Roads and the Environment a Handbook

Total Page:16

File Type:pdf, Size:1020Kb

Roads and the Environment a Handbook WORLD BANK TECHNICAL PAPER NO. 376 Roads and the Environment A Handbook Edited by Koji Tsunokawa ChristopherHoban The World Bank Washington,D.C. Copyright © 1997 The International Bank for Reconstruction and Development/THE WORLD BANK 1818 H Street, N.W. Washington, D.C. 20433, U.S.A. All rights reserved Manufactured in the United States of America First printing November 1997 Technical Papers are published to communicate the results of the Bank's work to the development community with the least possible delay. The typescript of this paper therefore has not been prepared in accordance with the procedures appropriate to formal printed texts, and the World Bank accepts no responsibility for errors. Some sources cited in this paper may be informal documents that are not readily available. The findings, interpretations, and conclusions expressed in this paper are entirely those of the author(s) and should not be attributed in any manner to the World Bank, to its affiliated organizations, or to members of its Board of Executive Directors or the countries they represent. The World Bank does not guarantee the accuracy of the data included in this publication and accepts no responsibility whatsoever for any consequence of their use. The boundaries, colors, denominations, and other information shown on any map in this volume do not imply on the part of the World Bank Group any judgment on the legal status of any territory or the endorsement or acceptance of such boundaries. The material in this publication is copyrighted. Requests for permission to reproduce portions of it should be sent to the Office of the Publisher at the address shown in the copyright notice above. The World Bank encourages dissemination of its work and will normally give permission promptly and, when the reproduction is for noncommercial purposes, without asking a fee. Permission to copy portions for classroom use is granted through the Copyright Clearance Center, Inc., Suite 910, 222 Rosewood Drive, Danvers, Massachusetts 01923, U.S.A. The complete backlist of publications from the World Bank is shown in the annual Index of Publications,which con- tains an alphabetical title list with full ordering information. The latest edition is available free of charge from the Dis- tribution Unit, Office of the Publisher, The World Bank, 1818 H Street, N.W.,Washington, D.C. 20433,U.S.A., or from Publications, The World Bank, 66, avenue d'Iena, 75116Paris, France. ISSN:0253-7494 Koji Tsunokawa is senior transport specialist in the Infrastructure Development Group in the World Bank's Middle East and Nort Africa Regional Office.Christopher Hoban is a senior highway engineer in the World Bank's South Asia Infrastructure Sector Unit. Library of Congress Cataloging-in-Publication Data Roads and the environment: a handbook /edited by Christopher Hoban and Koji Tsunokawa. p. cm. - (World Bank technical paper; no. 376) Includes bibliographical references and index. ISBN 0-8213-4031-X 1. Roads-Environmental aspects. 2. Environmental impact analysis. I. Hoban, Christopher J., 1952- . II. Tsunokawa, Koji,1947- .111.Series. TD195.R63R63 1997 333.77-DC21 97-28971 CIP Tableof Contents Listof Boxes,Figures and Tables ............................................................ x Foreword .....................................xm Acknowledgements........................................................... xiv Abstract ........................................................... xv Executivesummay.xv PARTI - THEENVIRONMENTAL ASSESSMENT PROCESS Chapter1 Assessingthe environmental impact of roadprojects 1.1 Theenvironment and its ecosystems............................................................... 4 1.2 Roads,the environment,and the needfor environmentalassessment .................................. 4 1.3 New,existing, rural, and urbanproject settings ..............................................................5 1.3.1 New versus existing project types...................................................................... 5 1.3.2 Rural versus urban project typen............................................. .........................5 1.3.3 The "mixed" rural-urban project...................................................................... 6 1.4 Theenvironmental assessment (EA) ................................................................ 6 1.A.1 EA and road project development ...................................................................... 7 1.4.2 Types of EA ..................................................................... 8 1.5 Environmentalassessment at the projectlevel ............................................................ .. 8 1.5.1 The project-specificEA ...................................................................... 8 1.5.2 The programmatic or class EA...................................................................... 8 1.5.3 Summary or initial environmental evaluation (SEE/IEE) ................... .....................9 1.5.4 The regional EA (REA)...................................................................... 9 1.6 Environmentalassessment at the strategiclevel ........................................... 10 1.6.1 The sectoral EA (SEA)..................................................................... 10 1.7 EAduration and budget............................................................... 11 1.8 Referencesand bibliography.............................................................. 12 Chapter2 Environmentalassessment management and institutional issues 2.1 EAand institutionaldevelopment .............................................................. 14 2.2 Functionsto be performedand the needfor environmentalskills . 14 2.2.1 Developing the policy and legal directives............................................................... 14 2.2.2 Conducting the EA studies ..................................................................... 15 2.2.3 Implementing the environmental management plan (EMP).................................. 16 2.2.4 Managing the EA process ..................................................................... 17 2.3 Providingthe requisiteenvironmental training .............................................................. 18 2.4 Establishingthe institutionalstructures .............................................................. 19 2.5 Referencesand bibliography.............................................................. 22 Chapter3 An overviewof environmentalassessment planning and EA reporting 3.1 Earlyplanning of EA.............................................................. 24 3.2 Screeningand scoping............................................................... 24 3.2.1 Description of the need for a project..................................................................... 25 3.2.2 Description of the proposed project and alternatives ..............................................25 iii 3.2.3 Identification of valued ecosystem components (VECs) ........................................25 3.2.4 Evaluation of potential impacts for alternative solutions .......................................26 3.2.5 Early consultation ......................................... 26 3.2.6 Selection of preferred project (solution) and identification of EA type to be applied ........................................ 26 3.3 Preparationof theproject terms of reference .. 27 3.4 Space,time and consultation .. 27 3.4.1 Space.27 3.4.2 Time requirements for the environmental study .27 3.4.3 Consultation .29 3.5 Theenvironmental impact statement (EIS) .. 29 3.5.1 Executive summary ........................... 30 3.5.2 The environmental assessment team .......................... 30 3.5.3 Introduction and background .......................... 30 3.5.4 Approach and methodology .......................... 30 3.5.5 Existing conditions .......................... 30 3.5.6 Analysis of alternatives .......................... 30 3.5.7 The preferred design .......................... 31 3.5.8 The environmental management plan.......................... 31 3.5.9 Consultation ....... 31 3.5.10 References.31 3.5.11 Appendices.31 3.6 Presentinginformation with mapsIn the EA report . .31 3.7 Referencesand bibliography .. 32 Chapter4 Keysteps involved in undertakingan environmental assessment 4.1 Sevenkey steps .34 4.2 Descriptionof baselineconditions .. 34 4.2.1 Collecting and analyzing existing basic documents .............................................35 4.2.2 Assembling information from different sources ............................................. 35 4.2.3 Consultation with local residents and professionals .............................................35 4.2.4 The sampling design ............................................. 35 4.2.5 The field investigations............................................. 35 4.2.6 Tracking project-induced versus natural environrment changes................. .......... 36 4.3 Analysisof potentialenvironmental impacts .. 36 4.3.1 Determniningsignificance .36 4.3.2 Impact characteristics.36 4.3.3 Impact types .37 4.4 Consideraon of altematives........................... 37 4.4.1 Alternative designs .37 4.4.2 Analysis of alternatives .37 4.5 Planningremedial measures .. 38 4.5.1 Avoidance.38 4.5.2 Mitigation.38 4.5.3 Including consultation in mitigation planning .......................................... 40 4.5.4 Compensation .......................................... 41 4.6 Monitoringand evaluation ........................................................ 41 4.6.1 Compliance monitoring .........................................
Recommended publications
  • Responsive Contract Governance for the Provision of Ecosystem Services from Agricultural Land
    RIVISTA QUADRIMESTRALE DI DIRITTO DELL’AMBIENTE - Quarterly Journal of Environmental Law NUMERO 2 - 2016 ANDREA SABA Responsive contract governance for the provision of ecosystem services from agricultural land G. Giappichelli editore RIVISTA QUADRIMESTRALE DI DIRITTO DELL’AMBIENTE - SAGGI - ANNO 2016 / NUMERO 2 ANDREA SABA* Responsive contract governance for the provision of ecosystem services from agricultural land TABLE OF CONTENTS: 1. Introduction. – 2. Dealing with uncertainty, risk and change in agri-environmental contracts. – 3. Overarching conceptual framework on law and governance: a ‘zoomed out’ view. – 4. Towards responsive contract governance for the provision of ecosystem services. – 4.1. Adaptability in accommodating uncertainty and changes. – 4.2. Reflexivity in facilitating a fit between regulatory framework and contract governance. – 5. Conclusions. 1. Introduction Academic scholarship on the value of benefits we receive from nature traces its origin back for several decades. However, ecosystem services - whose term was coined in the late 1960s - have been mainstreamed with the publication of the Millennium Ecosystem Assessment in 20051. In the literature, a general shift is emerging in considering the concept from an original ecological and pedagogical perspective to an inclusion of economic, legal and institutional aspects in its relevance for public policy2. The production of ecosystem services from agricultural land was understood through the concept of multifunctional agriculture3. Within this line, the paradigm of social- ecological systems has been recently placed4. It focuses on the close * PhD Fellow at the Institute of Law, Politics and Development (Dirpolis), Scuola Superiore Sant’Anna, Pisa. 1 For access the documents, see the Millennium Ecosystem Assessment website at <http://www.millenniumassessment.org/en/Index-2.html> accessed 14 March 2016.
    [Show full text]
  • Buying Green! a Handbook on Green Public Procurement (3Rd Edition
    Buying green! A handbook on green public procurement 3rd Edition Environment 2 Important notice This handbook is an indicative document of the Commission services and cannot be considered binding to this institution in any way. It should also be noted that the content of the handbook is subject to the evolution of EU law, including the revision of the Procurement Directives and case-law of the Court of Justice. It represents the state of play as of February 2016. The third edition of the Handbook has been compiled under Contract № 071201/2014/692772//SER/ENV.F.1 between the European Commission and ICLEI – Local Governments for Sustainability, supported by Public Procurement Analysis (PPA). Europe Direct is a service to help you find answers to your questions about the European Union Freephone number (*): 00 800 67 89 10 11 (*) Certain mobile telephone operators do not allow access to 00 800 numbers or these calls may be billed. More information on the European Union is available on the Internet (http://europa.eu). Cataloguing data can be found at the end of this publication. Luxembourg: Publications Office of the European Union, 2016 Design: www.rebekkadold.de Layout: Stephan Köhler (ICLEI) ISBN: 978-92-79-56848-0 doi: 10.2779/246106 © European Union, 2016 Reproduction is authorised provided the source is acknowledged. Printed in Belgium Printed on recycled paper that has been awarded the EU Ecolabel for graphic paper (http://ec.europa.eu/environment/ecolabel) Contents 3 Introduction . 4 Chapter 4 – Selecting and excluding tenderers . 42 Green procurement: the essentials . 8 4.1 Introduction .
    [Show full text]
  • Taj Mahal Andyt & Nick Nixon Nikki Hill Selwyn Birchwood
    Taj Mahal Andy T & Nick Nixon Nikki Hill Selwyn Birchwood JOE BONAMASSA & DAVE & PHIL ALVIN NUMBER FIVE www.bluesmusicmagazine.com US $7.99 Canada $9.99 UK £6.99 Australia A$15.95 COVER PHOTOGRAPHY © ART TIPALDI NUMBER FIVE 6 KEB’ MO’ Keeping It Simple 5 RIFFS & GROOVES by Art Tipaldi From The Editor-In-Chief 24 DELTA JOURNEYS 11 TAJ MAHAL “Jukin’” American Maestro by Phil Reser 26 AROUND THE WORLD “ALife In The Music” 14 NIKKI HILL 28 Q&A with Joe Bonamassa A Knockout Performer 30 Q&A with Dave Alvin & Phil Alvin by Tom Hyslop 32 BLUES ALIVE! Sonny Landreth / Tommy Castro 17 ANDY T & NICK NIXON Dennis Gruenling with Doug Deming Unlikely Partners Thorbjørn Risager / Lazy Lester by Michael Kinsman 37 SAMPLER 5 20 SELWYN BIRCHWOOD 38 REVIEWS StuffOfGreatness New Releases / Novel Reads by Tim Parsons 64 IN THE NEWS ANDREA LUCERO courtesy of courtesy LUCERO ANDREA FIRE MEDIA SHORE © PHOTOGRAPHY PHONE TOLL-FREE 866-702-7778 E-MAIL [email protected] WEB bluesmusicmagazine.com PUBLISHER: MojoWax Media, Inc. “Leave your ego, play the music, PRESIDENT: Jack Sullivan love the people.” – Luther Allison EDITOR-IN-CHIEF: Art Tipaldi CUSTOMER SERVICE: Kyle Morris Last May, I attended the Blues Music Awards for the twentieth time. I began attending the GRAPHIC DESIGN: Andrew Miller W.C.Handy Awards in 1994 and attended through 2003. I missed 2004 to celebrate my dad’s 80th birthday and have now attended 2005 through 2014. I’ve seen it grow from its CONTRIBUTING EDITORS David Barrett / Michael Cote / Thomas J. Cullen III days in the Orpheum Theater to its present location which turns the Convention Center Bill Dahl / Hal Horowitz / Tom Hyslop into a dazzling juke joint setting.
    [Show full text]
  • World Bank Document
    E1940 vol. 2 REPUBLIC OF KAZAKHSTAN MINISTRY OF AGRICULTURE Public Disclosure Authorized INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT Public Disclosure Authorized SECOND IRRIGATION AND DRAINAGE IMPROVEMENT PROJECT Public Disclosure Authorized ENVIRONMENTAL MANAGEMENT PLAN (Draft) December 2007 Public Disclosure Authorized TABLE OF CONTENTS 1. INTRODUCTION 1.1. Background 1.2. Objective 1.3. IBRD Safeguard Policies 2. DESCRIPTION OF THE CURRENT SITUATION 2.1 Description of Physical Environment 2.2 Description of Biological Environment 3. POLICY, LEGAL AND INSTITUTIONAL FRAMEWORK 3.1. Policy Context 3.2. Legal Framework for Environmental Assessment/Management 3.3 Institutional Framework for Environmental Assessment/Management 4. DESCRIPTION OF PROJECT AND ALTERNATIVES CONSIDERED 4.1. Description of Project 4.2. Analysis of Project Alternative 5. ENVIRONMENTAL IMPACTS AND PREVENTIVE ACTIONS AND MITIGATION MEASURES 5.1. Anticipated Positive Environmental Impacts 5.2. Potential Negative Environmental Impacts 6. ENVIRONMENTAL MANAGEMENT PLAN 6.1. Mitigation Plan 6.2. Monitoring Plan 6.3. Institutional Strengthening 6.4. Schedule 6.5. Institutional arrangements 7. CONSULTATION WITH STAKEHOLDERS AND BENEFICIARIES 8. PROPOSED BUDGET ANNEXES Annex A Guidelines for Preparation of Site-Specific EMPs Annex B Environmental Clauses for Construction Contracts Annex C Terms of Reference for Environmental Specialist 2 ACRONYMS CWR Committee for Water Resources EA Environmental Assessment EIA Environmental Impact Assessment EMP Environmental Management
    [Show full text]
  • The Green Shift: Environmental Policies to Match a Changing Public Climate
    the green shift: environmental policies to match a changing public climate The Smith Institute The Smith Institute is an independent think tank that has been set up to look at issues which flow from the changing relationship between social values and economic imperatives. If you would like to know more about the Smith Institute please write to: the green shift the green Edited by Peter Bill The Director The Smith Institute 3rd Floor 52 Grosvenor Gardens London SW1W 0AW Telephone +44 (0)20 7823 4240 Fax +44 (0)20 7823 4823 Email [email protected] Website www.smith-institute.org.uk Designed and produced by Owen & Owen 2006 Green_Shift_Text_V1.qxd 17/11/06 10:42 am Page 1 THE SMITH INSTITUTE the green shift: environmental policies to match a changing public climate Edited by Peter Bill Published by the Smith Institute ISBN 1 905370 13 X © The Smith Institute 2006 Green_Shift_Text_V1.qxd 17/11/06 10:42 am Page 2 THE SMITH INSTITUTE Contents Preface By Wilf Stevenson, Director, Smith Institute 3 Introduction Peter Bill, Editor of Estates Gazette 4 Chapter 1. Protecting and improving our environment Rt Hon Gordon Brown MP, Chancellor of the Exchequer 8 Chapter 2. Forging an environmental contract Rt Hon David Miliband MP, Secretary of State for the Environment, Food & Rural Affairs 18 Chapter 3. Preventing a catastrophe Professor Sir David King, Chief Scientific Adviser to the UK Government 24 Chapter 4. Setting credible targets Dr Dieter Helm, Fellow of New College, University of Oxford, and Member of the 30 Ministerial Task Force on Sustainable Development Chapter 5.
    [Show full text]
  • Climate Change and Sustainable Consumption: What Do the Public Think Is Fair?
    Climate change and sustainable consumption: What do the public think is fair? Tim Horton, Natan Doron December 2011 This report explores public attitudes to fairness in the context of sustainable consumption and climate change. Evidence from many areas of behaviour suggests that views about fairness can be powerful in driving pro-social behaviours. This research, through a series of focus groups, explored strategies that can tap into people’s sense of fairness around sustainable consumption and climate change to see if this could build public support for behaviour change and sustainability policies. The report: • asks if people can look at climate change and sustainable consumption in terms of fairness; • explores the basis of views about fairness in this context and investigates the types of information required for people to look at the issue in this way; • considers the extent to which looking at climate change in terms of fairness can motivate support for behaviour change; and • examines what people think is fair in actions to reduce household CO2 emissions. www.jrf.org.uk Contents List of fi gures and tables 4 Executive summary 5 Introduction: Fairness and obligation as motivations for pro-environmental attitudes and behaviour 9 1 Climate change as a co-operation dilemma 13 2 The focus groups 29 3 Attitudes to climate change and carbon emissions 35 4 Attitudes to fairness in reducing household emissions 45 5 Participants’ changing attitudes in response to the focus groups 63 Conclusion: Lessons for policy-makers and advocates 67 Notes
    [Show full text]
  • Album of the Week: New Fries' More,Mike D’S Top 5 Can’T Miss Shows of December,The Roots Report: a Future
    HXC: Interview with Alex McCormick of PartyWolfe PartyWolfe are an unstoppable force making its way slowly into the Providence music scene. These fine gentlemen hail from New Bedford, Fall River and Providence, and share some members with notable bands like Math The Band The Band. PartyWolfe does exactly what their name says: They bring energy to any show they play. All the members have fantastic stage presence, but Mr. Alex McCormick, vocalist, is absolutely insane on stage. You’d think that this man was fueled by that cute energizer bunny. I was lucky enough to steal some time from Alex’s rad life to ask him some questions about PartyWolfe and his thoughts on music and performing live. Matt Morales (Motif): So, could you name the members in the band and what they do? Alex McCormick: I’m on vocals and am the whimsical weirdo. Andrew Victorino is Stick flipper/Skin Ripper. Dan Hetu plays what he’s coined the dumb guitar, aka the bass. Jeff McGowan is our lead guitar/main writer/pedal pusher, and Kyle Sousa likes to party. MM: How long have you guys been writing music together? Please tell me the guys in the band saw you singing at karaoke one drunken night and recruited you from there! AM: We’ve been writing together for a year and a half. Kyle re-discovered me making an exchange with my local liquor dealer in Fall River at Sterlings Package Store. We went out, partied in Providence and I drunkenly free-styled vocals over some instrumentals in his car.
    [Show full text]
  • Worcestershire County Council
    WORCESTERSHIRE COUNTY COUNCIL MINERALS AND WASTE LOCAL DEVELOPMENT FRAMEWORK Pre-submission consultation statement (Regulation 30 document) 30: Pe-Submission Consultation Statement 28th November 2011 1 Contents 1. Introduction ................................................................................................. 4 2. Pre-commencement Consultation ............................................................. 6 Planning the Best Practicable Environmental Option (BPEO) (March – April 2003) ............................................................................................................ 6 The Joint Municipal Waste Management Strategy for Herefordshire and Worcestershire 2004-2034 (JMWMS) .............................................................. 8 Statement of Community Involvement .............................................................. 9 Planning Issues and Options for Managing Waste in Worcestershire – Evidence Gathering in Preparation of the Core Strategy .................................. 9 Responses .................................................................................................. 10 Sustainability Appraisal (April 2005) ............................................................... 10 Sustainability Appraisal, Waste Core Strategy: Scoping Report (July 2005) .. 11 “Moving Towards the Identification of Preferred Options” ............................... 11 Sustainability Appraisal of the Waste Core Strategy Issues and Options Consultation ..................................................................................................
    [Show full text]
  • On the Road with President Woodrow Wilson by Richard F
    On the Road with President Woodrow Wilson By Richard F. Weingroff Table of Contents Table of Contents .................................................................................................... 2 Woodrow Wilson – Bicyclist .................................................................................. 1 At Princeton ............................................................................................................ 5 Early Views on the Automobile ............................................................................ 12 Governor Wilson ................................................................................................... 15 The Atlantic City Speech ...................................................................................... 20 Post Roads ......................................................................................................... 20 Good Roads ....................................................................................................... 21 President-Elect Wilson Returns to Bermuda ........................................................ 30 Last Days as Governor .......................................................................................... 37 The Oath of Office ................................................................................................ 46 President Wilson’s Automobile Rides .................................................................. 50 Summer Vacation – 1913 .....................................................................................
    [Show full text]
  • In Serving the a 3AY Kunino Needs of the ONZN CZ Music & Record 11111 NY1NZOM Industry CI Cuvh3ra World Ho-S
    1111110!!:3H record !!!!- Dedicated To dOHSzoos-3 NNIn Serving The A 3AY kunino Needs Of The ONZN CZ Music & Record 11111 NY1NZOM Industry CI cuvH3ra world ho-s eptemter6, 1969 60c In the opinion of the editors, this week the following records are the SINGLE PICKS OF THE WEEK WHO IWAINTIMRWMA IN THE IOVI 01INI COON PEON MAW MD 0 00V Elvis Presley sings one of TheWinstonswillfollow- JamesBrown,whokeeps The Monkees bestrecord the songs fromhis Vegas up "Color Him Father" with combiningthebeatwith is now on the market. It's WORLD act, "Suspicion Minds" a smash. It's "Love of the thesocialmessage suc- called "Mommy andDad- (Press,BMI), whichisas Common People" (Tree, cessfully, has "World" dy" (Screen Gems -Columbia, good as anything's he's BMI) and has a won't -quit (Brown. BMI)intwo parts BMI)andMonkeeDolenz done (RCA 47-9764). beat (Metromedia 142). andit'llgo (King 6258). wrote it (Co!gems 5005). SLEEPER PICKS OF THE WEEK CatMotherand theAll The Baskerville Hounds are EdwardsHandis a new CaptainMilk(EdwinHub- NightNewsboysask the thefirst group from Avco duoproducedby George bard) plays the flute with vitalquestion,"Can You Embassy andtheirrocky Martin. Their first single is great facility,and crowds Dance to It?" (Cat Mother- initial release is oldie "If I Thought You'dEver willlovethisrepriseof Emm - Jay - Sea - Lark, EMI) "HoldMe"(Robbins, AS - Change Your Mind" (Al Gal- "Hey, Jude" (Maclen, BMI) (Polydor14007). CAP). Hot (4504). lico,BMI) (GRT13). (Tetragrammaton 1542). At Atlantic Signing To ALBUM PICKS OF THE WEEK Distribute Stone Flower Label, from Left: Atlantic VP Nesuhi Ertegun, Dave Kapralik, Stone Flower's Legal Counsellor Marty Machattlan-tic Exec VP JudyCollinsispresented The Vogues' "Memories" John Mayall, alongwith RobertaFlackwhoplays on "Recollections" in a extend back into the '50s Jon Mark, Steve Thompson piano and sings somewhere Jerry Wexler and, Seated, number of folk songs she when "Moments to Remem- and Johnny Thompson, bow between Washington, D.
    [Show full text]
  • The Urban Environment Cm 7009
    ROYAL COMMISSION ON ENVIRONMENTAL POLLUTION The Urban Environment Cover images Far left image of Brindleyplace, Birmingham reproduced by kind permission of David Borgan. © Crown copyright 2007 The text in this document (excluding the Royal Arms and departmental logos) may be reproduced free of charge in any format or medium providing that is reproduced accurately and not used in a misleading context. The material must be acknowledged as Crown copyright and the title of the document specified. Any enquiries relating to the copyright in this document should be addressed to the Licensing Division, HMSO, St Clements House, 2-16 Colegate, Norwich NR3 1BQ. Fax 01603 723000 or email licensing@cabinet-office.x.gsi.gov.uk ROYAL COMMISSION ON ENVIRONMENTAL POLLUTION CHAIRMAN: SIR JOHN LAWTON CBE, FRS Twenty-sixth Report The Urban Environment Presented to Parliament by Command of Her Majesty March 2007 Cm 7009 £32.50 PREVIOUS REPORTS BY THE ROYAL COMMISSION ON ENVIRONMENTAL POLLUTION Special report Crop Spraying and the Health of Residents and Bystanders ...................September 2005 25th report Turning the Tide – Addressing the Impact of Fisheries on the Marine Environment ........................................... Cm 6392, December 2004 Special report Biomass as a Renewable Energy Source ........................................ April 2004 24th report Chemicals in Products – Safeguarding the Environment and Human Health ..................................................... Cm 5827, June 2003 Special report The Environmental Effects of Civil
    [Show full text]
  • Voluntary Agreements to Protect Private Forests – a Realist Review
    Forest Policy and Economics 128 (2021) 102457 Contents lists available at ScienceDirect Forest Policy and Economics journal homepage: www.elsevier.com/locate/forpol Voluntary agreements to protect private forests – A realist review Matilda Miljand a,*, Therese Bjarstig¨ a, Katarina Eckerberg a, Eeva Primmer b, Camilla Sandstrom¨ a a Department of Political Science, Umeå University, Sweden b Finnish Environment Institute, Finland ARTICLE INFO ABSTRACT Keywords: There is increasing political interest in the use of voluntary agreements (VA) as a policy instrument. The Realist review attraction has grown also in environmental policy, VAs are expected to be less costly, more effective and more Voluntary conservation agreements cost-efficientthan regulation. Using a realist review methodology, our analysis focuses on the effect of contextual Private forest owners factors and mechanisms on private forest owners’ willingness to enter into formal voluntary nature conservation agreements. The framework we use to analyse the effects includes: forest owner characteristics, forest attributes, institutional context and process, advisors and other forest owners, and contract design, for contextual factors – and economic attitudes, environmental attitudes, sense of autonomy, sense of justice and fairness, trust as well as knowledge, for mechanisms. The analysis allowed merging findings from different types of VAs in varying contexts in a systematized way, and consolidating evidence of how the mechanisms influence the programme implementation process, and its outcome. 43 reviewed articles, from an originally retrieved set of 2231 papers, provide evidence for environmental attitudes supporting willingness to enter into an agreement. Environmental attitudes are strengthened by forest owners’ wishes to protect a heritage, suggesting considerable influence through personal, emotional attachment to the forest.
    [Show full text]