Bosphorus Cross-Continental Swim Trip Notes
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
TERRATEC Epbms Gear up for New Istanbul Metro Line
PRESS RELEASE 1 MARCH 2020 For Immediate Release Release Number: 13169 TERRATEC EPBMs gear up for new Istanbul Metro line Gulermak, Nurol & Makyol JV is currently completing TBM testing on-site for the new Ümraniye-Ataşehir-Göztepe line, the latest addition to Istanbul’s metro expansion. TERRATEC is pleased to announce that it now has a total of nine machines working concurrently on Istanbul’s Metro system, in Turkey. The on-site assembly of two 6.56m diameter Earth Pressure Balance Tunnel Boring Machines (EPBMs) is currently underway for the Ümraniye-Ataşehir-Göztepe (UAG) Metro line, which is being constructed by the by the Gulermak, Nurol & Makyol JV. These EPBMs, along with another pair of sister machines that have already been assembled for this project, are all due to be launched and mining by mid-May. The 13km-long Ümraniye-Ataşehir-Göztepe (UAG) line, along with its 11 new stations and NATM-built connections, will form a second north to south rail corridor under the densely-populated Anatolian side of Istanbul and will be located entirely underground at an average depth of about 30m. The robust TERRATEC TBMs have versatile mixed-face dome-style cutterheads with an opening ratio of about 35% that have proven to work extremely effectively in Istanbul’s 171 Davey Street, Hobart, Tasmania 7000, AUSTRALIA | Tel +61 362233282 11F Wharf T&T Centre, 7 Canton Road, Kowloon, HONG KONG | Tel +852 31693660 Page | 1 PRESS RELEASE 1 MARCH 2020 mixed geology – which includes low-strength sandstones, siltstones, limestones and shales – as well as other state-of-the-art features such as VFD electric cutterhead drives, tungsten carbide soft ground cutting tools that are interchangeable with 17’’ roller disc cutters, high torque screw conveyors and active articulation systems. -
2019 Annual Report Annual 2019
a force for good. 2019 ANNUAL REPORT ANNUAL 2019 1, cours Ferdinand de Lesseps 92851 Rueil Malmaison Cedex – France Tel.: +33 1 47 16 35 00 Fax: +33 1 47 51 91 02 www.vinci.com VINCI.Group 2019 ANNUAL REPORT VINCI @VINCI CONTENTS 1 P r o l e 2 Album 10 Interview with the Chairman and CEO 12 Corporate governance 14 Direction and strategy 18 Stock market and shareholder base 22 Sustainable development 32 CONCESSIONS 34 VINCI Autoroutes 48 VINCI Airports 62 Other concessions 64 – VINCI Highways 68 – VINCI Railways 70 – VINCI Stadium 72 CONTRACTING 74 VINCI Energies 88 Eurovia 102 VINCI Construction 118 VINCI Immobilier 121 GENERAL & FINANCIAL ELEMENTS 122 Report of the Board of Directors 270 Report of the Lead Director and the Vice-Chairman of the Board of Directors 272 Consolidated nancial statements This universal registration document was filed on 2 March 2020 with the Autorité des Marchés Financiers (AMF, the French securities regulator), as competent authority 349 Parent company nancial statements under Regulation (EU) 2017/1129, without prior approval pursuant to Article 9 of the 367 Special report of the Statutory Auditors on said regulation. The universal registration document may be used for the purposes of an offer to the regulated agreements public of securities or the admission of securities to trading on a regulated market if accompanied by a prospectus or securities note as well as a summary of all 368 Persons responsible for the universal registration document amendments, if any, made to the universal registration document. The set of documents thus formed is approved by the AMF in accordance with Regulation (EU) 2017/1129. -
The Mobility Opportunity Improving Public Transport to Drive Economic Growth
The Mobility Opportunity Improving public transport to drive economic growth. A research project commissioned by Siemens AG Contents 1. Executive summary 5 Why transport matters 5 A unique study 5 Key findings 6 Pointers for investment strategies 7 2. How the study was conducted 9 Scope of study 9 The true cost of transport 9 High-level approach 10 Economic audit 10 3. The economic opportunity 11 Cost and the size of the prize today 11 How cost and opportunity will change by 2030 13 4. How cities compare 17 Well-established cities 17 High density compact centres 17 Emerging cities 19 5. Pointers for investment strategies 21 The scale of the opportunity should dictate the level of investment 21 Using technology to improve quality may be the best route to economic uplift 24 Urban rail networks are a key way for larger cities to meet capacity demand 25 Integrated governance is crucial in planning and operating an efficient network 27 Appendix 1: Selected investment cases 29 Appendix 2: City profiles 35 Appendix 3: Methodology 71 Overview of approach 71 Key principles 72 Appendix 4: Technical audit 75 3 “Efficient transport can attract economic activity to cities, and boost productivity by improving connectivity and reducing time lost to travel” 4 1. Executive Summary Why transport matters cities face a need to upgrade and supplement existing infrastructure to meet modern requirements. Transport plays a key role in economic growth Cities account for around 80% of the world’s economic In other cities, such as Tokyo and Seoul, relatively recent output, and drive an even higher share of global growth. -
Issue #30, March 2021
High-Speed Intercity Passenger SPEEDLINESMarch 2021 ISSUE #30 Moynihan is a spectacular APTA’S CONFERENCE SCHEDULE » p. 8 train hall for Amtrak, providing additional access to Long Island Railroad platforms. Occupying the GLOBAL RAIL PROJECTS » p. 12 entirety of the superblock between Eighth and Ninth Avenues and 31st » p. 26 and 33rd Streets. FRICTIONLESS, HIGH-SPEED TRANSPORTATION » p. 5 APTA’S PHASE 2 ROI STUDY » p. 39 CONTENTS 2 SPEEDLINES MAGAZINE 3 CHAIRMAN’S LETTER On the front cover: Greetings from our Chair, Joe Giulietti INVESTING IN ENVIRONMENTALLY FRIENDLY AND ENERGY-EFFICIENT HIGH-SPEED RAIL PROJECTS WILL CREATE HIGHLY SKILLED JOBS IN THE TRANS- PORTATION INDUSTRY, REVITALIZE DOMESTIC 4 APTA’S CONFERENCE INDUSTRIES SUPPLYING TRANSPORTATION PROD- UCTS AND SERVICES, REDUCE THE NATION’S DEPEN- DENCY ON FOREIGN OIL, MITIGATE CONGESTION, FEATURE ARTICLE: AND PROVIDE TRAVEL CHOICES. 5 MOYNIHAN TRAIN HALL 8 2021 CONFERENCE SCHEDULE 9 SHARED USE - IS IT THE ANSWER? 12 GLOBAL RAIL PROJECTS 24 SNIPPETS - IN THE NEWS... ABOVE: For decades, Penn Station has been the visible symbol of official disdain for public transit and 26 FRICTIONLESS HIGH-SPEED TRANS intercity rail travel, and the people who depend on them. The blight that is Penn Station, the new Moynihan Train Hall helps knit together Midtown South with the 31 THAILAND’S FIRST PHASE OF HSR business district expanding out from Hudson Yards. 32 AMTRAK’S BIKE PROGRAM CHAIR: JOE GIULIETTI VICE CHAIR: CHRIS BRADY SECRETARY: MELANIE K. JOHNSON OFFICER AT LARGE: MICHAEL MCLAUGHLIN 33 -
Georgia Tech Basketball 2020-21
2020-21 GEORGIA TECH BASKETBALL GAME NOTES @GTMBB • @GTJOSHPASTNER GEORGIA TECH BASKETBALL 2020-21 ACC Champions 1985, 1990, 1993 • Final Four 1990, 2004 • 16 NCAA Tournament appearances GEORGIA TECH (17-9, 11-6 ACC) | ACC CHAMPIONS 2020-21 Schedule/Results ACC Tournament Champions • Regular-Season Finish: 4th place N25 GEORGIA STATE RSN L, 120-123 (4 ot) Tech Wins ACC Championship, N27 MERCER RSN L, 73-83 AT-A-GLANCE D6 vs. Kentucky# (20/na) ESPN W, 79-62 Plays in NCAA Tournament Tech in the NCAA Tournament 23-17 D9 at Nebraska+ ESPN2 W, 75-64 Ending an 11-year hiatus from the NCAA Tournament, NCAA Appearances 17 (Final Four in 1990 and 2004) Georgia Tech participated in March Madness for the first time D15 at Florida State (15/15) ACCN L, 61-74 Tech in the ACC Tournament 28-37 since 2010, losing its first-round game, 71-60, to Loyola D18 FLORIDA A&M RSN W, 74-64 Chicago at Hinkle Fieldhouse in Indianapolis, Ind. The Yellow ACC Championships 1985, 1990, 1993, 2021 D20 DELAWARE STATE ACCN W, 97-69 Jackets were a No. 9 seed in the field as an automatic qualifier Last game Lost to Loyola Chicago, 71-60, Midwest Regional D23 at UAB CBSSN cancelled after winning the Atlantic Coast Conference championship, the GEORGIA TECH YELLOW JACKETS D30 NORTH CAROLINA (rv/rv) RSN W, 72-67 first conference title for the team since 1993. Rankings (AP/coaches/KenPom/NET) rv | rv | 37 | 41 J3 WAKE FOREST ACCN W, 70-54 The Yellow Jackets entered the NCAA Tournament having Record breakdown 10-3 home | 4-5 road | 3-1 neutral J6 at Notre Dame RSN postponed won eight straight games following a Feb. -
Terratec Marks Another Major Milestone in Bangkok
Newsletter - Q2, 2020 TERRATEC MARKS ANOTHER MAJOR MILESTONE IN BANGKOK TERRATEC marks its latest milestone on the Orange Line metro project, in Bangkok, Thailand, with the breakthrough of the Westbound running tunnel on Contract E3. ecently, TERRATEC joined breakthrough on Contract E3 westwards from the Khlong Rworkers and officials in took place a full month ahead Ban Ma station box on January celebrating the breakthrough of schedule putting the project 12, 2019, and quickly got up of the 6.39m diameter S70 EPB on a good footing for the to speed following its initial machine by contractor Italian- upcoming Eastbound running drive. By late-March, the TBM Thai Development PCL (ITD) tunnel drive. was achieving progress rates on one of three underground of up to 18 rings per day and civil works contracts for the Contract E3, which was had already undertaken its first first 23km-long (East Section) awarded to ITD in May 2017, intermediate breakthrough. July phase of the Mass Rapid totals over 6km of TBM driven 2019 marked the TBM’s best Transit Authority of Thailand’s tunnel and three underground month of progress, achieving (MRTA) Orange Line Project. stations, extending from Hua a total advance of 663.4m and Mak to Khlong Ban Ma. The a best day’s performance of The Westbound running tunnel S70 machine began mining 40.6m. Newsletter - Q2, 2020 Newsletter - Q2, 2020 The TERRATEC S70 TBM was Manager. “The only remaining areas of flowing sands and high Line (East) contract are style to our own and because When complete, in 2023, designed to tackle the variable challenge was obstruction groundwater pressure. -
First Terratec Tbm Breaks Through on Mumbai Metro
Newsletter - Q2, 2019 FIRST TERRATEC TBM BREAKS THROUGH ON MUMBAI METRO The first of seven TERRATEC TBMs being used on Mumbai Metro’s highly anticipated 33.5km underground Line 3 corridor, in India, breaks through on its inaugural drive. n mid-February, TERRATEC 4.94km-long twin-tube tunnel Project Manager on Package Ijoined workers from the J. contract UGC-05 and 4.45km-long 6. “The machine has travelled Kumar – China Railway No. 3 twin-tube tunnel contract UGC-06 successfully through mixed Engineering Group (CRTG) JV (stretching from Dharavi Station to geology and considerable to celebrate the breakthrough the CSIA International Airport). water ingress and we credit of a 6.68m diameter TERRATEC TERRATEC’s TBM field service dual-mode hard rock Tunnel “We congratulate TERRATEC support experts for assisting Boring Machine (TBM) at work on on the performance of the our tunnelling operations with Mumbai Metro Rail Corporation Dual Mode TBM T62 and the close monitoring throughout Ltd’s (MMRCL) Line 3 project, in completion of its first 690m this period.” India. The machine is one of three drive of from the [CSIA] new TERRATEC dual-mode TBMs International Airport Station The versatile TERRATEC single being used by J. Kumar-CRTG to Sahar Road Station,” said shield TBMs are equipped to to excavate portions of the line’s Haluk Emre, J. Kumar-CRTG’s Newsletter - Q2, 2019 Newsletter - Q2, 2019 operate in either Open or Closed from the Chhatrapati Shivaji north-central with 26 underground mode in the predominantly Terminal (CST) TBM launch shaft and one at-grade station (see A FLEET OF TERRATEC EPBMS GEAR UP FOR fresh and slightly to moderately and are currently mining towards map). -
ISTANBUL CASE STUDY TRANSIT COSTS PROJECT Transitcosts.Com
ISTANBUL CASE STUDY TRANSIT COSTS PROJECT transitcosts.com Elif Ensari - Eric Goldwyn - Alon Levy Marron Institute of Urban Management, New York University OUTLINE • Introduction - How Istanbul became a global leader in rail construction - Our main takeaways • Cases - M4 Kadikoy – Kartal - Marmaray - M9 Atakoy- İkitelli • Challenges to building rail in Istanbul ISTANBUL M1A (LRT) Year: 2000 1 line, 16km (10 miles) ISTANBUL M1A-M1B M2 M3 BC1 M4 Year: 2014 5 lines, 100km (62 miles) ISTANBUL M1A-M1B + extension M2 M3 + extensions BC1 M4 + extensions M5 M6 M7 M8 M9 M10 M11 M12 M13 Year: 2029 14 lines, 345km (214 miles) ISTANBUL Global Weighted Average cost/km : $210 M Istanbul’s Weighted Average cost/km : $127 M HOW SO FAST? How Istanbul became a global leader in rail construction • Background - Rapid growth - Policies encouraging public + private involvement - The construction sector HOW SO CHEAP? Our main takeaways • Learning from the world • Steady stream of projects • Competition in the market - Cultivation of a rail construction eco-system • Improvement of the procurement and preliminary design process - Procurement of the preliminary design - Establishment of the Rail Systems Projects Directorate - Evolution of Design-Bid-Build to Design-Build • Flexibility on the agency and contractor’s side • Adoption of technology - Equipment pools - University collaboration in innovation - BIM (3D models) CASES M4 KADIKOY – KARTAL “flexibility” Owner Agency: Rail Systems Directorate, Istanbul Metropolitan Municipality (IMM) Cost: $170 M/km Length: 21.7 km 16 stations Speed: 3 km/year (2005-(2008)-2012) Issues/Highlights - Complicated timeline: - Major design changes and re-tendering - Collaboration between the agency and contractors - Blast drilling/NATM vs. -
Intensive Service in New Territories
THE INTERNATIONAL LIGHT RAIL MAGAZINE www.lrta.org www.tautonline.com NOVEMBER 2020 NO. 995 INTENSIVE SERVICE IN NEW TERRITORIES How LRT provided the foundations for modern Hong Kong UK: ‘Devastating consequences’ ahead? Berlin confirms expansion timetable Bucharest opens first M5 metro phase T yne and Wear Haifa – Nazareth £4.60 Looking forward to Global experience Metro’s next 40 years shapes Israeli LRT Certifi cate: PA05/04429 The design and implementation of urban Urban Transit light rail networks in busy towns and cities present signifi cant engineering challenges. Innovation Whether it’s for road or pedestrian crossings, tram stops, depots or complex crossovers Metro & Tramway Crossing Systemsand turnouts, our engineered solid rubber panels help you overcome your challenges Rosehill faster and more cost-effectively than other systems. Think Rosehill. For more information, call the Rosehill Rail sales team on +44 (0)1422 839 610. rosehillrail.com Rosehill Rail - TAUT Half page Ad_185x130mm_NOV2020.indd 1 30/09/2020 15:32 THE INTERNATIONAL LIGHT RAIL MAGAZINE Hong Kong Now amongst MTR’s worldwide operations, SYSTEMS the Hong Kong Light Rail system was devised to support local www.lrta.org FACTFILE and feeder www.tautonline.com demand No. MTR Light Rail - in newly- CHINA Hong Kong SAR, China urbanised areas. NOVEMBER 2020 N O. 995 157 By Neil Pulling. Hong Kong SUB SCRIBE NOW! INTENSIVE SERVICE IN NEW TERRITORIES Now in its 83rd year, Tramways & Urban Transit is ong Kong’s Light Rail A pair of Phase 1 LRVs (HKLR) system Wai (classified with Yuen Long). the world’s leading monthly publication dedicated solely to with a 706 circular installation sometimes followed The Wharf group, then owners of serves neighbouring service on Tin Shui construction of buildings, many being the tramway dating from 1904 on communities in a Road on 7 August 2020. -
Kabataş – Mecidiyeköy – Mahmutbey Projesi'nde İlk Fazın İşletmeye
ARALIK 2019 SAYI:110 Dünyamız 65. yılımızı geride bırakıp 2020‘ye adım atıyoruz Taahhüt Grubumuz tarafından yapımı devam etmekte olan Kabataş - Mecidiyeköy – Mahmutbey Metro Projesi’nin Bu Sayıda: ilk fazı olan Mecidiyeköy – 2020 yılı; Mahmutbey hattı 2020’nin ilk çeyreğinde açılıyor. Enerji taahhüt, sanayi Grubu şirketlerimizden MEDAŞ ve ticaret, 10. yılını kutlarken, MEPAŞ ise Kabataş – Mecidiyeköy – Mahmutbey enerji, turizm yepyeni bir mobil uygulamayı alanlarında hayata geçirdi. Yapılan yatırımlar Projesi’nde İlk Fazın İşletmeye Açılışı sayesinde Konya’da yaşayan Topluluk olarak vatandaşlarımıza ulaştırılan İçin Geri Sayım Başladı faaliyet ve kesintisiz enerjiden duyulan genel SAYFA 4 yatırımlarımızın memnuniyetten dolayı Konya Valiliği MEDAŞ’a teşekkür plaketi aynı hızla verdi. Alarko Carrier’ın küresel sürdüğü bir ısınma ve iklim değişikliğinin yıl olacak. etkilerine dikkat çekmek için bu yıl 6.’sının düzenlendiği “Küresel İklim Dergimizin Değişikliği Fotoğraf Yarışması” bu sayısında sonuçlandı. Birbirinden güzel Topluluk fotoğrafların yarıştığı bu etkinliğin ilk dört derecesini alan fotoğrafları MEDAŞ 10. Yılını Kutladı şirketlerimizin dergimizin 11. sayfasında profesyonel bulabilirsiniz. Alarko, marka olarak alanlarındaki Çin’de “En İyi Büyüme” ödülüne başarılarının lâyık bulundu. Öte yandan yurt içinde Alarko Carrier “Türkiye’nin yanında genç En Değerli 100 Markası” içindeki kitlelerin yerini korudu. İngilizlerin aylık 16 eğitimine, milyon sayfa görüntülemesi ve 400 binin üzerindeki günlük tiraja Hillside Beach Club kültüre, sahip The Times Gazetesi’nin sanata ve seyahat eki, Hillside Beach Club’ı The Times’ın “En İyiler” Listesinde spora verilen Akdeniz’in en iyileri arasında 22 SAYFA gösterdi. Ayrıca Hillside Beach desteklere Club dünyanın en ünlü seyahat ilişkin yönetim ve yaşam stili dergilerinden biri kadromuzun olarak kabul edilen Condé Nast Traveler tarafından Avrupa’nın da bizzat yer En İyi Resortları’ndan biri olarak aldığı birçok belirlendi. -
Project Selection by Using Constraint Programming
Journal of Trends in the Development of Machinery and Associated Technology Vol. 21, No. 1, 2018, ISSN 2303-4009 (online), p.p. 89-92 PROJECT SELECTION BY USING CONSTRAINT PROGRAMMING Assistant Prof. Dr. Evrencan Özcan Kırıkkale University, Faculty of Engineering, Department of Industrial Engineering, Kırıkkale, Turkey Res. Assistant Mustafa Hamurcu Kırıkkale University, Faculty of Engineering, Department of Industrial Engineering, Kırıkkale, Turkey Assistant Prof. Dr. Hacı Mehmet Alağaş Kırıkkale University, Faculty of Engineering, Department of Industrial Engineering, Kırıkkale, Turkey Associate Prof. Dr. Tamer Eren Kırıkkale University, Faculty of Engineering, Department of Industrial Engineering, Kırıkkale, Turkey ABSTRACT Project selection is considered as the first essential part of project in the urban transport. Project selection is also considered as a process to evaluate of different transport project ideas and chooses the one with the beneficial priority. Urban transport is one of the most important subjects for urban planner, inhabitants of the city and environment. So, it should be paid attention to the selection of transport projects and should be given priority to projects that will provide the most benefit to livable cities. This paper presents a solution for project selection using constraint programming for urban rail transport for the first time in the literature. Keywords: Project selection, constraint programming, urban transport 1. INTRODUCTION Today, many cities face challenges of rapid urbanization. Many factors based on economic, social and technological reasons play an important role in increased urbanization. Developing Turkey Republic carries out breakthrough in the transportation field with mega projects as in many areas. At the same time, there are operating to improve transportation with high-speed train projects for intercity transport and rail system projects for urban transport as well as mega projects. -
Georgia Tech Basketball 2020-21
2020-21 GEORGIA TECH BASKETBALL GAME NOTES @GTMBB • @GTJOSHPASTNER GEORGIA TECH BASKETBALL 2020-21 ACC Champions 1985, 1990, 1993 • Final Four 1990, 2004 • 16 NCAA Tournament appearances GEORGIA TECH (16-8, 11-6 ACC) vs. #15/13 FLORIDA STATE (16-5, 11-4 ACC) 2020-21 Schedule/Results ACC TOURNAMENT • Game 25 • March 13, 2021 • 8:30 p.m. EST N25 GEORGIA STATE RSN L, 120-123 (4 ot) N27 MERCER RSN L, 73-83 Tech Seeking Fourth ACC Championship GAME INFORMATION Seeking the fourth Atlantic Coast Conference D6 vs. Kentucky# (20/na) ESPN W, 79-62 Event site Greensboro Coliseum, Greensboro, N.C. championship in team history and first since 1993, Georgia D9 at Nebraska+ ESPN2 W, 75-64 Tech in the ACC Tournament 27-37 (3-3 as No. 4 seed) D15 at Florida State (15/15) ACCN L, 61-74 Tech faces 15th-ranked Florida State for the title at 8:30 p.m. Tech in Greensboro 10-17 D18 FLORIDA A&M RSN W, 74-64 Saturday at the Greensboro Coliseum. The No. 4-seeded Yellow Series vs. Florida State FSU leads, 44-29 D20 DELAWARE STATE ACCN W, 97-69 Jackets opened the tournament with a 70-66 quarterfinal D23 at UAB CBSSN cancelled victory Thursday over Miami, and advanced to the title game In the ACC Tournament FSU leads, 2-0 D30 NORTH CAROLINA (rv/rv) RSN W, 72-67 after Fridays semifinal contest against Virginia was cancelled. In 2020-21 FSU won 74-61 in Tallahassee, GT won 76-65 in Atlanta J3 WAKE FOREST ACCN W, 70-54 Georgia Tech update - The Yellow Jackets, winners of GEORGIA TECH YELLOW JACKETS seven straight games and 10-5 since its 17-day COVID pause in J6 at Notre Dame RSN postponed Rankings (AP/coaches/KenPom/NET) nr | nr | 35 | 38 January, grabbed its highest ACC finish since the 2004 national J9 at Louisville (rv/25) ACCN postponed runner-up team also finished fourth, and have a NCAA NET Record breakdown 10-3 home | 4-5 road | 2-0 neutral J13 PITTSBURGH ACCN postponed ranking of No.