Consolidated Emergency Operations Facilities

Total Page:16

File Type:pdf, Size:1020Kb

Consolidated Emergency Operations Facilities Consolidated Emergency Operations Facilities Consolidated U.S. Nuclear Emergency Regulatory NRC Papers and Associated Utility Operations Included Sites Commission Approval(s) Facility (EOF) (NRC) Region Location NRC Letter, dated 8/18/83 (Agencywide Documents and Access Management System (ADAMS) Legacy No. 8308290269) SECY-05-0172 –"Duke Power Company's Request to Incorporate the Oconee Emergency Operations Facility into the EOF Shared by Catawba and Catawba Nuclear Station McGuire Nuclear Stations,” dated William B. McGuire Nuclear 9/27/2005 (ADAMS Accession No. Station ML051880303) Oconee Nuclear Station Duke Energy William States Lee III Nuclear SRM-SECY-05-0172, dated 11/2/2005 Progress, LLC and Station (site not yet constructed) 2 Charlotte, NC (ADAMS Accession No. ML053070025) Duke Energy Brunswick Steam Electric Plant Carolinas, LLC (consolidation proposed) SECY-16-0094 – “Staff Statement in H. B. Robinson Steam Electric Support of the Uncontested Plant (consolidation proposed) Hearing for Issuance of Combined Shearon Harris Nuclear Power Licenses for the William States Lee III Plant (consolidation proposed) Nuclear Station, Units 1 and 2 (Docket Nos. 52-018 and 52-019),” dated 8/8/2016 (ADAMS Accession No. ML16123A064) Commission Memorandum and Order (CLI-16-19), dated 12/15/16 (ADAMS Accession No. ML16350A070) 1 of 3 Enclosure 1 Consolidated Emergency Operations Facilities Consolidated U.S. Nuclear Emergency Regulatory NRC Papers and Associated Utility Operations Included Sites Commission Approval(s) Facility (EOF) (NRC) Region Location SECY-98-274 –"Commonwealth Edison Company's Proposal to Centralize its Emergency Operations Facilities at its Corporate Offices," dated 11/23/1998 (ADAMS Accession No. ML020430397) SRM-SECY-98-274, dated 1/29/1999 Braidwood Station (ADAMS Accession No. ML003750972) Byron Station Clinton Power Station Exelon Corporation, SECY-02-0033 – “AmerGen's Request 3 Warrenville, Illinois Dresden Nuclear Power Station LLC to Consolidate the Clinton Power LaSalle County Station Station Emergency Operations Facility Quad Cities Nuclear Power (EOF) into the Centralized EOF Station Operated by Exelon Generation Co.,” dated 2/27/2002 (ADAMS Accession No. ML020430397) SRM-SECY-02-0033, dated 3/15/2002 (ADAMS Accession No. ML020740504) SECY-03-0033 –“Revised AmerGen's Request to Consolidate Three Mile Island Unit 1 Emergency Operations Facility (EOF) into Combined EOF for Three Mile Island, Unit 1 Peach Bottom Atomic Power Station Peach Bottom Atomic Power Exelon Corporation, 1 Coatesville, PA (PBAPS) & Limerick Generating Station Station LLC (LGS),” dated 3/7/2003 (ADAMS Limerick Generating Station Accession Number ML030650225) SRM-SECY-03-0033, dated 3/18/2003 (ADAMS Accession No. ML030780051) 2 of 3 Consolidated Emergency Operations Facilities Consolidated U.S. Nuclear Emergency Regulatory NRC Papers and Associated Utility Operations Included Sites Commission Approval(s) Facility (EOF) (NRC) Region Location EDO Memorandum, “Action Plan III.A.1.2 – EOF,” dated November 12, 1980 Browns Ferry Nuclear Plant Tennessee Valley 2 Chattanooga, TN Sequoyah Nuclear Plant SECY Memorandum, COMJA-80-37, Authority Watts Bar Nuclear Plant “Action Plan III.A.1.2-EOF,” dated January 21, 1981 (ADAMS Accession No. ML110340232) SECY-04-0236 – “Southern Nuclear Operating Company's Proposal to Establish a Common Emergency Operating Facility at its Corporate Farley Nuclear Plant Southern Nuclear Headquarters,” dated 12/23/2004 2 Birmingham, AL Hatch Nuclear Plant Operating Company (ADAMS Accession No. ML043270471) Vogtle Electric Generating Plant SRM-SECY-04-0236, dated 2/23/2005 (ADAMS Accession No. ML050550131) 3 of 3 .
Recommended publications
  • Exelon Nuclear Fact Sheet Exelon Nuclear, a Division of Exelon Generation, Is Headquartered in Kennett Square, Pa
    Exelon Nuclear Fact Sheet Exelon Nuclear, a division of Exelon Generation, is headquartered in Kennett Square, Pa. and operates the largest U.S. fleet of carbon-free nuclear plants with more than 17,800 megawatts of capacity from 21 reactors at 12 facilities in Illinois, Maryland, New York and Pennsylvania. Dave Rhoades is President and Chief Nuclear Officer, Exelon Nuclear. There are more than 10,000 nuclear professionals working in Exelon Generation’s nuclear division. These professionals implement industry best practices to ensure safe, reliable operation throughout Exelon’s nuclear fleet. Exelon believes that clean, affordable energy is the key to a brighter, more sustainable future. Exelon’s nuclear power plants account for approximately 60 percent of Exelon’s power generation portfolio. Nuclear power plants are critical to the stability of the U.S. electrical grid because they can produce an uninterrupted flow of electricity for extended periods. This uninterrupted flow supplies the necessary level of baseload electricity for the grid to operate around-the-clock. Exelon’s nuclear stations Braidwood Generating Station Braceville, Illinois Byron Generating Station Byron, Illinois Calvert Cliffs Nuclear Power Plant Lusby, Maryland Clinton Power Station Clinton, Illinois Dresden Generating Station Morris, Illinois FitzPatrick Nuclear Power Plant Scriba, New York Ginna Nuclear Power Plant Ontario, New York LaSalle County Generating Station Marseilles, Illinois Limerick Generating Station Pottstown, Pennsylvania Nine Mile Point Nuclear Station Scriba, New York Peach Bottom Atomic Power Station Delta, Pennsylvania Quad Cities Generating Station Cordova, Illinois Updated: January 2021 .
    [Show full text]
  • Nuclear Power Summary – Licensing Actions August 2020
    NUCLEAR POWER SUMMARY – LICENSING ACTIONS AUGUST 2020 Congressional Legislative Action: o August 2020: • The American Nuclear Infrastructure Act of 2020, which was heard by the Senate’s Committee on Environment and Public Works on August 5, 2020, will enable U.S. international leadership, preserve America’s uranium supply chain, reduce carbon emissions, and strengthen our economic, energy, and national security. • The Nuclear Energy Leadership Act (NELA), included in the National Defense Authorization Act (NDAA) for fiscal year 2021, was passed by the Senate on July 23, 2020. NELA will help facilitate the path to market for advanced reactors by allowing the federal government to be an early adopter of commercialized technologies; providing for needed scientific research facilities; demonstrating advanced reactor concepts; breaking down fuel availability barriers when the market cannot; and training the next generation of nuclear scientists. • The Nuclear Energy for the Future Act (HR 6796), which was introduced to the House on May 8, 2020, builds on the Nuclear Energy Innovation Capabilities Act (NEICA) to provide full authorization for the Versatile Test Reactor. • The Nuclear Energy Research and Development Act (HR 6097) was passed by the House Science, Space, and Technology Subcommittee on Energy on March 12, 2020 and forwarded to the full Committee. This act would authorize many programs within the Office of Nuclear Energy, including further research and development on the existing fleet of reactors, advanced reactors, hybrid energy systems, and advanced fuels. • The Integrated Energy Systems Act of 2019 (S 2702), which was heard by the Senate Committee on Energy and Natural Resources on December 17, 2019, would direct the Department of Energy to establish an integrated energy systems research, development, and demonstration program.
    [Show full text]
  • FEDERAL REGISTER INDEX January–October 2019
    FEDERAL REGISTER INDEX January–October 2019 Nuclear Regulatory Commission Ground Water Protection at Uranium In Situ Recovery Facilities – 574 RULES ( Jan 31); 6979 ( Mar 1) Access Authorization and Fitness-for-Duty Determinations – 43667 ( Aug 22) Harmonization of Transportation Safety Requirements with IAEA Adjustment of Civil Penalties for Inflation for Fiscal Year 2019 – 2433 ( Feb 7) Standards – 14898 ( Apr 12) Advanced Power Reactor 1400 (APR1400) Design Certification – 23439 List of Approved Spent Fuel Storage Casks: ( May 22) Holtec International HI-STORM 100 Cask System, Certificate of Compliance No. 1014, Amendment No. 13 – 6086 ( Feb 26) Advanced Power Reactor 1400 Design Certification – 41885 ( Aug 16) Holtec International HI-STORM 100 Multipurpose Canister Cask System, Clarification of Export Reporting Requirements for Nuclear Facilities, Certificate of Compliance No. 1014, Amendment No. 14 – 52815 Equipment, and Non-Nuclear Materials – 12483 ( Apr 2) ( Oct 3) Final State Agreement: Holtec International Storage, Transport and Repository 100 Storage Vermont: Discontinuance of Certain Commission Regulatory Authority System, Certificate of Compliance No. 1008, Amendment No. within the State – 51365 ( Sep 30) 3 – 43729 ( Aug 22) List of Approved Spent Fuel Storage Casks: NAC International NAC-UMS Universal Storage System, Certificate of Holtec International HI-STORM 100 Cask System, Certificate of Compliance Compliance No. 1015, Amendment No. 7 – 21728 ( May 15) No. 1014, Amendment No. 13 – 6055 ( Feb 26); 16201 ( Apr 18) Measurement Standards Used at U.S. Nuclear Power Plants – 21727 Holtec International HI-STORM 100 Multipurpose Canister Cask System, ( May 15) Certificate of Compliance No. 1014, Amendment No. 14 – 52747 Measurement Standards Used at U.S. Nuclear Power Plants; ( Oct 3) Correction – 33710 ( Jul 15) Holtec International HI-STORM 100 Multipurpose Canister Cask System, Certificate of Compliance No.
    [Show full text]
  • Oconee Nuclear Station, Units No. 1, 2, and 3 Docket No
    Steven M. Snider Vice President Oconee Nuclear Station Duke Energy ON01VP | 7800 Rochester Hwy Seneca, SC 29672 o: 864.873.3478 f: 864.873.5791 Steve.Snider @duke-energy.com Serial: RA-19-0418 10 CFR 50.55a May 6, 2021 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 OCONEE NUCLEAR STATION, UNITS NO. 1, 2, AND 3 DOCKET NO. 50-269, 270, AND 50-287 RENEWED LICENSE NO. DPR-38, DPR-47 AND DPR-55 SUBJECT: Proposed Alternative for Inservice Inspection of Containment Post- Tensioning System Components Pursuant to 10 CFR 50.55a(z)(1), Duke Energy Carolinas, LLC (Duke Energy) requests the NRC to grant relief from Section XI of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code) for Oconee Nuclear Station (ONS), Units 1, 2, and 3. Specifically, Duke Energy is proposing a modification to the scope and schedule currently required by ASME Code requirement IWL-2421(b) for post-tensioning system examinations. Relief is being sought on the basis that the alternative provides an acceptable level of quality and safety. The Relief Request is provided as Enclosure 1 to this letter. If you have questions concerning this request, please contact Art Zaremba, Director - Fleet Licensing, at (980) 373-2062. Sincerely, Steve M Snider. Site Vice President Oconee Nuclear Station Enclosure: 1. Relief Request RA-19-0418 cc : L. Dudes, Regional Administrator USNRC Region II J. Nadel, USNRC Senior Resident Inspector – ONS S. Williams, NRR Senior Project Manager – ONS Enclosure 1 Duke Energy Carolinas, LLC Oconee Nuclear Station, Units 1, 2 and 3 Relief Request RA-19-0418 (6 pages including cover) 10 CFR 50.55a Relief Request RA-19-0418 Enclosure 1 Page 1 of 5 1.
    [Show full text]
  • Sequoyah Nuclear Plant Docket Nos
    Shif et T XA04N2075 NUREG-001 U. S. Nuclear Evnedipation Iteport Regulatory Commission related to operation of Office of Nuclear Reactor Regulation Sequoyah Nuclear Plant Docket Nos. 50-327 Units and 2 50-328 INIS-XA-N--183 March 1979 Tennessee Valley Authority Available from National Technical Information Service Springfield, Virginia 22161 Price: Printed Cpy$11.75 ; Microfiche 3.00 The price of this document for requesters outside of the North American Continent can be obtained from the National Technical Information Service. NUREG-0011 March 1979 SAFETY EVALUATION REPORT BY THE OFFICE OF NUCLEAR REACTOR REGULATION U.S. NUCLEAR REGULATORY COMMISSION IN THE MATTER OF TENNESSEE VALLEY AUTHORITY SEQUOYAH NUCLEAR PLANT UNITS AND 2 DOCKET NOS. 50-327 AND 50-328 TABLE OF CONTENTS PAGE 1.0 INTRODUCTION AND GENERAL DESCRIPTION OF PLANT .................................. 1-1 1.1 Introduction .............................................................. 1-1 1.2 General Plant Description ................................................. 1-2 1.3 Comparison with Similar Facility Designs .................................. 1-3 1.4 Identification of Agents and Contractors .................................. 1-4 1.5 Summary of Principal Review Matters ....................................... 1-4 1.6 Outstanding Issues ........................................................ 1-5 1.7 Confirmatory Issues ....................................................... 1-6 1.8 Staff Positions - Licensing Conditions .................................... 1-9 1.9 Generic
    [Show full text]
  • Gao-13-493, Nuclear Reactor License Renewal: Nrc
    United States Government Accountability Office Report to Congressional Requesters May 2013 NUCLEAR REACTOR LICENSE RENEWAL NRC Generally Follows Documented Procedures, but Its Revisions to Environmental Review Guidance Have Not Been Timely GAO-13-493 May 2013 NUCLEAR REACTOR LICENSE RENEWAL NRC Generally Follows Documented Procedures, but Its Revisions to Environmental Review Guidance Have Not Been Timely Highlights of GAO-13-493, a report to congressional requesters Why GAO Did This Study What GAO Found Many U.S. commercial nuclear power The scope of the Nuclear Regulatory Commission’s (NRC) license renewal reactors are reaching the end of their process focuses on managing the effects of aging on a reactor and its associated initial 40-year operating period. To systems, structures, and components (i.e. safety) and assessing certain potential continue operating, their owners must environmental impacts of extending a reactor’s operating-life. As a result, reviews renew their licenses with NRC, the done as part of this process are not required to address as many topics as independent federal agency reviews for initial licensing, which include security and emergency planning. responsible for licensing and regulating nuclear reactors. NRC evaluates NRC has regularly updated the safety review guidance it uses in the license license renewal applications under two renewal process but has not revised most of its environmental review regulations parallel reviews for safety and potential and guidance since they were first issued. NRC has revised its safety review environmental impacts. NRC’s license guidance twice—in 2005 and 2010—and has issued interim updates for selected renewal process has received safety issues between those revisions.
    [Show full text]
  • Mailing List of U.S. Domestic Nuclear Utilities
    Mailing List of Domestic Nuclear Utilities ",Plant .. I Address Arkansas Nuclear One, Units 1 and 2 Vice President, Operations Arkansas Nuclear One Entergy Operations, Inc. 1448 S.R. 333 Russellville, AR 72802 Beaver Valley Power Station, Units 1 & 2 Eric A. Larson Beaver Valley Power Station P. O. Box 4, Route 168 Shippingport, PA 15077 Browns Ferry Nuclear Plant, Units 1, 2 & 3 Mr. Joseph W. Shea Vice President, Nuclear Licensing Tennessee Valley Authority 1101 Market Street, LP 3D-C Chattanooga, TN 37402-2801 Brunswick Steam Electric Plant Units 1 & 2 George T. Hamrick, Vice President Brunswick Steam Electric Plant P.O. Box 10429 Southport, NC 28461 Byron Station, Units 1 & 2/Braidwood Station, Michael J. Pacilio Units 1 & 2 Senior Vice President Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO) Exelon -Nuclear 4300 Winfield Road Warrenville, IL 60555 Callaway Plant, Unit 1 Mr. Adam C. Heflin Senior Vice President and Chief Nuclear Officer Union Electric Company Ameren Missouri P.O. Box 620 -Fulton, MO 65251 Calvert Cliffs Nuclear Power Plant Units 1 & 2 Mr. George H. Gellrich, Vice President Calvert Cliffs Nuclear Power Plant, LLC. Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Lusby, MD 20657-4702 Catawba Nuclear Station, Units 1 & 2 Mr. Kelvin Henderson Site Vice President Duke Energy Carolinas, LLC Catawba Nuclear Station 4800 Concord Road York, SC 29745 All -2- Plant Address Clinton Power Station, Unit No. 1 Michael J. Pacilio Senior Vice President Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO) Exelon Nuclear 4300 Winfield Rd. Warrenville, IL 60555 Columbia Generating Station Mr.
    [Show full text]
  • Federal Register/Vol. 85, No. 97/Tuesday, May 19, 2020/Notices
    Federal Register / Vol. 85, No. 97 / Tuesday, May 19, 2020 / Notices 29981 and all information needed to apply are Date and Time: September 21, 2018; issue and make immediately effective available at the Grants.gov website, 9:00 a.m.–5:00 p.m. any amendment to an operating license https://www.grants.gov/. September 22, 2018, 9:00 a.m.–12:00 or combined license, as applicable, FOR FURTHER INFORMATION CONTACT: p.m. upon a determination by the Questions regarding the funding Place: National Science Foundation, Commission that such amendment opportunity announcements should be 2415 Eisenhower Avenue, Alexandria, involves no significant hazards emailed to Donna Robertson, Harwood VA 22314, Room C9080 (Zoom consideration, notwithstanding the Grants Coordinator, at HarwoodGrants@ Videoconference). pendency before the Commission of a dol.gov or by telephone at 847–725– Type of Meeting: Open. request for a hearing from any person. 7805. Personnel will not be available to Attendance information for the This biweekly notice includes all answer questions after 5:00 p.m., ET. To meeting will be forthcoming on the amendments issued, or proposed to be obtain further information on the Susan website: https://www.nsf.gov/mps/ast/ issued, from April 21, 2020, to May 4, Harwood Training Grant Program, visit aaac.jsp. 2020. The last biweekly notice was the OSHA website at https:// Contact Person: Dr. Christopher published on May 5, 2020. www.osha.gov/harwoodgrants. Davis, Program Director, Division of DATES: Comments must be filed by June Questions regarding Grants.gov should Astronomical Sciences, Suite W 9136, 18, 2020. A request for a hearing or be emailed to [email protected] or National Science Foundation, 2415 petitions for leave to intervene must be directed to Applicant Support toll free Eisenhower Avenue, Alexandria, VA filed by July 20, 2020.
    [Show full text]
  • Federal Register/Vol. 84, No. 138/Thursday, July 18, 2019/Notices
    34410 Federal Register / Vol. 84, No. 138 / Thursday, July 18, 2019 / Notices NUCLEAR REGULATORY SUPPLEMENTARY INFORMATION: The text of readily assessed, will result in more COMMISSION the exemption is attached. efficient use of both Exelon and NRC financial and other resources. [Docket No. 50–461; NRC–2019–0107] Dated at Rockville, Maryland, this 15th day of July, 2019. II. Request/Action Exelon Generation Company LLC; For the Nuclear Regulatory Commission. Clinton Power Station Unit 1 Joel S. Wiebe, 10 CFR 54.17(a) requires that an Senior Project Manager, Licensing Projects application for a renewed license be in AGENCY: Nuclear Regulatory Branch III, Division of Operating Reactor accordance with Subpart A of 10 CFR, Commission. Licensing, Office of Nuclear Reactor Part 2, which includes 10 CFR 2.109(b). ACTION: Exemption; issuance. Regulation. In turn, 10 CFR 2.109(b) states, ‘‘If the SUMMARY: The U.S. Nuclear Regulatory ATTACHMENT—Exemption licensee of a nuclear power plant licensed under 10 CFR 50.21(b) or 50.22 Commission (NRC) is issuing an NUCLEAR REGULATORY files a sufficient application for renewal exemption in response to a November 8, COMMISSION 2018, request from Exelon Generation of either an operating license or a Company, LLC (Exelon) to allow Exelon Docket No. 50–461 combined license at least 5 years before to submit a sufficient license renewal Exelon Generation Company, LLC the expiration of the existing license, the existing license will not be deemed application for Clinton Power Station, Clinton Power Station, Unit 1 Unit 1, at least 3 years prior to the to have expired until the application has expiration of the existing license and Exemption been finally determined.’’ In its letter still receive timely renewal protection.
    [Show full text]
  • Federal Register/Vol. 85, No. 145/Tuesday, July 28, 2020/Notices
    Federal Register / Vol. 85, No. 145 / Tuesday, July 28, 2020 / Notices 45445 reproduction cost) payable to the United regulatory process for the development 1. Persons who wish to provide a States Treasury. of drugs and devices; an update on the written statement should submit an NRC’s Phase 2 revision of Regulatory electronic copy to Ms. Jamerson using Henry Friedman, Guide 8.39, ‘‘Release of Patients the contact information listed above. All Assistant Section Chief, Environmental Administered Radioactive Material’’; submittals must be received by the close Enforcement Section, Environment and and an update on the activities of the Natural Resources Division. of business on September 15, 2020, NRC’s Medical Radiation Safety Team. three business days before the meeting, [FR Doc. 2020–16299 Filed 7–27–20; 8:45 am] The agenda is subject to change. The and must pertain to the topics on the BILLING CODE 4410–15–P current agenda and any updates will be agenda for the meeting. available on the ACMUI’s Meetings and 2. Questions and comments from Related Documents web page at https:// members of the public will be permitted NATIONAL CREDIT UNION www.nrc.gov/reading-rm/doc- during the meeting, at the discretion of ADMINISTRATION collections/acmui/meetings/2020.html the Chairman. or by emailing Ms. Kellee Jamerson at 3. The draft transcript and meeting Sunshine Act Meeting the contact information below. summary will be available on ACMUI’s SUMMARY: Due to the COVID–19 Purpose: Discuss issues related to 10 website https://www.nrc.gov/reading- Pandemic, the meeting will be open to CFR part 35 Medical Use of Byproduct rm/doc-collections/acmui/meetings/ the public via live webcast only.
    [Show full text]
  • Commission Approved Emergency
    Commission-Approved Emergency Operations Facilities Located More Than 25 Miles From Respective Nuclear Power Reactor Site(s) Utility Applicable Nuclear Power Reactor Sites Facility Location NRC Region I: • Limerick Generating Station, Units 1/2 Exelon Generation • Peach Bottom Atomic Power Station, Units 1/2 Coatesville, PA Co., LLC • Three Mile Island Nuclear Station, Unit 1 Dominion Nuclear Hartford, CT • Millstone Power Station, Units 2/3 Connecticut, Inc. (backup1) NRC Region II: • Edwin I. Hatch Nuclear Plant, Units 1/2 • Joseph M. Farley Nuclear Plant, Units 1/2 Southern Nuclear • Birmingham, AL Operating Co. Vogtle Electric Generating Plant, Units 1/2 • Vogtle Electric Generating Plant, Units 3/4 (COL: under construction) • Browns Ferry Nuclear Plant, Units 1/2/3 Tennessee Valley • Sequoyah Nuclear Plant, Units 1/2 Chattanooga, TN Authority • Watts Bar Nuclear Plant, Units 1/2 Virginia Electric & Power Co. / • North Anna Power Station, Units 1/2 Glen Allen, VA Dominion Virginia • Surry Power Station, Units 1/2 Power Virginia Electric & Power Co. / • North Anna Power Station, Unit 3 Glen Allen, VA Dominion Virginia (COL: not yet constructed) (backup1,2) Power • Brunswick Steam Electric Plant, Units 1/2 • Catawba Nuclear Station, Units 1/2 • H.B. Robinson Steam Electric Plant, Unit 2 Duke Energy • McGuire Nuclear Station, Units 1/2 Charlotte, NC Carolinas, LLC • Oconee Nuclear Station, Units 1/2/3 • Shearon Harris Nuclear Power Plant, Unit 1 • William States Lee III Nuclear Station, Units 1/2 (COL: not yet constructed) 1 Per paragraph IV.E.8(b) to Appendix E of 10 CFR Part 50, a licensee with a primary emergency operations facility (EOF) that is located less than 10 miles from the nuclear power reactor site(s), must have a backup facility located between 10 miles and 25 miles of the nuclear power reactor site(s).
    [Show full text]
  • Gao-13-743, Nuclear Power
    United States Government Accountability Office Report to Congressional Requesters September 2013 NUCLEAR POWER Analysis of Regional Differences and Improved Access to Information Could Strengthen NRC Oversight GAO-13-743 September 2013 NUCLEAR POWER Analysis of Regional Differences and Improved Access to Information Could Strengthen NRC Oversight Highlights of GAO-13-743, a report to congressional requesters Why GAO Did This Study What GAO Found The 2011 disaster at Japan's The Nuclear Regulatory Commission (NRC) relies on its staff’s professional Fukushima Daiichi Nuclear Power judgment in implementing its processes for overseeing the safety of U.S. Plant demonstrated that unexpected commercial nuclear power reactors. In implementing this oversight, NRC nuclear accidents with extreme allocates specific roles and responsibilities to resident inspectors assigned to consequences can occur and, thus, each plant, regional officials at one of four regional offices responsible for most heightened concerns about NRC’s oversight activities, headquarters officials, and the nuclear power industry. NRC ability to oversee the safety of U.S. also builds into its processes incentives for plant managers to identify concerns commercial nuclear power reactors. about reactor safety, report those concerns to NRC, and take prompt actions to NRC oversees safety through multiple correct them. NRC’s processes for identifying and assessing findings and processes, such as physically violations are based on prescribed agency procedures and include several points inspecting reactors and also responding to signs of declining where NRC staff must exercise their professional judgment, such as determining performance (i.e., findings) or whether issues of concern identified during physical inspections constitute violations of its requirements.
    [Show full text]