ALLEY (NS) – Washington Avenue to Wright Avenue, Deane Boulevard to Quincy Avenue

Total Page:16

File Type:pdf, Size:1020Kb

ALLEY (NS) – Washington Avenue to Wright Avenue, Deane Boulevard to Quincy Avenue ALLEY (NS) – Washington Avenue to Wright Avenue, Deane Boulevard to Quincy Avenue Alderman District 9 – Trevor Jung Existing pavement - Bituminous Right-of-way width - 16’ PCI – Alleys not rated Improvement Cost - Concrete at $74.00/ft Alderman Request Last Public Hearing Date – Never City of Racine - Assessment Schedule CITY ENGINEER'S OFFICE AUTHORITY - Benefits and Damage FOR: PORTLAND CEMENT CONCRETE PAVING RESOLUTION NUMBER 058319 15-May-20 LOCATION - Alley (NS) from Washington Ave to Wright Ave, Deane Blv Page 1 of 2 TAXNO NAME FRONTAGE RATE BENEFITS ADJUST SPEC. ADJ. ADDRESS MAILING ADDRESS ASSESSMENT 10192000 Mauer, Kristi L. 35.000$74.00 $2,590.00 $0.00 $0.00 1367 Deane Boulevard 1367 Deane Boulevard Racine, WI 53405 $2,590.00 10193000 Arndt, Ryan 35.000$74.00 $2,590.00 $0.00 $0.00 1365 Deane Boulevard 1365 Deane Boulevard Racine, WI 53405 $2,590.00 10194000 Kosterman, Robert P. & Margaret M. 35.000$74.00 $2,590.00 $0.00 $0.00 1363 Deane Boulevard 1363 Deane Boulevard Racine, WI 53405 $2,590.00 10195000 Lochowitz, Justin 35.000$74.00 $2,590.00 $0.00 $0.00 1359 Deane Boulevard 1359 Deane Boulevard Racine, WI 53405 $2,590.00 10195000 Lochowitz, Justin 35.000$74.00 $2,590.00 $0.00 $0.00 1359 Deane Boulevard 1359 Deane Boulevard Racine, WI 53405 $2,590.00 10196000 Johnson, Kenneth Sr. 35.000$74.00 $2,590.00 $0.00 $0.00 Cloyd, Christina 1355 Deane Boulevard 1355 Deane Boulevard Racine, WI 53405 $2,590.00 10197000 Garcia, Gregory 40.000$74.00 $2,960.00 $0.00 $0.00 1351 Deane Boulevard 1351 Deane Boulevard Racine, WI 53405 $2,960.00 10198000 Williams, Randall 40.000$74.00 $2,960.00 $0.00 $0.00 Veltus, Julie 1345 Deane Boulevard 5735 Ridgecrest Drive Racine, WI 53403 $2,960.00 10199000 Degroot, Matthew J. & Amber M. 40.000$74.00 $2,960.00 $0.00 $0.00 1341 Deane Blvd W315 S7470 Lakecrest Ct Mukwanago, WI 53149 $2,960.00 10200000 Ludwig, Lynn A. 40.000$74.00 $2,960.00 $0.00 $0.00 1339 Deane Boulevard 1339 Deane Boulevard Racine, WI 53405 $2,960.00 10201000 Mattie, Amanda M. 35.000$74.00 $2,590.00 $0.00 $0.00 1335 Deane Boulevard 1335 Deane Boulevard Racine, WI 53405 $2,590.00 10202000 Betker, Victoria 63.450$74.00 $4,695.30 $0.00 $0.00 1329 Deane Boulevard 1329 Deane Boulevard Racine, WI 53405 $4,695.30 10203000 Hankinson, Dennis W. & Jessica A. 81.800$74.00 $6,053.20 $0.00 $0.00 1327 Deane Blvd 1327 Deane Blvd Racine, WI 53405 $6,053.20 10191000 Kumorkiewicz, Justin M. 35.000$74.00 $2,590.00 $0.00 $0.00 1338 Quincy Avenue 1338 Quincy Avenue Racine, WI 53405 $2,590.00 10190000 Petersen, Ashley A. 35.000$74.00 $2,590.00 $0.00 $0.00 1334 Quincy Ave 1334 Quincy Ave Racine, WI 53405 $2,590.00 10189000 Jacobson, Scott E. & Elissa A. 35.000$74.00 $2,590.00 $0.00 $0.00 1330 Quincy Avenue 1330 Quincy Avenue Racine, WI 53405 $2,590.00 10188000 Schorsch, Joseph A. 35.000$74.00 $2,590.00 $0.00 $0.00 1328 Quincy Avenue 6719 Bobolink Road Racine, WI 53402 $2,590.00 City of Racine - Assessment Schedule Page 2 of 2 TAXNO NAME FRONTAGE RATE BENEFITS ADJUST SPEC. ADJ. ADDRESS MAILING ADDRESS ASSESSMENT 10187000 Flores, Maria R. 40.000$74.00 $2,960.00 $0.00 $0.00 1326 Quincy Avenue 3508 Spruce Street Racine, WI 53403 $2,960.00 10186000 Foy, Renee C. 40.000$74.00 $2,960.00 $0.00 $0.00 1318 Quincy Avenue 1318 Quincy Avenue Racine, WI 53405 $2,960.00 10185000 Mc Intyre, James A. 40.000$74.00 $2,960.00 $0.00 $0.00 1314 Quincy Avenue 1314 Quincy Avenue Racine, WI 53405 $2,960.00 10184000 Gister, Catherine 40.000$74.00 $2,960.00 $0.00 $0.00 1310 Quincy Avenue 1310 Quincy Avenue Racine, WI 53405 $2,960.00 10183000 Land, Timothy & Jessica 40.800$74.00 $3,019.20 $0.00 $0.00 1306 Quincy Avenue 1306 Quincy Avenue Racine, WI 53405 $3,019.20 10182000 J and N Assets III LLC. 10.000$74.00 $740.00 $0.00 $0.00 c/o Land Realty LLC. 1302 Quincy Avenue 4419 Washington Road Kenosha, WI 53143 $740.00 10181000 Griffin, Darice 25.400$74.00 $1,879.60 $0.00 $0.00 2901 Washington Avenu 2901 Washington Avenue Racine, WI 53405 $1,879.60 10180000 Rockett, Shamica 28.730$74.00 $2,126.02 $0.00 $0.00 2907 Washington Avenu 2907 Washington Avenue Racine, WI 53405 $2,126.02 10179000 Starszak, Michael & Maritza 60.460$74.00 $4,474.04 $0.00 $0.00 2915 Washington Avenu 2915 Washington Avenue Racine, WI 53405 $4,474.04 10178000 Smith, Lawrence W. Jr. 25.730$74.00 $1,904.02 $0.00 $0.00 2925 Washington Avenu 2925 Washington Avenue Racine, WI 53405 $1,904.02 10177000 Byrne, Ralph 28.730$74.00 $2,126.02 $0.00 $0.00 2929 Washington Avenu 5 Greenwich Court Monroe Township, NJ 08831 $2,126.02 10176000 Cruz, Omar 28.730$74.00 $2,126.02 $0.00 $0.00 2931 Washington Avenu 2931 Washington Avenue Racine, WI 53405 $2,126.02 10175000 William D. Crawford, Family Trust 28.800$74.00 $2,131.20 $0.00 $0.00 Patricia E. Crawford Family Tr 2937 Washington Avenu 4618 Ridgecrest Drive Racine, WI 53403 $2,131.20 TOTALS 1,127.630 $83,444.62 $0.00 $0.00 $83,444.62 SPEC. ADJ. $0.00 CITY'S COST ADJUSTMENT $0.00 OTHER COST ($150.62) Total of 30 records for 29 Parcels TOTAL $83,294.00.
Recommended publications
  • American Title a Sociation ~ ~
    OFFICIAL PUBLICATION AMERICAN TITLE A SOCIATION ~ ~ VOUJME XXXVI JUNE, 1957 NUMBER 6 TITLE NEWS Official Publication of THE AMERICAN TITLE ASSOCIATION 3608 Guardian Building-Detroit 26, Michigan Volume XXXVI June, 1957 Number 6 Table of Contents Introduction-The Federal Highway Program ......... ... ................ .. .................... 2 J. E. Sheridan Highway Laws Relating to Controlled Access Roads ..... .. ....... ........... 6 Norman A. Erbe Title Companies and the Expanded Right of Way Problems ...... ............. .. 39 , Daniel W. Rosencrans Arthur A. Anderson Samuel J. Some William A . Thuma INTRODUCTION The Federal Highway Program J. E. SHERIDAN We are extremely grateful to Nor­ veloped its planning sufficiently to man A. Erbe, Attorney General of the show to the satisfaction of the dis­ State of Iowa, for permission to re­ trict engineer the effect of the pro­ print his splendid brief embracing posed construction upon adjace.nt the highway laws of various states property, the treatment of access con­ relating to the control in access roads. trol in the area of Federal acquisi­ Mr. Erbe originally presented this m tion, and that appropriate arrange­ narrative form before the convention ments have been made for mainte­ of the Iowa Title Association in May nance and supervision over the land of this year. As is readily ascertain­ to be acquired and held in the name able, this is the result of a compre­ of the United States pending transfer hensive study of various laws touch· of title and jurisdiction to the State ing on the incidents of highway regu­ or the proper subdivision thereof." lations. Additionally, we are privi­ It is suggested that our members leged to carry the panel discussion bring this quoted portion to the at­ of the American Right of Way Asso­ tention of officers of the Highway ciation Convention held in Chicago, Department and the office of its legal May 16 and 17, dealing with "Title division, plus the Office of the Attor­ Companies and the Expanded Right ney General within the members' ju­ of Way Problems".
    [Show full text]
  • Understanding Intersections –– Stopping at Intersections Are Places Where a Number of Road Users Cross Intersections Paths
    4 rules of the road Chapter 3, signs, signals and road markings, gave you some in this chapter information about the most common signs, signals and road markings you will see when driving. This chapter gives • Understanding you the information you’ll need to help you drive safely at intersections intersections, use lanes correctly and park legally. – signalling – types of intersections Understanding intersections – stopping at Intersections are places where a number of road users cross intersections paths. There is often a lot of activity in intersections, so it’s – right‑of‑way at important to be alert. Remember that other road users may be intersections in a hurry, and may want to move into the same space that you • Using lanes are planning on moving into. correctly – which lane Signalling should you use Signals are important — they let other traffic know what you are – lane tracking intending to do. You should signal when you’re preparing to: – turning lanes – reserved lanes • turn left or right – pulling into a • change lanes lane • park – passing – merging • move toward, or away from, the side of the road. – highway or freeway Types of intersections entrances and exits Controlled intersections – cul‑de‑sacs A controlled intersection is one that has signs or traffic lights – turning around telling you what to do. To drive safely in these intersections, you • Parking tips and need to know what the signals and signs mean, and also the rules right‑of‑way rules. But always be cautious. Other drivers may not be paying attention to the signs and signals. Uncontrolled intersections Uncontrolled intersections have no signs or traffic lights.
    [Show full text]
  • Access Management Manual, September 5, 2019 TABLE of CONTENTS
    AccessAccess ManagementManagement ManualManual T E X A S Prepared by the City of Irving Public Works/Traffic and Transportation Department Adopted September 5, 2019 Access Management Manual, September 5, 2019 TABLE OF CONTENTS Section 1 Introduction Page 1.0 Purpose 1 1.1 Scope 1 1.2 Definitions 3 1.3 Authority 10 Section 2 Principles of Access Management 2.1 Relationship between Access and Mobility 11 2.2 Integration of Land Use and Transportation 11 2.3 Relationship between Access and Roadway Efficiency 12 2.4 Relationship between Access and Traffic Safety 12 Section 3 Access Management Programs and Policies 3.1 Identifying Functional Hierarchy of Roadways 14 3.1.1 Sub-Classifications of Roadways 14 3.1.1.1 Revising the “Master Thoroughfare Plan” 15 3.1.2 Comprehensive Plan 15 3.1.3 Discretionary Treatment by the Director 15 3.2 Land Use 15 3.3 Unified Access Planning Policy 16 3.4 Granting Access 16 3.4.1 General Mutual Access 17 3.4.2 Expiration of Access Permission 17 3.4.3 “Grandfathered” Access and Non-Conforming Access 17 3.4.4 Illegal Access 19 3.4.4.1 Stealth Connection 19 3.4.5 Temporary Access 19 3.4.6 Emergency Access 19 3.4.7 Abandoned Access 20 3.4.8 Field Access 20 3.4.9 Provision for Special Case Access 20 3.4.10 Appeals, Variances and Administrative Remedies 20 3.5 Parking and Access Policy 20 3.6 Access vs Accessibility 21 3.7 Precedence of Access Rights Policy 21 3.8 Right to Access A Specific Roadway 22 3.9 Traffic Impact Analyses (TIA’s) 22 3.9.1 Level of Service (LOS) 22 3.9.2 Traffic Impact Analysis (TIA) Requirements
    [Show full text]
  • 95 Express Phase 3A-1 FPN #S: 433108-4-52-01 & 428009-1-52-01
    95 Express Phase 3A-1 FPN #s: 433108-4-52-01 & 428009-1-52-01 95 Express Phase 3A-1 will extend the existing express lanes north from just south of Broward Boulevard to just north of Commercial Boulevard in Broward County. One lane will be added and the High Occupancy Vehicle (HOV) lane will be Contact Us… converted to create two express lanes in each direction. This project includes ramp signalization from Hallandale Beach Boulevard to Commercial Boulevard. Other Email: work includes: installing Intelligent Transportation System (ITS) and tolling [email protected] equipment; widening bridges; and installing noise barrier walls at locations along I- 95 Southbound between Broward Boulevard and NW 6th Street, and along I-95 Northbound between Powerline Road and Commercial Boulevard. Contract time Call: for this $149 million project began Monday, October 4, 2015, with design activities currently underway. Construction began August 21, 2016, and is expected to be Construction PIO completed Spring 2020. Please note that this schedule is subject to change due to Office: weather or other unforeseen circumstances. (954) 299-6561 As of Winter 2016, project activities are as follows: • Or Design, survey and maintenance activities • Broward Boulevard ramp widening and reconstruction • Broward Boulevard widening and paving For information about • I-95 northbound milling and resurfacing 95 Express including lane closure Lane Closures & Traffic Impacts: information visit: Lane closures are occuring in the work zone from 10:30 p.m. to 5:30 a.m. Sunday through Thursday. Entrance and exit ramps will be closed as needed. 95Express.com Upcoming Project Milestones (weather permitting): • Winter 2016/2017: Ongoing milling and resurfacing of I-95 northbound from Broward Boulevard to Oakland Park Boulevard • Winter 2016/2017: Broward Boulevard construction anticipated to be completed • Early 2017: Sound wall work will begin For around-the-clock, real time, I-95 traffic information, call 511.
    [Show full text]
  • Installing Alley-Gates
    INSTALLING ALLEY-GATES: PRACTICAL LESSONS FROM BURGLARY PREVENTION PROJECTS Briefing Note 2/01 Shane Johnson and Camille Loxley July 2001 “The views expressed in this briefing note are those of the authors, not necessarily those of the Home Office (nor do they reflect Government policy).” Introduction Benefits of an alley-gate Alley-gating, the installation of security gates across Reducing burglary footpath and alleyways, is a form of situational crime Results from the 1998 British Crime Survey1 showed prevention that attempts to reduce the opportunity to that 55% of burglaries with entry occurred through the commit crimes such as domestic burglary. When rear in terraced and detached/semi-detached houses. installed and properly used, alley-gates should control Moreover, an analysis of recorded crime data for the access to vulnerable target areas – usually paths or county of Merseyside shows that this pattern is alleys at the rear and to the sides of houses. Although particularly evident for terraced housing, with entry there are good reasons for thinking that alley-gates being gained via the rear of the property for around 72% should reduce burglary, there is as yet little hard of burglaries. The implication of such findings is that in evidence that they do. This will be available later in the theory, by restricting access to the rear of properties, year when evaluations of projects funded by the Crime alley-gating should have a very significant effect on Reduction Programme report their findings. In the burglary, although there are as yet no impact interim, however, the promise of alley-gating is enough evaluations of alley-gating schemes available.
    [Show full text]
  • Circular Walk from Bury Knowle Park to the C. S. LEWIS NATURE
    Circular walk from Bury Knowle Park to the C. S. LEWIS NATURE RESERVE in Risinghurst, and on up to SHOTOVER; then a restricted byway to HORSPATH, and back to Headington through fields to THE RIDINGS (under 5½ miles/8.8 km) Walking boots essential in the Horspath area after rainy periods (1) Bury Knowle Park in central Headington to Risinghurst Leave Bury Knowle Park via the main gate, turn left on to the London Road, and cross that road at the first pelican crossing (opposite St Andrew’s School). Continue a short way eastwards on the London Road, and then take the first turning on the right down Wharton Road. Take the second turning on the left into St Leonard’s Road. Take the first turning on the right into Holley Crescent, and when it curves right, turn left on to Vallis Alley, the footpath that starts between Nos. 22 and 20 Holley Crescent. (This is a remnant of the old funeral path that the people of Quarry used to take to get to St Andrew’s Church before their own parish church opened in 1849.) If the alley is crowded, it is possible to go into Margaret Road recreation ground on the right and get back out on to the path again just before the pavilion. Continue on Vallis Alley all the way to the end, then cross Quarry High Street and enter the footpath that is opposite (Chapel Alley). The former Quarry Methodist Chapel of 1860 is on your left. At the end of Chapel Alley turn left into Quarry Hollow, then take the first right into Quarry School Place, with Headington Quarry Nursery School (formerly Headington Quarry National School) on your right.
    [Show full text]
  • Chapter 9- the Circulation Plan (PDF)
    CHAPTER 9- THE CIRCULATION PLAN The Circulation Plan in Middletown is coordinated with the State's system of expressways, including Interstate Route 91 about to be completed, Route 9 in the Connecticut valley and the future Route 6A across the State. Middletown needs a thoroughfare between Route I-91 near Country Club Road and the center. The Circulation Plan is also coordinated with the development of downtown Middletown, already described, including the circumferential "ring road" around the center. Regional Expressways The plan which the State Highway Department has made for a state-wide expressway system includes three such routes which traverse Middletown. Interstate Route 91 is under construction from New Haven northward and crosses the western part of the City. Meeting the Connecticut Turnpike at New Haven, this will be the principal approach to Middletown from the southwest, including metropolitan New York. This is scheduled to be completed by the end of 1965. Route 9 is the principal north-south artery of the Connecticut Valley. It passes through Middletown center as an at-grade boulevard along the riverfront mixing local and through traffic. South of the center, it has been improved as a four-lane expressway to a point near the Haddam town line. Its rebuilding as an expressway to the Connecticut Turnpike at Old Saybrook will be undertaken shortly. North of Middletown Route 9 will soon be relocated and rebuilt as an expressway, turning westerly from its present line to join I-91 in the western part of Cromwell. Thus traffic to Middletown from Hartford and the north will start on I-91 and transfer to the new Route 9 a few miles north of the City.
    [Show full text]
  • Shared Streets and Alleyways – White Paper
    City of Ashland, Ashland Transportation System Plan Shared Streets and Alleyways – White Paper To: Jim Olson, City of Ashland Cc: Project Management Team From: Adrian Witte and Drew Meisel, Alta Planning + Design Date: February 2, 2011 Re: Task 7.1.O White Paper: “Shared Streets and Alleyways” - DRAFT Direction to the Planning Commission and Transportation Commission Five sets of white papers are being produced to present information on tools, opportunities, and potential strategies that could help Ashland become a nationwide leader as a green transportation community. Each white paper will present general information regarding a topic and then provide ideas on where and how that tool, strategy, and/or policy could be used within Ashland. You will have the opportunity to review the content of each white paper and share your thoughts, concerns, questions, and ideas in a joint Planning Commission/Transportation Commission meeting. Based on discussions at the meeting, the material in the white paper will be: 1) Revised and incorporated into the alternatives analysis for the draft TSP; or 2) Eliminated from consideration and excluded from the alternatives analysis. The overall intent of the white paper series is to explore opportunities and discuss the many possibilities for Ashland. Shared Streets Introduction Shared Streets aim to provide a better balance of the needs of all road users to improve safety, comfort, and livability. They are similar to European concepts such as the Dutch based ‘Woonerf’ and the United Kingdom’s ‘Home Zone’, with some distinct differences. This balance is accomplished through integration rather than segregation of users. By eschewing many of the traditional roadway treatments such as curbs, signs, and pavement markings, the distinction between modes is blurred.
    [Show full text]
  • Indiana Drivers Manual: Ch. 7
    CHAPTER 7 | Safe Vehicle Operation CHAPTER SEVEN | SAFE VEHICLE OPERATION Even the most experienced drivers can be distracted while driving. A defensive driver looks out for the actions of other drivers and anticipates potential problems. LANE MARKINGS Lane markings separate traffic and alert drivers when it is permissible to pass other vehicles. Yellow Lane Markings Yellow lane markings separate multiple lanes of traffic going in opposite directions. You may cross a broken yellow line to pass another vehicle when it is safe, but you should not cross a solid yellow line except to turn. Two-lane road with a solid yellow line Two-lane road with a broken Four-lane road with a solid yellow line yellow line White Lane Markings White lane markings separate multiple lanes of traffic going in the same direction. Most roads with more than two lanes have broken white lines to separate the lanes. You may cross a broken white line when it is safe to change lanes, but you should not cross a solid white line. Three lanes of traffic with broken white lines CHANGING LANES AND PASSING OTHER VEHICLES Change only one lane at a time. When changing lanes to prepare for a turn, you must signal your intention to do so at least 200 feet prior to changing lanes or turning. Your signal distance must be at least 300 feet before the turn if you are operating a vehicle in a speed zone of at least 50 miles per hour. Do not weave in and out of lanes, which will greatly increase your risk of an accident.
    [Show full text]
  • I-82 Valley Mall Boulevard Full-Diamond Interchange Was Originally Built in 1964
    PRACTICAL DESIGN AT WORK — DESIGN I-82 – Valley Mall Boulevard – construct roundabout Background Agriculture and tourism, key industries in the Yakima Valley, increase population and drive congestion along the Interstate 82 corridor. Valley Mall Boulevard, located south of Yakima in Union Gap, connects retail and commercial development to the interstate system and provides a direct route to the Yakima Air Terminal. In 2011, the Washington State Department of Transportation improved the Valley Mall Boulevard connection to the I-82 corridor by constructing three roundabouts; a modern traffic trend, somewhat new to the northwest. Practical design solution The I-82 Valley Mall Boulevard full-diamond interchange was originally built in 1964. Minor improvements including widening ramps were complete in 1997. With three stoplights at the ramp terminal, the interchange configuration and traffic flow was not keeping up with the demands of growing retail and commercial development. Congestion at peak travel times resulted in long delays and an increased risk of collisions as traffic backed up onto the freeway. Engineers worried about safety as T-bone and rear-end collisions increased. Typical design options for the congestion and safety issues would entail costly ramps and bridges. The final design chosen embodied modern day practical design concepts. The project used three roundabouts to connect the on-ramps and off-ramps to Valley Mall the city of Union Gap, local businesses The diamond interchange had Boulevard and the adjacent local street, and the public through design and exceeded its service life and was at to improve traffic flow, reduce the risk construction. WSDOT attended city capacity.
    [Show full text]
  • Boulevard Planting ORDINANCE.Pdf
    ORDINANCE CITY OF SAINT PAUL, MINNESOTA An ordinance establishing height limits for boulevard plantings. THE COUNCIL OF THE CITY OF SAINT PAUL DOES ORDAIN: Chapter 105, Sec. 105.04 of the Saint Paul Legislative Code is hereby amended to read as follows: Sec. 105.04. - Boulevard planting. (a) Purpose. It is the purpose and intent of the city to allow property owners to plant and maintain the boulevard areas adjoining their property in a manner which enhances and improves the aesthetic appearance of city streets, avenues and alleys. (b) Definitions. Boulevard shall mean the public right-of-way lying between the property line and sidewalk, and between the sidewalk and the roadway, or where no sidewalk exists, between the property line and the roadway. Boulevard plantings shall mean plantings that do not meet the definition of boulevard rain garden. Boulevard rain garden shall mean a landscaped depressed area that can hold stormwater runoff from impervious surfaces while it infiltrates into the soil below. Drip line shall mean an imaginary vertical line that extends from the outermost branches of a tree's canopy to the ground. Noxious weeds shall mean the annual, biennial and perennial plants which are deemed by the commissioner of agriculture to be injurious to public health, environment, public roads, crops, livestock and other property, as set forth in Minn. Rules 1505.0730, including but not limited to: Convolvulus arvensis (field bindweed), Cannabis sativa (hemp), Rhus radicans (poison ivy), Euphorbia esula (leafy spurge), Sonchus arvensis (perennial sow thistle), Cirsium vulgare (bull thistle), Cirsium arvense (Canada thistle), Carduus nutans (musk thistle) and Carduus acanthoides (plumeless thistle).
    [Show full text]
  • Movingforward
    FORWARD movingfAll 2010 A quarterly review of news and information about Pennsylvania local roads. When to Use Stop Signs in Alleys A Guide to Understanding the State’s Requirements Related to Traffic-Control Devices at Alley Intersections by Patrick Wright, Pennoni Associates When deciding whether to use stop signs and other An alley is considered a “highway” in the Vehicle traffic-control devices in alleys, municipalities Code because it is a “roadway open to the use of the should be familiar with two major issues. The first public.” Following this logic, the junction of an alley is whether traffic control is even required, and the with another highway (including another alley) is con- second is how to properly place the signs especially sidered an “intersection” under the Vehicle Code, and within the space constraints found in most alleys. thus crosswalks (whether marked or unmarked) exist. Understanding Alleys What Traffic-Control and Intersections Devices Are Required? Alleys are defined separately in both the Now that the definitions of alleys and intersec- Pennsylvania Vehicle Code (Title 75) and the tions have been clarified, the next step is to deter- Manual on Uniform Traffic Control Devices mine what traffic-control devices are required for (MUTCD). According to the Vehicle Code (Title alleys. As at any intersection, the Vehicle Code does 75, Section 102) as well as the MUTCD, an alley not necessarily require stop signs or other traffic-con- is “a street or highway intended to provide access to trol devices. Instead, the code has specific “rules of the rear or side of lots or buildings in urban districts the road” that govern driving behavior and the right- and not intended for the purpose of through of-way at intersections depending on the situation.
    [Show full text]