PROM (P) 1P: APPENDIX A-39 EDINBURGH AIRPORT RAIL LINK BILL COMMITTEE PROMOTER's RESPONSE to COMMITTEE QUESTIONS the Referenc

Total Page:16

File Type:pdf, Size:1020Kb

PROM (P) 1P: APPENDIX A-39 EDINBURGH AIRPORT RAIL LINK BILL COMMITTEE PROMOTER's RESPONSE to COMMITTEE QUESTIONS the Referenc PROM (P) 1P: APPENDIX A-39 EDINBURGH AIRPORT RAIL LINK BILL COMMITTEE PROMOTER’S RESPONSE TO COMMITTEE QUESTIONS The Reference Case consists of the 2001 Base Year networks from the LUTI model1, updated to reflect recently-completed schemes plus schemes which are assumed to have sufficient merit and political/financial backing to be safely assumed to appear at some point in the future. The following list summarises the Reference Case changes made to the 2001 base-year networks from the CEC LUTI models and the assumed opening year (shown in brackets). Road Schemes • A1 Haddington-Dunbar dualling (completed 2004); • M80 Auchenkilns Roundabout; • M9 Spur Extension/A90 Upgrade (aka A8000), as per preferred option presented at the PLI (i.e. with no junction between the M9 and the B800/A8000 at Humbie) (2006); and • Rosyth Port link road (2006). Bus Schemes • all current ‘on the ground’ bus priority schemes in Edinburgh, as per information provided by CEC in November 2003 - York Place/ London Road/ A90/ A702 / etc (implemented 2003); • November/December 2003 inter-urban bus services entering Edinburgh, including accurate modelling of Ferrytoll services; • improvements to CEC orbital bus services and services to growth areas, based on November 2003 service patterns; • “Fastlink” – formerly WEBS (implemented 2004); • Straiton to Leith Quality Bus Corridor (implemented 2004); • new bus priority (all assumed in 2004), as specified by CEC during the SITCoS project69 as follows: - Lindsay Road / Commercial Street; - Inverleith Row/Granton Road; - Lindsay Road / Lower Granton Road; - Maybury Road; - Lanark Road /Inglis Green Road Signals, from roundabout (bus priority has been added but the junction is not currently modelled in detail); - Farmilehead Junction; - Drum Brae North; - Drum Street /Ferniehill Drive; 1 For more information on the LUTI model see CEC LUTI Functional Specification Report, MVA/DSC, August 2003 - Howden Hall Road / Captains Road; - Milton Link Signals, from roundabout (bus priority added but the junction is not currently modelled in detail); - Duddingston Park Roundabout; - Ferry Road (east); - Ferry Road (west); - West Granton Road / Silverknowes Parkway / Granton Midway; and - Crewe Toll / Pennywell Road. • New bus-based P&R at Ingliston, Straiton, Todhills and Hermiston (2006); • City Bypass bus service Airport - Ingliston - NRI, 1/2 hourly (2006); • City Bypass hard-shoulder bus priority (2006); • SESTRAN bus priority: Dalkeith-Little France (2006); • SESTRAN bus priority: additional on Maybury Road (2006); and • 540 additional parking spaces at Ferrytoll, (achieved by decking the existing car park) (2006). Rail Schemes • 15 minutes Edinburgh - Glasgow service (implemented 1999); • Edinburgh Crossrail/ Brunstane station/Newcraighall P&R (implemented 2003); • Edinburgh Park Station, served by all passing trains except the Edinburgh-Glasgow services (implemented 2003); • Waverley Station Redevelopment Phase 1 (2007); • Stirling-Alloa-Kincardine Rail Reopening and diversion of all coal freight from the Forth Rail Bridge (2007); • car park expansion at Dalgety Bay rail station (additional 107 spaces, to give total of 203 spaces, including 9 disabled) (2006); • car park expansion at Dunfermline railway station (additional 93 spaces to give a total of 192 spaces (including 6 disabled bays) (2006); • car park expansion at Kirkcaldy railway station (additional 395 spaces to give a total of 540 spaces (including 10 disabled bays) (2006); • car park expansion at Markinch railway station (additional 149 spaces to give a total of 177 spaces (including 9 disabled bays) (2006); • car park expansion at Rosyth railway station (additional 112 spaces to give a total of 152 spaces (including 9 disabled bays) – 2006; and • Platform-lengthening (to 6-car) on Fife Circle and Bathgate line (2006). Other Schemes • Edinburgh Tramline 2 (2011); • Edinburgh PT Interchange investment (Haymarket, Cameron Toll etc) (2006); • Electronic tolling on the Forth Road Bridge (2006); and • Central Edinburgh Traffic Management (CETM) measures (2006). .
Recommended publications
  • Excavations at Maybury Park, Edinburgh (1990–2)
    Excavations at Maybury Park, Edinburgh (1990–2) by Colm Moloney* and John A Lawson† *Headland Archaeology Ltd, Unit 4b, Europa Enterprise Park, Midelton, County Cork, Ireland †City of Edinburgh Council Archaeology Service, Museum of Edinburgh, 142 Canongate, Edinburgh EH8 8DD with contributions by Daniel Johnson, Alan Saville, Alison Sheridan, Catherine McGill, Mhairi Hastie and Valerie Dean illustrations by Louise Baker, Jonathan Miller and Marion O’Neil Scottish Archaeological Internet Report 23, 2006 www.sair.org.uk Published by the Society of Antiquaries of Scotland, www.socantscot.org.uk with Historic Scotland, www.historic-scotland.gov.uk and the Council for British Archaeology, www.britarch.ac.uk Editor Debra Barrie Produced by Archetype Information Technology Ltd, www.archetype-it.com ISBN: 0 903903 92 X ISSN: 1473-3803 Requests for permission to reproduce material from a SAIR report should be sent to the Director of the Society of Antiquaries of Scotland, as well as to the author, illustrator, photographer or other copyright holder. Copyright in any of the Scottish Archaeological Internet Reports series rests with the SAIR Consortium and the individual authors. The maps are reproduced from Ordnance Survey material with the permission of Ordnance Survey on behalf of The Controller of Her Majesty’s Stationery Office. ©Crown copyright 2001. Any unauthorized reproduction infringes Crown copyright and may lead to prosecution or civil proceedings. Historic Scotland Licence No GD 03032G, 2002. The consent does not extend to copying for general distribution, advertising or promotional purposes, the creation of new collective works or resale. ii Contents List of illustrations . v List of tables .
    [Show full text]
  • 210627 Edinburgh Park Vaccination
    Queensferry Road CITY CENTRE Frederick Queen Hanover Street York Place Street Street Queensferry New Town Castle Street 8 Edinburgh19 Bus Services89 to50 Edinburgh Park Vaccination Centre Street YD Bus Station Palmerston Place 1 Charlotte St. 29 George Street Andrew t Square Square e re Airlink 100 St Airlink 100 drop off Airlink 100 ith drop off City e Direct Services to71 Edinburgh Park Vaccinationa Centre YY L West PF p Centre SC 47 p terminus Waterloo r 7 End PRINCES o 88 STREET Service 2 Service 36 x Bridge North Place Western 74 57 i 21 m 63 Airlink 100 SD a T dropup off to every 20 minutes up to every 30t minutes9 Scott Harbour e h 69 Lothian Road Lothian 5 Monument Princes Street e Waverley HB 92 m L 22 36 W. Maitland Airlink 100 Station Granton ow Granton Ro 18 Street Gardens in e r ad Service 12 to Airport Skylink 300 u M oa t o R d Ocean Terminal e u n HH w Market Street o upHaymarket to every 30 minutes up to every hour a n t 40 Edinburgh lk d 46 ra n a t G p Castle es G Newhaven 55 k W p r a r Bridge IV George n o (Gyle Centre journeys only) n AirlinkService 100 i 21 x Skylink 400 34 51 im Pilton t L 79 o to Airport at Esplanade 59 Morrisone Street High Street n P n 5 Bridge South 3 m lk up to every 30 minutesinute wa up to every 30 minutes e R o J 28 e n o s o i h c Muirhouse a n n r s a 78 t y d r o r ad EICC Usher Hall n Te r w y Ro o Old Town Old Town err Service 22 e F Leith ll M 30 48 73 & Royal Mile Filmhouse Silverknowes R 21 o In up to every 12 minutes 16 a d v Grassmarket d 84 ry Roa e P Fer r i l lr e ig it h S 4
    [Show full text]
  • The City of Edinburgh Council Edinburgh LRT Masterplan Feasibility Study Final Report
    The City of Edinburgh Council Edinburgh LRT Masterplan Feasibility Study Final Report The City of Edinburgh Council Edinburgh LRT Masterplan Feasibility Study Final Report January 2003 Ove Arup & Partners International Ltd Admiral House, Rose Wharf, 78 East Street, Leeds LS9 8EE Tel +44 (0)113 242 8498 Fax +44 (0)113 242 8573 REP/FI Job number 68772 The City of Edinburgh Council Edinburgh LRT Masterplan Feasibility Study Final Report CONTENTS Page EXECUTIVE SUMMARY 1 1. INTRODUCTION 9 1.1 Scope of the Report 9 1.2 Study Background and Objectives 9 1.3 Transport Trends 10 1.4 Planning Context 10 1.5 The Integrated Transport Initiative 11 1.6 Study Approach 13 1.7 Light Rapid Transit Systems 13 2. PHASE 1 APPRAISAL 18 2.1 Introduction 18 2.2 Corridor Review 18 2.3 Development Proposals 21 2.4 The City of Edinburgh Conceptual Network 22 2.5 Priorities for Testing 23 2.6 North Edinburgh Loop 24 2.7 South Suburban Line 26 2.8 Appraisal of Long List of Corridor Schemes 29 2.9 Phase 1 Findings 47 3. APPROACH TO PHASE 2 50 3.1 Introduction 50 3.2 Technical Issues and Costs 50 3.3 Rolling Stock 54 3.4 Tram Services, Run Times and Operating Costs 55 3.5 Environmental Impact 55 3.6 Demand Forecasting 56 3.7 Appraisal 61 4. NORTH EDINBURGH LOOP 63 4.1 Alignment and Engineering Issues 63 4.2 Demand and Revenue 65 4.3 Environmental Issues 66 4.4 Integration 67 4.5 Tram Operations and Car Requirements 67 4.6 Costs 68 4.7 Appraisal 69 5.
    [Show full text]
  • Edinburgh Local Development Plan: Action Programme 2020 - Adoption
    Planning Committee 2.00pm, Wednesday, 26 February 2020 Edinburgh Local Development Plan: Action Programme 2020 - adoption Executive/routine Executive Wards All Council Commitments 1, 4, 6 10, 11 16, 17, 22, 26 28, 32 43 1. Recommendations 1.1 It is recommended that Committee agrees that the appended Edinburgh Local Development Plan (LDP) Action Programme 2020 be formally adopted, published and submitted to Scottish Ministers. Paul Lawrence Executive Director of Place Contact: Iain McFarlane, City Plan Programme Director E-mail: [email protected] | Tel: 0131 529 2419 Report Edinburgh Local Development Plan: Action Programme 2020 - adoption 2. Executive Summary 2.1 The Edinburgh Local Development Plan was adopted in November 2016. Planning authorities are required to prepare an Action Programme setting out how their Local Development Plan (LDP) will be implemented. 2.2 The Action Programme should be updated at least every two years. A new Action Programme has been prepared to align with financial planning and is now ready to be formally adopted and submitted to Scottish Ministers. 3. Background 3.1 Councils are required to publish an updated Action Programme at least every two years. It is intended that Edinburgh’s Action Programme is reviewed, reported and submitted to Scottish Ministers on an annual basis. To help to align with financial planning and keep track of changing circumstances. The first Edinburgh LDP Action Programme was adopted on 8 December 2016. The second was adopted in January 2018, and the third in January 2019. 4. Main report 4.1 The challenge for the adopted Edinburgh LDP is to help make the city of Edinburgh the best place it can be, for everyone, now and in the future.
    [Show full text]
  • ELBG Promoter Statement
    GROUP 12 – OBJECTION NO: 197 EDINBURGH AND LOTHIAN BADGER GROUP PROMOTER WITNESS STATEMENT BARRY CROSS ROSEBURN CORRIDOR/WESTERN GENERAL HOSPITAL 1.0 INTRODUCTION 1.1 I am Barry Cross. Until April 2005 I was the Transport Planning Manager with the City of Edinburgh Council. Since April 2005 I have been the Project Development Director with tie ltd, an “arms’ length” company wholly owned by the City of Edinburgh Council. tie has been commissioned by the Council to develop and implement the Edinburgh Tram Project. 1.2 I have a BSc in Civil Engineering from the University of Salford and an MSc in Transportation Engineering from the University of Leeds. 1.3 I have been closely involved with the development of the Tram Project in Edinburgh since its inception. 2.0 BACKGROUND 2.1 The railway route from Roseburn to Crewe Toll was closed to passenger services in 1962 and to goods services in 1967/8. The land was bought as part of a package of routes by the City of Edinburgh Council’s predecessor, Lothian Regional Council. It has been safeguarded, first for a new road, and then for light rapid transit, since 1978. 2.2 In the 1980s Lothian Regional Council developed a two line Light Rapid Transit proposal, branded as ‘Edinburgh Metro’. It was proposed that the East-West Metro line should run off-street from Haymarket to Crewe Toll along the disused railway route from Roseburn through Ravelston, Craigleith and Drylaw. The Metro proposals failed to progress beyond the design and public consultation stages because of the high capital cost and affordability consequent upon the extensive tunnelling elsewhere on the project.
    [Show full text]
  • PDF Timetable
    Service 24 Valid from 27th October 2003 Monday to Friday New Royal Infirmary — 0704 0734 — — 0804 0834 0912 0943 1018 1050 1120 1550 1615 1650 1720 — 1750 Cameron Toll — 0709 0740 — — 0811 0841 0918 0948 1023 1055 1125 1555 1621 1656 1726 — 1756 Blackford Station — 0716 0748 — — 0820 0850 0926 0956 1031 1103 1133 1603 1630 1705 1735 — 1805 Marchmont Road (top) — 0722 0755 — — 0827 0857 0932 1002 1037 1109 1139 1609 1636 1711 1741 — 1811 Tollcross — 0728 0802 — — 0835 0905 0937 1007 1042 1114 1144 1615 1642 1717 1747 — 1817 South St. David Street — 0738 0814 — — 0847 0917 0947 1017 1052 1124 1154 then 1627 W 1729 1759 — 1824 Blackhall Sainsbury's — S S — — 0905 0933 1003 1033 1108 1140 1210 every 1644 — S S — S Blackhall Bank of Scotland — — — — — 0911 0938 1008 1038 1113 1146 1216 30 1650 — — — — — Drylaw Church Q — — Q Q 0916 0943 1013 1043 1118 1151 1221 mins 1655 — — — Q — Davidsons Mains The Green 0736 — — 0818 0902 0920 0947 1017 1047 1122 1155 1225 until 1659 — — — 1724 — Safeway Davidsons Mains 0738 — — 0822 0904 0927 0954 1024 1054 1129 1202 1232 1706 — — — 1726 — Cramond Glebe Road 0743 — — 0827 0909 0932 0959 1029 1059 1134 1207 1237 1711 — — — 1731 — Maybury Rd (south end) 0757 — — 0841 0921 0942 1009 1039 1109 1144 1217 1247 1725 — — — 1745 — Gyle Centre 0805 — — 0849 0924 0945 1012 1042 1112 1147 1220 1250 1733 — — — 1753 — Edinburgh Park Station 0811 — — 0855 0928 0949 1016 1046 1116 1151 1224 1254 1739 — — — 1759 — New Royal Infirmary — 1820 — — 1845 — 1908 1938 2305 2335 Cameron Toll — 1824 — — 1849 — 1912 1942 then 2309 2339 Blackford Station — 1830 — — 1855 — 1918 1948 every 2315 2345 Marchmont Road (top) — 1835 — — 1900 — 1922 1952 30 2319 2349 Tollcross — 1840 — — 1905 — 1926 1956 mins 2323 2353 St.
    [Show full text]
  • North West Locality Open Space Action Plan
    North West Locality Open Space Action Plan March 2017 North West Edinburgh Open Space Action Plan (March 2017) Introduction This is one of four Open Space Action Plans to support delivery of Open Space 2021, Edinburgh’s Open Space Strategy. Open Space is a key element of Edinburgh’s physical, social and environmental fabric and Open Space 2021 sets guiding standards for existing and new open space provision as the city grows. Through standards based on open space quality, size and distance from homes, the Strategy aims to increase the number of people that can benefit from greenspaces that are sustainably managed, biologically diverse and contribute to health and wellbeing. The Open Space Profile shows how the Locality compares to the overall picture of open space across the city, highlighting changes to provision. It is a working plan, to be reviewed periodically to capture collective efforts which lead to the improvement and extension of Edinburgh’s green network. Actions, including estimated costs, may be subject to review, further feasibility studies and change. The Action Plan sets out proposals to help reduce inequalities in access to good quality open space and play provision. In time, it will reflect local environment priorities emerging through co-production of Locality Improvement Plans by Community Planning partners. The first version shows citywide priorities identified by Edinburgh’s annual parks quality assessment and actions carried forward from the existing Play Area Action Plan (2011-16) and previous Open Space Strategy (2010). The Action Plan will co-ordinate ongoing open space management actions with those relating to development, including changes arising from individual planning decisions and the delivery of new parks and play areas through the adopted Edinburgh Local Development Plan (LDP).
    [Show full text]
  • West Craigs Limited Response (7 May 2019)
    Response on behalf of West Craigs Limited 1 INTRODUCTION 1.1 We act for West Craigs Limited, and have been instructed by them to submit a response to Scottish Government following the City of Edinburgh Council’s response dated 5 April 2019 to the Scottish Government’s letter of 7 March 2019. 1.2 The Council has produced four different draft versions of its Supplementary Guidance (SG) following the adoption of the Edinburgh Local Development Plan in November 2016. Our clients have submitted responses to these drafts, and copies of those should already have been made available to you. For completeness, we enclose copies of our clients’ submissions. 1.3 The Council’s response is 39 pages and accompanied by a significant amount of supporting material. The response contains new explanations from the Council as to its approach, as well as new submissions of policy and fact. These submissions were not provided by the Council when responding to third party representations on the various different versions of the draft SG. 1.4 Our clients previously raised concerns regarding the Council’s failure to undertake proper and meaningful consultation on its draft SG, constituting a failure to comply with the requirements of Section 22 of the Town and Country Planning (Scotland) Act 1997 and Regulation 27 of the Town and Country Planning (Development Planning) (Scotland) Regulations 2008. The extensive nature of the Council’s response illustrates its failure to provide sufficient information during the consultation process. 2 QUESTION 1 LDP POLICY DEL 1 AND CIRCULAR 3/2012 2.1 In response to question 1, the Council make various submissions on policy Del 1 of the Edinburgh Local Development Plan, and Circular 3/2012.
    [Show full text]
  • Alfred Stewart Property Foundation Ltd Hilton, Rosyth
    Alfred Stewart Property Foundation Ltd Hilton, Rosyth (Residential) FIFEplan Local Development Plan Proposed Plan December 2014 PPCA Ltd FIFEPlan Contents Local Development Plan Proposed Plan 1 Introduction ...................................................................... 2 2 Planning Policy Context ................................................... 4 3 Hilton as a Development Location ................................... 9 4 Proposed Uses .............................................................. 10 Hilton, Rosyth LDP-ROS002 5 Site Effectiveness .......................................................... 11 6 Access ............................................................................ 14 PPCA Ltd On behalf of 7 Council Site Assessment ............................................... 15 Alfred Stewart Property Foundation Limited 8 Conclusion ...................................................................... 20 Appendix 1 – Location Plan .................................................. 21 Appendix 2 – Indicative Development Framework .............. 23 Appendix 3 – Transport Planning Accessibility Statement . 25 Appendix 4 – Fifeplan LDP Candidate Site Assessment ...... 43 ASPFL Hilton, Rosyth 1 Introduction 1.2 Hilton represents an excellent opportunity to deliver a high quality residential development that will, in part, contribute to meeting 1.1 PPCA Ltd has been instructed by the Alfred Stewart Property the SESPlan additional housing requirement and address the Foundation Limited (ASPFL) to make a representation to
    [Show full text]
  • Notices and Proceedings
    THE TRAFFIC COMMISSIONER FOR THE SCOTTISH TRAFFIC AREA NOTICES AND PROCEEDINGS PUBLICATION NUMBER: 2005 PUBLICATION DATE: 15 April 2013 OBJECTION DEADLINE DATE: 06 May 2013 Correspondence should be addressed to: Scottish Traffic Area Hillcrest House 386 Harehills Lane Leeds LS9 6NF Telephone: 0300 123 9000 Fax: 0113 249 8142 Website: www.gov.uk The public counter at the above office is open from 9.30am to 4pm Monday to Friday The next edition of Notices and Proceedings will be published on: 29/04/2013 Publication Price £3.50 (post free) This publication can be viewed by visiting our website at the above address. It is also available, free of charge, via e-mail. To use this service please send an e-mail with your details to: [email protected] NOTICES AND PROCEEDINGS Important Information All correspondence relating to bus registrations and public inquiries should be sent to: Scottish Traffic Area Level 6 The Stamp Office 10 Waterloo Place Edinburgh EH1 3EG The public counter in Edinburgh is open for the receipt of documents between 9.30am and 4pm Monday to Friday. Please note that only payments for bus registration applications can be made at this counter. The telephone number for bus registration enquiries is 0131 200 4927. General Notes Layout and presentation – Entries in each section (other than in section 5) are listed in alphabetical order. Each entry is prefaced by a reference number, which should be quoted in all correspondence or enquiries. Further notes precede sections where appropriate. Accuracy of publication – Details published of applications and requests reflect information provided by applicants.
    [Show full text]
  • Alfred Stewart Property Foundation Ltd Hilton, Rosyth (Employment)
    Alfred Stewart Property Foundation Ltd Hilton, Rosyth (Employment) FIFEplan Local Development Plan Proposed Plan December 2014 PPCA Ltd FIFEPlan Contents 1 Introduction ................................................................... 2 Local Development Plan Proposed Plan 2 Planning Policy Context .................................................. 4 3 Hilton as a Development Location ................................... 9 4 Proposed Uses ............................................................ 10 Hilton, Rosyth 7 Access ........................................................................ 12 8 Council Site Assessment .............................................. 13 9 Conclusion ................................................................... 19 PPCA Ltd On behalf of Appendix 1 – Location Plan ................................................. 20 Alfred Stewart Property Foundation Limited Appendix 2 – Fife Employment Land Audit Extract ................ 22 Appendix 3 – Indicative Development Framework ................. 25 Appendix 4 – Transport Planning Accessibility Statement ..... 27 Appendix 5 – FIFEPlan Development Strategy Consultation.. 40 Appendix 6 – Scottish Natural Heritage Letter ..................... 42 Appendix 7 – Energised Environments Environmental Supporting Information ....................................................... 55 Appendix 8 – Scottish Natural Heritage Email ...................... 70 Appendix 9 – Fifeplan LDP Candidate Site Assessment ......... 72 ASPFL Hilton, Rosyth 1 Introduction 1.1 PPCA Ltd
    [Show full text]
  • (Maybury) General Medical Services Provision Edinburgh Integration Joint Board 24 August 2020
    REPORT West Edinburgh (Maybury) General Medical Services Provision Edinburgh Integration Joint Board 24 August 2020 Executive Summary The purpose of this report is to provide the Edinburgh Integration Joint Board with the Initial Agreement for the Provision of General Medical Services in West Edinburgh (Maybury). The proposal seeks capital funding from NHS Lothian and the Initial Agreement has been prepared in line with the guidance contained in the Scottish Capital Investments Manual. Recommendations It is recommended that the Edinburgh Integration Joint Board 1. Agree the proposal to provide General Medical Services in West Edinburgh 2. Note that NHS Lothian invited Edinburgh Health and Social Care Partnership (EHSCP) to submit an Initial Agreement for this proposal following the conclusion of the 2020-21 Capital Prioritisation Process. 3. Approve the proposal and agree the presentation of the Initial Agreement to NHS Lothian’s Finance and Resources Committee. Directions Direction to City of ✓ Edinburgh Council, No direction required ✓ NHS Lothian or Issue a direction to City of Edinburgh Council both organisations Issue a direction to NHS Lothian Issue a direction to City of Edinburgh Council and NHS Lothian 1 Main Report 1. The population of Edinburgh has increased by some 65,000 people over the last 10 years and will continue to grow at a rate c5,000-6000 per annum, until at least 2026. This trend is expected to continue further in the next Local Development Plan known as City Plan 2030. 2. Greenfield space (site HSG19) (Initial Agreement appendix 2)adjacent to Maybury and between Turnhouse Road and the main rail link to Fife, has been released for housing development through the City of Edinburgh (CEC) Local Development Plan 2016 – 2026.
    [Show full text]