02 Operational Report
18 PTA Annual Report / Operational Report 02 Operational Report Photo: Stephen Endicott, N&I The summary is broken down as follows: A 2016-17 • 2.1 Our services – fleet, patronage, reliability, summary of our capacity and key operational activities. • 2.2 Fares and other revenue – overview of performance revenue and expenditure. • 2.3 PTA in the community – our commitment in providing to providing satisfactory, safe, well- safe, customer- communicated and sustainable operations. • 2.4 Infrastructure delivery – planning, focussed, projects, maintenance, upgrades and asset management. integrated and • 2.5 Our people – overview of our workforce and our strategy for developing, attracting and efficient transport retaining employees. services. A detailed overview of our targets and performance is available in the key performance indicators. PTA Annual Report / Our Services 19 Within the fleet, 677 buses conform to Euro5 and 2.1 Our services Euro6 emission standards (46 per cent of the total), and 492 buses to Euro4 (33.5 per cent). The other 300 buses conform to Euro0 and 2.1.1 Metro (Transperth) Euro3. Transperth is the brand and operating name of Transperth buses covered 280 standard the public transport system in the greater Perth timetabled bus routes (plus 32 non-timetabled metropolitan area. special event routes), 297 school routes and 10 The Transperth system consists of a bus network, CAT (Central Area Transit) routes. On a typical a fully-electrified urban train system and a ferry weekday this involved operating 15,317 standard service. It is managed by our Transperth branch service trips, 298 school service trips and 981 and covers key functions such as system CAT service trips.
[Show full text]