30 Ogos 2021 (Isnin)
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Summary of Environmental Impacts and Mitigating Measures All the Impacts That Are Likely to Be Generated by the Proposed Project Is Summarized in Table E
EIA for the Proposed Mixed Housing and Commercial Development on Lot 66166, Mukim Tanjung Dua Belas, Daerah Kuala Langat, Selangor Darul Ehsan for Setara Hati Sdn. Bhd. Summary of Environmental Impacts and Mitigating Measures All the impacts that are likely to be generated by the proposed Project is summarized in Table E. Mitigating measures specifically proposed for each of the impacts are also presented in a systematic manner in accordance to pre-construction, construction and operational phase. Hence, such data enable convenient identification of impacts along with their respective temporal (i.e., acute or residual) and spatial (i.e., magnitude) considerations. Table E: Summary of Environmental Impacts and Mitigating Measures for the Proposed Project PHASE OF DEVELOPMENT ACTIVITIES POTENTIAL IMPACTS MITIGATING MEASURES SIGNIFICANCE REMARKS A. Pre-Construction Phase Reconnaissance study of • Preparation of • The activity is rather None. Short-term. The pre-construction the Project Site. documentation and plans localized and not expected stage basically involves of the proposed to generate any the documentation, development. disturbances to the legal approval from the existing environment. relevant authorities, Detail study of the existing • Field survey and site • Some form of beneficial building construction condition. investigation by impacts such as job design and engineering and opportunities (i.e., development planning, environmental surveying works, field survey as well as consultants. associated labourers and site investigation. analytical laboratories) may be possible. d-i EIA for the Proposed Mixed Housing and Commercial Development on Lot 66166, Mukim Tanjung Dua Belas, Daerah Kuala Langat, Selangor Darul Ehsan for Setara Hati Sdn. Bhd. Cont…. PHASE OF DEVELOPMENT ACTIVITIES POTENTIAL IMPACTS MITIGATING MEASURES SIGNIFICANCE REMARKS B. -
ISES 2020 Brochure 05(Separated)
THE 5TH INTERNATIONAL SUSTAINABLE ENERGY SUMMIT 2020 EMPOWERING ENERGY TRANSITION g Energy erin Tran ow si p tio Em n 2020 20th - 21st April 2020 Dewan Jubli Perak Sultan Abdul Aziz Shah Alam, Selangor www.ises.gov.my CO-HOSTED WITH JOINTLY ORGANISED BY ENDORSED BY Selangor State's Environment, Green Technology, Science, Technology and Innovation and Consumer Affairs Committee About 5th ISES 2020 What’s new in 5th ISES? ring Energy Tr we ans po iti The International Sustainable Energy Summit The Authority is pleased to announce that the 5th m on E (ISES) is a knowledge-based platform specifically ISES 2020 will be held in collaboration with both 2020 focusing on renewable energy and energy MESTECC and the Selangor State Government, efficiency. The ISES is organised by the Sustainable through the Environment, Green Technology, Energy Development Authority (‘the Authority’) Science and Consumer Affairs Committee. The Malaysia in collaboration with the Ministry of current Government has set an aspirational Energy, Science, Technology, Environment and target of reaching 20% renewable energy (RE) in Climate Change (MESTECC). The ISES is a biennial the national installed capacity mix by 2025 and event, 2020 will be the 5th summit. The summit this includes hydropower of up to 100 MW. The typically spans over two days and has two key summit will launch the nation’s Renewable components: the knowledge (conference) and Energy Transition Roadmap (RETR) 2035 and business interactions via mini exhibition and part of this roadmap is to address how the 20% business matching session. RE target can be achieved. Guest of Honour YAB. -
23 November 2016
Bil. 52 Rabu 23 November 2016 MALAYSIA PENYATA RASMI PARLIMEN DEWAN RAKYAT PARLIMEN KETIGA BELAS ________________________________________________________________________________________________________ Diterbitkan oleh: PENGGAL KEEMPAT CAWANGAN PENYATA RASMI PARLIMEN MALAYSIA MESYUARAT KETIGA 2016 K A N D U N G A N JAWAPAN-JAWAPAN LISAN BAGI PERTANYAAN-PERTANYAAN (Halaman 1) RANG UNDANG-UNDANG DIBAWA KE DALAM MESYUARAT (Halaman 20) USUL MENTERI DI JABATAN PERDANA MENTERI DI BAWAH P.M.27(3): Menggantung Yang Berhormat Segambut Daripada Perkhidmatan Majlis Mesyuarat Selama Enam Bulan (Halaman 21) RANG UNDANG-UNDANG: Rang Undang-undang Kewangan 2016 (Halaman 25) Rang Undang-undang Kesalahan Yang Berhubungan Dengan Anugerah 2016 (Halaman 58) Rang Undang-undang Lambang dan Nama (Mencegah Penggunaan Tak Wajar)(Pindaan) 2016 (Halaman 82) Rang Undang-undang Pentadbiran Undang-undang Islam (Wilayah-wilayah Persekutuan)(Pindaan) 2016 (Halaman 83) Rang Undang-undang Pendaftaran Kelahiran dan Kematian (Pindaan) 20 (Halaman 100) Rang Undang-undang Pihak Berkuasa Penerbangan Awam Malaysia 2016 (Halaman 119) Rang Undang-undang Penerbangan Awam (Pindaan) 2016 (Halaman 138) USUL-USUL: Waktu Mesyuarat dan Urusan Dibebaskan Daripada Peraturan Mesyuarat (Halaman 20) Meminda Susunan Aturan Urusan Mesyuarat (Halaman 45) Menangguhkan Bacaan Kali Yang Kedua dan Ketiga Rang Undang-undang (Halaman 142) ________________________________________________________________________________________________________ Diterbitkan oleh: CAWANGAN PENYATA RASMI PARLIMEN MALAYSIA 2016 DR 23.11.2016 i AHLI-AHLI DEWAN RAKYAT 1. Yang Berhormat Tuan Yang di-Pertua, Tan Sri Datuk Seri Panglima Pandikar Amin Haji Mulia, P.S.M., S.P.D.K., S.U.M.W., P.G.D.K., J.S.M., J.P. 2. “ Timbalan Yang di-Pertua, Datuk Seri Dr. Ronald Kiandee, P.G.D.K., A.S.D.K. -
Comparison of Groundwater Quality Status at Active and Inactive Landfill in Selangor, Malaysia
International Journal of Civil Engineering and Technology (IJCIET) Volume 9, Issue 7, July 2018, pp. 1896–1902, Article ID: IJCIET_09_07_200 Available online at http://iaeme.com/Home/issue/IJCIET?Volume=9&Issue=7 ISSN Print: 0976-6308 and ISSN Online: 0976-6316 © IAEME Publication Scopus Indexed COMPARISON OF GROUNDWATER QUALITY STATUS AT ACTIVE AND INACTIVE LANDFILL IN SELANGOR, MALAYSIA M.H. Ahmad Faculty of Civil Engineering, Universiti Teknologi MARA, 40450 Shah Alam, Selangor, Malaysia J. Jani Faculty of Civil Engineering, Universiti Teknologi MARA, 40450 Shah Alam, Selangor, Malaysia ABSTRACT Landfills and dumping are one of the method for managing solid waste disposal activities in Malaysia and frequently shown as potential sources of groundwater pollution. However, groundwater pollution in the past has not been identified as key environmental issue in Malaysia since only a few cases of environmental and human health incidences have been reported. In our country, there are a lot of landfills which already in-active and active. Both active and in-active landfills still generate leachate. The most significant pollutant that need to be consider in both landfills are leachate contaminants. The objective of this study is to compare the groundwater quality status between active and inactive landfill sites. Tanjung Dua Belas Sanitary Landfill (TDBSL) is an active landfill, whereas Air Hitam Landfill Park (AHLP) is inactive landfill. The groundwater flow direction at TDBSL was from North East to the South West, whereas the groundwater in AHLP is flowing from East to West South West. The groundwater at TDBSL have exceeded the provided benchmark of Raw Drinking Water Quality Guideline in terms of high in NH3-N, TDS, COD, DO, BOD5, TSS, NO2ˉ and NO3ˉ. -
Malaysia Daybreak | 30 August 2021 FBMKLCI Index
Malaysia | August 30, 2021 Key Metrics Malaysia Daybreak | 30 August 2021 FBMKLCI Index 1,700 ▌What’s on the Table… 1,650 ———————————————————————————————————————————————————————————————————————————————————————— 1,600 1,550 Strategy Note – Reaction to new cabinet and events to watch 1,500 Market likely to be neutral on the new cabinet as key ministers were retained. 1,450 This suggests there will be continuity to policies implemented previously. The 5% 1,400 gain in KLCI in the past week suggests market has priced in political stability in Aug-20 Oct-20 Dec-20 Feb-21 Apr-21 Jun-21 Aug-21 the near term. Maintain KLCI target of 1,608 pts and top picks. ——————————————————————————— FBMKLCI Bumi Armada – A robust 2Q21 as FPSO assets working well 1,590.16 4.42pts 0.28% 1H21 core net profit of RM361m was above expectations, at 82% of our full-year AUG Future SEP Future 1595 - (0.60%) 1579.5 - (0.45%) forecast (76% of consensus) due to better-than-forecast FPSO profits. Upgrade ——————————————————————————— from Hold to Add, with higher SOP-based TP of 55 sen as we raise our earnings Gainers Losers Unchanged forecasts and use a stronger US$ rate of RM4.15 (vs. RM4). Likely strong 2H21F 397 616 445 ——————————————————————————— earnings may re-rate the stock; share price is down 9% from its 16 Jun-high of 49 Turnover sen; a good opportunity to buy, in our view. 4083.21m shares / RM2960.129m 3m avg volume traded 5042.52m shares Public Bank Bhd – A prudent move to enhance provision buffer 3m avg value traded RM2963.34m ——————————————————————————— PBB’s 1H21 net profit was within expectations at 53% of our full-year forecast Regional Indices and 50% of the Bloomberg consensus estimate. -
Cadangan Komplek Baru Kerajaan Daerah Kuala Langat Di Ladang Sungai Sedu Jalan Klang Banting Mukim Tanjung Dua Belas Daerah Sung
MS ISO 9001:2000 REG.NO. AR 2636 PROJECT:- CADANGAN KOMPLEK BARU KERAJAAN DAERAH KUALA LANGAT DI LADANG SUNGAI SEDU, JALAN KLANG BANTING, MUKIM TANJUNG DUA BELAS, DAERAH KUALA LANGAT, SELANGOR DARUL EHSAN LOCATION :- OWNER :- Sg. Sedu Estate (Main Division) Selangor State Government Klang-Banting Road, Kuala Langat PROJECT COST :- COMPLETION DATE:- RM23 Million October 2005 DESCRIPTION :- This project involved building a new District Office for Kuala Langat District. The building stands 3 storeys high and is to be made the heart of the entire development of Sg. Sedu Estate (Main Division). The building is specially designed with local cultural heritage features and also being built on soft ground. Soil improvement works were carried out on the site as the site was founded on soft marine clay. All infrastructure works were also designed to suit the ground condition. Structurally the new District Office is founded on pile foundation and built with precast slabs and wall, beams and columns throughout the building. Upon nearing completion, the new District Office was awarded The Nippon Paint Design Award for Architectural Coating 2006. SERVICES PROVIDED :- ¾ Feasibility study on the building location. ¾ Design of all infrastructure works. ¾ Desiggggn of reinforced concrete building structure and building foundation. ¾ Tendering and construction management. ¾ Construction supervision of the entire project. Kuala Langat Administrative Centre District Office WISMA SSP, LEVEL 8-18, NO. 1 JALAN SR 8/3 SERDANG RAYA SEKSYEN 8 TEL NO.: 03-89433366(HL) FAX NO.: 03-89432691/2707 43300 SERI KEMBANGAN SELANGOR DARUL EHSAN MALAYSIA EMAIL : [email protected] WEB SITE : www.sspsb.com.my. -
Malaysiakini.Com April 4, 2013 Selangor Menteri Besar Abdul
Selangor MB Khalid to move to Port Klang? MalaysiaKini.com April 4, 2013 Selangor Menteri Besar Abdul Khalid Ibrahim might not be defending his Ijok state assembly seat in the coming polls, with the Port Klang state assembly seat being touted as a likely destination. According to sources familiar with PKR’s election committee and seat allocations in the state, there is fear among some sections of Selangor PKR that Abdul Khalid might not retain the Ijok seat should he decide to contest there again. This is believed to be due to the strains of his job as MB, which has rendered him unable to be consistently present in Ijok. Under the Kuala Selangor PKR division, it has been known for infighting over the past few years. Abdul Khalid is also believed to have been receiving a cold response from the constituents when he does pay visits there, with turnouts at events being less than encouraging. Party sources also said that Abdul Khalid was even jeered by a crowd during a recent event, leading the party to really question the support that he has in the constituency. A few alternatives Abdul Khalid won Ijok by a majority of 1,920 votes in 2008 against Umno’s Mohamed Sayuti Said, and the constituency consists of 50 percent Malay voters, 32 percent Indians, and 18 percent Chinese. While there are a few alternatives that are currently being weighed up, Abdul Khalid might be fielded by the party in Port Klang in an attempt to show the voters that the PKR still takes the seat seriously. -
An Analysis of the Changing Spatial Location Of
AN ANALYSIS OF THE CHANGING SPATIAL LOCATION OF AGRICULTURAL ENTERPRISES IN SELANGOR STATE, MALAYSIA By Mohamed Tamin Yusof A dissertation submitted in partial fulfilment of the requirements for the degree of Master of Agricultural Development Economics in the Australian National University October 1985 DECLARATION Except where otherwise indicated this thesis is my cwn work. 7 June 1985 iii ACKNCWLEDGEMENTS I wish to express my sincerest thanks to the Government of Malaysia for nominating me to undertake this course in Australia and the Australian Government for their generous Colombo Plan scholarship. I am very greatly indebted to my supervisor, Dr Dan Etherington whose invaluable suggestions, criticisms, comments and guidance greatly inspired me to complete this research study. I am also greatful to Dr D.P. Chaudhri and Dr Clive Hamilton for their suggestions and advice during the course of the study. To Mr. Sean Foley, who helped in editing and also to Miss Yap Kim Lian, Ministry of Agriculture, Malaysia; Mr. Radzli Jaafar and my family who helped and provided the necessary information required in this study. I am greatful to all of them. To my wife, Zubaidah Arshard and son, Hanif for their understanding, and patience, I can hardly express the extent of my gratitude. And finally, to all my friends and colleagues, who contributed in diverse ways to this study, but too numerous to mention here, I am thankful. iv ABSTRACT This paper examines the changing land use of agricultural areas in Selangor State generally and specifically near urban areas of Kuala Lumpur between 1966 and 1982. Using two contrasting models designed to explain the spatial location of agricultural enterprises, the study found that von Thunen's model has become less relevent due to the modernization of transportation system with consequent significant reduction in transport costs. -
A Study on Landslide Risk Management by Applying Fault Tree Logics
MATEC Web of Conferences 95, 17009 (2017) DOI: 10.1051/ matecconf/20179517009 ICMME 2016 A Study on Landslide Risk Management by Applying Fault Tree Logics Danish Kazmi1, Sadaf Qasim1, I.S.H Harahap2, Syed Baharom2, Arjumend Masood1 and Muhammad Imran2 1Department of Civil Engineering, NED University of Engineering & Technology, Karachi, Pakistan - 75270 2Department of Civil & Environmental Engineering, Universiti Teknologi Petronas, Perak, Malaysia - 32610 Abstract. Slope stability is one of the focal areas of curiosity to geotechnical designers and also appears logical for the application of probabilistic approaches since the analysis lead to a “probability of failure”. Assessment of the existing slopes in relation with risks seems to be more meaningful when concerning with landslides. Probabilistic slope stability analysis (PSSA) is the best option in covering the landslides events. The intent here is to bid a probabilistic framework for quantified risk analysis with human uncertainties. In this regard, Fault Tree Analysis is utilized and for prediction of risk levels, consequences of the failures of the reference landslides have been taken. It is concluded that logics of fault trees is best fit, to clinch additional categories of uncertainty; like human, organizational, and knowledge related. In actual, the approach has been used in bringing together engineering and management performances and personnel, to produce reliability in slope engineering practices. 1 Introduction Table 1. Classes for probability of occurrence [8]. Learning from failures has long been a vital part of Qualitative Quantitative geotechnical engineering. Although there are many Evaluation Evaluation Value types of geotechnical failures, dam failures are especially Certain Every time 1.0 significant and lean to be explored vigilantly. -
Selangor Journal L APRIL 2021
Considering Kita Selangor: Eight Stepping up to protect A fair chance vaccine choices projects completed our earth in Bukit Lanjan 3 5 8&9 10 FREE l APRIL 2021 EDITION l www.selangorjournal.my SELANGOR Airshow ready for takeoff elangor will be hosting its inaugural Selangor Avi- ation Show 2021 (SAS 2021) from Aug 12 to 14. Themed ‘Selangor, the Asean Business & General Aviation Hub’, it is expected to draw at least 5,000 Svisitors and 30 exhibitors from local and international companies. The event is set to create a business ecosystem with investment opportunities on both the domestic and international stage. The state govern- ment had in its 2021 budget allocated a MORE ON total of RM2 million for the event. PAGE 7 2 NEWS Selangor Journal l APRIL 2021 Digital payments cut paper waste Exco: e-parking won’t be SHAH ALAM - Parking payments made through the Smart Selangor Parking (SSP) application has helped save 634,994 kilo- grams of paper, said state executive coun- imposed on everyone cillor for local government Ng Sze Han. He said the savings were calculated By SHERILYN PANG based on the number of users registered with the digital parking payment system SHAH ALAM - Visitors and non-residents which now exceeded 1.5 million since its of Selangor can still pay for their park- launch in July 2018. ing through e-parking agents once the “For the record in the last two to three Smart Selangor Parking (SSP) system is years, the response to the application has fully implemented next year. been very encouraging and (it) even has State executive councillor for local the largest number of users compared to government Ng Sze Han said e-parking other (similar) applications in Malaysia. -
Hansard 06 Nov 2020
06 NOVEMBER 2020 (JUMAAT) MESYUARAT KETIGA PENGGAL KETIGA DEWAN NEGERI SELANGOR YANG KEEMPAT BELAS TAHUN 2020 SHAH ALAM, 06 NOVEMBER 2020 (JUMAAT) Mesyuarat dimulakan pada jam 09.30 pagi YANG HADIR Y.B. Tuan Ng Suee Lim (Sekinchan) (Tuan Speaker) Y.A.B. Dato’ Seri Amirudin bin Shari (Sungai Tua) (Dato’ Menteri Besar Selangor) Y.B. Tuan Ganabatirau A/L Veraman (Kota Kemuning) Y.B. Puan Rodziah binti Ismail (Batu Tiga) Y.B. Tuan Ir. Izham bin Hashim (Pandan Indah) Y.B. Tuan Ng Sze Han (Kinrara) Y.B. Puan Dr. Siti Mariah binti Mahmud (Seri Serdang) Y.B. Tuan Hee Loy Sian (Kajang) Y.B. Tuan Mohd Khairuddin bin Othman (Paya Jaras) Y.B. Tuan Borhan bin Aman Shah, P.J.K. (Tanjong Sepat) 06 NOVEMBER 2020 (JUMAAT) Y.B. Tuan Mohd Zawawi bin Ahmad Mughni (Sungai Kandis) Y.B. Tuan Lau Weng San (Banting) Y.B. Tuan Haji Saari bin Sungib (Hulu Kelang) Y.B. Tuan Ean Yong Hian Wah (Seri Kembangan) Y.B. Puan Elizabeth Wong Keat Ping (Bukit Lanjan) Y.B. Puan Lee Kee Hiong (Kuala Kubu Baharu) Y.B. Tuan Dr. Idris bin Ahmad (Ijok) Y.B. Tuan Hasnul bin Baharuddin, P.P.T. (Morib) (Timbalan Speaker) Y.B. Tuan Rajiv A/L Rishyakaran (Bukit Gasing) Y.B. Tuan Ronnie Liu Tian Khiew (Sungai Pelek) Y.B. Puan Rozana binti Zainal Abidin (Permatang) Y.B. Puan Juwairiya binti Zulkifli (Bukit Melawati) Y.B. Tuan Ahmad Mustain bin Othman (Sabak) Y.B. Tuan Mohd Sany bin Hamzan (Taman Templer) Y.B. Tuan Chua Wei Kiat (Rawang) Y.B. -
Semua Aspek Berhubung Nyahwarta HSKLU Telah Diambil Kira: JPNS
Headline Semua aspek berhubung nyahwarta HSKLU telah diambil kira: JPNS MediaTitle Utusan Borneo Sarawak Date 02 Sep 2021 Color Black/white Section News Circulation 31,034 Page No 17 Readership 93,102 Language Malay ArticleSize 204 cm² Journalist N/A AdValue RM 760 Frequency Daily (EM) PR Value RM 2,281 Semua aspek berhubung nyahwarta HSKLU telah diambil kira: JPNS SHAH ALAM: Kerajaan Mesyuarat Kerajaan Negeri nilai biodiversiti hutan sim- dan fauna yang berkepent- negeri Selangor telah men- (MMKN) Selangor un- pan itu dan kawasan gantian ingan. gambil kira kesemua aspek tuk pertimbangan lanjut," adalah hampir sama. "Selain itu, MMKN juga dalam membuat keputusan menurut kenyataan itu. "Kawasan gantian HSK- telah meluluskan sebahagi- yang terbaik berkaitan Menurut kenyataan berk- LU yang dinyah warta an kawasan untuk peng- isu penyahwartaan Hutan enaan melalui MMKN terdiri daripada jenis hutan gantian baki Rizab Orang Simpan Kuala Langat Utara Ke-17/2021 5 Mei lalu paya gambut di mukim Asli Busut Baru iaitu seluas (HSKLU). yang disahkan oleh MMKN Sungai Panjang iaitu sama lebih kurang 42.1 hektar Jabatan Perhutanan Neg- Ke-18 pada 19 Mei lepas, jenis hutan dengan HSKLU di bawah Seksyen 7, Akta eri Selangor (JPNS) dalam hanya seluas lebih kurang manakala, kawasan gantian Orang Asli 1954. kenyataan hari ini memak- 536.70 hektar daripada kes- di Ampang Pechah dan "Justeru, isu tuntutan lumkan keputusan terse- eluruhan kawasan HSKLU Bukit Broga adalah jenis perizaban kawasan Orang but adalah selaras dengan ini diluluskan untuk dinyah hutan bukit. Asli Busut Baru seluas lebih matlamat pembangunan warta di bawah Seksyen "Kawasan gantian Am- kurang 404.6 hektar sebagai Selangor ke arah kestabilan 11 dan 12, Enakmen (Pe- pang Pechah mempunyai penggantian kawasan dis- sosioekonomi, dinamik, makaian) Akta Perhutanan kepentingan koridor rang- ebabkan pembinaan Lapan- mampan dan lestari.