Request for Proposals

Total Page:16

File Type:pdf, Size:1020Kb

Request for Proposals REQUEST FOR PROPOSALS Design Services for Master Planning & Concept Design for Block 27 Redevelopment (City Square West) in Historic Downtown Chaska Chaska, Minnesota August 4, 2017 SECTION I – GENERAL INFORMATION 1. Background The City of Chaska, Minnesota, was founded in 1854 and has a current population of 26,500. Chaska is located about 18 miles southwest of downtown Minneapolis on the Minnesota River, and is a developing community at the edge of the Twin Cities’ metro area. Chaska’s mission statement is “to be the Best Small Town in Minnesota” and its primary goal is to “maintain its unique, historic, small town image, and sense of community while supporting well planned, orderly growth”. In short, Chaska’s goal is to enhance community character through growth. Block 27 (City Square West) is located in Historic Downtown Chaska. It is bounded on the north by Fourth Street, on the west by Pine Street, on the south by Third Street, and on the east by Chestnut Street (TH41). For several decades, the site was host to the Carver County Courthouse and County Library, a two-story, Italianate-style building that proudly fronted City Square Park, until it was replaced in 1966. Today the site contains a bank, post office, and a mix of various retail uses including restaurants, laundromat and surface parking lots. The buildings on this block are primarily one-story structures, oriented more toward the automobile (parking lots and drive-thru facilities) than the pedestrian (streets and sidewalks). This pattern of development is consistent with their period of construction but does not reflect the character or development patterns of historic downtown Chaska. 2. Summary of Project Scope Chaska’s Downtown Master Plan (2012) identified Block 27 as one of three “catalyst sites”. The redevelopment of these catalyst sites are to provide for an identifiable concentration of desirable amenities that collectively create an economic “value premium” in the downtown. The $26 million dollar Firemen’s Park/Curling Rink/Event Center which was redeveloped in 2015 was also identified as a catalyst site. The Downtown Master Plan envisions the redevelopment of Block 27 as a self-parked mixed use site; containing retail, multi-family residential, civic and public parking facilities. Traditional storefront buildings that complement downtown’s historic character and scale are recommended. An aspect of the Downtown Master Plan, relative to Block 27, which has gained significant community and political traction is the inclusion of a major civic use on this site; namely a new public library. The existing library is located within City Hall (to the north of Block 27) and is significantly undersized based on the size of the community. The Carver County Library model is one in which Cities are responsible for the construction of the library building and the County is responsible for the staffing, stacking and programming of the facility. The City is interested in understanding the best way to locate the library and other complementary uses on the site; so as to maximize the mixed-use utilization of the block and to ensure that this block maximizes its catalytic potential for downtown Chaska, both inside and outside the building(s). 3. Supporting information, documents and studies The City is currently working with the owners of the block to conduct an ALTA survey of the block and to acquire preliminary soil boring information on the properties. The City anticipates that this work will be available prior to the commencement of this project and provided to the selected consultant team to assist in analysis and planning efforts. The City has a number of documents & studies which are relevant to the redevelopment of this block can be found at on the project web site: (http://www.chaskamn.com/174/Current-Projects - Block 27 - City Square West) 4. Primary point of contact and Schedule Questions can be directed to Kevin Ringwald, Community Development Director at 952- 448-9200 or [email protected]. All questions and responses will be posted on the project website (http://www.chaskamn.com/174/Current-Projects/CitySquareWest). • RFP released: Friday, August 4th 2017 • Proposals Due: Friday, August 18th 2017 (by 4pm) • Short-listing of firms: week of August 28th 2017 • Interviews: week of September 18th 2017 • Notify Selected Consultant: week of September 25th 2017 • Service Agreement/Contract Completed: Monday, October 2nd 2017 • Begin Scope of Work: Tuesday, October 3rd 2017 The detailed schedule and overall duration of the project will be coordinated with the selected consultant with a final completion date no later than May 1, 2018. 5. Terms This is a Request for Proposals (RFP) and in no way obligates the responder to enter into a relationship with the City. Nor does this RFP obligate the City to enter into a relationship with any entity that responds, nor does it limit or restrict the City’s right to enter into a relationship with any entity that does not respond to this RFP. In its sole discretion, the City may pursue discussions with one or more entities responding to this RFP, or none at all. The City further reserves the right, in its sole discretion, to cancel this RFP at any time for any reason. All costs associated with responding to this RFP will be solely at the responder’s expense. SECTION II – SCOPE OF SERVICES 1. Existing Facility Assessment The City Square West site, in its current state, includes existing buildings and surface parking. Planning options for future development may include adaptive reuse of one or more of the existing buildings. To better understand the feasibility and suitability of including existing buildings in future development, the Consultant shall provide an Existing Facility Assessment. The Existing Facility Assessment should include, but is not limited to, technical assessments and findings for architectural, structural, mechanical, life safety, and electrical systems. Deliverables: • A summary report of the Existing Facility Analysis by discipline and any associated conclusions/recommendations. 2. Review/Input and Community Engagement: Central to a successful master plan and concept design for the City Square West site is the inclusions of project stakeholders and the citizens of the City of Chaska. The master planning and concept design process seeks balance and consensus based on the diverse input received from all engaged parties. Input received through stakeholder input and the community engagement process shall inform and influence the master planning and concept design options. A City Council appointed Task Force will be formed to meet with and guide the consultant team. Community Engagement: The Consultant shall propose and facilitate a community engagement process that provides an inclusive and organized forum to solicit community input as it relates to development potential at the City Square West site. The Consultant shall propose a community engagement process that: invites broad input and participation, supports consensus building among large groups, and has demonstrated success in similar circumstances. The Consultant shall at a minimum prepare updates after each Task Force meeting and disseminate that information to the General Public, Ownership Group and City Employees. The Consultant shall also synthesize the information received and use it to inform future Task Force discussions. Deliverables: • Assume one(1) introductory meeting with the property owners • Assume six(6) meetings with the Task Force to seek input, review of in-process master planning and concept design work, and provide next-steps direction to consultant team. • Assume three(3) presentations to Chaska City Council and/or Chaska Planning Commission as directed by City staff • Assume two(2) community engagement sessions • Summaries of additional/necessary public outreach activities • Documentation of input and review comments from each meeting noted above 3. Site Analysis and Master Planning The City of Chaska has completed thorough and comprehensive site analysis and planning efforts intended to guide future development through visionary, sustainable, and coordinated planning principles. In order to ascertain the highest and best use of the City Square West site, the Consultant shall review the City’s goals and guidelines for development of this site as described in the City of Chaska 2030 Comprehensive Plan, Chaska Downtown Master Plan and other relevant documents found on the project web site. Based upon the City’s planning vision/guidelines, the Consultant shall prepare a minimum of three (3) preliminary master plan options exploring the “highest and best use” of the site. Master planning options shall be presented and reviewed with stakeholders and the Chaska community. Review comments and constructive suggestions shall inform and influence a final master plan concept. (Note: Given the mixed-use intent for the site, select areas of the master plan should be considered flexible to accommodate varied uses) Deliverables: • Site analysis notes/diagrams if deemed necessary to supplement existing planning information • Three (3) (minimum) Preliminary Master Plan Concepts communicated through clear illustrations/graphics and relevant metrics (building areas per program, parking capacity, blocking and stacking concepts, etc.) • One (1) Final Master Plan Concept communicated through clear illustrations/graphics and relevant metrics (building areas per program, parking capacity, blocking and stacking concepts, etc.) 4. Concept Design Building
Recommended publications
  • 1 Sec. 14-1, Comprehensive Zoning Ordinance SECTION I
    City of Terrell Hills Code Chapter 14--Zoning Sec. 14-1, Comprehensive Zoning Ordinance SECTION I: PURPOSE A. The City of Terrell Hills, Texas hereby adopts the following provisions of TITLE 7. REGULATION OF LAND USE, STRUCTURES, BUSINESSES, AND RELATED ACTIVITIES of the Texas Local Government Code as amended: 211 Municipal Zoning Authority 212 Municipal Regulation of Subdivisions and Property Development 213 Authority of Municipalities to Establish Building Lines 214 Municipal Regulation of Structures 215 Municipal Regulation of Miscellaneous Businesses and Other Activities 216 Regulation of Signs by Municipalities B. The zoning map and zoning regulations herein provide a comprehensive plan designed to lessen congestion in the streets, secure safety from fire, panic, and other dangers, promote health and the general welfare, provide adequate light and air, prevent overcrowding of land, avoid undue concentration of population, and facilitate the adequate provision of transportation, water, sewers and other public requirements. They have been prepared with careful consideration for particular uses, the conservation of the value of both land and improvements and the encouragement of the most appropriate uses of property throughout the City of Terrell Hills. SECTION II: GENERAL A. Zoning regulations and districts as herein set forth are approved and established. The City of Terrell Hills is hereby divided into districts of which there shall be three designated as: A Residential B Semi-commercial C Commercial B. The C Commercial District shall include: 1. The area at the northeast corner of the City between Rittiman Road and Eventide Drive and extending from Harry Wurzbach Highway west consisting of Lots 27, 30, 32 and 33 of Block 15, CB5848A.
    [Show full text]
  • Department of Architecture
    建築学セミナー Introduction to Architecture [Instructor] Hiroki Suzuki, Tatsuya Hayashi [Credits] 2 [Semester] 1st year Spring-Fall-Wed 1 [Course code] T1N001001 [Room] Respective laboratories *Please check the bulletin board of Department of Architecture , that will noticed where the lecture is held [Course objectives] Students and faculty members think together about study methods and attitudes as well as how to be aware of and interested in issues in the Department of Architecture. In particular, this course aims to teach the basic understanding of the fields of urban environmental and architectural planning as well as building structure design and to facilitate forming the basis of communication between the students and faculty members, by exposing the students in class in seminar format to educational research contents in each educational research field of the Department of Architecture. [Plans and Contents] Groups of about 10 students each will be formed. Each group will take a class in seminar format covering a total of four educational research fields and spend three to four weeks per field. The three to four week-long seminar for each field will be planned according to the characteristics of educational research in each field. [Textbooks and Reference Books] Not particularly [Evaluation] The grade will be determined by the average score ( if absent or not turned in) of exercises to be occasionally given during the lecture hours. Students will not be graded if they do not meet the rule of the Faculty of Engineering on the number of attendance days. [Remarks] Students will be assigned to their group in the first week.
    [Show full text]
  • Submission Instructions Is One Part of the Project Design Contracting Documents, Which Also Includes the Statement of Work and VA and NCA Design Criteria
    A/E Submission Requirements for National Cemetery Projects Program Guide PG 18-15 Volume D December 2011 FOREWORD This document states the minimum requirements for each submission in the production of VA Master Plans, Schematic Design, Design Development, Construction Documents, and Record Documents for National Cemetery Projects. It will give VA reviewers and Architects and Engineers a clear understanding of the minimum submission requirements of the A/E, including level of detail expected for each stage of design, itemized for each discipline. The A/E Submission Instructions is one part of the project design contracting documents, which also includes the Statement of Work and VA and NCA design criteria. This guide contains the vast majority of submission requirements for each discipline and the expected level of development at each phase of a national cemetery design project. It is not intended to be project specific. Not all disciplines will be involved in all projects. Therefore it is recommended that the project specific Statement of Work be the starting point for determining the actual submission requirements for each project. This document does not relieve A/E firms of their professional responsibility to produce a correct, complete, and fully coordinated set of construction documents for the successful completion of a project. Robert L. Neary Jr. David K. Schettler Acting Director, Office of Construction and Facilities Deputy Undersecretary for Management Management National Cemetery Administration ACKNOWLEDGEMENTS Many professionals at the Department of Veterans Affairs contributed their expertise to create this edition of PG 18-15, Volume D. Chief among them are: Donald L. Myers, Chief Facilities Quality Service (CFM) Rick Petersen, NCA Team Leader (CFM) Margaret Jensen, Architect (NCA) Jeet Kumar, Architect (CFM) Katti Zand, Project Manager (CFM) Sekhar Datta, General Engineer (CFM) Mo Ghorbanpour, General Engineer (CFM) Vijay P.
    [Show full text]
  • A/E Submission Instructions
    October 2010 revised August 1, 2013 ACKNOWLEDGEMENTS Many professionals at the Department of Veterans Affairs generously contributed their expertise to guide this edition of PG 18-15, Volume B. Chief among them are: Kurt D. Knight Director, Facilities Quality Service Sat Gupta Chief, Consulting Support Service Robert Smoot Chief, Cost Estimating Service Jeet Kumar Architect Krishna Banga Structural Engineer Robert Clifton Project Manager Dan Colagrande Architect Sekhar Datta General Engineer Byron Geddings Project Manager Asok Ghosh Structural Engineer William Goodman General Engineer Chanda P. Joshi Project Manager Vijay P. Kanodia General Engineer Larry Lau Electrical Engineer Kashief Moody Mechanical Engineer (student) Donald L. Myers Architect Mahmut Nazli Mechanical Engineer Robert Nowak Contract Specialist Brian T. Phillips Automated Transport Consultant Dennis Sheils Management & Program Analyst Nancy Z. Sussman Management & Program Analyst Jay Sztuk Architect Mark Wiersma General Engineer Renee Tietjen Architect Lam Vu Electrical Engineer. This edition was created by the National Institute of Building Sciences, working with the following subject matter experts: • John K. Dennington, Weidlinger Associates Inc. • Brian E. Garbecki, Gilbane Building Company • Christopher Kirchner, Syska Hennessey Group Inc. • Jason Richardson, NBBJ • Tom O. Sachs, Oudens Knoop Knoop + Sachs Architects • Kenneth Schram, Syska Hennessey Group Inc. • Peggy Van Eepoels, Weidlinger Associates Inc. National Institute of Building Sciences 1090 Vermont Avenue
    [Show full text]
  • From the President from the President 2
    International Press-in Association www.press-in.org Volume 2, Issue 2 June 2017 INSIDE THIS ISSUE Message 1. Message (P1) from the President from the President 2. Special Contribution (P2) Dr. Osamu Kusakabe I - Construction 3. On-site interview (P12) The General Assembly of the year of 2017, held in June, adopted the major amendment of the Constitution for the first time since IPA’s establishment in 2007. 4. Report (P17) The contents of By-laws and Regulations will be discussed at the first Board Meeting JPA Activities to be held in July, 2017, specified in the Constitution. It will facilitate the efficiency and productivity of IPA management. JPA - IPA 5. Serial Reports (P19) The General Assembly also endorsed the change of the Board Members. The list Cambridge - GIKEN below gives the outgoing and the incoming members of IPA Board Members. Many thanks go to the outgoing Board Members for their great contributions during the 6. Event Report (P22) terms. Very warm welcome goes to the new Board Members. Kumamoto Workshop Incoming Directors and Auditors 7. Announcement (P23) Michael Doubrovsky Kenneth Gavin Stuart Haigh 8. Event Diary (P24) Yukihiro Ishihara Masayuki Koda Andrew McNamara 9. Corporate Members (P25) Jun Otani Rodrigo Salgado Jiro Takemura 10. Editorial Remarks (P27) Hiroyuki Yasuoka Nor Azizi Bin Yusoff (11 Directors) Yoshihisa Fujisaki Albert T. Yeung ( 2 Auditors) Outgoing Directors, Auditors and Secretary General Robert D. Holtz Leo A. Hubert, Jr. Barry M. Lehane EDITORIAL BOARD Hiroaki Tanouchi A. Frits van Tol ( 5 Directors) Osamu Kusakabe Adrian F.L. Hyde Kazuyoshi Ishii ( 2 Auditors) Limin Zhang Andrew McNamara As was extensively reported in March issue, IPA seminar on Press-in Technology in Yukihiro Ishihara Singapore in March was a very successful event.
    [Show full text]
  • Refinement 17.2 Constructability Assessment
    TREASURE CONSTRUCTABILITY ASSESSMENT REPORT June 26, 2017 MPE INC. PO BOX 2429 PARK CITY, UTAH 84060 [email protected] June 26, 2017 Pat Sweeney MPE, Inc. P.O. Box 2429 Park City, Utah 84060 RE: Treasure Project Constructability Assessment This Report is an overview study of the constructability of the Treasure Project. The following planned construction methods and mitigation measures are outlined and support related activities defined. Excavation Estimated Material Quantities Excavated Material Management and Procedures Soils Management & Water Source Protection Soils Protocol Park City Municipal Corporation (PCMC) Water Sources Storm Water Management Construction Phase Post Construction Service Utilities Existing Facilities Anticipated PCMC Utility Improvements Updated Services Provider Letters Construction Phase Activities Employee Transportation Materials Delivery Overview of Construction Methodology General Outline of Project Schedule ___________________________ Rob Robert McMahon J, PMcMahon.E. 1352 White Pine Canyon Rd P.O. Box 2864 Park City, Utah 84068 (435)640-8777 www.alta-engr.com 2 SUMMARY This report brings together items that are anticipated to be encountered in the construction phase of the Treasure Project. The scope of the following construction items are defined together with mitigation measures. It is expected that the following construction items and mitigation measures will be augmented and further defined in the final design and review processes related to building permit application(s). The construction related items methodology and design have been defined and evaluated by professional consultants and references to supporting reports and documentation are provided. PRE-DEVELOPMENT SITE The existing geology and soil of the Treasure Site is characterized by a series of soil reports prepared for the Treasure Site and are assembled in the Historical Soils Reports ( ref.
    [Show full text]
  • Case Studies of Advanced Construction and Demolition Waste(CDW) Recycling Initiatives and Technologies in JAPAN”
    Case studies of Advanced Construction and Demolition waste(CDW) Recycling initiatives and technologies In JAPAN March,2019 Promotion Council for Recycling Construction Materials and Wastes Introductory notes on “Case studies of Advanced Construction and Demolition waste(CDW) Recycling initiatives and technologies In JAPAN” We act as the world top runner in terms of the policy system, actual recycli n g rate, and recycle technologies in the course of challenging to the Construction and Demolition waste (CDW) Recycling of Japan. (Refer to the description of following pages.) The Promotion Council for Recycling Construction Materials and Wastes has pushed forward various activities, such as preparation of this “Case Studies”, etc. With these activities, the academic, business, and government will deliver jointly the informat ion on advanced CDW recycling initiatives and technologi e s in Japan from Tokyo to all sections of Japan and further to the world. Such activities were motivated by the opportunity of Japan attracting the world attentions because of The 2020 Tokyo Olympic and Paralympic Games This “Case Studeis” has been compiled through cooperation of those concern ed and will be reviewed as required from time to time. Note that this “ Case Studeis” is available in PDF form from the following address: https://www.suishinkaigi.jp/en/works. html March, 2019 Promotion Council for Recycling Construction Materials and Wastes (Secret ariat; Advanced Construction Technology Center (ACTEC)) Construction and Demolition Waste(CDW) Recycling
    [Show full text]
  • DAVITA DIALYSIS CLINTON, MO 604 Kansas Avenue Clinton, MO 64735
    PROJECT MANUAL / SPECIFICATIONS DAVITA DIALYSIS CLINTON, MO 604 Kansas Avenue Clinton, MO 64735 for DAVITA PULSE PROJECT NO. 12102 SET NO. Pulse Design Group, Inc. ARCHITECTURE/INTERIORS/ MEDICAL EQUIPMENT (913) 438-9095 PROJECT MANUAL/SPECIFICATIONS For DAVITA DIALYSIS CLINTON, MO 604 Kansas Avenue Clinton, MO 64735 for DAVITA Pulse Design Group, Inc. ARCHITECTURE/INTERIORS/ MEDICAL EQUIPMENT 8207 Melrose Drive, Suite 145 Lenexa, Kansas 66214 (913) 438-9095 (913) 438-2660 FAX Malone Finkle Eckhardt & Collins, Inc. MECHANICAL / ELECTRICAL ENGINEERS 8700 Indian Creek Parkway, Ste 180 Overland Park, KS 66210 (913) 322-1400 (913) 825-6697 FAX __________________________________________________ Specification Date: July 1, 2013 __________________________________________________ This Project will not be constructed with Federal assistance Architect's Project No 12102 DAVITA DIALYSIS CLINTON, MO 604 Kansas Avenue Clinton, MO 64735 For DAVITA PULSE Project No. 12102 INDEX DIVISION 1 - GENERAL REQUIREMENTS Invitation to Bid Instructions to Bidders Bid Form Form of Bid Bond (AIA Document A310-1970) Form of Agreement (AIA Document A101-2007) Performance Bond and Payment Bond (AIA Document A312-1984) General Conditions of the Contract for Construction (AIA Document A201-2007) Supplementary General Conditions 01000 - Summary of Work 01027 - Applications for Payment 01035 - Modification Procedures 01040 - Coordination 01045 - Cutting & Patching 01050 - Field Engineering 01095 - Reference Regulations, Guidelines & Definitions 01100 - Enumeration of Contract
    [Show full text]
  • Measures Taken in Construction and Demolition Waste (CDW) Recycling in Japan
    Measures Taken in Construction and Demolition Waste (CDW) Recycling in Japan Environment and Recycle Planning office, Policy Planning and Coordination Division for Public Works Project, Policy Bureau, MLIT, Japan Ministry of Land, Infrastructure, Transport and Tourism History of dealing with waste in japan (Excretion treatment→Waste treatment→Sound Material-Cycle Society) Sanitary issues Public Cleansing Act (1954) Garbage and excretion were disposed of by ocean disposal and land disposal Mosquitoes and fly arise from waste disposal sites →Sanitary control required(since the 1945's) Pollution issues Waste Disposal and Public Cleansing Act (1971) Increase in waste volume due to rapid economic growth →Waste treatment by not only municipalities but also businesses is required. Construction of incineration plants and landfill sites (since the 1955's) Environmental and resource issues Recycling law according to the individual waste (1995~~~), Proper treatment and utilization of waste, Construction Materials Recycling Act (2000) More momentum on environmental issues Basic Act on Establishing a Sound Material-Cycle →Proper circulative resource such as recycling Society(2001) is necessary(since the 1989's) 1 -1- What is a Sound Material-Cycle Society ? a "Sound Material-Cycle Society" means a society in which the consumption of natural resources will be conserved and the environmental load will be reduced to the greatest extent possible, by preventing or reducing the generation of wastes(Basic Act on Establishing a Sound Material-Cycle Society
    [Show full text]
  • City of Charlotte, NC Request for Qualifications For
    City of Charlotte, NC Request for Qualifications for Progressive Design-Build Services for CMPD Northwest Division Office RFQ #: 2021-512 This REQUEST FOR QUALIFICATIONS (“RFQ”) from the Owner named below invites the submittal of a Statement of Qualifications (“SOQ”) from firms interested in providing Progressive Design-Build services for the Project described below. By submitting a SOQ, the Respondent represents that it has carefully read the terms and conditions of this RFQ and all attachments and Addenda and agrees to be bound by them. This RFQ is not an offer to enter into a contract, but merely a solicitation of persons interested in submitting SOQ to the Owner for the Project. DATE ISSUED: August 10, 2020 OWNER: City of Charlotte PROJECT: CMPD Northwest Division OWNER CONTACT PERSON: Maria Miles, [email protected] SOQ DUE DATE AND TIME Respondent’s SOQ shall be submitted no later than: September 23th, 2020 at 2:00 p.m. All SOQs must be submitted pursuant to the instructions herein. It is the Respondent’s sole responsibility to ensure that the SOQ is delivered in the manner required by this RFQ by the Due Date and Time. Owner has the right to reject any SOQs not properly delivered. DBIA Document No. 405 RFQ #2021-512: Progressive Design-Build Services Standard Form of Request for Qualifications for the CMPD Northwest Division Office © 2016 Design-Build Institute of America Page 1 TABLE OF CONTENTS SECTION 1: OWNER DESCRIPTION .....................................................................................................
    [Show full text]
  • Chapter 30: Zoning Ordinance
    Updated 02-28-20 Newton City Ordinances Volume II Newton, Massachusetts Chapter 30: Zoning Ordinance December 31, 2017 PAGE INTENTIONALLY LEFT BLANK ii Chapter 30: Zoning Ordinance | Newton, Massachusetts Table of Contents Article 1. General Provisions .......................1-1 Article 6. Use Regulations ......................... 6-1 Sec. 1.1. Short Title ......................................................... 1-2 Sec. 6.1. Use Determination ............................................6-3 Sec. 1.2. Purpose of Chapter .......................................... 1-2 Sec. 6.2. Residential Uses ............................................... 6-3 Sec. 1.3. Zoning Districts Established ............................. 1-2 Sec. 6.3. Civic/Institutional Uses .................................. 6-6 Sec. 1.4. Legal Status Provisions .................................... 1-3 Sec. 6.4. Commercial Uses ........................................... 6-10 Sec. 1.5. Rules of Measurement ...................................... 1-4 Sec. 6.5. Industrial Uses ................................................ 6-14 Sec. 6.6. Open Space Uses .......................................... 6-16 Article 2. Public Use & Open Space Districts 2-1 Sec. 6.7. Accessory Uses ............................................. 6-17 Sec. 2.1. Zoning District Intent ........................................ 2-2 Sec. 6.8. Temporary Uses ............................................. 6-22 Sec. 2.2. District Dimensional Standards ........................ 2-2 Sec. 6.9. Wireless Communication Equipment
    [Show full text]
  • BIM Implementation in China: a Case Study Approach Jiang Bo ,Rana Raheel Afzal Khan , Ahmed Vian and Cheng Zhijun
    International Conference on Information Technology and Management Innovation (ICITMI 2015) BIM Implementation in China: A Case Study Approach Jiang Bo1, a *,Rana Raheel Afzal Khan2,b , Ahmed Vian 2,c and Cheng Zhijun1,d 1 China Academy of Building Research, 30#, Bei San Huan Dong Lu, China 2 The University of Salford, The Crescent, Salford, M5 4WT, UK [email protected], b [email protected], c [email protected], [email protected] Keywords: Building Information Modelling (BIM); Sustainability; Implementation; Strategy; Standards; Case Studies Abstract. The term of Building Information Modelling (BIM) has become ubiquitous in construction industry of China. The purpose of this study is to investigate implementation of BIM in construction industry in China, including the BIM strategy, the BIM standards, and the projects that utilized BIM and so on. The methodology for this paper is based on a literature review of the strategy, the standards in relation to BIM and a detailed case study of 30 BIM implementation projects in construction industry in China. A range of key factors that affected the BIM implementation and the initiatives to accelerate the BIM development in China were found in this paper, such as the BIM standards system, the BIM commercial model, BIM contribution to sustainability and so on. From the research findings, some conclusions and recommendations were drawn to explore effective ways to promote the BIM implementation in China. Introduction The root of BIM of China can be traced back to 80’s last century when software only partly used on simple affairs such as words editing, construction calculation and drawing since mainframe computers were expensive with low speed and few personal computers were available.
    [Show full text]