Bristol - The City in Statistics All figures relate only to the area within the City administrative boundary.

Population 380,800 (2001 Census) Buses:

Number of bus stops: 1,560 Number of city bus services: every 15 minutes during the day: 14 every 30 minutes during the day: 20 Bus lanes (one-way): 16.4 km Park and Ride Services: 3

Rail: Number of stations: 12 Non-interchanging passengers using 5.2million (approx. 17,700 per weekday) Temple Meads Station (2003)

Highways: Motorways (M5,M49,M32): 17.6 km A class roads: 95.9 km B class roads: 54.5 km C Class roads: 70.0 km Unclassified roads: 972.8km Number of traffic signal road junctions and priority shuttles: 154

Parking: Multi-storey public spaces: 7,836 Park and Ride spaces (Brislington, Portway, Long Ashton): 3,100 Other off-street public spaces: 6,182 On-street Pay & Display spaces: 1,819

Walking: Number of pelican/puffin/toucan crossings: 165 Number of zebra crossings: 155 Traffic signals with pedestrian phase: 100 Public Rights of Way: 160 km

Cycling: Segregated and shared cycle routes: 66 km On-road cycle lanes (including bus lanes): 26km On-street cycle parking spaces (city centre): 1,011 Cycle parking spaces (Temple Meads Station): 250

Car Ownership: 25% (20% in 1991) (2001 Census, by households) 46% (46% in 1991) Two or more cars per household: 29% (34% in 1991) One car per household: Households without a car:

Means of Travel to Work: (2001 Census of residents) 1991 (%) 2001 (%) Rail or Bus: 14.7 13.5 Car driver/passenger: 58.6 57.1 Motor cycle: 2.8 1.6 Pedal cycle: 3.3 4.6 On foot: 14.7 15.6 Working at Home: 3.7 7.3 Bristol Local Transport Plan Annual Progress Report 2004 | CONTENTS |

Bristol Local Transport Plan Annual Progress Report 2004 Contents Executive Summary iii 1. Introduction 1 1.1 Achievements 2003/04 1 1.2 Joint LTP and Shared Priorities 3 1.3 Regional issues 4 2. Delivery of schemes on the ground 5 2.1 Comparison between programmed and outturn outputs (Proforma C) 5 2.2 Commentary on progress in delivering major schemes 10 2.3 Description of use made of reward funding 12 2.4 Best Value reviews 12 2.5 Centre of Excellence dissemination 13 3. Progress towards targets and objectives 15 3.1 Overview 15 3.2 Core Indicators on track 15 3.3 Core Indicators not on track 17 3.4 Local Indicators 18 3.5 Local Targets not on track 19 3.6 Road safety and social exclusion: update of progress 20 4. LTP spending programme 23 4.1 Tables and supporting narrative on 2003/04 spending programme 23 4.2 Tables and supporting narrative on 2004/05 spending programme 28 4.3 Supporting revenue expenditure programme 29 5. Accessibility of the Annual Progress Report 31 Glossary 32

Appendices A: Progress towards national core indicators (Proforma A) 35 B: Progress towards local targets and objectives (Proforma B) 39 C: Report on the status of targets and indicators 45 D: Implementation progress 2003/04 51 E: Supplementary bids 67 F: Additional information required for maintenance (Annex D) 75 G: Finance forms (LTP-F1 to LTP-F4) 77

| Bristol Local Transport Plan – Annual Progress Report 2004 | Contents | i | | EXECUTIVE SUMMARY |

Executive Summary No major schemes (defined as those over £5 million) are currently in progress. The position of each of the This is the fourth Annual Progress Report (APR) on the schemes previously described is set out in Section 2.2 Bristol Local Transport Plan (LTP) 2001/02 to 2005/06. of the report. The biggest disappointment has been It describes progress made in implementing the LTP in the Council’s reluctant decision to suspend work on its third year (i.e. the year ending in March 2004). Light Rapid Transit Line 1. It appears that such Good progress continued to be made in implementing schemes have become unaffordable in the current schemes, spending financial allocations in accordance national financial climate. Progress on other major with the programme and in moving towards meeting schemes is largely dependent on the outcome of the national core indicators and local targets. Greater Bristol Strategic Transport Study currently in progress. The Council has commenced work jointly A large number of schemes were completed in the with the three neighbouring authorities in the Bristol year, covering a wide range of transport priorities. city region on the preparation of the next five-year LTP, These are summarised in Section 1.1 of this report, and for submission in July 2005, and this is expected to described in more detail in Appendix D. Most notable bring forward a co-ordinated programme of new major of all the achievements this year was the completion schemes. of the first ‘Showcase’ bus corridor schemes on the A38 north and south of the city centre. Together with Good progress has been made towards meeting investment by the bus operator in new vehicles and national core indicators and local targets described in staff training, this has delivered a high quality bus Section 3 of this APR. Of the eight core indicators service on this route. The improvements have included applicable to Bristol, three are on track to meet targets, bus priority measures, improved passenger and two show no clear evidence of trend. Two of the information and bus stop and level access. The results remaining three moved sharply in the right direction have been dramatic – a 16% increase in the number of last year. Particularly encouraging has been the people using the services on weekdays. marked reduction of almost 20% in the number of people killed or seriously injured in road accidents, the Elsewhere, there has been notable progress on reduction of nearly one third in child casualties (which extending dial-a-ride and community transport is now on target), the increase of over one million in services, a pilot yellow school bus service, expansion of the number of bus passenger journeys and an increase the walking and cycling network, investment in in cycling of 27% over three years. Of the local targets, casualty reduction schemes, a range of travel the number of track has shown an encouraging rise to awareness and mobility management initiatives, and 73% (up from 60% last year). continued investment in road and bridge maintenance. The document also provides the specific technical The VIVALDI project continued to produce a large information requested in the government guidance. number of demonstration projects and initiatives in As in previous years, the aim has been to provide as line with the LTP programme. This project was accessible and informative a document as possible for facilitated by a successful supplementary bid to the those stakeholders and individuals concerned with Department for Transport (DfT) and from European , whilst meeting the detailed Commission funding. requirements of the guidance on the preparation of The spending programme to deliver these projects was the APR. effective, with all the funding allocation from Finally, included in this APR is a Supplementary Bid for government spent in full, and supplemented by £1.225 million to start the implementation of the Air additional funding from the Council’s own resources. Quality Action Plan (AQAP). This is essential if national The spending was largely in line with the programme, targets are to be met in respect of air quality in Bristol. although small variations were made where opportunities to bring forward schemes become available, or where there were unavoidable delays in implementation, taking advantage of the flexibility of the programme. The overall spending programme is described in Section 4, with the detailed allocations in Appendix D.

| Bristol Local Transport Plan – Annual Progress Report 2004 | Executive Summary | iii | | Introduction | SECTION 1 |

1. Introduction H 3 kilometres of new peak-period and 24 hour bus lanes; The purpose of this year’s Local Transport Plan Annual Progress Report (LTP APR) is to set out H 3 new signalised bus gates; what has been achieved in improving the local H Associated parking and waiting transport system in Bristol the year April 2003 to restrictions; March 2004. Progress is measured in terms of implementation of schemes, progress towards H Contra-flow bus and cycle lane at Parson national and local targets and delivering an Street (reducing bus journey times by 2 effective spending programme. This period minutes per vehicle), traffic signal control matches the financial year for which at gyratory, and new bus stop; government funds were allocated (to which H Real-time information displays at over 30 council funding is added) so that expenditure key bus stops; can be linked to results on the ground. However, there are some notable exceptions to H Buses equipped with ‘intelligent priority’ this: road accident casualties are required to be equipment to enable late running vehicle reported on a calendar, rather than financial, to benefit from additional green time at year basis; and larger schemes, such as traffic signals; showcase bus routes, often take more than one H year to be completed. Bus stops improved by enlarged bus parking areas with red surface treatment, This year’s APR reflects many important high profile poles and flags, and full achievements in the reporting period. The colour timetable displays; delivery programme was enhanced with funding H allocated from the council’s own resources in New buses on routes 76/77 comprising addition to the funding provided by super low-floor double-deckers, with government. The following is a summary of reduced exhaust emissions and CCTV, some of the major achievements in delivering and; schemes on the ground: H Further 50 bus stops equipped with raised kerbs for level access. 1.1 Achievements I Low floor, low emission midibus purchased Public Transport for city centre services, with 6 raised kerbs I Completion of the first ‘Showcase’ bus and 10 real time information displays corridor (comprising of A38 north and A38 I Pilot yellow school bus service serving south of the city centre) on the A38 for Henbury School introduced services 75, 76 and 77: I Feasibility studies commissioned of Park & Ride sites to serve M32 and A37 corridors I Improvements made to A4 Portway Park & Ride scheme including direction signs on motorway approaches, raised kerbs and realignment of lay-bys at bus stops and introduction of Redcliffe Way 24-hour bus lane and bus gate I Review of, and continued support for, the 8- route night bus network I Extension of Dial-a-Ride service to cover the final 6 wards in the city I Introduction of Knowle West Community Link Service, providing a community bus service

| Bristol Local Transport Plan – Annual Progress Report 2004 | Section 1 | 1 | | Introduction |

I Adoption of coach management strategy and I Extension of Legible City scheme to provision of free on-street parking for 20 Bedminster/Southville and Clifton coaches on Cumberland Road and pay-and- I Shared use walking and cycle path display parking for 40 coaches at Bristol City implemented at Cabot Park and design work football ground. commenced on 4 others I Taxi ranks refurbishment, introduction of 3 I 1.5 kilometres of cycle lanes (in addition to new ranks; extension of operating hours and 3 kilometres of bus lanes introduced in introduction of 4 new experimental taxi association with Showcase bus corridor hailing points scheme I Completion of a study to examine service I Additional 41 small cycle parking schemes, improvement options for the Bristol to advanced stop lines and cycle lanes Severn Beach and Avonmouth to Filton introduced railway lines I Cycle promotion including 229 adult cycle I Station enhancements (new shelters, seats, training sessions, Bristol’s Biggest Bike Ride, timetable poster panels and signage) at 3 Bike Breakfast, ‘Bike-Buddies’ journey stations – Stapleton Road, Bedminster and matching software and production and Montpelier national distribution of cycle advice leaflets I Continuation of revenue support for services on the Severn Beach rail line Highway Network Management I I Renewal of contract for commuter water-bus Urban Traffic Management and Control service in the City Docks schemes included 28 bus priority sites, 7 added to MOVA control, 6 to UTC control, new traffic signal control schemes at Muller Road/Eastgate Road and at Cheltenham Road/Cotham Brow. I Modernisation of traffic signals including installation of toucan and puffin crossings and introduction of full pedestrian facilities I 3 general traffic management schemes, including parking improvements for narrow road in a housing estate I Minor lining and signing projects throughout the city I 10 traffic management schemes introduced in association with development Walking and Cycling I Closure of 2 pedestrian subway systems at 2 Parking locations, in response to local concerns, with I Agreed new parking controls around Bristol replacement surface crossings Zoo, Clifton Village and North Street I Public footpath improved to fully accessible I New shoppers car park provided on standards and link to playing fields and safer Gloucester Road, in association with route to school Showcase bus corridor scheme I 32 signal controlled crossing improved to Road Safety meet pedestrian accessibility criteria I Modernisation of traffic signals at 7 I 8 new pedestrian crossings at Parson Street junctions on Showcase bus corridor, and at 6 gyratory, in association with Showcase bus other junctions corridor scheme

| 2 | Section 1 | Bristol Local Transport Plan – Annual Progress Report 2004 | | Introduction |

I Introduction of Vehicle-Activated Sign I High friction surfacing schemes introduced at 8 sites I 5 ‘Safer Routes to Schools’ schemes implemented I Advisory 20mph speed limits implemented at 23 sites, covering a total of 36 schools I ‘Kerbcraft’ skills continued to be taught in the first set of 14 schools and work commenced on the first 2 of an additional 9 schools. Air Quality I Adoption of Air Quality Action Plan Travel Awareness I I Continued expansion of LPG and electric Car Clubs membership increased and 5 vehicles within the Council’s fleet, including dedicated on-street bays installed, together 5 electric pool cars serving the city centre with 5 additional bays and 3 cars secured offices through planning agreements I I Extension of ‘Switch Off’ (vehicle engines) Bus Information Strategy adopted campaign to include schools I Launch of internet inter-modal journey I Production of ‘Don’t Choke Bristol’ listings planner and web-based real-time bus and activities brochure passenger information (www.travelbristol.org) Road and Bridge Maintenance I Marketing of services under the ‘Travel I 4 km of carriageway surfacing Bristol’ banner, including agreeing contract I 135 major footway reconstruction schemes for Information Centre, converting electric bus to travel information vehicle I 300,000 m2 of preventative works to arrest the deterioration of the carriageway and I ‘TravelSmart’ campaigns in Hartcliffe, and in 40,000 sqm for footway networks. Bishopston/Ashley and St Andrews areas I strengthening works I Installation of 10 ‘i+’ information kiosks and completed launch of transport information channel I Works on Cumberland Road and Smeaton I Involvement in travel awareness events, Road Bridges commenced including ‘Streets Alive!’ (part of ‘In Town Without My Car’), Ashton Gate School road I Five bridge maintenance projects completed, closure and New Year’s Resolution event incorporating Cumberland Road retaining walls, Netham Bridge and new Brislington I Support to 10 community/neighbourhood Bridge repairs, anti-graffiti coating and based schemes through Neighbourhood bridge painting Transport Initiatives Scheme 1.2 Joint LTP & Shared Priorities Travel Plans As in previous years, much has been achieved by I Appointment of Council Travel Plan Officer, working in collaboration and partnership with preparing staff travel plans for 36 separate the surrounding Unitary Authorities in the council workplaces former Avon area (i.e. Bath & North-East I Awards given to 15 employers schemes Somerset, North Somerset and South I Gloucestershire). This is to be expected in an Travel Plans secured for 29 new inter-dependent sub-region where transport developments needs and linkages do not correspond to local authority boundaries. Indeed, last year’s APR

| Bristol Local Transport Plan – Annual Progress Report 2004 | Section 1 | 3 | | Introduction |

included five pages of text summarising some of 1.3 Regional issues this activity on joint working. In the letter of Preparation of the joint LTP will be assisted by 19th December 2003 responding to the the adoption by the of the revised Regional submission of last year’s APR, the Government Transport Strategy for the South West which will Office for the South West (GOSW) commented: enable regional as well as national priorities to “We would…encourage…authorities in the South be considered. Work on developing a new West who have significant cross boundary issues Regional Spatial Strategy will also be important to consider whether they could be better in preparing the new LTP. However, the most addressed by a joint LTP with neighbouring eagerly-awaited input to the new LTP will be the authorities.” outcome of the Greater Bristol Strategic Transport Study (GBSTS). This has been The four former Avon area authorities have commissioned by GOSW, the four Unitary considered this carefully and decided that the Authorities, the Highways Agency and the South needs of the area are best served by preparing West Regional Development Agency. The study and adopting a joint LTP. Preparation work has commenced in November 2003 and is already commenced on this joint LTP for the programmed for completion in May 2005. It period 2006 to 2011, which will be submitted to will recommend strategic investment priorities government in July 2005. Adoption of a joint for a number of agencies including those that LTP will not be an easy process – the work can be delivered by the Unitary Authorities and programme to prepare a new joint Plan is large it will help to identify the major schemes to be and the constitutions of the four authorities promoted in the five-year LTP in this document. require the Plan to be adopted individually by meetings of the full Councils of each authority. Accordingly, any assistance from GOSW in developing the joint Plan would be very welcome, particularly in relation to the identification of strategic sub-regional transport priorities. The councils are confident that the joint LTP will be beneficial to the sub-region by giving a clear focus to co-ordinated transport investment needs and in obtaining a greater share of resources available for transport investment. Further close working between the four Unitary Authorities in this area has been carried out over the past few months as part of an exercise for the Department for Transport on shared transport priorities for the city region. The purpose of this exercise was to assist the DfT in making the case within government for the benefits of transport investment in city regions, as part of the government’s Comprehensive Spending Review. It has, however, also served to convince the authorities that we can work well together and that there are shared benefits in preparing a Joint LTP.

| 4 | Section 1 | Bristol Local Transport Plan – Annual Progress Report 2004 | | Delivery of schemes on the ground | SECTION 2 |

2. Delivery of schemes on maintenance projects are then phased into several stages, to co-ordinate with the many the ground other works planned on the highway. Proforma C below outlines the programmed Other divergences within the categories occur number of schemes that the council aimed to due the cross-cutting nature of many areas of complete during 2003/04 compared with the the programme that contain elements that fall actual outputs, under broad scheme categories under more than one category. As funding for a and sub categories. As set out in government particular scheme is allocated to the guidance, the scheme headings and corresponding budget, cross-cutting elements of programmed output figures are based on those the scheme may not be represented financially used in the LTP-F4 Finance Form in the 2003 APR in all areas of the programme, only as part of document, and this means that the delivery the main budget category. Where this is the shown in Proforma C solely covers projects case, programmed output of the crosscutting funded through the LTP settlement. In addition elements would not have been represented to this, the council uses many other sources of individually in Finance Form LTP-F4 (and capital finance to augment the capital programmed in Proforma C). An example of this programme, therefore the implementation table would be enhanced cycling facilities associated (Appendix D) must be viewed to establish the with a bus Showcase Corridor. full picture of scheme delivery in 2003/04. In Achieving progress against the range of global addition, some categories may show no schemes local and national targets (set out in Appendices even though projects of that type were actually A and B) is dependent on the delivery of a wide delivered, but these projects have been included and balanced programme of integrated elsewhere as they were part of another overall measures. It is not considered that divergences scheme, e.g. footway widening schemes being within individual areas of the programme will included within their parent safer route to have a visible impact on the year-on-year school project. Again, the implementation table progress towards meeting these targets, gives a fuller picture of overall scheme delivery. assuming the longer-term output of schemes is Divergences from the programmed outputs are maintained. shown as a percentage and where divergence exceeds more than +/-25% an explanation of the Divergences of more than +/-25% in each sub- reasons for this is set out below as requested in category are explained below: the guidance. The definition of discrete schemes Bus infrastructure schemes (+67%) can be difficult, particularly where many small Two additional discrete schemes are listed in this individual schemes make up an overall rolling category which gives rise to this divergence. The programme. Where this is the case, programmes new and improved bus stops were previously of small schemes are listed as one overall included within the overall showcase schemes, project, rather than many individual schemes but to provide a more complete picture they are which would give a false picture of actual listed here separately. progress.

2.1 Commentary of divergences from Public Transport Interchanges (+600%) programmed outputs This divergence is due to 3 programmed rail Comparison between programmed output and station enhancements slipping from 2002/03 actual scheme delivery of the major category into 2003/04, and to discrete works being headings listed in Proforma C shows no negative undertaken on new taxi ranks, which was divergence of more than –25% and indeed previously not identified separately on LTP- F4. taking the programme as a whole, the overall divergence is +56%. Much of this overall New cycle tracks (-50%) divergence is due to a far greater number of This negative divergence reflects that although individual footway maintenance schemes being preparatory was completed on 2 schemes, actual undertaken than was set out in last year’s APR. It implementation has slipped into 2004/05. can be very difficult to identify discrete schemes, However, preparatory work has also been particularly where programmes vary and single completed on 2 further schemes, and these 4 are

| Bristol Local Transport Plan – Annual Progress Report 2004 | Section 2 | 5 | | Delivery of schemes on the ground |

now ready to progress in 2004/05 [see Appendix Other urban traffic calming schemes (excl Home D: Implementation Table – ‘9 Cycling’]. The Zones) (-100%) extension to the Bristol and Bath Railway Path Parking reviews for Clifton Village and North has been delayed to correspond with works Street areas progressed in 2003/04, although progressing on the Dings Home Zone project projects now to be completed in 2004/05. (with which it will link). Delays in processing the Traffic Regulation Order for Frome Greenway Other schemes (+86%) have caused this project to slip to 2004/05. This heading covers all schemes that are not appropriately covered by any of the headline New cycle lanes (+300%) categories. As this is a generic category it is Much of this divergence is due to the more difficult to accurately predict delivery. implementation of cycle lanes as part of the A38 Funding for schemes covered by this heading Showcase Bus Corridor. Funding for this project comes from a variety of project areas so, as with was allocated to the ‘Bus Showcase Corridor other cross-cutting elements of the programme Projects’ budget (see Finance Form LTP-F2) so the the number of planned schemes may not be funding for the delivery of cycle lanes, and other accurately reflected in Finance Form LTP-F4 and crosscutting measures within this budget, was Proforma C. The Car Club project has been not represented individually in the programmed progressing faster than anticipated, accounting output in Finance Form LTP-F4. for 5 schemes in 2003/04. Other elements such as support to community/neighbourhood based Signalling/signing upgrading (outstations) schemes and travel awareness events are (+33%) ongoing and dependent on other stakeholders’ Additional projects completed as part of the A38 involvement so year-on-year delivery may showcase Bus routes. fluctuate.

Home Zones (-100%) Footway maintenance schemes (+80%) Due to the extensive public consultation being This positive divergence is due to the higher undertaken as part of the Southville Home Zone number of individual footway reconstruction project, the timescale for implementing the schemes that were delivered, compared to the scheme has slipped into 2004/05. Amendments programmed number in the previous APR. It can to the detail of the scheme proposals have be very difficult to identify numbers of discrete followed public consultation, which as resulted schemes, particularly where programmes vary in further consultation being required on the and single maintenance projects are then revised proposals. During this time, work has phased into several stages, to co-ordinate with also been progressing with the Dings Home the many other works planned on the highway. Zone proposals so long term delivery of Home Although individual numbers of schemes show a Zones should be maintained. divergence, spend on the overall footway maintenance programme was in line with that forecast.

| 6 | Section 2 | Bristol Local Transport Plan – Annual Progress Report 2004 | | Delivery of schemes on the ground | >0 >0 >0 >0 >0 0% 0% 0% 0% 0% -50% +67% +300% +600% +100% Divergence Actual cle lanes associated with the A38 Showcase Bus Corridor; cle lanes associated Cy ompletion of A38 North and A38 South Showcase Bus Corridors

ail station improvements (Bedminster, Stapleton Rd, Montpelier) Stapleton Rd, (Bedminster, improvements ail station astgate Centre access; Centre astgate ellow School Bus for Henbury School; ellow School Bus for New bus stop on A38 Showcase Bus Corridor ‘I Bus’ launched path; use cycle Shared (25 in total) with the A38 Showcase Bus Corridor stop lines associated Advanced parking schemes atSmall cycle 41 locations Improvements to 50 bus stops including raised kerbs and improved information. information. and improved kerbs to 50 bus stops including raised Improvements [part budget] of A38 Showcase Bus Corridor Bus Service Upgrade; City Centre final 6 wards to cover Dial-a-Ride services extended (3) New taxi ranks as part implemented path New cycle of the A38 Showcase Bus scheme E Muller Road; Moon Street 2C 2 1 1 3Y 5 6R 1 7 2 85 1 1 12 0 2 0 0 3 0 1 4 2 0 0 0 2 3 1 6 Programmed AL BUS PRIORITY SCHEMES AL BUS INFRASTRUCTURE SCHEMES SCHEMES AL CYCLING AL PUBLIC TRANSPORT INTERCHANGES TRANSPORT AL PUBLIC T T T T interchanges cling schemes alking Schemes omparison Between Programmed and Actual Outturn Outputs Programmed omparison Between ublic Transport Interchanges igure 2.1 - Proforma C: 2.1 - Proforma igure Scheme Type Bus priority schemes Bus priority schemes TO Schemes Bus Infrastructure New bus stop bus stops to existing Improvements schemes Other bus infrastructure TO P (Improvement) Single Mode Interchanges systems New dynamic information at TO Cy tracks New cycle lanes New cycle stop lines New advanced parking facilities New cycle TO W footways New or improved F C

| Bristol Local Transport Plan – Annual Progress Report 2004 | Section 2 | 7 | | Delivery of schemes on the ground | >0 >0 >0 >0 0% 0% -14% -20% -14% -17% +25% +25% Divergence Actual ersion of a Pelican crossing to a Puffin crossing at crossing to a Puffin crossing ersion of a Pelican Road Road/Cemetery Wells tnership; nv r ork commenced on Bristol City Council’s Employee Travel Plan Travel Employee on Bristol City Council’s ork commenced New employers progressing new Travel Plans; Travel new progressing New employers

ublic Rights of Way signing project Way of ublic Rights xtension of pedestrian signing scheme to Clifton; urther investment communication in SCOOT/CCTV egible City – extension of pedestrian scheme to Bedminster/Southville; egible City – extension Surface puffin replaced Quickthorne subway replaced puffin Surface New Junction at Brow Cheltenham Rd/Cotham 2 Public Rights of Way ImprovementWay of Rights 2 Public schemes L E Enhancement signing to tourist of brown attractions; ; hierarchy of road reclassification Map of proposed to meet crossings to 32 signal controlled Improvements pedestrian accessibility criteria; Airport junction modified to include full pedestrian facilities; Road Road/Bamfield P W to School schemes Routes Safer High friction in 8 locations; surfacing light of new red Installation and replacement and speed cameras jointly cameras of existing Camera with the Safety Pa ‘Kerbcraft’ skills taught in 14 schools at crossing New Puffin Muller Road/East Rd; Gate at crossing New Puffin Street Parson with the A38 Bus Showcase scheme; associated gyratory as part crossings to Puffin converted crossings 8 existing of the A38 Bus Showcase scheme; Co atJunctions refurbished Rd; Falcondale 10 to fully accessible standards; improved 1 Footpath 10 65 6 5 24 Hill; Sign – Clanage Road/Rownham Activation Vehicle 29 13 in 3 locations; of carriageways New mid-block crossings 3 1 17 1F 8 7 5 0 0 0 1 8 7 0 30 35 Programmed el Plans AL WALKING SCHEMESAL WALKING SCHEMESAL SAFETY CROSSINGS AL ROAD AL TRAVEL PLANS AL TRAVEL T T T T av affic Managementaffic Calming Traffic and oad Crossings oucan or puffin crossings oucan or puffin ocal Safety Schemes ocal Safety Scheme Type schemes Other walking TO Tr plans travel Employer TO L Schools implementing first scheme routes safe schemes Other safety TO R T Other signalled crossings Underpass replacement TO Tr (instations) Control Traffic Urban

| 8 | Section 2 | Bristol Local Transport Plan – Annual Progress Report 2004 | | Delivery of schemes on the ground | >0 0% 0% -22% -17% +33% +86% +80% +79% +86% +54% +56% -100% -100% Divergence Actual elSmart project inception; onmouth Rd environmental enhancement; environmental onmouth Rd av arious minor lining and signing projects arious minor lining and signing projects New junction at Brow; Cheltenham Rd/Cotham work completed Bristol Bridge strengthening Netham Bridge and new Brislington repairs, walls, retaining Cumberland Road completed:- projects Bridge maintenance Muller rd/East Gate; Av and pedestrian refuge; – Junction narrowing Parade Straits parking improvements; Walk Spartley Review; Parking Bristol Zoo V of ‘Don’tProduction Bristol’ Choke listings brochure; Involvement events awareness in 3 travel Resolution’ eventYear’s ‘New in Galleries shopping centre; Support based schemes; to 10 community/neighbourhood Tr Air Quality Action Plan submitted and bridge painting coating anti-graffiti 2823 Bus priority sites 7 implemented Advisory 20mph zones 0 0 59 13 on-street 5 dedicated car club bays; 13 9015 schemes reconstruction Major footway 1 to arrest works 300,000 m2 preventative of the carriageway the deterioration 5 111 271 0 9 1 1 7 1 6 7 21 50 15 33 72 174 Programmed AL MISCELLANEOUS AL MAINTENANCE SCHEMES T T AFFIC MANAGEMENT AND TRAFFIC CALMINGTRAFFIC AND AFFIC MANAGEMENT arriageway maintenance schemes maintenance arriageway ootway maintenance schemes maintenance ootway Scheme Type (outstations) upgrading Signalling/signing Urban 20mph zones managementOther traffic schemes Home Zones home zones) calming schemes (excl Other urban traffic TR Miscellaneous Other schemes TO schemes Maintenance F C loading to carry 40 tonne vehicular Strengthening capital maintenance Other schemes (using LTP funding) TO GRAND TOTAL all areas) (Across

| Bristol Local Transport Plan – Annual Progress Report 2004 | Section 2 | 9 | | Delivery of schemes on the ground |

2.2 Commentary on progress in delivering on the country where such routes are developed major schemes simultaneously in order to achieve a step- This section describes how the programme is change in the quality of public transport within developing in relation to major schemes and a short time. additional policy initiatives. A similar approach could also be considered for the further development of park and ride Major schemes schemes to serve Bristol. The three schemes Light Rapid Transit (LRT) that have been introduced, serving the A4 Bath Road, A370 Long Ashton and A4 Portway Following receipt of the Local Transport corridors have been successful and popular. Settlement letter from GOSW in December However, these have been delivered over a ten- 2003, the City Council took the decision to year period, mostly by use of funding from the suspend promotion of the Line 1 proposal which allocation for Integrated Transport since they do was the subject of an Annex E submitted to not individually qualify for major scheme status Government the previous year. This related to as they typically cost less than £5 million each. the route between the City Centre, northwards The council’s strategy for park and ride envisages to Bristol Parkway and represented the first similar schemes being introduced on other stage of a rapid transit network to serve the corridors, most notably the M32, A38 Greater Bristol area. Bedminster Down and A37 Wells Road. These The City Council has resolved to continue to proposals are at various stages of development, safeguard, for potential future public transport but there is merit in considering the benefits of use, all the routes identified in the LTP, Bristol introducing them together as a major scheme, in Local Plan and Structure Plan for rapid transit. conjunction with the bus operator, in order to This safeguarding will be effective pending the achieve a significant modal shift. Though this outcome of the GBSTS and further studies is the subject of study in GBSTS, the views of leading to the review of the transport strategy government are sought on this approach. for the area and finalisation of the Joint Local Such an approach is likely to feature in the new Transport Plan (2006 – 2011). joint LTP. However, the council would welcome As a result of this, the council has been the opportunity to discuss with the government considering how best to proceed in order to office whether a funding opportunity might promote high quality public transport as the present itself in advance of that, given the main alternative mode to private car use. As benefits that could be obtained and the speed at reported elsewhere in this document, the which such a project could be implemented. The major bus operator is currently very introduction of the showcase bus routes on the interested in making its own commitment to A38 corridor north-south across the city have invest in new buses if the timescale were been greatly successful in improving the quality sufficiently immediate. and reliability of these routes. This has already led both to a significant rise in usage of these Concentration on bus showcase routes could services and an improvement in customer include an element of vehicle guidance satisfaction. The council and the main bus technology (whether by physical measures such operator both wish to roll out the benefits of as kerbs or by wire) in appropriate locations in such an approach to the other main radial order to access some of the benefits of corridors in the Greater Bristol area as soon as segregated rail routes. However, such possible. However, the first routes on the A38 opportunities are likely to be limited in the corridor took about two years to deliver for a existing urban street network in locations where variety of reasons (including resource there is a high demand for bus usage. constraints, consultation requirements and legal Other forms of rapid transit are also under procedures). This pace of delivery is not fast consideration, many of which are based upon enough for either the council or the bus operator existing or disused railway corridors, which if the network-wide benefits are to be captured remain safeguarded following the cessation of in order to meet national and local targets. work on the LRT scheme. These will be Accordingly the council is attracted by the considered further in developing the new LTP, approach that has been adopted in other areas

| 10 | Section 2 | Bristol Local Transport Plan – Annual Progress Report 2004 | | Delivery of schemes on the ground | and are shortly to be the subject of a seminar for not to proceed with a potentially abortive study Elected Members of the council. to evaluate this scheme at this stage. This decision was made having regard to the Road User Charging government's decision not to fund a similar In 1999 the Council commissioned consultants scheme - the A38-A370 link In North Somerset - to provide the outline design for a viable road in advance of the outcome of GBSTS. user charging scheme for Bristol. After However, should there be the opportunity of considering alternative technologies and bidding for funding for the Callington Road link different possible geographical boundaries for a at an earlier stage, and subject to the scheme, the consultants recommended an inner identification of funding to carry out the city cordon with electronic tag/transponder necessary study, the council may be willing to technology. proceed with the evaluation of this scheme in Road User Charging is one element of the order to establish the case for investment. current integrated transport strategy. Modelling, consultation and behavioural research has ULTra System demonstrated that the Council’s traffic reduction This system, developed by Advanced Transport targets will not be met by improving Systems Limited is based on driverless, battery- alternatives to the car on their own. The Council powered guided vehicles each able to is investigating all aspects of implementing a accommodate up to four people, operating on a road user charging scheme. segregated, mostly elevated network. Following the reporting of this in last year’s APR, work has In partnership with the Department for continued on undertaking a feasibility study of a Transport (DfT) the Council undertook a demonstration project to test road user charging system for central Bristol and on refining and technology. This involved 50 volunteer vehicles testing the technology. The first commercial from a variety of commercial fleets from cars use of the system is likely to be at Heathrow and lorries to buses. Vehicles were fitted with Airport where it will provide a link between equipment to test the use of satellite technology peripheral car parks and the passenger for scenarios related to charging. Additionally, terminals. The feasibility study has partnership working with the Driver and Vehicle demonstrated that a system would be feasible Licensing Agency enabled the investigation of for a network serving central Bristol and is the use of automatic number plate recognition estimated to cost some £68 million. It could cameras for enforcement. provide a convenient, safe, quiet and non- polluting transport system for central Bristol, Callington Road Link linking key destinations with edge-of-centre car parks, and pave the way for the reduction of This scheme is identified in the adopted LTP. The proposal is to construct a new road along traffic in the city centre and possible other the line of a disused railway between the initiatives such as a Clear Zone or a Low southern end of St Phillips Causeway and Emission Zone. Callington Road, which forms part of the Ring Following advice in December’s settlement letter Road in south Bristol. This would provide that GOSW did not wish work to take place on improve access to south Bristol and potentially developing this scheme that might divert aid regeneration there by providing a continuous attention from resolving the outstanding issues high quality link from M32 junction 3. It would with the LRT scheme, the scheme has not been bypass the congested A4 route through worked up into an Annex E bid. However, it may Brislington and, in particular, avoid the junction be brought forward in the next LTP. between the A4 Bath Road and A4174 West Town Lane at Brislington Hill, where large delays Detrunking are experienced. The link has the potential also Discussions and negotiations between the to operate as a corridor for rapid transit and as council and the Highways Agency (HA) have part of the National Cycle Network Route 3. continued over the past year about the As reported in last year's APR, in the light of the arrangements for handing back control of the decision to commence the GBSTS it was decided M32 to the council following the government’s

| Bristol Local Transport Plan – Annual Progress Report 2004 | Section 2 | 11 | | Delivery of schemes on the ground |

decision not to include it in the core trunk road b) South Gloucestershire Urban Ring Road network. It has been agreed in principle that scheme. The partial success in securing the transfer of ownership will take place for the funding for this scheme is welcomed as the section south of the city boundary. Junction 1 improvements being implemented have the (in South Gloucestershire) will remain under the ability to complement schemes to encourage control of the HA because of its close proximity increased public transport usage and car to, and interaction with, junction 19 of the M4. sharing in Bristol, particularly those for the Negotiations have taken longer than expected M32 corridor described above. for a number of reasons, which include: high staff turnover at the HA; confirmation of the 2.3 Description of use made of reward precise legal process and wording of detrunking funding orders which, uniquely, for a road formerly in the In the settlement announced in December 2002 council’s ownership, need to be issued in parallel for funding for the 2003-04 financial year, the by the council and the HA; details of the HA’s council received a total settlement of £10.154 revised capital works programme for 2004-05 million. This included £7.114 million for which has a significant bearing on the financial Integrated Transport, which was £1.505 million consequences; confirmation of government greater than that previously indicatively policy on future maintenance schemes; and allocated, of which £800,000 was for the details of any special dowries that have been successful supplementary bid for the VIVALDI awarded to local authorities outside the project. The assessment of Bristol’s transport standard financial processes. performance was in the highest category (“well above average”). Though it was not explicitly These factors mean that it appears unlikely that stated in the settlement letter how much of he the detrunking process will be completed before additional funding was a reward for good April 2005, despite agreement on the special performance, the additional funding was grant sum that is available if the detrunking estimated at £705,000. The council was able to process has been completed by then. Subject use this additional funding to enhance the to resolution of the financial arrangements, the overall transport capital programme for 2003/04 council remains committed to resuming its role in line with ambitious investment programme as highway authority for this road, and is set out in the LTP. The council also added anxious to implement bus priority measures resources of its own to the capital programme. formerly identified by the HA for this important The end result of this was that greater resources corridor. The council also wishes develop a park could be utlised for investment in the Showcase and ride scheme for this corridor. Its preferred bus route that was previously envisaged. site is on land adjacent to junction 1, for which it gave evidence at the South Gloucestershire Local 2.4 Best Value reviews Plan Inquiry, although its second choice site is land in Bristol adjacent to the motorway which As reported last year, the Best Value Review of cannot currently be accessed. the Traffic Management Service continues to be delivered through the implementation of the It is likely that the new LTP will include a major Service Improvement Plan (SIP). Good progress scheme bid to implement the M32 bus priority has been demonstrated for the improvement measures in association with park and ride. areas of communication, performance and staff with the issues relating to environment and Major Schemes Outside Bristol options for change forwarded for consideration a) A38 – A370 Link. The position remains as with the Integrated Transport Best Value Review. last year that the council supports the North The Best Value Review of Integrated Transport Somerset bid for this scheme, but commenced in early 2004. The Review is understands that a decision awaits GBSTS. chaired by Professor Glen Lyons of the University The need for the scheme is likely to have of the West of England and managed by a increased following the continued growth of Review Board. The review commenced with a and the publication of the Air conference in February 2004 attended by 130 Transport White Paper, which foresees a people which brought together key stakeholders continuation of this growth. and identified the areas of challenge. Since

| 12 | Section 2 | Bristol Local Transport Plan – Annual Progress Report 2004 | | Delivery of schemes on the ground |

then work has continued though four theme is, however, disappointed that under current groups looking at finance and resources, staffing financial restrictions, the DfT appears unlikely to and structures, sustainable transport, equalities. provide the finance to allow the council to A second conference was held in June 2004 implement the additional measures over and which identified the key issues for comparison. above the LTP required to improve air quality The review is programmed to be completed by sufficiently to meet national air quality targets May 2005, following which it may be reviewed over the life of the AQAP. This is particularly the by Audit Commission Inspectors and the Council case given that air quality is one of the four will be presented with a Service Improvement shared priorities and where Bristol is playing a Plan for approval. leading role in developing actions to improve air quality. As aresult of the council’s role in leading 2.5 Centre of Excellence Dissemination Air Quality dissemination and the importance The council was designated a Centre of that it views the needs to improve air quality, it Excellence for its Local Transport Plan in 2000 is making a Supplementart Bid to fund the first with a particular role in disseminating best year of the AQAP in this APR, in line with practice on issues of transport and air quality. previous guidance from both DfT and DEFRA. Although specific DfT funding for this disseminating role has now ceased, the council continues to play a leading part in this area. It organises an annual conference in Bristol involving a unique mix of both transport planning and environmental health professionals, and this year for the first time, the conference was organised in conjunction with PTRC. This arrangement is likely to continue in the future. The council adopted its Air Quality Action Plan (AQAP) in April 2004 and submitted it to the Department of Environment, Food and Rural Affairs, where it has been acclaimed as an example of good practice. The document is submitted to the DfT with this APR. The council

| Bristol Local Transport Plan – Annual Progress Report 2004 | Section 2 | 13 | | Delivery of schemes on the ground |

| 14 | Section 2 | Bristol Local Transport Plan – Annual Progress Report 2004 | | Progress towards targets and objectives | SECTION 3 |

3Progress towards targets and This is now somewhat more apparent than in previous APR’s as the longer period that has now objectives elapsed has allowed the development of more 3.1 Overview robust trend data. However the lead-in time of some investment in transport infrastructure Eleven objectives were set out in the Local means that it is not always possible to ascertain Transport Plan and under these objectives significant global changes attributed to targets were set so that measurements of measures implemented through the Plan. progress could be made as the plan progresses. Subsequently, four key shared priorities, agreed As set out in Proforma A, of the 6 applicable core between central and local government, have indicators where an assessment can be made, been set out for transport. These key priorities 50% are currently on track to meet their targets. are fully in accordance with the objectives of the Of the three not on track, two are moving in the Bristol Local Transport Plan, and the council is right direction, although not currently at a pace now also measuring how it is delivering these to meet the target date, and only one, - shared priorities as well as the initial objectives satisfaction with local bus services, - is moving of the plan. The shared priorities for transport in the wrong direction. For reasons described on are to tackle the areas of:- Proforma A, the change in some maintenance I indicators means that no trend can yet be Congestion determined. Two of the core indicators, – light I Environmental impacts including air quality rail passenger journeys, and rural accessibility, - are not applicable to Bristol. I Accessibility Of the 28 local indicators described in Proforma I Road Safety B, currently 73% are considered to be on track to Progress on targets is set out in two tables, in meet their target. This shows a significant Appendices A and B whose format is determined increase on the 60% reported last year, as there by DfT guidance. Proforma A (see Appendix A) has been sufficient time for the benefits of the details national core indicators, against which measures implemented to start to be reflected Bristol measures progress, and Proforma B (see in the background indicators. Of the 7 targets Appendix B) lists local indicators set out in the not currently on track, only three indicators, Transport Plan. The local indicators set out in from the total of 28, are currently moving in the Proforma B are shown against the relevant wrong direction. There is the opportunity shared priority to which the indicator through the APR process to amend targets in contributes. As can be be noted all local order to reflect changing circumstances or early indicators contribute to at least one shared attainment, and this has been done in previous priority, and in many cases they contribute to years. This year it was considered inappropriate several. For example, indicators of car traffic to change targets because they will all be flow are shown against the congestion shared reviewed as part of the preparation of the new priority, but also contribute to the LTP, which is due to be submitted in July 2005. environmental impacts, likewise indicators on bus use and quality of service are shown under 3.2 Core Indicators on Track congestion but also apply to accessibility and Number of children killed or seriously injured in the environment. road collisions This is the progress report on the third year of As set out in the government’s 10 year plan for the 5 year period of the Bristol Local Transport transport, a crucial target of Bristol’s Transport Plan. The effects of much of the investment and Plan is to reduce the number of children killed or schemes implemented since the plan began are seriously injured (KSI) in road collisions by 50% beginning to be reflected in the indicators upon by 2010. Very welcome progress has been seen which the targets are based. in 2003 for the number of Child KSI’s with the total reducing by nearly a third on the previous year (23 in 2003 as compared with 34 in 2004). This has meant that the indicator is now below the target trend needed and is back on track to

| Bristol Local Transport Plan – Annual Progress Report 2004 | Section 3 | 15 | | Progress towards targets and objectives |

be met. However as can also be noted, the small growth is additional to an already high base, absolute numbers that are being analysed does with major progress made before the first LTP, mean that the annual variation can be quite evidenced by the 2001 National Census of wide. Further long term data should hopefully Population showing a 40% rise in levels of confirm this successful trend, however some cycling to work, compared with 1991. concerns still exist about the accuracy of serious casualty data. Levels of Cycling 50 No. of Children Killed or Seriously Injured (KSI) 45 35

40 30 35

25 30 cle Triple (000,s) cle Triple Cy

Child KSI's 25 20

20

15 15 98 99 00 01 02 03 04 05 06 07 08 09 10 Year 10 00 01 02 03 04 05 06 07 08 09 10 Year Road condition where structural maintenance should be considered Number of cycling trips (BV96, 97a and 97b) (LTP target 10) Bristol has its own highway network One of the key priorities of the plan, and of management plan which has been developed to central government, is to improve choice and address its own local conditions. promote modal shift away from less essential The management plan comprises a range of private car use. To this end ambitious targets functions with operational programmes which were set out to increase alternative modes, are based on basic engineering principles at its particularly cycling, where Bristol has continued core. The decision on any action is through a with the very stretching national target to triple hierarchical process, which can be broadly cycle use from 2000 to 2010. However the only regarded as: way that this target is likely to be met, either in Bristol or nationally, is when complementary 1. avoidance before prevention investment streams come together to form a more complete network towards the end of the 2. prevention before re-construction target period. It requires more than specific 3. and finally re-construction. cycling schemes to achieve this aim, including many other measures such as showcase bus It is not considered that Bristol has a backlog of routes, school travel plans, travel demand maintenance works. There is, inevitably, a need management and travel awareness. As the for works programmes in maintenance. Major aggregate total investment comes to fruition in works being required to remedy defects at a pre- later years, it is hoped that this will provide the determined level should be regarded as being critical mass needed for major change. This is contained within these rolling programmes and reflected in the exponential target trajectory set not as backlogs. out for this long term indicator. Progress has A backlog should only be used to define schemes been very encouraging with a 27% rise in cycling which cannot be delivered in time within levels over the first three years of the plan, operational programmes where there is no other which is in excess of the target trend. This is economic alternative to prevent further even more significant bearing in mind that this deterioration. Whilst it has not been possible to

| 16 | Section 3 | Bristol Local Transport Plan – Annual Progress Report 2004 | | Progress towards targets and objectives |

reconcile BVPI 96 & 97a/b survey results with Bus Passenger Journeys the council’s own findings, we are satisfied that 40 Bristol’s highway network is in a reasonably sound condition, having arrested the deterioration of the highway network. Notwithstanding the above, where council records show the 10 Year Plan target is being met, an assessment on Proforma A has been 35 attempted. The basis of measurement has

continuously evolved and it is very difficult to p.a. Million Passengers provide a reliable trajectory or trend under UKPMS parameters. Therefore for BV96 and 97a the current assesment is that there is no clear

evidence. However as the methodology for 30 99/0000/0101/0202/033 03/044 04/055 05/066 06/0707/088 08/099 09/1010/111 BV97b is to remain the same the future 99/00 00/01 01/02 02/0 03/0 04/0 05/0 06/07 07/0 08/0 09/10 10/1 trajectory is more comparable. Although only Year two years data area available, the indicator Bus passenger satisfaction shows a significant improvement and is below (BV104 and LTP target 7) the target trend. This indicator is only measured every three years 3.3 Core Indicators not on Track using Office of the Deputy Prime Minister (ODPM) guidelines. The base year of 2000/01 Number of bus passenger Journeys showed 40% of respondents to the survey (BV102 and LTP target 7) satisfied with local bus services. The repeat This indicator is based on annual bus passengers survey in 2003/04 showed a fall to 29% with the across the whole local authority area. Although indicator moving away from the target. The passenger numbers have risen by 3.9% from reasons for this are unclear and, of course, the 2002/03 to 2003/04 and are moving in the right council is not directly responsible for the direction, it is still below the trend needed to provision of bus services. There has been a long meet the target, and regrettably is not currently period of adverse publicity about the bus on track. However, where indicators are focussed services, including the impact of staff shortages. on areas where investment has occurred during Although these problems have now been the plan period, the picture is much more addressed, it is believed that the feeling of encouraging, with the A38 showcase route dissatisfaction remained at the time of the showing a 16% rise in patronage since its survey. opening, without abstraction from other The indicator should be viewed in conjunction services. It is this programme of investment in with its sister indicator (BV103), ‘satisfaction high quality public transport, which is targeted with public transport information’ which, as at addressing the shortfall in this indicator. The shown on Proforma B, has seen a 17 percentage accompanying graph shows the long term point rise. This reflects the efforts made by the trajectory needed to meet the target at 2010. council in improving information, through many Under the investment programme of this plan, measures including Traveline, individual travel and anticipated in the next LTP, the target trend marketing, real time information etc, as set out must be seen as an exponential line, with lower in the Bus Information Strategy document, growth in the first years, (particularly taking into submitted to the DfT with this APR. At the same account the ongoing redevelopment of the time as collecting information on the two public central bus station), and growth accelerating in transport satisfaction indicators, Bristol City later years as complementary investment comes Council also surveys the public’s satisfaction together and provides the step change in with general transport services. This covers all provision needed to achieve the significant aspects of transport including council supported increases. services such as the night buses, community transport, implementation of safety measures

| Bristol Local Transport Plan – Annual Progress Report 2004 | Section 3 | 17 | | Progress towards targets and objectives |

and specific projects such as Home Zones. This “serious”. So the sudden rise is statistical rather indicator has seen a rise from 42% to 57% than real. Separately it has emerged through between 2000/01 and 2003/04, and parallels investigation, that data recording prior to 1997 the rise in satisfaction with public transport was not as thorough as previously supposed, information. and the police estimate that there was an under- Bus Services satisfaction recording of casualties in the order of 10-20% before procedures were tightened up in 1997. As 50 a result of this, the baseline of all accident (including KSI) data for 1994-1998 is now

45 regarded as artificially low, which means that subsequent performance in reducing numbers of KSI’s has been much better than previously 40 supposed. What is most encouraging is the 20% fall in KSI’s from 2002 to 2003, with both years

35 data collected using the same accident form. While it is not wise to deduce trends from % of respondents satisfied % of respondents limited data, this markedly improved 30 performance is thought to have arisen from a combination of circumstances including increased capital resources invested in well- 25 00/01 01/02 02/03 03/04 04/05 05/06 targeted road safety engineering measures, Year increased revenue spending on road safety Number of deaths and serious injuries education, the impact of the Avon and Somerset (BV099 and LTP Targets 2 ) Safety Camera Partnership, and a much higher profile of road casualty awareness in the council. As already noted in previous progress reports the An indication that the trend in road casualties is council has been very concerned that road safety moving in the right direction is the overall measures were not seeming to achieve the decrease in total casualties by 6% observed results that were hoped for. To address this, the during 2002. council has re-prioritised resources to enhance No. of People Killed or Seriously Injured (KSI) investment in road safety, as well as confirming its commitment by signing a local public service 250 agreement (PSA) with government on road safety, stretching the target, and further strengthening the many measures aimed at improving road safety. It is extremely 200 encouraging to see that this re-focussing of

resources over recent years is being reflected in SI's K the indicators as the total number of people

killed or seriously injured in 2003 fell by almost 150 20%. During the period of the LTP, the number of people killed and seriously injured (KSI) in road accidents has remained stubbornly high, very 100 00 01 02 03 04 05 06 07 08 09 10 close to the 1994-1998 average base level. In Year 2002 there was a surprising 35% increase in the 3.4 Local Indicators figures. A detailed study of the data has been (Proforma B - see Appendix B) carried out, in dialogue with the DfT, in order to As described above the percentage of local understand what has happened. The most indicators currently on track to meet their probable explanation is that guidance for police targets has seen an encouraging rise to 73%, officers in defining serious injuries was from the 60% reported last year. Proforma B lists introduced to the accident report form in 2002 each local target under the shared priority and resulted in more injuries being classified as categories, and shows the good progress being

| 18 | Section 3 | Bristol Local Transport Plan – Annual Progress Report 2004 | | Progress towards targets and objectives |

made not only on Bristol’s own objectives but meet the 40ug/m3 target for 2005. This is the overall shared priorities of tackling partly a result of particularly elevated levels congestion, improving the environment, of air pollution during 2003 resulting from enhancing accessibility and improving road extreme weather conditions. However, such safety. events are likely to become more common and cannot be discounted. Even if 2003 had Of the 28 local targets listed in Proforma B, 19 been a more typical year the underlying are currently assessed as being on track to meet pollution trend, although downwards, would the targets, seven are not on track and not be improving rapidly enough to meet the unfortunately for two there is no clear evidence. target by 2005. To address this, the Council’s It was envisaged that all local targets would Air Quality Action Plan (AQAP) sets out a now have an assessment, but for cycling to work programme of additional measures to and car trips under 5 km this has unfortunately achieve the 40ug/m3 target by 2008. not proved possible. These targets were to be However, these amount to some £1 million measured through household interview surveys, p.a. and without additional resources, but the size of individual survey necessary to through a successful bid to fund the Air produce a statistically significant result has Quality Action Plan, this target will not be proved to be uneconomic, particularly as most met in the short-medium term. A resources are now targeted at delivery and Supplementary Bid to fund the first year of investment on the ground rather than the AQAP is included in this APR. background monitoring. However to address this, a related survey on quality of life in Bristol I Target 27; reduce car traffic in the outer area now includes information on these two areas, of Bristol. but at present the annual variations in results Although allied indicators for traffic in mean that longer term trend data is needed central Bristol and across Bristol as a whole before an assessment can be made. It is show welcome progress, traffic is still envisaged that this will be possible by the next growing in outer Bristol at a pace that means progress report, though current data from other it will not meet the target set for 2005. sources (including the 2001 Census) indicate Measures are being progressed to address that good progress is being made (e.g. 2001 this, particularly the programme of showcase Census shows a 40% increase in cycling to work bus routes to provide attractive public in Bristol). transport alternatives for longer distance car 3.5 Local Targets not on track travel from the outer areas of Bristol. Initial monitoring on the first showcase routes As described above, indicators on only three of show the great potential of these, with some the 28 local targets are currently moving in the one third of new users on the A38 routes wrong direction and away from their final being previous car users, removing 1,200 cars objectives. per week from the city’s highway network. I Target 12; reduce car journeys to school In the medium term, joint working on the next Local Transport Plan will enable cross- The proportion of journeys to school made city boundary movements to be assessed by car has risen for both primary and holistically. secondary school pupils. The survey is a sample of all schools and as the programmes The remaining four targets not on track are: of developing school travel plans and SRtS I Target 8, ensure that 90% of bus stops in the projects gather momentum, it is expected city display a current timetable. that positive benefits will be reflected in the overall indicator across all schools. Although increasing year on year, this target I has not been met. As part of the ongoing Target 13; achieve the national standard for investment in bus infrastructure, new pollutants covered in the national air quality timetabling software and close partnership strategy working with the majority operator which is The underlying trend for NO2 shows no responsible for 70% of the stops in the city, it change since 1999 and is not on track to is hoped that the objective will be reached by the end of the plan period.

| Bristol Local Transport Plan – Annual Progress Report 2004 | Section 3 | 19 | | Progress towards targets and objectives |

I Target 15, triple the level of cycling to Two local targets have already been met: the secondary schools. number of people taking part in cycling events, and the number of employers The proportion of cycle journeys to receiving the Avon Area Employers’ Travel secondary school saw a welcome rise in Award. Although these will still be 2003/04, but is not yet back on tack to meet monitored to ensure the good progress its target. As with the target for car trips to continues, it is considered inappropriate to school, described above, the sample of set new stretching targets because they will schools used to measure the indicator is not be reviewed as part of the preparation of the based on those that are undertaking school new LTP, which is due to be submitted in July travel plans, or have safer routes to schools 2005. In addition, it is proposed to focus projects. It is considered that as these resources towards the areas where targets programmes gather momentum, positive are not being met rather than areas where benefits will be reflected in an acceleration of the growth seen in the overall cycling success has already been achieved. indicator across all schools. 3.6 Road safety and social exclusion: update I Target 18, reduce the number of cyclists of progress killed or seriously injured (KSI). This update builds upon the Road Safety and It is very welcome to note that, whilst Social Exclusion Statement included in the general cycling levels are increasing, the rate Annual Progress Report for 2003. It seeks to of cyclist KSI’s actually fell in 2003/04, reduce the link between deprivation and road however not by enough to bring the trend casualties through a number of co-ordinated back on track. To address this and other road initiatives that includes education, engineering, safety indicators the council has re- enforcement and health promotion. prioritised resources to enhance investment Bristol City Council has recognised the in road safety, as well as confirming its relationship between social disadvantage and commitment by signing a local public service road safety in that residents of poor agreement (PSA) with government on road communities are more likely to become road safety, stretching the target, and further casualties. In particular, research has shown that strengthening the many measures aimed at child pedestrian accidents tend to be more improving road safety. prevalent in wards with higher deprivation. The I Target5 ensure all major NHS hospitals, extent of the problem was reported in the 2002 health facilities and community centres are Road Casualty Review (RCR) which included data served by accessible public transport. outlining road casualties for each ward against the multiple deprivation indices. This work has This indicator has seen little change so far been updated in the 2003 RCR which was over the life of the plan, and improvements published in July 2004. put in place, particularly with low floor buses and raised kerbs are yet to be reflected in Of the 35 wards in Bristol, 14 (Ashley, this indicator. This indicator is based on Bishopsworth, Easton, Filwood, Hartcliffe, scheduled bus services; however, overall Henbury, Hillfields, Kingsweston, Knowle, accessibility to health facilities has been Lawrence Hill, Lockleaze, Southmead, improved through the extension of the Dial- Whitchurch Park, and Windmill Hill) are amongst a-Ride service to cover the whole of the city. the 20% most deprived wards nationally as In keeping with the importance of measured by the Multiple Deprivation Index. accessibility to health provision, both locally Work will be carried out in the future to and as a national shared priority, the council compare the newly released Indices of is working with its partners in looking at the Deprivation 2004. The new Super Output Areas accessibility of proposed new health sites amount to 252 areas in Bristol, compared to the and increasing accessibility on public 35 existing wards. These new areas are more transport through additional low floor buses suitable for identifying pockets of deprivation and enhancing stops through the provision that may be overlooked at ward level. New of raised kerbs. domains have been added to the Index of

| 20 | Section 3 | Bristol Local Transport Plan – Annual Progress Report 2004 | | Progress towards targets and objectives | deprivation including crime and the living In Easton and Lawrence Hill the Local environment, which in turn includes road safety Neighbourhood Partnership has an Action Plan casualty data. This will have to be taken into with a number of strands including community account, when comparing this data with road safety, traffic and transport and business and safety casualty data. employment. The traffic and transport task groups are looking at the impact of the M32 and The level of deprivation and need in Bristol’s the A4320 which are major roads that pass inner city has meant that it has been able to through the area. Solutions are being sought to secure a number of funding avenues for road the issues around the restrictions that these safety education, engineering and major major roads place on the community in terms of regeneration funding programmes. travel and accessing local facilities particularly for vulnerable members of the community. Education Bristol has been successful in obtaining grant- The community safety group is addressing fear aid to run two Child Pedestrian Training of crime, which affects a significant number of Schemes (‘Kerbcraft’) in the five most deprived people particularly in the hours of darkness. The underpasses and footbridges that cross the wards of Bristol (Ashley, Filwood, Knowle, major roads have been identified as robbery Lawrence Hill and Southmead). hotspots even during daylight hours. The The second scheme bid was successful in 2003 business and employment task groups are and resulted in £30,000 per year for three years. concerned with removing barriers to Training has now started in two of the nine employment, such as transport. additional pilot schools. A complementary This has resulted in the closure of one of the scheme is being developed by the Council to pedestrian underpasses on the A4320 Easton reach children in the remaining 30 wards, Way (described elsewhere in the report) and the although schools within the most deprived provision of pedestrian facilities at the wards will continue to be prioritised first. signalised junction last year. Engineering A scheme on Bellevue Road is to be funded by Road casualty reduction and prevention will be this Partnership to reduce the speed of rat- delivered principally via the Local Safety Scheme running traffic and aid pedestrians crossing the programme. These are primarily selected by road. Bristol East Side Traders have also joined accident levels and by a number of factors, forces with the Partnership and have provided including a high number of child casualties, ideas such as a car parking review in the area. killed and seriously injured casualties and A number of studies have been commissioned accidents within the 14 most deprived wards in by the Road Safety Group with reference to the Bristol. Local Neighbourhood Partnership. These include Funding has been awarded by government the M32, junction 3/Newfoundland Way and following bids and have resulted in the Old Market Roundabout. M32 junction 3 is a roundabout without signals and grade- implementation of two schemes specifically to separated pedestrian facilities. Fear of crime in reduce child pedestrian casualties in crossing this barrier effectively cuts off the Kingsweston and Avonmouth. communities of Easton and St. Paul’s. Local Neighbourhood and Renewal Action Plans A study of the Old Market Roundabout at the have been established in Ashley, Easton and junction of the A420 and A4044 Temple Way in Lawrence Hill. In Ashley, the St. Paul’s the most deprived ward of Lawrence Hill has Community Partnership has been set up to bring also been commissioned. It is hoped that as a local people together with agencies, community result of this, improvements or schemes can be and voluntary groups to develop a locally owned identified for inclusion in next years work Neighbourhood Action Plan. There is a proposal programme. for an Inner City Community Bus Project which has been progressed by the ‘Getting About ’Task The NDC Pathfinder Partnership in Barton Hill Group and is part of the St. Paul’s Unlimited has established a local partnership called Community Partnership structure. Community at Heart. It was awarded £50m in

| Bristol Local Transport Plan – Annual Progress Report 2004 | Section 3 | 21 | | Progress towards targets and objectives |

January 2000 to spend over the next 10 years Enforcement regenerating Barton Hill, The Dings, Redfield and Bristol City Council is working with the Safety Lawrence Hill. The Delivery Plan identifies eight Camera Partnership for Avon, Somerset and key areas of work: employment and business, Gloucestershire to reduce casualties throughout healthy places, happy places, tackling crime, the partnership area. Many of the new selected lifelong learning, housing, community services, zones of enforcement are within deprived wards arts, sport and leisure, tackling racism. of Bristol where numbers of speed related accidents are high. Community at Heart is working in conjunction with the Traffic Management group to come up Health Promotion with a number of options. Marsh Lane is a Avonsafe Action for Safety is an alliance of potential scheme which could provide health, local authorities, emergency services, improvements for the community to cross a voluntary and private sectors. Avonsafe aims to busy road, especially for children and the elderly. co-ordinate and generate accident prevention activities across the former Avon area. The word “accident” here includes road accident casualty as well as accidents in the home. Avonsafe recognises that children up to age 15 years from unskilled families are five times more likely to die from accidental injury than those from professional families. One of its aims is to seek to address inequalities in health and promote access to accident prevention for all sectors of the community. Bristol City Council is a partner in this alliance which meets regularly to discuss these issues and identify remedial action. Bristol City Council is working with all these partners to bring about road safety improvements amongst other outcomes. Various traffic schemes have been able to be realised as a result of the funding possibilities of working with these partners. For instance a scheme was implemented at Lower Ashley Road last year through the St. Agnes and St Werburgh’s Regeneration area funding. The scheme involved improvements for cyclists and pedestrians. The Council will build upon this body of work in the context of the Casualty Reduction Public Service Agreement (PSA). The Road Safety Group will be developing links with the newly formed Crime and Disorder Reduction Partnership known as ‘Safer Bristol’.

| 22 | Section 3 | Bristol Local Transport Plan – Annual Progress Report 2004 | | LTP Spending Programme | SECTION 4 |

4. LTP Spending Programme 4.1 2003/04 Programme This section of the Progress Report sets out details on the LTP spending programme, covering actual expenditure in the 2003/04 financial year, and future programmes for the remaining two years of the five year plan period. As described in section 3 of this report, the investment programme of the plan is targeted at achieving both local and national objectives, incorporating the shared priorities for transport agreed between local and national government. In support of this, a detailed report on all transport capital expenditure in 2003/04, and programmed expenditure in 2004/05, is included in the implementation table in Appendix B of the APR and covers investment funded through all sources, not only LTP funding. This provides details of the local transport investment carried out through the Plan, and shows how this investment supports the shared priorities of reducing congestion, improving air quality, improving road safety and increasing accessibility. The summary expenditure for 2003/04 shown in this section should be viewed Table 4.1 also shows that the core LTP funding in conjunction with the outputs listed in section allocation for 2003/04 was augmented by 2 and Appendix D and the broad impacts these funding from many other areas, underlining the have had on the objectives and targets detailed Council’s commitment to progressing the Local in section 3. However some expenditure Transport Plan. In addition, the LTP settlement incurred in 2003/04 is preparatory expenditure for 2003/04 was actually some £705,000 higher for schemes to be completed in 2004/05 so that than the indicative amount provisionally this will not yet be directly reflected in the allocated. Though it was not explicitly stated in outputs detailed in this progress report. the settlement letter how much of the additional funding was a reward for good Table 4.1 describes the sources of funding for performance, this reflected the fact that the the investment programme of the plan, assessment of Bristol’s transport performance highlighting the way in which transport capital was in the highest category (“well above expenditure was resourced in 2003/04. The average”). As described in Appendix D of this broad programme covers the many areas of Progress Report, the council was able to use this capital investment aimed at securing the desired additional funding to enhance the overall improvements in local transport. Indicative transport capital programme for 2003/04 in line levels of LTP funding are given for future years; with ambitious investment programme set out however, the amount and sources of other areas in the LTP. The end result of this was that greater of transport capital funding are yet to be resources could be utilised for investment in the determined in many cases. The financial year Showcase Bus Route than was originally 2006/07 sees the start of the next five year LTP envisaged. Figure 4.1 and Table 4.2 summarise period and the proposed investment programme how the local transport plan funds were for this is currently being formulated as part of allocated and spent by comparing programmed the work in developing a joint Local Transport with actual outturn expenditure. Plan across the four local authorities of the Bristol sub-region.

| Bristol Local Transport Plan – Annual Progress Report 2004 | Section 4 | 23 | | LTP Spending Programme |

Table 4.1 Transport Capital Programme, Sources of funding (£000’s)

Currently programmed Capital Expenditure 1st LTP Period 2nd LTP Source of Funding ‘03/04 ‘04/05 ‘05/06 ‘06/07 LTP Settlement 9,354 8,822 8,364 - Indicative - Supplementary Bid Funding 800 0 - Discretionary element of single capital pot 0 0 To be decided - Council central funds 2,936 848 To be decided - Specific government bids - - - - Child Pedestrian Training grant3 Year Revenue funding ‘01/02-‘03/04 - - - - School Travel Plan Bursary - - - - Workplace Travel Plan Bursary - - - - Council Travel Plan Bursary - - - - Personalised Travel Planning 50 - - - - Urban Bus Challenge 435 574 172 - - Home Zones Challenge 170 227 - - European funding 655 850 430 - Total 14,400 11,321 8,966 -

Divergences from planned programme. As has been the case for each year of the plan so far, the council has fully utilised the capital resources received from government through the LTP settlement. As shown in Figure 4.1 actual expenditure in 2003/04 was broadly in line with what was programmed across the major areas of the LTP funded capital programme. The settlement received for 2003/04 amounted to £10.154million. Actual outturn expenditure on LTP funded projects amounted to £10.539 million, therefore more than utilising the full 2003/04 LTP allocation for integrated transport and maintenance. The implementation table in Appendix D provides details on progress in 2003/04 on all the specific measures and project areas of the capital programme. However, Table 4.2 shows a summary of overall expenditure across the broad areas of the programme. In order to maximise the implementation of the plan and fully utilise resources within the financial year, the programme has needed to be altered somewhat from originally planned to provide for areas that are progressing more rapidly compared with those experiencing some delays in delivery. Outturn expenditure on particular areas which have varied by more than 25% in financial terms are highlighted and described later in this section.

| 24 | Section 4 | Bristol Local Transport Plan – Annual Progress Report 2004 | | LTP Spending Programme |

Figure 4.1 - Actual Spend against LTP Capital Allocation 2003/04 LTP 2003/04 Programmed Spend - Allocation: £10.154m

Bus £2.04m

Rail & Other Public Transport £0.176m

Park & Ride £0.600m

Walk/Cycle £0.595

Road Safety (incl. Safer Routes to School) £1.570m

Studies £0.179m

Demonstration Projects & Promotional Work (incl. Vivaldi, Travel Plans, Car Clubs, Air Quality etc.) £1.104m

Road User Charging Investigation £0.245m

Traffic Management & Signals £0.605m

Maintenance £3.040m

LTP 2003/04 Actual Spend: £10.539m

Bus £2.62m

Rail & Other £0.213m

Park & Ride £0.378m

Walk/Cycle £0.907m

Road Safety (incl. Safer Routes to School) £1.341m

Studies £0.107m

Demonstration Projects & Promotional Work (incl. Vivaldi, Travel Plans, Car Clubs, Air Quality etc.) £1.163m

Road User Charging Investigation £0.245m

Traffic Management & Signals £0.627m

Maintenance £2.934m

| Bristol Local Transport Plan – Annual Progress Report 2004 | Section 4 | 25 | | LTP Spending Programme |

Table 4.2 Variations in LTP spend against LTP Capital Allocation 2003/04

LTP 2003/04 LTP 2004/05 Programmed Actual % Programmed Spend Spend difference Spend (£000s) (£000s) (£000s) Bus 2,040 2,624 +29% 940 Rail & Other Public Transport 176 213 +21% 168 Park & Ride 600 378 -37% 250 Walk/Cycle 595 907 +52% 240 Road Safety (incl. Safer Routes to School) 1,570 1,341 -15% 1,600 Studies 179 107 -40% 160 Demonstration Projects & Promotional Work 1,104 1,163 +5% 662 (incl. VIVALDI, Travel Plans, Car Clubs, Air Quality) Road User Charging Investigation 245 245 0 0 Traffic Management & Signals 605 627 +4% 1,255 Maintenance 3,040 2,934 -3% 3,547 Total 10,154 10,539 +5% 8,822

Significant Variations justified in providing greater public Variations in spend between programmed and acceptance of the measures, and this is actual outturn are shown in table 4.2. strengthened by some 200 people using the Significant variations of more than 25% are Gloucester Road car park daily, and average covered below, with an assessment of how these bus journey time savings of 2 minutes per divergences impacted on planned outputs and vehicle attributable rising from the Parson the targets of the plan. The planned 2004/05 Street Gyratory scheme alone. programme as described below, has been As described in detail in Appendix D, formulated to take account of these divergences additional expenditure on bus infrastructure and bring the overall programme back on track. has been reflected in results. Initial I Bus Infrastructure investment (29% higher monitoring has shown that patronage on the than programmed) 76/77 showcase services has increased by 16%, with one third of these new users Increased expenditure in this area was previously undertaking their journey by car largely due to unexpected conditions on site removing some 1,200 cars per week from the and under the existing road surface and the city’s highway network. This investment has cost of diverting underground services. Both not only benefited bus users, with initial factors led to increased contractor costs. In monitoring also showing that the number of addition, following significant public cyclists using the northern section of the consultation, elements of the A38 Bus route has increased by 8%. showcase were redesigned, and this has lead to some costs being higher than originally I Park and Ride Implementation and envisaged. Examples of this are the short Development (37% lower than programmed) stay car park on Gloucester Road and the key Expenditure in this area was lower than Parson Street Gyratory element of the forecast as several elements anticipated in scheme, incorporating a new contra flow bus 2003/04 have been delayed. Work on the lane, cycle lane and additional pedestrian expansion of the A4 Brislington Park and facilities. However the enhanced public Ride site, and preparatory work on the consultation is considered to have been proposal for the A38 South Park and Ride are

| 26 | Section 4 | Bristol Local Transport Plan – Annual Progress Report 2004 | | LTP Spending Programme |

now programmed in 2004/05. The necessary this expenditure was redeployed to enhance resources to carry out this work have been the implementation of schemes on the identified in the 2004/05 programme, to ground in 2003/04. enable this shortfall to be addressed. This underspend, although delaying these works, Addressing Minor Variations in the Programme. has not directly affected any of the core or I Local Rail local targets set out in Section3. Expenditure on rail and other public I Walk and cycle measures (52% higher than transport was some 21% higher than programmed) programmed. This was anticipated in last year’s APR, which reported that some In order to maximise progress in 2003/04 investment was delayed and expenditure within the overall traffic management slipped into 2003/04. This has meant that programme, adjustments to planned additional works were completed in expenditure were made to allow for certain 2003/04. Although the effects of national elements progressing rapidly while others trends may be more influential, it is very were delayed. This particularly affected welcome to see investment in the local rail planned walking and cycling expenditure, network reflected by a 6% rise in local rail where additional measures were able to be patronage in 2003/04. brought forward to compensate for other areas which were delayed. This is shown in I Road safety the increased outputs listed in Proforma C Expenditure in this area was some 15% lower and the more detailed implementation table than anticipated. This overall budget is made in Appdenix D. It is also welcome to note that up various individual schemes and a variety the significant investment in walking and of factors influenced their completion. One cycling, not only in 2003/04 but in previous of the major factors contributing to the year’s of the plan, is reflected in the slippage on the schemes related to the increasing levels of walking and cycling provision of legal and civil engineering input shown by the indicators detailed in Section3 that is required at certain critical stages. The of this report. in-house Legal Services and the Civil I Studies and Investigations (40% lower than Engineering Design team both suffered from programmed) staff shortages and work pressures adversely affecting their ability to meet required Actual expenditure in this area was lower deadlines. In addition public objection than previously programmed due to slippage delayed the implementation of some in one project, this being the A37 Corridor schemes and in the instance of the Study being conducted jointly with Bath and Cumberland Road improvement significant North East Somerset Council. This study is objection caused the project to stop. It is not investigating possible Park and Ride and the considered that this minor slippage in feasibility of the Whitchurch Bypass scheme 2003/04 has had an effect on the road safety and is now expected to be completed in indicators detailed in section 3. At least 3 2004/05. Funding had also been allocated to years after data is normally required before a carry out the necessary technical work for true picture of how particular investment the Callington Road Link, but as described has impacted on accident rates. However the elsewhere, this scheme is not now being priority given to the achievement of road progressed in advance of the outcome of the safety targets, highlighted by the local public Greater Bristol Strategic Transport Study. service agreement signed by the council for Although the delay in the A37 study is this area, has resulted in additional resources regrettable, the results will still be available again being targeted towards road safety in to inform the next LTP and should not delay 2004/05 to make up this shortfall. This can future possible implementation. Underspend be seen in the description of the overall of this budget area is not considered to have 2004/05 programme set out below. had an adverse effect on outputs and progress towards targets and implementation during the year, conversely

| Bristol Local Transport Plan – Annual Progress Report 2004 | Section 4 | 27 | | LTP Spending Programme |

4.2 2004/05 Programme previous spending levels. As described above, Table 4.2 summarises programmed LTP spend in road safety is again prioritised in the 2003/04, however the implementation table in programme, to ensure that the council keeps Appendix D of this progress report provides moving towards the road safety targets, and also fuller details of the current year capital to bring the programme back on track after a programme. slight underspend in 2003/04. The 2004/05 programme does differ The balance of the overall programme is shown somewhat from that previously reported. in Figure 4.2, and as can be seen the LTP Several variations have had to be made in the settlement for maintenance now forms a larger light of levels of available funding. Regrettably, proportion of a smaller overall programme, the supplementary bid for the VIVALDI project although this was anticipated through the was not supported in the 2004/05 LTP indicative allocations. The greater proportional settlement, and this has necessitated some re- funding for road safety can also be seen, prioritisation among the areas of investment in particularly compared with the balance of the programme. In order to complete the funding for the 2003/04 programme shown in VIVALDI project and prevent the loss of European Figure 4.1. Commission (EC) Grant, core LTP funding from the integrated transport block has been redirected to provide the necessary match funding for the EC resources. Other adjustments to the programme have been made to reflect

Figure 4.2 - Programmed 2004/05 LTP Capital Expenditure, Total £8.822m Supporting Revenue Expenditure

Bus £0.94m

Rail & Other 0.168m

Park & Ride £0.25m

Walk/Cycle £0.24m

Road Safety (incl. Safer Routes to School) £1.6m

Studies £0.16m

Demonstration Projects & Promotional Work (incl. Vivaldi, Travel Plans, Car Clubs, Air Quality etc.) £0.662m

Traffic Management & Signals £1.225m

Maintenance £3.547m

| 28 | Section 4 | Bristol Local Transport Plan – Annual Progress Report 2004 | | LTP Spending Programme |

4.3 Supporting revenue expenditure Table 4.3 lists relevant revenue budgets for both programme 2003/04 and 2004/05 financial years, which In order to successfully implement the support Local Transport Plan capital investment. programme of capital investment necessary to Unfortunately, unlike the 5 year LTP capital deliver the objectives of the plan and national allocations, it is not possible to forecast with objectives under the Ten Year Plan capital enough certainty available levels of supporting investment must be balanced with equivalent revenue funding for future years of the Plan. supporting revenue expenditure. This is crucial The figures listed in Table 4.3 do not include to maintain existing and new infrastructure, staff overheads. support existing and new services including Park and Ride, and provide for core staff resources. As reported last year there are strong concerns that the enhanced capital resources received through the local transport plan process are outstripping the more limited availability of revenue resources to support this programme. This undoubtedly constitutes one of the constraints on delivery of the LTP programme

Table 4.3 Transport Revenue Expenditure 2003/04 Outturns and 2004/05 Programmed

Areas of Revenue expenditure. 2003/04 2004/05 (reference numbers refer to related Outturn Planned capital expenditure in the Expenditure Expenditure1 Implementation Table in Appendix 1) 1. Night Bus Service 200 160 1. Supported Bus Services 1,663 2,000 1. Concessionary Fares 1,432 1,550 2. Park and Ride support 573 430 (existing & new sites, net of income) 3. Community Transport 817 780 6. Rail Services support 123 140 8. Water Transport (support for ferry operations) 15 13 16. Transport surveys 41 60 29. Road Safety including Education, 102 150 Training and Publicity 32. Highway Maintenance. 4,931 5,370 Routine maintenance of footways, carriageways, gully emptying, verge maintenance, lighting, cycleways and public rights of way. etc.

1 Draft Budget for 2004/05; final budget not avaiable at time of publication.

| Bristol Local Transport Plan – Annual Progress Report 2004 | Section 4 | 29 | | Accessibility of the Annual Progress Report | SECTION 5 |

5. Accessibility of the Annual Progress Report

The report is being made widely available: I All Local Transport Plan related documents can be viewed and downloaded via the Council’s Web site at the following address: www.bristol-city.gov.uk/transport An e-mail address is also provided for those seeking further information ([email protected]), I A minicom number (0117 922 3854) is also available. These sources are promoted through a variety of council’s transport publications and on the back page of the APR itself. I Libraries and a variety of other visitor outlets I Direct mailings to a large number stakeholder groups and individuals I Local media publicity All LTP related documents are available on the I Alternative formats on request Council's web site A short update leaflet will also be produced and disseminated through stakeholder networks, events and popular visitor destinations, and the Council’s web site.

The Journey Planner web site was developed as part of the VIVALDI project (www.travelbristol.org)

| Bristol Local Transport Plan – Annual Progress Report 2004 | Section 5 | 31 | | GLOSSARY | Accessibility of the Annual Progress Report |

Glossary APR Annual Progress Report AQAP Air Quality Action Plan AQMA Air Quality Management Area CCTV Closed Circuit Television DEFRA Department for Environment Food and Rural Affairs DETR Department of the Environment, Transport and the Regions DfT Department for Transport EC European Commission GBSTS Greater Bristol Strategic Transport Study GOSW Government Office for the South West KSI Killed and Seriously Injured LRT Light Rapid Transit LTPLocal Transport Plan MOVA Micro-processor Optimised Vehicle Activation ODPM Office of the Deputy Prime Minister PRN Primary Route Network PSAPublic Service Agreement SCE Supported Capital Expenditure SCOOT Split-Cycle Optical Optimisation Technique UTC Urban Traffic Control VIVALDI Visionary and Vibrant Actions through Local transport Demonstration Initiatives

| 32 | Section 5 | Bristol Local Transport Plan – Annual Progress Report 2004 | APPENDICES

| Bristol Local Transport Plan – Annual Progress Report 2004 | Appendices | 33 | | Progress towards National Core Indicators | APPENDIX A | ailable the indicator mparable, and although mparable, main the same future our figures. Also include our figures. ttempted. As the omprise preventative e-surfacing as a backlog,e-surfacing e-surfacing where it where e-surfacing is trajectory is more trajectory co area data years only two av the target trend Please outline the methodology and source used to calculate of data y other relevant any information. The basis of measurement & evolved has continuously it is not possible to reliably or trend a trajectory provide parameters. under UKPMS our own system of However, assethighway management a period of has indicated the period stability over We 2000/01 to the present. do not the annual regard of carriageway programme r but that a recognition rather it is all part of on-going which maintenance c treatment to arrest the of the deterioration natural as selective network as well r to carry out inappropriate superficial preventative techniques. Notwithstanding the above, show our own records where a will BV97b methodology for re a significant shows improvement and is below from collected Data whole of for operators as local authority area per requirements we are meeting the 10 year we are an assessment plan target, A has been on Proforma et have figures rg oncept first was with actual orrespond eported or target eported. emained unchanged, equested by guidance or BV96 & 97a or BV96 as set out in Bristol's r as is reasonable, so far accounttaking into that have the parameters changed since this c Future introduced. included are trajectories ( Best Performance Value Plan) although as noted in government guidance these will not probably c as the data methodology will change. Also as r f back to historical data 2000/01 is included though this is also not necessarily comparable. Please indicate if your Please indicate r changed have figures previously since you r Ta NO YES vidence vidence No Clear No Clear or this E E Is your LA Is your on track to meet its target f core indicator? 2010/11 2010/11 2010/11 2010/11 37,750 2009/10 2009/10 2009/10 2009/10 36,980 2008/09 2008/09 2008/09 2008/09 36,290 2007/08 2007/08 2007/08 2007/08 35,690 2 2006/07 2006/07 2006/07 2006/07 35,160 2005/06 14.7 2005/06 26.8 2005/06 15.9 2005/06 34,720 Actual and Traiectory Data Data Traiectory Actual and 2004/05 14.7 2004/05 26.8 2004/05 15.9 2004/05 34,350 2003/04 14.7 14.7 2003/04 26.8 26.8 2003/04 7.0 15.9 2003/04 33,3200 34,070 2002/03 14.7 2002/03 26.8 2002/03 15.9 2002/03 32,0600 33,870 2001/02 7.0 2001/02 5.3 2001/02 2001/02 32,0500 33,740 2000/01 0.3 2000/01 0.7 2000/01 2000/01 33,700 33,700 ajector ajector ajector ajector ear ear ear ear ear igures igures igures igures Y Y Actual F Tr ies Y Actual F Tr ies Y Actual F Tr ies Y Actual F Tr ies 3 ear and F ear) ear Type or Calendar or Financial Y C (Enter f Y f Y F F F F Bristol City cent cent cent alue V 14.7 14.7 Per 26.8 26.8 Per 15.9 15.9 Per 33,700 37,750 Thousands ear Y 2002/03 2005/06 2002/03 2005/06 2002/03 2005/06 2000/01 2010/11 1 2 1 2 1 2 1 2 Base Data Target Data Units Base Data Target Data Units Base Data Target Data Units Base Data Target Data Units V96 V97a V97b V102 oads - oads - Definitions (1) principal r B (2) non- principal r B (3) unclassifie - d roads B Thousands of bus passenger journeys (i.e. boardings) in per year the authority - B 4 5 ondition (% oad onsidered) Core Indicator R C where structural maintenance should be c Number of bus passenger journeys APR Core Indicators Pro-Forma A Pro-Forma Indicators APR Core

| Bristol Local Transport Plan – Annual Progress Report 2004 | Appendix A | 35 | | Progress towards National Core Indicators | ery three years. ery three udit Commission our figures. Also include our figures. igures include igures igures include igures oad network oad network epresentative local epresentative epresentative sample of epresentative Please outline the methodology and source used to calculate of data y other relevant any information. of a survey Questionnaire r with panel in accordance A conducted guidelines, ev Manual and automatic at surveys cycle r sites and screenlines the city. across police and from Data local authority accident = Year Base statistics. 1994-1998 Average F and trunk motorway r police and from Data local authority accident = Year Base statistics. 1994-1998 Average F motorway and trunk motorway r eported. eported or target Please indicate if your Please indicate r changed have figures previously since you r NO NO YES YES or this Is your LA Is your on track to meet its target f core indicator? 2010/11 2010/11 48549 2010 106 2010 15 2009/10 2009/10 42400 2009 110 2009 16 2008/09 2008/09 36900 2008 114 2008 18 2007/08 2007/08 32000 2007 118 2007 19 2 2006/07 2006/07 27800 2006 122 2006 20 2005/06 45 2005/06 24300 2005 126 2005 22 Actual and Traiectory Data Data Traiectory Actual and 2004/05 45 2004/05 21400 2004 134 2004 23 2003/04 29 45 2003/04 20608 19100 2003 197 142 2003 23 24 2002/03 40 2002/03 17235 17500 2002 243 158 2002 34 26 2001/02 40 2001/02 18090 16500 2001 180 164 2001 27 27 2000/01 40 40 2000/01 16183 16183 2000 175 171 2000 30 28 ajectories ajectories ajectories ajectories ear ear ear ear ear igures igures igures igures Y Y Actual F Tr Y Actual F Tr Y Actual F Tr Y Actual F Tr 3 ear and F ear) ear Type or Financial or Calendar Y C (Enter f Y f Y F F C C cent alue V 40 45 Per 16183 48549 Absolute numbers 177 106 Absolute numbers 29.6 15 Absolute numbers ear Y 2000/01 2005/06 2000/01 2010/11 See Right 2010 See Right 2010 1 2 1 2 1 2 1 2 Base Data Target Data Units Base Data Target Data Units Base Data Target Data Units Base Data Target Data Units centage ged less V104u ounting oads in the epresentativ Definitions Per of bus users with satisfied local bus services - B Number of trips cycling the across authority or number of trips cycling at a r e number of c points (please state which) Number of people killed or seriously on injured r authority Number of children (a than 16) killed or seriously in the injured authority 6 7 Core Indicator Bus passenger satisfaction Number of trips cycling Number of and deaths serious injuries (all ages)7 Number of children killed and seriously injured

| 36 | Appendix A | Bristol Local Transport Plan – Annual Progress Report 2004 | | Progress towards National Core Indicators | DICATOR NOT DICATOR NOT our figures. Also include our figures. Please outline the methodology and source used to calculate of data y other relevant any information. IN APPLICABLE IN APPLICABLE eported. eported or target Please indicate if your Please indicate r changed have figures previously since you r or this Is your LA Is your on track to meet its target f core indicator? 2 Actual and Traiectory Data Data Traiectory Actual and ajectories ajectories ear ear ear igures igures Y Y Actual F Tr Y Actual F Tr 3 ear and F ear Type ear) or Calendar or Financial Y C (Enter f Y f Y alue V ear Y 1 2 1 2 Base Data Target Data Units Base Data Target Data Units Definitions Thousands of light rail passengers per year % of rural9 households within 13 minutes walk of an hourly or better bus service or % of rural9 households within 800 of an metres hourly or better bus service (please state which) - Please refer to the DtF guidance on the Core Indicator Proforma for descriptions of footnotes. for Proforma Indicator to the DtF guidance on Core - Please refer

alk of an Core Indicator Light rail passenger journeys8 % of rural households within 13 minutes w hourly or better bus service8 NB

| Bristol Local Transport Plan – Annual Progress Report 2004 | Appendix A | 37 | | Progress Towards Local Targets and Objectives | APPENDIX B | to? e road e road ongestion ongestion ongestion c trip cycling c c Which national PSA or PSA Which national cle surveys cle surveys of s 5. triple the level Cy trian Surveys. road 1. Reduce nt edestrian Surveys road 1. Reduce ve undertaken on undertaken cycle two-year reliability Bus Surveys Bus Surveys bus 2. Increase sP sE s No Audit of stops bus use 2. Increase Ye Ye Ye not onTarget/ does the Local On track/Target Plan Year 10 (2,700) (3,000) (3,000) ents by 2002.ents Ride) = 1,000 Bike 10% the number and proportion of journeys = 100 made on foot by 2012. 20%reduction in 20%reduction by car traffic private 2015. ev area by 2005. area Index=100 of bus stops that ensure To (8) 90% 2000/01 – 50% 48 61 67 of bus the 6) Increase 2000/01 = 61% 61 64 64 alking. by 2002, and increase 13,533 surveys=

olume of growth in (1) Reduce Base: 971,000 102 102 102 edestrian the number of walking pedestrian cordon (102) (104) (106) (108) (110) ocal traffic traffic (vehicles) 20% by 2005, and to seek a thereafter = 100, Base Index w cyclists participating taking part in cycling the number of people Bristol's Biggest (participants in private car private by car traffic private cordons) (combined (106) (107) (108) (109) (110) (108)people (106) by in walking trend (103) ped combined (101) (13,533) (13,533) (99) (13,668) Yes (13,804) Surveys Traffic (13,939) (14,074) 1. Reduc (14,210) (14,345) (14,480) (14,616) Yes Pedes L P Flows the central trips into a displaying 7055. (trips)= of bus stops in the citycurrent (All bus stops)timetable a current display timetable by 2003. (63) (77) (90) BCC=67 BCC=73 BCC=78 services between 1 minute early proportion of local bus services whose journey is within time reliability and 5 minutes 1 minute early and 5 of late scheduled time journey time cheduled journey of s minutes late (61) (63) (63) (66) (66) Surveyed Surveyed by 10% (26) Increase area 2000 base central 113 118Number of 114 (11) Halt the downward 2000 baseline for 14,453 15,376Number of 14,788 by 300% (20) Increase 1996 Base year 3,000 2,913 3,735 tained contained outcomes contained tained contained outcomes ajectory Data for years shown in brackets) years ajectory for Data n r ONGESTION ocal Performance APR Local Targets Pro-Forma B Pro-Forma Targets APR Local (T C 1V 1 2% 4 4 7% L Objectives Indicatorsco in LTP or targets Local in LTP in LTP Baseline Data 2001/2 2002/3 2003/4 2004/5 2005/6 2006/7 2007/8 2008/9 2009/10 2010/11 track? of Data Source Link Outcome

| Bristol Local Transport Plan – Annual Progress Report 2004 | Appendix B | 39 | | Progress Towards Local Targets and Objectives | to? g trips ongestion 1. Reduce road road 1. Reduce c Which national PSA or PSA Which national el Award el Award congestion on Area Employers Employers on Area road 1. Reduce cle counts of 5 triple the level av v y Tr s sA sc No surveys School travel No No Quality of of 5. triple the level Ye Ye Ye Clear Survey Life trips cycling vidence not onTarget/ does the Local E On track/Target Plan Year 10 Secondary=14 (12.5) (11.8) (11) el Award by 2005 el Award av ompared with a 2000 ompared Tr is developed following following is developed occupancy planning application planning application plan and the full travel the central area area the central c base 2000 base. base. Achieve a 10% base. Achieve of journeys modal share by 2012 to work by bike of by 400% (21) Increase Base 2000/01 7 11 19

cle Flows into of cycling the level = 7,546 (7,700) (8,100) (8,900) (10,000) (11,300) (13,000) (14,900) (17,200) (19,800) (22,600) cyclin car mode car (12) Reduce 1999 Base modecycle 15) By 2010 triple the 1999 base = 2.5 34.7 1.4 38.4 1.9 40.2 2.3 oportion of 14) By 2005 to Increase Base 2002 33% 83%

o. entral Areaentral (25) By 2010 to triple 2000 base 8,543 8,362 10,658 r ocal eceiving the receiving employers business developments an where developments of new business travel where plan is travel interim plans are implemented of determination submitted prior to share for for share to journeys to school by journeys school 25% by 2003. Primary=35 for share (30.5) to journeys to of cycling (level school schools secondary (28.3) with a compared (26) 1999 Base (2.7) 16all new (2.9) 17.6 to 90% the proportion (3.2) 33% 18 (3.5) (4.0) (33%) (4.5) (50%)employersr (5.1) the number of Bristol (70%) awardtravel = 3 Employers Area Avon (90%) (5.9) (6.6) (7.5) (5) (7) (8) (10,) (12) Cy of cycle of triple the level determined journeys to journeys to work cycling work with a 2000 compared L Modal share (16) & (17) By 2010 to be - - - tained contained outcomes contained tained contained outcomes ajectory Data for years shown in brakets) years ajectory for Data n r ocal Performance APR Local Targets Pro-Forma Pro-Forma Targets APR Local (T 7C 8% 8% 8 9P 9N in LTP in LTP in LTP Baseline Data 2001/2 2002/3 2003/4 2004/5 2005/6 2006/7 2007/8 2008/9 2009/10 2010/11 track? of Data Source Link Outcome Objectives Indicatorsco or targets Local L

| 40 | Appendix B | Bristol Local Transport Plan – Annual Progress Report 2004 | | Progress Towards Local Targets and Objectives | to? trips.

ongestion c Which national PSA or PSA Which national fic Surveys road 1. Reduce dons congestion f ta from Publicta from bus use 2. Increase r on & Somerset of the level Triple 5. ery 3 years) a v ra providers panel (conducted ev Co Annual Rail censusAnnual Rail . road 1. Reduce of Questionnaire bus use 2. Increase sT sD sA s s No Household road 1. Reduce No Surveys Traffic road 1. Reduce Ye Ye Ye Ye Ye Clear Interview Surveys congestion vidence not onTarget/ does the Local E On track/Target Plan Year 10 outer area by 15% outer area by 2005 total) = 222,632 = 100 car by 10% 2005 5 kilometers made by by 2005 and 30% 2000) by 2015 (base year central area by 10% area central services by 2006 modal rail (Increase to 1.5% for share per day to work by journeys 2006) of theft cycle (22) Reduce 98 Base = 1,904. 1,781 1,577 1,429

of users Increase (7) & (BV103) 2000/01 base 35 35 35 52

o. ocal eported cycle by 33% 2012. Target 2012 for (1,704) (1,654) (1,604) (1,554) (1,504) (1,454) (1,404) (1,354) (1,304) (1,254) police cycling ail network use on local passenger movements L < 5km of trips less than flows traffic determined in the central traffic in central area inner & (combined by 10% 2005 area car cordon central (94) flows traffic and 30% by 2015 in the in car traffic (93) car (outer cordon = 399,637 100 trips) (106) (92) (107) (91) (108) (90)r (109) (88) (110) (86) (84) (82) (80) Cordons congestion central areacentral transport trips to the Index=100 (100)thefts. (103)trips on local in rail annum increase r passenger (107) (110) (25,750) (27,000) (112)transport (28,400) = 1,207 (114) (29,800) with satisfied with % of users satisfied (31,300)public (116)transport (32,900) information information (118) (120) (35) (35) (40) Transport (40) (40) (60) local representative Bus trips to public (24) Increase 2002/03 Base 100 116 tained contained outcomes contained tained contained outcomes ajectory Data for years shown in brakets) years ajectory for Data n r ocal Performance APR Local Targets Pro-Forma Pro-Forma Targets APR Local (T 11 % of car trips the number (28) Reduce to be11 of Index 11 total car (23) Reduce - 96. base year of Index 6 growth reduce To (27) - 92 1996 base 92 - 3N 109 93 11110 113 Number of a 5% per (9) Achieve 1999 base 23,400 25,0387% 26,405 27,930 L Objectives Indicatorsco in LTP or targets Local in LTP in LTP Baseline Data 2001/2 2002/3 2003/4 2004/5 2005/6 2006/7 2007/8 2008/9 2009/10 2010/11 track? of Data Source Link Outcome

| Bristol Local Transport Plan – Annual Progress Report 2004 | Appendix B | 41 | | Progress Towards Local Targets and Objectives | to? Which national PSA or PSA Which national acilities congestion F data data Survey Pedestrian Pedestrian Survey road 1. Reduce Access mapping of bus use 2. Increase s s No Air Quality air quality 4. Improve No Access mapping of bus use 2. Increase Ye Ye not onTarget/ does the Local On track/Target Plan Year 10 (to 71% by 05/06) Quality Strategy and to ensure the day, that the time-tabled time is no journey longer than 25 minutes and to the City Centre 15 minutes to the local neighbourhood centre, by 2010. erage erage for standard national 52.1 _g/m3 (49.9) (48.8) (47.7) (46.6) (45.5) (44.4) (43.3) (42.2) (41.1) (40.0) Monitoring pedestrian 14a) (& BV165) 2002/03 48% - 48% 58% of that (4) Ensure 98% of 2001 = 87% of 87 89 89 of NHS that (5) Ensure all 2000 Base year 51 51 51 ansport of at frequency least 4 25 minutes of

ublic with a by a route within population ocal ommunity by accessible served oadside covered the pollutants or disabled facilities incorporating acilities the % of Increase (60%) (66%) (71%) acilities and are centres community with facilities with facilities pedestrian facilities f people disabled people for f Annual Av r the (13) Achieve NO2 Levels Air by the National 99/00 base population 49.9within set live the population distance of of a within 400 metres P bus stop that within 45.9 population is served 400m of a bus Tr 90% of stop, node. (87) 54.0 (88) buses per hour during the city centre. (89) (91) hospitals, (92)health transport major NHS hospitals, by f (93) = 51%c and health facilities public centres by served (94)public 2010 transport (96) (56) (97) (61) (98) (66) (71) and population PT (76) (80) (85) (90) (95) (100) and healthcare PT L ESSIBILITY tained contained outcomes contained tained contained outcomes ajectory Data for years shown in brakets) years ajectory for Data C n r ocal Performance APR Local Targets Pro-Forma Pro-Forma Targets APR Local (T INCLUDING AIR QUALITY IMPACTS ENVIRONMENTAL 4 AC 1% 4% 5% in LTP in LTP in LTP Baseline Data 2001/2 2002/3 2003/4 2004/5 2005/6 2006/7 2007/8 2008/9 2009/10 2010/11 track? of Data Source Link Outcome Objectives Indicatorsco or targets Local L

| 42 | Appendix B | Bristol Local Transport Plan – Annual Progress Report 2004 | | Progress Towards Local Targets and Objectives | to? accessibility killed or seriously injured. killed or seriously injured. Which national PSA or PSA Which national Speed surveys Speed surveys the reduce To 3.

ta from ta from bus 2. Increase sample sites number of people a TC at operators accessibility Survey Bus StopsSurvey bus 2. Increase Annual survey road 1. Reduce sD s s sA No & Somerset Avon the reduce To 3. Ye Ye Ye Ye not onTarget/ does the Local On track/Target Plan Year 10 strategic sites across sites across strategic bus use by an average bus use by an average of 50 per year At road the city to improve safety. of fleet the 14b) Increase 00/01 = 15% 24% 26% 34%

SI's per number of cyclists (4.70) (4.59) (4.35) (4.18) (4.00) (3.83) (3.65) (3.48) (3.30) (3.13) police number of people ocal otal Cycle otal Cycle the (18) Reduce Base 94 to 98: 5.22 5.17 6.57 5.77 aised kerbs low floor equipped for ootpath ootpath total length of footpaths (68) (70) (72) (74) (76) of paths congestion. Number of the 14c) Increase 2000/01 = 175 223 284 334 L K 100,000 population traffic in road KSI by 2012. accidents mean traffic speeds in the ( traffic (28.3) (27.5) (26.7) (25.8) (25) low floor buses number of buses with stops with floor Platforms Low r number of stops f (20%)network (25%) easy to use by public (30%) (225) (35%) (275) (40%) (325)speeds (375) city by 5mph 2005. (425) State of State of Percentage (BVP178) 99/00 = 64% 67 Measured 70 average 19) Reduce 72 1999/00 30 mph 28.8 28 27.6 tained contained outcomes contained tained contained outcomes ajectory Data for years shown in brakets) years ajectory for Data AD SAFETY n r ocal Performance APR Local Targets Pro-Forma Pro-Forma Targets APR Local (T 5% 5 7 RO 3T 3 L Objectives Indicatorsco in LTP or targets Local in LTP in LTP Baseline Data 2001/2 2002/3 2003/4 2004/5 2005/6 2006/7 2007/8 2008/9 2009/10 2010/11 track? of Data Source Link Outcome

| Bristol Local Transport Plan – Annual Progress Report 2004 | Appendix B | 43 | | Report on status of targets and indicators | APPENDIX C |

Report on status of targets Not on Unfortunately this target has not track been met. For all bus stops across and indicators the city 67% had timetables when the audit was carried out for the SHARED PRIORITY: CONGESTION APR. Although the overall target Target 1. Reduce growth in private car traffic was not met, the proportion of by 20% by 2005, and thereafter to council controlled stops displaying seek a 20% reduction in private car timetables was 78% (a 16% rise in traffic by 2015. two years). This figure was On track This indicator is measured using diminished by only 62% of stops, for traffic surveys across the city on a which the private operator is series of cordons intercepting radial responsible. having timetables. movements, screenlines and sites Target 11. Halt the downward trend in looking at orbital movements. walking by 2002, and increase by These have been conducted since 10% the number and proportion of the base year 1996, and have shown journeys made on foot by 2012. an overall 2% rise since then. Consequently the indicator is On track As with the indicator for target 26 currently on track to meet the 2005 above, surveys have shown growth target of reducing forecast growth in walking levels since the baseline by 20%, which equates to a of 2000. Therefore on this indicator, maximum growth of 10%. (Forecast the downward trend has been growth was calculated from a halted and it is currently on track to modelled do-minimum scenario). meet the longer term target. At However, the current long term present this indicator is measured objective of a 20% absolute using on- highway surveys and reduction will be a more stretching reflects numbers rather than modal target . share. It is hoped that during the next 5 year LTP resources will be Target 26. Increase by 10% the number of sufficient to carry out surveys to walking trips into the central area measure walking levels through by 2005. modal share. On track A cordon of pedestrian surveys Target 20. Increase by 300% the number of around the central area of Bristol people taking part in cycling events has been conducted every year since by 2002. 1998. Using this indicator, the council now has a reliable record of Target met This target has been met and now longer term trend data on walking exceeded, with over 3,700 cyclists levels. Annual fluctuations are measured as taking part in the apparent (and anticipated) with this council’s flagship cycling event, the indicator; however, despite a slight annual Bristol’s Biggest Bike Ride in fall in walking levels in 2003/04, it 2003/04. It is not envisaged that a is still above the trajectory needed new target will be set for the to meet the target. Continued remaining two years of this plan, monitoring will, it is believed, show and a possible revised target will be the indicator remaining above the looked at as part of the formulation required trend and the target will of the next LTP. However this be met by 2005. indicator will continue to be measured, to ensure that Target 8. To ensure that 90% of bus stops in participation remains at this high the city display a current timetable level or increases to promote cycling by 2003. and encourage more people to cycle in Bristol.

| Bristol Local Transport Plan – Annual Progress Report 2004 | Appendix C | 45 | | Report on status of targets and indicators |

Target6. Increase the proportion of local bus Target 12. Reduce car journeys to school by services whose journey time 25% by 2003. reliability is within 1 minute early Not on The indicator for this target and for and 5 minutes late of scheduled track Target 15 below is measured journey time through school travel surveys On track This indicator is measured through undertaken at the same time each on-board surveys of a year. These cover a representative representative sample of bus sample of primary and secondary services throughout Bristol on a two schools throughout the city and are year basis. Reliability has improved analysed to take into account the by some 5% since the base, and differing patterns shown by faith with the introduction of further schools, which cover far larger showcase routes and bus priority catchment areas. This target is not measures across the city, it is on track as the proportion of pupils considered that the indicator will travelling to school by car has still be on track to meet the target actually increased on the baseline following the surveys to be figure, both for primary and conducted next year. secondary schools. The survey is a sample of all schools, not just those Target 25. By 2010 to triple the level of cycling that have in place school travel into the central area compared with plans or safer routes to schools a 2000 base projects, so it is hoped as these On track Surveys of cycling levels into the programmes gather momentum, central area of Bristol have shown a positive benefits will be reflected in 41% increase on the already high the overall indicator across all baseline levels of 2000. As with the schools. allied indicator of cycling across the Target 15. By 2010 triple the level of cycling to city as a whole, the only way that secondary schools compared with a this very ambitious target is likely to 2000 base. be met, is when complementary investment streams come together Not on As with the indicator for target 12 to create a more complete network track above, this has seen a fall on of facilities towards the end of the baseline levels and is not currently target period. It requires more than on track. However, unlike car travel specific cycling schemes to achieve to school, the last couple of years this aim, including many other have seen a rise in cycling to measures such as showcase bus secondary schools, and the indicator routes, school travel plans, travel is moving in the right direction. It is demand management and travel hoped that with continuing awareness. As the aggregate total investment in safer routes to investment comes to fruition in schools, travel plans and later years, it is hoped that this will promotional work, the increase can provide the critical mass needed for be maintained to bring this major change. This is reflected in indicator back on track. the exponential target trajectory set Target16 By 2010 triple the level of cycling to out for this long term indicator. The work compared with a 2000 current significant increase in cycling is well above this target Target17 base. Achieve a 10% modal share of trajectory, and future monitoring is journeys to work by bike by 2012 expected to continue to show significant progress in increasing No clear It was envisaged that all local cycling levels in Bristol. Evidence targets would now have an assessment, but for overall cycling

| 46 | Appendix C | Bristol Local Transport Plan – Annual Progress Report 2004 | | Report on status of targets and indicators |

to work this has unfortunately not 19 in 2003/04, and the target has proved possible. These targets were been met. Although progress will to be measured through household still be monitored, to ensure the interview surveys, but the size of good progress continues, it is individual survey necessary to considered inappropriate to set a produce a statistically significant new stretching target because it result has proved to be too costly, will be reviewed as part of the particularly as most resources are preparation of the new LTP, which is now targeted at delivery and due to be submitted in July 2005. It investment on the ground, rather is proposed to focus resources than background monitoring. In towards the areas where targets are order to address this, a related not being met rather than areas survey on quality of life in Bristol where success has already been now includes questions on this achieved. area, but at present the annual Target 28. Reduce the number of trips of less variations in results mean that than 5 kilometres made by car by longer term trend data is needed 10% by 2005 before an assessment can be made. It is envisaged that this will be No clear As with the target on cycle mode possible by the next progress Evidence share to work, it was envisaged that report. Current data from other this target would be measured sources (including the 2001 Census, through household interview and local employers’ travel plan surveys but the size of individual surveys) indicate that good progress survey necessary to produce a is being made (e.g. 2001 Census statistically significant result has shows a 40% increase in cycling to proved to be too costly, particularly work in Bristol compared with as most resources are now targeted 1991). at delivery and investment on the ground, rather than background Target 14. By 2005 to Increase to 90% the monitoring. In order to address this, proportion of new business a related survey on quality of life in developments where an interim Bristol now includes questions on travel plan is submitted prior to this area, but at present the annual determination of planning variations in results mean that application and the full travel plan longer term trend data is needed is developed following occupancy. before an assessment can be made. On Track In 2003/04 this indicator was met It is envisaged that this will be by 10 out of a total of 12 new possible by the next progress business developments, reflecting report. the resources targeted at promoting Target 23. Reduce total car traffic in the and encouraging the adoption and central area by 10% by 2005 and implementation of ambitious and 30% by 2015 achievable travel plans by new business developments. Monitoring On track Total car traffic in the central area of in this area will continue to ensure Bristol has seen a decrease since the that this good progress continues. base year of 1996, reflecting the removal of highway capacity Target 21. Increase by 400% the number of through the implementation of The Bristol employers receiving the Centre Project, the closure of Queen Avon Area Employers Travel Award Square and additional bus priorities, by 2005. and the improved provision of Target met The total number of employers public transport to the centre. receiving the above award grew to Annual fluctuations are apparent

| Bristol Local Transport Plan – Annual Progress Report 2004 | Appendix C | 47 | | Report on status of targets and indicators |

with this indicator, but the overall improvements are affecting public trend is below the target trajectory transport use. The A38 showcase and the indicator is assessed as route has shown a 16% rise in currently on track. However, even patronage since its opening, allowing for the anticipated annual without abstraction from other variations, there is some concern on services, and it is anticipated that the slowing of the rate of decrease future showcase routes will of the trendline, and this indicator continue this promising trend. will need to assessed carefully over Target 22. Reduce cycle theft by 33% by 2012. the remaining years of the plan to ensure that the trend is still on On track Information provided by Avon and track. Somerset Constabulary shows that reported cycle thefts have fallen by Target 27. To reduce growth in car traffic in a quarter since the baseline of the outer area by 15% by 2005 1998. This is extremely Not on Although allied indicators for traffic encouraging, and hopefully will track in central Bristol and across Bristol assist in promoting more cycle use as a whole show welcome progress, as security improves further. traffic is still growing in outer Target9. Achieve a 5% per annum increase in Bristol at a pace that means it will rail use on local passenger services not meet the target set for 2005. by 2006 Measures are being progressed to address this, particularly the On track Patronage on the local rail network programme of showcase bus routes has increased by 20% since the base to provide attractive public year and is currently on track with transport alternatives for longer the target trajectory. Apart from a distance car travel from the outer downturn after the Hatfield areas of Bristol. Initial monitoring Incident (which affected rail travel on the first showcase routes show nationwide) growth has been the great potential of these, with continuous throughout the plan some one third of new users on the period. A38 routes being previous car users, removing 1,200 cars per week from Target7 Increase % of users satisfied with the city’s highway network. In the (BV103) public transport information) medium term, joint working on the On track Using ODPM guidelines, data for new Local Transport Plan will enable this indicator is collected through a cross city boundary movements to survey every three years. The be assessed holistically. 2003/04 survey has shown an Target 24. Increase public transport trips to increase in satisfaction from 35% to the central area by 10% by 2005 52%, reflecting the considerable and 30% by 2015 (base year 2000). investment targeted at public transport information. The increase On track Data on trips to the central area of shown in the 2003/04 survey gives Bristol have not previously been much confidence that the target of available to the council. However, in 60% satisfaction by 2006/07 will be partnership with the majority achieved. private operator, information has been collected on bus patronage for the A38 showcase routes serving the central area. By focussing this indicator on areas where investment has occurred during the plan period, a more accurate picture can be seen of how infrastructure

| 48 | Appendix C | Bristol Local Transport Plan – Annual Progress Report 2004 | | Report on status of targets and indicators |

SHARED PRIORITY: ENVIRONMENTAL IMPACTS for the next LTP to utilise the new INCLUDING AIR QUALITY government accessibility software Target 13. Achieve the national standard for and datasets. the pollutants covered by the Target 5. Ensure that all major NHS hospitals, National Air Quality Strategy health facilities and community Not on The underlying trend for NO2 shows centres are served by accessible Track no change since 1999 and is not on public transport by 2010 track to meet the 40ug/m3 target Not on This indicator has seen little change for 2005. This is partly a result of Track so far over the life of the plan, and elevated levels of air pollution improvements put in place, during 2003 resulting from extreme particularly with low floor buses weather conditions. However, such and raised kerbs are yet to be events are likely to become more reflected in this indicator. This common and so cannot be indicator is based on scheduled bus discounted. Even if 2003 were a services, however overall more typical year the underlying accessibility to health facilities has pollution trend, although been improved through the downwards, would not be extension of the Dial-a-Ride service improving rapidly enough to meet to cover the whole of the city. the target in the foreseeable future. The Council’s Air Quality Action Plan Target 14a Increase the % of pedestrian sets out a programme of additional (BV165) facilities incorporating facilities for measures to achieve the 40ug/m3 disabled people target by 2008. Without additional On track Best Value indicator 165 has been resources this target will not be met revised since the start of the plan in the short-medium term. period and a new baseline and N.B After calibration between the target has been set to reflect this. network of continuous analysers Using the new criteria, the baseline and diffusion tubes the NO2 figures was measured at 48% and targeted for 2001 and 2002 have been investment in 2003/04 has seen revised (by -0.12 and +0.7 ug/m3 this rise 10 percentage points in one respectively) to remove slight year. The new target for the end of inaccuracies in the analysis of the the plan period is 71%, and diffusion tubes. although the interim target for 2003/04 is 60% the current rate of SHARED PRIORITY: ACCESSIBILITY investment , which is programmed Target 4. Ensure that 98% of the population to continue, should more than allow live within 400 metres of a bus stop the indicator to meet its target. that is served by a route with a Target 14b Increase the number of buses with frequency of at least 4 buses per low floor platforms hour during the day. On track This indicator has seen continued On Track This indicator is measured through growth through the plan period accessibility mapping software facilitated by the bus quality (ACCMAP) and updated with public partnership between the council transport service data. The and the majority operator, First in modelled accessibility has risen Bristol. As the council has from the base of 87% to 89%, which implemented bus priority schemes, is on course to meet the long-term full showcase routes and 98% target for 2010. This indicator enhancements to bus information, will be reviewed as part of the the operator has complemented ongoing work into accessibility, and this with investment in new low new indicators will be formulated

| Bristol Local Transport Plan – Annual Progress Report 2004 | Appendix C | 49 | | Report on status of targets and indicators |

floor vehicles, meaning that this SHARED PRIORITY: ROAD SAFETY indicator is currently ahead of its Target18Reduce the number of cyclists KSI in target trend to meet 40% of the bus road traffic accidents by 2012. fleet being low floor by the end of the plan period. Not on It is very welcome to note that Track whilst general cycling levels are Target 14c Increase the number of stops increasing the rate of cyclist KSI’s equipped for low floor bus use by actually fell in 2003/04. However, an average of 50 per year this decrease was not enough to On track In partnership with target 14b bring the indicator back on track to above, the council is investing in meet the target. To address this and upgrading stops, both on the other road safety indicators the showcase routes and in other areas council has re-prioritised resources of the city, with raised kerbs to to enhance investment in road complement the growing low floor safety, as well as confirming its bus fleet. The number of low floor commitment by signing a local bus stops has risen by 91% since public service agreement (PSA) with 2000/2001, and the investment government on road safety, programme is on track to continue stretching the target, and further delivering this improvement. strengthening the many measures aimed at improving road safety. TargetPercentage of total length of BVP178 footpaths easy to use by public Target 19 Reduce average traffic speeds in the city by 5mph by 2005. At strategic On track Although not an original LTP target, sites across the city to improve road this Best Value indicator is closely safety. allied to the plan’s objectives for improving accessibility and On track This indicator was set out in the improving pedestrian facilities. The original LTP to measure mean traffic public rights of way network in speeds at selected accident sites Bristol is a very valuable resource across the city. Measures to improve for providing direct and attractive road safety including the work of pedestrian routes across the city. the Safety Camera Partnership, have Because of these links, the indicator succeeded in reducing mean traffic is included here. The indicator is speeds at these specific sites by 8% measured annually using a random since the base year of 1999/00. The sample of part of the footpath current absolute measurement of network, and this survey has shown the indicator is slightly higher than the improvements brought about the target trajectory, however the by investment during the first three margin of error applied to the years of the plan, and is currently on automatic traffic counts used to track to meet its target of 76% of monitor these sites (+/- 5%) means the network easy to use by that the results are within the range 2005/06. of the target trend and are considered to be on track.

| 50 | Appendix C | Bristol Local Transport Plan – Annual Progress Report 2004 | | Implementation Progress 2003/04 | APPENDIX D | 3 SP 04/05 xpenditure E 2,423 610 1 03/04 d er LITY 4 = ROAD SAFETY LITY 4 = ROAD BI ts from the European Commission, from the council’s own financial resources, and from own financial resources, the council’s from Commission, the European ts from n capital programme. Much of this programme was funded from the government funded from was Much of this programme capital programme. the through

ed very useful in the pasted very much of the as a building block for and is required stakeholders for v Implementation Progress 2003/04 Progress Implementation as formally launched in December 2003, accompanied by a widespread leaflet by a widespread launched in December 2003, accompanied as formally The project to local residents. drop has ollowing considerable consultation with residents, the key Parson Street Parson the key with residents, consultation ollowing considerable re-built substantially was gyratory a incorporating omprehensive pedestrian facilities, in order to improve a location with a previous high accident with a previous a location to improve in order pedestrian facilities, omprehensive record. aised kerbs provided along the route in 2002/03. Furthermore, high profile bus stop poles and flags were also installed at bus stop poles and flags were high profile in 2002/03. Furthermore, along the route provided aised kerbs all the whole gyratory, delivered 8 new pedestrian crossings and provided a new, high quality bus stop on the contra-flow section. high quality bus stop on the contra-flow a new, and provided 8 new pedestrian crossings delivered the whole gyratory, The mini-roundabout at signals and with traffic replaced junction was Brow the busy A38 Cheltenham Road/Cotham c highly popular and proving area, retail the Gloucester Road to serve provided shoppers was high quality car park for A new, 200 shortserving approximately motorists per day. stay Time’ at 30 new `Real provided were Over displays (RTI) information In of bus arrivals. predictions stops giving accurate key Time’ `Real also equipped to provide were 75 route on the parallel addition to the 76/77 service, vehicles predictions. As part also been equipped with `Intelligent buses on the 75, 76 and 77 services have package, of the RTI Priority’ equipment, to benefit running vehicles enabling late time at additional green from the majority of signal junctions along the route. at provided New bus stops were Street Parson stops were In addition, existing area. retail and serving the Gloucester Road treatment surface bus stop cages and red with enlarged improved This is in addition to the existing to deter illegal parking. r with network and supporting in full colour re-formatted were and bus stop timetable displays stops along the route, information. the following The project and including 3 new signalised bus gates of new peak period and 24 hour bus lanes, 3 kilometres delivered supporting restrictions. parking and waiting F distance by 0.5 kilometres, their journey This has enabled inbound buses to reduce lane. bus and cycle new contra-flow ov signal control traffic In addition, this scheme upgraded of 2 minutes per vehicle. time saving journey an average delivering Bristol’s firstBristol’s and Hartcliffe the city centre the 76/77 services North and South on the A38 between Henbury, Showcase routes, w a step change improvement of schemes to provide a package delivered and also to of bus travel, in the quality and reliability include implemented features During 2003/04, key along the route. pedestrians and cyclists for facilities improve significantly omplete 75/76/77 upgrade, design omplete 75/76/77 upgrade, ehicle monitoring equipment. C A420/A431 work for and survey will The following Showcase Corridor. A420/A431 be phased over2003-5: Service kerbs; priority design and raised on orbital routes; 54; Stop upgrade at of 24 hour clearway Implementation on- bus stops; Southmead interchange; v BUS QUALITY PARTNERSHIP BUS QUALITY Project Area Output& Programmed 2003/04 WIDENING CHOICE 1. BUSES Implementation Progress 2003/04 Progress Implementation expenditure) programmed ‘04/05 are for in £000s; figures figures (Expenditure SHARED PRIORITY: RELEVANT SP = REFERENCETO INCLUDING 3 = ACCESSI AIR QUALITY IMPACTS 2 = ENVIRONMENTAL 1 = CONGESTION table sets outThe following the detail of transport investment schemes carried out the council’s in Bristol 2003/04 funded from local transport but settlement, a significant element specific government funded from was (such as Urban Bus Challenge), gra grants of this table is not provision with developers. agreements a requirement APR guidance, but of this year’s has pro the information in this document. summarised elsewhere information

| Bristol Local Transport Plan – Annual Progress Report 2004 | Appendix D | 51 | | Implementation Progress 2003/04 | 2 3 2 3 SP 04/05 76 230 1 34 1 xpenditure E 03/04 (Revenue) s w- Implementation Progress 2003/04 Progress Implementation ith regard to the A420/A431 route, preliminary discussions have been held with local stakeholders with regard to initial with regard been held with local stakeholders discussions have preliminary route, to the A420/A431 ith regard ybrid with low carbon emissions. 2003/04 also saw the purchase of 10 Real-Time Information (RTI) displays for installation in installation for displays (RTI) Information of 10 Real-Time ybrid with low carbon emissions. 2003/04 also saw the purchase xpansion to other schools in the city. ouncillors, the public, operators, interest groups and the Traffic Commissioner. The approach taken has been to set taken The approach interest the public, operators, ouncillors, Commissioner. definitive Traffic and the groups are continuing with the main commercial operator, First operator, with the main commercial continuing are about in Bristol Ltd, how to implement roadside for standards the key information. Approximately 1.5 kilometres of new cycle lanes have been provided as part been provided lanes have of new cycle 1.5 kilometres Approximately in addition to the bus lanes referred of the route, using the northern the number of cyclists section of the route As a consequence, also used by cyclists. which are to above by 8% between April 2003 and 2004. during peak periods increased First by the operator, delivered the 76/77 service were for New vehicles super lo are The vehicles in July 2003. in Bristol Ltd, of the engine to a diesel-electric conversion in June 2004, following delivery in 2003/04 for purchased midibus was A low-floor h 2004. The pilot Bus’ `Yellow in June 2003, using an American- serving project, Henbury school in North operation Bristol, commenced by Firststyle bus owned and operated in Bristol under contract It to the Council. close working with the Council’s involved Department 17,000 single passenger journeys over During the year Learning, the school and parents. and Lifelong of Education by to facilities journeys 113 separate used for was In addition, the vehicle home-school travel. made on the service for were amongst Behaviour other schools in the area. The school good with no reported damage to the vehicle. pupils has been very and it levels attendance has reported improved that is estimated by undertaken previously 32% of trips on the bus were The project car. private and/or operation will determine its future July 2005, and an ongoing appraisal until is due to continue e Transport with the Bristol consultation extensive in July 2004 following approved local was The finalised Strategy Forum, c in line with best of information, all basic forms for and challenging standards than current rather practice Discussion practice. floor double deckers, accessible to wheelchair users, with reduced exhaust with reduced accessible to wheelchair users, floor double deckers, emissions and CCTV. wheelchairs and pushchairs on to low access for to enable level kerbs In addition, a further equipped with raised 50 stops were prior to commencement been in the city centre, The majority of equipped stops have floor buses. on the second of works in 2004/05. the A420/A431, Showcase route, week a 7-day by 12% over on the 76/77 has increased Patronage encouraging. has been very Initial monitoring of the route by the operator undertaken surveys 2004). Passenger 2003 to May (year May comparison, – Friday on year and 16% Monday thathas demonstrated 1,200 cars per week removing car, undertook by private their journey of new users previously one third The growth has not network. highway the city’s from been as a result other routes. from of transfer W including bus journey work has been undertaken, survey Preliminary in partnership the route, with the operator. options for non- to speed up scheme design. A targeted, survey of a detailed topographic and the completion surveys time and reliability 2004. is scheduled for programme consultation statutory Insufficient the 54 service and it to Showcase standard, in 2003/04 to upgrade available were resources that is expected this in 2005. will follow upgrade AL BUS INFORMATION STRATEGY AL BUS INFORMATION C TY CENTRE BUS SERVICE BUS SERVICE TY CENTRE PGRADE - Phase 1 Upgrading city centre services with new city centre Upgrading together with low floor vehicles Links bus stop infrastructure. upgraded and Air Quality Action VIVALDI with 2 years). Plan (phased over CI U SCHOOL BUS PROJECT PILOT Henbury School Scheme LO Project Area Output& Programmed 2003/04

| 52 | Appendix D | Bristol Local Transport Plan – Annual Progress Report 2004 | | Implementation Progress 2003/04 | 3 4 2 SP 04/05 378 250 1 xpenditure enue Revenue funds funds E v 03/04 Re Implementation Progress 2003/04 Progress Implementation ansport the hour’ with buses departing ‘on and the Police, Forum ‘half-past 0000 – 0600 instead of the previous from the ompletion of elements of the Lamplighters Marsh Environmental and Landscape Management Marsh Environmental of the Lamplighters ompletion of elements Plan in 2003/04 has included xpansion of the 1300 space site which is presently operating close to or at operating xpansion of the 1300 space site which is presently capacity] erbs to facilitate access and the realignmenterbs to facilitate bus shelters and stop solar-powered bus docking. New, to improve of lay-bys unding reallocated during the year to Road Safety. Expansion of Portway Park & Ride will be considered in a future capital in a future & Ride will be considered Park of Portway Expansion Safety. to Road during the year unding reallocated onsidered by the Inquiry Inspectors. onsidered otal patronage on the Portway 902 service in 2003/04 exceeded 190,000 passengers on the Portway 902 service, an increase 190,000 passengers on the Portway 902 service in 2003/04 exceeded on the Portway otal patronage eliability on both the 902 and 904 (Brislington) park ride services. The Redcliffe Way 24-hour bus lane and bus gate, completed in September 2003, has reduced journey times and improved journey in September 2003, has reduced completed 24-hour bus lane and gate, Way The Redcliffe r A planning application supported by the Council has been submitted for a Park and Ride site to serve the A38 Bridgwater Road the A38 Bridgwater and Ride site to serve a Park has been submitted for supportedA planning application by the Council on the detail of application. continuing with the planning authority are Negotiations (south of Bristol) corridor. In 2003/04 a joint & North with Bath East study commenced Somerset of a the feasibility to investigate (B&NES) Council about consideration of the study will be a material The outcome Bristol. bypass and a park ride site to serve Whitchurch including a site in the B&NES Plan. Local and to the M32 corridor, suitable sites to serve study to identify a feasibility commissioned In December 2003 the Council the impact to mitigate measures the sites and associated to access/egress measures identify of the sites on surrounding in supportarea, at representations The study has included site of the Council’s Plan Inquiry. Local the South Gloucestershire being and are been identified sites have junction modellling and demand assessment. Preferred identification/suitability, c T of 57% on 2002/03. in to the corridor, on the approach installed on the M5 and M49 motorways signs were 2003, directional In November including raised along the route, the service has commenced for The bus stop upgrade Agency. partnership with the Highways k poles and flags will be installed in 2004/05. C adjacent of a fully accessible footpath and the laying orchard of a community the planting site. to the Portway F programme. in June 2004 Implemented options for The study will identify in July 2004. study commenced and Expansion and Ride Capacity Park Road [The A4 Bath e night finances an 8-route The Council throughout hourly frequencies bus network, which has been operating the night nightThe city’s evenings. and Saturday between 0000 and 0600 on Friday during 2003/04. [A new reviewed bus services were timetable introduced from 4th June 2004 following consultation with the operator, private security company, the Bristol security company, private with the operator, consultation 4th June 2004 following from timetable introduced Tr hour’ times of 0030 – 0530. As a result An to six per evening]. five the number of service from departures has increased SE RCHA & RIDE SITES ISLINGTON NEW CCTV ISLINGTON & STUDY EXPANSION ISLINGTON IGHT BUSES IGHT ears: The following will be phased over 2 will be phased over The following y A38 BRIDGWATER ROAD PARK & RIDE PARK ROAD A38 BRIDGWATER FOR M32 AND A37 PREPARATION PARK Transport(See 12. Major Studies) & RIDE -MOTORWAY PARK PORTWAY VMS UPGRADE, STOP SIGNAGE, LAND PURCHASE FOR PORTWAY PHASE 1B BR BR BRISLINGTON PLANNING APPLICATION; PU LAND N Project Area Output& Programmed 2003/04 2. & RIDE PARK

| Bristol Local Transport Plan – Annual Progress Report 2004 | Appendix D | 53 | | Implementation Progress 2003/04 | SP 04/05 11 91 100 3 217 240 3 xpenditure E 03/04 In tions Implementation Progress 2003/04 Progress Implementation tinual monitoring is undertaken of service passenger and revenue data. A total of 66,115 passengers were carried between A total of 66,115 passengers were data. of servicetinual monitoring is undertaken passenger and revenue tinued development Bus Project of the Inner City Community aimed at and Easton of Ashley based in the wards improving n n ansport, the tourist major tourist board, This sets out Board. and the attractions the current of of provision level oaches set up. down/pick esidential and health services, the conventional public transport the conventional and health services, esidential The and other facilities. training network, employment, or the following demands: setor the following short attractions, down and pick up for parking, and long stay overnight parking and touring acilities for coaches in Bristol and, the context coaches acilities for op considering facilities, coach of demand for categories of the differing The focus of the projectThe focus and Southmead. of Easton wards in the socially-deprived is health centres in the autumn of 2004.] in April 2004 and will launch Easton [The service started to Southmead Health Centre Tr f f c September 2003, two new vehicles were provided by the Council to facilitate full city wide operation. Total revenue funding for revenue Total full city wide operation. to facilitate by the Council provided were September 2003, two new vehicles £500,000 per annum. Dial-a-Ride in the city exceeds additional service supported by South Gloucestershire Council has also commenced to provide a link between central Bristol, a link between central to provide has also commenced additional service supported Council by South Gloucestershire Yate. and Stoke Bradley Co 2004. 2003 and 20th May 30th May of the service city-wide. making the provision to the final 6 wards, extended In April 2003, Bristol Dial-a-Ride services were Link Ashley/Easton Co access to employment caused by the M32 problem the severance services and addressing community education, areas, and the service with Bristol City Council in conjunction has developed made up of local residents A steering group motorway. at Community local organisations HeartTransport and Bristol Community launched in June 2004 under the [the service was name “Usbus”. WestKnowle Link Service Community throughoutStarted bus service operates in April 2003, this community West the Knowle between links of Bristol offering area r and made 5,600 trips and those on low incomes, service prioritises elderly people and disabled people, single parents 2004. April 2003 to March passenger trips from during 2004/05.] further take-up of the service to encourage [Further is being undertaken promotion Bristol Dial-a-Ride Development of the dual purpose project throughout appointments health centre disabled people to and from to take the day. Withywood and Hartcliffe Withywood. and Hartcliffe bus service for a community A successful Urban Bus Challenge bid for scheduled operated [Launched in April 2004, this is a locally led scheme to establish sustainable and accessible, community The service will provide areas. Withywood and in the Hartcliffe facilities with community minibus service linking residents social exclusion.] experiencing bus network to those currently to the mainstream and links access to facilities managementA coach of Passenger the Confederation operators, with coach in consultation has been produced strategy NG FACILITIES RKI H MANAGEMENT AN BUS CHALLENGE B AC er 2 years. est Link Service, Dial a Community ommunity Transportommunity to be phased eplacement Bristol Dial-a- for Vehicles eplacement Bristol for vehicles Ride, allowing service to be extended to Ride, allowing service to be extended funding secured). (revenue all wards R C ov R STRATEGY/COACH PA UR schemes supportedThree under Urban Knowle Bus Challenge( Ashley-Easton, W Ride). CO Project Area Output& Programmed 2003/04 3. TRANSPORT COMMUNITY

| 54 | Appendix D | Bristol Local Transport Plan – Annual Progress Report 2004 | | Implementation Progress 2003/04 | SP 04/05 3203 118 86 1 xpenditure E 03/04 . gy. Implementation Progress 2003/04 Progress Implementation tribution for a new entrance canopy at a new entrance at tribution for similar improvements up for been drawn have In addition, proposals Montpelier. onmouth – Filton freightonmouth – Filton significant any easily, relatively be implemented could passenger services, line for enhancements n ouncil Liaison oad. In liaison with Bristol City Football Club, a pay & display facility for up to 40 coaches has been launched at up to 40 coaches for facility & display a pay Club, oad. In liaison with Bristol City Football Gate Ashton onsultation paper on a strategy for Community Railways (February 2004) which includes the Severn Beach line. Whilst Beach line. 2004) which includes the Severn (February Railways Community for paper on a strategy onsultation esponds to policy consultations from the SRA. Recent the SRA. from esponds to policy consultations report the RPC’s are examples of the South Coast the future into to In line with the conclusions of the strategy, free on street free of the strategy, In line with the conclusions on Cumberland has been introduced 20 coaches parking for coach R As part police and disability groups Board, the Broadmead major attractions, organisations, with trade In consultation of the refurbishment an extensive has undertaken the Council review ongoing taxi ranks on the 3 new ranks and introduced of ranks taxi hailing points 4 new experimental hours on a further 2 ranks. the operating as well extending Whiteladies Road, A4018 in the city centre. introduced were Studies lines consultants’ - Filton Beach and Avonmouth The Bristol – Severn consultation study reported in Summer 2003 following Itwith local people and user groups. that concluded although a number of service improvement including use of the options, Av recommended The consultants in subsidy per passenger. long-term increases substantial, service would require to the existing that and modest facilities with further service, to station combined of the existing enhancements marketing effective more of strategy The study supports the council’s in the short-to-medium term. cost-effective would be more service improvements, Enhancements Station enhancementStation schemes at timetable poster seats, including new shelters, Bedminster and Montpelier, Stapleton Road, with a developer Trains, Wessex and funded by the Council in Summer 2003, jointly completed panels and signage, were co in Summer 2004. to be commenced local stations the remaining C and government the SRA companies, operating to liaise with the train continues The council and to frequency in relation and to pursue the joint policy matters, company and train national services, timetabling of local and regional strate local rail The council regularly participates in investigations carried out participates in investigations regularly The council Passengers’ by the Rail England, and Western for Committee [Further facilities are presently being investigated with a view to cater for longer term requirements]. for with a view to cater being investigated presently are [Further facilities station upgrades in partnership with Wessex Trains, and provides a useful basis for assessing the practicality and cost- assessing the practicality a useful basis for and provides Trains, Wessex in partnership with upgrades station if current service expansion options for of possible longer-term effectiveness passenger growth is sustained. r and the SRA’s should be improved, believes [now published in April 2004] which the council route Wales Bristol and South c railway’acknowledging the merits of ‘community about concerns has raised the council approach, the relationship line and the restbetween this urban branch and management standards network if separate rail of the local and regional is awaited. process of the consultation The outcome applied. were practices Street to Henbury in December 2003, which passes Parson Hartcliffe from The launch of the showcase bus route in station to and, in particular, interchange suburban bus/rail and promote to improve the potential south Bristol, has highlighted service at train enhance the low frequency been have Representations the city. which is on the main line across this station, at trains in stopping more advantages who acknowledge the potential Trains, Street Parson Wessex made to liaising and are to the major improvements to achieve Despite the lack of resources to pursue this objective. and the SRA with Network Rail useful benefits. changes to produce incremental cost-effective to make keen are and the operator local network, the council tribution to studies required for for tribution to studies required n ail Passenger Partnership bids. Partnership ail Passenger Upgrading of ranks. Upgrading and passenger facilities Upgrade co R Project Area Output& Programmed 2003/04 4. HIREVEHICLES AND PRIVATE TAXIS 5. RAIL ENHANCEMENTS

| Bristol Local Transport Plan – Annual Progress Report 2004 | Appendix D | 55 | | Implementation Progress 2003/04 | 2 3 SP 04/05 01 xpenditure E 03/04 s ion Implementation Progress 2003/04 Progress Implementation ail Service Support xisting service frequency and will apply until the end of 2006 or commencement and will apply until xisting service frequency During this time the of a new franchise. onstruction of an additional platform atonstruction of an additional platform in June completed in early 2004 [and was which commenced Wood, Abbey Filton A useful side-effect the city and beyond. ommuters across line-speeds and work to improve has been the preparatory ouncil will review its role in supporting local rail services and make further representations to the SRA regarding the inclus regarding to the SRA further services in supporting representations and make its role local rail ouncil will review of Suburban Bristol Railways. and Friends Trains Wessex olour and is distributed widely with the assistance of or 3 years, from Spring 2003. A detailed business plan has been drawn up and agreed between the funding partners, and between the funding partners, up and agreed Spring 2003. A detailed business plan has been drawn from or 3 years, A more major benefitA more Junction and of Filton by the re-modelling services will be achieved to local and longer-distance c employment and surrounding 2004]. Although the station it is in South Gloucestershire, area for is a major destination c during main working periods. route being used as a diversionary loop which was – Filton signalling on the Bristol – Avonmouth R depot on identifying Much useful work has continued and Property Ltd with Rail land purchase negotiating location, in future. which will enable a trial to be implemented over-bridge, the Cumberland Road strengthening The council has re-negotiated the Service Agreement with Wessex Trains for the revenue support the Service Agreement the revenue has re-negotiated for The council Trains Wessex service on the with of the weekday The new agreement 2004. in March due to expire Beach line, which was Severn to enable includes a performance regime The agreement of service if the standard is unacceptably poor. to be reduced subsidy payments of the continuation ensures e c franchise. Western of supported services in the new Greater and timetable leaflet an information produces The council This is now in full Beach line each summer. the Severn promoting c Heart Line of Wessex which supports chairs the Heart the currently The council Trains Wessex of local authorities and Partnership Rail Wessex of development route. and commuting and a tourism, leisure railway line as a community Weymouth of the Bristol to in the appointment in 2002/03 resulted Agency A successful funding bid to the Countryside Officer of a full-time Partnership f use, furthering social inclusion and boosting local economies. The line provides urban residents – especially those who may urban residents The line provides use, furthering social inclusion and boosting local economies. not their own transport have trips to the coast - with opportunities for the smaller and enables people from and countryside, towns and villages to visit and Bristol without in Bath the major shopping, and health facilities leisure The using their cars. that while recognising destination, as a leisure the whole of this 87 mile scenic route promotes partnership effectively the to car- as an alternative journeys work-related used for Bristol is also heavily and into northern Bath end of the line through borne commuting. The Heart has set Officer Partnership Rail Wessex of representatives local people and community to involve up a liaison group and interestalong the line in work of partnership. Community to the invited by the line are served in the area groups The partnership also administers a work. on the partnership’s their say enabling them to have annual meetings, partnership’s small grant to the line. related small projects funding for can apply for groups scheme to which local community implementation began in 2004 with work on several community- based projects down the line. By improving facilities on the facilities down the line. By improving based projects community- began in 2004 with work on several implementation stock (particularly rolling bigger trains appropriate to use more the operator encouraging line, publicising its attractions, it of the line, promoting the profile the partnership raising is actively events, during the busy summer period) and organising tribution towards vehicle costs. vehicle tribution towards ISTOL ELECTRIC RAILBUS ELECTRIC (BER) ISTOL n BR Depot building, and stations co VIVALDI. from Additional Contrib. Project Area Output& Programmed 2003/04

| 56 | Appendix D | Bristol Local Transport Plan – Annual Progress Report 2004 | | Implementation Progress 2003/04 | 3 3 4 4 4 4 SP 04/05 13 1 508 311 100 3 147 0 3 172 40271 3 100 1 xpenditure E 03/04 g Implementation Progress 2003/04 Progress Implementation ompletion of new shared use cycle path linking Cabot path use cycle ompletion of new shared to A403, part Park 4; of NCN Route ollowing submission to Government in December 2002, to Parkway) (Bristol City Centre route the revised E for of the Annex einstated and landscaped. The pedestrian at-grade controlled crossing facilities have been upgraded. The improved facilities The improved been upgraded. have facilities crossing controlled The pedestrian at-grade and landscaped. einstated F of This work included the incorporation in dialogue with DfT. the scheme appraisal to develop continued the City Council Governmentemerging refinement of Optimism Bias as well general guidance and application of the and optimisation design continued. and detailed route safeguarding In addition, route appraisal. of a replacementInstallation disabled people at for landing stage and new disabled access ramp SS Great again Britain was with compatibility and the need to ensure user requirements with the historic harbour, due to design issues associated delayed re-developmentplans for at of the visitor facilities and aesthetic the physical the site. Amended detailed plans to address 2004/05 beyond has now been deferred implementation However, up. been drawn with the site have associated problems due to budget the full scheme until facilities to the existing improvements interim the Harbourmaster will make constraints; at similar facilities up to provide also been drawn Initial plans have can proceed. landing stage, which is in Scotia the Nova urgent but need of improvement, at implementation It further this site has also been postponed until funding is available. is thatnow intended of the landing stage at renewal the SS Great over precedence should take Scotia the Nova Britain due to the being carried out improvements interim with the harbourside developments. in connection there at (near the junction with Quickthorne Close), and pedestrian subway Avenue installed on Oatlands crossing puffin Surface stopped up and closed. this location has been been demolished and the area have structures The associated decommissioned. been completely have The subways r will be strategy The junction control times. crossing include wider pedestrian islands and detection to extend the net all users and will have of the junction for the efficiency This will increase to MOVA. further upgraded effect of reducin (jointly to fully accessible standards into improved Service to fully integrate public footpath One existing with the Parks adjacent and Junior Schools (West access to local Infants free traffic Lane) also provides Route fields). playing Town assessment design and environmental Preliminary carried out works Way. of on 3 other Rights C throughout implemented of smaller measures A range lanes. Leaflet and; cycle the city e.g. parking, stop lines, cycle advanced prior to scheme implementation. consultation community for produced design work carried outPreliminary in the city (Leaflet routes on 4 schemes radial consultation): community for produced Feeder; Park; linking to Eastville to Stapleton Road - improvements Greenway • Frome Northern through Park; use path shared to provide canal side route of existing – upgrade • Route Although not part has been operating service in the City Docks waterbus commuter an enhanced weekday of this project, under contract that of the service revealed 2002 as an experiment. A review since May to the council of despite low levels to agreed 2004 the Council been growing, and in February passenger numbers have overall on some journeys, patronage the a new contractaward a further 2 years. for this service to continue for pedestrian waiting times. pedestrian waiting ON WAY SUBWAY CLOSURES SUBWAY WAY ON LING ansport Act Works & procedures. our NCN further Sections, greenway Additional funding for continuing Additional funding for development of the scheme including Tr to landing enhancements General stages. and of Quickthorne Subway Closure of P1-2 new starts on route provision Crossing. in 2003/4uffin improvements F schemes, contra-flow enhancements, parking, signing and small scale 2003-5 to be phased over measures period EAST WAY PUBLIC OF RIGHTS new to 2-3 PROWS, Improvements project preparation Project Area Output& Programmed 2003/04 6. (LRT) TRANSIT RAPID LIGHT 7. TRANSPORT WATER 8. WALKING 9CYC

| Bristol Local Transport Plan – Annual Progress Report 2004 | Appendix D | 57 | | Implementation Progress 2003/04 | 3 4 2 2 3 SP 04/05 52 1 96 100 1 846 500 1 xpenditure E 03/04 Implementation Progress 2003/04 Progress Implementation ompleted through Willmotte Park in 2002/03; Park Willmotte ompleted through c ork has progressed on the implementation of the 36 measures which comprise the VIVALDI projectVIVALDI the which comprise of the 36 measures on the implementation ork has progressed in partnership with ommencement Dock’ in partnership with ‘Mud Centre Resource August expected the Cycle for [completion of site works orum, ITSO and ITS UK and ITS orum, ITSO ommunity travel workers; legal agreement workers; ommunity travel joint signed for access with adjacent of shared home zoning new build. • Crox Bottom – upgrade of existing footway to provide shared use path through open space. Scheme links to route to route open space. Scheme links through use path shared to provide footway of existing Bottom – upgrade • Crox developments Quay Temple and to link Dings Home Zone Path Railway to Bristol Bath • Extension (see 1. Above). also been included in the A38 Showcase bus corridor have cyclists for facilities Improved 229 Adult Sessions Training Cycle Schemes 41 Small Parking at13 Presentations workplaces BiggestBristol’s Ride event Bike successfully held in partnership some 4,000 participants. with IKEA attracting BreakfastBike eventTrust successfully held in partnership with Primary Care – 500 Participants. C 2004]. ‘Bikebuddies’Week. Bike with National in association re-launched software matching a ordered the UK organisations across – 19 large Advice leaflets to other organisations and distribution of Cycle Production bids for building on successful previous proposals, programme used to pump prime EC Sixth Framework These funds are network management on POLIS work includes representation funding. Related and membership of Smart committee, Card F W Bristol Dial-a-Ride, FirstWest of the and the University Sustrans Group, The project of England. the funding from attracts in 2003/04 include:- achievements partner other European cities. Key with four and is co-ordinated Commission European of 10 ‘i+’ of installation - Completion and launch of transport kiosks information channel in June 2003. information fleet Council into introduced offices - 5 electric pool cars serving city centre 2004. March - Launch of internet in (www.travelbristol.org) time bus passenger information planner and web based real journey intermodal July 2003. TravelSmart- assisted by First. in October (2,500 people) undertaken 2003 with Sustrans phase 2 campaign in Hartcliffe by engendered and stakeholders with the participation of residents Dings Home Zone, for - Detailed design completed c and procurement- Consultation freight of Broadmead operator for undertaken scheme. consolidation & Ride element launch of Park for & Ride and parking smartcard scheme being progressed - Park in July 2004. agreement- Partnership signed with NorthTrust Bristol NHS and First of schemes promoting of package implementation for to Southmead hospital. sustainable travel Support of the Bristol Car detailed including the expansion a number of other schemes separately for has also been provided developmentClub, schemes in the Barton and cycling Hill of walking and a package of the service 76/77 showcase bus route, areas. and Hartcliffe total of 12,750 leaflets. elsmart campaign phase 2 in LE PROMOTION cleWest Agreement, Service Level av orum and ITS UK. Budgetorum and ITS includes to build upon previous successful to build upon previous Membership of Smartprojects. Card F costs. staff 'Pump priming EC Sixth Framework bids priming EC Sixth Framework 'Pump CYC Cy Bristol's Biggest Ride, cycle Bike maps/publications. VIVALDI project VIVALDI of Implementation of including progression measures project under the 8 key elements 2003/04 include the for Works themes. development of the Dings Home Zone, launch of initiatives, clean vehicle & Ride smartcard, parking/Park Hartcliffe, completion of the internet completion Hartcliffe, developmenttrip planner, of transport and freighttelematics systems. Tr Project Area Output& Programmed 2003/04 10.EUROPEAN INITIATIVES TRANSPORT

| 58 | Appendix D | Bristol Local Transport Plan – Annual Progress Report 2004 | | Implementation Progress 2003/04 | 2 3 3 2 SP 04/05 55 40 1 347 1 107 60 1 xpenditure E 03/04 . Implementation Progress 2003/04 Progress Implementation and micro-models being enhanced for detailed assessment being enhanced for and micro-models in city centre. proposals of major highway

RN dons and environmental impacts. This work aided the assessment impacts. dons and environmental of the scheme. TU r eightWest Business Board, with Broadmead in consultation scheme developed consolidation and other as also tested. In addition partnership working with the Driver and Vehicle Licensing Agency (DVLA) enabled an investigation (DVLA) Licensing Agency Vehicle as also tested. In addition partnership and working with the Driver allington Road Link Study deferred pending outcome of GBSTS. of GBSTS. pending outcome Link Study deferred allington Road ommission. Fr stakeholders. supported project Commission this European Bristol is co-ordinating and the effectiveness and evaluate to demonstrate urban transportacceptance of integrated transport pricing schemes to achieve The 8-city project revenue. and raise goals will bestprovide and experiences of schemes. Results implementation and cities considering policy makers for examples practice 2004. in February conference including an international widely, disseminated are and the DepartmentThe Council Transport for (DfT) project undertook a demonstration in Bristol as part project The demonstration of the DIRECTS Programme. Systems) Telematics End-to-End Charging Road-User of Interoperable (Demonstration to charging scenarios related technology fleets testing the use of satellite for commercial from vehicles 50 volunteer involved of contract year Second ‘Smart with providers Moves’ and significant new areas into Club extending saw Car growth in on-street 5 dedicated membership. 2004/05]. Five scheduled for [10 more with residents cosultation installed following bays as a result planning agreements through cars secured and three additional bays land-use planning car clubs into of integrating procedures. access and demand assessment & Ride Site appraisal, M32 Park Plan Local submission to South Gloucestershire for completed Inquiry (see 2. Above). Close involvementTransport Bristol Strategic with the Greater stakeholder including contributing as a key Study (GBSTS), funding. Existing development and in use for acquired and software hardware New computer LTP. the second for of policy and projects C & North with Bath East bypass study jointly Whitchurch & Ride and A37 Park Somerset being progressed currently Council [to reportwith consultants summer 2004]. A small number of routes around Bristol were selected by DfT and the potential of interoperability with a city charging scheme with a city charging selectedof interoperability by DfT and the potential Bristol were around A small number of routes w enforcement for cameras recognition number plate the use of Automatic into using both mobile units and of such schemes, reported in project were Results in the city centre. located cameras static been accepted by the which have deliverables, C the viability of wider with modelling work considering the city continued scheme for charging of a road-user The investigation co Increased marketing and awareness programme underway. underway. programme and awareness marketing Increased SA tribution to Greater Bristol Strategic tribution to Greater n er the 2003-5 period: omputer hardware to support omputer hardware oad Link study ehicles and electronic enforcement ehicles and electronic echnical Studies/Consultation for LTP; for echnical Studies/Consultation onsultants through the project through onsultants as part Based on the following, and phased obustness of impact assessment to esearch programme. This will trial GPS programme. esearch Meet current requirements contractual Regulation Traffic of the costs and cover and other legal work Orders PROGRESS DEMONSTRATION PROJECT DEMONSTRATION PROGRESS will be The PROGRESS demonstration in co-operation this year undertaken the DIRECTS with the DfT through r equipment commercial on volunteer v by This will be evaluated technology. c This work this year. of the activities for with the ongoing is closely associated Further of RUC in the city. investigation the work in 2003/4 will ensure r meet DfT audit requirements, and and awareness promotion development consultation of formal strategy.' ov and Ride Study (with B&NES); A37 Park and Ride Studies; M32 Park T Co Study; C software; Saturn/Accmap Model Callington Micro City centre R & Ride Study A37 Park Project Area Output& Programmed 2003/04 11.CAR CLUBS 12 MAJORSTUDIES TRANSPORT

| Bristol Local Transport Plan – Annual Progress Report 2004 | Appendix D | 59 | | Implementation Progress 2003/04 | 4 1 4 1 4 SP 04/05 30 3 182 500 1 xpenditure E 03/04 ol. Implementation Progress 2003/04 Progress Implementation • Traffic control schemes were carried out schemes were control Traffic • which involved: • 28 Bus Priority sites. control added to MOVA • 7 sites were including 3 new regions control • 6 to UTC failures. performance during comms on 40 junctions implemented to ensure back timings were fall • Comprehensive • Further investment between sites. communication integrated to provide communication / CCTV in SCOOT development• Continuing applications. ITS for information congestion of SCOOT / East• Muller Road control. and SCOOT facilities including puffin new scheme mostly implemented Road Gate Monitoring system. • 16 Sites added to Remote • New junctionat implemented Brow. / Cotham Cheltenham Road installed, • 3 new ‘mid-block’ and Puffins) (Toucans of carriageways crossings • Airport control. and MOVA crossings Modified to include puffin / Bamfield Road Road and Scoot to include full pedestrian facilities 3 junctions refurbished Road, • Falcondale Control. with the current to comply • 32 sites improved Best criteria. (BV165) performance indicator - Key Value Support to the bus showcase project provided works: including the following including Bus priority facilities. operation to puffin • 8 sites converted Street contr • Parson under MOVA all operating crossings to include Bus Priority and Puffin 4 sites fully refurbished Gyratory Draft September 2004] advertising date minor issues. [Proposed resolving in the main agreed, order & decision taken by officers resolved advertised one objection 2003/4. Order received, for included as a new area Bristol Zoo 2004. February powers. Completed under delegated with sealing of order to proceed set advertised one objectionOrder received, under with sealing of order to proceed & decision taken aside by officers powers delegated • 3 bus gates were installed were • 3 bus gates control. of MOVA and implementation New Controller / Sheene Road • Malago Road OLLED PARKING NG RESTRICTIONS REVIEW NG RESTRICTIONS I ersion of city centre leased cabling ersion of city centre TR N nv RK AFFIC SIGNAL MODERNISATION v budget duct (shares with NHS costs onsultations with Ward members now Ward with onsultations egions, emergency event emergency egions, funding. AND CONTROL 2003-5 to be phased over The following period: to convert programme Increased more to puffin pedestrian crossings latestoperation(supports 165 BV targets). Co CO Clifton Village: advertising commencing Village: Clifton North St: informal shortly, c 'carry-overs' to be funded from consentStudies/design/planning 1 for small site TR PA to private cabling to reduce pressure on pressure cabling to reduce to private re network), CCTV camera city centre upgrades, SCOOT/MOVA/CLF upgrades, pedestrian crossing improvement, pedestrian crossing SCOOT revalidate signal infrastructure, r RATEGIC NETWORK MANAGEMENT RATEGIC Project Area Output& Programmed 2003/04 ST 13.URBAN TRAFFIC MANAGEMENT 14.PARKING SPECIAL EVENT

| 60 | Appendix D | Bristol Local Transport Plan – Annual Progress Report 2004 | | Implementation Progress 2003/04 | 3 3 3 SP 04/05 24 3 78 62 1 62 50 2 183 1 101 1 xpenditure E 03/04 Implementation Progress 2003/04 Progress Implementation onsultation in December 2003. onsultation of city centre TravelBristol Info Centre providing a range of transport a range providing Centre Info and services.TravelBristol information of city centre quality data. quality data. c orks for column strengthening commissioned March 2004. Delay caused by the need to ensure that caused by the need to ensure 2004. Delay March commissioned strengthening column for orks the design solution was ansport a new ‘Concordat’ and has agreed Direct, Transport with Direct to permit database. SW Traveline the use of ompletion of detailed design, commissioning of materials for signing scheme commenced. for of materials ompletion of detailed design, commissioning ttractors. xtension of pedestrian scheme to Bedminster/Southville areas of inner Bristol completed. areas xtension of pedestrian scheme to Bedminster/Southville completed. xtension of pedestrian signing scheme to Clifton W budget.within the allocated user requirement an extensive • Following and First by the Council and occupation refitting for a licence prepared exercise, and air time congestion real outputs and definitions to serve to use common work in progress integration • Systems E C E Enhancement sign’ of ‘brown signing to tourist and key Bureau Tourism in partnership completed with Bristol attractions a completed. hierarchy of road reclassification Map of proposed for bus stops database national to develop projects and NPTIG has fully participated in NAPTAN During 2003/04, the Council Tr First supplier from successfully changed call centre and significantly The Council Masters, Information Telephone to Info service performance as a result. improved to set initiative Traveline lead the national the major bus operators The Council after SMS service with KIZOOM up a national of ‘Don’tProduction Bristol’ Choke and other local employers and wide distribution through listings and activities brochure outlets. Involvement events: awareness in 3 travel Alive’‘Streets – partWithout Town of ‘In Car’; My – also part closure School road Gate Ashton Without Town of ‘In and, Car’; My Resolution’Years ‘New event Bristol ‘Galleries’ in the central Shopping Centre. SupportTransport Neighbourhood based schemes through to 10 community/neighbourhood Initiatives. withdrew, and took on the Chairmanship of the national Traveline Data Working Group. Working Data Traveline and took on the Chairmanship of national withdrew, to ‘professionalise’ the medium term strategy has developed The Council management the data task by the appointment of a Bristol City and North Somerset. to cover Co-ordinator full time Data third • TravelBristol Info Bus mobile clean fuel transport Info TravelBristol • launched and first vehicle information used at Home Zone Southville (ITIC) tinuation of South West of South tinuation Traveline n ENCHARD STREET ANSPORT INITIATIVES) ANSPORT ents and campaigns including 'Don't ents ansport and Network Initiatives ompletion of technical specification. ehicular strategic signing design/ ehicular strategic ompletion of scheme design C of systems. Site selection. Integration on information Launch of congestion and internet. Advice Screen Travel the Development Bus providing of Info New web- information. mobile travel provision. based information V signing pilot Suburban ped./cycle c Co project. activities, awareness On-going travel ev Bristol' and supportChoke to 'Streets Neighbourhood Mapping info, Alive', Tr TR to enable strengthening Phase 2 works measures safety of columns/essential in 2003 CENTRE CENTRE (INC. NEIGHBOURHOOD TR Project Area Output& Programmed 2003/04 INFORMATION TRAVEL 15.INTEGRATED 16.LEGIBLE CITY INITIATIVE 2000 17. PTI AWARENESS 18.TRAVEL

| Bristol Local Transport Plan – Annual Progress Report 2004 | Appendix D | 61 | | Implementation Progress 2003/04 | 2 SP 900 4 04/05 01 1322 17 40 1 ost oss r c 562 100 4 xpenditure E (G 03/04 Income) includes n n Implementation Progress 2003/04 Progress Implementation of Excellence; hosted third Air Quality Action Planning conference. Air Quality Action Planning conference. hosted third of Excellence;

re el Plans were secured for 29 developments, 14 by s.106. Of these, 12 were business related. 14 by s.106. Of these, 12 were 29 developments, for secured el Plans were el Smart Project Inception/Project Actions. 1,761 households successfully Survey/Marketing Travel Design/Baseline tinued expansion of LPG and electric vehicles within the Councils’ of LPG and electric vehicles tinued expansion fleet. tinued awareness activity including extending the ‘Switch Off’ the ‘Switch activity including extending tinued awareness campaign to include schools. tacted in the Bishopston/Ashley and Sttacted in the Bishopston/Ashley (part Area Andrews items distributed. Information funded by DfT). 10,627 travel ther development and with the LTP linkages including strengthened and Sustainable Energy Protection Strategy of Climate 31 March 2004, work was under way on Staff Travel Plans for 36 separate BCC work places BCC 36 separate Plans for Travel on Staff under way 2004, work was 31 March n n nt r n ork also commenced atork also commenced Road Muller Road/Eastgate av av orporate Steering Group established – work commenced with four new sites within the authority. with four established – work commenced Steering Group orporate oluntary Travel Plans: 5 new employers have made significant have Plans: 5 new employers 4,500 plans (covering Travel travel oluntary in progressing advances etrofitting pollution–reduction devices to buses,- large-scale project large-scale to buses,- devices pollution–reduction etrofitting i by shortfall delayed (55 buses) with local bus company outes to School and other Minor Traffic ManagementTraffic outes to School and other Minor Works. SS funding paid for or contributed towards modernising traffic signals at modernising traffic towards or contributed SS funding paid for 7 intersections along the Showcase Corridor. City Centre brief issued early June and the Accidental Obstruction of the Railway brief is expected in July. Both will report in July. brief is expected Obstruction brief issued early June and the Accidental of Railway City Centre i Air Quality Action Plan. Fu Hartcliffe/Bishopston Phase 1 Travel SmartTravel Phase 1 Hartcliffe/Bishopston Project completed. – 354 interested. – 1,200 households approached Phase 2 completed Hartcliffe/Bishopston Appointment of Council Travel Plan Officer (2 year appointment) – in November 2003, funded from the council’s resources. the council’s 2003, funded from – in November Appointment appointment) (2 year Plan Officer Travel of Council At C V A further 10 medium/larger employers). by at reduced single car occupancy was where the latter achieved Three in bronze/silver/gold. level award reached employers least 10%. New Developments: Tr Tr co Draft and completed was the final AQAP further in October consultation submitted to DEFRA 2003. Following AQAP air quality. to improve of measures programme outlines 8-year submitted. AQAP R Ce has been dialogue under-reporting, and there of severity a historic problem conclusively Study demonstrated The Citywide KSI of this. with DfT to understand the consequences Old Market in July 2004]. [and will be ready been commissioned and M32 Junction 3 studies have [ L Assessment Signal Performance Traffic of junction by the signals identified Modernisation at: completed were Framework Avenue / Filton • Muller Road Road / Saville Road • Stoke / AirportWay • Hengrove Road W Energy Savings Trust Energy Savings in 2004/05]. to commence [This project. with other operators, along with projects grants. Co Co time for consideration for inclusion of any scheme/modification for the 2005/06 work programme.] for scheme/modification inclusion of any for consideration time for Risk Assessment Patrol The School Crossing with Safer planned in conjunction works and remedial complete is substantially R eting shorter through journeys tinuing support plan travel for AL SAFETY SCHEMESAL SAFETY AP measures. 'Centre of Excellence' 'Centre AP measures. C n trol. trol. rg etrofitting projects with fleet projects etrofitting Co amongstinitiatives and employers in Bristol. visitor attractions of the Air and promotion Preparation Quality Action Plan, and of some early implementation particularly joint measures through r future work for preparatory operators, AQ role dissemination MAJOR SCHEMES SAFETY St; M32 Park The Centre; Studies for A420 Old Way: jn3/Newfoundland Market roundabout Way; and Temple School Crossing Study: Citywide KSI Pa SHORTER JOURNEYS SHORTER Ta planning. DfT personalised travel scheme in for funding secures area. Bishopston/Ashley LO signal traffic High friction surfaces, performance assessment (year 2 of 3); based schemes; minor 18 site and route schemes. safety Project Area Output& Programmed 2003/04 PLANS 19.TRAVEL 20.AIR MANAGEMENT QUALITY REDUCTION 21.CASUALTY

| 62 | Appendix D | Bristol Local Transport Plan – Annual Progress Report 2004 | | Implementation Progress 2003/04 | 3 4 4 SP 04/05 604 600 1 175 4 351 680 2 xpenditure E 03/04 Implementation Progress 2003/04 Progress Implementation toria Park Infanttoria Park & Junior Phase 2 onmouth Rd – Environmental enhancement – Environmental onmouth Rd (partially planting grant scheme, tree funded). ells Road/Cemetery Road – conversion of pelican to puffin crossing with mast crossing of pelican to puffin – conversion Road ells Road/Cemetery arm. signals and pedestrian facilities. – new traffic Road / New Fosseway ells Road ork was carried outork was light to install new red Partnership camera wih the safety most and replace and speed cameras of the c xisting cameras in Bristol with new digital technology. xisting cameras epresenting the schools for the new zones were invited to a presentation at to a presentation invited were the new zones the schools for epresenting the beginning of 2004. Other schemes included: W W of signalised junction. – modification Quay Broad Sign. Activated Vehicle Hill - Clanage Road/Rownham at implemented In addition high friction schemes were surfacing prioritised by the number of which were 8 sites, pedestrian/wet/shunt type accidents. W e ‘Kerbcraft’ to be taught skills continued in the first set on the first of 14 schools and work commenced 2 of an additional 9 also carried outschools. Risk assessments at sites. patrol school crossing and by public of engineering design and legal orders, areas shortages in key by staff delayed were Some planned projects to School Schemes implemented: Routes 5 Safer Holymead Junior School project School area-wide Hartcliffe Phase 1 & 2 Air Balloon Infant and Junior Vi Primary School Christchurch at been implemented Advisory 20mph have the This has involved a total of 36 schools. covering the city, 23 sites across signs and repeater flashing amber wig wags signs incorporating 20mph zone of specially designed lamp columns, erection throughout It each zone. that is anticipated each site at for calming schemes will be considered traffic comprehensive a later at zones [More date. due to be installed in summer 2004]. 36 schools are 21 sites covering to comment invited All schools were In addition, all schools were made prior to implementation. were on the proposals felt they how strongly the signs to demonstrate artwork to produce for encouraged about Children matters. safety road r managementMuch of the traffic carried out work to Routes Safer Safety, with Road in conjunction in the city 2003/04 was and other programmes. cycling School, Showcase Bus Corridor, objections to proposals. Statutory consultation is conducted on all traffic orders, however the Council consulted much more consulted the Council however orders, on all traffic is conducted consultation Statutory objections to proposals. meetings with local residents This has involved of schemes. widely than this during the design and prior to implementation and leaflet as part conducted drops on schemes. of consultation wide project School Area on Phase 3 of Hartcliffe Detailed design completed Elmlea Infant for design completed Preliminary Down Infant Junior School and Ashley & Junior School & Av and pedestrian refuge. – Junction narrowing Parade Straits road estate narrow – parking improvements, Walk Spartley throughout completed were of minor lining and signing projects A variety the city. esidual committed expenditure; minor expenditure; esidual committed AFER ROUTES TO SCHOOL TO AFER ROUTES lining and signing and traffic schemes lining and signing traffic support.and staff R S to School Projects Routes 14 Safer period. 2 year phased over SCHOOLS OUTSIDE 20MPH ZONES 16 new schemes. Approximately WORKS Project Area Output& Programmed 2003/04 22.TRAFFIC - GENERAL MANAGEMENT

| Bristol Local Transport Plan – Annual Progress Report 2004 | Appendix D | 63 | | Implementation Progress 2003/04 | 3 4 4 4 3 SP 04/05 01 19 75 2 64 2 489 231 1 xpenditure E 03/04 (revenue) Implementation Progress 2003/04 Progress Implementation terstoke Road Bus Depot Road terstoke n ork substantially complete on a database (TRAMMIS) to assist (TRAMMIS) on a database complete ork substantially This ITC schemes. of traffic process the design/consultation orks were carried out were orks at with developments: in association locations the following ormal consultation has taken place with all relevant Traffic Regulation Orders (TROs) advertised and approved. place with all relevant (TROs) Orders has taken ormal consultation Regulation Traffic esults of site surveys final designs prepared. final designs prepared. esults of site surveys ormulation of a renewed Action Plan and survey work. A wider group of interested organisations from the commercial and the commercial from organisations of interested work. A wider group Action Plan and survey of a renewed ormulation W system will assist in the project with e-government in accordance and consultation delivery management, and Best Value.. W IKEA Cribbs Causeway Road Sandburrows Channons Hill Next Generation Gardens Innox Court Sainsburys Castle Wi South Bristol Business Park Brigstowe Hotel 14 working party meetings with streetThe street representatives. the to help develop liaise with residents representatives development New Build Home Zone Guidelines for now used as the basic principles for These are published by the council. the development through to follow developers both locally and nationally been well received and have process control housing development principles into Home Zone incorporating Liaison with Linden Homes regarding Avenue, Wessex off Horfield. A leaflet retrofit for Requests and selection criteria produced. strategy Home Zone detailing Bristol’s been have Home Zones A Freight government following Bristol and neighbouring authorities, (FQP) for Quality Partnership in agreed was guidelines, setprinciple and a Steering Group The FQP has been endorsed by the work on an initial action plan. up in 2002 to commence Joint in October unitary authorities, of members the four composed Transportation, Planning and Strategic for Committee and discuss the held, to assess progress in April 2004 was meeting, Council hosted by South Gloucestershire 2003. A strategic f included. public sectors are detailed Home Zone and 20mph Zone ideas for each of their streets. Embracing information from working party from meetings and information Embracing each of their streets. ideas for and 20mph Zone detailed Home Zone r showing the final bus (see 15 above) in January 2004 utilising the Information in the local Community Manned displays publication. made following designs for each streetdesigns for included 3D models to assist displayed Information seeking public comments. in the scheme area, understanding. F tinuation of outline consultation tinuation n AFFIC MANAGEMENT - AFFIC MANAGEMENT orks to be completed in 2003/4. to be completed orks eight Quality Partnership one schemes across the City. Budget the City. one schemes across onsultation/ site surveys and TROs are TROs and site surveys onsultation/ Co to work working through and survey outline and detailed design during through 2003. Progress spring/summer autumn works to phased construction of 2004 if outcome 2003/spring c Budgetpositive. costs. includes staff Z costs. includes staff (Residential Street(Residential Improvement) CHALLENGE ZONES HOME Challenge bid. Home Zone Southville and studies in supportSurveys of the Fr TR WORKS Section 106 W DEVELOPMENT ZONES HOME Development and promotional strategy new build and retrofitwork for Home Project Area Output& Programmed 2003/04 23.HOME ZONES 24.FREIGHT

| 64 | Appendix D | Bristol Local Transport Plan – Annual Progress Report 2004 | | Implementation Progress 2003/04 | SP 04/05 xpenditure E 3,665 4,395 4 9,2083,665 5,746 4,395 03/04 12,873 10,141 GRAND TOTAL FUNDING: GRAND TOTAL or footway networks or footway f 2 AL FUNDING 25): FOR MAINTENANCE (ITEM T TO AL FUNDING FOR INTEGRATED TRANSPORT (ITEMS 1 - 24): (ITEMS TRANSPORT AL FUNDING FOR INTEGRATED T TO Implementation Progress 2003/04 Progress Implementation of preventative works to arrest works of preventative and 40,000 m of the carriageway the deterioration 2 New Brislington Bridge repairs, Anti graffiti coating and bridge painting coating graffiti Anti New Brislington Bridge repairs, • Bristol Bridge strenghtening works completed works • Bristol Bridge strenghtening A Commercial Vehicle Drivers’Vehicle 2003 to guide freight published in March A Commercial Atlas, to access routes on to the appropriate vehicles main freight has been the first the Bristol urban area, across destinations achievement practical of the partnership. Its partners in almost has resulted by key successful promotion being distributed to freight 5000 copies and drivers companies throughout the country across has been form, the inclusion of a reply-paid through encouraged which was 2003. Feedback, of this initial ‘demonstration’The publication positive. strongly document project VIVALDI the European funded through was as a pilot freight comprehensive a more for and development updating its future resource; information is now seen as an elementessential work programme. of the FQP’s [Agreement 2004, in Summer/Autumn is expected and partnership working arrangements of a detailed work programme project for be available although only limited funding may work]. surfacing • 4 km of carriageway schemes reconstruction • 135 major footway • 300,000 m • Works on Cumberland Road and Smeaton Road Bridges commenced Road and Smeaton on Cumberland Road Works • Netham Bridge and walls, retaining Cumberland Road incorporating completed, projects bridge maintenance • Five Including Street Lighting, Highway and, Bridge Assessment Maintenance and Strengthening Project Area Output& Programmed 2003/04 MAINTENANCE 25.MAINTENANCE

| Bristol Local Transport Plan – Annual Progress Report 2004 | Appendix D | 65 | | Supplementary Bids | APPENDIX E |

Supplementary Bids 2 Air Quality Action Plan - Supplementary Bid 1 VIVALDI The Air Quality Action Plan adopted by Cabinet This year’s guidance that funding for earlier this year, set out a programme of Supplementary Bids is likely to be extremely measures to address the need to improve air scarce has been noted. The council has in the quality to meet government and European past made two successful bids for guidelines. This programme of measures is over supplementary funding to support European and above the broad range of measures set out Commission funding for the VIVALDI project. in the LTP, which on their own are insufficient to This has secured some £525,000 additional EC meet the air quality targets. Government advice funding for a variety of transport initiatives to in previous years has been that funding for improve the quality of life in Bristol. The council these areas could be sought through was extremely disappointed that its bid last year supplementary bids. Advice the year seems less for continued funding in 2004/05 was not encouraging, and this has been clarified with accepted, particularly when there had been DEFRA and DfT. Notwithstanding this, given the signs that it had found favour. few alternative sources of funding available to the council, a supplementary bid to enable the Given the huge benefits of attracting European implementation of the first year of the Air funding to this project, which is fully supportive Quality Action Plan is herewith submitted. The of the objectives of the LTP, the council chose to bid is for £1.225 million for 2005/06. allocate £500,000 from its Integrated Transport allocation for 2004/05, which has left other Why This Scheme is Needed budgets somewhat stretched this year. For Air pollution in over a quarter of the 2005/06 the VIVALDI project ends early in the geographical area of Bristol is predicted to fail to financial year, and much of the final phase on meet the government’s health-based air quality the project will be focused on reporting rather targets for 2005. Two areas were declared as Air than on implementation. Despite the fact that it Quality Management Areas (AQMA) in 2001 and appears to meet the funding criterion of being a amended in 2003. The majority of pollution in project for which funding has been awarded in these areas comes from road traffic. the past, given the disappointing non acceptance for funding of VIVALDI in 2004/05 Local authorities are required under the 1995 and the advice on the limitations of Environment Act to produce an Air Quality supplementary funding for 2005/06, the council Action Plan (AQAP) to address poor air quality in has reluctantly decided that the resources areas where AQMAs have been declared. The needed to prepare a supplementary bid would Bristol AQAP (sent separately to this APR) was be better utilised in delivering elements of the approved by the Council and submitted to existing project. DEFRA in April 2004. It contains a comprehensive package of measures aimed at reducing air pollution and improving health. The vast majority of pollution comes from road traffic, therefore the AQAP focuses predominately on transport measures. The AQAP aims to achieve the 40% reduction in pollution necessary to meet the LTP and 10 year transport plan targets for air quality, the statutory obligations under the National Air Quality Strategy, as well as contributing to a broader range of transport and environmental objectives. Many of the actions in the LTP are contributing to improved air quality, but not quickly enough to meet the government’s targets. The AQAP identifies 27 measures that will ‘top up’ the LTP to ensure a more rapid improvement in air

| Bristol Local Transport Plan – Annual Progress Report 2004 | Appendix E | 67 | | Supplementary Bids |

quality. Without additional resources to fund later than originally anticipated in the LTP, it has the AQAP it will not be possible to achieve been made clear since the production of the LTP significant reductions in air pollution in the that additional resources for the AQAP would be short term. required, as follows: Supplementary funding of £1.225m is sought to July 2000 LTP highlighted need for additional implement the first-year transport elements of resources in the future once the the AQAP in 2005/06. In order for the AQAP to AQAP had been produced. be effective it will require sustained funding July 2001 APR 1 highlighted future over 8 years. Figure 11 of the AQAP (reproduced supplementary bid for AQAP. at the end of this Appendix) outlines an implementation program for year 1 of the plan July 2002 APR2 - Acknowledged delays to together with an indication of the level of production of AQAP. Expressed funding required to 2011. concern at change of guidance on supplementary bids. This bid is being submitted in accordance with early guidance on LTPs Paragraph 3.3 of DEFRAs July 2003 APR 3 -Future supplementary bid for 2003 Local Air Quality Management Policy 2004 highlighted. Guidance (LAQM. PG(03), which states that “Local authorities in England are reminded that Oct 2003 Draft AQAP stated intention of they may make a bid through their Local submitting a supplementary bid for Transport Plans …. for resources to implement £1.2m with 2004 APR local transport measures to tackle air pollution April 2004 Full AQAP confirmed intention of problems”. submitting a supplementary bid for £1.2m with 2004 APR Why this scheme was not included in the Full LTP How it is consistent with the strategy contained The need to develop an AQAP was highlighted in in the LTP the Bristol Local Transport Plan 2001/2-2005/6 The majority of pollution in Bristol arises from (p 118-124). The then DETR Guidelines on road traffic (up to 97% in the central AQMA), producing AQAPs and the necessary supporting consequently the main focus of the AQAP is on technical work were not published in time to reducing emissions from transport. The polices allow the inclusion of the AQAP in the LTP. in the LTP will already go some way to reducing This situation was acknowledged in the LTP emissions, although not quickly enough to meet guidance which stated that “Where review and the government’s targets. The AQAP is assessment of air quality is not yet complete …. essentially a package of measures which ‘top up‘ [the] LTP may need to be amended to the LTP and these are fully integrated with the incorporate any necessary measures”. A local transport strategy. Of more than 50 statement which was re-enforced in Paragraph transport measures identified to improve air 75 of the 1st edition Guidance on Local quality, 19 are considered to be adequately met Transport Plan Annual Progress Reports (APR) by LTP polices, 14 involve expanding or (2001) which stated that “If circumstances have accelerating the introduction of LTP measures, arisen since submitting the LTP for which and 13 are new transport measures. In addition funding may need to be sought, authorities may to improving air quality these additional need to submit supplementary bids….. measures will have also have wider benefits and [including] possible additional funding that is contribute to the other LTP objectives, in necessary to deliver new local transport particular road safety and climate change measures to contribute to the success of an air emissions (as summarised in Figure 5 of the quality action plan”. AQAP). Although the lengthy period of technical work Although guidance on the second round of LTPs and consultation together with revised DEFRA is currently still awaited, indications are that the guidance has resulted in the submission of the AQAP is likely to be fully integrated with next AQAP and this supplementary bid somewhat LTP.

| 68 | Appendix E | Bristol Local Transport Plan – Annual Progress Report 2004 | | Supplementary Bids |

What outputs, targets and objectives it is while at the same time securing expected to deliver improvements in punctuality and The primary objective of the AQAP is to meet the reliability. air quality objectives set out in the National Air H to increase bus use in England (measured Quality Strategy. The AQAP also forms the by the number of passenger journeys) Council’s key contribution to reducing CO2 from 2000 levels by 10% by 2010, while contributions from the transport sector. at the same time securing improvements The AQAP will also deliver wider environmental, in punctuality and reliability social and economic benefits. These are H to reduce the number of people killed or summarised in Figure 5 of the AQAP. Many of seriously injured in Great Britain in road the additional AQAP transport measures will accidents by 40% by 2010 and the contribute directly to the core objectives of the number of children killed or seriously LTP, Community Strategy, the Council’s Corporate injured by 50%, compared with the Plan and national transport and environmental average for 1994-98. objectives, in particular the Road Safety and Climate Change targets. With regard to more H by 2010, to triple the number of cycling specific outcomes and targets, an trips compared with a 2000 base. implementation and monitoring framework is It is acknowledged that the 10-year plan has identified in AQAP and this will be developed in now been amended by the ‘Future of Transport: more detail once the scale of available resources a network for 2030’ published in June 2004, but is known. it is considered that the above summary remains robust. How it will help the Government deliver its 10 year Plan targets. Why it is not possible to meet the bid by re- The AQAP forms the Council’s main contribution prioritising existing allocations. to the government’s Shared Priority target for air The AQAP is based on a comprehensive quality. It will also contribute directly to two of assessment of air quality in Bristol (Stage 3 and the key targets in the 10-year Transport Plan: Stage 4 Air Quality Review and Assessment). This I to improve air quality by meeting our process takes in to account existing policies, National Air Quality Strategy targets for including the package of measures identified in carbon monoxide, lead, nitrogen dioxide, the LTP. The AQAP, therefore, identifies what particles, sulphur dioxide, benzene and 1-3 transport measures are required above and butadiene beyond those in the LTP. Figure 6 of the AQAP I illustrates the do-minimum scenario (predicted to reduce greenhouse gas emissions by impact of LTP measures with no AQAP). 12.5% from 1990 levels, and move towards a 20% reduction in carbon dioxide emissions The current allocation of resources contains a by 2010 modest sum for specific actions to reduce air pollution. Further progress was being made on The AQAP, if fully funded, will also contribute piloting AQAP measures through the VIVALDI to several other 10-year Plan objectives and project but following the unsuccessful Shared Priority areas: supplementary bid for 2003/04 the scope for H to reduce road congestion on the inter- significant gains through this project has been urban network and in large urban areas greatly reduced. Any further re-allocation of in England below current levels by 2010 existing allocations would undermine the ability by promoting integrated transport to deliver the package of LTP measures, which solutions and investing in public form the key foundation of the AQAP. This in transport and the road network turn would reduce the effectiveness of the LTP in reducing levels of air pollution and the ability to H to increase rail use in Great Britain meet other key objectives of the LTP and 10-year (measured in passenger kilometres) from transport plan 2000 levels by 50% by 2010, with investment in infrastructure and capacity,

| Bristol Local Transport Plan – Annual Progress Report 2004 | Appendix E | 69 | | Supplementary Bids |

Why it is not possible to meet the bid from the additional funding of £1 million per year to authorities own resources, or from other resource the AQAP would inevitably lead to resources, cutting back of essential work in other service The council has been successful in supporting areas of the council. some elements of the AQAP though other funding sources. Much of the technical work What the impact would be if it were not met. associated with modelling and monitoring the If this supplementary bid is not funded then it AQAP has been funded from other sources and a will not be possible to implement the further £72,000 of Supported Capital comprehensive package of measures outlined in Expenditure (SCE) money has recently been the AQAP and achievement of the National Air granted for the technical work. Quality Strategy Objective for NO2 (target date 2005) will not be achievable by 2008 (the date Much of the recent pump-priming of AQAP identified in the AQAP). measures such as personalised travel planning, retrofitting buses and freight vehicles, and The result of this will be that the 100,000 people promoting alternatively fuelled vehicles has who live in the AQMAs areas (including 13,000 been achieved through the EU-supported children) and tens of thousands more work or go VIVALDI project. However, following the to school in them will continue to be exposed to unsuccessful supplementary bid for 2003/04 the potentially harmful levels of air pollution. It is funding of additional measures will no longer be estimated that the deaths of more than 400 possible through this project. people per year in Bristol are brought forward or There may be scope for funding some element caused by air pollution. Many thousands more of the plan through other sources, e.g. national will continue to suffer from acute or chronic assistance for roadside testing and the Energy effects that will reduce their quality of life. Savings Trust (EST) Clean Up grants. However, the recent cut in EST grants has greatly increased the cost of retrofitting to the Council and has resulted in a substantial scaling-back of projects to clean up buses in the city. There is scope for securing limited additional funds for the AQAP through the planning system. However this can only be used to mitigate the deterioration in air quality caused by these new developments. The council will continue to explore other revenue sources, but these are currently insufficient to fund the AQAP; therefore additional resources are being sought through this LTP supplementary bid.

Why it cannot be met from the flexibility provided by the SCP In a similar fashion to the to the LTP, other areas of council services also set out their medium term programmes in investment and asset management plans. These currently fully utilise the council’s anticipated allocations through the single capital pot (SCP). Although the flexibility of the SCP is used to manage capital spend across the different service areas of the council,

| 70 | Appendix E | Bristol Local Transport Plan – Annual Progress Report 2004 | | Supplementary Bids | by providing assistance and incentives. Sustained action over the life Sustained action over assistance and incentives. by providing

MA cling network and promotion covered in LTP. Focus extra resources within resources extra Focus in LTP. covered cling network and promotion aluate pilotaluate scheme. home delivery ell-established programme of Travel Plans through LTP. Accelerate the Accelerate LTP. Plans through Travel of ell-established programme ork has commenced on information and awareness initiatives. Implement initiatives. and awareness on information ork has commenced alking strategy – programme of action in LTP. Undertake study of barriers of action in LTP. – programme alking strategy ar Club established in Bristol and membership levels are growing. Target growing. are ar Club established in Bristol and membership levels stablished programme of SRS in LTP (4-6 per year), Needs additional focus (4-6 per year), of SRS in LTP stablished programme of the AQAP. of the AQAP. W aimed at of AQAP life over initiatives of education sustained programme of awareness range and broaden change. Expand behavioural encouraging initiatives. W within businesses and schools located plans for travel adoption of voluntary AQ E schools within of SRS for the implementation Accelerate within the AQAP. 8 years. over 3 additional schools per year the AQAP. at targeted Marketing Travel Individualised shorter being piloted journeys out project. and roll additional areas Identify VIVALDI through Shorter and Introduce per year. in 2 new areas including ITM Strategy Journeys ev W speed reduction) 9 area-based (see also Measure within AQMA. to walking Cy at parking and changing facilities routes, cycle for the AQMA destinations training. and cycle C of older car ownership. of high levels in areas Club locations additional Car membership. to increase membership offer introductory Offer Status / Action Status BCC BCC BCC BCC BCC/ Moves ead / Key L Businesses BCC / Smart BCC BCC / Schools BCC Organisations ost c - er 8 80 ears 200 200 240 480 y 2400 1000 4200 ov Est. 0 0 enue ear v y ost per c Re ear 25 25 30 30 60 10 300 125 555 y apital ost per C c s s-m s-m s-m-l s-m-l s-m-l s/m/l L= 6+ yrs S=1-2 yrs, M= 3-5 yrs, 0 2 4 6 6 6 6 (%) Oppose 97 92 92 79 88 88 71 (%) Support 1. Information & 1. Information Raising Awareness initiatives Sub-Total of Alternatives and Provision Promotion Plans 2. Travel to Routes 3. Safer Travel School / Plans 4. Shorter Journeys (including Individualised Travel Marketing) Walking 5(a). Facilities 5(b).Cycling Clubs 6. Car Sub-Total Measure and Promotion Information Consultation Time-scale Cost (000's) P+ igure 11 Additional AQAP Transport 11 Additional AQAP igure Measures LTP+ LT LTP+ LTP+ LTP+ LTP+ LTP+ F

| Bristol Local Transport Plan – Annual Progress Report 2004 | Appendix E | 71 | | Supplementary Bids | MC network being extended through LTP. Potential for further air quality for Potential LTP. through MC network being extended ost speed management within AQMA. areas in residential measures esources required for residential areas within AQMA. Implement within AQMA. areas residential for required esources low- area-wide Major programme of bus priorities in LTP. Additional problem sites to be Additional problem of bus priorities in LTP. Major programme ahead of ‘Showcase’improved assessment Preliminary programme. of possible Implementsites has been undertaken and 5 sites identified. at priority measures possible additional sites. and identify 3 years 5 sites over Speed management to required Additional resources being produced. strategy undertake blanket to tackle speeding and harsh driving. approach Implement / routes speeding on key smoother driving and reduce to encourage measures within AQMA. areas Programme Hierarchy. Road planned in revised areas 20 mph limits in residential Additional the LTP. through schools being introduced around of 20 mph zones r c UT enhancementbenefits through vehicle use of selective of the system. Extend Undertake study to sites has commenced. of problem identification Preliminary 'Hotidentify Implement feasible. engineering solutions are Spots' where appropriate. where measures Most Limited by parking and loading restrictions. covered already are routes key underway. of parking restrictions Review enforcement. of targeted programme Undertake air required. undertaken, further evaluation evaluation Preliminary quality modelling to assess impacts of speed management options. Discuss speed management and Police. Agency options with the Highways Undertake further managing speed with assessment. Discuss options for Cost / Police. Agency Highways depends on enforcement options. A blanket speed limit would be cheaper to implement one. than a variable and enforce lane use Preliminary Agency. with Highways underway De-trunking negations study undertaken. De-trunk M32. Undertake detailed study of management Submit (including air quality assessment). options and priority measures & Ride site. Implement Park for planning application management corridor scheme. detection for buses and trial use of ‘greenwaves’detection for emissions within the to reduce Air Quality management use of improved Investigate Clear Zone. high plans for pollution days. Additional enforcement in the routes on key of parking and loading restrictions management Discuss delivery city. with freight quality partnership. olice olice BCC BCC BCC BCC gency BCC / BCC P P gency / gency / A A A operators BCC / bus BCC Highways Highways Highways BCC/ Police BCC/ ost c er 8 ears 800 800 400 800 y ov Est. ? enue ear v 100 50 y ost per c Re Not yet calculated Not yet calculated be funded through LTP be funded through

ear 50 To 100 100 100 y apital ost per C c m m m-l s-m s-m s-m s-m-l s-m-l s-m-l L= 6+ yrs S=1-2 yrs, M= 3-5 yrs, 5 9 9 12 13 10 16 15 (%) Oppose 80 80 75 85 75 80 70 74 68 (%) Support As (M32) M pollution hot spots ones in residential eduction (20 mph Managing the Road Network Managing the Road of Road 7. Reallocation Space (Bus Priority ) measures 8. Improved enforcement of existing speed limits speed 9. Area-based r z ) areas 10. Intelligent traffic Traffic signals (Urban management 11. Traffic at Enforcement 12. Parking 13a. Stronger enforcement of current speed limits motorway Motorway Reduced 13b. speed limits around AQ 14. M32 Management Management & Control -UTMC) & Management of Times Delivery LTP+ LTP+ LTP+ LTP+ LTP+ LTP+ New New New (LTP)

| 72 | Appendix E | Bristol Local Transport Plan – Annual Progress Report 2004 | | Supplementary Bids | benefits. 2 eight study. Quality partnership. Undertake feasibility ommitment Fleet. in Council Undertaken fuelled vehicles to LPG and alternative ouncil’s LPG fleetouncil’s technologies (including further trialling alternative Continue ilot projectVIVALDI through logistic scheme being progressed (target 30 ilot schemes undertaken with bus and freight voluntary Negations operators. ehicles legislation. rial undertaken and permanent Implement scheme being developed. roadside obby Government systems and for de-NOx for incentives stronger for obby government system. taxation beneficial vehicle environmentally a more for obby Government cleaner technology / incentivise at to promote to do more a etrofitting smaller HGVs. etrofitting etailers). Review outcomes of VIVALDI trans-shipmentVIVALDI of outcomes Review etailers). pilot. centre Discuss with or further programmes underway. Retrofit underway. or further programmes fuelled buses all conventionally operating in Bristol with particulate filters and ultimately de-NOx systems. de-NOx in Bristol with particulate filters and ultimately operating of freight retrofitting voluntary Promote vehicles. L r P r Fr under covered Initiatives being developed. are A number of initiatives encouragement network chapters. and managing the road and education, idling to enforce using parking attendants 8 ,9 &10) Investigate (measures v T testing at and free emissions testing programme and other supermarkets locations. and information buyers 'cleaner vehicle' Promote being evaluated. Currently efficient less polluting and more buying of smaller, encourage vehicles. L of PTWs performance the environmental Investigate C fuels alternative to promote Continue technology. vehicle trials of alternative and government of with the expansion Continue cleaner vehicles. for grants P f C buses). and hybrid electric vehicles technology in cleaner fuel and vehicle and trial / promote Monitor developments appropriate. these technologies where L taking in to account factors, based on wider environmental level, national local pollution and not just CO EST olice olice ehicle BCC/ BCC/ BCC/ P P V BCC/EST operators BCC/ EST/ BCC/ operators/ authorities BCC/ Freight BCC/ neighbouring ost c er 8 - ? ears 50 enue) y 160 280 ov (240 v 3050 Est. re enue - ear 30 v y 100 ost per c Re - ear 50 50 20 35 See 450 y apital ost per (study) C c 8,9 & 10 Measures m-l s/m s/m/l s/m/l s/m/l s/m/l L= 6+ yrs S=1-2 yrs, M= 3-5 yrs, - - 3 9 2 1 (%) Oppose - - 73 83 86 97 (%) Support oadside Emissions ehicles. ehicles esting 15. Freight trans- shipment centres Sub-Total Emissions Management emissions 16. Reduce poorly driven from v maintenance- 17. Vehicle R T 18. Encouragement of efficientmore vehicles. / pilot 19. Promote / vehicles alternative fuels. for 20. Advice / incentives 'cleaning up' large v New New New New LTP+ LTP+

| Bristol Local Transport Plan – Annual Progress Report 2004 | Appendix E | 73 | | Supplementary Bids | As. aluation of age profile of vehicle fleet of vehicle of age profile aluation schemes Discuss potential underway. eight (FQP) established. Pilot Quality Partnership freight scheme retrofitting ones Strategy. ilot details of how a examining is currently The Council scheme being examined. obby Government to undertake pilot cost cars. Examine scheme for retrofitting obby Government and undertake a scrappage vehicle for incentives to provide obby Government buses operating for emissions standard national to introduce etrofitting programme. etrofitting Z Ev smaller vehicles. retrofitting options for Investigate organisations. Taxi with L detail (part in more of clean-up programme 2). study - Measure of LEZ P pilot to prevent including safeguards would work in practice abuse of the scheme L pilot scheme in Bristol. in supported being introduced buses are for Minimum emissions standards and monitor all contracts into emissions standards Introduce services contracts. effectiveness. L in cities with AMQAs Fr undertaken with local firm. Undertake assessment of local HGV of composition fleet voluntary Extend with FQP. Discuss setting of minimum emissions standards r assessmentPreliminary impacts feasibility of LEZ undertaken. Undertake LEZ up including assessment Bristol being drawn central RUC scheme for of impact to the RUC possible enhancements and evaluate Examine on air quality. air quality. scheme to improve Draft in July 2003. Some produced Bristol was central for Strategy Clear Zone Implement being piloted and progressed. already measures outlined in measures Clear revised and produce Clear Zone into AQAP Incorporate strategy. Clear Zones air pollution monitoring). improved for (+25k pa revenue study. Lobby Government Lobby study. cities with 'Clean up' scheme for national to introduce AQM BCC BCC BCC ehicle BCC/ BCC/ V operators operators operators BCC / bus BCC BCC/ EST/ BCC/ Govt/ Bus Operators. BCC/ Freight BCC/ ost c er 8 ears 60 550 y ov 8,000 Est. Not yet calculated enue ear LTP 30 60 v y 160 ost per Not yet calculated c Re see measure 20 see measure 20 see measure measures and LTP measures unded under other F ear 20 20 50 195 y apital ost per 1,225 C c l m-l s-m s-m s-m-l L= 6+ yrs S=1-2 yrs, M= 3-5 yrs, - - - 8 1 1 10 (%) Oppose - - - 78 97 95 68 (%) Support ehicles egulation (emissions egulation 21. Retrofitting Smaller 21. Retrofitting V Incentives 22. Scrappage 23. Bus Emissions R in contracts) standards and assist 24. Promote freight emissions agreements Emission Zone 25. Low ( LEZ) User Charging 26. Road (RUC) Central for 27. Clear Zone Bristol Sub-Total TOTAL New New New New New LTP New (LTP)

| 74 | Appendix E | Bristol Local Transport Plan – Annual Progress Report 2004 | | Additional information required for maintenance (ANNEX D) | APPENDIX F |

Additional information required for maintenance (ANNEX D) TABLES FOR REPORTING MAINTENANCE DATA Latest available carriageway and footway condition data from 2003/04 surveys Indicator Best Value Performance Indicator Value Principal Road Condition BV 96 CVI RP 3.02 14.7% Non-principal classified road condition BV 97a CVI RP 3.02 26.8% Non-principal unclassified road condition BV 97b CVI RP 3.02 7.0% Categories 1 & 2 footway condition BV 187 36.8% averaged over 2 years The BV indicators show the proportion of the network that should be considered for structural treatment. When stating BV96 value, authorities should also state the survey method used. Latest bridge data No. of bridges requiring strengthening 22 No. of bridges requiring major maintenance (>£50,000) 7 Total no. of bridges (>1.5m span) 245

Latest Strengthening and Major Maintenance Data for Bridges and Retaining Walls on the "nationally recognised" Primary Route Network (PRN) Also includes major maintenance on non primary routes Structure Name Primary Route Indicate Cost Date (shown In Bold) Strengthening £ (i.e. road number) or Major Maintenance (>£50,000)? Cumberland Road Bridge C125 Strengthening 400,000 In progress Smeaton Road Bridge C125 Strengthening 330,000 In progress Whiteladies Road Bridge A4018 Strengthening 200,000 2004 Lawrence Hill Bridge No.1 A420 Strengthening 250,000 2004 BCC share jointly with Network Rail Portway Viaduct A4 Strengthening 50,000 Frome Culvert Broadweir Strengthening 100,000 2005 St Georges Road Viaduct C124 Strengthening 75,000 2005 College St Viaduct Strengthening 75,000 2005 Feeder Road Dock Bridge C125 Strengthening 300,000 2006 Frome Bridge C111 Strengthening 50,000 St Phillips Causeway A4320 Major Maintenance 500,000 2006

Percentage of "Appendix B" lighting inventory completed Percentage completed 60 %

Note that the ‘Appendix B’ inventory itself is not required to be submitted with this APR – Please refer to Bristol’s APR 2003 for this information (Appendix A: Street Lighting Inventory).

| Bristol Local Transport Plan – Annual Progress Report 2004 | Appendix F | 75 | | Finance Forms | APPENDIX G |

FINANCE FORMS This appendix includes copies of the completed finance forms LTP-F1 to F4. As set out in the technical guidance to the finance forms, expenditure shown in the 2002/03 and 2003/04 financial years is on a cash basis, which only includes transactions wholly completed in one financial year. Therefore the forms differ from scheme expenditure outlined in Section 4 of the Annual Progress Report and in the Implementation Table in Appendix D. These are based on the council ’s own accounting system. The forms have been completed to show expenditure against current and anticipated LTP allocations. Individual yearly totals do not include the significant contributions which the council uses to enhance the transport capital investment programme, using funds from the council’s own resources, from specific bids for funds outside of the LTP process, from the EC and from development. As requested in the technical guidance, outline planning figures are included for the 2006/07 and 2007/08 financial years which are in the next LTP five-year period. However, levels of funding and the full programme of works for these years are not available. The next LTP to be submitted in July 2005, which will be a joint plan between the four unitary authorities of the Bristol sub-region, will set the actual programmes over the five-year period, so the figures entered for 2006/07 and 2007/08 do not constitute a bid nor a full programme. A supplementary bid is made for funding to progress measures as part of Bristol’s Air Quality Action Plan, and this is included in the 2005/06 expenditure listed in the finance forms. LTP-F4, together with the other finance forms, has been completed to show schemes and projects funded from the LTP block allocations. As stated above, the council ’s transport capital investment programme is enhanced with other sources of funding, therefore LTP-F4 does not show all the schemes and projects included in the LTP implementation programme. The Implementation Table in Appendix D provides a more comprehensive picture of the overall programme of schemes, including all areas of expenditure for the current and previous year in support of the Council’s transport strategy.

| Bristol Local Transport Plan – Annual Progress Report 2004 | Appendix G | 77 | | Finance Forms | 1 of Version No: 1 Authority No: 132 Settlement Year: 200506 ures in £000 g All fi 0000250 70 244 1,085 745 150 200 200 7,085 8,908 5,275 6,549 9,800 9,550 3,0331,091 1,352 455 2,103 699 2,328 562 2,400 2,400 600 600 11,523 11,800 8,822 9,589 13,000 13,000 200203 200304 200405 200506 200607 200708 E.J.MINIHANE 0117 9036712 lic transport schemes and major highway maintenance schemes. in row 5 for all other schemes. ajor schemes row (row 4) of this table. terisks, or insert text in any number cells. flect resources held from previous years Contact Name : Authority Name: Bristol ) Telephone Number (with extension) : Block of principal and non-principal highways (MM1, MM3, MM5) other (including street lighting) (MM9) , assessment, strengthening of bridges and other structures (MM7, MM8) Other Individual schemes costing less than £5 million or groups of related ( ) Individual schemes costing £5 million or more LOCAL TRANSPORT PLAN - CAPITAL PROGRAMME EXPENDITURE 200203 TO 200708 LTP-F1: Summary of actual, estimated outturn and projected local transport capital expenditure (LTP - F3) Total Notes: LTPF1 1. Expenditure on schemes with Gross Costs of £5 million or more (including major maintenance schemes) is included in the m 2. Expenditure on schemes with Gross Costs of less than £5 million is recorded in rows 1, 2 and 3 for maintenance LTPF2 and LTPF3 3. Where available, audited cash information should be used. 4. For years before the current financial year, actual or estimated outturn expenditure should be given. 5. Give estimated outturn expenditure for the current financial year. 6. Give projected expenditure for years after the current financial year. You should not make any adjustments this to re or resources which are sought for expenditure will occur, have occurred, in other financial years. 7. Enter all financial data in multiples of £1000, e.g. 500 = £500,000. DO NOT use commas or decimal places. Do not insert as LTPF2 8. Use LTPF2 for existing and new major schemes with gross costs of £5 million or more. This includes road schemes, pub 9. For new schemes, the local authority priority (DfT Ref/Pry 1,2, 3 ... etc) must not have equal rankings. LTPF3 10. Use LTPF3 for all schemes not included in LTPF2. LTP-F4 Refer to the LTP Technical Guidance (LTP - F2 (LTP - F3) Maintenance (LTP - F3) Maintenance (LTP - F3) Maintenance

| 78 | Appendix G | Bristol Local Transport Plan – Annual Progress Report 2004 | | Finance Forms | Authority No: 132 ures in £000 g All fi more 0000 00250 19,465 9,465 70 0 0 0 0 250 Gross Total Total Net 200203 200304 200405 200506 200607 200708 Works End of Main Works Joint Start of Main Ref/Pry Bristol RD3OS1 9083 9359 01-Mar-07 01-Dec-09 01-Jun-08 01-Dec-11 8,300 11,165 8,30 1,165 70 0 0 0 0 0 Type Scheme Name Authority Name: LOCAL TRANSPORT PLAN - CAPITAL PROGRAMME EXPENDITURE 200203 TO 200708 LTP-F2: Actual, estimated outturn and projected local transport capital expenditure on individual schemes costing £5 million or Scheme Name Type DfT TOTAL LTPF2 - ALL PAGES A4 BATH ROAD TO CALLINGTON LINK ROAD USER CHARGING SCHEME

| Bristol Local Transport Plan – Annual Progress Report 2004 | Appendix G | 79 | | Finance Forms | 1 of 2 Authority No: 132 s ures in £000 g All fi 000000 00000115 000000 00002500 6 0000000 0000000 500 26 518 181 1, s than £5 million and groups of related scheme 00000000 00000000 30000000 0 0 14 7 500 750 384 181 000 , ,5 ,5 , ,7 1,5 133,293 79,022 11,453 11,800 8,822 9,589 13,000 12,750 3 3 11 22 12 2 14 14 41 WA6 700 700 184 226 40 50 100 100 WA6 809 809 147 262 100 100 100 100 TM4WA1 534 219 75 219 0 19 0 0 75 0 0 0 100 0 100 0 LS1LS5TM4 3,260 1,181 1,896 3,260 1,181 1,896 641 51 617 740 209 79 429 171 0 450 250 400 500 300 400 500 200 400 TM9TM2 189 1,175 1,175 189 203 65 272 124 200 0 100 0 200 0 200 0 BL1BI BI4BI4BI4TM3 19,299 338 11,299 284 566 2,416 338 1,049 234 2,416 566 2,702 67 0 464 41 610 40 122 34 175 1,384 230 430 100 0 2,000 0 400 50 2,000 0 500 0 100 100 500 0 100 100 IN7CY3CY3 2,750 400 350 659 200 80 103 0 0 194 0 0 0 0 0 100 0 0 100 200 80 0 0 0 IN TM9IN 225 225 0 0 0 0 225 0 TM3WA TM3 475 700 200 600 0 0 0 0 0 0 0 0 200 400 0 200 IN TM TM3RD TM3 450 250 250 200 0 0 0 0 250 0 0 0 0 0 0 200 PR OS1 1,245 245 0 245 0 0 0 0 PR1PR2 2,500 1,500 550 1,500 0 0 0 0 50 150 100 200 500 0 650 400 PR1PR1PR1 3,502 2,000 2,000 3,502 460 400 842 57 0 304 0 0 0 50 0 0 0 0 0 0 0 0 0 400 TM1 937 937 137 0 300 100 200 200 LR Bristol Type Gross Total Total Net 200203 200304 200405 200506 200607 200708 Authority Name: LOCAL TRANSPORT PLAN - CAPITAL PROGRAMME EXPENDITURE 200203 TO 200708 PUBLIC FOOTPATH ENHANCEMENTS PEDESTRIAN ENHANCMENTS - GENERAL PEDESTRIAN ENHANCEMENTS - IMPROVED FOOTWAYS HOME ZONE CHALLENGE, SOUTHVILLE 20MPH ZONES OUTSIDE SCHOOLS HOME ZONE PROJECTS SAFER ROUTES TO SCHOOL PROJECTS TRAFFIC SIGNALS TRAFFIC CALMING TOLLGATE SHUTTLE BUS URBAN BUS CHALLENGE PROJECTS YELLOW SCHOOL BUS PROJECT COMMUNITY TRANSPORT GENERAL TRAFFIC MANAGEMENT BUS SHOWCASE CORRIDOR PROJECTS WHITELADIES ROAD CORRIDOR CYCLE IMPROVEMENTS A38 SOUTH CORRIDOR CYCLE IMPROVEMENTS INTEGRATED TRAVEL INFORMATION CENTRE NEW INTERCHANGE FACILITIES IN THE CENTRE NEW BUS AND COACH STATION CENTRAL BRISTOL A420 OLD MARKET STREET/WEST STREET ST JAMES BARTON GYRATORY REDCLIFFE WAY/MILLENIUM MILE SCOPE ROUTE CENTRAL AREA A4018 CRIBBS CAUSEWAY TRAFFIC MANAGEMENT A38 HAYMARKET ENVIRONMENTAL ENHANCEMENTS A4 HOTWELL RD/JACOB'S WELLS RD HOTWELLS TEMPLE MEADS INTERCHANGE ENHANCEMENT QUEEN SQUARE PROJECT A4 PORTWAY PARK AND RIDE PHASE 2 PROGRESS EUROPEAN PROJECT A4 BRISLINGTON PARK AND RIDE EXPANSION M32 PARK AND RIDE A38 BRISTOL SOUTH PARK AND RIDE A37 PARK AND RIDE, PHASE 1 A4 PORTWAY PARK AND RIDE URBAN TRAFFIC MANAGEMENT AND CONTROL TOTAL LTPF3 - ALL PAGES RAPID TRANSIT LINE 1 PREPARATORY WORK LTP-F3: Actual, estimated outturn and projected local transport capital expenditure on individual schemes costing les Scheme Name

| 80 | Appendix G | Bristol Local Transport Plan – Annual Progress Report 2004 | | Finance Forms | 2 of Authority No: 132 s 540405050 ures in £000 g All fi 000000 0000000 2010000 0000000 0000000 108 s than £5 million and groups of related scheme 50000000 50000000 4 5 108 936 850 490 000 ,4 ,4 15, 133,293 79,022 11,453 11,800 8,822 9,589 13,000 12,750 1 1 11 31 5 3 4 MM9OS1 1,082 2,160 1,082 1,757 244 360 193 897 95 500 150 0 200 0 200 0 MM3MM3MM1MM8 3,241 1,571 8,804 910 3,241 1,571 8,804 910 242 488 2,303 13 157 1,125 70 450 35 1,500 153 1,276 792 0 260 1,300 800 262 300 1,300 800 300 300 300 TM3WA6LS5LS 8,079 1,199 5,753 8,079 1,177 5,753 40 347 681 167 7 972 32 0 1,000 1,225 1,000 200 1,000 1,000 335 1,000 1,100 0 MM7 3,097 3,097 1,078 420 699 300 300 300 OS1OS1 272 141 272 141 0 47 72 14 50 0 50 0 50 40 50 40 OS OS BI IN1OS1LS OS 70 90 70 90 17 0 3 30 20 0 10 20 10 20 10 20 BI4OS1 219 133 219 133 60 20 78 13 62 0 0 20 0 40 0 40 OS1OS1OS1TM 402 377 287 402 127 287 8 0 28 109 5 60 100 0 0 100 0 125 0 OS1IN2MM9 275 501 1,542 275 1,542 501 20 0 72 5 892 118 650 0 86 0 25 0 100 100 0 100 150 0 CY7TP6 152 329 152 329 0 132 52 32 0 40 25 0 50 50 50 50 Bristol CY3CY1 1,298 773 1,298 773 315 251 533 22 50 50 100 150 150 150 150 150 Type Gross Total Total Net 200203 200304 200405 200506 200607 200708 Authority Name: LOCAL TRANSPORT PLAN - CAPITAL PROGRAMME EXPENDITURE 200203 TO 200708 VIVALDI MAINTENANCE OF STRUCTURES OTHER LTP MAINTENANCE SCHEMES BRIDGE ASSESSMENT AND STRENGTHENING CARRIAGEWAY MAINTENANCE PRINCIPAL ROADS STRUCTURAL HIGHWAY MAINTENANCE ON NON PRN FOOTWAY MAINTENANCE LEGIBLE CITY INITIATIVE LOCAL SAFETY SCHEMES CHILD PEDESTRIAN CASUALTY REDUCTION AWARD AIR QUALITY MANAGEMENT SUPPLEMENTARY BID SHORTER JOURNEYS PROJECTS TRAVEL AWARENESS INITIATIVES NEW LORRY PARK NEW MULTI-STOREY CAR PARK PROVISION NEW COACH PARKING FACILITIES TRENCHARD STREET CAR PARK REFURBISHMENT PARKING INITIATIVES SAFETY IN PUBLIC CAR PARKS (CCTV) TAXI FACILITIES FERRY INFRASTRUCTURE IN CENTRAL BRISTOL TRANSPORT INFORMATION (PTI 2000) DEVELOPMENT ASSOCIATED TRAFFIC MANAGEMENT WORKS EUROPEAN TRANSPORT INITIATIVES CAR CLUBS INITIATIVE ADVANCE PROCEDURES TO PROGRESS FUTURE SCHEMES RAILWAY FACILITIES HIGHWAY LIGHTING SCHEME ASSESSMENT AND MONITORING CYCLING PROMOTION TRANSPORT PROMOTION, TRAVEL PLANS TOTAL LTPF3 - ALL PAGES LTP-F3: Actual, estimated outturn and projected local transport capital expenditure on individual schemes costing les Scheme Name CYCLING FACILITIES - ON HIGHWAY CYCLING FACILITIES - OFF HIGHWAY

| Bristol Local Transport Plan – Annual Progress Report 2004 | Appendix G | 81 | | Finance Forms | 1 of 5 132 Authority No: 020111 000795 000000 000000 000000 000000 000000 000000 010000 000000 011111 233222 000000 000000 000000 000000 000000 000000 200203 200304 200405 200506 200607 200708 Unit of Data km 0 0 0 0 0 0 Code BL1BL2BL3 number km BL5 number BL6BL7 number km number BG1BG2 number km BI3 number BL4 BI1BI2 number BI4 number number LR1LR2LR3 number LR4 km LR5 number km number LR6 number s respectively) Bristol Authority Name: round up to the nearest kilometre or metre. round up Unless indicated otherwise, codes include new schemes and improvements or extensions to existing schemes; For distances, use whole numbers only - Authorities should give complete data for all the years in accordance with Technical Guidance. LOCAL TRANSPORT PLAN - CAPITAL PROGRAMME EXPENDITURE 200203 TO 200708 Scheme Type Bus priority schemes (excluding signalling) quality bus corridor / showcase route schemes high occupancy vehicle (HOV) lanes improvements to existing bus stops busways / bus lanes other bus priority schemes Guided Bus Schemes new guided bus scheme Bus Infrastructure Schemes (excluding interchanges) new bus stop bus stops with travel information displays other bus infrastructure scheme light rail (including tram and other rapid transit systems; excluding interchanges) new light rail line (excluding extensions) light rail line improvements (including track dualling and extensions) additional capacity (vehicles) other light rail schemes LTP-F4: Actual and proposed use of LTP Integrated Transport block maintenance funding (for actual indicative allocation General points: 1. 2. 3.

| 82 | Appendix G | Bristol Local Transport Plan – Annual Progress Report 2004 | | Finance Forms | 2 of 5 132 Authority No: 000011 200000 423233 211111 585677 011111 110111 232233 011111 200203 200304 200405 200506 200607 200708 numbernumber 0 0 0 0 0 0 0 0 0 0 0 0 numbernumber 0 0 0 0 0 0 0 0 0 1 1 0 numbernumbernumbernumber 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 numbernumber 0 0 0 6 0 3 0 1 0 2 1 2 Unit of Data CY7 number CY1CY2 number km CY6 number WA1 number CY5 number CY3CY4 number km PR3 PR4 IN7 number PR2 Code s respectively) extensions to existing schemes (improvement) IN6 new schemesextensions to existing schemes PR1 (new) IN5 (new)(improvement) IN4 IN3 (new)(improvement) IN2 IN1 Bristol Authority Name: round up to the nearest kilometre or metre. round up Unless indicated otherwise, codes include new schemes and improvements or extensions to existing schemes; For distances, use whole numbers only - Authorities should give complete data for all the years in accordance with Technical Guidance. Walking schemes new or improved footways new advanced stop lines cycle lanes other cycling schemes new dynamic information systems at interchanges Park and Ride park and ride (bus/road related) : park and ride (rail-related) :Cycling schemes cycle tracks new cycle parking facilities new schemes multi-modal interchanges public transport interchanges at airports LOCAL TRANSPORT PLAN - CAPITAL PROGRAMME EXPENDITURE 200203 TO 200708 Scheme Type Public Transport Interchanges single mode interchanges LTP-F4: Actual and proposed use of LTP Integrated Transport block maintenance funding (for actual indicative allocation General points: 1. 2. 3.

| Bristol Local Transport Plan – Annual Progress Report 2004 | Appendix G | 83 | | Finance Forms | 3 of 5 132 Authority No: 000000 000000 138 8 8 000000 9103 010000 000000 000000 000000 000000 552555 000000 000000 000000 0 0 0 0130 030000 000000 010000 10 5 5 6 6 6 28 24 19 20 20 20 100 0 0 0 0 0 200203 200304 200405 200506 200607 200708 Unit of Data WA2WA3 metres number Code WA4WA5WA6 metres number number TP1TP2TP3 number number number RC1RC2 number number TP4TP5TP6 number number number LS1LS2LS3 number number number RC3RC4 number number LS4LS5 number number s respectively) Bristol Authority Name: round up to the nearest kilometre or metre. round up Unless indicated otherwise, codes include new schemes and improvements or extensions to existing schemes; For distances, use whole numbers only - Authorities should give complete data for all the years in accordance with Technical Guidance. LOCAL TRANSPORT PLAN - CAPITAL PROGRAMME EXPENDITURE 200203 TO 200708 Scheme Type pedestrianisation new or improved pedestrian/cycle bridge Road crossings toucan or puffin crossings other signalled crossings other walking schemes Travel Plans local highway authority site travel plans shire district travel plans school travel plans further/higher education establishment travel plans hospital travel plans employer travel plans Local Safety Schemes schools implementing first safe routes scheme other sites implementing first 'safe routes' scheme schemes which include new CCTV cameras schemes which include new street lighting other safety schemes other unsignalled crossings underpass replacement LTP-F4: Actual and proposed use of LTP Integrated Transport block maintenance funding (for actual indicative allocation General points: 1. 2. 3.

| 84 | Appendix G | Bristol Local Transport Plan – Annual Progress Report 2004 | | Finance Forms | 4 of 5 132 Authority No: 101100 000000 000000 02316101010 000000 400000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 111111 000000 11 7 7 8 10 10 26 28 13 10 15 15 200203 200304 200405 200506 200607 200708 Unit of Data TM3TM4TM5 number TM6 number TM7 number TM8 number TM9 number TM10 number number number RD1RD2RD3 number RD4 km RD5 number km number Code TM1TM2 number number RD6RD7RD8 km RD9 number RD10 km RD11 number RD12 metres number number s respectively) Bristol Authority Name: round up to the nearest kilometre or metre. round up Unless indicated otherwise, codes include new schemes and improvements or extensions to existing schemes; For distances, use whole numbers only - Authorities should give complete data for all the years in accordance with Technical Guidance. home zones quiet lanes clear zones / low-emission Urban 20mph zones Rural 20mph zones other urban traffic calming schemes (excluding home zones) LOCAL TRANSPORT PLAN - CAPITAL PROGRAMME EXPENDITURE 200203 TO 200708 Scheme Type Traffic Management and Calming (excluding CCTV cameras) Urban Traffic Control (instations) other traffic management schemes other rural traffic calming schemes (excluding quiet lanes) Local Road Schemes (excluding trunk roads) new rural bypasses new relief road or urban ring new or improved access roads with specific regeneration social inclusion benefits road dualling and widening schemes road realignment schemes new junction or improvement schemes other local road schemes signalling/signal upgrading (outstations) LTP-F4: Actual and proposed use of LTP Integrated Transport block maintenance funding (for actual indicative allocation General points: 1. 2. 3.

| Bristol Local Transport Plan – Annual Progress Report 2004 | Appendix G | 85 | | Finance Forms | 5 of5 132 Authority No: 145 5 5 6134 643444 000000 000000 212111 000000 654555 7024 90 15 80 10 60 18 60 18 60 18 200203 200304 200405 200506 200607 200708 11000 13500 12000 10500 10500 10500 Unit of Data MM4 km Code OS1 number MM1MM2MM3 number metres MM5 number MM6 number km MM7MM8MM9 number number number s respectively) Bristol Authority Name: round up to the nearest kilometre or metre. round up Unless indicated otherwise, codes include new schemes and improvements or extensions to existing schemes; For distances, use whole numbers only - Authorities should give complete data for all the years in accordance with Technical Guidance. LOCAL TRANSPORT PLAN - CAPITAL PROGRAMME EXPENDITURE 200203 TO 200708 Scheme Type Miscellaneous other schemes (using LTP Integrated Transport Block funding) Maintenance schemes footway maintenance schemes carriageway maintenance scheme noise reducing road surfaces strengthening to carry 40 tonne vehicular loading structural maintenance and enhancement of existing highway structures other schemes (using LTP capital maintenance funding) LTP-F4: Actual and proposed use of LTP Integrated Transport block maintenance funding (for actual indicative allocation General points: 1. 2. 3.

| 86 | Appendix G | Bristol Local Transport Plan – Annual Progress Report 2004 |