Gold Coast Transport Strategy Technical
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
New South Wales Class 1 Load Carrying Vehicle Operator’S Guide
New South Wales Class 1 Load Carrying Vehicle Operator’s Guide Important: This Operator’s Guide is for three Notices separated by Part A, Part B and Part C. Please read sections carefully as separate conditions may apply. For enquiries about roads and restrictions listed in this document please contact Transport for NSW Road Access unit: [email protected] 27 October 2020 New South Wales Class 1 Load Carrying Vehicle Operator’s Guide Contents Purpose ................................................................................................................................................................... 4 Definitions ............................................................................................................................................................... 4 NSW Travel Zones .................................................................................................................................................... 5 Part A – NSW Class 1 Load Carrying Vehicles Notice ................................................................................................ 9 About the Notice ..................................................................................................................................................... 9 1: Travel Conditions ................................................................................................................................................. 9 1.1 Pilot and Escort Requirements .......................................................................................................................... -
Question on Notice No. 2325 Asked on 24 November 2010 DR
Question on Notice No. 2325 Asked on 24 November 2010 DR DOUGLAS asked the Minister for Police, Corrective Services and Emergency Services (MR ROBERTS)— QUESTION: With reference to rail squads in the South Eastern Policing Region— (1) Will the Minister provide (a) the total number of rail squads, (b) their location and (c) the number of Queensland Police officers in each squad? (2) Due to the region’s growth and the southern extension of the Gold Coast railway line will the Minister outline why no rail squad has been formed and based permanently at any one of the Gold Coast rail stations south of Beenleigh? ANSWER: The Queensland Police Service has a dedicated Railway Squad established within the Specialist Services Branch, Operations Support Command. The Railway Squad is supervised by an Inspector of Police and is administratively coordinated from a central location at the Roma Street railway station. The squad has operational teams at Roma Street railway station and four satellite locations (known as outposts) at Beenleigh, Petrie, Manly and Redbank railway stations. There is no specific approved staffing strength at these outposts as they are annexes of the main Roma Street office where all members are officially stationed. The Minister for Transport and I recently announced an increase of 10 additional police officer positions for the Railway Squad. Five of these additional positions were recently allocated, bringing the approved squad strength to 59 sworn members. The remaining five will be allocated in the 2011/12 financial year, which will bring the squad’s strength to 64 officers. The staffing model for the Railway Squad includes five non-operational positions (Officer- in-Charge, Tactician, Intelligence Officers and a Crime Prevention Coordinator) as well as a dedicated Firearms and Explosive Detection Dog Handler. -
Aviation Development
Aviation Development Gold Coast Airport has efficient and cost effective passenger processing and aircraft turn-around times that is underpinned by a strong focus on safety. 6.1 INTRODUCTION The aviation development plan in this Master Plan improves safety, efficiency and capacity of This focus on safety and customer experience the Airport to 2037. It also facilitates flexibility makes the Airport a very attractive proposition to and adaptability of the airfield to respond to the Australian and international carriers. It is important constantly evolving aviation industry. The planned that aviation infrastructure investment reflects infrastructure is vital to support future passenger the anticipated growth in passengers, aircraft and aircraft movements through the Airport. movements and demand placed on the Airport. To ensure Gold Coast Airport remains competitive, it is Figure 6.1 shows the Five-Year Airport Development essential that the Airport remains safe, efficient and Plan; Figure 6.2 shows the Twenty-Year Airport reliable. Development Plan. Sections 6.2 – 6.5 outline the key elements shown on the development plans. The typical airport master planning process is to first identify and prioritise solutions based on the airside component – identify gate requirements and locate aircraft parking positions and their supporting taxi lanes to optimise the overall efficiency of the airfield. Then the internal layout of the terminal building(s), landside curb and terminal roadway systems are developed. 93 N Drainage Reserve 14 1. Passenger Terminal 7 2. Apron 3. General Aviation Apron 4. Helicopter FATO GOLD COAST HIGHWAY 5. Airport Fire Service PACIFIC C 6. Control Tower 7. ILS MOTOR 8. -
Road Amendment (Dangerous Goods) Rule 2019 Under the Road Transport Act 2013
New South Wales Road Amendment (Dangerous Goods) Rule 2019 under the Road Transport Act 2013 Her Excellency the Governor, with the advice of the Executive Council, has made the following Rule under the Road Transport Act 2013. ANDREW CONSTANCE, MP Minister for Transport and Roads Explanatory note The object of this Rule is to make further provision for the carriage of dangerous goods on certain roads and in certain tunnels in New South Wales. This Rule is made under the Road Transport Act 2013, including section 23 (the general statutory rule-making power). Published LW 5 July 2019 (2019 No 316) Road Amendment (Dangerous Goods) Rule 2019 [NSW] Road Amendment (Dangerous Goods) Rule 2019 under the Road Transport Act 2013 1 Name of Rule This Rule is the Road Amendment (Dangerous Goods) Rule 2019. 2 Commencement This Rule commences on the day on which it is published on the NSW legislation website. Page 2 Published LW 5 July 2019 (2019 No 316) Road Amendment (Dangerous Goods) Rule 2019 [NSW] Schedule 1 Amendment of Road Rules 2014 Schedule 1 Amendment of Road Rules 2014 [1] Rule 300–2 NSW rule: carriage of dangerous goods in prohibited areas Omit rule 300–2 (2). Insert instead: (2) A driver of a dangerous goods transporter does not contravene subrule (1) if: (a) the dangerous goods transporter is: (i) displaying a permit issued by the Commissioner of Police under clause 18 (2) of the Road Transport (General) Regulation 2013 authorising it to be used in a prohibited area, and (ii) used in accordance with any conditions on which the permit was issued, or (b) the placard load of the dangerous goods transporter only consists of a radioactive substance (within the meaning of the Radiation Control Act 1990) used in nuclear medicine that has a half-life of 100 days or less. -
Gold Coast Highway Multi-Modal Corridor Study
Department of Transport and Main Roads Study finding's Buses Traffic analysis Buses currently play an important role in the movement of people A detailed traffic analysis process was undertaken to determine along and beyond the Gold Coast Highway corridor to a wide the number of traffic lanes, intersection configuration and Gold Coast Highway (Burleigh Heads to Tugun) range of destinations. Consistent with the approach adopted performance of the Gold Coast Highway now and into the future. in the previous stages of the light rail, some bus routes would The analysis confirmed that the nearby Mi (Varsity Lakes to Tugun) be shortened or replaced (such as the current route 700 and upgrade will perform a critical transport function on the southern 777 buses along the Gold Coast Highway), while other services Gold Coast providing the opportunity to: Multi-modal Corridor Study would be maintained and potentially enhanced to offer better • accommodate a significant increase in vehicle demands connectivity overall. including both local demands on service roads and regional demands on the motorway itself. This study has identified the need for buses to continue to connect March 2020 communities to the west of the Gold Coast Highway to key centres • improve local connections to the Mi and service roads including and interchanges with light rail. Connections between bus and a new connection between the Mi and 19th Avenue. light rail will be designed to be safe, convenient and accessible. Planning for the future This significant increase in capacity will provide through traffic Further work between TMR. TransLink and City of Gold Coast will with a viable alternative, reducing demand on the Gold Coast The Department of Transport and Main Roads (TMR) has confirm the design of transport interchanges and the network of Highway. -
747 City Planning Committee Meeting
747th Council Meeting 28 November 2017 ADOPTED REPORT City Planning Committee Meeting 22 November 2017 494 ITEM 6 CITY PLANNING OUR NATURAL CITY STRATEGY IMPLEMENTATION PLAN CE196/440/36(P1) Refer 32 page attachment 1 BASIS FOR CONFIDENTIALITY Not Applicable. 2 EXECUTIVE SUMMARY Our Natural City Strategy (ONC) Implementation Plan has been developed to support the coordinated delivery of key priority actions and associated tasks to achieve outcomes of the recently adopted ONC Strategy. It outlines a governance framework, deliverables, performance reporting and adopted strategy funding plan estimates. It is intended to be reviewed annually to inform planning and budget cycles and reported to Council in line with established corporate strategy reporting requirements. 3 PURPOSE OF REPORT The purpose of this report is to provide Council with an ONC Strategy Implementation Plan to support delivery of the adopted ONC Strategy. 4 PREVIOUS RESOLUTIONS G16.0624.002 2B Miscellaneous Recommendations of Special Budget Committee Adopted by Council 4 That expenditure on the following items be subject to prior consideration and approval by the Council: a. iNature $200,000 b. Targeted Statutory Covenant $50,000 5 That the Mayor submit to the Council during 2016-17 a proposed ‘Our Natural City Strategy’, which shall be for the balance of the current Council term, together with an associated funding plan. Such funding plan to include relevant funding sources such as Open Space Preservation Levy, Reserves and other sources. G17.0303.015 2 That the proposed Our Natural City Strategy proceeds to community consultation in May 2017. 3 That actions funded in the 2016-17 budget are approved to commence implementation. -
Priority Infrastructure Plan & Infrastructure Charges Schedule
PART 8 INFRASTRUCTURE DIVISIONS 1-3 PRIORITY INFRASTRUCTURE PLAN & INFRASTRUCTURE CHARGES SCHEDULE PART 8 INFRASTRUCTURE DIVISION 1 PRIORITY INFRASTRUCTURE PLAN (PIP) 1.0 INTRODUCTION This is the Priority Infrastructure Plan (PIP) for Gold Coast City Council prepared in accordance with the requirements of the Integrated Planning Act 1997 (IPA) and IPA Infrastructure Guidelines 1/04 and 2/04. The PIP will be subject to reviews in accordance with the requirements of IPA and will also be reviewed after the adoption of the Local Growth Management Strategy, which is required under the South East Queensland Regional Plan 2005-2026 (SEQRP). 1.1. Purpose The purpose of the PIP is to define the scale, type, timing and location of growth in the Gold Coast in order to plan future trunk infrastructure and to determine the charges required to fund it in a timely fashion. IPA requires integration of land use and infrastructure planning to allow infrastructure to be supplied in a coordinated, efficient and orderly manner. This enables sustainable development and encourages urban growth in areas where adequate infrastructure exists or can be provided efficiently. 1.2. PIP Terms, Acronyms and Definitions Definitions are provided to assist the reader’s understanding of the PIP. Where appropriate, reference should be made to the relevant legislation for statutory definitions. Term Acronym Definition Additional Trunk (a) the costs of supplying infrastructure to development that is: Infrastructure Costs (i) inconsistent with the assumptions about the type, scale, location or timing of future development stated in the PIP, or , (ii) is located wholly or partially outside the PIA, and (b) would impose additional trunk infrastructure costs on the infrastructure provider taking into account: (i) infrastructure charges or regulated infrastructure charges levied on the development, and (ii) trunk infrastructure supplied or to be supplied by the applicant in respect of the development. -
The Pacific Motorway Report
Report of the Queensland Ombudsman The Pacific Motorway Report An investigation into the actions of the Department of Main Roads in relation to noise and safety issues concerning the Pacific Motorway. March 2007 Report of the Queensland Ombudsman The Pacific Motorway Report An investigation into the actions of the Department of Main Roads in relation to noise and safety issues concerning the Pacific Motorway March 2007 © Queensland Ombudsman, 2007 Apart from any fair dealing for purposes related to the functions of the Ombudsman or the purpose of private study, research, criticism or review, as permitted under the Copyright Act, no part of this document may be reproduced by any process without permission. Inquiries should be made to the publishers, Queensland Ombudsman. ISBN 978-0-9758442-9-8 Queensland Ombudsman Level 25, 288 Edward Street Brisbane Qld 4000 GPO Box 3314 Brisbane Qld 4001 Tel: (07) 3005 7000 Fax: (07) 3005 7067 Email: [email protected] Web: www.ombudsman.qld.gov.au 6 March 2007 The Honourable John English MP Acting Speaker of the Legislative Assembly Parliament House George Street BRISBANE QLD 4000 Dear Mr English In accordance with s.52 of the Ombudsman Act 2001, I hereby furnish to you my report, The Pacific Motorway Report: An investigation into the actions of the Department of Main Roads in relation to noise and safety issues concerning the Pacific Motorway. Yours faithfully David Bevan Queensland Ombudsman Enc Foreword Every year my Office receives thousands of complaints from Queenslanders about Queensland public sector agencies. Some complaints go beyond the circumstances of individual complainants and may best be described as ‘systemic’ complaints because the actions of the agency may affect many people. -
Gold Coast Rapid Transit
Gold Coast Rapid Transit 8 Transport and Traffic Impacts This document has been prepared specifically for TransLink in relation to this Project and should not be relied upon by other parties nor used for any other purpose without the specific permission of the Gold Coast Rapid Transit Project Team. REVISION SCHEDULE Rev. Date Description Prepared Reviewed Approved No. By By By 1.0 30 June 08 PRELIM DRAFT PK LSS / GM 2.0 29 August 08 REVISION 2 – DRAFT LSS LSS 3.0 6 Sept 08 REVISION 3 – DRAFT DB / LSS LSS 4.0 19 February 09 REVISION 4 - FINAL LSS LSS LSS Gold Coast Rapid Transit Concept Design Impact Management Plan Volume 2 Chapter 8 – Traffic and Transport Contents 1. Introduction 1 1.1 Background and Context 1 1.2 Previous Work 4 1.3 Terms of Reference (ToR) 5 1.4 Methodology 5 1.5 Sections of the Chapter 6 2. Transport and Traffic Demand Forecasting 7 2.1 Overview 7 2.2 Strategic Transport Modelling Methodology 9 2.3 Simulation Modelling Methodology 13 3. Existing Transport System 17 3.1 Travel Demand, Characteristics and Trends 17 3.2 Road Network 22 3.3 Public Transport 41 3.4 Pedestrians and Cyclists 49 3.5 Parking 55 4. The Project 59 4.1 Description of the Project 59 4.2 Services 59 4.3 Other Projects 67 5. Future Overview and Project Need 68 5.1 Demographics 68 5.2 Land Use 71 5.3 Drivers for the Project 72 5.4 Strategic Justification 72 5.5 Opportunity – Consequences of Delay 73 5.6 The Strategic Network 74 6. -
EPBC Act Referral
EPBC Act referral Note: PDF may contain fields not relevant to your application. These fields will appear blank or unticked. Please disregard these fields. Title of proposal 2020/8646 - Stage 1 Coomera Connector Section 1 Summary of your proposed action 1.1 Project industry type Transport - Land 1.2 Provide a detailed description of the proposed action, including all proposed activities The Australian and Queensland Government are committed to ensuring the efficiency and safety of the M1 Pacific Motorway (M1) as a key component of the National Land Transport Network. The M1 is the highest-trafficked road in Queensland and is an enabling link for long distance traffic (freight, tourism, commercial and commuter) between economic hubs on the east coast of Queensland and New South Wales. The lack of capacity on the road network between Brisbane and the Gold Coast was highlighted as a problem in the Infrastructure Australia Audit. The 2015 Audit identified the M3/M1 Pacific Motorway in the top ten road corridors with the highest projected delay cost by 2031 nationally, and the section from Beenleigh to Helensvale as the third largest projected delay cost in the corridor in Queensland in 2031. The 2019 Audit projected the cost of congestion for the Brisbane, Gold Coast and Sunshine Coast area to increase to over $9 billion by 2031. The Brisbane to Gold Coast corridor has been, and will continue to be, one of the fastest growing areas in Australia. The cities of Logan and Gold Coast will continue to experience high rates of residential growth, while the city of Brisbane will have the highest growth in employment in Queensland – thereby being an important source of employment for commuting residents in Logan and on the Gold Coast. -
Register of Architects & Non Practising Architects
REGISTER OF ARCHITECTS & NON PRACTISING ARCHITECTS Copyright The Board of Architects of Queensland supports and encourages the dissemination and exchange of information. However, copyright protects this document. The Board of Architects of Queensland has no objection to this material being reproduced, made available online or electronically , provided it is for your personal, non-commercial use or use within your organisation; this material remains unaltered and the Board of Architects of Queensland is recognised as the owner. Enquiries should be addressed to: [email protected] Register As At 29 June 2021 In pursuance of the provision of section 102 of Architects Act 2002 the following copy of the Register of Architects and Non Practicing Architects is published for general information. Reg. No. Name Address Bus. Tel. No. Architects 5513 ABAS, Lawrence James Ahmad Gresley Abas 03 9017 4602 292 Victoria Street BRUNSWICK VIC 3056 Australia 4302 ABBETT, Kate Emmaline Wallacebrice Architecture Studio (07) 3129 5719 Suite 1, Level 5 80 Petrie Terrace Brisbane QLD 4000 Australia 5531 ABBOUD, Rana Rita BVN Architecture Pty Ltd 07 3852 2525 L4/ 12 Creek Street BRISBANE QLD 4000 Australia 4524 ABEL, Patricia Grace Elevation Architecture 07 3251 6900 5/3 Montpelier Road NEWSTEAD QLD 4006 Australia 0923 ABERNETHY, Raymond Eric Abernethy & Associates Architects 0409411940 7 Valentine Street TOOWONG QLD 4066 Australia 5224 ABOU MOGHDEB EL DEBES, GHDWoodhead 0403 400 954 Nibraz Jadaan Level 9, 145 Ann Street BRISBANE QLD 4000 Australia 4945 ABRAHAM, -
Legislative Assembly Hansard 1988
Queensland Parliamentary Debates [Hansard] Legislative Assembly TUESDAY, 11 OCTOBER 1988 Electronic reproduction of original hardcopy Papers 11 October 1988 1027 TUESDAY, 11 OCTOBER 1988 Mr SPEAKER (Hon. L. W. PoweU, Isis) read prayers and took the chair at 10 a.m. ASSENT TO BILLS Assent to the following Bills reported by Mr Speaker— Surrogate Parenthood Bill; Status of Children Act Amendment Bill; Holidays Act Amendment Bill; Drainage of Mines Act Repeal Bill; Brisbane Forest Park Act Amendment Bill. PETITIONS The Clerk announced the receipt of the following petitions— Sealing of Gregory Developmental Road From Mr Lester (283 signatories) praying that the Parliament of Queensland will take action to ensure the complete sealing of the Gregory Developmental Road. Licensed Sporting Clubs From Mr Lester (67 signatories) praying that the Parliament of Queensland will review the restrictions on trading hours, fund-raising and other activities in licensed sporting clubs. Compulsory Wearing of Safety Helmets by Cyclists From Mr FitzGerald (5 signatories) praying that the Pariiament of Queensland will legislate for compulsory wearing of safety helmets by cyclists. Introduction of Poker Machines From Mr Wells (208 signatories) praying that the Parliament of Queensland will take action to introduce poker machines. Redevelopment of Expo Site From Mr Innes (1 580 signatories) praying that the Parliament of Queensland will reject the River City 2000 proposal and use the Expo site for parkland, the retention of historic buildings and public access to the river for the full length of the site. Petitions received. STATEMENT OF UNFORESEEN EXPENDITURE, 1987-88 Mr SPEAKER read a message from His ExceUency the Govemor transmitting the Statement of Unforeseen Expenditure to be Appropriated for the year 1987-88.