat and Marking $0.00 $150,000.00 $0.00 $150,000.00

90 CONCORDIA PARISH AIRPORT Rehabilitate Runway $1,350,000.00 $150,000.00 $0.00 $1,500,000.00

91 ST JOHN THE BAPTIST PARISH Taxiway Extension $0.00 $660,000.00 $0.00 $660,000.00 AIRPORT

92 HARRY P. WILLIAMS MEMORIAL Dredge and Stabilize Seaway - Phase I (Design) $0.00 $100,000.00 $0.00 $100,000.00 AIRPORT

93 TENSAS PARISH AIRPORT Rehabilitate Runway $0.00 $200,000.00 $0.00 $200,000.00

94 BUNKIE MUNICIPAL AIRPORT Runway Sealcoat $0.00 $170,379.00 $0.00 $170,379.00

95 ABBEVILLE CHRIS CRUSTA MEMORIAL Terminal Building - Phase I (Design) $0.00 $72,450.00 $8,050.00 $80,500.00 AIRPORT

Wednesday, January 13, 2016 General Aviation Capital Outlay Page 9 of 16

General Aviation Capital Outlay Federal Item Airport Project Description Funds State Match Local Other Total Funds

96 BEAUREGARD REGIONAL AIRPORT Rehabilitate Apron and Repair Drainage - Phase I $0.00 $80,000.00 $0.00 $80,000.00 (Design)

97 JACKSON AIRPORT Rehabilitate Runway $0.00 $356,800.00 $0.00 $356,800.00

98 BUNKIE MUNICIPAL AIRPORT Airfield Lighting and Navaid Rehabilitation - Phase I $0.00 $36,890.00 $0.00 $36,890.00

99 PINEVILLE MUNICIPAL AIRPORT Construct Seaplane Ramp and Dock $0.00 $179,291.00 $0.00 $179,291.00

100 RUSTON REGIONAL AIRPORT Construct Runway Extension - Phase I (Design) $405,000.00 $45,000.00 $0.00 $450,000.00

101 HAMMOND NORTHSHORE REGIONAL Master Plan Update $0.00 $225,000.00 $0.00 $225,000.00 AIRPORT

102 JONESVILLE MUNICIPAL AIRPORT Rehabilitate Aprons - Phase II $332,500.00 $36,944.00 $0.00 $369,444.00

103 SOUTH LAFOURCHE LEONARD Runway LED Upgrades $0.00 $50,000.00 $0.00 $50,000.00 MILLER, JR. AIRPORT

104 CONCORDIA PARISH AIRPORT Relocate Signage/Markings $0.00 $25,000.00 $0.00 $25,000.00

105 ABBEVILLE CHRIS CRUSTA MEMORIAL Construct T-Hangar Taxilane (Phase II - Construction) $222,300.00 $24,700.00 $0.00 $247,000.00 AIRPORT

106 VICKSBURG-TALLULAH REGIONAL Rehabilitate Taxiway $184,500.00 $20,500.00 $0.00 $205,000.00 AIRPORT

107 DAVID G. JOYCE AIRPORT Design Apron Rehabilitation $0.00 $40,000.00 $0.00 $40,000.00

108 HART AIRPORT Design and Construct Apron Overlay $0.00 $200,000.00 $0.00 $200,000.00

109 JENA AIRPORT Fuel Farm Installation $0.00 $65,000.00 $20,000.00 $85,000.00

110 ST LANDRY PARISH-AHART FIELD Security Fencing - Northeast end $0.00 $70,150.00 $0.00 $70,150.00

Wednesday, January 13, 2016 General Aviation Capital Outlay Page 10 of 16

General Aviation Capital Outlay Federal Item Airport Project Description Funds State Match Local Other Total Funds

111 JENNINGS AIRPORT Relocate Wind Cone and Construct Segmented Circle $0.00 $96,000.00 $0.00 $96,000.00

112 ST TAMMANY REGIONAL AIRPORT Extend Runway 18/36 - Phase I (Environmental) $180,000.00 $20,000.00 $0.00 $200,000.00

113 ST JOHN THE BAPTIST PARISH Expand Auto Parking $464,540.00 $51,616.00 $0.00 $516,156.00 AIRPORT

114 KELLY-DUMAS Instrument Approach Survey $0.00 $85,000.00 $0.00 $85,000.00

115 NATCHITOCHES REGIONAL AIRPORT Install New Perimeter Fence and Repair Existing Fence $360,000.00 $40,000.00 $0.00 $400,000.00

116 HARRY P. WILLIAMS MEMORIAL Upgrade Perimeter Fence and Security System $0.00 $100,000.00 $0.00 $100,000.00 AIRPORT

117 MOREHOUSE MEMORIAL AIRPORT Apron Rehabilitation $292,500.00 $32,500.00 $0.00 $325,000.00

118 JONESBORO AIRPORT Fuel Farm $0.00 $110,000.00 $20,000.00 $130,000.00

119 ACADIANA REGIONAL AIRPORT ARFF Station Relocation - Phase I (Design) $288,000.00 $32,000.00 $0.00 $320,000.00

120 ACADIANA REGIONAL AIRPORT Construct Hangar $0.00 $350,000.00 $0.00 $350,000.00

121 NATCHITOCHES REGIONAL AIRPORT Replace AWOS III P/T $0.00 $200,000.00 $0.00 $200,000.00

122 HART AIRPORT Design Runway Extension $0.00 $160,000.00 $0.00 $160,000.00

123 PINEVILLE MUNICIPAL AIRPORT Small Scope Master Plan - Phase II $0.00 $56,000.00 $0.00 $56,000.00

124 CONCORDIA PARISH AIRPORT Runway Extension - Preliminary $60,750.00 $6,750.00 $0.00 $67,500.00

125 JACKSON AIRPORT Construct Taxiway and Apron $0.00 $256,250.00 $0.00 $256,250.00

126 PINEVILLE MUNICIPAL AIRPORT Relocate Hangars Behind Building Restriction Line $0.00 $752,512.00 $0.00 $752,512.00

Wednesday, January 13, 2016 General Aviation Capital Outlay Page 11 of 16

General Aviation Capital Outlay Federal Item Airport Project Description Funds State Match Local Other Total Funds

127 MOREHOUSE MEMORIAL AIRPORT Rehabilitate Runway - Phase I $57,000.00 $6,333.00 $0.00 $63,333.00

128 COLUMBIA AIRPORT Construct Runway - Preliminary $0.00 $175,000.00 $0.00 $175,000.00

129 BUNKIE MUNICIPAL AIRPORT Perimeter Fencing - Phase I $0.00 $82,900.00 $0.00 $82,900.00

130 SPRINGHILL AIRPORT Construct Perimeter Fencing $405,000.00 $45,000.00 $0.00 $450,000.00

131 ARCADIA-BIENVILLE AIRPORT Construct Perimeter Fencing $0.00 $500,000.00 $0.00 $500,000.00

132 NATCHITOCHES REGIONAL AIRPORT Construct Agricultural Ramp & Wash Rack $0.00 $325,000.00 $0.00 $325,000.00

133 DE QUINCY INDUSTRIAL AIRPARK Perimeter Fencing - Phase I $31,500.00 $3,500.00 $0.00 $35,000.00

134 HART AIRPORT Design & Construct Perimeter Fencing $0.00 $350,000.00 $0.00 $350,000.00

135 LE GROS MEMORIAL AIRPORT Installation of Runway 13-31 Lighting $0.00 $383,600.00 $0.00 $383,600.00

136 PINEVILLE MUNICIPAL AIRPORT Expand Automobile Parking Lot $0.00 $125,802.00 $0.00 $125,802.00

137 CONCORDIA PARISH AIRPORT Taxiway Extension - Preliminary $60,750.00 $6,750.00 $0.00 $67,500.00

138 DE QUINCY INDUSTRIAL AIRPARK Replace Rotating Beacon $0.00 $50,000.00 $0.00 $50,000.00

139 LEESVILLE AIRPORT GA Development Area - Taxilanes and Drainage $0.00 $217,100.00 $0.00 $217,100.00

140 COLUMBIA AIRPORT Construct AG Apron $0.00 $231,000.00 $0.00 $231,000.00

141 TENSAS PARISH AIRPORT Apron Expansion - Phase I $0.00 $55,000.00 $0.00 $55,000.00

142 JOHN H.HOOKS JR. MEMORIAL Design & Environmental for Runway & Taxiway $152,000.00 $16,889.00 $0.00 $168,889.00 Extension

Wednesday, January 13, 2016 General Aviation Capital Outlay Page 12 of 16

General Aviation Capital Outlay Federal Item Airport Project Description Funds State Match Local Other Total Funds

143 KELLY-DUMAS Construct Three Box Hangars $0.00 $350,000.00 $0.00 $350,000.00

144 ARCADIA-BIENVILLE AIRPORT Design Agriculture Apron, Taxilane, and Entrance Road $0.00 $85,000.00 $0.00 $85,000.00

145 ESLER REGIONAL AIRPORT Construct T-Hangars $0.00 $373,258.00 $0.00 $373,258.00

146 JONESBORO AIRPORT Design to Construct Agriculture Apron $51,319.00 $5,702.00 $0.00 $57,021.00

147 VICKSBURG-TALLULAH REGIONAL Design to Construct Hangar $0.00 $75,000.00 $0.00 $75,000.00 AIRPORT

148 ESLER REGIONAL AIRPORT Small Scale Airport Master Plan $0.00 $150,000.00 $0.00 $150,000.00

149 ARCADIA-BIENVILLE AIRPORT Construct Agriculture Apron, Taxilane, and Entrance $0.00 $600,000.00 $0.00 $600,000.00 Road

150 LE GROS MEMORIAL AIRPORT Construct Aviation Fuel System $0.00 $194,000.00 $0.00 $194,000.00

151 DAVID G. JOYCE AIRPORT Rehabilitate Airfield Lighting $0.00 $325,000.00 $0.00 $325,000.00

152 DE QUINCY INDUSTRIAL AIRPARK Hangar Rehabilitation $0.00 $300,000.00 $0.00 $300,000.00

153 RED RIVER PARISH AIRPORT Airport Action Plan $0.00 $125,000.00 $0.00 $125,000.00

154 ARCADIA-BIENVILLE AIRPORT Construct Hangar $0.00 $500,000.00 $0.00 $500,000.00

155 VIVIAN AIRPORT Environmental Assessment to Construct New Runway $0.00 $150,000.00 $0.00 $150,000.00 9/27

156 ARCADIA-BIENVILLE AIRPORT Design Hangar $0.00 $120,000.00 $0.00 $120,000.00

157 HART AIRPORT Airport Action Plan $0.00 $125,000.00 $0.00 $125,000.00

158 ARCADIA-BIENVILLE AIRPORT Action Plan/ALP $0.00 $125,000.00 $0.00 $125,000.00

Wednesday, January 13, 2016 General Aviation Capital Outlay Page 13 of 16

General Aviation Capital Outlay Federal Item Airport Project Description Funds State Match Local Other Total Funds

159 ARCADIA-BIENVILLE AIRPORT Design Terminal and Fuel Farm $0.00 $90,000.00 $0.00 $90,000.00

160 HOMER MUNICIPAL AIRPORT Construct Runway Safety Area Improvements $0.00 $831,600.00 $0.00 $831,600.00

161 HOMER MUNICIPAL AIRPORT Design Runway Safety Area Improvements $0.00 $105,000.00 $0.00 $105,000.00

162 MARKSVILLE MUNICIPAL AIRPORT Northeast Apron Improvements - Phase I (Design) $0.00 $47,000.00 $0.00 $47,000.00

163 JACKSON AIRPORT Temporary Runway Lighting $0.00 $51,600.00 $0.00 $51,600.00

164 JONESBORO AIRPORT Construct Hangars $0.00 $292,000.00 $8,000.00 $300,000.00

165 DAVID G. JOYCE AIRPORT Rehabilitate Apron - South Section $0.00 $460,000.00 $0.00 $460,000.00

166 VICKSBURG-TALLULAH REGIONAL Runway Extension (Feasibility Study) $0.00 $39,670.00 $0.00 $39,670.00 AIRPORT

167 BEAUREGARD REGIONAL AIRPORT Airport Layout Plan Update $0.00 $60,000.00 $0.00 $60,000.00

168 MOREHOUSE MEMORIAL AIRPORT Construct Hangars $315,000.00 $35,000.00 $0.00 $350,000.00

169 VICKSBURG-TALLULAH REGIONAL Construct Access Road Rehabilitation $90,000.00 $10,000.00 $0.00 $100,000.00 AIRPORT

170 JOHN H.HOOKS JR. MEMORIAL Construct Hangar AccessTaxiway Phase I $58,500.00 $6,500.00 $0.00 $65,000.00

171 KELLY-DUMAS Install AWOS $0.00 $200,000.00 $0.00 $200,000.00

172 BUNKIE MUNICIPAL AIRPORT Update Airport Layout Plan $0.00 $50,000.00 $0.00 $50,000.00

173 FRANKLINTON AIRPORT Perimeter Fencing - Phase I $0.00 $135,000.00 $0.00 $135,000.00

174 WELSH AIRPORT Rehabilitate Airfield Lighting - Phase I (Design) $0.00 $80,000.00 $0.00 $80,000.00

Wednesday, January 13, 2016 General Aviation Capital Outlay Page 14 of 16

General Aviation Capital Outlay Federal Item Airport Project Description Funds State Match Local Other Total Funds

175 JONESBORO AIRPORT Construct Agriculture Apron $450,000.00 $50,000.00 $0.00 $500,000.00

176 WELSH AIRPORT Runway Rehabilitation $0.00 $180,000.00 $0.00 $180,000.00

177 UNION PARISH AIRPORT Land Acquisition for Taxilanes/Hangar Development $0.00 $150,000.00 $0.00 $150,000.00

178 DELHI MUNICIPAL AIRPORT Runway Rehabilitation $0.00 $100,000.00 $0.00 $100,000.00

179 LE MAIRE MEMORIAL AIRPORT Ramp Expansion $0.00 $400,000.00 $0.00 $400,000.00

180 KELLY-DUMAS Rehabilitate Access Road $150,000.00 $350,000.00 $0.00 $500,000.00

181 JONESVILLE MUNICIPAL AIRPORT Rehabilitate Aprons - Phase I $0.00 $65,000.00 $0.00 $65,000.00

182 DELHI MUNICIPAL AIRPORT Perimeter Fencing - Phase I $0.00 $40,000.00 $0.00 $40,000.00

183 UNION PARISH AIRPORT Update ALP $0.00 $75,000.00 $0.00 $75,000.00

184 HOMER MUNICIPAL AIRPORT Airport Master Plan $0.00 $173,250.00 $0.00 $173,250.00

185 TENSAS PARISH AIRPORT Land Acquisition (Phase I) $0.00 $250,000.00 $0.00 $250,000.00

186 FRANKLINTON AIRPORT Update Airport Layout Plan $0.00 $100,000.00 $0.00 $100,000.00

187 DELHI MUNICIPAL AIRPORT Perimeter Fencing - Phase II $0.00 $50,000.00 $0.00 $50,000.00

188 DELHI MUNICIPAL AIRPORT Perimeter Fence - Phase III $0.00 $330,000.00 $0.00 $330,000.00

189 EUNICE AIRPORT Land Acquistion - West $0.00 $300,000.00 $0.00 $300,000.00

190 JENA AIRPORT Land Acquisition $0.00 $200,000.00 $0.00 $200,000.00

191 OLLA AIRPORT Perimeter Fencing $0.00 $400,000.00 $0.00 $400,000.00

Wednesday, January 13, 2016 General Aviation Capital Outlay Page 15 of 16

General Aviation Capital Outlay Federal Item Airport Project Description Funds State Match Local Other Total Funds

192 JONESVILLE MUNICIPAL AIRPORT Airport Layout Plan $67,500.00 $7,500.00 $0.00 $75,000.00

193 DELHI MUNICIPAL AIRPORT Land Acquisition $0.00 $95,000.00 $0.00 $95,000.00

194 NATCHITOCHES REGIONAL AIRPORT Upgrade Localizer $0.00 $450,000.00 $0.00 $450,000.00

195 DELHI MUNICIPAL AIRPORT Update Airport Layout Plan (ALP) $0.00 $40,000.00 $0.00 $40,000.00

196 WINNSBORO MUNICIPAL AIRPORT Site Selection & EA for new Airport $270,000.00 $30,000.00 $0.00 $300,000.00

197 BYERLEY AIRPORT Construct New Shade Ports $450,000.00 $50,000.00 $0.00 $500,000.00

198 CONCORDIA PARISH AIRPORT Construct Segmented Circle $0.00 $30,000.00 $0.00 $30,000.00

199 COLUMBIA AIRPORT Construct Access Taxilane $0.00 $290,400.00 $0.00 $290,400.00

200 JENA AIRPORT Taxiway A Extension - North - Phase III (Construction) $0.00 $400,000.00 $0.00 $400,000.00

201 JENA AIRPORT Taxiway A Extension - Phase I $0.00 $180,000.00 $0.00 $180,000.00

202 JENA AIRPORT T-hangar Apron $0.00 $75,000.00 $0.00 $75,000.00

203 JENA AIRPORT Taxiway A Extension - South - Phase II (Construction) $0.00 $1,275,000.00 $0.00 $1,275,000.00

204 JENA AIRPORT Taxiway Lighting $0.00 $25,000.00 $0.00 $25,000.00

General Aviation Capital Outlay Totals $24,340,414.00 $38,575,536.00 $906,050.00 $63,822,000.00

Wednesday, January 13, 2016 General Aviation Capital Outlay Page 16 of 16

Air Carrier Unfunded 2018-2021 Airport Construction and Development Priority Program Unfunded 2018-2021

Air Carrier Capital Outlay Federal Item Airport Project Description Funds State Funds Local Other Total Funds 1 BATON ROUGE METROPOLITAN Reconstruct Runway 4R/22L & Taxiway E - Phase II $0.00 $2,980,000.00 $20,000.00 $3,000,000.00 AIRPORT (Design & Construction)

2 SHREVEPORT REGIONAL AIRPORT WHA Mitigation Drainage Project $2,400,000.00 $266,667.00 $0.00 $2,666,667.00

3 BATON ROUGE METROPOLITAN Airfield Perimeter Security Improvements $2,187,243.00 $243,027.00 $0.00 $2,430,270.00 AIRPORT

4 BATON ROUGE METROPOLITAN Construct EMAS Replacement $5,000,000.00 $555,556.00 $0.00 $5,555,556.00 AIRPORT

5 LAFAYETTE REGIONAL AIRPORT Obstruction Removal $0.00 $100,000.00 $0.00 $100,000.00

6 NEW ORLEANS LOUIS ARMSTRONG Terminal Construction Project - Phase VI $2,080,000.00 $3,277,333.00 $416,000.00 $5,773,333.00 INTERNATIONAL AIRPORT

7 BATON ROUGE METROPOLITAN North General Aviation Development - Phase II $0.00 $2,980,000.00 $20,000.00 $3,000,000.00 AIRPORT

8 BATON ROUGE METROPOLITAN North General Aviation Development - Phase III $2,160,000.00 $3,220,000.00 $20,000.00 $5,400,000.00 AIRPORT

9 ALEXANDRIA INTERNATIONAL AIRPORT Install Emergency Generators for Navigational Aids $0.00 $300,000.00 $0.00 $300,000.00

10 BATON ROUGE METROPOLITAN Reconstruct Runway 4R/22L & Taxiway E - Phase III $0.00 $2,980,000.00 $20,000.00 $3,000,000.00 AIRPORT

11 BATON ROUGE METROPOLITAN GA Runway 4R/22L Reconstruction Phase IV $0.00 $1,500,000.00 $0.00 $1,500,000.00 AIRPORT

12 BATON ROUGE METROPOLITAN Reconstruct Runway 4R/22L & Taxiway E - Phase IV $0.00 $1,480,000.00 $20,000.00 $1,500,000.00 AIRPORT

Wednesday, January 13, 2016 Air Carrier Capital Outlay Page 1 of 42 Airport Construction and Development Priority Program Unfunded 2018-2021

Air Carrier Capital Outlay Federal Item Airport Project Description Funds State Funds Local Other Total Funds 13 BATON ROUGE METROPOLITAN GA Runway 4R/22L Reconstruction Phase III $0.00 $3,000,000.00 $0.00 $3,000,000.00 AIRPORT

14 BATON ROUGE METROPOLITAN Northwest Box Culvert - Phase III $0.00 $1,480,000.00 $0.00 $1,480,000.00 AIRPORT

15 BATON ROUGE METROPOLITAN Northwest Box Culvert - Phase IV $0.00 $1,480,000.00 $0.00 $1,480,000.00 AIRPORT

16 BATON ROUGE METROPOLITAN Wildlife Hazard Mitigation - Phase VII $4,500,000.00 $500,000.00 $0.00 $5,000,000.00 AIRPORT

17 LAFAYETTE REGIONAL AIRPORT Rehabilitate North General Aviation Apron - Phase V of V $0.00 $3,000,000.00 $0.00 $3,000,000.00

18 BATON ROUGE METROPOLITAN Wildlife Hazard Mitigation - Phase III $5,788,580.00 $643,176.00 $0.00 $6,431,756.00 AIRPORT

19 BATON ROUGE METROPOLITAN Wildlife Hazard Mitigation - Phase V $4,500,000.00 $500,000.00 $0.00 $5,000,000.00 AIRPORT

20 BATON ROUGE METROPOLITAN Wildlife Hazard Mitigation - Phase VI $4,500,000.00 $500,000.00 $0.00 $5,000,000.00 AIRPORT

21 BATON ROUGE METROPOLITAN Wildlife Hazard Mitigation - Phase IV $4,500,000.00 $500,000.00 $0.00 $5,000,000.00 AIRPORT

22 BATON ROUGE METROPOLITAN Air Carrier Apron Rehabilitation - Phase II $1,977,943.00 $219,771.00 $0.00 $2,197,714.00 AIRPORT

23 MONROE REGIONAL AIRPORT Airfield Drainage Rehabilitation - Phase II (Construction) $0.00 $800,000.00 $0.00 $800,000.00

24 BATON ROUGE METROPOLITAN GA Runway to Taxiway Conversion - Phase II $2,700,000.00 $300,000.00 $0.00 $3,000,000.00 AIRPORT

Wednesday, January 13, 2016 Air Carrier Capital Outlay Page 2 of 42 Airport Construction and Development Priority Program Unfunded 2018-2021

Air Carrier Capital Outlay Federal Item Airport Project Description Funds State Funds Local Other Total Funds 25 SHREVEPORT REGIONAL AIRPORT Widen & Extend Taxiways E & K - Construction $2,880,000.00 $320,000.00 $0.00 $3,200,000.00

26 MONROE REGIONAL AIRPORT Runway 14/32 Extension - Phase II $1,300,000.00 $3,014,444.00 $0.00 $4,314,444.00

27 SHREVEPORT REGIONAL AIRPORT Airfield Drainage Rehabilitation - Design & Construction $0.00 $2,000,000.00 $0.00 $2,000,000.00 Phase III

28 SHREVEPORT REGIONAL AIRPORT Widen & Extend Taxiways E & K - Design $0.00 $250,000.00 $0.00 $250,000.00

29 BATON ROUGE METROPOLITAN North Airport Development - Phase II $0.00 $900,000.00 $0.00 $900,000.00 AIRPORT

30 MONROE REGIONAL AIRPORT Replace Airfield Regulators $0.00 $60,000.00 $0.00 $60,000.00

31 BATON ROUGE METROPOLITAN Airfield Drainage Improvements - Phase II Construction $5,519,500.00 $613,278.00 $0.00 $6,132,778.00 AIRPORT

32 BATON ROUGE METROPOLITAN Taxiway F Reconstruction and Extension - Phase IV $5,415,000.00 $601,667.00 $0.00 $6,016,667.00 AIRPORT

33 ALEXANDRIA INTERNATIONAL AIRPORT Thermoplast Hold Lines and Markings - Phase II $0.00 $400,000.00 $0.00 $400,000.00

34 LAFAYETTE REGIONAL AIRPORT Rehabilitate North General Aviation Apron - IV of V $0.00 $3,000,000.00 $0.00 $3,000,000.00

35 LAKE CHARLES REGIONAL AIRPORT Construct Perimeter Road - Phase II (Construction) $1,000,000.00 $111,111.00 $0.00 $1,111,111.00

36 LAKE CHARLES REGIONAL AIRPORT Runway 5/23 Rehabilitation $0.00 $1,884,000.00 $0.00 $1,884,000.00

Wednesday, January 13, 2016 Air Carrier Capital Outlay Page 3 of 42 Airport Construction and Development Priority Program Unfunded 2018-2021

Air Carrier Capital Outlay Federal Item Airport Project Description Funds State Funds Local Other Total Funds 37 LAKE CHARLES REGIONAL AIRPORT Bury Utiltiy Lines on Airport - Phase III $0.00 $1,002,000.00 $0.00 $1,002,000.00

38 MONROE REGIONAL AIRPORT Rehabilitate Runway 04/22 Markings $0.00 $308,730.00 $0.00 $308,730.00

39 MONROE REGIONAL AIRPORT Wildlife Hazard Mitigation $337,500.00 $37,500.00 $0.00 $375,000.00

40 NEW ORLEANS LOUIS ARMSTRONG Rehabilitate Taxiways E, S, & F $3,431,250.00 $381,250.00 $762,500.00 $4,575,000.00 INTERNATIONAL AIRPORT

41 BATON ROUGE METROPOLITAN Taxiway F Reconstruction and Extension - Phase III $7,999,000.00 $888,778.00 $0.00 $8,887,778.00 AIRPORT

42 BATON ROUGE METROPOLITAN GA Runway to Taxiway Conversion - Phase I $4,680,000.00 $520,000.00 $0.00 $5,200,000.00 AIRPORT

43 BATON ROUGE METROPOLITAN Air Cargo Apron Expansion $4,750,000.00 $527,778.00 $0.00 $5,277,778.00 AIRPORT

44 SHREVEPORT REGIONAL AIRPORT Extend Runway 6 & Taxiway C - Construction $9,360,000.00 $1,040,000.00 $0.00 $10,400,000.00

45 LAKE CHARLES REGIONAL AIRPORT North Apron Expansion for Development - Phase I $0.00 $1,500,000.00 $0.00 $1,500,000.00 (Construction)

46 LAKE CHARLES REGIONAL AIRPORT Construct Middle Ramp $0.00 $701,000.00 $0.00 $701,000.00

47 MONROE REGIONAL AIRPORT Improve Security Fence $0.00 $400,000.00 $0.00 $400,000.00

48 NEW ORLEANS LOUIS ARMSTRONG Rehabilitate Runway 1/19 $1,571,808.00 $174,645.00 $349,291.00 $2,095,744.00 INTERNATIONAL AIRPORT

Wednesday, January 13, 2016 Air Carrier Capital Outlay Page 4 of 42 Airport Construction and Development Priority Program Unfunded 2018-2021

Air Carrier Capital Outlay Federal Item Airport Project Description Funds State Funds Local Other Total Funds 49 LAFAYETTE REGIONAL AIRPORT Rehabilitate Perimeter Fence $2,000,000.00 $222,222.00 $0.00 $2,222,222.00

50 BATON ROUGE METROPOLITAN Runway 4L Drainage & Perimeter Road Improvements $4,200,000.00 $466,667.00 $0.00 $4,666,667.00 AIRPORT

51 BATON ROUGE METROPOLITAN ARFF PH II (AIP) $511,936.00 $56,882.00 $0.00 $568,818.00 AIRPORT

52 ALEXANDRIA INTERNATIONAL AIRPORT Runway Rubber Removal and Striping $630,000.00 $70,000.00 $0.00 $700,000.00

53 ALEXANDRIA INTERNATIONAL AIRPORT Install LED Runway Lighting $0.00 $750,000.00 $0.00 $750,000.00

54 ALEXANDRIA INTERNATIONAL AIRPORT Master Drainage Rehabilitation - Phase III $900,000.00 $100,000.00 $0.00 $1,000,000.00

55 MONROE REGIONAL AIRPORT Thermoplastic Markings $498,150.00 $55,350.00 $0.00 $553,500.00

56 ALEXANDRIA INTERNATIONAL AIRPORT Install LED Taxiway Sign Fixtures $0.00 $375,000.00 $0.00 $375,000.00

57 MONROE REGIONAL AIRPORT Runway 14/32 Extension - Phase I (Environmental $382,500.00 $42,500.00 $0.00 $425,000.00 Assessment)

58 ALEXANDRIA INTERNATIONAL AIRPORT Rehabilitate FBO Apron - Phase II (Construction) $1,537,957.00 $170,884.00 $1,634,544.00 $3,343,385.00

59 BATON ROUGE METROPOLITAN Air Cargo Access Road - Design $475,000.00 $52,778.00 $0.00 $527,778.00 AIRPORT

60 LAFAYETTE REGIONAL AIRPORT Straighten Taxiway Bravo $2,403,000.00 $267,000.00 $0.00 $2,670,000.00

Wednesday, January 13, 2016 Air Carrier Capital Outlay Page 5 of 42 Airport Construction and Development Priority Program Unfunded 2018-2021

Air Carrier Capital Outlay Federal Item Airport Project Description Funds State Funds Local Other Total Funds 61 LAFAYETTE REGIONAL AIRPORT Taxiway Delta Removal $382,500.00 $42,500.00 $0.00 $425,000.00

62 LAFAYETTE REGIONAL AIRPORT Taxiway Hotel Re-configuration $1,260,000.00 $140,000.00 $0.00 $1,400,000.00

63 ALEXANDRIA INTERNATIONAL AIRPORT GA Apron Rehabilitation $0.00 $110,000.00 $990,000.00 $1,100,000.00

64 LAFAYETTE REGIONAL AIRPORT Taxiway Kilo Removal $495,000.00 $55,000.00 $0.00 $550,000.00

65 ALEXANDRIA INTERNATIONAL AIRPORT North Apron Rehabilitation - Joint Seal and Spall Repair $382,500.00 $42,500.00 $0.00 $425,000.00

66 ALEXANDRIA INTERNATIONAL AIRPORT Southeast Apron Expansion $0.00 $8,000,000.00 $0.00 $8,000,000.00

67 ALEXANDRIA INTERNATIONAL AIRPORT Rehabilitate Overrun Area Runway 18/36 $190,000.00 $21,111.00 $0.00 $211,111.00

68 ALEXANDRIA INTERNATIONAL AIRPORT Midfield Apron (N) New Construction North Ramp $0.00 $22,600,000.00 $0.00 $22,600,000.00

69 ALEXANDRIA INTERNATIONAL AIRPORT Midfield Apron (S) New Construction North Ramp $0.00 $34,000,000.00 $0.00 $34,000,000.00

70 LAKE CHARLES REGIONAL AIRPORT Terminal Loading Bridge $1,000,000.00 $111,111.00 $0.00 $1,111,111.00

71 ALEXANDRIA INTERNATIONAL AIRPORT Rehabilitate Taxiway "F" $1,092,500.00 $121,389.00 $0.00 $1,213,889.00

72 ALEXANDRIA INTERNATIONAL AIRPORT Emergency Access Road Improvements - Phase II $900,000.00 $100,000.00 $0.00 $1,000,000.00

Wednesday, January 13, 2016 Air Carrier Capital Outlay Page 6 of 42 Airport Construction and Development Priority Program Unfunded 2018-2021

Air Carrier Capital Outlay Federal Item Airport Project Description Funds State Funds Local Other Total Funds 73 BATON ROUGE METROPOLITAN Airport Police Vehicle $0.00 $20,000.00 $0.00 $20,000.00 AIRPORT

74 BATON ROUGE METROPOLITAN Relocate South Portion of Plank Road - Phase XIV $0.00 $1,500,000.00 $0.00 $1,500,000.00 AIRPORT

75 BATON ROUGE METROPOLITAN Emergency Drainage - Phase II Construction $6,359,300.00 $706,589.00 $0.00 $7,065,889.00 AIRPORT

76 BATON ROUGE METROPOLITAN Relocate South Portion of Plank Road - Phase XII $0.00 $1,500,000.00 $0.00 $1,500,000.00 AIRPORT

77 BATON ROUGE METROPOLITAN Relocate South Portion of Plank Road - Phase XI $0.00 $1,500,000.00 $0.00 $1,500,000.00 AIRPORT

78 BATON ROUGE METROPOLITAN Relocate South Portion of Plank Road - Phase X $0.00 $1,500,000.00 $0.00 $1,500,000.00 AIRPORT

79 BATON ROUGE METROPOLITAN Relocate South Portion of Plank Road - Phase IX $0.00 $1,500,000.00 $0.00 $1,500,000.00 AIRPORT

80 SHREVEPORT REGIONAL AIRPORT F.A.R. Part 150 Land Acquisition $3,000,000.00 $333,333.00 $0.00 $3,333,333.00

81 BATON ROUGE METROPOLITAN Relocate South Portion of Plank Road - Phase VIII $0.00 $1,500,000.00 $0.00 $1,500,000.00 AIRPORT

82 BATON ROUGE METROPOLITAN Relocate South Portion of Plank Road - Phase VII $0.00 $1,500,000.00 $0.00 $1,500,000.00 AIRPORT

83 BATON ROUGE METROPOLITAN Relocate South Portion of Plank Road - Phase VI $0.00 $1,500,000.00 $0.00 $1,500,000.00 AIRPORT

84 BATON ROUGE METROPOLITAN Relocate South Portion of Plank Road - Phase V $0.00 $1,500,000.00 $0.00 $1,500,000.00 AIRPORT

Wednesday, January 13, 2016 Air Carrier Capital Outlay Page 7 of 42 Airport Construction and Development Priority Program Unfunded 2018-2021

Air Carrier Capital Outlay Federal Item Airport Project Description Funds State Funds Local Other Total Funds 85 BATON ROUGE METROPOLITAN Relocate South Portion of Plank Road - Phase IV $0.00 $1,500,000.00 $0.00 $1,500,000.00 AIRPORT

86 BATON ROUGE METROPOLITAN Relocate South Portion of Plank Road - Phase III $0.00 $1,500,000.00 $0.00 $1,500,000.00 AIRPORT

87 BATON ROUGE METROPOLITAN Relocate South Portion of Plank Road - Phase II $0.00 $1,500,000.00 $0.00 $1,500,000.00 AIRPORT

88 BATON ROUGE METROPOLITAN Relocate South Portion of Plank Road - Phase XV $0.00 $1,100,000.00 $0.00 $1,100,000.00 AIRPORT

89 MONROE REGIONAL AIRPORT General Aviation Hangar Rehabilitation $0.00 $865,000.00 $0.00 $865,000.00

90 MONROE REGIONAL AIRPORT Construct General Aviation Hangars and Parking $0.00 $1,150,000.00 $0.00 $1,150,000.00

91 BATON ROUGE METROPOLITAN Relocate South Portion of Plank Road - Phase XIII $0.00 $1,500,000.00 $0.00 $1,500,000.00 AIRPORT

92 MONROE REGIONAL AIRPORT Rehabilitate Maintenance Facility $0.00 $350,000.00 $0.00 $350,000.00

93 MONROE REGIONAL AIRPORT General Aviation Hangars $0.00 $700,000.00 $0.00 $700,000.00

94 ALEXANDRIA INTERNATIONAL AIRPORT Runway Blast Pads $0.00 $5,400,000.00 $0.00 $5,400,000.00

95 ALEXANDRIA INTERNATIONAL AIRPORT Runway 18 Extension: Environmental Assessment $0.00 $500,000.00 $0.00 $500,000.00

96 BATON ROUGE METROPOLITAN Taxiway F Reconstruction and Extension - Phase V $2,660,000.00 $295,556.00 $0.00 $2,955,556.00 AIRPORT

Wednesday, January 13, 2016 Air Carrier Capital Outlay Page 8 of 42 Airport Construction and Development Priority Program Unfunded 2018-2021

Air Carrier Capital Outlay Federal Item Airport Project Description Funds State Funds Local Other Total Funds 97 ALEXANDRIA INTERNATIONAL AIRPORT Extend Runway 14/32 - Phase II $0.00 $765,000.00 $14,535,000.00 $15,300,000.00

98 MONROE REGIONAL AIRPORT Relocate Taxiway D Holding Position $0.00 $31,980.00 $0.00 $31,980.00

99 ALEXANDRIA INTERNATIONAL AIRPORT Extend Taxiway A $0.00 $5,850,000.00 $5,850,000.00 $11,700,000.00

100 MONROE REGIONAL AIRPORT Rehabilitate Entrance Road $360,000.00 $40,000.00 $0.00 $400,000.00

101 MONROE REGIONAL AIRPORT Rehabilitate General Aviation South Access Road $0.00 $950,000.00 $0.00 $950,000.00

102 BATON ROUGE METROPOLITAN Air Cargo Access Road $4,750,000.00 $527,778.00 $0.00 $5,277,778.00 AIRPORT

103 MONROE REGIONAL AIRPORT Rehabilitate General Aviation North Access Road $0.00 $900,000.00 $0.00 $900,000.00

104 LAKE CHARLES REGIONAL AIRPORT Construct Perimeter Road - Phase I (Design) $0.00 $200,000.00 $0.00 $200,000.00

105 LAKE CHARLES REGIONAL AIRPORT Airport Entrance Improvements $0.00 $1,319,000.00 $0.00 $1,319,000.00

106 ALEXANDRIA INTERNATIONAL AIRPORT Large Southeast Apron Hangar & Delushe (100K S.F.) $0.00 $22,000,000.00 $0.00 $22,000,000.00

107 SHREVEPORT REGIONAL AIRPORT Construct West End AOA Perimeter Road - Phase II $0.00 $2,200,000.00 $0.00 $2,200,000.00 (Construction)

108 LAKE CHARLES REGIONAL AIRPORT Acquire Runway Sweeper $0.00 $200,000.00 $0.00 $200,000.00

Wednesday, January 13, 2016 Air Carrier Capital Outlay Page 9 of 42 Airport Construction and Development Priority Program Unfunded 2018-2021

Air Carrier Capital Outlay Federal Item Airport Project Description Funds State Funds Local Other Total Funds 109 BATON ROUGE METROPOLITAN North GA Terminal Facility $0.00 $2,980,000.00 $20,000.00 $3,000,000.00 AIRPORT

110 BATON ROUGE METROPOLITAN West Box Culvert $9,900,000.00 $1,100,000.00 $0.00 $11,000,000.00 AIRPORT

111 MONROE REGIONAL AIRPORT Geographic Information System $270,000.00 $30,000.00 $0.00 $300,000.00

112 BATON ROUGE METROPOLITAN West Box Culvert - Phase VIII $0.00 $500,000.00 $0.00 $500,000.00 AIRPORT

113 BATON ROUGE METROPOLITAN West Box Culvert - Phase VII $0.00 $1,500,000.00 $0.00 $1,500,000.00 AIRPORT

114 BATON ROUGE METROPOLITAN West Box Culvert - Phase II $0.00 $1,500,000.00 $0.00 $1,500,000.00 AIRPORT

115 BATON ROUGE METROPOLITAN West Box Culvert - Phase IV $0.00 $1,500,000.00 $0.00 $1,500,000.00 AIRPORT

116 BATON ROUGE METROPOLITAN West Box Culvert - Phase V $0.00 $1,500,000.00 $0.00 $1,500,000.00 AIRPORT

117 BATON ROUGE METROPOLITAN West Box Culvert - Phase VI $0.00 $1,500,000.00 $0.00 $1,500,000.00 AIRPORT

118 BATON ROUGE METROPOLITAN West Box Culvert - Phase III $0.00 $1,500,000.00 $0.00 $1,500,000.00 AIRPORT

119 ALEXANDRIA INTERNATIONAL AIRPORT Install CAT 1 Approach - Runway 18/36 (Equipment $0.00 $2,500,000.00 $0.00 $2,500,000.00 Lighting)

120 SHREVEPORT REGIONAL AIRPORT East AOA Perimeter Road - Design & Environmental $0.00 $500,000.00 $0.00 $500,000.00

Wednesday, January 13, 2016 Air Carrier Capital Outlay Page 10 of 42 Airport Construction and Development Priority Program Unfunded 2018-2021

Air Carrier Capital Outlay Federal Item Airport Project Description Funds State Funds Local Other Total Funds 121 ALEXANDRIA INTERNATIONAL AIRPORT ILS Upgrade $1,900,000.00 $211,111.00 $0.00 $2,111,111.00

122 ALEXANDRIA INTERNATIONAL AIRPORT Runway 18 Extension - Construction Phase II $1,765,275.00 $3,700,688.00 $4,540,913.00 $10,006,876.00

123 ALEXANDRIA INTERNATIONAL AIRPORT North Ramp Rehabilitation - Phase III $8,550,000.00 $950,000.00 $0.00 $9,500,000.00

124 ALEXANDRIA INTERNATIONAL AIRPORT Construct Holding Bay at Runway 36 End $1,900,000.00 $211,111.00 $0.00 $2,111,111.00

125 BATON ROUGE METROPOLITAN Northwest Box Culvert $9,000,000.00 $1,000,000.00 $0.00 $10,000,000.00 AIRPORT

126 MONROE REGIONAL AIRPORT Electronic Airport Layout Plan $0.00 $400,000.00 $0.00 $400,000.00

127 ALEXANDRIA INTERNATIONAL AIRPORT Large Southeast Apron Hangar - Two $0.00 $19,200,000.00 $0.00 $19,200,000.00

128 ALEXANDRIA INTERNATIONAL AIRPORT Large Southeast Apron Hangar - Three $0.00 $19,200,000.00 $0.00 $19,200,000.00

129 ALEXANDRIA INTERNATIONAL AIRPORT 10 Unit T-hangar $0.00 $700,000.00 $0.00 $700,000.00

130 ALEXANDRIA INTERNATIONAL AIRPORT Runway 14 Parallel Taxiway Westside $0.00 $43,000,000.00 $0.00 $43,000,000.00

131 ALEXANDRIA INTERNATIONAL AIRPORT Rehabilitate Terminal Access Roadway $0.00 $500,000.00 $0.00 $500,000.00

132 BATON ROUGE METROPOLITAN Air Cargo Access Road - Phase II (Construction) $7,125,000.00 $791,667.00 $0.00 $7,916,667.00 AIRPORT

Wednesday, January 13, 2016 Air Carrier Capital Outlay Page 11 of 42 Airport Construction and Development Priority Program Unfunded 2018-2021

Air Carrier Capital Outlay Federal Item Airport Project Description Funds State Funds Local Other Total Funds 133 BATON ROUGE METROPOLITAN Air Cargo Access Road - Phase I (Design) $475,000.00 $52,778.00 $0.00 $527,778.00 AIRPORT

134 BATON ROUGE METROPOLITAN South Entergy Pole Relocation $2,700,000.00 $300,000.00 $0.00 $3,000,000.00 AIRPORT

135 ALEXANDRIA INTERNATIONAL AIRPORT North Emergency Access Road Widening & Bridge $0.00 $600,000.00 $5,400,000.00 $6,000,000.00 Improvements

136 ALEXANDRIA INTERNATIONAL AIRPORT Relocate Fuel Farm - Phase IV (Demolition of Old Fuel $665,000.00 $73,889.00 $0.00 $738,889.00 Farm)

137 ALEXANDRIA INTERNATIONAL AIRPORT Westside Infrastructure Improvements (Electrical, Water, $0.00 $83,000,000.00 $0.00 $83,000,000.00 Sewer, Drainage and Access)

138 ALEXANDRIA INTERNATIONAL AIRPORT Property Acquisition for Industrial Park Development $0.00 $204,000.00 $0.00 $204,000.00

139 BATON ROUGE METROPOLITAN Construct Hangar $5,400,000.00 $600,000.00 $0.00 $6,000,000.00 AIRPORT

140 ALEXANDRIA INTERNATIONAL AIRPORT Emergency Access Road Improvements - Phase I $900,000.00 $100,000.00 $0.00 $1,000,000.00

141 BATON ROUGE METROPOLITAN Hangar No.1 - Phase II $0.00 $1,500,000.00 $0.00 $1,500,000.00 AIRPORT

142 BATON ROUGE METROPOLITAN Hangar No.1 - Phase IV $0.00 $1,500,000.00 $0.00 $1,500,000.00 AIRPORT

143 BATON ROUGE METROPOLITAN Hangar No.1 - Phase III $0.00 $1,500,000.00 $0.00 $1,500,000.00 AIRPORT

144 BATON ROUGE METROPOLITAN Relocate South Portion of Plank Road - Phase I $0.00 $1,500,000.00 $0.00 $1,500,000.00 AIRPORT

Wednesday, January 13, 2016 Air Carrier Capital Outlay Page 12 of 42 Airport Construction and Development Priority Program Unfunded 2018-2021

Air Carrier Capital Outlay Federal Item Airport Project Description Funds State Funds Local Other Total Funds 145 BATON ROUGE METROPOLITAN West Box Culvert - Phase I $0.00 $1,500,000.00 $0.00 $1,500,000.00 AIRPORT

146 ALEXANDRIA INTERNATIONAL AIRPORT Large Southeast Apron Hangar - One $0.00 $19,200,000.00 $0.00 $19,200,000.00

147 ALEXANDRIA INTERNATIONAL AIRPORT Southeast Apron N Two Large Hangars (100K S.F.) $0.00 $18,000,000.00 $0.00 $18,000,000.00

148 BATON ROUGE METROPOLITAN RW 4R/22L Reconstruction - Phase V $0.00 $1,500,000.00 $0.00 $1,500,000.00 AIRPORT

149 BATON ROUGE METROPOLITAN Northwest Box Culvert - Phase V $0.00 $1,500,000.00 $0.00 $1,500,000.00 AIRPORT

150 BATON ROUGE METROPOLITAN Northwest Box Culvert - Phase VI $0.00 $1,500,000.00 $0.00 $1,500,000.00 AIRPORT

151 BATON ROUGE METROPOLITAN Northwest Box Culvert - Phase VII $0.00 $1,000,000.00 $0.00 $1,000,000.00 AIRPORT

152 BATON ROUGE METROPOLITAN Hangar No. 1 - Phase I $0.00 $1,500,000.00 $0.00 $1,500,000.00 AIRPORT

153 BATON ROUGE METROPOLITAN North Airpark Development - Phase X $0.00 $1,500,000.00 $0.00 $1,500,000.00 AIRPORT

154 BATON ROUGE METROPOLITAN North Airpark Development - Phase IX $0.00 $1,500,000.00 $0.00 $1,500,000.00 AIRPORT

155 BATON ROUGE METROPOLITAN North Airpark Development - Phase VIII $0.00 $1,500,000.00 $0.00 $1,500,000.00 AIRPORT

156 BATON ROUGE METROPOLITAN North Airpark Development - Phase VI $0.00 $1,500,000.00 $0.00 $1,500,000.00 AIRPORT

Wednesday, January 13, 2016 Air Carrier Capital Outlay Page 13 of 42 Airport Construction and Development Priority Program Unfunded 2018-2021

Air Carrier Capital Outlay Federal Item Airport Project Description Funds State Funds Local Other Total Funds 157 BATON ROUGE METROPOLITAN North Airpark Development - Phase IV $0.00 $1,500,000.00 $0.00 $1,500,000.00 AIRPORT

158 BATON ROUGE METROPOLITAN North Airpark Development - Phase III $0.00 $1,500,000.00 $0.00 $1,500,000.00 AIRPORT

159 BATON ROUGE METROPOLITAN Air Cargo Phase 3 - Cold Storage - Phase IV $0.00 $500,000.00 $0.00 $500,000.00 AIRPORT

160 BATON ROUGE METROPOLITAN Air Cargo Phase 3 - Cold Storage - Phase III $0.00 $1,500,000.00 $0.00 $1,500,000.00 AIRPORT

161 BATON ROUGE METROPOLITAN Air Cargo Phase 3 - Cold Storage - Phase II $0.00 $1,500,000.00 $0.00 $1,500,000.00 AIRPORT

162 BATON ROUGE METROPOLITAN North Airpark Development - Phase V $0.00 $1,500,000.00 $0.00 $1,500,000.00 AIRPORT

163 BATON ROUGE METROPOLITAN Property East Side of Plank Road - Phase V $0.00 $500,000.00 $0.00 $500,000.00 AIRPORT

164 BATON ROUGE METROPOLITAN Property South of Blount Road - Phase III $0.00 $1,099,450.00 $0.00 $1,099,450.00 AIRPORT

165 BATON ROUGE METROPOLITAN Property South of Blount Road - Phase II $0.00 $1,500,000.00 $0.00 $1,500,000.00 AIRPORT

166 BATON ROUGE METROPOLITAN Property East Side of Plank Road - Phase IV $0.00 $1,500,000.00 $0.00 $1,500,000.00 AIRPORT

167 BATON ROUGE METROPOLITAN Property East Side of Plank Road - Phase III $0.00 $1,500,000.00 $0.00 $1,500,000.00 AIRPORT

168 BATON ROUGE METROPOLITAN Property East Side of Plank Road - Phase II $0.00 $1,500,000.00 $0.00 $1,500,000.00 AIRPORT

Wednesday, January 13, 2016 Air Carrier Capital Outlay Page 14 of 42 Airport Construction and Development Priority Program Unfunded 2018-2021

Air Carrier Capital Outlay Federal Item Airport Project Description Funds State Funds Local Other Total Funds 169 BATON ROUGE METROPOLITAN Air Cargo Access Road Improvements - Phase II $0.00 $1,500,000.00 $0.00 $1,500,000.00 AIRPORT

170 BATON ROUGE METROPOLITAN Air Cargo Access Road Improvements - Phase III $0.00 $1,500,000.00 $0.00 $1,500,000.00 AIRPORT

171 BATON ROUGE METROPOLITAN Air Cargo Access Road Improvements - Phase IV $0.00 $1,500,000.00 $0.00 $1,500,000.00 AIRPORT

172 BATON ROUGE METROPOLITAN Air Cargo Access Road Improvements - Phase VI $0.00 $1,500,000.00 $0.00 $1,500,000.00 AIRPORT

173 BATON ROUGE METROPOLITAN Air Cargo Access Road Improvements - Phase V $0.00 $1,500,000.00 $0.00 $1,500,000.00 AIRPORT

174 BATON ROUGE METROPOLITAN Green Building Initiative (Lighting, Mechanical Energy $0.00 $1,500,000.00 $0.00 $1,500,000.00 AIRPORT Management System) - Phase II

175 BATON ROUGE METROPOLITAN Northwest Box Culvert - Phase I $0.00 $1,500,000.00 $0.00 $1,500,000.00 AIRPORT

176 BATON ROUGE METROPOLITAN Green Building Initiative (Lighting, Mechanical Energy $0.00 $1,000,000.00 $0.00 $1,000,000.00 AIRPORT Management System) - Phase III

177 BATON ROUGE METROPOLITAN Install USGS Survey Monuments Around Airport $0.00 $50,000.00 $0.00 $50,000.00 AIRPORT

178 BATON ROUGE METROPOLITAN Property South of Blount Road - Phase I $0.00 $1,500,000.00 $0.00 $1,500,000.00 AIRPORT

179 BATON ROUGE METROPOLITAN Property East Side of Plank Road - Phase I $0.00 $1,500,000.00 $0.00 $1,500,000.00 AIRPORT

180 BATON ROUGE METROPOLITAN Air Cargo Access Road Improvements - Phase I $0.00 $0.00 $0.00 $0.00 AIRPORT

Wednesday, January 13, 2016 Air Carrier Capital Outlay Page 15 of 42 Airport Construction and Development Priority Program Unfunded 2018-2021

Air Carrier Capital Outlay Federal Item Airport Project Description Funds State Funds Local Other Total Funds 181 BATON ROUGE METROPOLITAN Green Building Initiative (Lighting, Mechanical Energy $0.00 $1,500,000.00 $0.00 $1,500,000.00 AIRPORT Management System) - Phase I

182 BATON ROUGE METROPOLITAN Air Cargo Access Road Improvements $8,100,000.00 $900,000.00 $0.00 $9,000,000.00 AIRPORT

Air Carrier Capital Outlay Totals $185,558,442.00 $468,973,535.00 $34,598,248.00 $689,130,225.00

Wednesday, January 13, 2016 Air Carrier Capital Outlay Page 16 of 42

General Aviation Unfunded 2018-2021 Airport Construction and Development Priority Program Unfunded 2018-2021

General Aviation Capital Outlay Federal Item Airport Project Description Funds State Funds Local Other Total Funds 1 SLIDELL AIRPORT Mitigate Obstructions $981,000.00 $109,000.00 $0.00 $1,090,000.00

2 SOUTHLAND FIELD Clear Airspace - Phase II (Land Acquisition/Easements) $346,500.00 $38,500.00 $0.00 $385,000.00

3 LOUISIANA REGIONAL AIRPORT Obstruction Removal - Phase I (SW Transitional) $0.00 $80,000.00 $0.00 $80,000.00

4 LOUISIANA REGIONAL AIRPORT Obstruction Removal - Phase II $0.00 $150,000.00 $0.00 $150,000.00

5 SLIDELL AIRPORT Obstruction Removal East Transition - Phase II $0.00 $250,400.00 $0.00 $250,400.00

6 SLIDELL AIRPORT Land Acquisition West Side $0.00 $375,000.00 $0.00 $375,000.00

7 SLIDELL AIRPORT Obstruction Removal West Side Transition Surface (30 $0.00 $258,500.00 $0.00 $258,500.00 Acres)

8 LOUISIANA REGIONAL AIRPORT Hangar Development - Phase II $0.00 $780,000.00 $20,000.00 $800,000.00

9 ACADIANA REGIONAL AIRPORT Obstruction Removal $0.00 $200,000.00 $0.00 $200,000.00

10 HAMMOND NORTHSHORE REGIONAL Property Acquisition for Runway 18 Approach $902,000.00 $100,222.00 $0.00 $1,002,222.00 AIRPORT

11 SLIDELL AIRPORT Apron Expansion - Phase II $675,000.00 $75,000.00 $0.00 $750,000.00

12 ESLER REGIONAL AIRPORT Obstruction Removal - Phase I $0.00 $21,000.00 $0.00 $21,000.00

Wednesday, January 13, 2016 General Aviation Capital Outlay Page 17 of 42 Airport Construction and Development Priority Program Unfunded 2018-2021

General Aviation Capital Outlay Federal Item Airport Project Description Funds State Funds Local Other Total Funds 13 CHENNAULT INTERNATIONAL AIRPORT Purchase ARFF Vehicle $1,170,000.00 $130,000.00 $0.00 $1,300,000.00

14 SOUTHLAND FIELD Clear Airspace - Phase 1 (Environmental) $99,000.00 $11,000.00 $0.00 $110,000.00

15 FALSE RIVER REGIONAL AIRPORT Obstruction Removal - Runway 18 Approach $0.00 $250,000.00 $0.00 $250,000.00

16 NATCHITOCHES REGIONAL AIRPORT Obstruction Removal $1,350,000.00 $150,000.00 $0.00 $1,500,000.00

17 SLIDELL AIRPORT Purchase of Avigation Easement for East Transition $0.00 $67,500.00 $0.00 $67,500.00 Surface

18 SLIDELL AIRPORT Rehabilitate Fuel System $0.00 $450,000.00 $50,000.00 $500,000.00

19 NEW ORLEANS LAKEFRONT AIRPORT Rehabilitate Taxiway A - Phase II (Construction) $270,000.00 $30,000.00 $0.00 $300,000.00

20 SLIDELL AIRPORT Obstruction Mitigation (Runway 36 RPZ) $0.00 $101,400.00 $0.00 $101,400.00

21 HOUMA-TERREBONNE AIRPORT Improve 18/36 Runway Safety Area - Phase II $0.00 $750,000.00 $0.00 $750,000.00

22 NEW ORLEANS LAKEFRONT AIRPORT Rehabilitate Runway 18R/36L - Preliminary Study $0.00 $100,000.00 $0.00 $100,000.00

23 HOUMA-TERREBONNE AIRPORT Improve 18/36 Runway Safety Area - Phase III $0.00 $1,000,000.00 $0.00 $1,000,000.00 (Construction)

24 FELICIANA AIRPARK Obstruction Removal - North and West Runway 15 $0.00 $67,000.00 $0.00 $67,000.00

Wednesday, January 13, 2016 General Aviation Capital Outlay Page 18 of 42 Airport Construction and Development Priority Program Unfunded 2018-2021

General Aviation Capital Outlay Federal Item Airport Project Description Funds State Funds Local Other Total Funds 25 RUSTON REGIONAL AIRPORT Construct Taxilanes and T- Hangars - Phase II $270,000.00 $30,000.00 $0.00 $300,000.00 (Construction)

26 HOUMA-TERREBONNE AIRPORT Taxiway A Extension - Phase II (Construction) $900,000.00 $1,100,000.00 $0.00 $2,000,000.00

27 CONCORDIA PARISH AIRPORT Obstruction Relocation $0.00 $500,000.00 $0.00 $500,000.00

28 NATCHITOCHES REGIONAL AIRPORT Bury Powerlines Runway 7 $0.00 $575,000.00 $0.00 $575,000.00

29 ABBEVILLE CHRIS CRUSTA MEMORIAL Rehabilitate Runway & Partial Taxiway (Phase II - $1,064,700.00 $118,300.00 $0.00 $1,183,000.00 AIRPORT Construction)

30 ACADIANA REGIONAL AIRPORT GA Taxiway Improvements Phase III $1,530,000.00 $170,000.00 $0.00 $1,700,000.00

31 ACADIANA REGIONAL AIRPORT GA Taxiway Rehabilitation - Phase II (Construction) $1,170,000.00 $380,000.00 $0.00 $1,550,000.00

32 NEW ORLEANS LAKEFRONT AIRPORT Rehabilitate Taxiway A - Phase I (Design) $22,500.00 $2,500.00 $0.00 $25,000.00

33 ACADIANA REGIONAL AIRPORT Heavy Jet Apron Rehabilitation - Phase II of III $4,500,000.00 $500,000.00 $0.00 $5,000,000.00 (Construction)

34 ACADIANA REGIONAL AIRPORT Heavy Jet Apron Rehabilitation - Phase III of III $5,580,000.00 $620,000.00 $0.00 $6,200,000.00 (Construction)

35 ABBEVILLE CHRIS CRUSTA MEMORIAL Rehabilitate Aprons, Taxilanes and & T-Hangar Areas $890,550.00 $98,950.00 $0.00 $989,500.00 AIRPORT (Phase II - Construction)

36 TENSAS PARISH AIRPORT Obstruction Removal (Phase III) $0.00 $125,000.00 $0.00 $125,000.00

Wednesday, January 13, 2016 General Aviation Capital Outlay Page 19 of 42 Airport Construction and Development Priority Program Unfunded 2018-2021

General Aviation Capital Outlay Federal Item Airport Project Description Funds State Funds Local Other Total Funds 37 LOUISIANA REGIONAL AIRPORT Land Acquisition North (T-Hangar Development) $0.00 $200,000.00 $20,000.00 $220,000.00

38 VIVIAN AIRPORT Obstruction Removal $0.00 $200,000.00 $0.00 $200,000.00

39 ACADIANA REGIONAL AIRPORT Seaway Lighting Rehabilitation - Phase II (Construction) $0.00 $450,000.00 $0.00 $450,000.00

40 NEW ORLEANS LAKEFRONT AIRPORT Rehabilitate Airfield Lighting/Signs $0.00 $380,000.00 $0.00 $380,000.00

41 GEORGE R. CARR MEMORIAL AIRPORT Land Acquistion - North End (Runway Safety Area $1,080,000.00 $120,000.00 $0.00 $1,200,000.00 Improvements)

42 HOUMA-TERREBONNE AIRPORT Airport Perimeter Fencing and Control Gates - Phase II $0.00 $1,000,000.00 $0.00 $1,000,000.00

43 NATCHITOCHES REGIONAL AIRPORT Rehabilitate Runway 17/35 Thresholds - Phase II $270,000.00 $30,000.00 $0.00 $300,000.00 (Construction)

44 SLIDELL AIRPORT Extend Runway 18/36 and Parallel Taxiway - Phase II $1,595,160.00 $177,240.00 $0.00 $1,772,400.00 (Construction)

45 SLIDELL AIRPORT Extend Runway 18/36 and Parallel Taxiway - Phase I $250,650.00 $27,850.00 $0.00 $278,500.00 (Design and EA)

46 HOUMA-TERREBONNE AIRPORT Improve 18/36 Runway Safety Area - Phase I $0.00 $750,000.00 $0.00 $750,000.00

47 ST TAMMANY REGIONAL AIRPORT Runway Rehabilitation - Phase II (Construction) $0.00 $184,760.00 $0.00 $184,760.00

48 SOUTH LAFOURCHE LEONARD MILLER, Runway Pavement Strengthening - Phase II (Construction) $0.00 $4,450,000.00 $0.00 $4,450,000.00 JR. AIRPORT

Wednesday, January 13, 2016 General Aviation Capital Outlay Page 20 of 42 Airport Construction and Development Priority Program Unfunded 2018-2021

General Aviation Capital Outlay Federal Item Airport Project Description Funds State Funds Local Other Total Funds 49 RUSTON REGIONAL AIRPORT Construct Runway Extension - Phase III (Construction) $3,330,000.00 $370,000.00 $0.00 $3,700,000.00

50 SOUTH LAFOURCHE LEONARD MILLER, Taxiway Pavement Strengthening - Phase II (Construction) $3,600,000.00 $400,000.00 $0.00 $4,000,000.00 JR. AIRPORT

51 RUSTON REGIONAL AIRPORT Construct Apron Expansion - Phase II (Construction) $675,000.00 $75,000.00 $0.00 $750,000.00

52 HAMMOND NORTHSHORE REGIONAL Construct 5 Hangars $0.00 $500,000.00 $0.00 $500,000.00 AIRPORT

53 RUSTON REGIONAL AIRPORT Construct Apron Expansion - Phase III $990,000.00 $110,000.00 $0.00 $1,100,000.00

54 JENNINGS AIRPORT North Apron Development - Phase II (Construction) $680,400.00 $75,600.00 $0.00 $756,000.00

55 VICKSBURG-TALLULAH REGIONAL Taxiway Lighting - Phase II $0.00 $275,000.00 $0.00 $275,000.00 AIRPORT

56 NEW ORLEANS LAKEFRONT AIRPORT Extend Runway 18L/36R $4,500,000.00 $500,000.00 $0.00 $5,000,000.00

57 CONCORDIA PARISH AIRPORT Rehabilitate Southwest Apron - Phase II $475,000.00 $52,778.00 $0.00 $527,778.00

58 LOUISIANA REGIONAL AIRPORT Land Acquisition for MALSAR $0.00 $365,000.00 $0.00 $365,000.00

59 LEESVILLE AIRPORT Extend Runway 18/36 - Phase II (Construction) $1,080,000.00 $120,000.00 $0.00 $1,200,000.00

60 HAMMOND NORTHSHORE REGIONAL Taxiway A Realignment $1,679,625.00 $186,625.00 $0.00 $1,866,250.00 AIRPORT

Wednesday, January 13, 2016 General Aviation Capital Outlay Page 21 of 42 Airport Construction and Development Priority Program Unfunded 2018-2021

General Aviation Capital Outlay Federal Item Airport Project Description Funds State Funds Local Other Total Funds 61 JENNINGS AIRPORT 8-Unit T-Hangars $0.00 $262,500.00 $262,500.00 $525,000.00

62 SHREVEPORT DOWNTOWN AIRPORT Construct 10-Unit T-Hangar $0.00 $500,000.00 $0.00 $500,000.00

63 LEESVILLE AIRPORT Construct Parallel Taxiway - Phase II $1,260,000.00 $140,000.00 $0.00 $1,400,000.00

64 ABBEVILLE CHRIS CRUSTA MEMORIAL Rehabilitate Runway & Partial Taxiway (Phase I - Design) $55,800.00 $6,200.00 $0.00 $62,000.00 AIRPORT

65 LOUISIANA REGIONAL AIRPORT South Apron Expansion - Phase III (Design/Construction) $0.00 $750,000.00 $0.00 $750,000.00

66 GEORGE R. CARR MEMORIAL AIRPORT Design Parallel Taxiway - Phase III $171,000.00 $19,000.00 $0.00 $190,000.00

67 GEORGE R. CARR MEMORIAL AIRPORT Construct Parallel Taxiway - Phase III $990,000.00 $110,000.00 $0.00 $1,100,000.00

68 HAMMOND NORTHSHORE REGIONAL Runway 13/31 Obstruction Removal $0.00 $100,000.00 $0.00 $100,000.00 AIRPORT

69 GEORGE R. CARR MEMORIAL AIRPORT Design Parallel Taxiway - Phase II and III $154,299.00 $17,144.00 $0.00 $171,443.00

70 LOUISIANA REGIONAL AIRPORT Midfield Apron Expansion - Phase II (Construction) $0.00 $540,000.00 $0.00 $540,000.00

71 HOUMA-TERREBONNE AIRPORT Construct and Extend East Aircraft Parking Apron - Phase I $6,176,016.00 $686,224.00 $0.00 $6,862,240.00

72 ACADIANA REGIONAL AIRPORT GA Taxiway Rehabilitation - Phase I (Design) $0.00 $100,000.00 $0.00 $100,000.00

Wednesday, January 13, 2016 General Aviation Capital Outlay Page 22 of 42 Airport Construction and Development Priority Program Unfunded 2018-2021

General Aviation Capital Outlay Federal Item Airport Project Description Funds State Funds Local Other Total Funds 73 ST TAMMANY REGIONAL AIRPORT Apron Extension - Phase II (Construction) $0.00 $1,149,591.00 $0.00 $1,149,591.00

74 SOUTH LAFOURCHE LEONARD MILLER, T-Hangars $0.00 $500,000.00 $300,000.00 $800,000.00 JR. AIRPORT

75 NEW ORLEANS LAKEFRONT AIRPORT ARFF Truck $675,000.00 $75,000.00 $0.00 $750,000.00

76 HOUMA-TERREBONNE AIRPORT Airport Perimeter Fencing - Phase I $0.00 $750,000.00 $0.00 $750,000.00

77 VICKSBURG-TALLULAH REGIONAL Runway Extension - Phase II $5,355,000.00 $595,000.00 $0.00 $5,950,000.00 AIRPORT

78 HOMER MUNICIPAL AIRPORT Rehabilitate Runway - Phase III $1,016,325.00 $112,925.00 $0.00 $1,129,250.00

79 ACADIANA REGIONAL AIRPORT Peimeter/Emergency Access Road - Phase II $675,000.00 $75,000.00 $0.00 $750,000.00 (Construction)

80 VICKSBURG-TALLULAH REGIONAL Runway Extension - Phase I $378,000.00 $42,000.00 $0.00 $420,000.00 AIRPORT

81 ALLEN PARISH AIRPORT Install Perimeter Fence - Phase II (Construction) $0.00 $588,000.00 $0.00 $588,000.00

82 NEW ORLEANS LAKEFRONT AIRPORT Reconstruct North Seawall - Phase I $5,700,000.00 $633,333.00 $0.00 $6,333,333.00

83 NEW ORLEANS LAKEFRONT AIRPORT Construct Perimeter Road (around Runway 27 ) with AOA $187,105.00 $20,789.00 $0.00 $207,894.00 Fence Relocation

84 NEW ORLEANS LAKEFRONT AIRPORT Reconstruct West Seawall - Phase I $4,750,000.00 $527,778.00 $0.00 $5,277,778.00

Wednesday, January 13, 2016 General Aviation Capital Outlay Page 23 of 42 Airport Construction and Development Priority Program Unfunded 2018-2021

General Aviation Capital Outlay Federal Item Airport Project Description Funds State Funds Local Other Total Funds 85 HAMMOND NORTHSHORE REGIONAL Taxiway Connector A3 Rehab $0.00 $410,000.00 $0.00 $410,000.00 AIRPORT

86 SHREVEPORT DOWNTOWN AIRPORT Runway 5/23 Extension/Shift- Construction Phase II $13,500,000.00 $1,500,000.00 $0.00 $15,000,000.00

87 RUSTON REGIONAL AIRPORT Construct Taxilanes and T Hangars - Phase III $0.00 $400,000.00 $0.00 $400,000.00 (Construction)

88 LOUISIANA REGIONAL AIRPORT Runway & Taxiway Overlay - Phase II (Construction) $2,340,000.00 $260,000.00 $0.00 $2,600,000.00

89 HARRY P. WILLIAMS MEMORIAL AIRPORT MALSR Grading & Drainage Improvement $0.00 $150,000.00 $0.00 $150,000.00

90 PINEVILLE MUNICIPAL AIRPORT Construct Hangars $0.00 $332,850.00 $0.00 $332,850.00

91 HARRY P. WILLIAMS MEMORIAL AIRPORT Runway Safety Area Improvements $150,000.00 $16,667.00 $0.00 $166,667.00

92 HARRY P. WILLIAMS MEMORIAL AIRPORT Rehab Public Heliport $0.00 $40,000.00 $0.00 $40,000.00

93 ST LANDRY PARISH-AHART FIELD Runway 18-36 Lighting Rehabilitation $360,000.00 $40,000.00 $0.00 $400,000.00

94 ST JOHN THE BAPTIST PARISH AIRPORT Construct South Aircraft Parking Apron $427,282.00 $47,476.00 $0.00 $474,758.00

95 CONCORDIA PARISH AIRPORT Rehabilitate Runway $0.00 $175,000.00 $0.00 $175,000.00

96 HART AIRPORT Construct T-Hangars $0.00 $280,000.00 $20,000.00 $300,000.00

Wednesday, January 13, 2016 General Aviation Capital Outlay Page 24 of 42 Airport Construction and Development Priority Program Unfunded 2018-2021

General Aviation Capital Outlay Federal Item Airport Project Description Funds State Funds Local Other Total Funds 97 C.E. (RUSTY) WILLIAMS AIRPORT T-Hangars $0.00 $800,000.00 $0.00 $800,000.00

98 HAMMOND NORTHSHORE REGIONAL Rehab MITL $243,000.00 $27,000.00 $0.00 $270,000.00 AIRPORT

99 CHENNAULT INTERNATIONAL AIRPORT Apron Rehab - PCI Upgrade $285,000.00 $31,667.00 $0.00 $316,667.00

100 NATCHITOCHES REGIONAL AIRPORT Construct 10-Unit T-Hangar & Box Hangar $0.00 $650,000.00 $0.00 $650,000.00

101 ACADIANA REGIONAL AIRPORT Runway 17/35 Extension - Phase I (Design) $0.00 $500,000.00 $0.00 $500,000.00

102 HARRY P. WILLIAMS MEMORIAL AIRPORT Runway Rehabilitation $2,700,000.00 $300,000.00 $0.00 $3,000,000.00

103 HARRY P. WILLIAMS MEMORIAL AIRPORT Rehabilitate North Apron - Phase I (Design) $0.00 $35,000.00 $0.00 $35,000.00

104 HAMMOND NORTHSHORE REGIONAL Taxiway E Improvements - Phase I (Design) $0.00 $75,000.00 $0.00 $75,000.00 AIRPORT

105 LOUISIANA REGIONAL AIRPORT North T-Hangar Development - Phase I (Environmental) $0.00 $100,000.00 $0.00 $100,000.00

106 SLIDELL AIRPORT LED Lighting Conversion $570,000.00 $63,333.00 $0.00 $633,333.00

107 HAMMOND NORTHSHORE REGIONAL Taxiway E Improvements $0.00 $445,000.00 $0.00 $445,000.00 AIRPORT

108 SHREVEPORT DOWNTOWN AIRPORT Construct Seaplane Lane & Taxiway $4,500,000.00 $500,000.00 $0.00 $5,000,000.00

Wednesday, January 13, 2016 General Aviation Capital Outlay Page 25 of 42 Airport Construction and Development Priority Program Unfunded 2018-2021

General Aviation Capital Outlay Federal Item Airport Project Description Funds State Funds Local Other Total Funds 109 SHREVEPORT DOWNTOWN AIRPORT Design Sea Lane and Sea Taxiway $0.00 $150,000.00 $0.00 $150,000.00

110 ESLER REGIONAL AIRPORT Rehabilitate Runway 14/32 (Construction) $492,840.00 $54,760.00 $0.00 $547,600.00

111 NEW ORLEANS LAKEFRONT AIRPORT Runway 36L/18R Extension $18,000,000.00 $2,000,000.00 $0.00 $20,000,000.00

112 ST JOHN THE BAPTIST PARISH AIRPORT East Side Levee Relocation - Phase I (Environmental) $241,200.00 $26,800.00 $0.00 $268,000.00

113 MARKSVILLE MUNICIPAL AIRPORT Runway 4/22 Extension - Phase II (Environmental) $0.00 $155,000.00 $0.00 $155,000.00

114 MARKSVILLE MUNICIPAL AIRPORT Runway 4/22 Extension - Phase III (Construction) $1,692,000.00 $188,000.00 $0.00 $1,880,000.00

115 NATCHITOCHES REGIONAL AIRPORT Rehabilitate Taxiway A $2,115,000.00 $235,000.00 $0.00 $2,350,000.00

116 C.E. (RUSTY) WILLIAMS AIRPORT Access Road and Parking $0.00 $100,000.00 $0.00 $100,000.00

117 CHENNAULT INTERNATIONAL AIRPORT Install SSALR Approach Lighting System $0.00 $1,000,000.00 $0.00 $1,000,000.00

118 DE QUINCY INDUSTRIAL AIRPARK Rehabilitate Runway $1,710,000.00 $190,000.00 $0.00 $1,900,000.00

119 HART AIRPORT Construct T-Hangar $0.00 $300,000.00 $36,000.00 $336,000.00

120 BUNKIE MUNICIPAL AIRPORT Runway Rehabilitation $0.00 $400,000.00 $0.00 $400,000.00

Wednesday, January 13, 2016 General Aviation Capital Outlay Page 26 of 42 Airport Construction and Development Priority Program Unfunded 2018-2021

General Aviation Capital Outlay Federal Item Airport Project Description Funds State Funds Local Other Total Funds 121 C.E. (RUSTY) WILLIAMS AIRPORT Seal Coat Runway and Taxiways $0.00 $150,000.00 $0.00 $150,000.00

122 SPRINGHILL AIRPORT Acquire Hangar $0.00 $85,000.00 $85,000.00 $170,000.00

123 NATCHITOCHES REGIONAL AIRPORT Rehabilitate Access Road - Phase II $0.00 $400,000.00 $0.00 $400,000.00

124 NEW ORLEANS LAKEFRONT AIRPORT Construct New East Apron $3,600,000.00 $400,000.00 $0.00 $4,000,000.00

125 PINEVILLE MUNICIPAL AIRPORT Mill & Overlay Aircraft Apron $0.00 $565,141.00 $0.00 $565,141.00

126 SOUTH LAFOURCHE LEONARD MILLER, Taxiway Pavement Strengthening - Phase I (Design) $270,000.00 $30,000.00 $0.00 $300,000.00 JR. AIRPORT

127 NEW ORLEANS LAKEFRONT AIRPORT Rehabilitate Flood Wall $18,000,000.00 $2,000,000.00 $0.00 $20,000,000.00

128 ST JOHN THE BAPTIST PARISH AIRPORT Airport Security/Wildlife Fence $540,000.00 $60,000.00 $0.00 $600,000.00

129 JENNINGS AIRPORT Install Taxiway Lighting $429,300.00 $47,700.00 $0.00 $477,000.00

130 C.E. (RUSTY) WILLIAMS AIRPORT Corporate Hangar $0.00 $2,000,000.00 $0.00 $2,000,000.00

131 NATCHITOCHES REGIONAL AIRPORT Repair Hangar Taxilanes $0.00 $125,000.00 $0.00 $125,000.00

132 JONESBORO AIRPORT Parallel Taxiway - Phase II (Construction) $405,000.00 $45,000.00 $0.00 $450,000.00

Wednesday, January 13, 2016 General Aviation Capital Outlay Page 27 of 42 Airport Construction and Development Priority Program Unfunded 2018-2021

General Aviation Capital Outlay Federal Item Airport Project Description Funds State Funds Local Other Total Funds 133 DE QUINCY INDUSTRIAL AIRPARK Overlay Taxiway and South Apron $562,500.00 $62,500.00 $0.00 $625,000.00

134 ESLER REGIONAL AIRPORT GA Apron Strengthening and Expansion $150,000.00 $200,000.00 $0.00 $350,000.00

135 JENNINGS AIRPORT North Apron Development - Phase I (Design) $0.00 $70,000.00 $0.00 $70,000.00

136 JENNINGS AIRPORT Approach Lights for Runway 8/26 (ODALS) $242,105.00 $26,901.00 $0.00 $269,006.00

137 VICKSBURG-TALLULAH REGIONAL Taxiway Lighting - Phase I $0.00 $35,000.00 $0.00 $35,000.00 AIRPORT

138 NEW ORLEANS LAKEFRONT AIRPORT Construct Parallel Taxiway $2,700,000.00 $300,000.00 $0.00 $3,000,000.00

139 NATCHITOCHES REGIONAL AIRPORT Construct Partial Parallel Taxiway $405,000.00 $45,000.00 $0.00 $450,000.00

140 ST JOHN THE BAPTIST PARISH AIRPORT Construct Aircraft Parking Apron $1,475,000.00 $913,889.00 $66,168.00 $2,455,057.00

141 RUSTON REGIONAL AIRPORT Construct SSALR $0.00 $800,000.00 $0.00 $800,000.00

142 RUSTON REGIONAL AIRPORT Rehabilitate Runway - Phase I $153,000.00 $17,000.00 $0.00 $170,000.00

143 LEESVILLE AIRPORT Construct Parallel Taxiway - Phase I $189,000.00 $21,000.00 $0.00 $210,000.00

144 ST TAMMANY REGIONAL AIRPORT Parallel Taxiway $3,316,590.00 $368,510.00 $0.00 $3,685,100.00

Wednesday, January 13, 2016 General Aviation Capital Outlay Page 28 of 42 Airport Construction and Development Priority Program Unfunded 2018-2021

General Aviation Capital Outlay Federal Item Airport Project Description Funds State Funds Local Other Total Funds 145 NATCHITOCHES REGIONAL AIRPORT Complete Parallel Taxiway B $1,170,000.00 $130,000.00 $0.00 $1,300,000.00

146 CONCORDIA PARISH AIRPORT Rehabilitate Southwest Apron - Phase I $71,250.00 $7,917.00 $0.00 $79,167.00

147 NATCHITOCHES REGIONAL AIRPORT Relocate Road Around Localizer $0.00 $750,000.00 $0.00 $750,000.00

148 LE GROS MEMORIAL AIRPORT Parallel Taxiway for Runway 4-22 $2,047,500.00 $227,500.00 $0.00 $2,275,000.00

149 GEORGE R. CARR MEMORIAL AIRPORT Runway 18-36 and Parking Apron Pavement Improvement $1,980,000.00 $220,000.00 $0.00 $2,200,000.00

150 NATCHITOCHES REGIONAL AIRPORT Construct Hammer Head for Runway 7 $0.00 $350,000.00 $0.00 $350,000.00

151 FALSE RIVER REGIONAL AIRPORT Perimeter Fencing of Runway 18 RPZ (5.0 acres) and $72,000.00 $8,000.00 $0.00 $80,000.00 Install Culvert for Runway 36 RPZ

152 HART AIRPORT Construct Runway Extension - Phase II $0.00 $800,000.00 $0.00 $800,000.00

153 MINDEN AIRPORT Design Apron Expansion, Connector Taxiway, and Access $108,000.00 $12,000.00 $0.00 $120,000.00 Road Extension

154 LE GROS MEMORIAL AIRPORT LPV Survey $61,750.00 $6,861.00 $0.00 $68,611.00

155 FALSE RIVER REGIONAL AIRPORT Taxiway Lighting to Terminal Area and T-Hangar Area $0.00 $50,000.00 $0.00 $50,000.00

156 ST TAMMANY REGIONAL AIRPORT Apron Extension - Phase I (Design) $0.00 $146,000.00 $0.00 $146,000.00

Wednesday, January 13, 2016 General Aviation Capital Outlay Page 29 of 42 Airport Construction and Development Priority Program Unfunded 2018-2021

General Aviation Capital Outlay Federal Item Airport Project Description Funds State Funds Local Other Total Funds 157 TENSAS PARISH AIRPORT Environmental Assessment for Runway Extension $0.00 $175,000.00 $0.00 $175,000.00

158 HARRY P. WILLIAMS MEMORIAL AIRPORT Rehabilitate Segmented Circle $0.00 $7,500.00 $0.00 $7,500.00

159 TENSAS PARISH AIRPORT Design Runway Extension $0.00 $150,000.00 $0.00 $150,000.00

160 MINDEN AIRPORT Construct Apron Expansion, Connector Taxiway, and $1,530,000.00 $170,000.00 $0.00 $1,700,000.00 Access Road Extension

161 ALLEN PARISH AIRPORT Install Perimeter Fence - Phase I $0.00 $22,500.00 $0.00 $22,500.00

162 HART AIRPORT Construct Parallel Taxiway $0.00 $2,000,000.00 $0.00 $2,000,000.00

163 LE GROS MEMORIAL AIRPORT Security Fencing and Gates $176,580.00 $19,620.00 $0.00 $196,200.00

164 LEESVILLE AIRPORT Install Perimeter Fence $360,000.00 $40,000.00 $0.00 $400,000.00

165 ACADIANA REGIONAL AIRPORT Perimeter/Emergency Access Road - Phase I (Design) $288,000.00 $32,000.00 $0.00 $320,000.00

166 FRANKLINTON AIRPORT Hangar Taxilane - Phase II (Construction) $0.00 $300,000.00 $0.00 $300,000.00

167 HART AIRPORT Design Parallel Taxiway $0.00 $200,000.00 $0.00 $200,000.00

168 RUSTON REGIONAL AIRPORT Design Runway & Taxiways Rehabilitation $0.00 $50,000.00 $0.00 $50,000.00

Wednesday, January 13, 2016 General Aviation Capital Outlay Page 30 of 42 Airport Construction and Development Priority Program Unfunded 2018-2021

General Aviation Capital Outlay Federal Item Airport Project Description Funds State Funds Local Other Total Funds 169 NEW ORLEANS LAKEFRONT AIRPORT Expand ARFF Building $1,350,000.00 $150,000.00 $0.00 $1,500,000.00

170 VIVIAN AIRPORT 6 Unit T-Hangar $0.00 $400,000.00 $38,000.00 $438,000.00

171 DE QUINCY INDUSTRIAL AIRPARK Apron Expansion $1,719,068.00 $191,008.00 $0.00 $1,910,076.00

172 JENA AIRPORT Apron Rehabilitation - Phase III $0.00 $232,000.00 $0.00 $232,000.00

173 VICKSBURG-TALLULAH REGIONAL Rehabilitate Apron $120,000.00 $13,333.00 $0.00 $133,333.00 AIRPORT

174 ST JOHN THE BAPTIST PARISH AIRPORT GA Hangar $0.00 $700,000.00 $0.00 $700,000.00

175 ST JOHN THE BAPTIST PARISH AIRPORT New Terminal Building and Apron $0.00 $2,800,000.00 $0.00 $2,800,000.00

176 RUSTON REGIONAL AIRPORT Construct Taxilanes and T Hangars - Phase I (Design) $0.00 $75,000.00 $0.00 $75,000.00

177 HOMER MUNICIPAL AIRPORT Apron Rehabilitation Phase II $0.00 $175,000.00 $0.00 $175,000.00

178 ST LANDRY PARISH-AHART FIELD T-Hangars $246,600.00 $27,400.00 $0.00 $274,000.00

179 COLUMBIA AIRPORT Construct New Runway - Phase I $0.00 $350,000.00 $0.00 $350,000.00

180 BUNKIE MUNICIPAL AIRPORT Perimeter Fencing - Phase II $0.00 $325,000.00 $0.00 $325,000.00

Wednesday, January 13, 2016 General Aviation Capital Outlay Page 31 of 42 Airport Construction and Development Priority Program Unfunded 2018-2021

General Aviation Capital Outlay Federal Item Airport Project Description Funds State Funds Local Other Total Funds 181 EUNICE AIRPORT New Aircraft Hangars $900,000.00 $100,000.00 $0.00 $1,000,000.00

182 SOUTH LAFOURCHE LEONARD MILLER, Master Plan Update $225,000.00 $25,000.00 $0.00 $250,000.00 JR. AIRPORT

183 JENNINGS AIRPORT Land Acquisition OFZ North of Runway 8-26 $0.00 $294,000.00 $0.00 $294,000.00

184 NATCHITOCHES REGIONAL AIRPORT Construct Taxilanes for T-Hangars $450,000.00 $50,000.00 $0.00 $500,000.00

185 UNION PARISH AIRPORT Parallel Taxiway Extension - Phase II $1,125,000.00 $125,000.00 $0.00 $1,250,000.00

186 THIBODAUX MUNICIPAL AIRPORT Airport Terminal $0.00 $25,000.00 $8,000.00 $33,000.00

187 CHENNAULT INTERNATIONAL AIRPORT Land Aquisition - Phase I $0.00 $900,000.00 $0.00 $900,000.00

188 CHENNAULT INTERNATIONAL AIRPORT Land Acquistion Adjacent to Taxiway G $9,025,000.00 $1,002,778.00 $0.00 $10,027,778.00

189 BEAUREGARD REGIONAL AIRPORT Construct T-Hangar Taxilanes $1,352,502.00 $150,278.00 $0.00 $1,502,780.00

190 COLUMBIA AIRPORT Construct Apron and Taxiway Stub - Phase I $0.00 $60,000.00 $0.00 $60,000.00

191 CHENNAULT INTERNATIONAL AIRPORT Perimeter Road Rehabilitation $1,170,000.00 $130,000.00 $0.00 $1,300,000.00

192 VIVIAN AIRPORT Construct Apron - Phase I Design $0.00 $60,000.00 $0.00 $60,000.00

Wednesday, January 13, 2016 General Aviation Capital Outlay Page 32 of 42 Airport Construction and Development Priority Program Unfunded 2018-2021

General Aviation Capital Outlay Federal Item Airport Project Description Funds State Funds Local Other Total Funds 193 PINEVILLE MUNICIPAL AIRPORT East Access Road and Site Improvements $0.00 $200,000.00 $0.00 $200,000.00

194 FALSE RIVER REGIONAL AIRPORT (4) Box Hangars $0.00 $530,000.00 $0.00 $530,000.00

195 RUSTON REGIONAL AIRPORT Construct Hangar Taxiways - Phase II $1,170,000.00 $130,000.00 $0.00 $1,300,000.00

196 SPRINGHILL AIRPORT Design Taxilanes for T-Hangar Development Area $67,500.00 $7,500.00 $0.00 $75,000.00

197 THIBODAUX MUNICIPAL AIRPORT Midfield Connector Taxiway $216,900.00 $24,100.00 $0.00 $241,000.00

198 KELLY-DUMAS Construct Parallel Taxiway - Phase III $2,280,000.00 $120,000.00 $0.00 $2,400,000.00

199 RED RIVER PARISH AIRPORT Construct Parallel Taxiway $1,100,000.00 $122,222.00 $0.00 $1,222,222.00

200 COLUMBIA AIRPORT Perimeter Fencing $0.00 $356,200.00 $0.00 $356,200.00

201 LE MAIRE MEMORIAL AIRPORT Runway Overlay $0.00 $400,000.00 $0.00 $400,000.00

202 COLUMBIA AIRPORT Runway Rehabilitation $0.00 $100,000.00 $0.00 $100,000.00

203 GEORGE R. CARR MEMORIAL AIRPORT Apron Expansion $720,000.00 $80,000.00 $500,000.00 $1,300,000.00

204 ST TAMMANY REGIONAL AIRPORT Box Hangar $0.00 $600,000.00 $0.00 $600,000.00

Wednesday, January 13, 2016 General Aviation Capital Outlay Page 33 of 42 Airport Construction and Development Priority Program Unfunded 2018-2021

General Aviation Capital Outlay Federal Item Airport Project Description Funds State Funds Local Other Total Funds 205 GEORGE R. CARR MEMORIAL AIRPORT Hangar $0.00 $700,000.00 $0.00 $700,000.00

206 COLUMBIA AIRPORT Install AWOS $0.00 $230,100.00 $0.00 $230,100.00

207 VIVIAN AIRPORT AGIS Survey for New Runway/Extension $0.00 $80,000.00 $0.00 $80,000.00

208 VIVIAN AIRPORT Site Preparation for New Runway 9/27 $2,227,500.00 $522,500.00 $0.00 $2,750,000.00

209 TENSAS PARISH AIRPORT Perimeter Fencing Phase I $0.00 $250,000.00 $0.00 $250,000.00

210 FALSE RIVER REGIONAL AIRPORT Construction of Corporate Hangar $114,000.00 $12,667.00 $30,000.00 $156,667.00

211 ESLER REGIONAL AIRPORT Rehabilitate Security Fencing & Gates $0.00 $108,977.00 $0.00 $108,977.00

212 ESLER REGIONAL AIRPORT Access Road and Security Checkpoints $1,080,000.00 $120,000.00 $0.00 $1,200,000.00

213 VIVIAN AIRPORT Construct New Runway 9/27 $1,822,500.00 $427,500.00 $0.00 $2,250,000.00

214 WELSH AIRPORT Airfield Perimeter Fencing - Phase II $0.00 $250,000.00 $0.00 $250,000.00

215 MARKSVILLE MUNICIPAL AIRPORT Runway 4/22 Extension - Phase I (Design) $0.00 $122,000.00 $0.00 $122,000.00

216 UNION PARISH AIRPORT Design Runway Extension $180,000.00 $20,000.00 $0.00 $200,000.00

Wednesday, January 13, 2016 General Aviation Capital Outlay Page 34 of 42 Airport Construction and Development Priority Program Unfunded 2018-2021

General Aviation Capital Outlay Federal Item Airport Project Description Funds State Funds Local Other Total Funds 217 TENSAS PARISH AIRPORT Acquire and Install AWOS $0.00 $200,000.00 $0.00 $200,000.00

218 JOHN H.HOOKS JR. MEMORIAL New East Apron - Phase I $95,000.00 $10,556.00 $0.00 $105,556.00

219 HOUMA-TERREBONNE AIRPORT Rehabilitate Airfield Drainage - Phase I $0.00 $750,000.00 $0.00 $750,000.00

220 JOHN H.HOOKS JR. MEMORIAL New East Apron - Phase II $475,000.00 $52,778.00 $0.00 $527,778.00

221 MOREHOUSE MEMORIAL AIRPORT 1000 Foot Runway Extension $1,000,000.00 $111,111.00 $0.00 $1,111,111.00

222 FRANKLINTON AIRPORT Hangar Taxilane - Phase I (Design) $0.00 $50,000.00 $0.00 $50,000.00

223 RED RIVER PARISH AIRPORT Design & Construct Hangars for New Apron $0.00 $350,000.00 $0.00 $350,000.00

224 HARRY P. WILLIAMS MEMORIAL AIRPORT Update ALP/Convert to eALP $90,000.00 $10,000.00 $0.00 $100,000.00

225 ALLEN PARISH AIRPORT Construct T-Hangars $0.00 $300,000.00 $0.00 $300,000.00

226 THIBODAUX MUNICIPAL AIRPORT Renovate Terminal/FBO Hangar $0.00 $137,515.00 $0.00 $137,515.00

227 LEESVILLE AIRPORT Access Road Rehabilitation $27,000.00 $3,000.00 $0.00 $30,000.00

228 SOUTH LAFOURCHE LEONARD MILLER, Security Cameras $0.00 $60,000.00 $0.00 $60,000.00 JR. AIRPORT

Wednesday, January 13, 2016 General Aviation Capital Outlay Page 35 of 42 Airport Construction and Development Priority Program Unfunded 2018-2021

General Aviation Capital Outlay Federal Item Airport Project Description Funds State Funds Local Other Total Funds 229 NATCHITOCHES REGIONAL AIRPORT Rehabilitate Access Road - Phase I $0.00 $50,000.00 $0.00 $50,000.00

230 LE MAIRE MEMORIAL AIRPORT Apron Rehabilitation $0.00 $350,000.00 $0.00 $350,000.00

231 FALSE RIVER REGIONAL AIRPORT Bury Powerlines - Runway 36 Approach $0.00 $250,000.00 $0.00 $250,000.00

232 FALSE RIVER REGIONAL AIRPORT Overlay Runway and Taxiway - Phase II (Construction) $1,485,000.00 $165,000.00 $0.00 $1,650,000.00

233 BUNKIE MUNICIPAL AIRPORT Airport Access Drive $0.00 $128,400.00 $0.00 $128,400.00

234 HOMER MUNICIPAL AIRPORT Construct Parallel Taxiway $0.00 $836,063.00 $0.00 $836,063.00

235 RED RIVER PARISH AIRPORT Design Parallel Taxiway $180,000.00 $20,000.00 $0.00 $200,000.00

236 DAVID G. JOYCE AIRPORT Rehabilitate Apron - North Section $0.00 $250,000.00 $0.00 $250,000.00

237 LE MAIRE MEMORIAL AIRPORT T-Hangar Complex $0.00 $400,000.00 $0.00 $400,000.00

238 MINDEN AIRPORT Construct Terminal Building $0.00 $500,000.00 $0.00 $500,000.00

239 RED RIVER PARISH AIRPORT Design New Apron $54,000.00 $6,000.00 $0.00 $60,000.00

240 THIBODAUX MUNICIPAL AIRPORT Resurface Terminal Building Parking Lot $150,000.00 $16,667.00 $0.00 $166,667.00

Wednesday, January 13, 2016 General Aviation Capital Outlay Page 36 of 42 Airport Construction and Development Priority Program Unfunded 2018-2021

General Aviation Capital Outlay Federal Item Airport Project Description Funds State Funds Local Other Total Funds 241 COLUMBIA AIRPORT Mitigate Wastewater Treatment Facility $0.00 $187,200.00 $0.00 $187,200.00

242 COLUMBIA AIRPORT Fuel Farm $0.00 $100,000.00 $0.00 $100,000.00

243 MINDEN AIRPORT Obstruction Mitigation Temporary Terminal $0.00 $50,000.00 $0.00 $50,000.00

244 LE MAIRE MEMORIAL AIRPORT Runway Extension $0.00 $250,000.00 $0.00 $250,000.00

245 ST JOHN THE BAPTIST PARISH AIRPORT Construct 4-Unit Hangar Building $0.00 $307,700.00 $0.00 $307,700.00

246 NATCHITOCHES REGIONAL AIRPORT Wildlife Hazard Study $0.00 $75,000.00 $0.00 $75,000.00

247 TENSAS PARISH AIRPORT Land Acquisition (Phase II) $0.00 $350,000.00 $0.00 $350,000.00

248 CONCORDIA PARISH AIRPORT Security Lighting for Main and T-Hangar Ramps $142,500.00 $15,833.00 $0.00 $158,333.00

249 COLUMBIA AIRPORT Relocate Airport Access Road - Phase I $0.00 $40,000.00 $0.00 $40,000.00

250 COLUMBIA AIRPORT Relocate Airport Access Road and Auto Parking - Phase II $0.00 $200,000.00 $0.00 $200,000.00

251 ST JOHN THE BAPTIST PARISH AIRPORT East Airfield Interior Access Road $0.00 $500,000.00 $0.00 $500,000.00

252 MINDEN AIRPORT Mitigate Obstructions - Phase II Construction $2,150,000.00 $238,889.00 $0.00 $2,388,889.00

Wednesday, January 13, 2016 General Aviation Capital Outlay Page 37 of 42 Airport Construction and Development Priority Program Unfunded 2018-2021

General Aviation Capital Outlay Federal Item Airport Project Description Funds State Funds Local Other Total Funds 253 TENSAS PARISH AIRPORT Construct Access Road $0.00 $700,000.00 $0.00 $700,000.00

254 JOHN H.HOOKS JR. MEMORIAL Terminal Building - Phase I $95,000.00 $10,556.00 $0.00 $105,556.00

255 JOHN H.HOOKS JR. MEMORIAL New Fuel Farm $0.00 $50,000.00 $0.00 $50,000.00

256 JOHN H.HOOKS JR. MEMORIAL Terminal Building - Phase II $475,000.00 $52,778.00 $0.00 $527,778.00

257 CONCORDIA PARISH AIRPORT Construct T-Hangars $0.00 $425,000.00 $0.00 $425,000.00

258 HOUMA-TERREBONNE AIRPORT Airport Perimeter Fencing and Control Gates - Phase III $0.00 $750,000.00 $0.00 $750,000.00

259 GEORGE R. CARR MEMORIAL AIRPORT Construct Perimeter Road $855,000.00 $95,000.00 $0.00 $950,000.00

260 DAVID G. JOYCE AIRPORT Construct Parallel Taxiway - Apron to Midfield $0.00 $471,000.00 $0.00 $471,000.00

261 SPRINGHILL AIRPORT Construct Taxilanes for T-Hangar Development Area $675,000.00 $75,000.00 $0.00 $750,000.00

262 MINDEN AIRPORT New Fuel Facility $0.00 $250,000.00 $0.00 $250,000.00

263 ARCADIA-BIENVILLE AIRPORT Design Parallel Taxiway $0.00 $100,000.00 $0.00 $100,000.00

264 ARCADIA-BIENVILLE AIRPORT Construct Parallel Taxiway $0.00 $1,500,000.00 $0.00 $1,500,000.00

Wednesday, January 13, 2016 General Aviation Capital Outlay Page 38 of 42 Airport Construction and Development Priority Program Unfunded 2018-2021

General Aviation Capital Outlay Federal Item Airport Project Description Funds State Funds Local Other Total Funds 265 DAVID G. JOYCE AIRPORT Design Parallel Taxiway $0.00 $58,000.00 $0.00 $58,000.00

266 ST TAMMANY REGIONAL AIRPORT Runway 18/36 Extension - Phase III (Construction) $2,713,842.00 $301,538.00 $0.00 $3,015,380.00

267 ESLER REGIONAL AIRPORT Drainage Study $0.00 $22,200.00 $0.00 $22,200.00

268 NATCHITOCHES REGIONAL AIRPORT Rehabilitation of Parallel Taxiway Lighting $0.00 $650,000.00 $0.00 $650,000.00

269 GEORGE R. CARR MEMORIAL AIRPORT Pave Auto Parking Lot $135,000.00 $15,000.00 $0.00 $150,000.00

270 UNION PARISH AIRPORT Parallel Taxiway Extension - Phase I $135,000.00 $15,000.00 $0.00 $150,000.00

271 EUNICE AIRPORT Taxiway Extension (South) with Associated Lighting and $540,000.00 $60,000.00 $0.00 $600,000.00 Signage

272 TENSAS PARISH AIRPORT Parking Lot $0.00 $65,000.00 $0.00 $65,000.00

273 ST TAMMANY REGIONAL AIRPORT Runway 18/36 Extension - Phase IV (Widening and $1,140,000.00 $126,667.00 $0.00 $1,266,667.00 Overlay)

274 ARCADIA-BIENVILLE AIRPORT Perimeter Fencing - Phase I $0.00 $70,000.00 $0.00 $70,000.00

275 UNION PARISH AIRPORT Runway Extension $950,000.00 $105,556.00 $0.00 $1,055,556.00

276 EUNICE AIRPORT Relocate Perimeter Fence on East Property Line $54,000.00 $6,000.00 $0.00 $60,000.00

Wednesday, January 13, 2016 General Aviation Capital Outlay Page 39 of 42 Airport Construction and Development Priority Program Unfunded 2018-2021

General Aviation Capital Outlay Federal Item Airport Project Description Funds State Funds Local Other Total Funds 277 HOMER MUNICIPAL AIRPORT Construct Hangars $0.00 $272,816.00 $0.00 $272,816.00

278 RUSTON REGIONAL AIRPORT RehabilitateTaxiway - Phase II $135,000.00 $15,000.00 $0.00 $150,000.00

279 RED RIVER PARISH AIRPORT Construct Terminal Building $400,000.00 $44,444.00 $0.00 $444,444.00

280 BYERLEY AIRPORT Rehabilitate Airfield Lighting $405,000.00 $45,000.00 $0.00 $450,000.00

281 DE QUINCY INDUSTRIAL AIRPARK Construct Six T-Hangars with Taxilane $397,100.00 $44,122.00 $0.00 $441,222.00

282 ST LANDRY PARISH-AHART FIELD Sealcoat Ramp $0.00 $174,619.00 $0.00 $174,619.00

283 BYERLEY AIRPORT Apron Rehabilitation $463,500.00 $51,500.00 $0.00 $515,000.00

284 ST LANDRY PARISH-AHART FIELD Runway 6-24 Pavement Patching, Joint Repair, and Reseal $0.00 $749,642.00 $0.00 $749,642.00

285 MARKSVILLE MUNICIPAL AIRPORT LPV Obstruction Survey $0.00 $60,000.00 $0.00 $60,000.00

286 HAMMOND NORTHSHORE REGIONAL Runway 13/31 LPV Survey $0.00 $48,000.00 $0.00 $48,000.00 AIRPORT

287 NATCHITOCHES REGIONAL AIRPORT Runway 17/25 Extension- Phase I $0.00 $175,000.00 $0.00 $175,000.00

288 HOUMA-TERREBONNE AIRPORT Land Acquisition $0.00 $750,000.00 $0.00 $750,000.00

Wednesday, January 13, 2016 General Aviation Capital Outlay Page 40 of 42 Airport Construction and Development Priority Program Unfunded 2018-2021

General Aviation Capital Outlay Federal Item Airport Project Description Funds State Funds Local Other Total Funds 289 SPRINGHILL AIRPORT Design/Construct 6 Unit T-Hangar $0.00 $350,000.00 $0.00 $350,000.00

290 LE MAIRE MEMORIAL AIRPORT Land Acquisition $0.00 $150,000.00 $0.00 $150,000.00

291 EUNICE AIRPORT Construct Ag Loading Area with Access Road $284,202.00 $31,578.00 $0.00 $315,780.00

292 NATCHITOCHES REGIONAL AIRPORT Rehabilitate Taxiway B $270,000.00 $30,000.00 $0.00 $300,000.00

293 WINNSBORO MUNICIPAL AIRPORT Rehabilitate Airside Access Road $112,500.00 $12,500.00 $0.00 $125,000.00

294 FRANKLINTON AIRPORT Airport Terminal $0.00 $32,000.00 $8,000.00 $40,000.00

295 EUNICE AIRPORT Construct Maintenance Hangar $270,000.00 $30,000.00 $0.00 $300,000.00

296 WINNSBORO MUNICIPAL AIRPORT AGIS Survey $21,900.00 $43,100.00 $0.00 $65,000.00

297 COLUMBIA AIRPORT Terminal Building $0.00 $50,000.00 $0.00 $50,000.00

298 UNION PARISH AIRPORT Construct Hangars $0.00 $650,000.00 $0.00 $650,000.00

299 EUNICE AIRPORT Land Acquisition - East $630,000.00 $70,000.00 $0.00 $700,000.00

300 VIVIAN AIRPORT Site Selection from Previous ALP Update $112,500.00 $12,500.00 $0.00 $125,000.00

Wednesday, January 13, 2016 General Aviation Capital Outlay Page 41 of 42 Airport Construction and Development Priority Program Unfunded 2018-2021

General Aviation Capital Outlay Federal Item Airport Project Description Funds State Funds Local Other Total Funds 301 ST LANDRY PARISH-AHART FIELD Install Localizer Runway 18 $225,000.00 $25,000.00 $0.00 $250,000.00

302 WELSH AIRPORT T-Hangar $0.00 $400,000.00 $0.00 $400,000.00

303 C.E. (RUSTY) WILLIAMS AIRPORT Taxiway Lighting System $0.00 $400,000.00 $0.00 $400,000.00

304 WINNSBORO MUNICIPAL AIRPORT Construct Entrance Drive, Gating & Erosion Control $360,000.00 $40,000.00 $0.00 $400,000.00 Measures for New Airport Site

305 VIVIAN AIRPORT Construct Apron - Phase II Construction $575,000.00 $63,889.00 $0.00 $638,889.00

306 DELHI MUNICIPAL AIRPORT Fuel Farm $0.00 $100,000.00 $0.00 $100,000.00

307 WELSH AIRPORT Airport Layout Plan (ALP) $0.00 $80,000.00 $0.00 $80,000.00

308 BYERLEY AIRPORT Fuel Farm $0.00 $50,000.00 $0.00 $50,000.00

309 NATCHITOCHES REGIONAL AIRPORT Relocate Fairgrounds Road Project - Phase I $0.00 $125,000.00 $0.00 $125,000.00

310 PINEVILLE MUNICIPAL AIRPORT Airport Terminal $0.00 $25,000.00 $8,000.00 $33,000.00

311 DAVID G. JOYCE AIRPORT Construct Parallel Taxiway - Midfield to Runway 09 $0.00 $508,000.00 $0.00 $508,000.00

312 COLUMBIA AIRPORT Access Gate and Terminal Area Fencing $0.00 $50,000.00 $0.00 $50,000.00

General Aviation Capital Outlay Totals $206,039,141.00 $88,614,981.00 $1,451,668.00 $296,105,790.00

Wednesday, January 13, 2016 General Aviation Capital Outlay Page 42 of 42

Cancelled Projects and Addendum PROJECTS TO BE CANCELLED

Listed below are projects in the Aviation Priority Program for the Fiscal Years indicated. These projects are either idle or outdated, and their scopes of work are no longer valid. Therefore, we recommend approval of the sponsor’s request to withdraw the following projects from the Aviation Priority Program:

Fiscal Year 2013-2014 Funded List

General Aviation 03GA Shreveport Downtown - Mitigate Obstructions; $50,000 28GA Delhi - Obstruction Removal; $55,000 42GA Springhill - Rehabilitate Airfield Pavement - Phase I (Design); $3,000

Fiscal Year 2014-2015 Funded List

General Aviation 13GA St. Landry Parish-Ahart Field – Obstruction Removal Runway 18 Approach; $15,525 17GA Slidell Airport – Runway Pavement Rehabilitation; $49,500 41GA St. Landry Parish-Ahart Field – Security Fence-North; $6,345

Air Carrier 03AC Shreveport Regional – WHA Mitigation Drainage Project; $55,556 07AC Shreveport Regional – Airfield Lighting Rehab – Phase II; $1,200,000

Fiscal Year 2015-2016 Funded List

General Aviation 49GA David G Joyce - Apron Rehabilitation - Phase I (Design); $3,000 53GA Red River Parish - Construct Perimeter Fence - Design Only; $4,500

General Aviation Cancelled Projects: $186,870

Air Carrier Cancelled Projects: $1,255,556 Total Cancelled Projects: $1,442,426

Additional Comments to the Airport Construction and Development Priority Program Funded 2016-2017, Unfunded Program 2017-2018, and Unfunded Program 2018-2021.

The actual project cost, on a project by project basis, may be below or above the estimate. However, the total amount approved for the Airport Construction and Development Priority Program, for fiscal year 2016-2017, will not be exceeded.

In accordance with Act 451, 1989 regular Session, paragraph 803 (B), which states “…if governing authority of an airport authority, district, parish or of any local unit of government obtains ninety percent or more funding for an airport, or for an airport project, from federal sources or from sources other than state funds, the legislature shall give priority to funding the remaining amount necessary for the airport or for the airport project, even if the project is not on the priority list of projects.” The legislature does further authorize LA DOTD to provide matching funds for any project during the Fiscal Year 2016-2017, which does not specifically appear on the list of projects developed in compliance with the Louisiana Airport Construction and Development Priority Program, but which has received a commitment of ninety percent or more funding.

The available funds will be distributed in the following order:

1) Projects in the FY 2016-2017 Airport Construction and Development Priority Program are funded directly from the Transportation Trust Fund that is allocated in FY 2016-2017 to the Airport Construction and Development Priority Program.

2) Any other project or eligible enhancements to previously approved projects which receives 90% funding from any source, other than another State source, but which has not been processed and prioritized and is not in either the FY 2016-2017 funded or the FY 2017-2018 and 2018-2021 unfunded portion of the Airport Construction and Development Priority Program.

3) The General Aviation and Reliever Airports Maintenance Grant Program shall be funded in accordance with the conditions specified in Chapter 8 of Title 2 of the Louisiana Revised Statues.

4) In the event that additional funds become available, through special appropriations, underruns, project cancellations, or otherwise, certain unfunded, state only projects required for safety or infrastructure preservation at airports not eligible for Federal Aviation Administration (FAA) Airport Improvement Program (AIP) funding may be moved from the Unfunded FY 2017-2018 or Unfunded FY 2018-2021 Airport Construction and Development Priority Program to the FY 2016- 2017 Airport Construction and Development Priority Program (funded list).

5) Aviation Trust Funds will not be used as a match for projects funded with Passenger Facility Charges (PFC) as PFCs can be approved by the FAA at 100% of the project cost.

Glossary GLOSSARY

AC (Air Carrier): Airports or aircraft providing service to fare paying passengers

Apron: Parking area for aircraft

ALP: Airport Layout Plan

ARFF (Aircraft Rescue & Firefighting): Trucks and equipment for fighting aircraft fires

ATC (Air Traffic Control): A service operated by appropriate authority to promote the safe, orderly, and expeditious flow of air traffic.

ATCT (Air Traffic Control Tower): Air traffic control facility located on airport responsible for controlling local airport traffic.

ASOS (Automated Surface Observation System): Automated system that transmits weather data to aircraft

AWOS (Automated Weather Observation System): Automated system that transmits weather data to aircraft

Blast Pad: Concrete extension at the end of a runway to prevent erosion caused by jet blast

CAT (Category): Category of instrument landing system based on visibility requirements.

Construct: Build a new system

DME (Distance Measuring Equipment): A transponder-based radio navigation technology that measures distance by timing the propagation delay of radio signals

DNL (Average Day/Night Noise Level): Noise levels measured in the vicinity of an airport

EA: Environmental Assessment

EDS (Explosive Detection System): Electronic equipment for screening luggage

EMAS (Engineered Mechanical Arresting System): An area at the end of a runway paved with special, soft concrete to stop aircraft in an emergency

FBO (Fixed Base Operator): A commercial operator of aviation services on an airport that provides fuel, maintenance, aircraft rental, etc.

GA (General Aviation): All aviation except air carriers and military

GIS: Geographic Information Systems

GLS (GNSS Landing System)

GNSS (Global Navigation Satellite System)

Grooving: Longitudinal grooves cut into runways to promote drainage and prevent hydroplaning

Holding Bay: Paved pull-off area for temporary aircraft parking near the runway end

ILS (Instrument Landing System): Ground based instrument approach system that provides precision guidance to an aircraft approaching and landing on a runway.

Incursion Device: Detects aircraft or vehicles that go onto a runway without approval

Joints: Space between concrete slabs

LLWAS: Low Level Wind shear Alert System

LNAV: Lateral navigation instrument approach procedure

LNAV/VNAV: Lateral Navigation/Vertical Navigation instrument approach procedure

Localizer: The component of an instrument landing system that provides course guidance to the runway centerline.

LOI: (Letter of Intent) The FAA’s intent to obligate AIP discretionary and entitlement funds from future budgetary authority in an amount not greater than the Federal Government’s share of allowable costs for that project.

LPV: Localizer performance with vertical guidance instrument approach procedure

MALSR (Medium Intensity Approach Lighting System with Runway Alignment Indicator Lights): Lighting system used to align landing aircraft with the runway

Marking: Numbers, letters, and symbols painted on runways and taxiways

Master Plan: A plan for airport growth during a 20-25 year period

MIRL (Medium Intensity Runway Lights): Lights that mark the edge of a runway

MITL (Medium Intensity Taxiway Lights): Lights that mark the edge of a taxiway

Noise Compatibility: FAA program to assist homeowners near airports

Obstruction Removal: A planned program to remove obstructions (trees, buildings, ditches, etc) from an RPZ or safety areas

Overlay: A layer of asphalt placed on top of an existing asphalt surface

Overrun: Area beyond the end of a runway used for aircraft unable to stop on the runway

PAPI (Precision Approach Path Indicator): A visual landing aid that provides landing information by the use of colored lights

Parallel Taxiway: A taxiway paralleling a runway

Passenger Loading Bridge: Enclosed movable hallway connecting a passenger aircraft to the terminal

PCI: Pavement Condition Index PCC: Portland Concrete Cement

RAIL (Runway Alignment Indicator Lights): Sequence flashing lights used as part of an approach lighting system

Ramp: Parking area for aircraft

Reconstruct: Rebuild an existing system

Rehabilitate: Major repairs to an existing system

REIL (Runway End Identifier Lights): Flashing lights that identify the runway end

Rejuvenator: An additive that replaces lost oils in asphalt

RPZ (Runway Protection Zone): Area which must be free of vertical obstacles

Runway: A strip of concrete, asphalt, or turf used for the landing and takeoff of aircraft

Safety Area: Land immediately adjacent to runways and taxiways

Sealcoat: Protective surface applied to asphalt pavements (sometimes called a slurry seal)

Seaway: Landing area for seaplanes or amphibious airplanes

Segmented Circle: A system of visual indicators designed to provide traffic pattern information to aircraft

Sound Mitigation: FAA program to assist homeowners near airports

SSALR (Simplified Short Approach Light System with RAIL): Lighting system used to align landing aircraft with the runway

Striping: White or yellow lines painted on runways and taxiways

Stub Taxiway: Small taxiway connecting a runway to a parallel taxiway, apron or ramp

Taxilane: Small taxiway leading to hangars

Taxiway: Strip of concrete, asphalt, or turf used to move aircraft to and from the runway

Terminal: Building used by pilots and passengers for creature comfort and flight planning. Also adjacent aircraft parking

T-hangar: Hangars shaped like a “T” designed for storing airplanes tail to tail

Tie Down: A ring set in an apron for anchoring small aircraft

UAS: Unmanned Aerial Systems

UHF (Ultra High Frequency): Radio signals primarily used by military aircraft

Vault: Building that houses electrical equipment for an airport

WHA: Wildlife Hazard Assessment

Wind Cone: Device for detecting and displaying wind direction (also called wind sock)

Wind Tee: Device for detecting and displaying wind direction