Appendix a – Major Flood Control Projects
Total Page:16
File Type:pdf, Size:1020Kb
Appendix A – Major Flood Control Projects Table 1.1: Major Drainage Projects in Northern NT (Completed Projects) Construction Completion Location of Significant Project Title Cost Length (km) Start Date Date Brief Description Improvements and Benefits Rural Drainage Rehabilitation 193 4.2 11/1998 12/2001 Construction of drainage San Wai Barracks, Kwan Tei, Scheme, stage 1, phase 1A œ channels and box culvert Wang Leng, Hung Leng, Leng rehabilitation works at Ng (about 170 m) Tsai, Wang Shan Keuk San Tung River Tsuen, Tai Tong Wu, Shan Tong, San Tong Po Rural drainage rehabilitation 156 4.9 04/1999 12/2001 Construction of drainage Hang Tau Tai Po, Hang Tau, scheme, stage 1, phase 1B œ channel Cheung Lek, Lin Tong Mei, Tsiu rehabilition works at Sheung Keng Lo Wai, Tsiu Keng Pang Uk, Yue River Tsiu Keng San Wai, Chan Uk Po River training works for the 756 4.6 08/1999 03/2003 Training of drainage Fu Tei Au, Sheung Shui Wa Upper River Indus channel Shan, Ting Ping Shan Tsuen, Shek Wu San Tsuen, Wu Nga Lok Yeung, Ma Shi Po, Siu Hang San Tsuen, Siu Hang Tsuen, Kan Lung Tsuen, San Wai, San Uk Tsuen Shek Wu Hui Development 265 1.7 09/1998 02/2002 River training in Area 30 Tsung Yuen, Ho Sheung Heung, Package 4, engineering works Ying Kong River training works for the 253 2.6 03/1999 03/2001 Construction of drainage Lo Wu, Tak Yuet Lau, Shek Ma, Lower River Indus and River channel Ngam Pin, Pai Tau Lo, Ho Beas Sheung Heung, Tong Kok, Shek Tsai Leng, Kwu Tung, Ying Kong Table 1.2: Major Drainage Projects in Northern NT (Projects Under Construction) Construction Completion Location of Significant Project Title Cost Length (km) Start Date Date Brief Description Improvements and Benefits Regulation of Shenzhen 386 4 12/2001 End 2006 Training of Shenzhen River Lo Wu, Yuen Leng Chai, Nam River, stage III upstream of Lo Wu to Lo Hang, Man Kam To, Muk Wu, Shue Leng Muk Wu Nga Yiu, Lo Shue Ling, Ta Kwu Ling Rural drainage rehabilitation 185# 1.7 05/2003 Early 2006 Drainage rehabilitation Chow Tin Tsuen, Ta Kwu Ling scheme œ Drainage works at Ping Yuen River Village, Kan Tau Wai, Fung Wong rehabilitation works at Ping Wu, Lei Uk, Tong Fong, Shui Hau Yuen River and Mo Fan Heung Stream (NNT Portion) Drainage improvement for Ma 233 1.8 06/2005 End 2006 Construction of drainage Kau Lung Hang and north of Wat River at Kau Lung Hang channels in Ma Wat and Hong Lok Yuen north of Hong Lok Yuen # The total cost of the project Appendix A – Major Flood Control Projects Table 1.3: Major Drainage Projects in Northern NT (Projects Under Design/Planning ) Construction Completion Location of Significant Project Title Cost Length (km) Start Date Date Brief Description Improvements and Benefits Drainage improvement in 440# 13.7 Mid 2006 Early 2010 Construction of drainage Ping Kong, Tai Lung, Tong Hang, Northern New Territories œ channels in Ping Kong, Kau Kau Lung Hang Lo Wai, Kiu Tau, package A Lung Hang, Nam Wah Po Kau Lung Hang San Wai, Yuen (NNT portion) and for the upstream part Leng, Tai Wo, Nam Wa Po, Tai of Ma Wat River, upgrading Hang, Shek Wu Hui, Luen Wo and rehabilitation of urban Hui, Sam Po Shue, Sheung Shui drains in Sheung Shui and and Fanling Town Fanling Town Drainage Improvement in 314# 7.6 End 2005 End 2009 Construction of drainage Ma Tso Lung, Tse Koo Hang, Northern New Territories œ channels in Kwu Tung, Ma Shun Yee San Tsuen, Ma Tso Package B Tsao Lung and Fu Tei Au Lung San Tsuen, Lo Wu Camp, (NNT portion) Tsung Yuen, Hang Tau Tai Po, Tong Kung Leng, Lin Tong Mei Tsoi Yuen, Ying Pun, Tsiu Keng Lo Wai, Tsiu Keng Pang Uk, Tsiu Keng San Wai, Luk Mei Tsuen, Pang Loon Tei Drainage Improvement in 319 8 Mid 2007 Mid 2011 Construction of drainage Lin Ma Hang, Ping Che, Tai Po Northern New Territories œ channels in Lung Yeuk Tau, Tin, Sheung Shan Kai Wat, Man Package C Man Uk Pin, Ta Kwu Ling, Uk Pin, Loi Tung, Ng Uk Tsuen, (NNT portion) Ping Che and Lin Ma Hang Tan Chuk Hang Lo Wai, Tan Chuk Hang, San Tong Po, Tai Wo, Ma Wat Wai, Ma Liu Shui San Tsuen, Leng Tsai # The total cost of the project Appendix A – Major Flood Control Projects Table 2.1: Major Drainage Projects in Northwestern NT (Completed Projects) Construction Completion Location of Significant Project Title Cost Length (km) Start Date Date Brief Description Improvements and Benefits Main drainage channels for 106 1.7 03/2000 12/2002 Construction of drainage Yau Tam Mei Tsuen, Yau Tam Ngau Tam Mei, phase 2 œ channel from Ngau Tam Mei San Tsuen, Wai Tsai Ngau Tam Mei to Yau Mei San Mei to Yau Mei San Tsue Tsuen section Village flood protection for 136 0.9 12/2001 12/2004 Construction of floodwater Wang Chau and Pok Wai Yuen Long, Kam Tin and pumping station in Wang Ngau Tam Mei, North West Chau; and construction of New Territories, stage 1 - Pok Wai drainage channel remainder Main drainage channels for 230 3.4 05/2001 07/2003 Construction of drainage Tsz Tong Tsuen, Ng Ka Tsuen, Yuen Long and Kam Tin, channels near Ng Ka Tsuen Kam Tsin Wai, Nam Hing Lei, stage 2 œ remainder and Shek Tau Wai Chung Sum Tsuen, Pak Pin Tsuen, Uk Tau Tsuen, To Uk Tsuen, Shek Tau Wai, Tsz Tong Tsuen Main drainage channels for 314 3.1 08/1999 03/2004 Construction of drainage Kam Tin San Tsuen, Wing Lung Yuen Long and Kam Tin stage channel from Kam Tin San Wai, Kiu Tau Tsuen, Pang Ka 2 œ Kam Tin San Tsuen to Tsuen to Wan Toi Shan Tsuen, Shek Kong San Tsuen, Wang Toi Shan section Wang Toi Shan Main drainage channels for 229 3.5 07/1999 03/2002 Construction of drainage Kat Hing Wai, Tai Hong Tsuen, Yuen Long and Kam Tin stage channel from Kam Tin Road Shek Wu Tong, Tin Sam Tsuen, 2 œKam Tin Road to Tai Kek to Tai Kek Tai Kek section Main drainage channels for 359 2.3 11/1999 03/2005 Construction of drainage Yau Mei San Tsuen, Chuk Yuen Ngau Tam Mei phase 1 œ Yau channels from Yau Mei San Tsuen, Man Yuen Chuen Mei San Tsuen to Tai Sang Tsuen to Tai Sang Wai Wai section Village flood protection for 122 - 11/2000 03/2003 Construction of floodwater Chuk Yuen Tsuen and Ha San Chuk Yuen Tsuen and Ha San pumping station in Chuk Wai Wai, North West New Yuen Tsuen and Ha San Territories Wai Village flood protection for 169# - 12/2001 03/2004 Construction of floodwater Ma Tin Tsuen and Shui Pin Wai Mai Po Lo Wai, Mai Po San pumping stations in, Ma Tin Tsuen, Ma Tin Tsuen and Tsuen and Shui Pin Wai Shui Pin Wai, North West New Territories # The total cost of the project Appendix A – Major Flood Control Projects Table 2.2: Major Drainage Projects in Northwestern NT (Projects under Construction) Construction Completion Location of Significant Project Title Cost Length (km) Start Date Date Brief Description Improvements and Benefits Yuen Long, Kam Tin, Ngau 167 7.5 12/2001 Mid 2005 Upgrading of urban Yuen Long town, Ping Shan, Tam Mei and Tin Shui Wai drainage in Yuen Long Hung Shui Kiu and Tin Shui Wai drainage improvement, stage town, Ping Shan and Hung 1 phase 1-Yuen Long and Tin Shui Kiu and bank raising Shui Wai in Tin Shui Wai Yuen Long, Kam Tin, Ngau 139 3.2 06/2004 Early 2007 Construction of secondary Cheung Kong, Tai Kong Po, Tsat Tam Mei and Tin Shui Wai drainage channels in Kam Sing Kong, Ha Che, San Wai drainage improvements, Tin and Ngau Tam Mei Tsuen stage 1, phase 2A œ Kam Tina nd Ngau Tam Mei Main drainage channel for 125 1.5 09/2003 End 2005 Construction of drainage Lung Tin Tsuen, Lam Hau Tsuen Yuen Long and Kam Tin œ channel in Lung Tin Tsuen Shan Ha Tsuen to Lam Hau Tsuen section Yuen Long bypass floodway 432 3.8 01/2003 Early 2006 Construction of drainage Yuen Long town, Tung Shing Lei, channels in Yuen Long Au Tau, Small Traders New South Village, Yeung Uk Tsuen, Chuk San Tsuen, Kong Tau San Tsuen, Shung Ching San Tsuen, Sham Chung Tsuen San Tin Eastern Main 339 2.4 10/2002 Mid 2006 Construction of the Eastern Lok Ma Chau Drainage Channel Main drainage channels in San Tin Village flood protection for 169# - 12/2001 Mid 2005 Construction of floodwater Mai Po Lo Wai, Mai Po San Tsuen Mai Po Lo Wai, Mai Po San pumping station in Mai Po Tsuen, Ma Tin Tsuen and Lo Wai Shui Pin Wai, North West New Territories (Mai Po Lo Wai, Mai Po San Tsuen portion) # The total cost of the project Table 2.3: Major Drainage Projects in Northwestern NT (Projects under Design/Planning) Construction Completion Location of Significant Project Title Cost Length (km) Start Date Date Brief Description Improvements and Benefits Yuen Long, Kam Tin, Ngau 135 4.4 Mid 2006 Mid 2009 Construction of secondary Cheung Chun San Tsuen, Yuen Tam Mei and Tin Shui Wai drainage channels in Kam Kong San Tsuen, Cheung Po, Ma drainage improvement, stage Tin On Kong, Kam Tsin Wai 1, phase 2B œ Kam Tin Drainage improvement in 440# 2.1 Mid 2007 Early 2010 Construction of the western Western San Tin Northern New Territories œ main drainage channel in package A San Tin (NWNT portion) Drainage improvements in 314# 1.5 End 2005 End 2009 Construction of drainage Shek Wu Wai, Ki Lun Tsuen, Northern New Territories œ channels in San Tin South Pang Loon Tei, Luk Mei Tsuen Package B (NWNT portion) # The total cost of the project Appendix A – Major Flood Control Projects Table 3.1: Major Drainage Projects in West Kowloon (Completed Projects) Construction Completion Location of Significant Project Title Cost Length (km) Start Date Date Brief Description Improvements and Benefits West Kowloon drainage 453 10 04/1998 06/2003 Improvement of 10 km of Yau Ma Tei, Mong Kok, Kowloon improvement, stage 1 works stormwater drains Tong, Tai Hung Tung, Tai Kok Tsui, Lai Chi Kok, Cheung Sha Wan, Sham Shui Po West Kowloon drainage 799 23 12/1999 12/2004* Improvement of 23km of Tsim Sha Tsui, Mong Kok, Tai improvement, stages 2 phase stormwater drains Kok Tsui, Lai Chi Kok, Cheung 1 works Sha Wan, Sham Shui Po West Kowloon drainage 1355# N/A 01/2001 10/2004 Construction of Tai Hang Mong Kok improvement, stage 2 phase Tung flood stage scheme 2 and stage 3 phase 1 works and Kai Tak stormwater (stage 2 phase 2 works) transfer tunnel # The total cost of the project * Substantial completion date.