Federal Register/Vol. 85, No. 97/Tuesday, May 19, 2020/Notices

Total Page:16

File Type:pdf, Size:1020Kb

Federal Register/Vol. 85, No. 97/Tuesday, May 19, 2020/Notices Federal Register / Vol. 85, No. 97 / Tuesday, May 19, 2020 / Notices 29981 and all information needed to apply are Date and Time: September 21, 2018; issue and make immediately effective available at the Grants.gov website, 9:00 a.m.–5:00 p.m. any amendment to an operating license https://www.grants.gov/. September 22, 2018, 9:00 a.m.–12:00 or combined license, as applicable, FOR FURTHER INFORMATION CONTACT: p.m. upon a determination by the Questions regarding the funding Place: National Science Foundation, Commission that such amendment opportunity announcements should be 2415 Eisenhower Avenue, Alexandria, involves no significant hazards emailed to Donna Robertson, Harwood VA 22314, Room C9080 (Zoom consideration, notwithstanding the Grants Coordinator, at HarwoodGrants@ Videoconference). pendency before the Commission of a dol.gov or by telephone at 847–725– Type of Meeting: Open. request for a hearing from any person. 7805. Personnel will not be available to Attendance information for the This biweekly notice includes all answer questions after 5:00 p.m., ET. To meeting will be forthcoming on the amendments issued, or proposed to be obtain further information on the Susan website: https://www.nsf.gov/mps/ast/ issued, from April 21, 2020, to May 4, Harwood Training Grant Program, visit aaac.jsp. 2020. The last biweekly notice was the OSHA website at https:// Contact Person: Dr. Christopher published on May 5, 2020. www.osha.gov/harwoodgrants. Davis, Program Director, Division of DATES: Comments must be filed by June Questions regarding Grants.gov should Astronomical Sciences, Suite W 9136, 18, 2020. A request for a hearing or be emailed to [email protected] or National Science Foundation, 2415 petitions for leave to intervene must be directed to Applicant Support toll free Eisenhower Avenue, Alexandria, VA filed by July 20, 2020. at 1–800–518–4726. Applicant Support 22314; Telephone: 703–292–4910. Purpose of Meeting: To provide ADDRESSES: You may submit comments is available 24 hours a day, 7 days a by any of the following methods: week except Federal holidays. advice and recommendations to the • National Science Foundation (NSF), the Federal Rulemaking Website: Go to SUPPLEMENTARY INFORMATION: National Aeronautics and Space https://www.regulations.gov and search Funding Opportunity Number: Administration (NASA) and the U.S. for Docket ID NRC–2020–0112. Address SHTG–FY–20–01 (Targeted Topic Department of Energy (DOE) on issues questions about NRC Docket IDs in Training grants). within the field of astronomy and Regulations.gov to Jennifer Borges; Funding Opportunity Number: astrophysics that are of mutual interest telephone: 301–287–9127; email: SHTG–FY–20–02 (Training and and concern to the agencies. [email protected]. For technical Educational Materials Development Agenda: To hear presentations of questions, contact the individual(s) grants). current programming by representatives listed in the FOR FURTHER INFORMATION Funding Opportunity Number: CONTACT section of this document. from NSF, NASA, DOE and other • SHTG–FY–20–03 (Capacity Building agencies relevant to astronomy and Mail comments to: Office of grants). astrophysics; to discuss current and Administration, Mail Stop: TWFN–7– Catalog of Federal Domestic potential areas of cooperation between A60M, U.S. Nuclear Regulatory Assistance Number: 17.502. the agencies; to formulate Commission, Washington, DC 20555– Authority and Signature recommendations for continued and 0001, ATTN: Program Management, new areas of cooperation and Announcements and Editing Staff. Loren Sweatt, Principal Deputy mechanisms for achieving them. For additional direction on obtaining Assistant Secretary of Labor for information and submitting comments, Occupational Safety and Health Dated: May 14, 2020. see ‘‘Obtaining Information and Administration, directed the Crystal Robinson, Submitting Comments’’ in the preparation of this notice. The authority Committee Management Officer. SUPPLEMENTARY INFORMATION section of for this notice is Section 21 of the [FR Doc. 2020–10745 Filed 5–18–20; 8:45 am] this document. Occupational Safety and Health Act of BILLING CODE 7555–01–P FOR FURTHER INFORMATION CONTACT: 1970, (29 U.S.C. 670), Public Law 113– Shirley J. Rohrer, Office of Nuclear 235, and Secretary of Labor’s Order No. Reactor Regulation, 301–415–5411, 1–2012 (77 FR 3912). NUCLEAR REGULATORY email: [email protected], U.S. Signed at Washington, DC. COMMISSION Nuclear Regulatory Commission, Loren Sweatt, [NRC–2020–0112] Washington, DC 20555–0001. Principal Deputy Assistant Secretary of Labor, SUPPLEMENTARY INFORMATION: Occupational Safety and Health Biweekly Notice; Applications and Administration. Amendments to Facility Operating I. Obtaining Information and [FR Doc. 2020–10726 Filed 5–18–20; 8:45 am] Licenses and Combined Licenses Submitting Comments BILLING CODE 4510–26–P Involving No Significant Hazards A. Obtaining Information Considerations Please refer to Docket ID NRC–2020– AGENCY: 0112, facility name, unit number(s). NATIONAL SCIENCE FOUNDATION Nuclear Regulatory Commission. docket number(s), application date, and Astronomy and Astrophysics Advisory ACTION: Biweekly notice. subject, when contacting the NRC about Committee; Notice of Meeting the availability of information for this SUMMARY: Pursuant to section 189.a.(2) action. You may obtain publicly- In accordance with the Federal of the Atomic Energy Act of 1954, as available information related to this Advisory Committee Act (Pub. L. 92– amended (the Act), the U.S. Nuclear action by any of the following methods: 463, as amended), the National Science Regulatory Commission (NRC) is • Federal Rulemaking Website: Go to Foundation (NSF) announces the publishing this regular biweekly notice. https://www.regulations.gov and search following meeting: The Act requires the Commission to for Docket ID NRC–2020–0112. Name and Committee Code: publish notice of any amendments • NRC’s Agencywide Documents Astronomy and Astrophysics Advisory issued, or proposed to be issued, and Access and Management System Committee (#13883). grants the Commission the authority to (ADAMS): You may obtain publicly- VerDate Sep<11>2014 17:57 May 18, 2020 Jkt 250001 PO 00000 Frm 00063 Fmt 4703 Sfmt 4703 E:\FR\FM\19MYN1.SGM 19MYN1 29982 Federal Register / Vol. 85, No. 97 / Tuesday, May 19, 2020 / Notices available documents online in the The Commission is seeking public order which may be entered in the ADAMS Public Documents collection at comments on this proposed proceeding on the petitioner’s interest. https://www.nrc.gov/reading-rm/ determination. Any comments received In accordance with 10 CFR 2.309(f), adams.html. To begin the search, select within 30 days after the date of the petition must also set forth the ‘‘Begin Web-based ADAMS Search.’’ For publication of this notice will be specific contentions which the problems with ADAMS, please contact considered in making any final petitioner seeks to have litigated in the the NRC’s Public Document Room (PDR) determination. proceeding. Each contention must reference staff at 1–800–397–4209, 301– Normally, the Commission will not consist of a specific statement of the 415–4737, or by email to pdr.resource@ issue the amendment until the issue of law or fact to be raised or nrc.gov. The ADAMS accession number expiration of 60 days after the date of controverted. In addition, the petitioner for each document referenced (if it is publication of this notice. The must provide a brief explanation of the available in ADAMS) is provided the Commission may issue the license bases for the contention and a concise first time that it is mentioned in this amendment before expiration of the 60- statement of the alleged facts or expert document. day period provided that its final opinion which support the contention determination is that the amendment and on which the petitioner intends to B. Submitting Comments involves NSHC. In addition, the rely in proving the contention at the Please include Docket ID NRC–2020– Commission may issue the amendment hearing. The petitioner must also 0112, facility name, unit number(s), prior to the expiration of the 30-day provide references to the specific docket number(s), application date, and comment period if circumstances sources and documents on which the subject, in your comment submission. change during the 30-day comment petitioner intends to rely to support its The NRC cautions you not to include period such that failure to act in a position on the issue. The petition must identifying or contact information that timely way would result, for example in include sufficient information to show you do not want to be publicly derating or shutdown of the facility. If that a genuine dispute exists with the disclosed in your comment submission. the Commission takes action prior to the applicant or licensee on a material issue The NRC will post all comment expiration of either the comment period of law or fact. Contentions must be submissions at https:// or the notice period, it will publish in limited to matters within the scope of www.regulations.gov as well as enter the the Federal Register a notice of the proceeding. The contention must be comment submissions into ADAMS. issuance. If the Commission makes a one which, if proven, would entitle the The NRC does not routinely edit final NSHC determination, any hearing petitioner to relief. A petitioner who comment submissions to remove will take place after issuance. The fails to satisfy the requirements at 10 identifying or contact information. Commission expects that the need to CFR 2.309(f) with respect to at least one If you are requesting or aggregating take action on an amendment before 60 contention will not be permitted to comments from other persons for days have elapsed will occur very participate as a party. submission to the NRC, then you should infrequently. Those permitted to intervene become inform those persons not to include parties to the proceeding, subject to any identifying or contact information that A. Opportunity To Request a Hearing limitations in the order granting leave to they do not want to be publicly and Petition for Leave To Intervene intervene.
Recommended publications
  • Oconee Nuclear Station, Units No. 1, 2, and 3 Docket No
    Steven M. Snider Vice President Oconee Nuclear Station Duke Energy ON01VP | 7800 Rochester Hwy Seneca, SC 29672 o: 864.873.3478 f: 864.873.5791 Steve.Snider @duke-energy.com Serial: RA-19-0418 10 CFR 50.55a May 6, 2021 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 OCONEE NUCLEAR STATION, UNITS NO. 1, 2, AND 3 DOCKET NO. 50-269, 270, AND 50-287 RENEWED LICENSE NO. DPR-38, DPR-47 AND DPR-55 SUBJECT: Proposed Alternative for Inservice Inspection of Containment Post- Tensioning System Components Pursuant to 10 CFR 50.55a(z)(1), Duke Energy Carolinas, LLC (Duke Energy) requests the NRC to grant relief from Section XI of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code) for Oconee Nuclear Station (ONS), Units 1, 2, and 3. Specifically, Duke Energy is proposing a modification to the scope and schedule currently required by ASME Code requirement IWL-2421(b) for post-tensioning system examinations. Relief is being sought on the basis that the alternative provides an acceptable level of quality and safety. The Relief Request is provided as Enclosure 1 to this letter. If you have questions concerning this request, please contact Art Zaremba, Director - Fleet Licensing, at (980) 373-2062. Sincerely, Steve M Snider. Site Vice President Oconee Nuclear Station Enclosure: 1. Relief Request RA-19-0418 cc : L. Dudes, Regional Administrator USNRC Region II J. Nadel, USNRC Senior Resident Inspector – ONS S. Williams, NRR Senior Project Manager – ONS Enclosure 1 Duke Energy Carolinas, LLC Oconee Nuclear Station, Units 1, 2 and 3 Relief Request RA-19-0418 (6 pages including cover) 10 CFR 50.55a Relief Request RA-19-0418 Enclosure 1 Page 1 of 5 1.
    [Show full text]
  • Sequoyah Nuclear Plant Docket Nos
    Shif et T XA04N2075 NUREG-001 U. S. Nuclear Evnedipation Iteport Regulatory Commission related to operation of Office of Nuclear Reactor Regulation Sequoyah Nuclear Plant Docket Nos. 50-327 Units and 2 50-328 INIS-XA-N--183 March 1979 Tennessee Valley Authority Available from National Technical Information Service Springfield, Virginia 22161 Price: Printed Cpy$11.75 ; Microfiche 3.00 The price of this document for requesters outside of the North American Continent can be obtained from the National Technical Information Service. NUREG-0011 March 1979 SAFETY EVALUATION REPORT BY THE OFFICE OF NUCLEAR REACTOR REGULATION U.S. NUCLEAR REGULATORY COMMISSION IN THE MATTER OF TENNESSEE VALLEY AUTHORITY SEQUOYAH NUCLEAR PLANT UNITS AND 2 DOCKET NOS. 50-327 AND 50-328 TABLE OF CONTENTS PAGE 1.0 INTRODUCTION AND GENERAL DESCRIPTION OF PLANT .................................. 1-1 1.1 Introduction .............................................................. 1-1 1.2 General Plant Description ................................................. 1-2 1.3 Comparison with Similar Facility Designs .................................. 1-3 1.4 Identification of Agents and Contractors .................................. 1-4 1.5 Summary of Principal Review Matters ....................................... 1-4 1.6 Outstanding Issues ........................................................ 1-5 1.7 Confirmatory Issues ....................................................... 1-6 1.8 Staff Positions - Licensing Conditions .................................... 1-9 1.9 Generic
    [Show full text]
  • Gao-13-493, Nuclear Reactor License Renewal: Nrc
    United States Government Accountability Office Report to Congressional Requesters May 2013 NUCLEAR REACTOR LICENSE RENEWAL NRC Generally Follows Documented Procedures, but Its Revisions to Environmental Review Guidance Have Not Been Timely GAO-13-493 May 2013 NUCLEAR REACTOR LICENSE RENEWAL NRC Generally Follows Documented Procedures, but Its Revisions to Environmental Review Guidance Have Not Been Timely Highlights of GAO-13-493, a report to congressional requesters Why GAO Did This Study What GAO Found Many U.S. commercial nuclear power The scope of the Nuclear Regulatory Commission’s (NRC) license renewal reactors are reaching the end of their process focuses on managing the effects of aging on a reactor and its associated initial 40-year operating period. To systems, structures, and components (i.e. safety) and assessing certain potential continue operating, their owners must environmental impacts of extending a reactor’s operating-life. As a result, reviews renew their licenses with NRC, the done as part of this process are not required to address as many topics as independent federal agency reviews for initial licensing, which include security and emergency planning. responsible for licensing and regulating nuclear reactors. NRC evaluates NRC has regularly updated the safety review guidance it uses in the license license renewal applications under two renewal process but has not revised most of its environmental review regulations parallel reviews for safety and potential and guidance since they were first issued. NRC has revised its safety review environmental impacts. NRC’s license guidance twice—in 2005 and 2010—and has issued interim updates for selected renewal process has received safety issues between those revisions.
    [Show full text]
  • Mailing List of U.S. Domestic Nuclear Utilities
    Mailing List of Domestic Nuclear Utilities ",Plant .. I Address Arkansas Nuclear One, Units 1 and 2 Vice President, Operations Arkansas Nuclear One Entergy Operations, Inc. 1448 S.R. 333 Russellville, AR 72802 Beaver Valley Power Station, Units 1 & 2 Eric A. Larson Beaver Valley Power Station P. O. Box 4, Route 168 Shippingport, PA 15077 Browns Ferry Nuclear Plant, Units 1, 2 & 3 Mr. Joseph W. Shea Vice President, Nuclear Licensing Tennessee Valley Authority 1101 Market Street, LP 3D-C Chattanooga, TN 37402-2801 Brunswick Steam Electric Plant Units 1 & 2 George T. Hamrick, Vice President Brunswick Steam Electric Plant P.O. Box 10429 Southport, NC 28461 Byron Station, Units 1 & 2/Braidwood Station, Michael J. Pacilio Units 1 & 2 Senior Vice President Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO) Exelon -Nuclear 4300 Winfield Road Warrenville, IL 60555 Callaway Plant, Unit 1 Mr. Adam C. Heflin Senior Vice President and Chief Nuclear Officer Union Electric Company Ameren Missouri P.O. Box 620 -Fulton, MO 65251 Calvert Cliffs Nuclear Power Plant Units 1 & 2 Mr. George H. Gellrich, Vice President Calvert Cliffs Nuclear Power Plant, LLC. Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Lusby, MD 20657-4702 Catawba Nuclear Station, Units 1 & 2 Mr. Kelvin Henderson Site Vice President Duke Energy Carolinas, LLC Catawba Nuclear Station 4800 Concord Road York, SC 29745 All -2- Plant Address Clinton Power Station, Unit No. 1 Michael J. Pacilio Senior Vice President Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO) Exelon Nuclear 4300 Winfield Rd. Warrenville, IL 60555 Columbia Generating Station Mr.
    [Show full text]
  • Gao-13-743, Nuclear Power
    United States Government Accountability Office Report to Congressional Requesters September 2013 NUCLEAR POWER Analysis of Regional Differences and Improved Access to Information Could Strengthen NRC Oversight GAO-13-743 September 2013 NUCLEAR POWER Analysis of Regional Differences and Improved Access to Information Could Strengthen NRC Oversight Highlights of GAO-13-743, a report to congressional requesters Why GAO Did This Study What GAO Found The 2011 disaster at Japan's The Nuclear Regulatory Commission (NRC) relies on its staff’s professional Fukushima Daiichi Nuclear Power judgment in implementing its processes for overseeing the safety of U.S. Plant demonstrated that unexpected commercial nuclear power reactors. In implementing this oversight, NRC nuclear accidents with extreme allocates specific roles and responsibilities to resident inspectors assigned to consequences can occur and, thus, each plant, regional officials at one of four regional offices responsible for most heightened concerns about NRC’s oversight activities, headquarters officials, and the nuclear power industry. NRC ability to oversee the safety of U.S. also builds into its processes incentives for plant managers to identify concerns commercial nuclear power reactors. about reactor safety, report those concerns to NRC, and take prompt actions to NRC oversees safety through multiple correct them. NRC’s processes for identifying and assessing findings and processes, such as physically violations are based on prescribed agency procedures and include several points inspecting reactors and also responding to signs of declining where NRC staff must exercise their professional judgment, such as determining performance (i.e., findings) or whether issues of concern identified during physical inspections constitute violations of its requirements.
    [Show full text]
  • Federal Register/Vol. 68, No. 88/Wednesday, May 7
    24510 Federal Register / Vol. 68, No. 88 / Wednesday, May 7, 2003 / Notices displays a currently valid OMB control Comments can also be submitted by violations set forth in the notice of number. telephone at (202) 395–3087. violation that the Licensee admitted, the 1. Type of submission, new, revision, The NRC Clearance Officer is Brenda Order Imposing a Civil Monetary or extension: Revision. Jo. Shelton, 301–415–7233. Penalty should be sustained. 2. The title of the information Dated in Rockville, Maryland, this 1st day Except to the extent an early collection: 10 CFR part 140, ‘‘Financial of May, 2003. settlement or other circumstance Protection Requirements and Indemnity renders them unnecessary, the For the Nuclear Regulatory Commission. Agreements.’’ Licensing Board may, during the course 3. The form number if applicable: Not Brenda Jo. Shelton, of this proceeding, conduct one or more applicable. NRC Clearance Officer, Office of the Chief prehearing conferences and evidentiary 4. How often the collection is Information Officer. hearing sessions. The time and place of required: As necessary in order for NRC [FR Doc. 03–11305 Filed 5–6–03; 8:45 am] these sessions will be announced in to meet its responsibilities called for in BILLING CODE 7590–01–P Licensing Board Orders. sections 170 and 193 of the Atomic For the Atomic Safety and Licensing Energy Act of 1954, as amended (the Board. Act). NUCLEAR REGULATORY COMMISSION Dated in Rockville, Maryland, on April 30, 5. Who will be required or asked to 2003. report: Licensees authorized to operate [Docket No. 30–35594–CivP, ASLBP No.
    [Show full text]
  • Nuclear Regulatory Commission
    This document is scheduled to be published in the Federal Register on 02/23/2021 and available online at federalregister.gov/d/2021-03107, and on govinfo.gov [7590-01-P] NUCLEAR REGULATORY COMMISSION [NRC-2021-0049] Monthly Notice Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations AGENCY: Nuclear Regulatory Commission. ACTION: Monthly notice. SUMMARY: Pursuant to section 189.a.(2) of the Atomic Energy Act of 1954, as amended (the Act), the U.S. Nuclear Regulatory Commission (NRC) is publishing this regular monthly notice. The Act requires the Commission to publish notice of any amendments issued, or proposed to be issued, and grants the Commission the authority to issue and make immediately effective any amendment to an operating license or combined license, as applicable, upon a determination by the Commission that such amendment involves no significant hazards consideration (NSHC), notwithstanding the pendency before the Commission of a request for a hearing from any person. This monthly notice includes all amendments issued, or proposed to be issued, from January 8, 2021, to February 4, 2021. The last monthly notice was published on January 26, 2021. DATES: Comments must be filed by [INSERT DATE 30 DAYS AFTER DATE OF PUBLICATION IN THE FEDERAL REGISTER]. A request for a hearing or petitions for leave to intervene must be filed by [INSERT DATE 60 DAYS AFTER DATE OF PUBLICATION IN THE FEDERAL REGISTER]. ADDRESSES: You may submit comments by any of the following methods; however, the NRC encourages electronic comment submission through the Federal Rulemaking Web Site: Federal Rulemaking Web Site: Go to https://www.regulations.gov and search for Docket ID NRC-2021-0049.
    [Show full text]
  • 1 GFE Annual Letter for FY 2021.Docx
    January 11, 2021 THIS LETTER DISTRIBUTED TO THE FOLLOWING DOCKET NUMBERS: Browns Ferry Nuclear Plant, Docket Nos. 50-259, 50–260 and 50-296 Brunswick Steam Electric Plant, Docket Nos. 50-325 and 50-324 Catawba Nuclear Station, Docket Nos. 50-413 and 50-414 Joseph M. Farley Nuclear Plant, Docket Nos. 50-348 and 50-364 Shearon Harris Nuclear Power Plant, Docket No. 50-400 E. I. Hatch Nuclear Plant, Docket Nos. 50-321 and 50-366 McGuire Nuclear Station, Docket Nos. 50-369 and 50-370 North Anna Power Station, Docket Nos. 50-338 and 50-339 Oconee Nuclear Station, Docket Nos. 50-269, 50-270 and 50-287 H. B. Robinson Steam Electric Plant, Docket No. 50-261 St. Lucie Nuclear Plant, Docket Nos. 50-335 and 50-389 Sequoyah Nuclear Plant, Docket Nos. 50-327 and 50-328 Virgil C. Summer Nuclear Station, Docket No. 50-395 Surry Power Station, Docket Nos. 50-280 and 50-281 Turkey Point Nuclear Plant, Docket Nos. 50-250 and 50-251 Vogtle Electric Generating Plant, Docket Nos. 50-424, 50-425, 52-025 and 52-026 Watts Bar Nuclear Plant, Docket Nos. 50-390 and 50-391 SUBJECT: ANNUAL LETTER - GENERIC FUNDAMENTALS EXAMINATION (GFE) SECTION OF THE WRITTEN OPERATOR LICENSING EXAMINATION FOR 2021 The U.S. Nuclear Regulatory Commission (NRC) plans to administer the generic fundamentals examination (GFE) section of the written operator licensing examination on the following dates during this calendar year: Date of GFE exams Date registration for 2021 letters from facilities due to NRC March 10, 2021 February 8, 2021 September 8, 2021 August 9, 2021 Due to the COVID-19 public health crisis, it is preferable to register personnel to take the GFE electronically, through https://www.nrc.gov/reactors/operator-licensing/electronic-gfe- registration-info.html, or through encrypted email to the OLA in your region and a copy to the headquarters OLA at [email protected].
    [Show full text]
  • Sequoyah Nuclear Plant Comprehensive Schedule
    '. LEAVE BLANK . REQUEST FOR RECORDS DISPOSITION AUTHORITY JUB.' NO. (See Instructions on reverse) tJ ///L/z-ftf-,I? ~TO~:-G--E-N-E-R-A-L-S-E-R-V-I-C-E-S-A-D-M~IN-I-S-T-R-A-T-IO-N--------------------------~D~AC~T~E~R~E~CEIV_ED /_ J~ ~_I p~ NATIONAL ARCHIVES AND RECORDS SERVICE, WASHINGTON, DC 20408 ~ /1 q fJ / 1. FROM (Aeency or establishment) NOTI FICATION -T-=-O-A~G-:-E::cN-C-:-Y,.,----- --------------------._-------------- Tennessee Valley Authority In accordance with the provisions of 44 U.S.C, 3303a ~2.~M~A~J~O~R~S~u~e~D~lv~I~S~IO~N~-----------~--------------------------------- the disposal request, including amendments, is approved except for items that may be marked "disposition not Nuclear Power approved" or "withdrawn" in column 10. If no records -=-3.--:M-"""'1N"""O""'R=-=s""u=e=D"77 V"'"'Ic-=S"""IO""'N,..,----------------------·--------- - --- --- ---- -- - ---- 1 are proposed for disposal, the signatureof the Archivist is Sequoyah Nuclear Plant not required. 4. NAME OF PERSON WITH WHOM TO CONFER 5~TELEPHONE EXT. ARCHIVIST OF THE UNITED STATES \ Ronald E. Brewer 615/751 2520 6. CERTIFICATE OF AGENCY REPRESENTATIVE I hereby certify that I am authorized to act for this agency in matters pertaining to the disposal of the agency's records; that the records proposed for disposal in this Hequest of __ _ _ __paqets) are not now needed for the business of this agency or will not be needed after the retention periods specified; and that written concurrence from the General Accounting Office, if required under the provisions of Title 8 of the GAU Manual tor Guidance of Federal Agencies, is attached.
    [Show full text]
  • Educational and Promotional Films
    LEAVE BLANK REQUEST FOR RECORDS DISPOSITION AUTHORITY • JOB NO (See Instructions on reverse) iJ I --/Lfl- ~~1'~(p TO: GENERAL SERVICES ADMINISTRATION DATE RECEIVEO NATIONAL ARCHIVES AND RECORDS SERVICE, WASHINGTON, DC 20408 /t-/It; - ff' 1. F ROM (A,~nc)' or ~atabli'hment) NOTIFICATION TO AGENCY Tennessee Valley Authority In accordance with the provisions of 44 U.S.C. 3303a 2. MAJOR SUBDIVISION the disposal request. including amendments. is approved Governmental and Public Affairs except for Items that may be marked "disposition not approved" or "withdrawn" in column 10. If no records 3. MINOR SUBOIVISION are proposed for dlsoosal. the signature of the Archivist is Media Relations not required. 4, NAME OF PERSONWITH WHOM TO CONFER 5, TELEPHONE EXT. ARCHIVIST OF THE UNITED STATES _~C~ C Ronald E. Brewer 615/751-2520 Z ;:;D ~~ 10 6. CERTIFICATE OF AGENCY REPRESENTATIVE I I hereby certify that I am authorized to act for this agency in matters pertaining to the disposal of the agency's records; that the records proposed for disposal in this Request of page(s) are not now needed for the businessof this agency or will not be needed after the retention periods specified; and that written concurrence from the General Accounting Office, if required under the provisions of Title 8 of the GAO Manual for Guidance of Federal Agencies, is attached. A. GAO concurrence: D is attached; or [!] is unnecessary. B. DATE C. SIGNATURE OF AGENCY REPRESENTATIVE D. TITLE Assistant TVA Archivist 9. GRS OR 10. ACTION SUPERSEDED TAKEN ITEM (With Inc/u.ive Datet or RetenHon Period.) JOB (NARSUSE NO.
    [Show full text]
  • Beans Coming Attractions Facility Updates
    To: Jim Mehl, ERSIS Manager From: Zack Clayton, Rad Coordinator Subject: August Monthly Report Date: September 1, 2015 _________________________________________________________________ Beans Training: 0 Drills: 0 Meetings: 1 Technical Assistance: 3 Public Assistance: 3 Web Page Views: There were 19 page views in August. Radiological Safety Program Pages: http://epa.ohio.gov/derr/ersis/er/rad.aspx Coming Attractions 10/5 URSB 10/22 NEPAC Facility updates Davis-Besse Nuclear Power Station Davis-Besse operated at full power for the month. Davis-Besse provided an update on the elevated levels of tritium in ground water that were first detected on February 3, 2015. The sample results for August show 13 samples above the agreed reporting threshold of 2000 picocuries of tritium per liter (pCi/L). Generally the sample results are holding steady or slightly decreasing. The highest sample result was 6246 pCi/L. The limit for tritium in drinking water is 20,000 pCi/L. Perry Nuclear Power Plant Perry operated at full power for the month. Beaver Valley Power Station At approximately 530 am on August 26, a single warning siren in Beaver County Pennsylvania was inadvertently activated. No emergency was declared at the Beaver Valley Power Station. The plant is required to report this event to the Nuclear Regulatory Commission. See Event number 51345. Beaver Valley Unit I Unit I operated at full power for the month. Beaver Valley Unit II Unit II operated at full power for the month. At 0837 EDT on August 17, 2015, it was determined that Beaver Valley Unit 2 had experienced a small oil leak of approximately 1 liter from equipment located inside the Alternate Intake structure.
    [Show full text]
  • Federal Register/Vol. 71, No. 123/Tuesday, June 27, 2006/Notices
    36556 Federal Register / Vol. 71, No. 123 / Tuesday, June 27, 2006 / Notices Docket Nos. 50–259, 50–260, & 50–296 Columbia Generating Station Energy Act (42 U.S.C. 2039, 2232b), the License Nos. DPR–33, DPR–52, & DPR– Docket No. 50–397 Advisory Committee on Reactor 68 License No. NPF–21 Safeguards (ACRS) will hold a meeting 10835 Shaw Rd. Snake River Warehouse on July 12–14, 2006, 11545 Rockville Athens, AL 35611 North Power Plant Loop Pike, Rockville, Maryland. The date of Mr. Michael Skaggs Richland, WA 99352 this meeting was previously published Site Vice President Mr. Christopher M. Crane in the Federal Register on Tuesday, Watts Bar Nuclear Plant, Unit 1 President and Chief Nuclear Officer November 22, 2005 (70 FR 70638). Tennessee Valley Authority AmerGen Energy Company, LLC Oyster Creek Nuclear Generating Station Wednesday, July 12, 2006, Conference Docket No. 50–390 Room T–2b3, Two White Flint North, License No. NPF–90 Docket No. 50–219 License No. DPR–16 Rockville, Maryland Highway 68 Near Spring City 4300 Winfield Road Spring City, TN 37381 8:30 a.m.–8:35 a.m.: Opening Warrenville, IL 60555 Remarks by the ACRS Chairman Mr. Randy Douet Mr. Christopher M. Crane (Open)—The ACRS Chairman will make Site Vice President President and Chief Nuclear Officer opening remarks regarding the conduct Sequoyah Nuclear Plant, Units 1 and 2 Exelon Generation Company, LLC of the meeting. Tennessee Valley Authority Dresden Nuclear Power Station, Units 2 8:35 a.m.–10 a.m.: Final Review of the Docket Nos. 50–327 and 50–328 and 3 License Renewal Application for the License Nos.
    [Show full text]