F e a t u r e d P r o j e c t s Jurutera Perunding Zaaba Sdn. Bhd. Airport Division
Start End Project Cost (mil) Client Kuala Lumpur International Aiport, Sepang, Selangor. (Project 1994 1998 9,000.0 Ministry of Transport Management) Terminal 3, Subang Airport (Design Consultancy Including Pre-Planning 2001 2003 150.0 Ministry of Transport Study) Trans Resources The Upgrading Works For The New Large Aircraft (Nla) Ab-380 Operations Corporation Sdn. Bhd. 2005 2005 at Kl International Airport, Sepang (Up To Tender Stage Only) - Design 88.0 Consultancy (In Conjunction With Design-And-Build Contractor) Malaysia Airports Sdn. Bhd.
2005 2007 External Parking Apron for MAS Hangar at KLIA 25.0 Malaysia Airlines System
Rehabilitation And Strengthening Of Runway Pavement at Penang SM Pelangi Sdn. Bhd. and 2006 2008 International Airport - Design Consultancy (In Conjunction With Design-And- 15.0 Malaysia Airports Sdn. Bhd. Build Contractor) Rehabilitation Of Airfield Pavement For Parking Apron and Deepening Of 2006 2009 25.0 Malaysia Airports Sdn. Bhd The Parking Apron Operations at Penang International Airport Redevelopment of Penang International Airport – User Requirement and 2006 2009 Study Malaysia Airports Sdn. Bhd Pre-Planning Study Rehabilitation of Air-field Pavement For Parking Apron Bay 3,4,5 & 6 at Malaysia Airports Holding 2006 2009 36 Penang International Airport Berhad DCA Project In Relation To LCAT at Kl International Airport, Sepang Ministry of Transport 2007 2008 20.0 Package B (In Conjunction With Design-And-Build Contractor Department of Civil Aviation Rehabilitation Of Taxiways At Penang International Airport ( Design 2007 2009 12.0 Malaysia Airports Sdn. Bhd Consultancy)
2007 2007 Upgrading of Miri Airport 20.0 Binapuri Holdings Berhad
Senai Airport Teriminal 2007 2008 Senai International Airport, Johor Bharu, Johor 90 Services Sdn.Bhd. Risk Upgrading of Kuala Terengganu Air-port, Terengganu: Package IV(a) & 2008 2009 Managemen Inai Kiara Sdn. Bhd. IV(b) Sea Reclamation & Coastal Erosion t Upgrading Of Kuala Terengganu Airport, Terengganu: Package IV(A) - Trans Resources 2008 2010 250.0 Runway Extension and Associated Works Corporation Sdn.Bhd.
2008 2010 The proposed of aerodrome certification in Kerteh Airport 1.6 Petronas
Rehabilitation Of Airfield Pavement For Runway, Taxiways And Parking Malaysia Airports Holding 2008 2009 Apron And All Associated Facilities At Sultan Abdul Aziz Shah International 28 Berhad Airport, Subang KLIA2 – Detail Design and Construction Supervision for Package AF01 – Malaysia Airports Holdings 2009 2013 336.0 Runway 3, Taxiway and Drainage Berhad
2009 2011 Upgrading of Sultan Ismail Petra Airport, Kota Bharu, Kelantan 50.0 Ministry of Transport
2010 2012 Upgrading of Sultan Azlan Shah Airport, Ipoh ,Perak 47.8 Ministry of Transport
Al-Bakri and Sons Holdings Masterplan Privatisation Of The Proposed Rehabilitation Expansion, Development, Co. and 2010 2011 Operation And Maintenance Of Prince Mohammed Bin Abdulaziz Preliminary International Airport, Madinah Al-Munawarah, Kingdom Of Saudi Arabia Malaysia Airports Holdings Design Berhad
*Cost in Malaysian Ringgit (Million) 58 F e a t u r e d P r o j e c t s Jurutera Perunding Zaaba Sdn. Bhd. Airport Division
Start End Project Cost (mil) Client
Proposed of design & consultancy services for Apron Widening, Kerteh 2010 2014 7.0 Petronas Airport, Keerteh, Kemaman, Terengganu
A Study On Proposed Expansion And Upgrading Of Facilities To 2011 2012 Accommodate The Growth Of Cebu Pacific Air At Ninoy Aquino International Study Cebu Pacific Airport In The Philippines
Amona Holdings Berhad Rehabilitation, Expansion, Development, Operation And Maintenance Of Proposed Upgrading and Extension Works, Development, Operation And China Railway Group Maintenance Of Iranian Imam Khomeini International Airport , Islamic 2011 2012 Masterplan Limited Republic Of Iran – Airport Master Plan For China Railway, Amona and Imam Khomeini Imam Khomeni International International Airport Consortium Airport, Iran.
Ministry of Petroleum and Mineral Resources, 2012 2012 Upgrading of The Existing Suai Aiport, Timor-Leste 300.0 Republic Democratic of Timor-Leste
The Government of Kazakhstan Privatisation Of The New Al-Maty International Airport, Kazakhstan 2012 2013 - Technical Feasibility Study And Airport Master Plan Masterplan Airport Limo(M) Sdn.Bhd - Detail Engneering Design Malaysia Airports Holdings Berhad
Redang Airport, Technical feasibility study for the upgrading of the airport for Destination Resorts and 2013 2013 Study option B-737 operations and option – ATR72-600 operations Hotel Sdn.Bhd.
Senai Airport Aviation Park Senai Airport Terminal 2013 2014 36.0 Planning and Detail Design Of Aviation Park Services Sdn.Bhd
2013 2014 Upgrading of Sandakan Airport, Sandakan, Sabah 60.0 Ministry of Transport
Study On The Proposed Facilities For The Development Of Subang 2013 2017 145 Subang Skypark Sdn Bhd. Skypark, Sultan Abdul Aziz International Airport, Subang
Senai Business Aviation Centre – Proposed Phase 1 Development Senai Airport Terminal 2013 2014 Construction Of Hangars and General Aviation At Senai International 40.0 Services Sdn. Bhd. Airport
2014 2015 The upgrading of Sultan Ahmad Shah Airport, Kuantan, Pahang 16.9 Ministry of Transport
Senai Business Aviation Centre-Proposed Phase 2 development MMC Engineering Services 2014 2015 construction of hangars and general aviation at Senai International Airport – 64 Sdn.Bhd. VVIP hangar
Development Plan for Batu Berendam Airport (Land Development and Pre- 2016 2017 165.0 Ministry of Transport Planning Study)
Pre-feasibility study for Thakhek Airport, Khammoun District, Lao People’s 2016 2017 Study Inovica Global Sdn.Bhd. Democratic Republic
*Cost in Malaysian Ringgit (Million) 59 F e a t u r e d P r o j e c t s Jurutera Perunding Zaaba Sdn. Bhd. Airport Division
KLIA2 – Runway 3, Taxiways, Drainage and Associated Works
KLIA2 - Official Opening of Runway 3 - Trial Landing. Upgrading Of Kuala Terengganu Airport, Terengganu - Runway Extension On Reclaimed Area and Associated Works.
Senai Airport - VVIP Hangar and Associated Services
60 F e a t u r e d P r o j e c t s Jurutera Perunding Zaaba Sdn. Bhd. Airport Division
Upgrading of Sultan Azlan Shah Airport, Ipoh ,Perak – Landside and Airside
Penang International Airport – Pavement Rehabilitation
Sandakan Airport Passenger - Terminal Building Upgrading
61 F e a t u r e d P r o j e c t s Jurutera Perunding Zaaba Sdn. Bhd. Airport Division
Suai Airport, Timor-Leste - Under Construction
Suai Airport, Timor-Leste – Overall Upgrading Scope
62 F e a t u r e d P r o j e c t s Jurutera Perunding Zaaba Sdn. Bhd. Airport Division
Kota Bharu runway reposition and helipad
Privatisation Project for The Expansion, Upgrading Operation And Maintenance Of Iranian Imam Khomeini International Airport , Islamic Republic Of Iran – Airport Master Plan For China Railway, Amona and Imam Khomeini International Airport Consortium
Senai Hangar, view from outside and inside of hangar.
Privatisation Project For Prince Mohammed Bin Abdulaziz International Airport - Madinah Al-Munawarah, Kingdom Of Saudi Arabia - Airport Masterplan For Al-Bakry and Malaysia Consortium
63