Patrind Hydropower Project on Conservation Status of the Vegetation of the Area
Total Page:16
File Type:pdf, Size:1020Kb
Environmental & Social Monitoring Report (July-September 2013) Annexures Page 86 of 213 Environmental & Social Monitoring Report (July-September 2013) Annex-C1 Sample Warning Letter Page 87 of 213 Environmental & Social Monitoring Report (July-September 2013) Page 88 of 213 Environmental & Social Monitoring Report (July-September 2013) Annex-D1 Gas Concentration (H2S, LEL, O2) Page 89 of 213 Environmental & Social Monitoring Report (July-September 2013) Page 90 of 213 Environmental & Social Monitoring Report (July-September 2013) Page 91 of 213 Environmental & Social Monitoring Report (July-September 2013) Page 92 of 213 Environmental & Social Monitoring Report (July-September 2013) Annex-D2 Dust Test, CO2, N2O, NO2 Page 93 of 213 Environmental & Social Monitoring Report (July-September 2013) Page 94 of 213 Environmental & Social Monitoring Report (July-September 2013) Annex-D3 (HIRAC) Page 95 of 213 Environmental & Social Monitoring Report (July-September 2013) Page 96 of 213 Environmental & Social Monitoring Report (July-September 2013) Page 97 of 213 Environmental & Social Monitoring Report (July-September 2013) Page 98 of 213 Environmental & Social Monitoring Report (July-September 2013) Page 99 of 213 Environmental & Social Monitoring Report (July-September 2013) Page 100 of 213 Environmental & Social Monitoring Report (July-September 2013) Page 101 of 213 Environmental & Social Monitoring Report (July-September 2013) Page 102 of 213 Environmental & Social Monitoring Report (July-September 2013) Page 103 of 213 Environmental & Social Monitoring Report (July-September 2013) Page 104 of 213 Environmental & Social Monitoring Report (July-September 2013) Page 105 of 213 Environmental & Social Monitoring Report (July-September 2013) Page 106 of 213 Environmental & Social Monitoring Report (July-September 2013) Page 107 of 213 Environmental & Social Monitoring Report (July-September 2013) Page 108 of 213 Environmental & Social Monitoring Report (July-September 2013) Page 109 of 213 Environmental & Social Monitoring Report (July-September 2013) Annex-D4 (Nearmiss) Page 110 of 213 Environmental & Social Monitoring Report (July-September 2013) Page 111 of 213 Environmental & Social Monitoring Report (July-September 2013) Page 112 of 213 Environmental & Social Monitoring Report (July-September 2013) Annex-D5 (Medical Treatment Record List and OPD Form) Page 113 of 213 Environmental & Social Monitoring Report (July-September 2013) Page 114 of 213 Environmental & Social Monitoring Report (July-September 2013) Page 115 of 213 Environmental & Social Monitoring Report (July-September 2013) Annex-D6 (Inspection Checklists) Page 116 of 213 Environmental & Social Monitoring Report (July-September 2013) Page 117 of 213 Environmental & Social Monitoring Report (July-September 2013) Page 118 of 213 Environmental & Social Monitoring Report (July-September 2013) Page 119 of 213 Environmental & Social Monitoring Report (July-September 2013) Page 120 of 213 Environmental & Social Monitoring Report (July-September 2013) Page 121 of 213 Environmental & Social Monitoring Report (July-September 2013) Annex-E1 (Labour Dispute Report) Page 122 of 213 Environmental & Social Monitoring Report (July-September 2013) Page 123 of 213 Environmental & Social Monitoring Report (July-September 2013) Annex-E1 (Blood Test Sample) Page 124 of 213 Environmental & Social Monitoring Report (July-September 2013) Page 125 of 213 Environmental & Social Monitoring Report (July-September 2013) Page 126 of 213 Environmental & Social Monitoring Report (July-September 2013) Annex-F1 (Meeting Agenda) Page 127 of 213 Environmental & Social Monitoring Report (July-September 2013) Meetings 1- Weekly HSE Meeting with Construction Team Weir Site Date/ Location Attendance Main Issued Discussed 24/07/2013 Daewoo (HSE): Action Status of Last Meeting: Weir Site 1. Chung Myung Hun Sungbo Purchased more PPEs for its workers on 2. Yasir Ghauri HSE recommendations and provision of PPEs to 3. M. Javed workers made proper 4. M. Kamran 5. Abdul Hameed Site Inspection: 6. Haroon Akhtar During site inspection, it was observed that one Sub Contractor: of the Sungbo workers was throwing loose 1. Sang Chull Lee material in river, he was issued with a warning 2. Mushtaq Ahmed letter and also guided properly on site Incident investigation and recurrence prevention: Some of the workers were standing near the dangerous edges and handrail was not properly completed, their site engineer was informed regarding the matter. Other concerns of HSE: Generally put all issues to the managers of subcontractor companies and manager QA/QC during weekly meetings with them. 2- Weekly HSE Meeting with Construction Team Weir Site Date/ Location Attendance Main Issued Discussed 17/07/2013 Daewoo (HSE): Action Status of Last Meeting: Weir Site 1. Chung Myung Hun Housekeeping and other issues resolved but 2. Yasir Ghauri other issues like telecom installation are still 3. M. Javed pending 4. M. Kamran Site Inspection: Daewoo (QA/QC): During site inspection HSE team observed that 1. Abdul Manan Some of the workers of Subcontractor company (Sungbo) were working without PPEs and at Page 128 of 213 Environmental & Social Monitoring Report (July-September 2013) sandtrap unsafe cutter was being used with Sub Contractor: broken disc. 1. Sang Chull Lee HSE Statistics and Performance: 2. Choi Byeng Gum 3. Jong Yong Sik HSE observes all issues on site regularly and identifies hazard at workplace and do proper mitigation measures against them Other concerns of HSE: Recommendations to Sungbo to provide proper PPEs to their workers 3- Weekly HSE Meeting with Construction Team Weir Site Date/ Location Attendance Main Issued Discussed 10/07/2013 Daewoo (HSE): Action Status of Last Meeting: Weir Site 1. Chung Myung Hun Kyung Dong made proper walkway in Adit 2. Yasir Ghauri Tunnel in response of NCR, Housekeeping 3. M. Javed made proper, Ventilator extended but 4. M. Kamran emergency telecom not in working condition Daewoo (QA/QC): and some issues regarding electric panels 1. Abdul Manan Site Inspection: Sub Contractor: During site inspection HSE team observed some issues like poor housekeeping of Electric panels 1. Sang Chull Lee and earthing of generators barrication near 2. Choi Byeng Gum river edges concrete waste and electric cables 3. Attique ul Rehman arrangement problems 4. Mushtaq Ahmed 5. Jong Yong Sik HSE Statistics and Performance: All HSE Issues were pointed out during weekly meeting with sub contractors site construction teams and proper recommendations given Incident investigation and recurrence prevention: On July 6, 2013, fire incident happened due to short circuiting of electric wires in Sungbo office. Other concerns of HSE: Sub. Contractors were recommended to Get corrective actions on NCR issued and other Page 129 of 213 Environmental & Social Monitoring Report (July-September 2013) remedial actions on issues discussed during meeting 4- Weekly HSE Meeting with Construction Team Lower Site Date/ Location Attendance Main Issued Discussed 20/08/2013 Daewoo (HSE): 1. No drilling for blasting or loading of the Camp Office 1. Chung Myung Hun face should occur until all other activities at 2. Aftab Alam the rock face are completed; ad only related 3. Haroon Akhtar personnel should be present in the vicinity. Daewoo (QA/QC): 2. The tunnel should be cleaned out at more regular intervals to maintain conditions 1. Abdul Manan more suitable for working in, and all personnel should be provided with the Kyung Dong: necessary PPEs, including waterproof rubber boots with metal-lined toe caps and 1. Sang Chull Lee soles. 2. Choi Byeng Gum 3. Sim Sang Hun 5- Weekly HSE Meeting with Construction Team Lower Site Date/ Location Attendance Main Issued Discussed 13/08/2013 Daewoo (HSE): Site Inspections: Camp Office 1. Chung Myung Hun 1. Cleaning of sedimentation tank is required 2. Aftab Alam near adit tunnel. 3. Addil Yusaf 2. Do not wash heavy equipment and machinery inside the tunnel. Daewoo (QA/QC): 3. Housekeeping is required in batching plant area. 1. Muhammad Adnan Baber 4. Provision of shelters in power house area. 5. Provision of barrier on bridge near power Kyung Dong: house. 1. Kim Tae Jin HSE Statistics and performance: 1. All the issues have to be addressed to sub con and construction department. Before next meeting all issues will be checked again on site area. New Hazards: 1. Waste material from tunnel is going into river due to the overfilling of the sedimentation tank. 2. Excavator having iron pieces instead of Page 130 of 213 Environmental & Social Monitoring Report (July-September 2013) proper bolting/ 3. Placement of electrical cable on non designated area in tunnel. 6- Weekly HSE Meeting with Construction Team Upper Site Date/ Location Attendance Main Issued Discussed 14/08/2013 Daewoo (HSE): 1. Electric earthing and loose connection. 2. Concrete work and house keeping Weir Site Office 1. Chung Myung Hun 3. Safe access and repair of stair case 2. Yasir Ghauri 4. Status of ID board at Adit-Tunnel 3. M. Javed 4. Kamran Khan Site Inspection: 1. During site inspection, HSE Team observed Daewoo (QA/QC): that some workers of Sungbo work without PPE, and safety induction and some other 1. Asim Riaz HSE Issues pending till yet. 2. Annas Gillani 2. HSE Statistics and Performance: 3. Abdul Raheem 3. HSE team observed the unsafe act and unsafe condition time to time and Kyung Dong: discussed all these issues with Sub Con. HSE team during meeting. 1. Jung Yong Sik 4. New Hazards: 7- Weekly HSE Meeting with Construction Team