Capitol Boulevard Plan Infrastructure Projects Update Chat Ribbon and Poll
Total Page:16
File Type:pdf, Size:1020Kb
Capitol Boulevard Plan Infrastructure Projects Update Chat Ribbon and Poll 2 City of Tumwater Foundation To Build On Corridor Plan Feasibility Study • 2011 to 2014 • 2013 to 2019 • Cost - $235,000 • Cost - $745,000 3 City of Tumwater Transportation Projects Derived from Plan Feasibility Study Interstate 5 / Trosper Rd / Capitol Blvd Reconfiguration Capitol Blvd, M St to Israel Rd Design N-S Connector Road T Street Roundabout X Street Roundabout Dennis Street Roundabout Access Control, Mutlimodal Improvements, and Traffic Calming 4 City of Tumwater Interstate 5 / Trosper Rd / Capitol Blvd Total project cost - $14 million Funds . State - $6.6 million . Transportation CFP - $6 million . Utilities - $1.4 million Schedule . Design – 2018 to 2021 . Right of Way – 2019 to 2021 . Construction – 2021 to 2023 5 City of Tumwater It is going to be frustrating… 6 City of Tumwater Capitol Blvd, M St to Israel Rd Design Design Cost - $1.5 million Five separate “bite-sized” projects: • N-S Connector Road • T Street Roundabout • X Street Roundabout • Dennis Street Roundabout • Access Control, Mutlimodal, and Traffic Calming Funds • State Grant - $1,032,000 • Transportation CFP - $168,500 • Utilities - $252,000 Schedule - 2021 to 2022 7 City of Tumwater North-South Connector Road Total project cost - $2.5 million Funds • Transportation CFP - $950,000 • Unfunded - $1,550,000 Schedule • Design – 2021 to 2022 • Right of Way – 2019 to unknown • Construction – 2026 8 City of Tumwater T Street Roundabout Total project cost - $4.9 million Funds • Unfunded - $4.9 million Schedule • Design – 2021 to 2022 (60%) • Right of Way – To be determined • Construction – To be determined 9 City of Tumwater X Street Roundabout Total project cost - $4.7 million Funds • Federal - $866,000 • Transportation CFP - $1,640,000 • Unfunded - $2,000,000 Schedule • Design – 2018 to 2021 • Right of Way – 2023 to 2025 • Construction – 2026 10 City of Tumwater Dennis Street Roundabout Total project cost - $2.9 million Funds • Unfunded Schedule • Design – 2021 to 2022 (60%) • Right of Way – To be determined • Construction – To be determined 11 City of Tumwater Access Control, Multimodal Improvements, and Traffic Calming Total project cost - $9.2 million Funds • To be determined Schedule • Design – 2021 to 2022 (60%) • Right of Way – To be determined • Construction – To be determined 12 City of Tumwater Summary 13 City of Tumwater Thank You Brandon Hicks, PE, Director Transportation & Engineering (360) 754-4140 [email protected] Bill Lindauer, PE, Engineering Services Manager Transportation & Engineering (360) 754-4140 [email protected] Mike Matlock, AICP, Director Community Development (360) 754-4180 [email protected] 14 City of Tumwater Coming Soon… Old Hwy 99 Corridor E Street Connection Tumwater Blvd Interchange 15 City of Tumwater Roundabouts Everywhere! Why? According to the Insurance Institute of Highway Safety, there are many safety benefits associated with the modern roundabout: • 90 percent reduction in fatal crashes • 75 percent reduction in injury crashes • 30-40 percent reduction in pedestrian crashes • 10 percent reduction in bicycle crashes • 30-50 percent increase in traffic capacity There are other benefits to roundabouts, including • reduction in fuel use and pollution • no signal equipment to install and repair quieter neighborhoods 16 • City of Tumwater.