Innocenti Research Brief
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Provincial Public Health Laboratory Janakpurdham, Province-2 Covid 19 Pcr Test Report
PROVINCIAL PUBLIC HEALTH LABORATORY JANAKPURDHAM, PROVINCE-2 COVID 19 PCR TEST REPORT Total New Sample Tested =368 Reporting Date : 2078-01-27 Positive Result =221 Time: 11:25 AM Negative Result =147 S. No. Date Patient Id Name A/G Address District Contact Result 1 21/05/08 46783 50Y/M mithila-10 Dhanusha Positive 2 21/05/08 46784 46Y/M bardibas-01 Mahottari Positive 3 21/05/08 46785 17Y/M bardibas-01 Mahottari Positive 4 21/05/08 46786 50Y/M bardibas-01 Mahottari Positive 5 21/05/08 46787 21Y/F bardibas-01 Mahottari Positive 6 21/05/08 46788 59Y/M mithila-03 Dhanusha Positive 7 21/05/08 46789 25Y/M BARDIBAS-5 Mahottari Positive 8 21/05/08 46791 Gauri Shankar Chaudhary 27Y/M bardibas Mahottari Negative 9 21/05/08 46792 Nakul Sedai 27Y/M bardibas Mahottari Negative 10 21/05/08 46793 Rama Pandit 26Y/M baedibas-8 Mahottari Negative 11 21/05/08 46794 Riyan Sedai 20Y/M bardibas-8 Mahottari Negative 12 21/05/08 46795 Rakesh Yadav 37Y/M bardibas-4 Mahottari Negative 13 21/05/08 46796 Nirmala Bhujel 23Y/F bardibas-5 Mahottari Negative 14 21/05/08 46797 34Y/M BARDIBAS-2 Mahottari Positive 15 21/05/08 46798 Samichari Devi Mahato 32Y/F BARDIBAS-2 Mahottari Negative 16 21/05/08 46799 51Y/M BARDIBAS-2 Mahottari Positive 17 21/05/08 46800 51Y/F BARDIBAS-2 Mahottari Positive 18 21/05/08 46801 49Y/M BARDIBAS-1 Mahottari Positive 19 21/05/08 46802 20Y/M BARDIBAS-5 Mahottari Positive 20 21/05/08 46803 45Y/M BARDIBAS-3 Mahottari Positive 21 21/05/08 46804 29Y/M BARDIBAS-24 Mahottari Positive 22 21/05/08 46805 25Y/ BARDIBAS Mahottari Positive 23 21/05/08 -
Federal Democratic Republic of Nepal
FEDERAL DEMOCRATIC REPUBLIC OF NEPAL MINISTRY OF IRRIGATION MINISTRY OF AGRICULTURE DEVELOPMENT FEDERAL DEMOCRATIC REPUBLIC OF NEPAL NEPAL AGRICULTURE RESEARCH COUNCIL MINISTRY OF IRRIGATION MINISTRY OF AGRICULTURE DEVELOPMENT NEPAL AGRICULTUREPREPARATORY RESEARCH SURVEY COUNCIL ON JICA'S COOPERATION PROGRAM FOR AGRICULTUREPREPARATORY AND RURAL SURVEY DEVELOPMENT IN NEPALON JICA'S COOPERATION PROGRAM - FOODFOR AGRICULTURE PRODUCTION ANDAND AGRICULTURERURAL DEVELOPMENT IN TERAI - IN NEPAL - FOOD PRODUCTION AND AGRICULTURE IN TERAI - FINAL REPORT MAIN REPORT FINAL REPORT MAIN REPORT OCTOBER 2013 JAPAN INTERNATIONAL COOPERATION AGENCY OCTOBER(JICA) 2013 JAPAN INTERNATIONALNIPPON KOEI COOPERATION CO., LTD. AGENCY VISION AND SPIRIT(JICA) FOR OVERSEAS COOPERATION (VSOC) CO., LTD. NIPPON KOEI CO., LTD. C.D.C. INTERNATIONAL CORPORATION VISION AND SPIRIT FOR OVERSEAS COOPERATION (VSOC) CO., LTD. 4R C.D.C. INTERNATIONAL CORPORATION JR 13 - 031 FEDERAL DEMOCRATIC REPUBLIC OF NEPAL MINISTRY OF IRRIGATION MINISTRY OF AGRICULTURE DEVELOPMENT FEDERAL DEMOCRATIC REPUBLIC OF NEPAL NEPAL AGRICULTURE RESEARCH COUNCIL MINISTRY OF IRRIGATION MINISTRY OF AGRICULTURE DEVELOPMENT NEPAL AGRICULTUREPREPARATORY RESEARCH SURVEY COUNCIL ON JICA'S COOPERATION PROGRAM FOR AGRICULTUREPREPARATORY AND RURAL SURVEY DEVELOPMENT IN NEPALON JICA'S COOPERATION PROGRAM - FOODFOR AGRICULTURE PRODUCTION ANDAND AGRICULTURERURAL DEVELOPMENT IN TERAI - IN NEPAL - FOOD PRODUCTION AND AGRICULTURE IN TERAI - FINAL REPORT MAIN REPORT FINAL REPORT MAIN REPORT OCTOBER 2013 JAPAN INTERNATIONAL -
Government of Nepal Ministry of Forests and Environment Nepal
Government of Nepal Ministry of Forests and Environment Nepal Forests for Prosperity Project Environmental and Social Management Framework (ESMF) March 8, 2020 Executive Summary 1. This Environment and Social Management Framework (ESMF) has been prepared for the Forests for Prosperity (FFP) Project. The Project is implemented by the Ministry of Forest and Environment and funded by the World Bank as part of the Nepal’s Forest Investment Plan under the Forest Investment Program. The purpose of the Environmental and Social Management Framework is to provide guidance and procedures for screening and identification of expected environmental and social risks and impacts, developing management and monitoring plans to address the risks and to formulate institutional arrangements for managing these environmental and social risks under the project. 2. The Project Development Objective (PDO) is to improve sustainable forest management1; increase benefits from forests and contribute to net Greenhouse Gas Emission (GHG) reductions in selected municipalities in provinces 2 and 5 in Nepal. The short-to medium-term outcomes are expected to increase overall forest productivity and the forest sector’s contribution to Nepal’s economic growth and sustainable development including improved incomes and job creation in rural areas and lead to reduced Greenhouse Gas (GHG) emissions and increased climate resilience. This will directly benefit the communities, including women and disadvantaged groups participating in Community Based Forest Management (CBFM) as well and small and medium sized entrepreneurs (and their employees) involved in forest product harvesting, sale, transport and processing. Indirect benefits are improved forest cover, environmental services and carbon capture and storage 3. The FFP Project will increase the forest area under sustainable, community-based and productive forest management and under private smallholder plantations (mainly in the Terai), resulting in increased production of wood and non-wood forest products. -
Impact Evaluation of Remittances: a Case Study of Dhanusha District
Impact Evaluation of Remittances: A Case Study of Dhanusha District Nepal Rastra Bank Banking Development and Research Unit Janakpur July, 2012 July, 2012 Impact Evaluation of Remittances: A Case Study of Dhanusha District Contents List of Tables................................................................................................................................. iii List of Figures................................................................................................................................ iv Dhanusha District: Facts ................................................................................................................ v List of Abbreviations .....................................................................................................................vi Foreword .......................................................................................................................................vii Executive Summary ..................................................................................................................... viii Chapter 1: Introduction ....................................................................................................................1 Chapter 2: Literature Review .......................................................................................................... 5 Chapter 3: Research Methodology and Survey Design................................................................... 8 Chapter 4: Results and Discussion .................................................................................................11 -
Nepal National Association of Rural Municipality Association of District Coordination (Muan) in Nepal (NARMIN) Committees of Nepal (ADCCN)
Study Organized by Municipality Association of Nepal National Association of Rural Municipality Association of District Coordination (MuAN) in Nepal (NARMIN) Committees of Nepal (ADCCN) Supported by Sweden European Sverige Union "This document has been financed by the Swedish "This publication was produced with the financial support of International Development Cooperation Agency, Sida. Sida the European Union. Its contents are the sole responsibility of does not necessarily share the views expressed in this MuAN, NARMIN, ADCCN and UCLG and do not necessarily material. Responsibility for its content rests entirely with the reflect the views of the European Union'; author." Publication Date June 2020 Study Organized by Municipality Association of Nepal (MuAN) National Association of Rural Municipality in Nepal (NARMIN) Association of District Coordination Committees of Nepal (ADCCN) Supported by Sweden Sverige European Union Expert Services Dr. Dileep K. Adhikary Editing service for the publication was contributed by; Mr Kalanidhi Devkota, Executive Director, MuAN Mr Bimal Pokheral, Executive Director, NARMIN Mr Krishna Chandra Neupane, Executive Secretary General, ADCCN Layout Designed and Supported by Edgardo Bilsky, UCLG world Dinesh Shrestha, IT Officer, ADCCN Table of Contents Acronyms ....................................................................................................................................... 3 Forewords ..................................................................................................................................... -
Nepal: Community -Managed Irrigated Agricultural Sector Project Bachharaja Irrigation Subproject, Dhanusha District
Initial Environmental Examination Document Project Number: 33209-01 June 2009 Nepal: Community -Managed Irrigated Agricultural Sector Project Bachharaja Irrigation Subproject, Dhanusha District Project Proponent: Department of Irrigation Prepared by Central Irrigation Development Division No. 1 (Mahottari) This Initial Environmental Examination is a document of the borrower. The views expressed herein do not necessarily represent those of ADB’s Board of Directors, Management, or staff, and may be preliminary in nature. 1 ABBREVIATIONS ADB - Asian Development Bank ADP - Agricultural Development Plan CMIASP - Community-Managed Irrigated Agricultural Sector Project CPMO - Center Project Management Office DADO - District Agriculture Development Office DB - Design Branch DDC - District Development Committee DOI - Department of Irrigation EB - Environment Branch EMP - Environmental Monitoring Plan FMIS - Farmer-managed irrigation systems ha - Hectare IDD - Irrigation Development Division IDSD - Irrigation Development Sub-division IEE - Initial Environmental Examination IPM - Integrated Pest Management ISPM - Institutional Strengthening and Project Management km - Kilo Meter LEP Livelihood Enhancement Plan lps - Liter Per Second MEQCB - Monitoring, Evaluation, and Quality Control Branch MoEST - Ministry of Environment, Science and Technology NGO - Non Governmental Organization O&M - Operation and Maintenance PDMED - Planning, Design, Monitoring and Evaluation Division RCC - Reinforce Concrete Cement Rs. - Rupees SISP - Second Irrigation Sector Project SWD - Surface Water Division VDC - Village Development Committee VRB - Village Road Bridge WECS - Water Energy Commission Secretariat WUA - Water User’s Association ZoI - Zone of Influence WEIGHTS AND MEASURES ha - hectare km - kilometer l - liter m - meter mo - month s - second t - ton yr - year CURRENCY EQUIVALENTS (as of 31 March 2009) Currency Unit - Nepalese Rupee (NR) NR 1.00 = $0.01226 $1.00 = NRs 81.54 NOTE In this report, “$” refers to US Dollars. -
School Governance and Accountability Situation: A
HAMRO SHIKSHYA PROJECT School Governance and Accountability Situation: A Comprehensive Assessment of Dhanusha, Mahottari and Siraha Districts Final Report NATIONAL CAMPAIGN FOR EDUCATION NEPAL December, 2016 Research Team Dr. Megh Raj Dangal (Team Leader) Mr. Rebat Kumar Dhakal (Research Coordinator) Mr. Kul Prasad Khanal (Researcher) Ms. Rupa Munakarmi (Researcher) Acknowledgements This study has been possible with the support and contribution of a large number of people. The study team gratefully acknowledges the support and help of all those who contributed to the study. We would like to express our special gratitude and thanks to National Campaign for Education Nepal (NCE-Nepal), Search for Common Ground and GoGo Foundation for their trust in us and for the opportunity given to us in conducting and reporting this study. Particularly, we are grateful to Dr. Bhola Prasad Dahal and Mr. Ram Gaire for providing us with necessary guidelines and support during the entire period of this research. Our thanks and appreciations also go to Mr. Salikram Kalathoki and Ms. Reeza Shrestha who helped in reaching the field and meeting with the local project staffs, who in turn, supported us in accessing the gatekeepers and participants as well as providing us with timely support. Further, we would like to thank the entire team of GoGo Foundation. We heartily acknowledge Mr. Alok Thakur's, regional representative from Search for Common Ground, help in providing us with all the important information and documents during consultation meetings and interviews. The District Education Officials in Dhanusha, Mahottari and Siraha also deserve our sincere thanks. Finally, we thank all the participants for their active participation and sharing useful information with us. -
Vulnerable Community Development Plan for Khimti
Vulnerable Community Development Plan NEPAL ELECTRICITY AUTHORITY (His Majesty's Government Undertakings) Transmission Line/Substation Construction Department Vulnerable Community Development Plan For Khimti - Dhalkebar 220 kV Transmission Line Project FINAL REPORT Prepared by: Environmental and Social Studies Department Engineering Services Adwait Marg, Kathmandu, Nepal Phone: 977 1 4226730 Fax: 977 1 4225248 Email: [email protected] February 2006 Khimti - Dhalkebar 220 kV Transmission Line Project 1 Vulnerable Community Development Plan Table of Contents Page No. Abbreviations and Acronyms i List of Tables ii List of Annexes iii CHAPTER 1: INTRODUCTION 1 1.1 Introduction 1 1.2 Objectives 1 1.3 Methodology 1 1.4 Project Description 3 1.5 Project Affected Areas and Locations 4 1.6 Vulnerable Communities in the Project Affected Areas 5 CHAPTER 2: SOCIO-ECONOMIC INFORMATION 6 2.1 Population and Households 6 2.2 Age and Sex Demographics 6 2.3 Education Status 7 2.4 Occupational Status 7 2.5 Income an Expenditures Patterns 8 2.6 Housing Patterns 9 2.7 Poverty Ranking 9 2.8 Community Facilities 9 CHAPTER 3: INSTITUTIONAL ARRANGEMENT 10 3.1 Existing Institutional Capacity 10 3.2 Strengthening Institutional Capacity 11 CHAPTER 4: IMPACT ASSESSMENT 12 4.1 Impacts on Land and Houses 12 Khimti - Dhalkebar 220 kV Transmission Line Project 2 Vulnerable Community Development Plan 4.2 Loss of Standing Crops 13 4.3 Occupation Safety and Health Hazards 14 4.4 Socio-cultural Impacts 14 4.5 Health and Sanitation Impacts 14 4.6 Reduction in Land Value -
A Review of Simarongarh's History on Its Nexus Areas with References Of
18 Prakash Darnal A Review of Simarongarh’s History on Its Nexus Areas with References of Archaeological Evidences Prakash Darnal Abstract After the Lichachhavi period, Nepal was bounded within the Kathmandu valley only. Sinja emerged as a powerful state in the west of Nepal. Likewise, Karnata dynasty became strong and powerful to the south of Nepal in the beginning of 10th and 11th century A. D. They were so strong and powerful that they attacked Kathmandu valley several times and plundered for the sake of wealth. So Simraongarh was once an important medieval kingdom of Nepal. It was established by Karnata dynasty Nanyadev in 1097 A. D. After capturing Mithila, Nanyadev began to rule it from Simraongarh. He has been credited in the records for the unification of Tirhut. Under the Karnatas Tirhut had developed on economic, social and cultural which was also known as golden age. They ruled over Mithila for about 227 years and after that Gayasuddin Tuglak conquered. Muslims ruled about three hundred years, and then it came under Sens of Makawanpur. Lohang Sen had extended his territories up to Vijayapur. When Prithivi Narayan Shah conquered Makawanpur in 1762 A. D. all part of eastern Terai including Tirhut or Mithila became integral part of Nepal. After the Anglo Nepal war in 1814 - 16 A.D., Nepal lost some parts of eastern Terai, it came again under its jurisdiction in Sugauli Treaty of 1816 A.D. But now people seem to forget Simarongarh which was once so rich and highly developed. Therefore, the objective of this article is not only to remind of its glorious past history but also to prove how important this area through archaeological findings. -
Table of Province 02, Preliminary Results, Nepal Economic Census
Number of Number of Persons Engaged District and Local Unit establishments Total Male Female Saptari District 16,292 44,341 28,112 16,229 20101SAPTAKOSHI MUNICIPALITY 940 1,758 1,248 510 20102KANCHANRUP MUNICIPALITY 1,335 3,157 2,135 1,022 20103 AGMISAIR KRISHNA SABARAN RURAL MUNICIPALITY 774 2,261 1,255 1,006 20104RUPANI RURAL MUNICIPALITY 552 2,184 1,319 865 20105SHAMBHUNATH MUNICIPALITY 960 1,844 1,093 751 20106KHADAK MUNICIPALITY 1,124 5,083 2,808 2,275 20107SURUNGA MUNICIPALITY 1,264 5,462 3,094 2,368 20108 BALAN-BIHUL RURAL MUNICIPALITY 433 1,048 720 328 20109BODE BARSAIN MUNICIPALITY 1,013 2,598 1,801 797 20110DAKNESHWORI MUNICIPALITY 949 2,171 1,456 715 20111 BELHI CHAPENA RURAL MUNICIPALITY 615 999 751 248 20112 BISHNUPUR RURAL MUNICIPALITY 406 766 460 306 20113RAJBIRAJ MUNICIPALITY 2,485 7,116 4,507 2,609 20114 MAHADEWA RURAL MUNICIPALITY 593 1,213 855 358 20115TIRAHUT RURAL MUNICIPALITY 614 1,207 828 379 20116 HANUMANNAGAR KANKALINI MUNICIPALITY 1,143 2,836 1,911 925 20117TILATHI KOILADI RURAL MUNICIPALITY 561 1,462 1,011 451 20118 CHHINNAMASTA RURAL MUNICIPALITY 531 1,176 860 316 Siraha District 13,163 43,902 28,989 14,913 20201LAHAN MUNICIPALITY 2,127 6,201 4,244 1,957 20202DHANGADHIMAI MUNICIPALITY 931 2,268 1,535 733 20203GOLBAZAR MUNICIPALITY 1,293 7,687 5,120 2,567 20204MIRCHAIYA MUNICIPALITY 1,567 5,322 2,559 2,763 20205KARJANHA MUNICIPALITY 551 1,230 802 428 20206KALYANPUR MUNICIPALITY 799 1,717 1,064 653 20207 NARAHA RURAL MUNICIPALITY 390 1,390 1,038 352 20208 BISHNUPUR RURAL MUNICIPALITY 599 1,236 915 321 20209 ARNAMA -
Community Based Flood and Glacial Lake Outburst Risk Reduction Project (CFGORRP) PIMS #4657 (GEF ID 4551)
FINAL REPORT Community Based Flood and Glacial Lake Outburst Risk Reduction Project (CFGORRP) PIMS #4657 (GEF ID 4551) March 2018 Nepal Prepared for UNDP Nepal Prepared by Tonkin & Taylor Ltd Date Job Number Evaluation Team Bapon Fakhruddin, PhD Govinda Basnet, PhD Document Control Title: Date Version Description Prepared by: Reviewed Authorised by: by: 18/12/17 Draft Draft Final Report Bapon Govinda Bapon Fakhruddin Basnet Fakhruddin 18/03/18 Final Final Report Govinda Bapon Bapon Basnet Fakhruddin Fakhruddin Distribution: UNDP Nepal copies Table of contents 1 Introduction 1 1.1 Purpose of the Evaluation 1 1.2 Scope and Methodology 2 1.3 Structure of the evaluation report 5 2 Project description and development context 5 2.1 Project start and duration 7 2.2 Problems the project sought to address 7 2.2.1 Technical and management challenges 8 2.2.2 Financial Challenges 8 2.3 Immediate and development objectives of the project 9 2.4 Baseline Indicators Established 9 2.5 Main stakeholders 10 2.6 Expected Results 12 2.7 Project Working Area 12 3 Findings 13 3.1 Project Design / Formulation 13 3.1.1 Analysis of LFA/Results Framework (Project logic/strategy; Indicators) 14 3.1.2 Assumptions and Risks 1 3.1.3 Lessons from other relevant projects (e.g., same focal area) incorporated into project design 1 3.1.4 Planned stakeholder participation 1 3.1.5 Replication approach 3 3.1.6 UNDP’s comparative advantage 3 3.1.7 Linkages between project and other interventions within the sector 3 3.1.8 Management arrangements 4 3.2 Project Implementation -
Spatial Assesment of Forest Fire Distribution, Occurrence and Dynamics in Province-2, Nepal
Research Article ISSN: 2574 -1241 DOI: 10.26717/BJSTR.2021.35.005666 Spatial Assesment of Forest Fire Distribution, Occurrence and Dynamics in Province-2, Nepal Dipika Badal1 and Ram Asheshwar Mandal2* 1Kathmandu Forestry College, Nepal 2School of Environment Science and Management, Nepal *Corresponding author: Ram Asheshwar Mandal, School of Environment Science and Management, Kathmandu, Nepal ARTICLE INFO ABSTRACT Received: April 06, 2021 burnt area and its causes and management measures in Province-2, Nepal. Altogether Published: April 20, 2021 48 QuestionnaireThis study was Survey objectively and 32 conducted Key Informant to assess Interviews trends wereof forest organized fire occurrence, to collect primary data while secondary data were collected from Fire Information for Resource Management System from year, 2002 to 2019. Total 36 maps were produced showing Citation: Mandal. Spatial Assesment of Forest Fire Distribution, Dipika Occurrence Badal, andRam Dynamics Asheshwar in fire occurrences (18) and burnt area pattern (18) of targeted area. Result showed that Province-2, Nepal. Biomed J Sci & Tech Res coveringtotal 5289 56.24%. forest fireThe incidents highest incidence and total was 499,538.9 recorded ha inwere Lower burnt Tropical from 2002Sal and to Mixed2019. The highest number of forest fire incidents was observed in March with 2975 incidents 35(2)-2021.Keywords: MODIS;BJSTR. MS.ID.005666.Fire Incidence; Burnt Broadleaf Forest with 3237 observations. One-Way ANOVA showed that fire occurrence Area; People Perceptions; Fire Manage- and burnt area among Lower Tropical Sal and Mixed Broadleaf Forest (LTSMF), Hill ment Sal Forest (HSF) and Outside Forest Region (OFR) were significantly different at 95% confidence level.