DEVELOPMENTS LARGE BLOCKS and Downtownwest RINO Whitney EAST RINO 303.407.1465Hake PLATTE ST/LOHI [email protected]

Total Page:16

File Type:pdf, Size:1020Kb

DEVELOPMENTS LARGE BLOCKS and Downtownwest RINO Whitney EAST RINO 303.407.1465Hake PLATTE ST/LOHI Whitney.Hake@Transwestern.Com denver DEVELOPMENTS LARGE BLOCKS and downtownWEST RINO whitney EAST RINO 303.407.1465hake PLATTE ST/LOHI [email protected] LOWER DOWNTOWN MIDTOWN billy UPPER DOWNTOWN woodward303.952.5591 [email protected] centralCHERRY CREEK alison 720.388.6087utz southeastBELLEVIEW & I-25 [email protected] ARAPAHOE & I-25 DRY CREEK & I-25 3858 WALNUT STREET SUITE 164 LINCOLN & I-25 DENVER, CO 80205 downtownWEST RINO ACTIVE DEVELOPMENTS SUBLEASE LARGE BLOCKS UNION REV 360 JUNCTION 23 STATION 3600 BRIGHTON BOULEVARD 2323 DELGANY ST Developer Tributary Real Estate & Haselden Construction Developer EverWest Real Estate Investors & WHI RBA 171,000 RSF RBA 86,140 RSF COORS MAX Contiguous 65,000 RSF MAX Contiguous 86,140 RSF FIELD Rate $34.00/SF NNN Rate Est. $32.00/SF NNN OPEX $14.20/SF OPEX Est. $15.00/SF Delivery Date Q3 2020 Delivery Date N/A A Notes WeWork has signed a lease for 65,000 SF with a last-to- C Notes WeWork signed a full-building lease in late 2018. No TI close provision. Planned 4:1,000 parking ratio for Mission occurred, default is claimed by both parties. Site may Ballroom overflow. Leased by JLL (Roupp). sell to multifamily developer. C 2650 ARKINS COURT A N BROADWAY D 2650 ARKINS COURT DIRECT LARGE BLOCKS STALLED DEVELOPMENTS 3100 BRIGHTON BOULEVARD E NORTH WYNKOOP DENARGO MARKET LARIMER ST ST LARIMER LARIMER WALNUT ST ST WALNUT WALNUT BLAKE ST BLAKE BLAKE ST BLAKE 4180 WYNKOOP STREET 2650 ARKINS COURT Developer Westfield Developer Golub, Formativ & BlackRock RBA 88,925 RSF D RBA 11-13 Acres of Unimproved Land MAX Contiguous 64,995 RSF F 3555 BRIGHTON BOULEVARD Rate $32.00/SF NNN 3100 BRIGHTON OPEX $15.00/SF 3100, 3108 & 3120 BRIGHTON BOULEVARD Delivery Date N/A B Notes Completed AEG Live (38,000 SF) lease. Leased by NKF Developer Beacon Capital & Elevation Development Group G E RBA 334,290 RSF 3600 BRIGHTON BOULEVARD A 3615 DELGANY STREET (Harrington). Considering executive suites for one floor WYNKOOP ST BRIGHTON BLVD of vacant space. WATERSHED 3555 BRIGHTON BOULEVARD Developer Koelbel & Company F RBA 120,000 RSF THE CURRENT, RIVER NORTH 3615 DELGANY STREET Developer Schnitzer West H 4040 WYNKOOP STREET G RBA 191,000 RSF 4180 WYNKOOP STREET B NORTH WYNKOOP 4040 WYNKOOP STREET Developer Westfield H RBA 444,570 RSF downtownEAST RINO ACTIVE DEVELOPMENTS LARGE BLOCKS UNION HUB NORTH ROCK DRILL STATION 3650 BLAKE STREET 3939 WILLIAMS STREET Developer Beacon Capital Partners Developer Weiss Family & Saunders RBA 105,340 RSF RBA 318,000 RSF COORS MAX Contiguous 105,340 RSF MAX Contiguous 310,000 RSF Rate $33.00-$34.00/SF NNN FIELD Rate $26.00-$32.00/SF NNN OPEX $14.00/SF OPEX TBD Delivery Date Q3 2020 Delivery Date Q3 2020 A Notes HUB South was purchased by MetLife for ~$620 PSF in B Notes Currently, the project is comprised of 150,000 square 2020. Datadog is pursuing a lease at HUB North. Leased feet of adaptive reuse/historic buildings. Leased by CW by JLL (Roupp & Rhoades). (Wheeler, Wulf & Hutt). N BROADWAYA LARIMER ST LARIMER LARIMER ST LARIMER STALLED DEVELOPMENTS PARADIGM RIVER NORTH 3400 WALNUT STREET Developer Jordon Perlmutter & Co. C RBA 191,998 RSF WALNUT ST ST WALNUT WALNUT BLAKE ST BLAKE 3400 WALNUT STREET C ST BLAKE D 3423 BLAKE STREET THE CHARLIE BLAKE E 3500 BLAKE STREET 3423 BLAKE STREET Developer Infinity Property Collection & Saunders WYNKOOP ST 3650 BLAKE STREET A BRIGHTON BLVD D RBA 88,807 RSF T3 OFFICES 3500 BLAKE STREET 38TH AVENUE & WALNUT STREET F Developer McCaffery, Hines & Ivanhoe Cambridge E RBA 250,000 RSF 3939 WILLIAMS STREET GB WORLD TRADE CENTER DENVER G 40TH AVENUE & WALNUT STREET 38TH & BLAKE STREET Developer Golub, Formativ & Goldman Sachs F RBA 368,000 RSF TRAIN DENVER 4000 BLAKE STREET Developer Invent Development Partners & Halpern Real Estate Ventures G RBA 275,000 RSF PLATTEdowntown ST/LOHI ACTIVE DEVELOPMENTS ONE PLATTE 1701 PLATTE STREET Developer Nichols & Shorenstein RBA 252,000 RSF MAX Contiguous 240,811 RSF (60,000-SF Floorplate) Rate Withheld OPEX TBD Delivery Date Q3 2021 A Notes $213 Per land SF. Broke ground on 2/10/20, moving dirt will take 12 months; leased by NKF (Gard). COORS FIELD STALLED DEVELOPMENTS THE CAMPUS AT PLATTE 15 UNION 20TH STREET 20TH 20TH STREET 20TH PEPSI 2300 15TH STREET STATION CENTER Developer Crescent & Lionstone B RBA 81,570+ RSF A SPEAR STREET G B E C W 15TH STREET B 2300 15TH STEET PLATTE STREET 1701 PLATTE STREET A ACTIVE DEVELOPMENTS SUBLEASE LARGE BLOCKS SAKURA SQUARE 1144 FIFTEENTH 1255 19TH STREET & 1947 LAWRENCE STREET 1144 15TH STREET LOWER DOWNTOWN Developer Hines & Sakura Square LLC Developer Hines downtown RBA Up to 2MSF of Mixed-Use RBA 672,000 RSF MAX Contiguous Up to 2MSF of Mixed-Use MAX Contiguous 75,969 (Sublease) Rate TBD Rate $40.00/SF NNN (Sublease) OPEX TBD OPEX $20.25/SF Delivery Date Next Cycle F Delivery Date N/A A Notes It may take two to three years or more to redevelop Notes Chipotle has subleased to Cooley, Comp: 25,323 RSF; Colorado's Japanese community new location. Still $38.00/SF NNN; 2.25% Escalations; 158 Mos, 22 Mos Free; MCGREGOR SQUARE having weekly project meetings at Hines. $100.00/SF in TI. 1901 WAZEE STREET Developer Colorado Rockies 18TH STREET ATRIUM RBA 208,406 RSF 1621 18TH STREET MAX Contiguous 203,406 RSF Developer Stoltz Real Estate Partners Rate $40.00/SF NNN RBA 117,470 RSF OPEX $25.00+/SF NORTH BROADWAY MAX Contiguous 65,678 RSF (Sublease) B Delivery Date Q1 2021 Rate $37.00/SF NNN (Sublease) Notes Tattered Cover bookstore leased 7,000 SF of retail space. OPEX N/A Post-Covid, Bank of Colorado (25,000 SF), Lewis Roca G Delivery Date N/A (50,000 SF) and Red Canary are still circling. Notes Checkr sublease through 10/31/2030. Checkr plans to keep ~100 employees in Denver, its second HQ. LARGE BLOCKS COORS A 1255 19TH STREET & 1947 LAWRENCE STREET 1125 SEVENTEENTH STREET FIELD 1125 17TH STREET A BLOCK I 1901 ARAPAHOE STREET Developer Hines & Goldman Sachs 1881 16TH STREET RBA 499,975 RSF Developer Continuum Partners MAX Contiguous 60,875 RSF RBA 53,478 RSF A Rate $48.00/SF FSG MAX Contiguous 36,537 RSF (Sublease) C 1125 17TH STREET OPEX N/A Rate $35.00/SF NNN (Sublease) C Delivery Date N/A OPEX N/A B G Notes Chase bank is moving to Market Station, thus creating H Delivery Date N/A space for Velocity Global to move from INDUSTRY RiNo Notes Antero Resources sublease post-Covid. Antero has not 1200 17TH STREET E Station to 1125 17th St. listed their Union Station South Wing space for sublease yet. SUBLEASE LARGE BLOCKS COLFAX AVENUE COLFAX 1515 ARAPAHOE STREET D F 1144 15TH STREET AVENUE COLFAX 1901 WAZEE STREET B PARK CENTRAL 1515 ARAPAHOE STREET STALLED DEVELOPMENTS G 1621 18TH STREET ARAPAHOE STREET Developer Invesco RBA 558,346 RSF 1900 LAWRENCE UNION 1901 ARAPAHOE STREET STATION MAX Contiguous 54,657+ RSF (Sublease) Rate $32.00/SF FSG (Sublease) Developer Riverside Investment & Developments OPEX N/A I RBA 650,000+ RSF 15TH STREET Delivery Date N/A SPEER BOULEVARD D Notes Gusto's further expansion is on hold post-Covid. Bike 1420 WYNKOOP H 1881 16TH STREET barn construction is complete. Ashford University sublease through 8/31/21. 1420 WYNKOOP STREET TABOR CENTER Developer Unico J 1420 WYNKOOP STREET 1200 17TH ST J RBA 88,000 RSF Developer Beacon Capital Partners RBA 645,159 RSF 1900 16TH ST PHASE II MAX Contiguous 53,713 RSF (Sublease) Rate $33.00+/SF NNN (Sublease) 1551 WEWATTA PARKING GARAGE K 1900 16TH STREET OPEX Est. $17.00/SF Developer BentallGreenOak K DE Delivery Date N/A RBA 185,000 RSF E Notes 53,713 RSF of WeWork enterprise space available, C vacated by tenants like Amazon, Verizon and Full W Contact. downtownMIDTOWN LARGE BLOCKS SUBLEASE LARGE BLOCKS PRISM GRANITE TOWER 999 17TH STREET 1099 18TH STREET Developer Shea Properties & Oaktree Capital Developer KBS Realty Advisors RBA 111,836 RSF RBA 593,527 RSF MAX Contiguous 86,230 RSF MAX Contiguous 130,068 RSF (Sublease) Rate $34.00-$36.00/SF NNN Rate $24.00/SF NNN (Sublease) OPEX $17.00 SF OPEX Est. $16.00/SF Delivery Date N/A Delivery Date N/A A Notes Hall Render Comp: 11,893 RSF; $35.50/SF NNN; 2.5% D Notes Occidental/Anadarko sublease through 4/30/2033. Escalations; 132 Mos, 12 Mos Free; $105.00/SF in TI. Now leased by JLL (Foley & Beason). NORTH BROADWAY INDEPENDENCE PLAZA THE VAULT 1050 17TH STREET 821 17TH STREET Developer Heitman Developer Harbor Associates 1055 19TH STREET F D 1099 18TH STREET RBA 567,286 RSF RBA 106,231 RSF MAX Contiguous 102,035 RSF MAX Contiguous 64,803 RSF (Sublease) COORS Rate $25.00/SF NNN Rate $32.00+/SF NNN FIELD OPEX $16.00/SF OPEX TBD Delivery Date N/A Delivery Date N/A E 821 17TH STREET B Notes Floors 19-23 are now available as direct space since E Notes 64,803 RSF of first-gen WeWork enterprise space Merkle, Tracker Resource Development and Keane Group available, never occupied before. A 999 17TH STREET A are known 2020 vacates. B B 1050 17TH STREET G THE LINK 930 15TH STREET Developer Rialto & Steelwave RBA 225,000 RSF COLFAX AVENUE COLFAX C 930 15TH STREET AVENUE COLFAX MAX Contiguous 222,064 RSF 17TH STREET Rate $32.00-$34.00/SF NNN OPEX $13.50/SF ARAPAHOE STREET C Delivery Date Q4 2020 UNION Notes $200 PSF redevelopment underway.
Recommended publications
  • Energy Star Qualified Buildings
    1 ENERGY STAR® Qualified Buildings As of 1-1-03 Building Address City State Alabama 10044 3535 Colonnade Parkway Birmingham AL Bellsouth City Center 600 N 19th St. Birmingham AL Arkansas 598 John L. McClellan Memorial Veterans Hospital 4300 West 7th Street Little Rock AR Arizona 24th at Camelback 2375 E Camelback Phoenix AZ Phoenix Federal Courthouse -AZ0052ZZ 230 N. First Ave. Phoenix AZ 649 N. Arizona VA Health Care System - Prescott 500 Highway 89 North Prescott AZ America West Airlines Corporate Headquarters 111 W. Rio Salado Pkwy. Tempe AZ Tempe, AZ - Branch 83 2032 West Fourth Street Tempe AZ 678 Southern Arizona VA Health Care System-Tucson 3601 South 6th Avenue Tucson AZ Federal Building 300 West Congress Tucson AZ Holualoa Centre East 7810-7840 East Broadway Tucson AZ Holualoa Corporate Center 7750 East Broadway Tucson AZ Thomas O' Price Service Center Building #1 4004 S. Park Ave. Tucson AZ California Agoura Westlake 31355 31355 Oak Crest Drive Agoura CA Agoura Westlake 31365 31365 Oak Crest Drive Agoura CA Agoura Westlake 4373 4373 Park Terrace Dr Agoura CA Stadium Centre 2099 S. State College Anaheim CA Team Disney Anaheim 700 West Ball Road Anaheim CA Anahiem City Centre 222 S Harbor Blvd. Anahiem CA 91 Freeway Business Center 17100 Poineer Blvd. Artesia CA California Twin Towers 4900 California Ave. Bakersfield CA Parkway Center 4200 Truxton Bakersfield CA Building 69 1 Cyclotron Rd. Berkeley CA 120 Spalding 120 Spalding Dr. Beverly Hills CA 8383 Wilshire 8383 Wilshire Blvd. Beverly Hills CA 9100 9100 Wilshire Blvd. Beverly Hills CA 9665 Wilshire 9665 Wilshire Blvd.
    [Show full text]
  • Bronx Civic Center
    Prepared for New York State BRONX CIVIC CENTER Downtown Revitalization Initiative Downtown Revitalization Initiative New York City Strategic Investment Plan March 2018 BRONX CIVIC CENTER LOCAL PLANNING COMMITTEE Co-Chairs Hon. Ruben Diaz Jr., Bronx Borough President Marlene Cintron, Bronx Overall Economic Development Corporation Daniel Barber, NYCHA Citywide Council of Presidents Michael Brady, Third Avenue BID Steven Brown, SoBRO Jessica Clemente, Nos Quedamos Michelle Daniels, The Bronx Rox Dr. David Goméz, Hostos Community College Shantel Jackson, Concourse Village Resident Leader Cedric Loftin, Bronx Community Board 1 Nick Lugo, NYC Hispanic Chamber of Commerce Milton Nuñez, NYC Health + Hospitals/Lincoln Paul Philps, Bronx Community Board 4 Klaudio Rodriguez, Bronx Museum of the Arts Rosalba Rolón, Pregones Theater/Puerto Rican Traveling Theater Pierina Ana Sanchez, Regional Plan Association Dr. Vinton Thompson, Metropolitan College of New York Eileen Torres, BronxWorks Bronx Borough President’s Office Team James Rausse, AICP, Director of Planning and Development Jessica Cruz, Lead Planner Raymond Sanchez, Counsel & Senior Policy Manager (former) Dirk McCall, Director of External Affairs This document was developed by the Bronx Civic Center Local Planning Committee as part of the Downtown Revitalization Initiative and was supported by the NYS Department of State, NYS Homes and Community Renewal, and Empire State Development. The document was prepared by a Consulting Team led by HR&A Advisors and supported by Beyer Blinder Belle,
    [Show full text]
  • National Register of Historic Places Registration Form JUL I U
    i-orm 10-SOU (Oct. 1SSO) 'V '.••. !?r RECEIVED 2280 ' United States Department of the Interior National Park Service JUL i u P*d National Register of Historic Places f CES Registration Form NAT REGISTER Of HiSlUKIl Pl> NATIONAL PARKSERVICE.•^i i 1 1"^ This form is for use in nominating or requesting determinations for individual properties and districts. See instructions in How to Complete the National Register of Historic Places Registration Form (National Register Bulletin 16A). Complete each item by marking "x" in the appropriate box cr by entering the information requested. If an item does not apply to the property being documented, enter "N/A" for "not applicable." For functions, architectural classification, materials, and areas of significance, enter only categories and subcategories from the instructions. Place additional entries and narrative items on continuation sheets (NPS Form 10-900a). Use a typewriter, word processor, or computer, to complete all items. 1. Name of Property___________________________________________________________ historic name Berkeley Historic Civic Center District other names/site number N/A 2. Location street & number not for publication citv or town __ Berkeley N/A Q state California code CA county A lame da code _201 Zip code 3, State/Federal Agency Certification As the designated authority under the National Historic Preservation Act, as amended, I hereby certify that this 23 nomination Q request for determination of eligibility meets the documentation standards for registering properties in the National Register of Historic Places and meets the procedural and professional requirements set forth in 36 CFR Part 60. In my opinion, the property CS3 meets G does not meettlie National-Register criteria.
    [Show full text]
  • Jennifer Falck Linssen, Franklin G
    TALONWERK LLC 2221 S. WEBSTER AVE. , STE. A, #177 JENNIFER FALCK LINSS EN GREEN BAY, WI 54301 WWW.JENNIFERFALCKLIN SSEN.COM JENNIFER@JENNIFERFAL CKLINSSEN.COM b. 1971 Indianapolis, Indiana SOLO MUSEUM EXHIBITIONS 2012 At First Light: The Katagami Sculpture of Jennifer Falck Linssen, Franklin G. Burroughs-Simeon B. Chapin Art Museum, Myrtle Beach, SC 2010 Between the Lines: The Katagami Sculpture of Jennifer Falck Linssen, Springfield Art Museum, Springfield, MO 2009 Jennifer Falck Linssen: Beyond Katagami, Longmont Museum, Longmont, CO 2008 Contemporary Katagami: Works by Jennifer Falck Linssen, Craft and Folk Art Museum, Los Angeles, CA SOLO UNIVERSITY & GALLERY EXHIBITIONS 2017 Flow, Bemidji State University, Bemidji, MN 2013 Parched, Berea College, Berea, KY 2010 Captured Light: The Contemporary Katagami Works of Jennifer Falck Linssen, Hope College, Holland, MI 2009 Inside Out, Illinois Central College, Peoria, IL 2008 Drawing with a Knife, Mesa State College, Grand Junction, CO Jennifer Falck Linssen, Cervini Haas Fine Art, Scottsdale, AZ 2007 How to See the Forest through the Trees, Arts Incubator, Kansas City, MO SELECT GROUP EXHIBITIONS 2019 art + identity: an international view, browngrotta arts, Wilton, CT 2018 Tea Collaborative - Connecting Cultures, Mary C. Daly RSM Art Gallery, Mercy By The Sea Center, Madison, CT Chasing The Sky, Chicago Art Source Gallery, Chicago, IL (2 person exhibit) Blue/Green: Color/Code/Context, browngrotta arts, Wilton, CT 2018 Sculpture Objects and Functional Art (S.O.F.A.) Exposition – Chicago, Chicago, IL (Kirsten Muenster Projects, San Francisco, CA) 2016,2010, S.O.F.A. - Chicago, Chicago, IL (browngrotta arts, Wilton, CT) 2009-2005 S.O.F.A.
    [Show full text]
  • Invesco Real Estate House View H1 2019 North America Market Outlook Invesco Real Estate Global Research Team
    Invesco Real Estate House View H1 2019 North America Market Outlook Invesco Real Estate Global Research Team Global Asia Pacific Europe North America Timothy Bellman Thomas Au Mike Bessell Mike Sobolik Global Asia Pacific European North American Research Strategist Research Strategist Research Strategist Research Strategist Sabrina Unger Catherine Chen Christian Eder Nicholas Buss Analyst Director Director Senior Director Katherine Seamans Jerry Song Matthew Hall Joshua Bova Project Coordinator Vice President Director Analyst Jade Tan Guy-Young Lamé Brock Lacy Associate Director Director Analyst Lauren van Aanholt Julia Maurer Joyce Galvan Associate Director Analyst Associate Invesco Real Estate locations Atlanta Beijing Dallas Hong Kong Hyderabad London Luxembourg Madrid Milan Munich New York Newport Beach Paris Prague San Francisco Seoul Shanghai Singapore Sydney Tokyo Warsaw Cover image: Austin, TX is a market inclusive of innovation hubs, the key driver of economic growth and office demand. This document is for Professional Clients only in Dubai, Continental Europe (as defined in the important information), Ireland and the UK, for Qualified Investors in Switzerland, for Institutional Investors only in the United States, Australia and Singapore, and for Professional Investors only in Hong Kong and in Japan as defined under the Financial Instruments and Exchange Law of Japan. In Canada, the document is intended only for accredited investors as defined under National Instrument 45–106. It is not intended for2 andIn
    [Show full text]
  • Denver Public Library Clipping Files
    DENVER CLIPPINGS Last printed out: 2005 Last Updates 5/21/19 CR See also: GENERAL CLIPPINGS “SEE:” References located at END of this file DENVER. See also: DENVER. METROPOLITAN AREA. DENVER. ROCKY MOUNTAIN NEWS SERIES. DO YOU KNOW YOUR DENVER. DENVER. 150 YEAR BIRTHDAY DENVER. Other towns / cities named “Denver,” see: DENVER. SISTER CITIES. DENVER. 1858-1859. DENVER. 1860-1869. DENVER. 1870-1879. DENVER. 1880-1889. DENVER. 1890-1899. DENVER. 1900-1909. DENVER. 1910-1919. DENVER. 1920-1929. DENVER. 1930-1939. DENVER. 1940-1949. DENVER. 1950-1959. DENVER. 1950-1959. DENVER: A PROGRESS REPORT OF THE GREATER DENVER AREA. 1957. DENVER POST SUPPLEMENT TO EMPIRE MAGAZINE. DENVER. 1950-1959. MAGAZINE EXCERPTS. DENVER. 1950-1959. THE QUEEN CITY: A MILE HIGH AND STILL GROWING. DENVER POST SUPPLEMENT. DENVER. 1960-1969. 1 DENVER. 1960-1969. MAGAZINE EXCERPTS. DENVER. 1960-1969. TEN STEPS TO GREATNESS. SERIES. 1964. DENVER. 1970-1979. DENVER. 1970-1979. MAGAZINE EXCERPTS. DENVER. 1970-1979. THE WHOLE CONSUMER GUIDE: A DENVER AREA GUIDE TO CONSUMER AND HUMAN RESOURCES. DENVER POST SUPPLEMENT. NOVEMBER 5, 1978. DENVER. 1980-1989. DENVER. 1980-1989. MAGAZINE EXCERPTS. DENVER. 1990-1999. DENVER. 2000-2009. DENVER. 2003. THE MILE HIGH CITY. DENVER. DENVER. 2008. 2008 OFFICIAL VISITORS GUIDE. DENVER. A SHORT HISTORY OF DENVER. 1 OF 2. DENVER. A SHORT HISTORY OF DENVER. 2 OF 2. DENVER. AFRICAN AMERICANS. 1860-1899. DENVER. AFRICAN AMERICANS. 1890-1899. DENVER. AFRICAN AMERICANS. 1900-1909. DENVER. AFRICAN AMERICANS. 1910-1919. DENVER. AFRICAN AMERICANS. 1920-1929. DENVER. AFRICAN AMERICANS. 1930-1939. DENVER. AFRICAN AMERICANS. 1940-1949. DENVER. AFRICAN AMERICANS. 1950-1959. DENVER.
    [Show full text]
  • The San Francisco Civic Center
    - THE SAN FRANCISCO CIVIC CENTER: A STUDY IN URBAN FORM OCTOBER 1987 URBAN DESIGN RECOMMENDATIONS FOR SAN FRANCISCO'S CIVIC CENTER UNDERTAKEN BY THE URBAN DESIGN COMMITTEE AMERICAN INSTITUTE OF ARCHITECTS SAN FRANCISCO CHAPTER DEVELOPED IN CONJUNCTION WITH THE SAN FRANCISCO DEPARTMENT OF CITY PLANNING & THE CIVIC DESIGN COMMITTEE SAN FRANCISCO ARTS COMMISSION SPONSORED BY THE ARCHITECTURAL FOUNDATION OF NORTHERN CALIFORNIA PREFACE/ACKNOWLEGEMENTS. The report presented herein is the culmination of a design charrette undertaken to reawaken public interest/civic spirit in the Civic Center Area. The goal of this study is to facilitate the completion of a world-class civic center begun in the early 20th century. The vision of this special urban place and the current physical form is the combined efforts and talents of many individuals. With sensitive reinforcement we believe the vision of civic leaders, nearly 80 years ago, can be fully realized. It is our hope that this study can act as a catalyst in evolving this vision and that the continued completion of this great civic composition is accomplished. The charrette study took place on the 13, 14 , 22 and 23 of July 1987. We wish to accnowledge the valued participation of the following individuals: Clark Manus, Chairperson Alex Bonutti, Steering Committee F. Lee Moulton, Steering Commitee Bruce Race, Group Leader Philip Enquist, Group Leader Michael Stanton, Group Leader Erin Bell, Camilo Carrillo, Marien Coss, Norman Davis, Mary Dooley, Lester Gerstman, Rob Gibson, Maria Gray, Ricka Hale,
    [Show full text]
  • San Diego Civic Center Complex
    ATTACHMENT E lWagellall DMJM H&N AECOM CO~'Ul"~C Facilities Condition Assessment San Diego Civic Center Complex Facilities Condition Assessment Staubach, Inc. San Diego, California April 2008 Facilities Condition Assessment San Diego Civic Center Complex 21 • DMJM H&N • MAGELLAN CONSULTING • Facilities Condition Assessment San Diego Civic Center Complex San Diego Qvic Center Complex Fad/ities Condition Assessment ITable of Contents The San Diego Civic Center Complex Condition Assessment JJ'as conductedfrom l.Vfarch 24, 2008 through iVfarch 28, 2008. The assessment IJJas conducted JJ}ith architectural, mechanical. electrical and stmct1lral engineering disciplines represented. This dOCllment contains the restllts ifthe assessment and includes thejolloJJJing: Introduction and Methodology 5 An explanation of the approach for the assessment Summary of Findings 6 Cross Tab of Deficiencies by System by Priority 6 Cross Tab of Deficiencies by Category by Priority 6 life Cycle Capital Renewal Forecast 7 Overview of Assessed Buildings 8 Overview 8 City Administrative BUilding 8 City Operations Building 9 Civic Center Exhibition BUilding 10 Parkade II Civic Center Plaza II Possible Demolition Phasing Plan and Cost 12 Assessment Findings 13 Assessment Building Facility Condition Index 13 Facility Condition Assessment Detail Reports 14 City Administrative BUilding I of25 City Operations Building I of21 Civic Center Exhibition BUilding I of20 Parkade I of 18 Civic Center Plaza I of21 Appendix A Replacement Cost Model Assumptions A Deficiency Soft Cost
    [Show full text]
  • Downtown Denver Partnership, Inc
    STATE OF DOWNTOWN DENVER SEPTEMBER 2012 Downtown Denver Partnership, Inc. With support from: STATE OF 1 DOWNTOWN DENVER INTRODUCTION TABLE OF CONTENTS Introduction Letter .................................................1 Dear Downtown Denver Stakeholder, Key Facts ...............................................................2 Thank you for picking up a copy of the Downtown Denver Partnership’s annual State of Downtown Denver report, a fact-driven report that provides timely, Denver’s Downtown Area Plan ..............................3 objective and accurate data about Downtown Denver. This year we are proud Notable Rankings ..................................................4 to collaborate with Newmark Knight Frank Frederick Ross to bring you the most complete statistics and analysis about Downtown Denver. Office Market .................................................... 6-7 Employers & Employees ..................................... 8-9 In his 2012 State of the City address, Mayor Michael B. Hancock remarked that a vibrant downtown core is essential to the health of the city. At the 2012 Retail & Restaurants .............................................11 Rocky Mountain Urban Leadership Symposium, Governor Hickenlooper and Downtown Residents ..................................... 12-13 other leaders in the Rocky Mountain West stressed the importance of urban centers in creating strong place-based economies that attract and retain top Transportation ............................................... 14-15 talent. Downtown Denver is one
    [Show full text]
  • Denver 2030 District 2015 Annual Report
    DENVER 2030 DISTRICT 2015 ANNUAL REPORT Jay Yuan / Shutterstock.com Denver’s High Performance Building District WHY THE DISTRICT 2030 Districts form out of the communities they What makes the district concept unique and serve. They rise up because of a shared vision of important is that it leverages the performance of the future where high performance buildings are our urban core as a district rather than individual the foundation for economic vitality. The Denver buildings. This allows Denver and our local building 2030 District has positioned our city as a beacon industry to share a common set of performance for efficient resource use around energy, water targets and metrics. It allows us to benchmark and transportation and the market and economic and improve our city as a whole and to share development that results from investments in high best practices and work together to achieve performance. The 2030 District catalyzes Denver’s our common goals. It also allows us to leverage national leadership position that is also visible in our economies of scale to provide unique benefits and exemplary ENERGY STAR and LEED buildings. opportunities to Denver 2030 District members. The 2030 District is led by the private sector, 2030 Districts are designated urban areas primarily by the building owners and managers that committed to meeting the energy, water and comprise the district. And while it is private sector transportation emissions reduction targets of the led, the support the District gets from the City of 2030 Challenge for Planning developed by the Denver and local community groups such as the building industry nonprofit, Architecture 2030.
    [Show full text]
  • 2007 Labeled Buildings List Final Feb6 Bystate
    ENERGY STAR® Qualified Buildings and Manufacturing Plants As of December 31, 2007 Building/Plant Name City State Building/Plant Type Alabama Calhoun County Administration Building Anniston AL Courthouse Calhoun County Court House Anniston AL Courthouse 10044 Birmingham AL Office Alabama Operations Center Birmingham AL Office BellSouth City Center Birmingham AL Office Birmingham Homewood TownePlace Suites by Marriott Birmingham AL Hotel/Motel Roberta Plant Calera AL Cement Plant Honda Manufacturing of Alabama, LLC Lincoln AL Auto Assembly Plant Alaska Elmendorf AFB, 3MDG, DoD/VA Joint Venture Hospital Elmendorf Air Force Base AK Hospital Arizona 311QW - Phoenix Chandler Courtyard Chandler AZ Hotel/Motel Bashas' Chandler AZ Supermarket/Grocery Bashas' Food City Chandler AZ Supermarket/Grocery Phoenix Cement Clarkdale AZ Cement Plant Flagstaff Embassy Suites Flagstaff AZ Hotel/Motel Fort Defiance Indian Hospital Fort Defiance AZ Hospital 311K5 - Phoenix Mesa Courtyard Mesa AZ Hotel/Motel 100 North 15th Avenue Building Phoenix AZ Office 1110 West Washington Building Phoenix AZ Office 24th at Camelback Phoenix AZ Office 311JF - Phoenix Camelback Courtyard Phoenix AZ Hotel/Motel 311K3 - Courtyard Phoenix Airport Phoenix AZ Hotel/Motel 311K4 - Phoenix North Courtyard Phoenix AZ Hotel/Motel 3131 East Camelback Phoenix AZ Office 57442 - Phoenix Airport Residence Inn Phoenix AZ Hotel/Motel Arboleda Phoenix AZ Office Bashas' Food City Phoenix AZ Supermarket/Grocery Biltmore Commerce Center Phoenix AZ Office Biltmore Financial Center I Phoenix AZ
    [Show full text]
  • DAVID M. GRIGGS 715 Galapago St
    DAVID M. GRIGGS 715 Galapago St. www.publicartist.com Denver, CO 80204 [email protected] (303) 446 – 3030 Public Art Design Team Resume: over 60 commissioned works of art, including the following Design Team and Master Planning Projects: Denver International Airport (1990 - 1994) This was a project to design and build a public art piece for the Central Core of the International Concourse. With a budget of $465,000., this 4-year project was installed in the facility at the time that it was being built. In order to manage this process I formed a design team consisting of an Architect, Engineer, Lighting Designer, General Contractor and numerous fabricators. The implementation of the project involved over a dozen subcontractors. Hope, Arkansas (1996 - 2000) I was on the design team for the renovation of Hope, Arkansas, President Bill Clinton's birthplace. The team focused on Hope’s historic train depot and the adjacent downtown area. The public art design work is based on: 1) the history of this small southern town, 2) the legacy of the railroad as transportation and metaphor, and, 3) the town itself as a metaphor for historic opportunities and possibilities. Colorado School of Mines (1998 - 2001) This was a design team collaboration with an architect, an artist, and the client/users on a new facility for the Department of Metallurgy. The team was involved with designing and shaping the public spaces of the building and incorporating art into functional elements such as floors, columns, windows, sidewalks and so on. This incorporation of art was focused on the relationship between the exploration of the Metallurgy Dept.
    [Show full text]