Appendix a – Major Flood Control Projects

Total Page:16

File Type:pdf, Size:1020Kb

Appendix a – Major Flood Control Projects Appendix A – Major Flood Control Projects Table 1.1: Major Drainage Projects in Northern NT (Completed Projects) Construction Completion Location of Significant Project Title Cost Length (km) Start Date Date Brief Description Improvements and Benefits Rural Drainage Rehabilitation 193 4.2 11/1998 12/2001 Construction of drainage San Wai Barracks, Kwan Tei, Scheme, stage 1, phase 1A œ channels and box culvert Wang Leng, Hung Leng, Leng rehabilitation works at Ng (about 170 m) Tsai, Wang Shan Keuk San Tung River Tsuen, Tai Tong Wu, Shan Tong, San Tong Po Rural drainage rehabilitation 156 4.9 04/1999 12/2001 Construction of drainage Hang Tau Tai Po, Hang Tau, scheme, stage 1, phase 1B œ channel Cheung Lek, Lin Tong Mei, Tsiu rehabilition works at Sheung Keng Lo Wai, Tsiu Keng Pang Uk, Yue River Tsiu Keng San Wai, Chan Uk Po River training works for the 756 4.6 08/1999 03/2003 Training of drainage Fu Tei Au, Sheung Shui Wa Upper River Indus channel Shan, Ting Ping Shan Tsuen, Shek Wu San Tsuen, Wu Nga Lok Yeung, Ma Shi Po, Siu Hang San Tsuen, Siu Hang Tsuen, Kan Lung Tsuen, San Wai, San Uk Tsuen Shek Wu Hui Development 265 1.7 09/1998 02/2002 River training in Area 30 Tsung Yuen, Ho Sheung Heung, Package 4, engineering works Ying Kong River training works for the 253 2.6 03/1999 03/2001 Construction of drainage Lo Wu, Tak Yuet Lau, Shek Ma, Lower River Indus and River channel Ngam Pin, Pai Tau Lo, Ho Beas Sheung Heung, Tong Kok, Shek Tsai Leng, Kwu Tung, Ying Kong Table 1.2: Major Drainage Projects in Northern NT (Projects Under Construction) Construction Completion Location of Significant Project Title Cost Length (km) Start Date Date Brief Description Improvements and Benefits Regulation of Shenzhen 386 4 12/2001 End 2006 Training of Shenzhen River Lo Wu, Yuen Leng Chai, Nam River, stage III upstream of Lo Wu to Lo Hang, Man Kam To, Muk Wu, Shue Leng Muk Wu Nga Yiu, Lo Shue Ling, Ta Kwu Ling Rural drainage rehabilitation 185# 1.7 05/2003 Early 2006 Drainage rehabilitation Chow Tin Tsuen, Ta Kwu Ling scheme œ Drainage works at Ping Yuen River Village, Kan Tau Wai, Fung Wong rehabilitation works at Ping Wu, Lei Uk, Tong Fong, Shui Hau Yuen River and Mo Fan Heung Stream (NNT Portion) Drainage improvement for Ma 233 1.8 06/2005 End 2006 Construction of drainage Kau Lung Hang and north of Wat River at Kau Lung Hang channels in Ma Wat and Hong Lok Yuen north of Hong Lok Yuen # The total cost of the project Appendix A – Major Flood Control Projects Table 1.3: Major Drainage Projects in Northern NT (Projects Under Design/Planning ) Construction Completion Location of Significant Project Title Cost Length (km) Start Date Date Brief Description Improvements and Benefits Drainage improvement in 440# 13.7 Mid 2006 Early 2010 Construction of drainage Ping Kong, Tai Lung, Tong Hang, Northern New Territories œ channels in Ping Kong, Kau Kau Lung Hang Lo Wai, Kiu Tau, package A Lung Hang, Nam Wah Po Kau Lung Hang San Wai, Yuen (NNT portion) and for the upstream part Leng, Tai Wo, Nam Wa Po, Tai of Ma Wat River, upgrading Hang, Shek Wu Hui, Luen Wo and rehabilitation of urban Hui, Sam Po Shue, Sheung Shui drains in Sheung Shui and and Fanling Town Fanling Town Drainage Improvement in 314# 7.6 End 2005 End 2009 Construction of drainage Ma Tso Lung, Tse Koo Hang, Northern New Territories œ channels in Kwu Tung, Ma Shun Yee San Tsuen, Ma Tso Package B Tsao Lung and Fu Tei Au Lung San Tsuen, Lo Wu Camp, (NNT portion) Tsung Yuen, Hang Tau Tai Po, Tong Kung Leng, Lin Tong Mei Tsoi Yuen, Ying Pun, Tsiu Keng Lo Wai, Tsiu Keng Pang Uk, Tsiu Keng San Wai, Luk Mei Tsuen, Pang Loon Tei Drainage Improvement in 319 8 Mid 2007 Mid 2011 Construction of drainage Lin Ma Hang, Ping Che, Tai Po Northern New Territories œ channels in Lung Yeuk Tau, Tin, Sheung Shan Kai Wat, Man Package C Man Uk Pin, Ta Kwu Ling, Uk Pin, Loi Tung, Ng Uk Tsuen, (NNT portion) Ping Che and Lin Ma Hang Tan Chuk Hang Lo Wai, Tan Chuk Hang, San Tong Po, Tai Wo, Ma Wat Wai, Ma Liu Shui San Tsuen, Leng Tsai # The total cost of the project Appendix A – Major Flood Control Projects Table 2.1: Major Drainage Projects in Northwestern NT (Completed Projects) Construction Completion Location of Significant Project Title Cost Length (km) Start Date Date Brief Description Improvements and Benefits Main drainage channels for 106 1.7 03/2000 12/2002 Construction of drainage Yau Tam Mei Tsuen, Yau Tam Ngau Tam Mei, phase 2 œ channel from Ngau Tam Mei San Tsuen, Wai Tsai Ngau Tam Mei to Yau Mei San Mei to Yau Mei San Tsue Tsuen section Village flood protection for 136 0.9 12/2001 12/2004 Construction of floodwater Wang Chau and Pok Wai Yuen Long, Kam Tin and pumping station in Wang Ngau Tam Mei, North West Chau; and construction of New Territories, stage 1 - Pok Wai drainage channel remainder Main drainage channels for 230 3.4 05/2001 07/2003 Construction of drainage Tsz Tong Tsuen, Ng Ka Tsuen, Yuen Long and Kam Tin, channels near Ng Ka Tsuen Kam Tsin Wai, Nam Hing Lei, stage 2 œ remainder and Shek Tau Wai Chung Sum Tsuen, Pak Pin Tsuen, Uk Tau Tsuen, To Uk Tsuen, Shek Tau Wai, Tsz Tong Tsuen Main drainage channels for 314 3.1 08/1999 03/2004 Construction of drainage Kam Tin San Tsuen, Wing Lung Yuen Long and Kam Tin stage channel from Kam Tin San Wai, Kiu Tau Tsuen, Pang Ka 2 œ Kam Tin San Tsuen to Tsuen to Wan Toi Shan Tsuen, Shek Kong San Tsuen, Wang Toi Shan section Wang Toi Shan Main drainage channels for 229 3.5 07/1999 03/2002 Construction of drainage Kat Hing Wai, Tai Hong Tsuen, Yuen Long and Kam Tin stage channel from Kam Tin Road Shek Wu Tong, Tin Sam Tsuen, 2 œKam Tin Road to Tai Kek to Tai Kek Tai Kek section Main drainage channels for 359 2.3 11/1999 03/2005 Construction of drainage Yau Mei San Tsuen, Chuk Yuen Ngau Tam Mei phase 1 œ Yau channels from Yau Mei San Tsuen, Man Yuen Chuen Mei San Tsuen to Tai Sang Tsuen to Tai Sang Wai Wai section Village flood protection for 122 - 11/2000 03/2003 Construction of floodwater Chuk Yuen Tsuen and Ha San Chuk Yuen Tsuen and Ha San pumping station in Chuk Wai Wai, North West New Yuen Tsuen and Ha San Territories Wai Village flood protection for 169# - 12/2001 03/2004 Construction of floodwater Ma Tin Tsuen and Shui Pin Wai Mai Po Lo Wai, Mai Po San pumping stations in, Ma Tin Tsuen, Ma Tin Tsuen and Tsuen and Shui Pin Wai Shui Pin Wai, North West New Territories # The total cost of the project Appendix A – Major Flood Control Projects Table 2.2: Major Drainage Projects in Northwestern NT (Projects under Construction) Construction Completion Location of Significant Project Title Cost Length (km) Start Date Date Brief Description Improvements and Benefits Yuen Long, Kam Tin, Ngau 167 7.5 12/2001 Mid 2005 Upgrading of urban Yuen Long town, Ping Shan, Tam Mei and Tin Shui Wai drainage in Yuen Long Hung Shui Kiu and Tin Shui Wai drainage improvement, stage town, Ping Shan and Hung 1 phase 1-Yuen Long and Tin Shui Kiu and bank raising Shui Wai in Tin Shui Wai Yuen Long, Kam Tin, Ngau 139 3.2 06/2004 Early 2007 Construction of secondary Cheung Kong, Tai Kong Po, Tsat Tam Mei and Tin Shui Wai drainage channels in Kam Sing Kong, Ha Che, San Wai drainage improvements, Tin and Ngau Tam Mei Tsuen stage 1, phase 2A œ Kam Tina nd Ngau Tam Mei Main drainage channel for 125 1.5 09/2003 End 2005 Construction of drainage Lung Tin Tsuen, Lam Hau Tsuen Yuen Long and Kam Tin œ channel in Lung Tin Tsuen Shan Ha Tsuen to Lam Hau Tsuen section Yuen Long bypass floodway 432 3.8 01/2003 Early 2006 Construction of drainage Yuen Long town, Tung Shing Lei, channels in Yuen Long Au Tau, Small Traders New South Village, Yeung Uk Tsuen, Chuk San Tsuen, Kong Tau San Tsuen, Shung Ching San Tsuen, Sham Chung Tsuen San Tin Eastern Main 339 2.4 10/2002 Mid 2006 Construction of the Eastern Lok Ma Chau Drainage Channel Main drainage channels in San Tin Village flood protection for 169# - 12/2001 Mid 2005 Construction of floodwater Mai Po Lo Wai, Mai Po San Tsuen Mai Po Lo Wai, Mai Po San pumping station in Mai Po Tsuen, Ma Tin Tsuen and Lo Wai Shui Pin Wai, North West New Territories (Mai Po Lo Wai, Mai Po San Tsuen portion) # The total cost of the project Table 2.3: Major Drainage Projects in Northwestern NT (Projects under Design/Planning) Construction Completion Location of Significant Project Title Cost Length (km) Start Date Date Brief Description Improvements and Benefits Yuen Long, Kam Tin, Ngau 135 4.4 Mid 2006 Mid 2009 Construction of secondary Cheung Chun San Tsuen, Yuen Tam Mei and Tin Shui Wai drainage channels in Kam Kong San Tsuen, Cheung Po, Ma drainage improvement, stage Tin On Kong, Kam Tsin Wai 1, phase 2B œ Kam Tin Drainage improvement in 440# 2.1 Mid 2007 Early 2010 Construction of the western Western San Tin Northern New Territories œ main drainage channel in package A San Tin (NWNT portion) Drainage improvements in 314# 1.5 End 2005 End 2009 Construction of drainage Shek Wu Wai, Ki Lun Tsuen, Northern New Territories œ channels in San Tin South Pang Loon Tei, Luk Mei Tsuen Package B (NWNT portion) # The total cost of the project Appendix A – Major Flood Control Projects Table 3.1: Major Drainage Projects in West Kowloon (Completed Projects) Construction Completion Location of Significant Project Title Cost Length (km) Start Date Date Brief Description Improvements and Benefits West Kowloon drainage 453 10 04/1998 06/2003 Improvement of 10 km of Yau Ma Tei, Mong Kok, Kowloon improvement, stage 1 works stormwater drains Tong, Tai Hung Tung, Tai Kok Tsui, Lai Chi Kok, Cheung Sha Wan, Sham Shui Po West Kowloon drainage 799 23 12/1999 12/2004* Improvement of 23km of Tsim Sha Tsui, Mong Kok, Tai improvement, stages 2 phase stormwater drains Kok Tsui, Lai Chi Kok, Cheung 1 works Sha Wan, Sham Shui Po West Kowloon drainage 1355# N/A 01/2001 10/2004 Construction of Tai Hang Mong Kok improvement, stage 2 phase Tung flood stage scheme 2 and stage 3 phase 1 works and Kai Tak stormwater (stage 2 phase 2 works) transfer tunnel # The total cost of the project * Substantial completion date.
Recommended publications
  • List of Recognized Villages Under the New Territories Small House Policy
    LIST OF RECOGNIZED VILLAGES UNDER THE NEW TERRITORIES SMALL HOUSE POLICY Islands North Sai Kung Sha Tin Tuen Mun Tai Po Tsuen Wan Kwai Tsing Yuen Long Village Improvement Section Lands Department September 2009 Edition 1 RECOGNIZED VILLAGES IN ISLANDS DISTRICT Village Name District 1 KO LONG LAMMA NORTH 2 LO TIK WAN LAMMA NORTH 3 PAK KOK KAU TSUEN LAMMA NORTH 4 PAK KOK SAN TSUEN LAMMA NORTH 5 SHA PO LAMMA NORTH 6 TAI PENG LAMMA NORTH 7 TAI WAN KAU TSUEN LAMMA NORTH 8 TAI WAN SAN TSUEN LAMMA NORTH 9 TAI YUEN LAMMA NORTH 10 WANG LONG LAMMA NORTH 11 YUNG SHUE LONG LAMMA NORTH 12 YUNG SHUE WAN LAMMA NORTH 13 LO SO SHING LAMMA SOUTH 14 LUK CHAU LAMMA SOUTH 15 MO TAT LAMMA SOUTH 16 MO TAT WAN LAMMA SOUTH 17 PO TOI LAMMA SOUTH 18 SOK KWU WAN LAMMA SOUTH 19 TUNG O LAMMA SOUTH 20 YUNG SHUE HA LAMMA SOUTH 21 CHUNG HAU MUI WO 2 22 LUK TEI TONG MUI WO 23 MAN KOK TSUI MUI WO 24 MANG TONG MUI WO 25 MUI WO KAU TSUEN MUI WO 26 NGAU KWU LONG MUI WO 27 PAK MONG MUI WO 28 PAK NGAN HEUNG MUI WO 29 TAI HO MUI WO 30 TAI TEI TONG MUI WO 31 TUNG WAN TAU MUI WO 32 WONG FUNG TIN MUI WO 33 CHEUNG SHA LOWER VILLAGE SOUTH LANTAU 34 CHEUNG SHA UPPER VILLAGE SOUTH LANTAU 35 HAM TIN SOUTH LANTAU 36 LO UK SOUTH LANTAU 37 MONG TUNG WAN SOUTH LANTAU 38 PUI O KAU TSUEN (LO WAI) SOUTH LANTAU 39 PUI O SAN TSUEN (SAN WAI) SOUTH LANTAU 40 SHAN SHEK WAN SOUTH LANTAU 41 SHAP LONG SOUTH LANTAU 42 SHUI HAU SOUTH LANTAU 43 SIU A CHAU SOUTH LANTAU 44 TAI A CHAU SOUTH LANTAU 3 45 TAI LONG SOUTH LANTAU 46 TONG FUK SOUTH LANTAU 47 FAN LAU TAI O 48 KEUNG SHAN, LOWER TAI O 49 KEUNG SHAN,
    [Show full text]
  • The Pearl River's Tributaries
    CB(1)1986/09-10(01) Liquid Assets Water Security and Management in the Pearl River Basin and Hong Kong December 2009 Dinesh Sadhwani Jonas Chau Christine Loh Mike Kilburn Andrew Lawson Table of Contents Foreword 1 Acknowledgements 2 Contributors 3 Glossary 4 Introduction 5 Part 1: Hong Kong’s Fresh Water 6 Part 2: The Dongjiang and the Pearl River Basin 14 Part 3: Threats to the Water Supply in the Pearl River Basin and Beyond 18 Part 3.1: Climate Change: an Emerging Threat to Supply? 20 Part 3.2: Pollution 22 Part 3.3: Competition 27 Part 4: Hong Kong’s Water Management 33 Part 5: Conclusion 40 References 42 © Civic Exchange, December 2009. The views expressed in this report are those of the authors and do not necessarily represent the opinions of Civic Exchange, Noble Group or the reviewers. Report layout and illustrations by Jonas Chau. Foreword South China, including Hong Kong and Macau, depends on the Pearl River and its tributaries. It is in our interest to protect, restore and sustain these rivers and the watershed as a whole for all times. The other major river systems in China – the Yellow and Yangtze rivers – suffer from severe pollution and over-use. The threats facing the Pearl River, although serious, are of a lower order of magnitude by comparison. It is thus incumbent upon the south to ensure that the key source of life is much better managed. Civic Exchange is grateful to Noble Group for funding this research to focus attention on the Pearl River watershed.
    [Show full text]
  • 場刊house Programme
    場 刊 House Programme 節目簡介 忘記了 卻不想忘記 那天一覺醒來 一切都去了 倒下來 還是要繼續 高掛高掛高高掛 前進前進前前進 我們其實都很幸福 誰與誰在誰左誰右誰上誰下誰前誰後胡說八道 高舉著掉下來 再高高舉在上 再狠狠地掉下來 迷了 著了迷 被迷着了 在自由的空氣中窒息地呼吸 在框架中閒人在跳舞 被帶到遙遠的國度去 1 節目簡介 我的爺爺是屠夫 在歌唱尖叫狂奔 在希望的門前門後進進出出 出門入門開門關門閂門 人們你們我們 記起來 還是記不起 生下來 還是被生生的生下 門卻仍然關上 還有她他牠的媽的他媽的媽媽 門開了沒有? 完了還是沒完沒了...... 2 「多空間」 「多空間」於1995年3月由馬才和及嚴明然於香港成立,是一個非牟利的表演 藝術團體。成立宗旨是希望透過舞蹈來開拓表演藝術的可能性、尋找新的舞蹈 語言及演出路向。其作品除糅合不同媒體作創作元素外,更嘗試打破形式的規 限,於劇場內外各種不同空間進行創作及表演,當中包括:即興創作、舞蹈劇 場、環境舞蹈、純舞蹈表演,以至舞蹈影帶製作等。 「多空間」成立至今,其作品曾多次被國際藝術節及藝術機構邀請前往參與表 演及交流。更不斷積極在本地民間推廣舞蹈藝術及透過「Y劇場」開拓另類的 創作和欣賞空間。而多年來,「多空間」除致力將其藝團發展成為一個富本土 文化特色的表演團體外,更積極參與國際間的文化交流活動。 Y-Space Y-Space was founded in 1995 by Victor Choi-wo Ma and Mandy Ming-yin Yim in Hong Kong, with the mission of exploring the infinite possibilities of dance, and searching for new dance idioms and new artistic directions. Y-Space has been invited by international arts festivals and arts organizations to perform and conduct artistic exchange. To date, its Improvisation Land series has reached its 42nd series, while its Dancing All Around series has gone beyond the 10th mark. Since 2009, Y-Space has been hosting the i-Dance HK festival. Now in its 18th year, Y-Space has become an important arts group on the Hong Kong contemporary dance through creating new work, promoting dance and providing training, education and research work through activities conducted at community level and at the Y-Space Dance Studio. 3 導演的話 寫在《門》邊上 田戈兵 2014年的《鐵馬》之後,香港似乎漸行漸遠。 去年在北京遇見馬才和嚴明然夫婦,馬試探我:「願不願在他來年新作 裏做劇場構作?」我很快答應,雖然有這樣那樣的時間問題,但我好奇 這個「不靠譜」的想法。當然,還有一個原因就是想看看四年以後的香 港現況。
    [Show full text]
  • Water Market Asia
    Water Market Asia “In shallow waters, shrimps make fools of dragons.” Chinese Proverb (C) GWI 2006 - Reproduction Prohibited i Water Market Asia This report was researched, written and edited by Jensen & Blanc-Brude, Ltd. for Global Water Intelligence Jensen & Blanc-Brude, Ltd. Global Water Intelligence 22 Leathermarket Street, Unit 6 Published by Media Analytics, Ltd. London SE1 3HP The Jam Factory, 27 Park End Street United Kingdom Oxford OX1 1HU [email protected] United Kingdom www.jensenblancbrude.com [email protected] www.globalwaterintel.com While every effort has been made to ensure the accuracy of the information in this report, neither Global Water Intelligence, Jensen & Blanc-Brude Ltd or Media Analytics Ltd, nor any of the contributors accept liability for any errors or oversights. Unauthorised distribution or reproduction of the contents of this publication is strictly prohibited without the written permission of the publisher and authors. Contact Media Analytics Ltd or Jensen & Blanc-Brude Ltd for permission. Opportunities in the Water & Wastewater Sectors in Asia & the Pacifi c ii Water Market Asia Acknowledgements The authors would like to thank the following contributors to this report: Seungho Lee researched and wrote the South Korea profi le Michiko Iwanami researched and wrote the Japan profi le Marie Hélène Zerah researched and contributed to the India profi le Kathy Liu contributed to the China profi le The GWI team provided helpful comments and support. The authors also wish to thank the following practitioners
    [Show full text]
  • The Future of Frontier Closed Area By
    THE FUTURE OF FRONTIER CLOSED AREA BY CHAN PAT FAN Student No.: 01014641 AN HONOURS PROJECT SUBMITTEDIN PARTIAL FULFILMENT OF THE REQUIREMENTS FOR THE DEGREE OF BACHELOR OF SOCIAL SCIENCES (HONOURS) IN GEOGRAPHY HONG KONG BAPTIST UNIVERSITY 04/2004 HONG KONG BAPTIST UNIVERSITY April / 2004 We hereby recommend that the Honours Project by Mr. CHAN Pat Fan, entitled “The Future of Frontier Closed Area” be accepted in partial fulfillment of the requirements for the Bachelor of Social Sciences (Honours) in Geography. _________________ _________________ Professor S. M. Li Dr. C. S. Chow Chief Adviser Second Examiner Continuous Assessment: _______________ Product Grade: _______________________ Overall Grade: _______________________ 2 Acknowledgements I would like to thank my supervisor, Professor S. M. LI for suggesting the research topic and guiding me through the entire study. In addition, also thank for staff of The Public Records Office of Hong Kong (PRO) provide me useful information and documentaries. _____________________ Student’s signature Department of Geography Hong Kong Baptist University Date: 5th April 2004 ___ 3 TABLE OF CONTENTS ACKNOWLEDGEMENT LIST OF MAPS ---------------------------------------------------------------------I LIST OF TABLES ------------------------------------------------------------------II LIST OF PLATES ------------------------------------------------------------------III ABSTRACT--------------------------------------------------------------------------IV CHAPTER ONE INTRODUCTION 1.1 BACKGORUND OF FRONTIER
    [Show full text]
  • 0066834 Draft Executive Summary Chinese Revision 6
    TECHNICALPROPOSAL ,-UV EXECUTIVESUMMARY AgreementNo.PLNG13/2007 SurveyonFeatureswithCulturalHeritage AgreementNo.PLNG13/2007 ValueCoveringPartof PlanningDepartment theNorthernNewTerritories YZ[ SurveyonFeatureswithCulturalHeritage DraftExecutiveSummary TheGovernmentoftheHongKongSpecial AdministrativeRegion \]^_︰PLNG13/2007 !"#$%&'()*+,-.-/ ValueintheShaTauKok, TaKwuLingand ,-UVWX MaTsoLungAreas uvwxxyk. lmno*pqrs \]^_︰PLNG13/2007 28th September2007 Qabcd、fgh&ijt k. 0OO 12340567 lmno*pqrs ExecutiveSummary TenderforContractNo.06/9036 ,-UV 17th December2007 0OO 12504517 EnvironmentalResourcesManagement ()IJKLMNOPQRST 21/FLincolnHouse TaikooPlace979King'sRoad IslandEastHongKong ()<=>313? @ABCDEF05GH Telephone89 22713000 Facsimile:; 27235660 www.erm.com Deliveringsustainablesolutionsinamorecompetitiveworld CONTENTS 1 INTRODUCTION 1 1.1 BACKGROUND 1 1.2 STUDY AREA 1 1.3 APPROACH TO THE ASSIGNMENT 1 2 FINDINGS 3 2.1 FEATURES CODING 3 2.2 CLASSIFICATION OF FEATURES WITH CULTURAL HERITAGE VALUE 4 2.3 SUMMARY OF FINDINGS 5 3 CONCLUSIONS 11 1 INTRODUCTION 1.1 BACKGROUND The Planning Department commissioned ERM - Hong Kong, Ltd (ERM) to undertake a on Features with Cultural Heritage Value in Sha Tau Kok, Ta Kwu Ling and Ma Tso Lung Areas. The work was undertaken under Agreement No. PLNQ 13/2007 (hereafter referred to as the Assignment). This area, near the boundary with Shenzhen, is not yet covered by any statutory town plan and the establishment of a database of built heritage is therefore important in future land use planning for this area. 1.2
    [Show full text]
  • For Discussion on 24 November 2009 LEGISLATIVE COUNCIL PANEL
    CB(1)396/09-10(07) For discussion on 24 November 2009 LEGISLATIVE COUNCIL PANEL ON DEVELOPMENT Study on Land Use Planning for the Closed Area - Draft Development Plan and Stage 2 Community Engagement Purpose This paper seeks Members’ views on the Draft Development Plan proposed in the consultancy study entitled “Land Use Planning for the Closed Area” (the Study) as part of the Stage 2 Community Engagement of the Study. Background 2. The Stage 1 Community Engagement on the Draft Concept Plan proposed under the Study took place from May to August 2008. We consulted the Panel on the Draft Concept Plan on 27 May 2008 (LC Paper No. CB(1)1602/07-08(03)). A series of community engagement activities were undertaken for different stakeholders including local residents, rural committees, district councils, Town Planning Board, Heung Yee Kuk, green groups, Advisory Council on the Environment, academic and professional institutes. Three public forums were held at different venues to gauge the public’s views. Each forum was well attended by over 100 participants of different backgrounds. A discussion session on the Draft Concept Plan with the relevant bureaux of the Shenzhen Municipal Government was also held on 20 June 2008. In addition, a total of 74 written submissions were received. A copy of the Stage 1 Community Engagement Report is enclosed at Appendix 1. Major Public Views 3. The major public views gathered during the Stage 1 Community Engagement are summarized as follows: - 2 - (a) The respondents generally supported the vision of promoting the Study Area as “A Belt of Conservation, Cultural Heritage and Sustainable Uses between Hong Kong and Shenzhen” and agreed to the three proposed development themes, i.e.
    [Show full text]
  • Issue No. 20 March 2011 Feature Article Contents a Review of The
    Issue No. 20 March 2011 www.hkbiodiversity.net Feature Article Contents A Review of the Status of the Feature Article: A Review of the Status of IUCN Red List of IUCN Red List of Threatened Plants Threatened Plants in Hong Kong page 1 in Hong Kong Working Group Column: K. S. Pang, Joseph K. L. Yip and Patrick C. C. Lai Aquatica leii (雷氏螢): Plant Working Group A New Record of an Aquatic Firefly Species in Hong Kong page 9 世界自然保護聯盟瀕危物種紅色名錄用以評估動植物的保育 狀況的評估方法,一向被認為是最全面和客觀的全球性評估。在 The First Record of Two 香港,紅色名錄經常被用作評估物種的稀有度及其保育狀況的參 Bagrid Fishes in Hong Kong: 考。在本港記錄到17種收錄在紅色名錄的瀕危植物,而在這些植 條紋鮠 物當中,有些品種在本港卻是十分常見。當為物種制定保育措施 Tachysurus virgatus ( ) and 或作影響評估時,除了參考紅色名錄外,我們亦應考慮它們在本 Pelteobagrus vachellii (瓦氏黃顙魚) page 12 地的保育狀況,從而更有效及適切地運用有限的資源以作保育。 本文介紹這17種瀕危植物的特徵及本地的保育狀況,並就其中一 Division Column: 些品種在紅色名錄的評估及其保育作出討論。 A Short Note on the First Record of the Philippine Duck (Anas luzonica, 棕頸鴨) Introduction in Hong Kong page 15 The International Union for Conservation of Nature (IUCN) Red List of Threatened Species (Red List) (世界自然保護聯盟瀕危物種 紅色名錄) is widely recognised as the most comprehensive and Subscribing Hong Kong Biodiversity objective approach for evaluating the global conservation status of If you would like to have a copy, or plant and animal species. The Red List is essentially a checklist of taxa that have undergone extinction risk assessments using the IUCN Red if you know anyone who is interested in List Categories and Criteria. The majority of the assessments for the receiving a copy of this newsletter, please Red List were carried out by members of the IUCN Species Survival send the name, organisation, and email (soft Commission Specialist Groups, appointed by the Red List Authorities, copy) or postal addresses (hard copy) to the or by participants of the Global Biodiversity Assessment workshops.
    [Show full text]
  • Chapter 4 Recommended Development Plan
    Planning Department Agreement No. CE 60/2005 (TP) Land Use Planning for the Closed Area – Feasibility Study Final Report 4 RECOMMENDED DEVELOPMENT PLAN 4.1 Guiding Principles A composite version of the RDP has been prepared and is provided in Figure 4.1. The plan provides a Study-wide appreciation of the land use framework provided in the preceding section of this report. The key principles in developing the RDP are to: Protect, preserve and enhance the rural village character and natural landscape within the Study Area Enhance degraded rural landscapes and identify development opportunities that are not inconsistent with the vision of the Study. Protect, preserve and enhance the natural habitats including the fishponds/wetlands hilly landscaped area, undisturbed woodlands, riparian habitats and environmentally sensitive areas as appropriate Protect natural features that contribute to creating a green area between Hong Kong and Shenzhen and enhancing the unique visual setting of the Study Area Protect the rights of existing villages. Sufficient land will be provided to accommodate Small house demand development in indigenous villages as appropriate Protect and preserve existing heritage features including heritage buildings, traditional village settings, Fung Shui woodlands/ponds as appropriate Promote the use of flat land for a range of agritourism and eco-tourism uses that will also meet the intent of creating a „Green Area‟ between Hong Kong and Shenzhen Protect existing permitted burial grounds Limit development in order to maintain the unique setting of the Study Area and limit any adverse impact on limited infrastructure 4.2 Function of the Study Area Areas immediately adjacent to the Study Area in Shenzhen, including the core commercial and business areas in Futian and Luohu districts, are highly urbanized.
    [Show full text]
  • Executive Summary
    TABLE OF CONTENTS Page 1. Introduction 1 1.1 Background 1 1.2 Study Objective 1 1.3 Study Methodology 1 1.4 Study Area 3 1.5 Development Constraints 3 1.6 Opportunities 4 2. Community Engagement 4 3. Land Use Framework 5 3.1 Strategic Context 5 3.2 Vision 6 3.3 Theme 1 – Strengthen Nature Conversation 6 3.4 Theme 2 – Conserve Cultural Heritage Resources 8 3.5 Theme 3 – Promote Sustainable Uses 8 3.6 Others 9 3.7 Recreation and Tourism Concept 10 4. Recommended Development Plan (RDP) 11 4.1 Development Concept 11 4.2 Western Portion 11 4.3 Middle Portion 12 4.4 Eastern Portion 13 4.5 Overview 14 Page 1 5. Broad Technical Assessment 16 5.1 Transport and Traffic Assessment 16 5.2 Drainage and Sewerage Assessment 16 5.3 Water and Utility Impact Assessment 17 5.4 Geotechnical Assessment 17 5.5 Visual Impact Assessment 17 5.6 Landscape Impact Assessment 17 5.7 Air Ventilation Assessment 17 5.8 Socio-Economic Assessment 18 5.9 Sustainability Assessment 18 6. Strategic Environmental Assessment 19 7. Implementation 21 8. Conclusion and Way Forward 22 8.1 Balance between Conservation and Economic Development 22 8.2 Population Growth 22 8.3 Generating Employment Opportunities 22 8.4 Improving Social Well-being 22 8.5 Enhancing Cross-boundary Trading 23 8.6 Boosting the Local Economy and Protecting Residents‟ Interests 23 8.7 Building of Sustainable Communities 23 8.8 Conservation and Protection of Natural Environment 23 8.9 Preservation of Land Resources for Future Generations 23 Page 2 Land Use Planning for the Closed Area – Feasibility Study Executive Summary 1.
    [Show full text]
  • Memorandum of Understanding on Jointly Developing the Lok Ma
    (English translation) Memorandum of Understanding on Jointly Developing the Lok Ma Chau Loop by Hong Kong and Shenzhen between the Hong Kong Special Administrative Region Government and the Shenzhen Municipal People’s Government Introduction In order to establish a “Hong Kong/Shenzhen Innovation and Technology Park” (“the Park”) in the Lok Ma Chau Loop (“the Loop”), the Hong Kong Special Administrative Region (“HKSAR”) Government and Shenzhen Municipal People’s Government (“both sides”) have agreed to jointly develop the Loop (actual location shown in the attached Plan 1). This Memorandum of Understanding (“the MOU”) is signed by both sides, following friendly negotiations. Background In accordance with Order No. 221 of the State Council of the People’s Republic of China promulgated on 1 July 1997 (the “State Council Order No. 221”), after the training of the Shenzhen River, the boundary will follow the new centre line of the river. The Loop, originally within the administrative boundary of Shenzhen, has since been included within the administrative boundary of the HKSAR. On 25 November 2011, both sides signed the Co-operation Agreement on Jointly Taking Forward the Development of the Lok Ma Chau Loop (“the Co-operation Agreement”). Out of respect for the above historical fact, both sides have agreed to co-operate in taking forward the Loop’s development under the “One Country, Two Systems” principle, and in accordance with the laws of the HKSAR, as well as following the principle of “co-development and mutual benefit”. Both sides subsequently conducted proactive negotiations in accordance with the Co-operation Agreement and reached a consensus to jointly develop the Loop into the Park, construct relevant higher education and complementary facilities in the Park and formulate this MOU.
    [Show full text]
  • Chapter 7 Strategic Environmental Assessment
    Planning Department Agreement No. CE 60/2005 (TP) Land Use Planning for the Closed Area – Feasibility Study Final Report 7 STRATEGIC ENVIRONMENTAL ASSESSMENT To examine the future use of areas to be released from the existing Closed Area and put them under planning control, Strategic Environmental Assessment Study (the SEA Study) is conducted to provide strategic and regional environmental information and suggestions to address any potential environmental conditions, so as to achieve sustainable development in the Study Area. The SEA study is not intended to be a project-based study. The purpose of this Strategic Environmental Assessment (SEA) Report is to evaluate at strategic level the potential landuse environmental impacts, the cumulative environmental impacts and environmental sustainability implications of the planning framework of the Recommended Development Plan (RDP) formulated under the Main Study. Major environmental issues in relation to air quality, noise, water quality, hazard, landfill, waste, ecology and cultural heritage have been evaluated. Environmental mitigation measures to address the impacts and follow-up investigations requirements are recommended together with the policy and institutional framework arrangements, where applicable. Innovative ideas and new technologies that provide an alternative to resolve the existing and potential future environmental problems are also examined. It should also be noted that this Study is a broad brush assessment only and when individual project is implemented, detailed studies and/or assessments shall be carried out by the respective project proponent(s) to evaluate and confirm adequacy and technical feasibility of the recommended environmental mitigation measures and infrastructure facilities. Some of these environmental mitigation measures and infrastructure facilities should also be implemented as recommended prior to population intake of the proposed developments.
    [Show full text]