July 2, 2021 Mr. Matt Hansen, AIA, NCARB Principal IKM Architecture

Total Page:16

File Type:pdf, Size:1020Kb

July 2, 2021 Mr. Matt Hansen, AIA, NCARB Principal IKM Architecture July 2, 2021 Mr. Matt Hansen, AIA, NCARB Principal BARBER & HOFFMAN, INC . IKM Architecture Consulting Engineers Eleven Stanwix Street, Suite 2200 Pittsburgh, PA 15222 PRINCIPALS Re: Butler Area School District Niru S. Dabholkar Middle School – Gymnasium Ceiling Evaluation Jon T. Leuthaeuser Michael R. Miller Dear Matt: James D. Pospisil Today, I visited the Butler Area School District Middle School to observe the existing tile SENIOR ASSOCIATES ceiling within the gymnasium. You had indicated prior to the visit, a portion of the tile Brad A. Boomer ceiling had collapsed. You have indicated the school district intends to utilize the Middle James M. Colella School during the 2021-2022 educational school year but may not utilize the middle school Tyler J. McGrady in years afterwards. When I arrived on site, a six- by eight-foot portion of the existing 2-foot by 4-foot ceiling ASSOCIATES tiles were missing. It is B&H understanding, from discussions with District maintenance Alexandra S. Koepl personnel, these tiles suddenly fell without warning. The area of the collapsed tiles was Michael A. Mazzocco located towards the west end of the gymnasium. See Photographs 1 through 4. Andrew J. Bollinger I observed the ceiling with the assistance of a vertical lift which the District has been Matthew C. Dacek utilizing within the gymnasium. From this observation, it appears the original ceiling David W. Deaton construction includes 1x wood “bead-boards” attached to 2x wood ceiling joists spaced at Mark D. Heinzen 2’-0”. The ceiling joists appear to be supported by the steel roof trusses. The wood ceiling Andrew J. Lesak joist do not appear to be roof joists, thus they do not support the roof membrane and roof insulation. The ceiling tile system appears to have been installed during a renovation Ang Liu project and is located approximately 6- to 7-inches below the original ceiling. In the area Nagul Nagappar where the tiles fell, a portion of the “bead board” has detached from the ceiling joist. See Kyle E. Shepherd Photograph 5. The extent of the detachment is unclear since it is typically concealed by S. Nick Sparks the ceiling tile. Prior to arriving on site, District maintenance staff indicated they have been installing supplemental fasteners to stabilize the existing tile ceiling at 4’-0” spacing each way. They indicated their intent was to provide these fasteners at every ceiling T which extends between the steel trusses. At the observed ceiling location, it appears the fasteners attach to the 1x “bead-boards”, and not into the 2x ceiling joists. See Photograph 6. In addition, it does not appear as though the ceiling Ls (located at each side of each truss) are not positively attached to the trusses but are bearing on the tops of the truss diagonal angles. See Photographs 7 and 8. Based upon the observations performed, B&H has developed to repair options for this gymnasium ceiling. These options were described to the District maintenance staff and the Middle School Principal. Either option is acceptable to B&H. Option 1 – Ceiling Tile Removal: This approach would include the removal of all the 1659 Route 228 existing ceiling tiles. The existing metal ceiling framing could remain in place, however Suite 200 loose or non-positively attached metal framing is also recommended to be removed or Cranberry Twp., PA attached to the ceiling joists above. This approach would remove the weight imposed upon 16066-5319 724.741.0848 CLEVELAND OH | CRANBERRY TWP. PA | COLUMBUS OH barberhoffman.com the existing fasteners. In addition, loose/detached “bead-boards” should be reattached to the existing ceiling joists. District maintenance personnel indicated the ceiling tiles are attached to the ceiling metal framing with clips, thus their removal would be challenging, especially from the lift. Option 2 – Supplemental Fasteners: This approach would include the installation of two new fasteners with a spreader plate between them spaced at 4’-0” each way. It appears the fasteners which are currently being used could be utilized for this option. The spreader plate could be aluminum 3/16”x2” plate (by 2’-3” long) with holes drilled at 2’-0”. With this option, the fasteners would be anchored through the “bead-board” and embedded at least 2” into the existing ceiling joists. The spreader plates would be located below the ceiling T which occur between the steel trusses. If this option is chosen, then B&H recommends a repair detail be developed to insure the repair intent is clearly understood. Let me know if you have any questions and if further discussions with the District are required. If Option 2 is selected, then provide B&H a day or two to issue the repair detail. Very truly yours, BARBER & HOFFMAN, INC. Michael R. Miller, PE Principal Enclosure: Photographs 1 through 8 MRM/mrm Butler Area School District Middle School – Gymnasium Ceiling Evaluation Page 2 of 2 Photograph 1 Photograph 2 Butler Area School District Middle School – Gymnasium Ceiling Evaluation Photograph Page 1 of 4 Photograph 3 Photograph 4 Butler Area School District Middle School – Gymnasium Ceiling Evaluation Photograph Page 2 of 4 Photograph 5 Photograph 6 Butler Area School District Middle School – Gymnasium Ceiling Evaluation Photograph Page 3 of 4 Photograph 7 Photograph 8 Butler Area School District Middle School – Gymnasium Ceiling Evaluation Photograph Page 4 of 4 .
Recommended publications
  • RFP Moore Gymnasium Bethune Cookman University the Objective
    Scope Statement Development Instructions RFP Moore Gymnasium Bethune Cookman University The objective of this project is multifaceted. The existing building (Moore Gym) was built in 1954. The athletic facility is a single building. This project will be a major renovation to not only the cosmetics of this building, but the upgrade that will cover Life Safety Systems, MEP, Envelope and Roofing Systems. The time line for this project is as follows: The project must be completed no later than December 31, 2021. This will ensure that it is completed for school opening. The implementation plan needs to include methodologies and systems that will be the least disruptive and most cost effective as possible for University. All installation will be done in a professional workmanship like manner. Finally, all work will be done in such a manner as to mitigate any possibility of injury and exposure to Bethune Cookman University, its employees, students, and/or visitors. 06/30/2021 Page 1 of 11 Scope Statement Development Instructions TABLE OF CONTENTS Contents A. Executive Summary ............................................................................................... 3 B. Business Objectives ............................................................................................... 3 C. Project Description ............................................................................................... 4 D. Project Controls .................................................................................................... 7 E. Scope Statement
    [Show full text]
  • FYI Newsletter May 5, 2021
    FYI Newsletter May 5, 2021 John 13:34 A new commandment I give to you, that you love one another; as I have loved you, that you also love one another. By this all will know that you are My disciples, if you have love for one another. BOOSTER CLUB MEETING **MEET THE COACHES FOR FALL SPORTS** Monday, May 10th 5:00P Event Center FAITHACADEMYBELLVILLE.ORG REGISTRATION & SPONSORSHIP FORMS ARE ATTACHED Mrs. Hargrave’s 3rd Grade Class Friday, May 14th 9:00A - 10:00A Event Center Mother's Day is coming up on Sunday, May 9 and many FA supporters are shopping for gifts. This is a great opportunity to increase Faith Academy of Bellville's AmazonSmile donations by reminding your Last Day to observe supporters to shop at smile.amazon.com. in the classroom is Use the tool kit below in email, social media, and on your website to spread the word to your Friday, May 14th staff, families and volunteers when you shop Mother's Day gifts at smile.amazon.com/ch/76-0509102 AmazonSmile donates to Faith Academy Join us on Monday, May 17th to celebrate the Senior Class of 2021 8:00 a.m. Gymnasium All Are Welcome!! 2021 Faith Academy Awards (High School Only) May 17, 2021 Tickets $15 (for sale in the office) Meal Served @ 6:00P Semi-formal Attire *Tickets Must Be Purchased before May 12 ELEMENTARY AWARDS & RECOGNITION Academic, Classroom Awards, AR & Roadrunner Thursday, May 20th 1:00P Beth Keaton Gymnasium All are invited!! & RECOGNIZING JUNIOR HIGH STUDENTS for ACADEMICS & SPORTS Thursday, May 20th 2:00P Beth Keaton Gymnasium All are invited!! Friday May 21st End of school Black-out Pep Rally @ 2:30 in the gym and BLUE BOWL Festivities after school Watch for more info next week!! Senior Graduation Ceremony Sunday, May 23rd 3:00P Beth Keaton Gymnasium Family, Friends & Community are invited Kindergarten Graduation Ceremony Monday, May 24th 6:00P Beth Keaton Gymnasium EEC has a role in the program & are excited to share with you what they have learned this year!! Family, Friends & Community are invited FA Knight News by Mrs.
    [Show full text]
  • Key Digital Transforms Preparatory School's Multi-Use Gymnasium
    CASE STUDY Key Digital Transforms Preparatory School’s Multi-Use Gymnasium Key Digital’s Compass Control® Pro system gives the Brentwood Academy a faculty-friendly control solution that can accommodate variety of school events. Pro Tech Media Solutions (A Division of Audio Electronics, Inc.) is Key Digital’s hallmark control solution allowed for seamless and a full service Audio/Visual Company located in Nashville, TN, knew independent control of the multiple scenes in the school gymnasium. to turn to Key Digital’s flexible control system, Compass Control® “ One of the most unique designs for this installation is the score table Pro, for the Brentwood Academy gymnasium transformation. for the basketball games. The score table announcer has a computer from which he plays the tunes to get the crowd revved up and he also Located just south of Nashville in Brentwood, Tennessee, Brentwood Academy is a coeducational independent Christian college preparatory has his own mic for announcing. With the incredibly customizable ® school for grades six through twelve. After years of frustrating audio Compass Control Pro PTMS made a GUI with two large mute buttons and video issues the school needed an easy and manageable control so he can put the iPad on either side of him and just reach over and system in the upper gymnasium which is used for sporting events, school press one button to talk. With that one button press the audio from all assemblies, pep rallies, and chapel services. other sources mute and his mic is heard loud and clear. The school Prior to the Compass Control® absolutely loves that feature!” said Dewayne Rains, VP of Sales, All of the settings that Pro installation the school’s Key Digital Systems.
    [Show full text]
  • Secondary School
    Secondary school A secondary school is an organization that provides secondary education and the building where this takes place. Some secondary schools provide both lower secondary education and upper secondary education (levels 2 and 3 of the ISCED scale), but these can also be provided in separate schools, as in the American middle and high school system. Secondary schools typically follow on from primary schools and prepare for vocational or tertiary education. Attendance is usually compulsory for students until the age of 16. The organisations, buildings, and terminology are more or less unique in each Tóth Árpád Gimnázium, a secondary school in Debrecen, country.[1][2] Hungary Contents Levels of education Terminology: descriptions of cohorts Theoretical framework Building design specifications Secondary schools by country See also References External links Levels of education In the ISCED 2011 education scale levels 2 and 3 correspond to secondary education which are as follows: Lower secondary education- First stage of secondary education building on primary education, typically with a more subject-oriented curriculum. Students are generally around 12-15 years old Upper secondary education- Second stage of secondary education and final stage of formal education for students typically aged 16–18, preparing for tertiary/adult education or providing skills relevant to employment. Usually with an increased range of subject options and streams. Terminology: descriptions of cohorts Within the English speaking world, there are three widely used systems to describe the age of the child. The first is the 'equivalent ages', then countries that base their education systems on the 'English model' use one of two methods to identify the year group, while countries that base their systems on the 'American K-12 model' refer to their year groups as 'grades'.
    [Show full text]
  • The Gymnasium Building Mooresville, Indiana
    The Gymnasium Building Mooresville, Indiana In 1996, the Save the Newby Gym Committee was formed to raise money to repair the aging building. The committee was comprised of junior basketball league officers, school administrators, and civic leaders, some of whom had played on the Newby court during their high school athletic careers. The committee worked from 1996 until renovations were completed in the fall of 1999. A grant from the Lilly Endowment in the amount of $77,150 was presented to the committee in 1997. These funds, along with other money raised by the committee through donations and fundraising efforts, allowed for the much needed repairs to the facility. These repairs included; improving the structural integrity of the north wall, building and painting bleachers for the north side of the gym, replacing all of the windows, replacing the entire floor, and the installation of a handicapped accessible bathroom – not to mention evicting numerous bats that had made the Newby Gym their home. The renovated gym was reded- icated on September 11, 1999. Top right: Sophomore girls dance around the Maypole during May Day 1957 events; Top Left: Homecoming dance 1956; Below: The Girls Athletic Association plays basketball in the gym 1955. Front Cover: Top: 1957 Graduation; Lower Left: Basketball 1955; Lower Right: The Gymnasium in 2012. A fund for the preservation of the Newby Gym is set up at the Community Foundation of Morgan County. Plaques with pieces of the original wood floor are available for sale with proceeds benefitting the fund. Find more information at www.cfmconline.org or 317-831-1232.
    [Show full text]
  • William Hall Walker Gymnasium Other Names/Site Number  2
    NPS Form 10-900 OMB No. 1024-0018 United States Department of the Interior National Park Service National Register of Historic Places Registration Form This form is for use in nominating or requesting determinations of eligibility for individual properties or districts. See instructions in How to Complete the National Register of Historic Places Registration Form (National Register Bulletin 16A). Complete each item by marking "x" in the appropriate box or by entering the information requested. If an item does not apply to the property being documented, enter "N/A" for "not applicable." For functions, architectural classification, materials and areas of significance, enter only categories and subcategories listed in the instructions. Place additional entries and narrative items on continuation sheets (NPS Form 10-900a). Use a typewriter, word processor, or computer, to complete all items. 1. Name of Property historic name William Hall Walker Gymnasium other names/site number 2. Location street & number Sixth Street at Fieldhouse Road, Castle Point on Hudson not for publication city or town City of Hoboken vicinity state New Jersey code 034 county Hudson code 017 zip code 07030 3. State/Federal Agency Certification As the designated authority under the National Historic Preservation Act, as amended, I certify that this X nomination request for determination of eligibility meets the documentation standards for registering properties in the National Register of Historic Places and meets the procedural and professional requirements set forth in 36 CFR Part 60. In my opinion, the property X meets does not meet the National Register criteria. I recommend that this property be considered significant nationally statewide locally.
    [Show full text]
  • Czech Republic Gymnasium "Prirodni Skola"
    OECD - Innovative Learning Environment Project Universe Case Czech Republic Gymnasium "Prirodni skola" This (state-subsidized private) school for students aged 12 to 20, is specialized in science; students need to pass an entrance exam before inscribing. The objective of the school is to allow children to work independently under the provision of relevant short-term feedback on their decisions. The curriculum of most subjects is divided into study requirements that students must meet within three-month periods by delivering different proofs of knowledge (e.g., presentations, portfolios). Students can direct their course of education both by deciding when to fulfil given requirements, and by choosing among different requirements in some subjects. In addition to traditional classroom training, students learn in cross- curricular research projects, both on “project-Wednesday” and during school tours (in total ca. six weeks per school year during which students and teachers live together). Students’ social development is fostered through work of a student advisory board, a system of patrons (older students helping younger students), and peer teaching. Main Focus of Innovation: CONTENT, ORGANISATION General Information Name of the ILE: Gymnasium “Prirodni skola” Location/Address: Prague 9, Frycovicka 462, 199 00 Website: www.prirodniskola.cz 1 OECD - Innovative Learning Environment Project Universe Case Rationale Why do you suggest that it should be included in the project? How does it respond to 21st century learning challenges? We think that our system and methods combining student-oriented education focusing on the development of individuals, cross-curricular education, and the upbringing of decent and active people with their own opinions might be found inspiring by other schools.
    [Show full text]
  • Czech Education System Is in the Midst of Implementing a Comprehensive Set of Reforms
    Profile of the Czech Republic’s Education System National Center on Education and the Economy New Commission on the Skills of the American Workforce National Center on Education and the Economy, 2006 National Center on Education and the Economy America’s Choice II Profile of the Czech Republic’s Education System The Czech Republic has one of the strongest economies and lowest poverty rates of former Soviet bloc countries in Europe. With very high rates of literacy and strong performance in math and science on international comparisons of educational achievement, the Czechs are poised to become a increasingly competitive force within the EU. Yet, their education system is still in transition. Despite significant reforms aimed at moving away from communist-style central management, the Czechs are still struggling to modernize to keep pace with the rest of the EU and the demands of a global economy. The first wave of reform has been structural; Czech schools are only beginning to wrestle with changing "old school" pedagogy and opening access to higher education to a broader sector of the population. I. Context The Czech Republic was established in 1993, when it split from what is now known as the Slovak Federal Republic. The former Czechoslovakia had united the two states since the end of World War I. Reunited after the war, the Czechs and the Slovaks hoped that the Soviet Union would allow them the freedom to choose their own government and that the country could act as a bridge between West and East. These hopes were short-lived, as the Soviet-led Communist Party seized power, purged reform-minded elements of the party and installed hardliner Antonin Novotny as the party chief.
    [Show full text]
  • Trends in Differentiation of Student Achievement and Learning Conditions in the Czech Compulsory Education
    Trends in differentiation of student achievement and learning conditions in the Czech compulsory education. Findings from TIMSS. Jana Straková, [email protected] Paper to be presented at IRC 2010 conference Trends in differentiation of student achievement and learning conditions in the Czech compulsory education. Findings from TIMSS. Jana Straková, Institute of Sociology, Academy of Sciences of the Czech Republic and Institute for Information on Education, [email protected] Abstract Many studies show that one of the most important factors related to delivering equity in education is the design of education system, its differentiation, and the age at the time of the first selection. In a system in which early self-selection is constrained by the choice structure there is less educational inequality than in a system where consequential decisions about the educational career are taken at a very young age. On that account, grouping according to student performance has been one of the most controversial issues in education for more than 80 years. Its effects, particularly on student achievement, have been extensively studied over that time period, mainly in United States and Great Britain. In the Czech Republic tracking is very extensive and starts from very young age. In all international comparative studies of student achievement the Czech Republic exhibits a relatively strong relationship between student achievement and family background. National analyses show high differences between achievement and social composition of students in individual tracks. In last decade the differentiation of Czech education system at the primary and lower secondary level has been escalating. The data from the IEA TIMSS study show that the growing differentiation of educational pathways leads to the growing differentiation of student achievement and learning experience of students in various schools and tracks.
    [Show full text]
  • List of Certified Schools by Country
    LIST OF CERTIFIED SCHOOLS BY COUNTRY Please click to select country AUSTRIA BELGIUM BULGARIA CROATIA CYPRUS CZECH REPUBLIC DENMARK ESTONIA FINLAND FRANCE GERMANY GREECE HUNGARY IRELAND ITALY LATVIA LITHUANIA LUXEMBOURG MALTA NETHERLANDS POLAND PORTUGAL ROMANIA SLOVAKIA SLOVENIA SPAIN SWEDEN AUSTRIA Name of School Website Official Email BBAfEP Haspingerstraße https://www.bafep-ibk.at/ [email protected] Bernoulligymnasium https://www.bernoulligymnasium office@bernoulligymnasiu .at/ m.at BG Babenbergerring https://www.bg-bab.ac.at/ [email protected] BG Seekirchen http://bg-seekirchen.at/ [email protected] BG/BRG für Slowenen https://www.slog.at/home_de bg-klu-slow@bildung- ktn.gv.at BG/BRG Judenburg https://www.brg-judenburg.ac.at/ direktion(at)brg- judenburg.ac.at BG/BRG Klusemannstraße https://www.klusemann.at/ [email protected] BG/BRG Leibnitz https://www.gym-leibnitz.at/ [email protected] BG/BRG Lilienfeld https://bglilienfeld.ac.at/cms_wor [email protected]. dpress/ at BG/BRG Purkersdorf https://www.gympurkersdorf.ac.a [email protected] t/ BG/BRG Tulln https://www.bgtulln.ac.at/ [email protected] BG/BRG Villach St. Martin https://www.it-gymnasium.at/ direktion@it- gymnasium.at BG/BRG Waidhofen an der Thaya http://www.gymwt.at [email protected] BG/BRG/BORG Eisenstadt https://www.gymnasium- [email protected] eisenstadt.at/kontakt/ BG/BRG/BORG Köflach https://www.ahskoeflach.at/ [email protected] BG/BRG/BORG Oberpullendorf http://www.brgop.at [email protected] BHAK Korneuburg https://www.hak-korneuburg.at/ hak.korneuburg@noeschul e.at BHAK Spittal/Drau https://www.hakspittal.at/ [email protected] BHAK und BHAS Baden https://www.hak-baden.com/ [email protected] BHAK Weiz http://www.hakweiz.at [email protected] BHAK/BHAS Bruck an der Leitha https://www.bebruck.at/ [email protected] BHAK/BHAS Deutschlandsberg http://www.bhak-dl.ac.at [email protected] BHAK/BHAS Liezen https://www.hak-liezen.at/ [email protected] BHAK/BHAS St.
    [Show full text]
  • 1 Survey and Research Report on the Derita High School Gymnasium
    1 Survey and Research Report On The Derita High School Gymnasium October 30, 2018 Derita High School Gymnasium 2018 Derita High School Gymnasium c. 1960 1. Name And Location Of The Property. The Derita High School Gymnasium is located at 6115 Rumple Road, Charlotte, N.C. 2 2. Name And Address Of The Present Owner Of The Property. Charlotte Mecklenburg Board of Education P.O. Box 30035 Charlotte, N.C. 28230 3. Representative Photographs Of The Property. The report contains representative photographs of the property. 4. Map Depicting The Location Of The Property. This report contains a map depicting the location of the property. 3 Derita High School Gymnasium 5. Current Tax Parcel Number Of The Property. The tax parcel number of the property is 04704312. 4 6. A Brief Historic Sketch Of The Property. The report contains a brief historical sketch of the property prepared by Dr. Dan L. Morrill. 7. A Brief Physical Description Of The Property. The report contains a brief physical description of the property prepared by Dr. Dan L. Morrill. 8. Documentation Of Why And In What Ways The Property Meets The Criteria For Designation Set Forth In N.C.G.S. 160A-400.5. a. Special Significance In Terms Of Its History, Architecture, And/Or Cultural Importance . The Charlotte-Mecklenburg Historic Landmarks Commission judges that the Derita High School Gymnasium possesses special significance in terms of Mecklenburg County. The Commission bases its judgment on the following considerations: 1) The Derita High School Gymnasium is one of only three extant gymnasiums that were erected by the Mecklenburg County Board of Education before World War Two.
    [Show full text]
  • Study to Implement Full-Day Kindergarten February 2018
    Needham Public Schools Study to Implement Full-Day Kindergarten February 2018 Dore Whittier Architects Newburyport, Massachusetts Study To Implement Full Day Kindergarten – Needham Public Schools Table of Contents • Executive Summary • Individual School Analyses • Broadmeadow School • Eliot School • Mitchell School • Newman School • Sunita L. Williams School • Appendices • X-01 Classroom and Class Size Calculations • X-02 Conceptual Cost Estimates i Study To Implement Full Day Kindergarten – Needham Public Schools ii Study To Implement Full Day Kindergarten – Needham Public Schools Executive Summary Purpose and Scope In October 2017, the Town of Needham, through the Town Manager and its Permanent Public Building Committee, hired Dore & Whittier to provide designer services for the preparation of a Space Study and Cost Estimate to address the School Committee’s objective to provide Full-Day Kindergarten (FDK) within the Needham School District. This study’s key objective was to determine how best to utilize the existing assets within the District to roll out the FDK program without redistricting and causing the least impact on existing educational programs such as Art, Music, STEAM, and Language programs. Dore & Whittier’s primary scope included the following: • Review all prior studies and background information for the FDK program. • Analyze the program needs with the NPS staff and Principals from each elementary school and assess how the kindergarten students could best be accommodated at each school. Identify the size of the existing Kindergarten rooms including bathrooms and storage, and the programmatic needs of the additional Kindergarten rooms. • Identify the rooms that will be available once KASE moves out and determine how they might be repurposed.
    [Show full text]