Summary of Environmental Impacts and Mitigating Measures All the Impacts That Are Likely to Be Generated by the Proposed Project Is Summarized in Table E
Total Page:16
File Type:pdf, Size:1020Kb
EIA for the Proposed Mixed Housing and Commercial Development on Lot 66166, Mukim Tanjung Dua Belas, Daerah Kuala Langat, Selangor Darul Ehsan for Setara Hati Sdn. Bhd. Summary of Environmental Impacts and Mitigating Measures All the impacts that are likely to be generated by the proposed Project is summarized in Table E. Mitigating measures specifically proposed for each of the impacts are also presented in a systematic manner in accordance to pre-construction, construction and operational phase. Hence, such data enable convenient identification of impacts along with their respective temporal (i.e., acute or residual) and spatial (i.e., magnitude) considerations. Table E: Summary of Environmental Impacts and Mitigating Measures for the Proposed Project PHASE OF DEVELOPMENT ACTIVITIES POTENTIAL IMPACTS MITIGATING MEASURES SIGNIFICANCE REMARKS A. Pre-Construction Phase Reconnaissance study of • Preparation of • The activity is rather None. Short-term. The pre-construction the Project Site. documentation and plans localized and not expected stage basically involves of the proposed to generate any the documentation, development. disturbances to the legal approval from the existing environment. relevant authorities, Detail study of the existing • Field survey and site • Some form of beneficial building construction condition. investigation by impacts such as job design and engineering and opportunities (i.e., development planning, environmental surveying works, field survey as well as consultants. associated labourers and site investigation. analytical laboratories) may be possible. d-i EIA for the Proposed Mixed Housing and Commercial Development on Lot 66166, Mukim Tanjung Dua Belas, Daerah Kuala Langat, Selangor Darul Ehsan for Setara Hati Sdn. Bhd. Cont…. PHASE OF DEVELOPMENT ACTIVITIES POTENTIAL IMPACTS MITIGATING MEASURES SIGNIFICANCE REMARKS B. Construction Phase Construction of the access • The provision of proper • Main impact is in terms of • Constant wetting of the road Short-term within The contractor should road transportational routes is noise and dust and covering the transported the duration of the ensure that the given foremost disturbances. raw or fill material with proposed Project. transportation of heavy consideration in any • Increment of traffic risks canvas sheets to control machineries, developmental project. especially by heavy fugitive dust during times of equipments and This is to ensure vehicles plying Jalan low precipitation. construction material convenience to the Kampong Lombong, and • Flagmen must be stationed adhere to specific workers as well as Jalan Lombong Emas 3. at the access road junctions guidelines from enabling smooth • Spillage of raw to control and direct traffic. relevant authorities. transportation of construction material • The vehicles will have to construction materials onto public roads. observe speed limits and any and heavy machinery. damage done to the Main Access route to • Transportation of transportation routes should Project Site machineries, equipment be repaired. and construction material • Proper warning signs, signals to the site is from Jalan or warning light and Kampong Lombong, barricades are recommended Jalan Lombong Emas 3. to ensure safety and smooth flow of traffic. Access Route within • Existing earthen routes • A wash trough will be project site within the site. • As the access route has constructed to avoid dirtying been established within the public road. the Project area, the • Establishment of tarred road magnitude of disturbance or at least compacted unto the physical crusher run roads and environment may be constant wetting of work considered as nominal. tracks to minimize dust dispersion. d-ii EIA for the Proposed Mixed Housing and Commercial Development on Lot 66166, Mukim Tanjung Dua Belas, Daerah Kuala Langat, Selangor Darul Ehsan for Setara Hati Sdn. Bhd. Cont…. PHASE OF ACTIVITIES POTENTIAL IMPACTS MITIGATING MEASURES SIGNIFICANCE REMARKS DEVELOPMENT Mobilization on site • Construction of workers • The benefits to the local • Adequate facilities to prevent an Short-term within camp. community would be unhealthy environment. the duration of the • The sewage to be source of employment • Providing safety devices which proposed Project. generated during the and small-scale business are recommended in the construction stage is at investment. Occupational Safety and Health 22,500 l/day 1 • It is estimated that an Act 1994 (OSHA) for construction (~estimated-100 approximate of 100 workers to ensure their safety. workers). workers shall be needed • All foreign workers shall be • Provision of maintenance to complete the stage. screened against the presence of yard/ workshop. • In terms of adverse contagious diseases. impact, presence of • A total of 3 numbers of septic foreign labour might tanks with a capacity of 35 PE poses antisocial behaviour each are required to contain the and risk of introduction of sewage discharge of 100PE at the contagious diseases that site to the compliance limits. needs to be addressed. • No open-burning of rubbish • Organic pollution in terms should be carried out. of sewage waste. • Proper skid tank storage to curtail • Heavy machinery and the possibility of oil and grease equipment can generate contamination. oily waste. • The generated spent oil and • Oil/ grease and hydraulic grease from the maintenance spill onto soil causing the works have to be stored and soil and groundwater handled as per the Environmental contamination. Quality (Scheduled Wastes) Regulations 2005 1 Assumption during construction stage based on per worker with per capita discharge rate of 225l/day. Adapted from MS1228 Sewage Guidelines. d-iii EIA for the Proposed Mixed Housing and Commercial Development on Lot 66166, Mukim Tanjung Dua Belas, Daerah Kuala Langat, Selangor Darul Ehsan for Setara Hati Sdn. Bhd. Cont…. PHASE OF DEVELOPMENT ACTIVITIES POTENTIAL IMPACTS MITIGATING MEASURES SIGNIFICANCE REMARKS Site Clearing and Biomass • Site clearing will involve the • The loss of current • Biomass stockpile area should Short term Close compliance to the Disposal. removal of mainly of oil vegetation and the related be earmarked within the proposals in the ESCP palm trees and shrubs and habitats. Project area prior being plan, biomass disposal small woody plants as well • May lead to soil erosion disposed off site to an plan proper as involve hacking of the and increase in surface approved dumpsite. management practices existing buildings. runoff. • Open burning is strictly on-site will help • Biomass generation is • If not disposed off prohibited , as it would lead to prevent excessive approximately 10,230.44 properly, can lead to air pollution problems. water quality tons for estimated palm water quality • The undergrowth and small deterioration. trees area at the Project Site deterioration and attract woody plants such as area. unwanted pests and high branches of secondary organic loading in the vegetations as well as river shredded oil palm fronds and • Demolishing activities trunks can be mulched on would generate higher site. sound and dust levels, • Implementation of best which might pose a management practice on-site nuisance towards nearby (i.e., turfing, temporary earth population. drains and sediment basins) • Open burning of biomass • The Contractor should place or solid waste shall heavy emphasis in soil generate soot and dust. conservation by adopting • Earthwork and environmentally integrated construction activities measures to counter against limited nesting and soil erosion. habitat of faunas within • Demolished material will be the Project Site area. disposed off site to an approved dumpsite and any reusable material from the demolished waste is sold to an external party by the contractor. d-iv EIA for the Proposed Mixed Housing and Commercial Development on Lot 66166, Mukim Tanjung Dua Belas, Daerah Kuala Langat, Selangor Darul Ehsan for Setara Hati Sdn. Bhd. Cont…. PHASE OF DEVELOPMENT ACTIVITIES POTENTIAL IMPACTS MITIGATING MEASURES SIGNIFICANCE REMARKS Impact of earthworks. • The cut and fill quantities • The main impact • Site clearing, earthworks and Short term are approximated to generated from construction works of the 1,561m3 and 1,871,847m3 earthworks activities is proposed development will be • The cut and fill respectively. probably in the form of conducted in 2 stages and five activity are • The shortage of soil washout into the river (5) sediment basins to spread out up to 1,870,286m 3 shall be especially during heavy minimize the extent of the 18 month for imported from a borrow pit rain. bare soil exposure and each stages. source from Dengkil, • Settlement of the subsequently, soil erosion • Earthworks are located 40km away from underlying subsoil by the problems. carried out in the project site. load imposed after filling. • Any sediment generated from stages according • Excavation of higher • If not properly compacted, the site shall be retained in to its stages. grounds to form platforms, fill areas is susceptible to the silt structure before being roads and other area as erosion, slipping and discharged into Sg. Klang. shown in design drawings subsidence. • Covering of platform should • Filling to lower area to form • If the cuttings are too be carried out immediately at embankments and platform steep and are not properly all exposed areas. Measures to design levels protected, stability such as mulching, problems may arise hydroseeding, installation of • The leveling of ground and turf mats or other suitable