Notice of Invitation for Dispute Resolution Services of Four Road

Total Page:16

File Type:pdf, Size:1020Kb

Notice of Invitation for Dispute Resolution Services of Four Road ETHIOPIAN ROADS AUTHORITY SPECIFIC PROCUREMENT NOTICE NATIONAL COMPETITIVE BIDDING Notice of Invitation for the Selection of Claims and Dispute Management Team of Experts for Suspended Projects Due to Law Enforcement (Re-Bid) 1. The Federal Democratic Republic of Ethiopia (FDRE) is undertaking different road projects financed by the Government. ERA, as representative of the FDRE, intends to select Claims and Dispute Management Team of Experts for the consultancy services of Claims and Dispute Management Team of Experts for the under mentioned contracts. Item No. Name of Project 1. Adiremet – Adihardi – Beaker Design and Build Road Project 2. Adiremet – Kulita – Adigoshu Design and Build Road Project 3. Wukro – Atsbi – Konoba Road Project 4. Metema – Abrhajira Design and Build Road Project 5. Abiadi – Semema Design and Build Road Project 6. Semema – Endabaguna Design and Build Road Project Wukro – Abreha Weatsbha – Filafel and Mykentel Spur Road Lot 1: Nebelet- 7. Filafel Road project and Mykenetel Spur Road Wukro – Abreha Weatsbha – Filafel and Mykentel Spur Lot 2: Wukro – Nebelet 8. Road Project including Wukro Town Spur Road Fiyel Weha – Abi Adi Road Project, Contract 1: Fiyel Weha – Tekeze River 9. Design and Build Road Project 10. Adiabune – Rama – Mereb Design and Build Road Project Zalambesa – Alitena – Merewa – Edagahamus, Lot I: Zalambesa – Alitena 11. Design and Build Road Project 12. Construction Works of Adishehu – Dela – Samre Design and Build Road Project Korem – Sekota – Abiadi Road Project, Contract 3: Abergele – Agbe Design and 13. Build Road Project 14. Mekele – Abi Adi – Adwa: Lot III: Werei Ridge – Adwa Road Project 15. Access to Mekelle Industrial Park Design and Build Road Project 16. Quiha – Mayemekden Design and Build Road Project 17. Mekelle –Dengolate – Samre – Finarwa Upgrading Road Project Korem – Sekota – Abi Adi Design and Build Road Project Contract I: Korem – 18. Lalibela Junction 19. Maichew – Mehoni Design and Build Road Project 20. Rama – Chila – Adidaro – Semema Road Project 21. Seroka – Ergoye – Aberajera Design and Build Road Project 2. The Ethiopian Roads Authority (ERA), duly representing the FDRE hereby invites all interested professionals to submit their applications with their qualification documents/ CVs and testimonies, FOR THE SELECTION OF CLAIMS AND DISPUTE MANAGEMENT TEAM OF EXPERTS FOR SUSPENDED PROJECTS DUE TO LAW ENFORCEMENT of the aforementioned projects. Page 1 of 4 The Claims and Dispute Management Team of Experts shall be selected according to the following criteria: 1. Requirement for Team Leader General Qualification in Education and Experience i. M.Sc. in Civil Engineering, Construction Technology and Management, Construction Law or Related Fields ii. 20 years of general experience in Civil Engineering or Related in road A. construction/upgrading/rehabilitation projects. OR iii. 15 years devoted to the practice of Construction Contracts and Construction Law in road construction/ upgrading / rehabilitation projects. B. Specific Experience i. Experience of direct involvement in handling of Claims and/or disputes on road construction or rehabilitation Projects representing Any of the Parties (15 years’ experience) ii. Experience in road construction and/or supervision and/or Contract Administration of FIDIC based contracts (10 years’ experience; or experience in 5 projects, with not less than 1 year experience in each project) representing any of the Parties. iii. Experience in dispute resolution as Dispute Review Expert and/or Dispute Review Board, and/or as Arbitrator or Adjudicator or Mediator, etc. (6 years of experience or experience in 4 projects) Proficiency in the English language; Experts shall be fluent in the full use (i.e., the writing, reading and speaking) of English language. Registration; Foreign experts must be FIDIC or Dispute Board Federation registered. Local experts must be registered under Addis Ababa Chamber of Commerce and Sectorial Associations Arbitration Institute. The determinations given by the experts’ which are published on the respective registration organization web sites as appropriate will be merited accordingly. 2. Requirement for Claims Expert General Qualification in educational and Experience A. i. Minimum of B.Sc. in Civil Engineering, Construction Technology and Management, Construction Law or Related Fields ii. 15 years of general experience in Civil Engineering or Related in road construction/upgrading/rehabilitation projects. OR iii. 10 years devoted to the practice of Construction Contracts and Construction Law in road construction/upgrading/rehabilitation projects. B. Specific Experience i. Experience of direct involvement in handling of Claims and/or disputes on road construction or rehabilitation Projects representing Any of the Parties (10 years’ experience) Page 2 of 4 ii. Experience in road construction and/or supervision and/or Contract Administration of FIDIC based contracts (7 years’ experience; or experience in 5 projects, with not less than 1 year experience in each project) representing any of the Parties. iii. Experience in Dispute resolution as Dispute Review Expert and/or Dispute Review Board, and/or as Arbitrator or Adjudicator or Mediator, etc. (3 years of experience or experience in 3 projects) Proficiency in the English language; Experts shall be fluent in the full use (i.e., the writing, reading and speaking) of English language. Registration; Foreign experts must be FIDIC or Dispute Board Federation registered. Local experts must be registered under Addis Ababa Chamber of Commerce and Sectorial Associations Arbitration Institute. The determinations given by the experts which are published on the respective registration organization web sites as appropriate will be merited accordingly. 3. Requirement for Lawyer General Qualification in educational and Experience A. i. Minimum of LLB in Law OR related fields ii. 10 years of general experience in law and court procedures. OR iii. 8 years devoted to the practice of case handling in Construction Contracts and Construction Law in road construction/upgrading /rehabilitation projects. B Specific Experience i. Experience of direct involvement in handling of Claims and/or disputes on road construction or rehabilitation Projects representing Any of the Parties (6 years’ experience) ii. Experience in road construction and/or supervision and/or Contract Administration of FIDIC based contracts (3 years’ experience; or experience in 5 projects, with not less than 1 year experience in each project) representing any of the Parties. iii. Experience in dispute resolution as Dispute Review Expert and/or Dispute Review Board, and/or as Arbitrator or Adjudicator or Mediator, etc. (2 years of experience or experience in 3 projects) Proficiency in the English language; Experts shall be fluent in the full use (i.e., the writing, reading and speaking) of English language. 3. Short listed applicants will be provided the detailed Terms of Reference to submit their price quotations. ERA will establish the teams after finalizing the selection process of individual experts. Page 3 of 4 4. The CVs of interested applicants should be submitted to the following address on or before August 30, 2021 at 4:30 P.M. local time: 5. ERA reserves the right to reject any or all CVs. Note: The CVs of applicants should clearly indicate the assigned position and period of assignment of month(s) and year(s) and a testimony shall be attached for each stated experiences in the CV. Attn: Mr. Zekarias G/Giorgis Engineering Procurement Directorate, Director 1st Floor, New Building, P. O. Box 1770 Ras Abebe Aregay Street Tel.: +251 11 515 04 19 Fax: +251 11 554 4434 E-mail: [email protected] Addis Ababa, Ethiopia Ethiopian Roads Authority Page 4 of 4 .
Recommended publications
  • R4 Rural Resilience Initiative QUARTERLY REPORT | JANUARY - MARCH 2013 CONTENTS
    R4 Rural Resilience Initiative QUARTERLY REPORT | JANUARY - MARCH 2013 CONTENTS Execu5ve summary 1 Status summary 3 Accomplishments this quarter 5 R4 Rural Resilience in Ethiopia: 2012 End of season assessment 7 R4 Rural Resilience in Senegal: Na5onal Policy Analysis 10 Conclusion 13 Appendix I: R4 partners and ins5tu5onal roles 14 Appendix II: Rural resilience event series 16 Appendix III: Media cita5ons and resources 17 Cover: At a community mee5ng in Michael Debir village in Ethiopia’s Amhara region, farmers look back to the 1980s as they recall which years had the most severe droughts. Through this exercise farmers are helping to design insurance contracts that will work best for them. Geoffrey McCarney / Interna)onal Research Ins)tute for Climate and Society (IRI) EXECUTIVE SUMMARY For the 1.3 billion people living on less than a dollar a day who that the ini5a5ve integrates. Ini5ated in 2010, December, the depend on agriculture for their livelihoods, vulnerability to program builds on the ini5al success of HARITA (Horn of Africa climate-related shocks is a constant threat to food security and Risk Transfer for Adapta5on), an integrated risk management well-being. As climate change drives an increase in the frequency framework developed by Oxfam America, the Relief Society of and intensity of natural hazards, the challenges faced by food- Tigray (REST), together with Ethiopian farmers and several other insecure communi5es struggling to improve their lives and na5onal and global partners1 to enable poor farmers to livelihoods will also increase. The ques5on of how to build rural strengthen their food and income security through a combina5on resilience against climate-related risk is cri5cal for addressing of improved resource management (risk reduc5on), insurance global poverty.
    [Show full text]
  • Ethiopia: Access
    ETHIOPIA Access Map - Tigray Region As of 31 May 2021 ERITREA Ethiopia Adi Hageray Seyemti Egela Zala Ambesa Dawuhan Adi Hageray Adyabo Gerhu Sernay Gulo Mekeda Erob Adi Nebried Sheraro Rama Ahsea Tahtay Fatsi Eastern Tahtay Adiyabo Chila Rama Adi Daero Koraro Aheferom Saesie Humera Chila Bzet Adigrat Laelay Adiabo Inticho Tahtay Selekleka Laelay Ganta SUDAN Adwa Edaga Hamus Koraro Maychew Feresmay Afeshum Kafta Humera North Western Wukro Adwa Hahayle Selekleka Akxum Nebelat Tsaeda Emba Shire Embaseneyti Frewoyni Asgede Tahtay Edaga Arbi Mayechew Endabaguna Central Hawzen Atsbi May Kadra Zana Mayknetal Korarit TIGRAY Naeder Endafelasi Hawzen Kelete Western Zana Semema Awelallo Tsimbla Atsibi Adet Adi Remets Keyhe tekli Geraleta Welkait Wukro May Gaba Dima Degua Tsegede Temben Dima Kola Temben Agulae Awra Tselemti Abi Adi Hagere May Tsebri Selam Dansha Tanqua Dansha Melashe Mekelle Tsegede Ketema Nigus Abergele AFAR Saharti Enderta Gijet AMHARA Mearay South Eastern Adi Gudom Hintalo Samre Hiwane Samre Wajirat Selewa Town Accessible areas Emba Alaje Regional Capital Bora Partially accessible areas Maychew Zonal Capital Mokoni Neqsege Endamehoni Raya Azebo Woreda Capital Hard to reach areas Boundary Accessible roads Southern Chercher International Zata Oa Partially accessible roads Korem N Chercher Region Hard to reach roads Alamata Zone Raya Alamata Displacement trends 50 Km Woreda The boundaries and names shown and the designations used on this map do not imply official endorsement or acceptance by the United Nations. Creation date: 31 May 2021 Sources: OCHA, Tigray Statistical Agency, humanitarian partners Feedback: [email protected] http://www.humanitarianresponse.info/operations/ethiopia www.reliefweb.int.
    [Show full text]
  • Farm-Level Adoption of New Sorghum Technologies in Tigray Region, Ethiopia
    Farm-Level Adoption of New Sorghum Technologies in Tigray Region, Ethiopia By Nega Wubeneh M.Sc. Thesis Purdue University Dept. of Agricultural Economics West Lafayette, IN 47907·2056 USA May 2003 FARM-LEVEL ADOPTION OF NEW SORGHUM TECHNOLOGIES IN TIGRAY REGION, ETHIOPIA A Thesis Submitted to the Faculty of Purdue University by Nega Wubeneh In Partial Fulfillment of the Requirements for the Degree of Master of Science May 2003 iii ACKNOWLEDGEMENTS A number of individuals and institutions have contributed to this work and it is impossible for me to mention all by name. I thank all of them. Foremost, my special thanks go to Dr. John Sanders for providing financial support for my MS study through the INTSORMIL project and for data collection in field work for this study. I am also very grateful for his insightful comments and guidance through various drafts of the thesis. I express my sincere appreciation to my graduate committee members Drs. Jess Lowenberg-DeBoer, William Masters, and Channing Arndt for their valuable comments and constructive criticisms which have greatly improved this work. Special thanks are due to Dr. Simeon Ehui of International Livestock Research Institute (ILRI) for his continuous encouragement, inspiration and mentoring and also support in providing office space and computer during my data entry work. Several staff members of the Mekelle Agricultural Center helped me in many ways. I especially thank Ato Aderajew Haddis and Ato Amare Belay for logistical support in providing vehicles and drivers during my field work and for their comments. My thanks also go to staff members of the Tigray Regional Bureau, the Western Zone and to Tahtay-Adiabo Woreda Department of Natural Resources and Agriculture.
    [Show full text]
  • Tigray Region As of 28 February 2021
    ETHIOPIA Access Snapshot - Tigray Region As of 28 February 2021 Humanitarian partners access to Tigray improved According to the regional Emergency Coordination Centre (ECC) N in February, with a number of requests for the ERITREA in Mekelle, relief food actors were unable to operate in nine ERITREA Badime woredas, seven of which in Central zone, i.e. Adet, Keyhe Tekli, deployment of international aid workers cleared Ethiopia Zala 1000 Km at the Federal level and progress in mobilizing Ambesa Ahsea, Chila, Egela, Hahayle, and Aheferom (Central Zone), in Adi Hageray Gerhu Sernay Dawuhan addition to Neqsege (Southern) and Asgede (North-Western). emergency supplied into the region. Adi Nebried Rama Fatsi Partners reported limited logistic capacity (unavailability of Despite these advancements, the humanitarian and Sheraro Adigrat Yeha Bzet Humera Chila Inticho trucks, private operators refusing to work due to insecurity, access situation within Tigray remains highly restricted as a result Adabay Eastern SUDAN Adwa of continued insecurity, and limited assistance reaching people in North Western Akxum Feresmay Edaga limited storage capacity in rural areas), while the lack of adminis- Nebelat Hamus May Wukro Edaga Arbi tration at local level hampered targeting/monitoring of distribu- need, particularly in rural areas. Kadra Shire Frewoyni Baeker Western Central tions. This notwithstanding, important progress was achieved in Endabaguna Mayknetal Hawzen By early February, mobile communications were re-established in Zana Semema terms of dispatching food through the region. Atsibi Wukro main towns, banking services resumed in Adigrat and Shire (in Adi Remets Edaga May Gaba Selus Hayka The presence of EDF along the northern corridor bordering addition to Mekelle and Alamata).
    [Show full text]
  • R4 Rural Resilience Initiative Annual Report January - December 2015
    R4 Rural Resilience Initiative ANNUAL REPORT JANUARY - DECEMBER 2015 Contents Acronyms 2 Executive Summary 3 Foreword 5 The R4 Rural Resilience Initiative 6 Background 6 The R4 model 6 Project Status 8 Ethiopia 8 Senegal 10 Malawi 12 Zambia 12 Evaluation and Learning 14 Going forward 15 Country Level Evaluation Results 16 R4 Policy Engagement 20 Conclusion 22 Funding progress 22 Looking ahead 23 Annex 1. R4 partners and institutional roles 25 Annex 2. Metrics from the field 28 Annex 3. Advocacy, media citations and resources 33 Annex 4. Rural resilience event series 37 Figures Figure 1. R4 Achievements 4 Figure 2. R4 Scale-up: Goal vs. actual households covered 9 Figure 3. R4 Ethiopia timeline for the 2015 agricultural season 10 Figure 4. R4 Senegal timeline for the 2015 agricultural season 11 Figure 5. R4 Malawi and Zambial timeline for the 2015 agricultural season 13 Figure 6. Donor contributions to R4 23 Cover: R4 participants keep rainfall records from rain gauges in Balaka, Malawi. WFP / ErinCollins Acronyms AIR Annual Impact Reflection CA Conservation Agriculture CASU Conservation Agriculture Scale Up Project CHIRPS Climate Hazards Group InfraRed Precipitation with Station data CNAAS Compagnie Nationale d’Assurance Agricole du Sénégal DAPP Development Aid from People to People DRMFSS Disaster Risk Management and Food Safety Sector DRR disaster risk reduction EVI Enhanced Vegetation Index FCS Food Consumption Score FEG Food Economy Group FFA Food Assistance for Assets FGD focus group discussion FHH female-headed household GFCS Global
    [Show full text]
  • And Drought Affected Population in TIGRAY
    EMERGENCIES UNIT FOR UNITED NATIONS ETHIOPIA (UN-EUE) UPDATE ON HUMANITARIAN SITUATION of war- and drought affected population IN TIGRAY Assessment Mission: 9- 22 February 2003 By Ahmed Ali Egeh and Dechassa Lemessa, UN-Emergencies Unit for Ethiopia 1 Introduction and background Tigray region suffered from prolonged civil war and the Ethio-Eritrea border conflict being the most recent conflict that inflicted heavy social, economic and material damages to the country as a whole. Furthermore, like most parts of the country, the region has been hit by recurrent droughts and has been suffering and still is from the 2000 and 2002 droughts. Following these humanitarian crisis, substantial humanitarian assistances is being provided to the affected population through various humanitarian partners to reduce the scale of the problem. As a matter of fact, large areas and population segments of Tigray Region have been under constant humanitarian assistance due to food insecurity both chronic and acute for the last 12 years. The UN-Emergencies Unit for Ethiopia (UN-EUE) launched a mission to Tigray National Regional State from 09-22 February 2003 to undertake a quick assessment on the overall humanitarian situation with specific reference to drought relief activities, war affected population such as the condition of remaining IDPs, of deportees such as people that returned from Eritrea and refugees from Eritrea. The mission also looked into the current decentralization process and progress made so far in moving decision making from zonal to woreda level and including the status of preparation for rural resettlement programme planned to be launched in Tigray. The mission travelled from South to East, North-West and West Tigray Zones with discussions held with regional authorities, UN and NGO staff in the areas visited.
    [Show full text]
  • Eritrea Sud An
    ETHIOPIA Administrative map: Tigray Region As of October 2020 Airdromes ! Red Sea Airport ERITREA Airstrip SUDAN TIGRAY YEMEN Towns ERITREA Regional capital ! Badme Zonal capital AFAR Gulf of Aden DJIBOUTI Woreda capital AMHARA BENISHANGUL Roads GUMUZ Doguaele ! Endalgeda May abay All weather (Asphalt) Addis Ababa SOMALIA May Hamato All weather (Gravel) Weraetle Adi Awala GAMBELA Adi Kilte OROMIA Adi Teleom Boundaries Gemhalo SOMALI Adi Hageray International SNNP Hoya medeb ç Daya Alitena SOUTH Egela Zala Anbesa Dewhan Semhal Gerhusernay Marta Erob Regional SUDAN çSheraro Seyemti Adyabo Hagere Lekuma Badme Adi Ftaw Godefey Adis Tesfa Zonal Adi Hageray Debre Harmaz Adis Alem Adi Kahsu ç Sebeya Shimblina Mihikwan Kebabi Adi Hageray Rama Gulo Mekeda Woreda Kileat Rama Shewit Lemelem Endamosa Arae Musie Adi Nebri Id Zeban Guila Deguale Midri Felasi Egub Beriha- Rama Town Hareza seb'aeta Sheraro town Hayelom River Sedr Adi Nebri Id Habtom Fatsi Haben Ademeyti Lemlem Maywedi Amberay Haftemariam Indian Ocean Tahtay Adiyabo Terawur May Weyni Erdi Jeganu Firedashum UGANDA KENYA Sheraro Ambesete Fikada Water body Fithi Ahsea Mezabir Adi Tsetser Adishimbru Tahtay Koraro Adigabat Rama Medhin Rigbay Medebay Bete Gebez Hagere Selam Meshul Suhul Kokeb Tsibah Geblen Hadishadi Mezbir Marwa ç Border crossing point Lesen Migunae Andin Abinet May Tsaeda Hibret Adi Gedena Meriha Senay /Sehul Tahtay Zban Adi Daero Mdebay Terer Aheferom Sero Mereta Adi Million Wuhdet Kisad Maeteb ! Adi Nigisti Asayme Degoz Baati May Mesanu Adi Daero Simret Ziban Gedena Chila Chila Giter Keren TMegaryatsemri Hilet Koka Tekeze River Mentebteb Adiselam Gola'a Genahti Atsirega Bizet Sewne ç! Awot Wedihazo Adi Daero Hadegti Chila Enticho Adigrat town Dalol Humera Yeha May Suru Adekeney Mergahya Saesie Humera 01 Simret ! Saesie Shame Dibdibo Bizet Kuma Sebha Humera 02 Adi Eleni Wedi Keshi Selam Enticho town Buket Nihibi Welwalo L.
    [Show full text]
  • 20210729 Tigray Region Partners Presence V1
    ETHIOPIA Tigray Region : 3W Operational Presence from 31 May to 26 July 2021 51 number of implementing partners ERITREA Ethiopia 32 11 International NGO National NGO Adi Hageray Zalambesa town Seyemti Egela Erob 2 6 Adyabo Gulo UN Agency Government Sheraro Ahsea Mekeda town Tahtay Eastern Adi Daero Rama Koraro Chila Aheferom Adigrat TownSaesie Tahtay Adiyabo Bizet Humora Inticho town Laelay Adiabo Laelay Adwa Ganta Tahtay Selekleka Maychew Hahayle Afeshum Edagahamus Town North Western Koraro Adwa town Kafta Humera Tahtay Emba Tsaeda Emba Shire town Mayechew Akxum Asgede town Edaga Seneiti Central Arbi Hawzen Frewoyni Town Atsbi May Kadra TIGRAY Endafelasi Hawzen Endabaguna town Naeder Korarit Town Kelete Western Zana Awelallo Tsimbla Adet Atsibi Town Geraleta Wukro May Gaba Keyhe tekli Welkait Degua town Dima Kola Temben Temben Agulae Tsegede Awra Tselemti Abiy Adi town Hagereselam town Tanqua May Tsebri town Dansha Melashe Mekele Tsegede AFAR Abergele Saharti Enderta AMHARA South Eastern Adigudom town #Partner Presence by cluster Hintalo Samre Wajirat # Implementing Organizations Health 21 Selewa Protection by woreda Alaje 20 Bora WASH 18 0 Endamehoni Raya Azebo ESNFI 17 Maychew town Mokhoni town 1 - 3 Neqsege Nutrition 14 Southern Food 7 4 - 7 Ofla Agriculture Zata 6 >= 8 Korem town Chercher Education 4 Alamata town Cash WG 3 Raya Alamata Partner Presence by zone and cluster Zone Agriculture ES/NFI Education Food Health Nutrition Protection WASH ICRC, REST IHS, MEDAIR, SP CARE, FH, REST, JEOP AAH, FGAE, FHI360, AAH, FHI360, GE, IMC,
    [Show full text]
  • Abraha Hailu Lemma Enrolment No
    Socio-economic Factors Affecting People’s Participation in Rural Development Projects: The Case of Bio-fuel project at Tanqua-Abergele and Kola-Tembien Districts of Central Tigray Zone, Ethiopia By Abraha Hailu Lemma Enrolment No. 099108596 E-mail: [email protected] A Thesis Submitted to Indra Ghandi National Open University (IGNOU) in Partial Fulfillment of the Requirements for the Degree of Master of Arts in Rural Development (MARD) Advisor: Maru Shete (Asst. Prof.) May, 2014 Addis Ababa, Ethiopia Table of Contents Page Acknowledgements ................................................................................................................................ III Abstract ................................................................................................................................................. IV List of tables ............................................................................................................................................ V List of Figures ......................................................................................................................................... VI List of Annexes ...................................................................................................................................... VII Acronyms ............................................................................................................................................. VIII Glossary ................................................................................................................................................
    [Show full text]
  • 20210624 Partner Presence in Tigray
    Tigray Region Humanitarian Response On Going Partner Presence in Tigray / Ethiopia as of 24 June 2021 Woreda Partners Abergele (TG) MSF-S Abi Adi town MSF-S/TRHB/AAH 25 Operational Partners Adet MSF-S With on-going activities, out of 29 total partners Adi Daero IRC Adigrat town MSF-S/SCI Adigudom WHO/GE Adwa FHI360/MSF-S/SCI Woredas with Partners Presence Adwa town MSF-S/TPHC 67 Adi Hageray Seyemti Adyabo Zala Anbesa town Agulae UNICEF/TRHB Egela Erob Aheferom FHI360/MCMDO Gulo Mekeda Ahsea MSF-S Sheraro town Alamata town CRS/UNFPA/ERCS Ahsea Asgede UNICEF/TRHB Rama Ganta Afeshum Atsbi CWW/MCMDO/UNICEF/TRHB Tahtay Adiyabo Adi Daero Chila Aheferom Axum town FGAE/FHI360/IMC/MSF-S/TPHC Enticho town Bizet Adigrat town Bora (TG) UNICEF/TRHB Saesie Setit Humera Laelay Adiabo Adwa Chila FHI360/MSF-S Edaga Hamus town Adwa town Degua Temben MCMDO Tahtay Koraro Hahayle Selekleka Axum town Edaga arbi MSF-S Indasilassie town Tsaeda Emba Edaga Hamus town WHO/GE Laelay Maychew Egela FHI360 Asgede Emba Sieneti Freweyni town Emba Alaje CRS Kafta Humera Hawzen town Atsbi Emba Sieneti MSF-S Endabaguna town Tahtay Mayechew Endafelasi MSF-S May Kadra Naeder Edaga arbi Hawzen Zana Endafelasi Atsbi town Endamehoni CRS Korarit Tsimbla Kelete Awelallo Enderta UNICEF/TRHB/WHO/GE Adet Erob MSF-S/UNICEF/TRHB May Gaba Geraleta Wukro town Ganta Afeshum MSF-S/SCI Keyhe tekli Geraleta CWW Welkait Agulae Gulo Mekeda MSF-S/SCI/UNICEF/TRHB Hagere Selam town Hahayle FHI360/MSF-S Awra (TG) Dima (TG) Kola Temben Tselemti Abi Adi town Hawzen MCMDO/MSF-S/UNICEF/TRHB May Tsebri
    [Show full text]
  • Qualitative Research and Analyses of the Economic Impacts of Cash Transfer Programmes in Sub-Saharan Africa
    Qualitative research and analyses of the economic impacts of cash transfer programmes in sub-Saharan Africa Ethiopia country case study report Qualitative research and analyses of the economic impacts of cash transfer programmes in sub-Saharan Africa Ethiopia country case study report FOOD AND AGRICULTURE ORGANIZATION OF THE UNITED NATIONS Rome, 2014 i The From Protection to Production (PtoP) programme is, jointly with UNICEF, exploring the linkages and strengthening coordination between social protection, agriculture and rural development. PtoP is funded principally by the UK Department for International Development (DFID), the Food and Agriculture Organization of the UN (FAO) and the European Union. The programme is also part of a larger effort, the Transfer Project, together with UNICEF, Save the Children and the University of North Carolina, to support the implementation of impact evaluations of cash transfer programmes in sub-Saharan Africa. For more information, please visit PtoP website: www.fao.org/economic/ptop The designations employed and the presentation of material in this information product do not imply the expression of any opinion whatsoever on the part of the Food and Agriculture Organization of the United Nations (FAO) concerning the legal or development status of any country, territory, city or area or of its authorities, or concerning the delimitation of its frontiers or boundaries. The mention of specific companies or products of manufacturers, whether or not these have been patented, does not imply that these have been endorsed or recommended by FAO in preference to others of a similar nature that are not mentioned. The views expressed in this information product are those of the author(s) and do not necessarily reflect the views or policies of FAO.
    [Show full text]
  • Final Evaluation of the IUC Partner Programme with Mekelle University, Ethiopia
    Final evaluation of the IUC partner programme with Mekelle University, Ethiopia July 2013 Ben van Baren & Alemayehu Assefa Foreword This report contains the findings, conclusions and recommendations of the external final evaluation of the Institutional University Cooperation (IUC) Partner Programme (2003 – 2012) with the Mekelle University in Mekelle, Ethiopia. The VLIR-UOS IUC programme is an interuniversity cooperation programme of Flemish universities that started in 1999. Based on a system of programme funding provided by the Belgian government, the IUC is directed at a limited number of partner universities in the South. Each partnership, covering two five-year periods, consists of a coherent set of policies and actions aiming at the improvement of research, teaching and service provision of the partner university as well as the strengthening of its institutional functioning. The IUC programmes are evaluated mid-term and, after their finalization, by an external evaluation team consisting normally of an international and a local expert. The present evaluation was carried out by Mr Ben van Baren, international consultant and Mr Alemayehu Aseffa, national consultant. Guiding document for the evaluation were extensive terms of reference provided by VLIR-UOS. Self- assessments by both northern and southern programme management on the overall programme and by the mixed project teams on the different individual projects provided the basic information on the results and achievements of the programme on which the evaluation team could build further through analysis of programme and project documents like programme proposals and annual plans and reports and through interviews and field visits. Prior to the field mission the evaluation team leader was briefed by VLIR-UOS in Brussels where he also interviewed all programme and project responsible persons from the Flemish side.
    [Show full text]