Capitol Boulevard Plan Infrastructure Projects Update Chat Ribbon and Poll

Capitol Boulevard Plan Infrastructure Projects Update Chat Ribbon and Poll

Capitol Boulevard Plan Infrastructure Projects Update Chat Ribbon and Poll 2 City of Tumwater Foundation To Build On Corridor Plan Feasibility Study • 2011 to 2014 • 2013 to 2019 • Cost - $235,000 • Cost - $745,000 3 City of Tumwater Transportation Projects Derived from Plan Feasibility Study Interstate 5 / Trosper Rd / Capitol Blvd Reconfiguration Capitol Blvd, M St to Israel Rd Design N-S Connector Road T Street Roundabout X Street Roundabout Dennis Street Roundabout Access Control, Mutlimodal Improvements, and Traffic Calming 4 City of Tumwater Interstate 5 / Trosper Rd / Capitol Blvd Total project cost - $14 million Funds . State - $6.6 million . Transportation CFP - $6 million . Utilities - $1.4 million Schedule . Design – 2018 to 2021 . Right of Way – 2019 to 2021 . Construction – 2021 to 2023 5 City of Tumwater It is going to be frustrating… 6 City of Tumwater Capitol Blvd, M St to Israel Rd Design Design Cost - $1.5 million Five separate “bite-sized” projects: • N-S Connector Road • T Street Roundabout • X Street Roundabout • Dennis Street Roundabout • Access Control, Mutlimodal, and Traffic Calming Funds • State Grant - $1,032,000 • Transportation CFP - $168,500 • Utilities - $252,000 Schedule - 2021 to 2022 7 City of Tumwater North-South Connector Road Total project cost - $2.5 million Funds • Transportation CFP - $950,000 • Unfunded - $1,550,000 Schedule • Design – 2021 to 2022 • Right of Way – 2019 to unknown • Construction – 2026 8 City of Tumwater T Street Roundabout Total project cost - $4.9 million Funds • Unfunded - $4.9 million Schedule • Design – 2021 to 2022 (60%) • Right of Way – To be determined • Construction – To be determined 9 City of Tumwater X Street Roundabout Total project cost - $4.7 million Funds • Federal - $866,000 • Transportation CFP - $1,640,000 • Unfunded - $2,000,000 Schedule • Design – 2018 to 2021 • Right of Way – 2023 to 2025 • Construction – 2026 10 City of Tumwater Dennis Street Roundabout Total project cost - $2.9 million Funds • Unfunded Schedule • Design – 2021 to 2022 (60%) • Right of Way – To be determined • Construction – To be determined 11 City of Tumwater Access Control, Multimodal Improvements, and Traffic Calming Total project cost - $9.2 million Funds • To be determined Schedule • Design – 2021 to 2022 (60%) • Right of Way – To be determined • Construction – To be determined 12 City of Tumwater Summary 13 City of Tumwater Thank You Brandon Hicks, PE, Director Transportation & Engineering (360) 754-4140 [email protected] Bill Lindauer, PE, Engineering Services Manager Transportation & Engineering (360) 754-4140 [email protected] Mike Matlock, AICP, Director Community Development (360) 754-4180 [email protected] 14 City of Tumwater Coming Soon… Old Hwy 99 Corridor E Street Connection Tumwater Blvd Interchange 15 City of Tumwater Roundabouts Everywhere! Why? According to the Insurance Institute of Highway Safety, there are many safety benefits associated with the modern roundabout: • 90 percent reduction in fatal crashes • 75 percent reduction in injury crashes • 30-40 percent reduction in pedestrian crashes • 10 percent reduction in bicycle crashes • 30-50 percent increase in traffic capacity There are other benefits to roundabouts, including • reduction in fuel use and pollution • no signal equipment to install and repair quieter neighborhoods 16 • City of Tumwater.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    16 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us