New Bago-Kyaikto Highway Section) in the Republic of the Union of Myanmar
Total Page:16
File Type:pdf, Size:1020Kb
Ministry of Construction Republic of the Union of Myanmar Preparatory Survey for the East-West Economic Corridor Highway Development Project (New Bago-Kyaikto Highway Section) in the Republic of the Union of Myanmar Final Report Volume 1 Main Report February 2020 Japan International Cooperation Agency Oriental Consultants Global Co., Ltd. Nippon Koei Co., Ltd. International Development Center of Japan Inc. 1R Metropolitan Expressway Co., Ltd. JR(P) 20-003 Ministry of Construction Republic of the Union of Myanmar Preparatory Survey for the East-West Economic Corridor Highway Development Project (New Bago-Kyaikto Highway Section) in the Republic of the Union of Myanmar Final Report Volume 1 Main Report February 2020 Japan International Cooperation Agency Oriental Consultants Global Co., Ltd. Nippon Koei Co., Ltd. International Development Center of Japan Inc. Metropolitan Expressway Co., Ltd. Currency Equivalents USD 1.00 = MMK1,500 = JPY 109.0 (January 2020) *MMK: Myanmar Kyat Location Map and Site Conditions around East-West Economic Corridor and National Highway ③NH8 (West area of the existing ④The existing Sittang Bridge ⑤NH8 (East area of the existing ①NH8 Toll Gate (BOT) ②NH8 Waw City ⑥NH8 Kyaito City Sittang Bridge) (oparated in 2008) Sittang Bridge) ⑦Crossing River Point of the New Sittang Bridge on the left bank (1) ③ ② ④ ① ⑤ ⑨ ⑮ ⑩ ⑦ ⑥ ⑭ ⑧ ⑧Crossing River Point of the New Sittang Bridge on the left bank (2) ⑬ ⑫ ⑨Crossing River Point of the New ⑪ Sittang Bridge on the left bank (Paddy Field Zone) ⑩Crossing River Point of the New ⑪Kawkareik - Thin Gan Nyi ⑮NH1 Bago City ⑭NH1 (South of Bago City) ⑬Thilawa-Bago Road ⑫Eindu - Kawkareik Sittang Bridge on the right bank Naung Bypass (Plantation Zone) Location Map around Thuwunna Research Laboratory and Training Center Yangon Project Site N 0 1 2km Research Laboratory HOSTEL MOC Training Center N Vocational Training Center 0 200 400m Perspective of the Project (New Sittaung Bridge) Perspective of the Project (New Sittaung Bridge) Perspective of the Project (New Sittaung Bridge) Perspective of the Project (New Sittaung Bridge) Bird’s Eye View of Thuwunna Research Laboratory and Training Center Perspective View of the Vocational Training Center Perspective View of the Hostels Interior Perspective View of Research Laboratory Preparatory Survey for the East-West Economic Corridor Highway Development Project (New Bago-Kyaikto Highway Section) Final Report Vol.1 Main Report Preparatory Survey for the East-West Economic Corridor Highway Development Project (New Bago-Kyaikto Highway Section) EXECUTIVE SUMMARY 1. INTRODUCTION 1.1 Background of the Project The Republic of the Union of Myanmar (hereinafter referred to as “Myanmar”) has had continuing high economic growth with the shift to democratization (March 2011). There is active trade with neighboring Thailand in the background. Trade between the two countries is expected to further expand in the future, but the current maritime transport via the Malay Peninsula is very inefficient. As an alternative means of transportation to the sea, it is expected that the East-West Economic Corridor (hereinafter referred to as “EWEC”) connecting the two countries as well as other ASEAN countries by land will be developed soon. The other countries’ section of EWEC has been improved with international standards that can correspond to international logistics. On the other hand, there are many bottleneck sections that impede smooth land transportation, such as weight limitation due to aging bridges, incorrect alignment and profiles such as steep and sharp curves, passage through dense urban areas, etc. Therefore, the government of Myanmar has put the development of the route as a high priority and has promoted improvement through the support of international organizations and the Thai government. As a result, from the Thai border to the Thaton and Mawlamyine section, the roadway has been improved to a two-lane paved road corresponding to international standards, thereby domestic and international logistics are expected to be activated. Meanwhile, issues such as traffic congestion and deterioration of safety are beginning to surface. Especially, traffic congestion is predicted to occur due to the mixture of regional traffic and transit traffic because the existing road passes through the urban area from the Bago to Kyaikto section about 100 km from Thaton to Yangon. Therefore, in order to separate regional traffic and transit traffic to ensure safety, it is necessary to build an alternative highway that can divert the traffic from urban areas in this section. Moreover, in response to logistics promotion in line with the country’s economic growth, a lot of roads and bridges have been constructed recently in Myanmar and results in lack of technical capacity and human resources. Thus, MOC needs to strengthen technical training programs which will improve the technical and project management skills of engineers in MOC. To reflect to this, enhancement of the Thuwunna Central Training Center (hereafter referred to as “Thuwunna CTC”)’s function and Research Laboratories’ quality control function are strongly required. However it was recognized that advanced trainings and quality inspections cannot be provided sufficiently in the existing Thuwunna CTC and laboratories due to its aging and insufficient facilities. Hence, the upgrading of the CTC and Research Laboratories facilities is strongly required for providing the necessary advanced trainings S-1 Preparatory Survey for the East-West Economic Corridor Highway Development Project (New Bago-Kyaikto Highway Section) Final Report Vol.1 Main Report and quality inspections for sustainable operation, maintenance and management of highways and bridges including this Project road. Under these circumstances, the Japan International Cooperation Agency (hereinafter referred to as “JICA”) decided to implement a Feasibility Study (F/S) necessary for the development of the new road between Bago and Kyaikto and upgrading the existing training center including laboratories for quality inspections of construction materials, in cooperation with the Asian Development Bank (hereafter referred to as “ADB”). The JICA’s Study (hereafter referred to as “the Study”) is concerned for the “Construction of the New Sittaung Bridge” and “Upgrading Thuwunna Research Laboratory and Training Center” (hereinafter referred to as “the Project”) and ADB’s Study is concerned for the construction of the road section from Bago to Kyaikto section. 1.2 Outline of the EWEC Project The objective of the East-West Economic Corridor Highway Development Project (New Bago-Kyaikto Highway Section) (hereinafter referred to as “the EWEC Project”) is the development of a new arterial road of about 63.9km connecting Bago to Kyaikto including the construction of New Sittaung Bridge and the upgrading of Thuwunna Research Laboratory and Training Center (hereafter referred to as “Thuwunna RLTC”). In addition, the subject of the Study is the New Sittaung Bridge section which is about 2.5km in length as well as upgrading of Thuwunna RLTC, studied in the view of the JICA loan. The outline of the EWEC Project is shown in Table S 1.2.1. Table S 1.2.1 Outline ofthe EWEC Project Project Name East-West Economic Corridor Highway Development Project (New Bago-Kyaikto Highway Section) Project Purpose To improve the efficiency of international and domestic logistics by responding to the increasing traffic demand through developing a new road from Bago to Kyaikto section of the EWEC and strengthening the road operation and maintenance capacity of MOC, thereby contributing to the vitalization of Myanmar's trade. Project Outline Study object of JICA’s loan ・Construction of New Sittaung Bridge (total length of 2.5km) ・Upgrading of Thuwunna Research Laboratory and Training Center Study object of ADB’s loan ・Construction of new arterial road except for New Sittaung Bridge (total length of 61.4km) Project Area Mon State, Bago Region and Yangon Region of Myanmar Related Government Ministry of Construction(MOC), Department of Bridge (DOB) and Department of Highways Agency (DOH) Source: JICA Study Team 1.3 Objective of the Study The objective of the Study is to conduct a necessary survey, such as objectives, outline, project cost, implementation schedule, implementation method (procurement, construction), project implementation organization, operation and maintenance system, environmental and social considerations, etc., for the examination for implementation of construction of New Sittaung Bridge and upgrading of Thuwunna RLTC under the EWEC Project as Japan’s loan cooperation. S-2 Preparatory Survey for the East-West Economic Corridor Highway Development Project (New Bago-Kyaikto Highway Section) Final Report Vol.1 Main Report 1.4 Study Area The details of the EWEC Project area are shown in Figure S 1.4.1 and Figure S 1.4.2. Source: JICA Study Team Figure S 1.4.1 Project Location Map (New Sittaung Bridge) Source: JICA Study Team Figure S 1.4.2 Project Location Map (Thuwunna RLTC) S-3 Preparatory Survey for the East-West Economic Corridor Highway Development Project (New Bago-Kyaikto Highway Section) Final Report Vol.1 Main Report 1.5 Study Schedule The work schedule of the Study is shown in Figure S 1.5.1. 2017 2018 2019 2020 Apr May Jun Jul Aug SepOctNovDecJanFebMar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb DryRainy SeasonDry SeasonRainy SeasonDry SeasonRainy Season Review of Relebant Plants and Studies Traffic Demand Forecast