Walsall SAD and Town Centre AAP: Core Document List for Submission Last Updated 25th September 2017
Walsall Sites Allocation Document (SAD)
Core Document List for Submission
Note: All documents are produced by Walsall Council unless the author is given.
Ref Document Publication Date
Examination Documents - Post Submission Documents
EXAM1 Main Matter 3 – Housing Topic Paper July 2017 matter_3_housing_topic_paper.pdf
EXAM2 Walsall Council SAD Examination Opening Statement September Walsall_Site_Allocation_Document_Opening_Statement_MS_05_09_2017.pdf 2017
EXAM3 Appeal Decision 2009 - Land to the west of Northgate, Aldridge, Walsall, WS9 8TL (Appeal Ref: APP/V4630/A/08/2091047) September Appeal_Decision_2009_-_Land_to_the_West_of_Northgate.pdf 2017
EXAM4 Note Submitted by Mr Griffiths including Planning Permission for Unit 10 Merchants Way September Note_submitted_by_Mr_Griffiths_including_Planning_Permission_for_Unit_10_Merchants_Way.pdf 2017
EXAM5 Main Matter 5 - Minerals Examination Note September Matter_5_Minerals_Note.pdf 2017
1
Walsall SAD and Town Centre AAP: Core Document List for Submission Last Updated 25th September 2017
Ref Document Publication Date
EXAM6 Main Matter 6 - Waste Examination Note September Matter_6_Waste_Note.pdf 2017
EXAM7 HBF – Chiltern Delivery DPD – Initial Appraisal September HBF-Chiltern_Delivery_DPD_Initial_Appraisal.pdf 2017
EXAM8 HBF – Chiltern Delivery DPD – Inspector’s Suspension Letter September HBF-Chiltern_Delivery_DPD-Inspector_Suspension_Letter.pdf 2017
EXAM9 HBF – Forest of Dean Interim Findings September HBF-Forest_of_Dean_Interim_Findings.pdf 2017
EXAM10 Royal Tunbridge Wells Borough Council Site Allocations Local Plan Judgment February Royal Tunbridge Wells Borough Council Site Allocations Local Plan Judgment 2017
EXAM11 Main Matter 3 - Housing Supply Note September Main Matter 3 - Housing Supply Note 2017
EXAM12 Main Matter 3 - Traveller Site Number Note September Main Matter 3 - Traveller Site Number Note 2017
EXAM13 Walsall SAD Section 20(7) Request September Walsall SAD Section 20(7) Request 2017
2
Walsall SAD and Town Centre AAP: Core Document List for Submission Last Updated 25th September 2017
Ref Document Publication Date
EXAM14 Walsall Council Response to HBF Matter 3 Submission September Walsall Council Response to HBF Matter 3 Submission 2017
EXAM15 Walsall Friends of the Earth Comments on SAD Policy ENV5 September Walsall Friends of the Earth Comments on SAD Policy ENV5 2017
EXAM16 Beacon Action Group Agricultural Land Quality September Beacon Action Group Agricultural Land Quality 2017
EXAM17 A- Transport for West Midlands 2026 Delivery Plan for Transport September Transport for West Midlands 2026 Delivery Plan for Transport 2016 B- Annex 1 - 16 Corridor Strategies Annex 1 - 16 Corridor Strategies C- Annex 2 - Four Dashboards of Schemes Annex 2 - Four Dashboards of Schemes
EXAM18 Cannock Chase Local Plan Part 2 – HRA Scoping Report December Cannock Chase Local Plan Part 2 – HRA Scoping Report 2016
EXAM19 Natural England Citations for the Cannock Extension Canal SAC September Natural England Citations for the Cannock Extension Canal SAC 2017
EXAM20 Suggested Wording to Policy EN4 as Discussed at MM8 September Suggested Wording to Policy EN4 as Discussed at MM8 2017
3
Walsall SAD and Town Centre AAP: Core Document List for Submission Last Updated 25th September 2017
Ref Document Publication Date
EXAM21 A- SAD Policy EN4 – Table of Discussions September SAD Policy EN4 – Table of Discussions 2017 B- Cannock Chase Council – Duty to Co-operate Meeting Cannock Chase Council – Duty to Co-operate Meeting C- Correspondence between Walsall Council and Canal & River Trust on Policy EN4 Correspondence between Walsall Council and Canal & River Trust on Policy EN4
EXAM22 Policy EN3: Flood Risk - Statement of Common Ground between Walsall Council and Cory Environmental Ltd September Policy EN3: Flood Risk - Statement of Common Ground between Walsall Council and Cory Environmental Ltd 2017
EXAM23 Preferred Options Consultation Responses – Historic England November Preferred Options Consultation Responses – Historic England 2015
EXAM24 Former Deeleys Castings, Leamore Lane – IN328 – Agreed Position Statement of Key Issues September Former Deeleys Castings, Leamore Lane – IN328 – Agreed Position Statement of Key Issues 2017
EXAM25 Summary of Natural England’s Submission and Proposed Main Modification to Policy MP9 Statement of Common Ground September Summary of Natural England’s Submission and Proposed Main Modification to Policy MP9 Statement of Common Ground 2017
Main Submission Documents - General (MS)
MS1 Procedural and Legal Compliance Statement Planning 2026 page May 2017 ms1_-_procedural_and_legal_compliance_statement__may_2017_.pdf
MS2 PAS Soundness Self-Assessment Checklist – SAD May 2017
4
Walsall SAD and Town Centre AAP: Core Document List for Submission Last Updated 25th September 2017
Ref Document Publication Date ms2_-_pas_soundness_self-assessment_checklist_-_sad__may_2017_.pdf
MS3 PAS Soundness Self-Assessment Checklist – AAP May 2017 ms3_-_pas_soundness_self-assessment_checklist_-_aap__may_2017_.pdf
MS4 List of Current Development Plan (Saved Unitary Development Plan) Policies to be replaced by the SAD and /or the AAP May 2017 ms4_-_list_of_current_development_plan_policies_to_be_replaced__may_2017_.pdf
MS5 Local Development Scheme (LDS) Revision lds_revision_june_2017_website_.pdf June 2017
SAD Main Submission Documents (SM)
SM1 SAD Submission Plan (showing Pre-Submission Modifications agreed Post-Publication and Further Proposed Modifications April 2017 following the Pre-Submission Consultation) sm1_-_sad_submission_plan_showing_pre-submission_modifications_and_further_proposed_modifications__april_2017_.pdf
SM2 SAD Submission Policies Map (showing Pre-Submission Modifications agreed Post-Publication and Further Proposed April 2017 Modifications following the Pre-Submission Consultation) sm2_-_sad_submission_policies_map_showing_pre- submission_modifications_and_further_proposed_modifications__april_2017_.pdf
SM3 SAD Schedule of Pre-Submission Modifications November sad_schedule_of_pre-submission_modifications.pdf 2016 5
Walsall SAD and Town Centre AAP: Core Document List for Submission Last Updated 25th September 2017
Ref Document Publication Date
SM4 SAD Schedule of Further Proposed Modifications April 2017 sm4_-_sad_sechedule_of_further_proposed_modifications__april_2017_.pdf
SM4b SAD Schedule of Further Proposed Modifications August 2017 sad_schedule_of_further_proposed_modifications_august_2017.pdf
SM5 SAD Technical Appendices – Assets and Constraints Maps Updated November sm5_-_sad_technical_appendicies_assets_and_constraints_maps_updated__november_2016_-2.pdf 2016
SM6 SAD Technical Appendices – Nature Conservation Designations Sites and Assets Updated November sm6_-_sad_technical_appendicies_nature_conservation_designated_sites_and_assets_updated__november_2016_.pdf 2016
SM7 SAD Technical Appendices –Designated Heritage Assets Updated November sm7_-_sad_technical_appendicies_designated_heritage_assets_updates__november_2016_.pdf 2016
SM8 SAD Technical Appendices –List of Open Space Site Allocations Updated April 2017 sm8_-_sad_technical_appendicies_open_space_site_allocations_updated__april_2017_.pdf
Sustainability Appraisal and Habitats Regulation Assessment (SA)
SA1 SAD and AAP Submission Sustainability Appraisal (SA) October Cover and Contents 2016
6
Walsall SAD and Town Centre AAP: Core Document List for Submission Last Updated 25th September 2017
Ref Document Publication Date Non-Technical Summary Chapter 1 - Content & Objectives of SAD & AAP Chapter 2 - SA Process Chapter 3 - Review of Existing Plans & Programmes Chapter 4 - Review of Baseline Conditions Chapter 5 - SAD & AAP Objectives Testing Chapter 6 - SAD & AAP Options Appraisal Chapter 7 - SA of SAD Chapter 8 - SA of AAP Chapter 9 - Pre-Submission Modifications Updated SAD and AAP SA Chapter 10 - Monitoring Chapter 11 - Conclusions Appendix A - Review of SA & SEA Topics (July 2015) Appendix B - Review of SA Objectives (July 2015) Appendix C - Revised SA Objectives Testing (July 2015) Appendix D - Revised SA Objectives and Criteria (July 2015) Appendix E - Revised SA Framework (July 2015) Appendix F - Revised SAD Objectives Testing (January 2016) Appendix G - Revised AAP Objectives Testing (January 2016) Appendix H - SAD Options Appraisal Summary (October 2016)
7
Walsall SAD and Town Centre AAP: Core Document List for Submission Last Updated 25th September 2017
Ref Document Publication Date Appendix I - AAP Options Appraisal Summary (January 2016) Appendix J - SA of SAD - Summary (January 2016) Appendix K - SA of AAP - Summary (January 2016) Appendix L - SAD Rejected Options - Non Reasonable (October 2016) Appendix M - AAP Rejected Options - Non Reasonable (January 2016) Appendix N - SA of Options for Cannock Chase SAC Mitigation (October 2016) Appendix Oi and Oii - Update of Plans and Programmes (February 2016) Appendix P - Guide to where the SA Requirements have been addressed (March 2016) Appendix Q - SA of Pre-Submission Proposed Modifications (October 2016)
SA2 SAD and AAP Habitats Regulation Assessment (HRA) October hra_-_sad__aap_screening_assessment_publication_28-10-16_final.pdf 2016
SA3 Draft Legal Agreement Proposed between Walsall Council and Cannock Chase SAC Partnership May 2017 draft_legal_agreement_with_cannock_chase_sac_partnership_(june_2017).pdf
Consultation Evidence (CE)
CE1 SAD and AAP Regulation 22 Statement May 2017 ce1_-_sad_and_aap_regulation_22_statement__may_2017_-2.pdf
8
Walsall SAD and Town Centre AAP: Core Document List for Submission Last Updated 25th September 2017
Ref Document Publication Date
CE2 SAD and AAP Duty to Cooperate Overview May 2017 ce2_-_sad_and_aap_duty_to_cooperate_overview__may_2017_.pdf
CE3 Walsall’s Statement of Community Involvement (SCI) February walsall_revised_sci_2012.final.pdf 2012
CE4 SAD and AAP Publication and Pre-Submission Modifications Consultation Report March 2017 ce4_-_sad_and_aap_publication_and_pre- submission_modifcation_consultation_report_with_all_appendices__march_2017_.pdf
CE5 SAD and AAP Preferred Options Consultation Report February ce5_-_sad_and_aap_preferred_options_consultation_report_with_all_appendices__february_2016_.pdf 2016
CE6 SAD and AAP Issues and Options Consultation Report August 2015 issues_and_options_consultation_report.pdf
CE7 SAD Pre-Submission Modification Consultation Schedule of Representations January 2017 SAD_Pre-Submission_Modification_Consultation_Schedule_of_Representations__28January_2017.pdf
CE8 AAP Pre-Submission Modification Consultation Schedule of Representations January 2017 aap_responses_to_ps_modifications_redacted.pdf
CE9 SAD and AAP Pre-Submission Modifications Late Responses January 2017 2658_environment_agency_duty_to_co-operate_sad_aap_cil_late_representations_redacted.pdf
9
Walsall SAD and Town Centre AAP: Core Document List for Submission Last Updated 25th September 2017
Ref Document Publication Date
CE10 SAD Pre-Submission Modifications Consultation Representations and Council Responses April 2017 SAD_Pre-Submission_Modifications_Consultation_Representations_and_Council_Responses_28_April_2017.pdf
CE11 AAP Pre-Submission Modifications Consultation Representations and Council Responses April 2017 aap_-_pre_submission_proposed_mods_consultation_responses.pdf
CE12 SAD Publication Consultation Schedule of Representations May 2016 sad_schedule_of_representations_part_1.pdf sad_schedule_of_representations_part_2.pdf sad_schedule_of_representations_part__3.pdf
CE13 AAP Publication Consultation Schedule of Representations May 2016 town_centre_aap_publication_stage_-_schedule_of_representations.pdf
CE14 SAD Publication Consultation Representations and Council Responses November sad_responses_to_publication_stage_representations.pdf 2016
CE15 AAP Publication Consultation Representations and Council Responses November aap_responses_to_publication_stage_representations.pdf 2016
CE16 SAD Preferred Options Consultation Representations and Council Responses March 2016 sad_po_responses_spreadsheet_for_web-2.xlsx
10
Walsall SAD and Town Centre AAP: Core Document List for Submission Last Updated 25th September 2017
Ref Document Publication Date
CE17 AAP Preferred Options Consultation Representations and Council Responses March 2016 aap_po_responses_spreadsheet_-_website-2.xlsx
CE18 SAD Issues and Options Consultation Representations and Council Responses September sad_issues__options_consultation_response_summary_-_final_to_publish.xlsx 2015
CE19 AAP Issues and Options Consultation Representations and Council Responses September 2015 aap_consultation_responses_280813.xlsx
CE20 Call for Sites Submissions and Walsall Council Responses September call_for_sites_-_council_response_2015.pdf 2015
CE21 Historic England Email May 2017 2149_historic_england_duty_to_co-operate_correspondence_sad_en7-2.pdf
Policy Context (PC)
PC1 Black Country Core Strategy (BCCS) Adopted (Dudley, Sandwell, Walsall and Wolverhampton Councils) February 2011 black_country_core_strategy_final.pdf appendices_1__3-9_final.pdf core_strategy_appendix_2_final.pdf
11
Walsall SAD and Town Centre AAP: Core Document List for Submission Last Updated 25th September 2017
Ref Document Publication Date
PC2 BCCS Inspectors’ Report (Planning Inspectorate) October http://blackcountrycorestrategy.dudley.gov.uk/t4/p3/?assetdet13885227=12114 2010
PC3 Walsall Unitary Development Plan (UDP) – annotated version showing policies that have been superseded by the BCCS or not Adopted saved. March 2005 annotated_2011_udp_-_february_2011.pdf – annotated version February 2011
PC4 Walsall Unitary Development Plan (UDP) Proposals Map Adopted udp_proposals_map_with_jcs_note.pdf March 2005
PC5 Walsall Unitary Development Plan (UDP) Town Centre Inset Plan (note we haven’t provided digital copies of the District Centre Adopted Inset Plans as they are not being replaced – these can be found on our website and made available on request) March 2005 udp_walsall_town_centre_inset_map_with_jcs_note.pdf
Walsall SAD Evidence (SE)
Delivery and Viability (SED)
SED.1 Walsall Site Allocation Document and CIL Deliverability and Viability Study (DTZ) September (Also evidence for the AAP) 2015 sad_cil_study_september_2015__full_version_.pdf
12
Walsall SAD and Town Centre AAP: Core Document List for Submission Last Updated 25th September 2017
Ref Document Publication Date
SED.2 Walsall SAD and Town Centre AAP Delivery Strategy and Infrastructure Plan April 2017 (Also evidence for the AAP) https://go.walsall.gov.uk/Portals/0/images/importeddocuments/sed.2_- _walsall_sad_and_town_centre_aap_delivery_strategy_and_infrastructure_plan_(april_2017).pdf
SED.3 Walsall Authority Monitoring Report 2015 – 2016 May 2017 (Also evidence for the AAP) sed.3_-_walsall_authority_monitoring_report_2015-16.pdf
SED.4 West Midlands Land Commission (February 2017) West Midlands Land Commission (The final report was presented to the West February Midlands Combined Authority Board 17th February. This document provides the papers for the board meeting which the report 2017 was attached to) https://www.wmca.org.uk/media/1412/wmlc-final-report.pdf
Housing (SEH)
SEH.1 Walsall Strategic Housing Land Availability Assessment Update (SHLAA) May 2016 (Also evidence for the AAP) walsall_shlaa_update_2016-2.pdf
SEH.2 Dementia and Town Planning (RTPI Practice Paper) January 2017 policy_hc3_dementia_and_town_planning__january_2017__rtpi_practice_paper.pdf
13
Walsall SAD and Town Centre AAP: Core Document List for Submission Last Updated 25th September 2017
Ref Document Publication Date
Gypsies, Travellers and Travelling Showpeople (SEG)
SEG.1 Travelling Showpeople's Sites - A Planning Focus (The Showmen's Guild) policy_hc4_showmen_site_model_layout_undated_showmens_guild.pdf
SEG.2 Designing Gypsy and Traveller sites: good practice guide (Department for Communities and Local Government) May 2008 policy_hc4_designing_traveller_sites_good_practice_may_2008_dclg.pdf
SEG.3 Black Country Gypsy and Traveller Accommodation Needs Assessment (Fordham Research Group) July 2008 policy_hc4_black_country_gypsy_and_traveller_accommodation_needs_assessment_2008_fordham.pdf
SEG.4 Walsall Council Gypsy, Traveller and Travelling Showpeople Site Assessment and Appendix (Roger Tym and Partners) November gtts_site_assessment_-_march_2013.pdf 2010 but published March 2013
SEG.5 Gypsy, Traveller and Travelling Showpeople Preferred Options Background Document August 2015 https://go.walsall.gov.uk/Portals/0/images/importeddocuments/seg.5_- (updated _gypsy_traveller_and_travelling_showpeople_background_document__(may_2017_update).pdf May 2017)
SEG.6 Housing Act 1985 Section 8 as amended 2016 policy_hc4_housing_act_1985_section_8_amended.pdf
SEG.7 Walsall Site Allocation Document Gypsies, Travellers and Travelling Showpeople Site Assessment Matrix January 2016 gypsy_and_traveller_sites_assessment_matrix_january_2016_walsall_council-2.pdf
14
Walsall SAD and Town Centre AAP: Core Document List for Submission Last Updated 25th September 2017
Ref Document Publication Date
SEG.8 Walsall Gypsy and Traveller Accommodation Assessment Revision 2016 – updated March 2017 walsall_gtaa_revision_2016_final.pdf
SEG.9 Gypsies, Travellers and Travelling Showpeople Background Paper May 2017 https://go.walsall.gov.uk/Portals/0/images/importeddocuments/seg.9_- _gypsies,_travellers_and_travelling_showpeople_background_paper_(may_2017).pdf
Industry (SEI)
SEI.1 Black Country Joint Core Strategy Assessment of Employment Sites (GVA Grimley) November https://go.walsall.gov.uk/Portals/0/images/importeddocuments/final_report_november_2009_pt1_(1).pdf 2009 https://go.walsall.gov.uk/Portals/0/images/importeddocuments/final_report_november_2009_app1.pdf https://go.walsall.gov.uk/Portals/0/images/importeddocuments/final_report_november_2009_app2.pdf
SEI.2 Walsall Employment Land Review (ELR) (Roger Tym & Partners) January 2012 walsall_elr_2012_vol1-2.pdf walsall_elr_volume_2.pdf walsall_elr_2012_area_plans.pdf
SEI.3 Black Country Enterprise Zone Brochure (Black Country LEP) December ez_brochure.pdf 2012
SEI.4 Darlaston Local Development Order (LDO) 2015 April 2015 ldo.htm
15
Walsall SAD and Town Centre AAP: Core Document List for Submission Last Updated 25th September 2017
Ref Document Publication Date
SEI.5 Walsall Employment Land Review (ELR) Update April 2017 (Also evidence for the AAP) walsall_elr_2016_update_(april_2017).pdf
Local Centres (SEL)
SEL.1 Walsall Local Centres Study April 2017 walsall_local_centres_study_april_2017_update.pdf
Open Space, Leisure and Community Facilities (SEO)
SEO.1 Walsall’s Playing Pitch Strategy (PPS) (Scott Wilson) January 2011 walsall_pps_report_complete_20.01.11.pdf Appendix 1 - National Strategic Context Appendix 2 - Supply Data Appendix 3 - Demand Data Appendix 4 - Playing Pitch Model 2010 -15 Appendix 5 - Playing Pitch Model 2020 Appendix 6 - Quality Value Matrix Appendix 7 - GIS Maps
16
Walsall SAD and Town Centre AAP: Core Document List for Submission Last Updated 25th September 2017
Ref Document Publication Date
SEO.2 Walsall’s Open Space, Sport and Recreational Facilities: PPG17 Audit and Assessment (Scott Wilson) February walsall_ppg17_final_report_-_compressed.pdf 2011 Appendix 1 - Site List Appendix 2 - Consultation Overview Appendix 3 - Quality Audit Assessment Criteria Appendix 4 - GIS Mapping Appendix 5 - Standards Calculator Appendix 6 - Indoor Sports Facility Audit 1 Appendix 6 - Indoor Sports Facility Audit 2 Appendix 6 - Indoor Sports Facility Analysis
SEO.3 Walsall’s Green Space Strategy 2012-2017 August 2012 https://go.walsall.gov.uk/Portals/0/images/importeddocuments/green_space_strategy_finalv6_opt.pdf
SEO.4 Transforming Health and Wellbeing for all in Walsall. The Health and Wellbeing Strategy for Walsall 2013-2016 2014 final_2014_hws_refresh-2.pdf
SEO.5 Gorway Campus Planning Permission 15/0165/FL January 2016 15-0165-fl_gorway_campus.pdf
17
Walsall SAD and Town Centre AAP: Core Document List for Submission Last Updated 25th September 2017
Ref Document Publication Date
SEO.6 Bentley Lane Cemetery Planning Permission 15/0744/FL and report to Planning Committee February 15-0744-fl_bentley_land_cemetery.pdf 2016 willenhall_lawn_ceme.pdf
SEO.7 Walsall Joint Strategic Needs Assessment Refresh 2016 http://www.walsallintelligence.org.uk/themedpages-walsall/JSNA/jsna2014) Note this is an online document so haven’t been provided electronically
SEO.8 Walsall Playing Pitch Assessment (Knight, Kavanagh & Page) walsall_pps_assessment_report_final_march_2016.pdf March 2016
SEO.9 Walsall Draft Playing Pitch Strategy (Knight, Kavanagh & Page) April 2017 walsall_pps_strategy_final_april_2017.pdf
SEO.10 Education and Health Background Paper April 2017 (Also evidence for the AAP) education_and_health_background_paper_april_2017_walsall_council-2.pdf
Environmental Networks (SEE)
SEE.1 Habitats Regulations Assessment (HRA) of the Black Country Core Strategy (BCCS) (White Young Green) November black_country_cs_screenin-report_issue_3_final__1_.pdf 2008
18
Walsall SAD and Town Centre AAP: Core Document List for Submission Last Updated 25th September 2017
Ref Document Publication Date
SEE.2 Strategic Flood Risk (SFR) Assessment for the Black Country (Level 1) (Jacobs) February (Also evidence for the AAP) 2009 blackcountry_sfra_finareporl_feb09-2.pdf walsall_floodmap.jpg
SEE.3 Hatherton Canal Restoration Supplementary Feasibility Report (Atkins) February atkins_hatherton_supplement.pdf 2009
SEE.4 Black Country Environmental Infrastructure Guidance (EIG) Phase 1 (Dudley, Sandwell, Walsall and Wolverhampton Councils) June 2009 (Also evidence for the AAP) environmental_infrastructure_guidance_phase_1-2.pdf
SEE.5 Policy Advice Notice: Inland Waterways, Unlocking the Potential and Securing the Future of Inland Waterways through the July 2009 Planning System (Town and Country Planning Association and British Waterways) (Also evidence for the AAP) 30984-planning-advice-note-inland-waterways.pdf
SEE.6 Black Country Water Cycle Study and Scoping Surface Water Management Plan (Scott Wilson) September http://blackcountrycorestrategy.dudley.gov.uk/t4/p1/c/?assetdet13885227=299772&assetdet13950554=299772 2009
SEE.7 Humber River Basin Management Plan (Environment Agency) December (Also evidence for the AAP) 2009 humber_river_basin_management_plan__december_2009__environment_agency.pdf
19
Walsall SAD and Town Centre AAP: Core Document List for Submission Last Updated 25th September 2017
Ref Document Publication Date
SEE.8 Gazetteer of operating pre-1940 Breweries in England (Brewery History Society) February gazatteer_of_operating_breweries.pdf 2010
SEE.9 Habitats Regulations Assessment (HRA) of the Black Country Core Strategy: Screening Report (UE Associates) June 2010 bccs_hra_screening_report_june_2010.pdf
SEE.10 Habitats Regulations Assessment (HRA) of the Black Country Core Strategy: Appropriate Assessment (UE Associates) June 2010 bccs_hra_june_2010.pdf
SEE.11 “Making Space for Nature”: a review of England’s Wildlife Sites and Ecological Network (DEFRA) September space-for-nature.pdf 2010
SEE.12 Highgate Conservation Area Appraisal (The Conservation Studio) November 2010 highgate_ca___mp_30-11-09__low-res_-2.pdf
SEE.13 Walsall Council Preliminary Flood Risk Assessment March 2011 (Also evidence for the AAP) walsall_pfra__mar_2011_.pdf
SEE.14 Natural Environment White Paper: The natural choice: securing the value of nature (DEFRA) June 2011 white_paper_2011.pdf
20
Walsall SAD and Town Centre AAP: Core Document List for Submission Last Updated 25th September 2017
Ref Document Publication Date
SEE.15 UK Biodiversity Action Plan (BAP); Priority Habitat Descriptions: Wood-Pasture and Parkland (Joint Nature Conservation 2011 Committee) https://go.walsall.gov.uk/Portals/0/images/importeddocuments/see.15_-_uk_bap_wood- pasture_and_parkland_(2011)_joint_nature_conservation_committee.pdf
SEE.16 Managing Water Abstraction (The Environment Agency) May 2013 managing_water_abstration_-_ea.pdf
SEE.17 Supporting documents submitted as part of current undetermined planning applications for Great Barr Hall and Estate including Various 13/1567/FL Accessed via: http://planning.walsall.gov.uk/swift/apas/run/wphappcriteria.display
SEE.18 Cannock Chase Local Plan (Part 1) (Cannock Chase Council) Policy CP9 - A Balanced Economy - Hatherton Branch Canal April 2014 Restoration https://www.cannockchasedc.gov.uk/sites/default/files/local_plan_part_1_09.04.14_low_res.pdf
SEE.19 Local Plans: Delivering Inland Waterway Restoration Projects in England and Wales (Canal & River Trust and The Inland April 2015 Waterways Association) 9949-canal___rivertrust.pdf
SEE.20 The State of the Environment Dashboard (Birmingham & Black Country Local Nature Partnership) September bbclnp_soe_dashboard_working_copy_final__1_.pdf 2015
SEE.21 Ashdown Forest Economic Development Llp and (1) Wealden District Council(2) South Downs National Park Authority [2015] 2015 EWCA Civ 681 http://www.bailii.org/ew/cases/EWCA/Civ/2015/681.html 21
Walsall SAD and Town Centre AAP: Core Document List for Submission Last Updated 25th September 2017
Ref Document Publication Date
SEE.22 Black Country Local Flood Risk Management Strategy (Dudley, Sandwell, Walsall, Wolverhampton Councils and WSP Parsons February Brinckerhoff) 2016 (Also evidence for the AAP) the_black_country_local_flood_risk_management_strategy_feb_2016-2.pdf
SEE.23 Great Barr Hall and Chapel Historic England Listing Review Advice Report (Historic England) April 2016 notification_report_229122ba-fb9b-493b-a198-8b73d4910735_sept_2016.pdf
SEE.24 Preparatory Work for Walsall Local Flood Risk Management Strategy (JBA) Mapping (Also evidence for the AAP) produced 2013, preparatory_work_for_walsall_local_flood_risk_management_strategy_december_2016_reduced.pdf document published December 2016
SEE.25 Great Barr Hall Background Paper to Policy ENV7 December https://go.walsall.gov.uk/Portals/0/images/importeddocuments/see.25_- 2016 _great_barr_hall_background_paper_to_policy_env7_(december_2016).pdf
SEE.26 Birmingham and Black Country Nature Improvement Area (NIA) Ecological Strategy 2017 - 2022 (The Wildlife Trust for 2017 Birmingham & Black Country) nia_ecological_strategy_2017-22_summary.pdf
SEE.27 Cannock Chase Local Plan (Part 2) Issues and Options (Cannock Chase Council) Chapter 6: Employment. Issue BE1 January 2017 https://www.cannockchasedc.gov.uk/sites/default/files/local_plan_part_2_issues_and_options_final.pdf
22
Walsall SAD and Town Centre AAP: Core Document List for Submission Last Updated 25th September 2017
Ref Document Publication Date
SEE.28 National Heritage List for England – Historic England entry for Great Barr Hall www.historicengland.org.uk/listing/the-list/list- entry/1076395 National Heritage List for England – Historic England entry for Great Barr Registered Park www.historicengland.org.uk/listing/the-list/list-entry/1001202 Heritage at Risk Register 2016 entry for Great Barr Hall Registered Park and Garden: https://historicengland.org.uk/advice/heritage-at-risk/search-register/list-entry/1982124 Note these are live webpages so haven’t been provided electronically
SEE.29 National Heritage List for England – Historic England entry for Highgate Brewery www.historicengland.org.uk/listing/the-list/list- entry/1342652 Note these are live webpages so haven’t been provided electronically
Waste (SEW)
SEW.1 Black Country Core Strategy - Waste Planning Study (Atkins) May 2009 http://blackcountrycorestrategy.dudley.gov.uk/t4/p1/f/
SEW.2 Black Country Core Strategy - Waste Background Paper 2 and Appendices (Black Country Authorities - Dudley, Sandwell, Walsall February and Wolverhampton Councils) 2010 waste_background_paper_2-2.pdf appendices-5.pdf
SEW.3 Black Country Core Strategy – Waste Monitoring Update (Black Country Authorities - Dudley, Sandwell, Walsall and June 2010 Wolverhampton) jcs_waste_monitoring_update_2010.pdf
23
Walsall SAD and Town Centre AAP: Core Document List for Submission Last Updated 25th September 2017
Ref Document Publication Date
SEW.4 Planning Applications / Decisions: Various 11/0943/FL - 11-0943-fl_branton_hill.pdf 13/0725/WA - 13-0725-wa_decision.pdf 14/0619/CM - 14-0619-cm_atlas_quarry-2.pdf 15/0801/FL - 15-0801-fl_former_wesson_steel_works_bull_lane.pdf 15/1157 - 15-1157.pdf 16/0465 - 16-0465_highfields_south_quarry-2.pdf
Minerals (SEM)
SEM.1 Mineral Resource Information for Development Plans: West Midlands (British Geological Survey) 1999 http://www.bgs.ac.uk/downloads/start.cfm?id=2625
SEM.2 Mineral Resource Map of Warwickshire / West Midlands (British Geological Survey) 1999 http://www.bgs.ac.uk/downloads/start.cfm?id=2623
SEM.3 Provision of Geological Information and a Revision of Mineral Consultation Areas for Staffordshire County Council (British 2006 Geological Survey) https://www.staffordshire.gov.uk/environment/planning/policy/thedevelopmentplan/mineralslocalplan/Minerals-Local-Plan- document-library.aspx
SEM.4 Survey of Arisings and Use of Alternatives to Primary Aggregates in England 2005 - Construction, Demolition and Excavation February Waste and Other Materials (Capita Symonds / WRg) 2007 surveyconstruction2005.pdf
24
Walsall SAD and Town Centre AAP: Core Document List for Submission Last Updated 25th September 2017
Ref Document Publication Date
SEM.5 Black Country Joint Core Strategy – Minerals Study (RPS) March 2008 http://blackcountrycorestrategy.dudley.gov.uk/t4/p1/f/
SEM.6 Black Country Core Strategy (BCCS) – Minerals Background Paper 2 (Dudley, Sandwell, Walsall and Wolverhampton Councils) February http://blackcountrycorestrategy.dudley.gov.uk/t4/p1/f/ 2010
SEM.7 Black Country Core Strategy (BCCS) – Minerals Monitoring Update (Dudley, Sandwell, Walsall and Wolverhampton Councils) June 2010 jcs_minerals_monitoring_update_2010.pdf
SEM.8 Mineral Safeguarding in England – Good Practice Advice (British Geological Survey and Coal Authority in association with 2011 Mineral Products Association and Planning Officers’ Society) Please note this is a live website so has not been provided electronically - https://www.bgs.ac.uk/mineralsuk/planning/legislation/home.html https://www.gov.uk/government/publications/safeguarding-surface-coal-resources
SEM.9 Collation of the Results of the Aggregate Minerals Survey for England and Wales 2014 (British Geological Survey (BGS), DCLG November and Welsh Government) 2016 This document is available online for download from the gov.uk website, and so has not been provided electronically: https://www.gov.uk/government/publications/aggregate-minerals-survey-for-england-and-wales-2014
25
Walsall SAD and Town Centre AAP: Core Document List for Submission Last Updated 25th September 2017
Ref Document Publication Date
SEM.10 Developing Onshore Gas and Oil – Facts about Fracking (DECC) December – link provided below. 2013 Guidance on Fracking: Developing Shale Gas in the UK (DBIS) This is online guidance so has not been provided electronically - https://www.gov.uk/government/publications/about-shale-gas-and-hydraulic-fracturing-fracking/developing-shale-oil-and-gas- January 2017 in-the-uk
SEM.11 Walsall Council SAD & AAP Minerals Project (Amec Foster Wheeler) July 2015 (Also evidence for the AAP) sad_aap_minerals_project_report_20_07_2015.pdf
SEM.12 West Midlands Metropolitan Area Local Aggregates Assessment (LAA) 2015 (West Midlands Metropolitan Authorities) November wmma_laa__nov_2015__-_final_version.pdf 2015
SEM.13 Written Ministerial Statement: Priorities for UK Energy and Climate Change Policy (18), (Secretary of State for Energy and November Climate Change) 2015 Please note this is a live website so has not been provided electronically - https://www.gov.uk/government/speeches/priorities-for-uk-energy-and-climate-change-policy
26
Walsall SAD and Town Centre AAP: Core Document List for Submission Last Updated 25th September 2017
Ref Document Publication Date
SEM.14 Onshore Oil and Gas Activity - Map (Oil and Gas Authority) Please note this is a live interactive online map so has not been provided electronically - https://decc-edu.maps.arcgis.com/apps/webappviewer/index.html?id=29c31fa4b00248418e545d222e57ddaa This interactive online map has superseded the downloadable maps that used to be published on the gov.uk website. The Oil and Gas Authority is now responsible for issuing oil and gas exploration licences (took over role from DECC in 2016, so information on licensing is now on a separate website not on gov.uk). The above link takes you directly to the ‘living’ online interactive map of Onshore Oil and Gas Activity on this website, which shows current oil and gas exploration activity as well as extant onshore exploration licences. Links to home page of Oil and Gas Authority website and Oil and Gas Authority Interactive Maps and Tools are here: https://www.ogauthority.co.uk/ https://www.ogauthority.co.uk/data-centre/interactive-maps-and-tools/
SEM.15 Brick Clay Supply in Walsall December brick_clay_supply_in_walsall_-_december_2015__v2_.xlsx 2015 SEM.15A Brick Clay Supply in the West Midlands – Tables (West Midlands Non-Aggregate Minerals DTC Group) SEM.15B https://go.walsall.gov.uk/Portals/0/sem_15a_-_brick_clay_supply_in_west_midlands_-_tables__mar_2016__-_wm_non- March 2016 ag_dtc_group.xlsx Brick Clay Supply in the West Midlands – Map (West Midlands Non-Aggregate Minerals DTC Group) May 2016 sem.15b_-_brick_clay_supply_in_west_midlands_-_map__may_2016__-_wm_non-ag_dtc_group.pdf
SEM.16 Coalfield Plans: Walsall Area (Coal Authority): April-May SEM.16A Walsall: Coal Mining Risk Area Plan (April 2016) 2016
27
Walsall SAD and Town Centre AAP: Core Document List for Submission Last Updated 25th September 2017
Ref Document Publication Date SEM.16B Walsall: Specific Coal Mining Legacy Plan (May 2016) SEM.16C Walsall: Surface Coal Resource Plan (April 2016) Please note these maps are in PDF format and are available for download from the gov.uk website so have not been provided electronically - https://www.gov.uk/government/publications/coalfield-plans-walsall-area
SEM.17 Staffordshire Minerals Local Plan 2015-30 (adopted Feb 2017) (Staffordshire County Council) February SEM.17A Staffordshire Minerals Local Plan 2015-30 (adopted February 2017) – Appendices (Staffordshire County Council 2017 SEM.17B Staffordshire Minerals Local Plan 2015-30 (adopted February 2017) – Policies & Proposals Map, Staffordshire County Council All the documents are available in Staffordshire’s website so have not been provided electronically - https://www.staffordshire.gov.uk/environment/planning/policy/thedevelopmentplan/mineralslocalplan/mineralsLocalPlan.aspx
SEM.18 Planning Applications / Decisions: Various EB593 (EB3410) - eb3410_-_decision_notice.pdf EB233 - eb233_-_appeal_decision_28.01.54_-_brownhills_common___birch_coppice.pdf BA5827 - ba5827_-_decision_notice.pdf BA17797P – BA17797P.pdf BC40528P – bc40528p_-_decision_notice.pdf BC39489 – BC39489P_-_Vigo_Utopia_Working_Conditions_26_05_95.pdf BC64995P - Location Plan, Environmental Setting and Installation Drawing, Proposed Conceptual Masterplan, Proposed Restoration Masterplan (N.B. ‘Live’ application – not yet determined, revised environmental information submitted in 2016) BC61247P - bc61247p_-_aldridge_quarry_romp_-_cttee_report__03.01.pdf BC52105P – bc52105p_-_branton_hill_romp_-_decision_26.03.99.pdf BC48813P - bc48813p_-_planning_committee_report_20.07.99.pdf 02/1376/M1/M1 - 02-1376-MI-M1.pdf 28
Walsall SAD and Town Centre AAP: Core Document List for Submission Last Updated 25th September 2017
Ref Document Publication Date 04/1603/MI/M1 - 04-1603-m1-m1_ibstock_brick-4.pdf 07/0046/WA/E1 - 07-0046-wa-e1_highfields_south.pdf 08/1338/FL - 08-1338-fl_wienerberger-3.pdf 09/1730/MI – 09-1730-mi_sandown_quarry.pdf 10/0165/FL - 10-0165-fl_vigo_utopia.pdf 11/0943/FL - 11-0943-fl_branton_hill_lane_access_road.pdf 11/0953/FL - 11-0953-fl_highfields_soth_landfill_site.pdf 14/0619/CM - 14-0619-cm_ibstock_brick.pdf 15/0303/FL - 15-0303-fl_wienerberger.pdf 15/1403/FL - 15-1403_cory_env.pdf
SEM19 Minerals Planning Factsheets, British Geological Survey (BGS): Various as SEM.19A Alternative Fossil Fuels (October 2011) indicated SEM.19B Brick Clay (February 2007) SEM.19C Coal (August 2010) SEM.19D Construction Aggregates (June 2013) SEM.19E Fireclay (October 2006) SEM.19F Onshore Oil and Gas (March 2011) All of the above are available online for download from the Minerals UK website, and so have not been provided electronically: https://www.bgs.ac.uk/mineralsuk/planning/mineralPlanningFactsheets.html
Transport and Infrastructure (SET)
29
Walsall SAD and Town Centre AAP: Core Document List for Submission Last Updated 25th September 2017
Ref Document Publication Date
SET.1 Review of Black Country Transport Strategy (Mott Macdonald) April 2009 review_of_black_country_transport_strategy_2009_mott_macdonald.pdf
SET.2 PRISM Black Country Core Strategy Transport Technical Document (PRISM Joint Application Team) July 2009 prism_black_country_core_strategy_transport_technical_document_2009.pdf
SET.3 Core Strategy Delivery & Implementation Plan (Black Country Consortium) February bccs_final_delivery_plan_feb_2010.pdf 2010
SET.4 West Midlands and Chilterns Route Utilisation Strategy (Network Rail) May 2011 west_midlands_and_chilterns_route_utilisation_strategy_-_may_2011.pdf
SET.5 Black Country Rapid Transit Review (Steer Davies Gleave) October 2015 (Also AAP Evidence)
bcrts_final_report_oct_2015_steer_davies_gleave-2.pdf
SET.6 Strategic Transport Plan: “Movement for Growth” (West Midlands Combined Authority) December (Also AAP Evidence) 2015
movement-for-growth-3.pdf
SET.7 16/0806 Bradley Lane Moxley Planning Permission November 16-0806_bradley_lane_moxley.pdf 2016
30
Walsall SAD and Town Centre AAP: Core Document List for Submission Last Updated 25th September 2017
Ref Document Publication Date
SET.8 17/0165 Scoping Opinion Response for Junction 10 of M6 Improvements March 2017 17-0165_junction_10.pdf
SAD Background Documents (SB)
SB1 SAD Issues and Options Consultation Summary April 2013 site_allocation_document_consultation_summary_final.pdf
SB2 SAD Issues and Options Main Detailed Report April 2013 Chapter 01 - Introduction (PDF 365KB) Chapter 02 - About Walsall and Policy Context (PDF 180KB) Chapter 03 - Housing (PDF 430KB) Chapter 04 - Land for Industry (PDF 519KB) Chapter 05 - Shopping and Services (PDF 361KB) Chapter 06 - Open Space, Leisure and Community Facilities (PDF 397KB) Chapter 07 - Environmental Network (PDF 306KB) Chapter 08 - Waste Management (PDF 302KB) Chapter 09 - Minerals (PDF 521KB) Chapter 10 - Transport (PDF 259KB) Chapter 11 - Utilities Infrastructure (PDF 213KB) Chapter 12 - Sites, Choices and Constraints (PDF 627KB)
31
Walsall SAD and Town Centre AAP: Core Document List for Submission Last Updated 25th September 2017
Ref Document Publication Date Chapter 13 - Delivery and Viability (PDF 49KB) Chapter 14 - Next Steps (PDF 33KB)
Appendices: Contents and Appendix 03a - Housing (PDF 1.44MB) Appendix 04a - Land for Industry (PDF 288KB) Appendix 05a - Shopping and Services (PDF 118KB) Appendix 06a - Open Space (PDF 331KB) Appendix 06b - Community and Leisure Facilities (PDF 43.3KB) Appendix 06c - Education, Training and Health (PDF 124KB) Appendix 07a - Historic Environment (PDF 21.4KB) Appendix 08a - Waste (PDF 136KB) Appendix 09a - Minerals (PDF 109KB) Appendix 10a - Transport (PDF 54.6KB) Appendix 12a - Options Rejected (PDF 52.4KB) Schedule of Ward Maps and Site Tables - Maps and site tables by ward (PDF 1.86MB)
SB3 SAD Preferred Options Draft Plan September https://go.walsall.gov.uk/Portals/0/images/importeddocuments/final_sad_with_cover_sep_2015_-_to_publish_(reduced_size)- 2015 3.pdf
32
Walsall SAD and Town Centre AAP: Core Document List for Submission Last Updated 25th September 2017
Ref Document Publication Date
SB4 SAD Preferred Options Full Document September sad_preferred_option_full_document_v1.pdf 2015 Appendices: Constraint and Asset Maps (PDF 4.37MB) Designated Heritage Assets (PDF 231KB) List of Open Space Sites (PDF 180KB) Minerals Appendix - Resource Maps (PDF 833KB) Nature Conservation Designations (PDF 51.4KB) Sites for Gypsies Travellers and Travelling Showpeople (PDF 2.78MB) Waste Appendix 1 - Glossary (PDF 273KB) Waste Appendix 2 - Waste Data Tables (PDF 211KB) Waste Appendix 3 - Existing Waste Sites (PDF 800KB) Waste Appendix 4 - Potential Waste Sites Evaluation (PDF 387KB) Waste Appendix 5 - Potential Waste Sites Constraints (PDF 263KB)
SB5 SAD Preferred Options Draft Policies Map September sad-draft-policies-map2000.jpg 2015
SB6 SAD Preferred Options Draft Plan Ward Map Book September sad_map_book.pdf 2015
SB7 SAD Publication Draft Plan March 2016
33
Walsall SAD and Town Centre AAP: Core Document List for Submission Last Updated 25th September 2017
Ref Document Publication Date sad_publication_draft_plan.pdf
Appendices: Technical Appendices (PDF 7.30MB) - provides maps of the assets and constraints considered as part of the plan making process Nature Conservation Designations (PDF 98KB) Allocated Open Space Sites (PDF 77KB)
SB8 SAD Publication Draft Policies Map March 2016 sad_draft_policies_map_publication_consultation_version_march.jpg
SB9 SAD Publication Draft Ward Map Book March 2016 sad_publication_stage_ward_map_book.pdf
34