Ivolt Exceeds Proposed Savings at Edinburgh College Campuses
Total Page:16
File Type:pdf, Size:1020Kb
SECTOR: EDUCATION CASE STUDY: ISS FACILITY SERVICES iVolt Exceeds Proposed Savings at Edinburgh College Campuses aving set themselves an ambitious iVolt were selected as our Edinburgh College, with Sighthill going target to reduce CO2 emissions preferred partner as we found ahead in May and Midlothian and Hby 250 metric tonnes over the they had the most thorough Granton following in June. Utilising next 2-3 years, as well as reducing their ‘process for identifying and iVolt’s IRT™ system and secure web based utility costs by up to 10% over the same evaluating the savings across the portal for accessing information, both period, Edinburgh College is very close sites. The work was completed Edinburgh College and ISS were able to to achieving this goal in the first year to a very high standard. Would measure and verify actual energy savings following the installation of iVolt’s highly recommend using iVolt as compared to the proposed ones; all in unique technology. With higher than a credible company for reducing real time. A report was submitted to ISS expected savings the college are set to electrical consumption in your showing the project payback had dropped save 208 metric tonnes of CO2 and over building. from an estimated 3.85 years down to 3.45 £35,000. Sandy Clark years with the ROI (Return On Investment) Edinburgh College, whose TFM increasing from 26% to 29%. Head of Hard FM services are managed by ISS Facility Services, is set across 4 campuses – the benefits of voltage stabilisation as a AT A GLANCE... Granton, Midlothian, Milton Road way to further reduce CO2 and energy PROJECT / CUSTOMER and Sighthill – and offers higher and costs at the college campuses, as well ISS Facility Services – vocational education for Edinburgh, as understand the processes that are Edinburgh College campuses the Lothians and surrounding undertaken by iVolt from initial contact DATE OF INSTALL communities by providing a varied to completion of a project. Following an 30th May, 20th June & 21st June 2015 range of courses including music, explanation of the thorough engineering ANNUAL kWhr CONSUMPTION performing arts, construction, hair, audit process and post evaluation 6,623,286 beauty and contemporary therapies, validation iVolt were instructed to carry electrical engineering with renewables, out surveys at each campus and provide IVOLT UNIT SIZE computing, business and languages. All a detailed proposal; this would include 500A,1200A &1500A 4 campuses have undergone significant financial summary, projected kWhr ENERGY SAVING refurbishment over the past 10 years; consumption reduction, energy saving 6.4% including the addition of one of the most and CO2 emissions reduction along with EXPECTED RETURN ON INVESTMENT advanced technology teaching centres in a detailed schematic of each installation. 29% Scotland that features an Oil Production From the subsequent surveys 3 of Platform Simulator at Midlothian the 4 campuses were identified that CO2 EMISSIONS REDUCTION (METRIC TONNES) Campus. Midlothian Campus is at the would benefit from installing voltage 208.4 forefront of developing the skills of the stabilisation; these were Granton, next generation of engineers for the Midlothian and Sighthill. As Sighthill The iVolt® was designed in the UK and production takes place at its facility quickly expanding renewable energy required a 1500A unit and one of the near Heathrow Airport. The company is sector by developing a teaching project, more complex delivery routes, a carefully part of the global Sollatek group and is this has been achieved by installing a Solar planned Hi-Ab offload and positioning accredited to ISO9001:2008 Meadow with over 2,500 photovoltaic process would need to be undertaken panels! It has also lead to the Campus to by the designated freight forwarders to FOR MORE INFORMATION ON IVOLT: become less reliant on fossil fuels. ensure the health & safety of personnel T: 01753 21450 0 In 2014 contact was made by Sandy working on site. In March 2015 the E: [email protected] Clark, Head of Hard FM at ISS, to discuss 3 projects were approved by ISS and W: www.ivoltsystems.co.uk We don’t predict energy savings at iVolt - we PROVE them* “One of 30 British businesses with world class potential” The Daily Telegraph *And we’re the only voltage optimisation manufacturer who can ... www.ivoltsystems.co.uk SHORTLISTED FOR HSBC Voltage Optimisation Industry GLOBAL CONNECTIONS AWARD Council for Excellence.