DOCUMENT RESUME ED 028 619 EF 003 025 A Comprehensive Survey of the Metropolitan School Systemof Nashville and Davidson County, Tennessee. Educational Research Services, Inc., White Plains, N.Y. Pub Date Sep 63 Note-298p-

- EDRS Price MF-S1.25 HC-SI5.00 Descriptors-*Centralization, *County School Systems, *EducationalAdministration, Educational Finance, Enrollment Projections, Facility Requirements, Program Development,*School Redistricting, *School Surveys, Student Personnel Services The result of a comprehensive survey of the Nashville andDavidson County school systems, which are now unified as the MetropolitanSchool System.. Following an outline of the major aspects of the legal structure of thecharter for the new system, projections of enrollments are made, and the purposesand goals of education are identified to guide the new system in its development. Subject matterachievement levels are evaluated utilizing results of standardized achievement tests,and detailed descriptions are presented of the elementary and secondary school programs aswell as vocational-technical,adult evening school and community college education in each of the two systems. Descriptive and evaluative information is alsopresented for the following aspects of the systems--(1) pupil personnel services, (2) specialeducation services for exceptional children, (3) personnel,(4) physical plant, (5) building requirements, (6) business management, (7) administrative organization.and (8) financial implications. Based on the survey findings, recommendations aremade throughout the report for implementation in the development of theunified school sys tem. (FS) A COMPREHENSIVE SURVEY OF THE METROPOL I TAN SCHOOL SYSTEM

Nashville and DavidsonCounty,

Tennessee

Educational Research SCHOOL AND COLLEGE CONSULTANTS Services inc. A COMPREHENSIVESURVEY

of the

METROPOLITAN SCHOOLSYSTEM of

NASHVILLE AND DAVIDSONCOUNTY, TENNESSEE

September 1963

HEALTH, EDUCATION &WELFARE U.S. DEPARTMENT Of OFFICE OF EDUCATION

REPRODUCED EXACTLY AS RECEIVEDFROM THE THIS DOCUMENT HAS BEEN ORIGINATING IT.POINTS OF VIEW OR OPINIONS PERSON OR ORGANIZATION REPRESENT OFFICIAL .OFFICE OFEDUCATION STATED DO NOT NECESSARILY

POSITION OR POLICY.

Educational Research Services,Inc. 7 Holland Avenue,White Plains, New York TRANSITIONAL BOARD OF EDUCATION Metropolitan Government of Nashville and DavidsonCounty

Dr. Henry H. Hill, Chairman E. C. Carman, Vke-Chairman Mrs. Tom A. Bland E. D. Chappell Dr. Walter S. Davis Andrew B. Gibson Elmer L. Pettit Frank P. White S. L. Wright, Jr.

Superintendent of City Schools

W. H. Oliver

Superintendent of County Schools

J. E. Moss

.... and Staff of Report Preparedby Consultants Inc. EDUCATIONALRESEARCH SERVICES,

Consultants and Staff

Francis G. Cornell,Director Willard S. Elsbree David B. Austin Warren G. Findley Sarah Lou Hammond Jame:, E. Greene Richard H. Hagemeyer Lloyd M. Dunn William C. Geer Vernon E. Johnson Fritz Hess Walter M. Ormsby Frank Lopez John Garment Antoinette Cunniffe Barbara Dunton Rosa Sposato Joan P. O'Malley ACKNOWLEDGMENTS

This survey would not have been possible without theexcellent coop- eration of the staffs of the Nashville City school system,the Davidson County school system and many officials and citizens inthe community.

In addition to the regular staff of EducationalResearch Services, Inc., several specialists were engaged as part of the survey team.These include Willard S. Elsbree, Professor Emeritus, Teachers College,Columbia University, whose major contribution was Chapter XI on Personnel; David B. Austin, Professor ofEducation, Teachers College, Columbia University, who prepared Chapter VII onThe Secondary School Program; Warren G. Findley, Professor of Education andCoordinator of Educational Research, and James E. Greene, Chairman, Divisionof Graduate Studies, both of the College of Education, University ofGeorgia, who prepared staff studies on which Chapter V on Subject Matter AchievementLevels and Chapter IX on Pupil Personnel Services were based; SarahLou Hammond, Head, Elementary Education, Department of Early Childhood Education,School of Edu- cation, The Florida State University, who was responsiblefor the preparation of Chapter VI on The Elementary Sehool Program; Richard H. Hagemeyer,Assistant Superintendent, Adult and Technical Education, Charlotte-MecklenburgSchools, Charlotte, N.C., who provided Chapter VIII materials onVocational-Technical, Adult Evening School and Community College Education; and Lloyd M.Dunn, Chairman, Department of Special Education, George Peabody Collegefor Teachers, who together with William C. Geer, Executive Secretary, theCounail for Exceptional Children, and Vernon L. Johnson, Director, Special Education, Tennessee State Department of Education, prepared materialsreported in Chapter X on SpecialEducation Services for Exceptional Children.

While the foregoing made major contributions to the report, asindi- cated above, the undersigned, as Director of this Survey,takes full responsibility for the conclusions and recommendations reported herein.

September 1963 Francis G. Cornell Educational Research SCHOOL AND COLLEGE CONSULTANTS 7 HOLLAND AVENUE / WHITE PLAINS. NEW YORK Services inc. September 30, 1963

Dr. Henry H. Hill, President Transitional Board of Education Metropolitan Government of Nashville and Davidson County, Tennessee Nashville, Tennessee

Dear Dr. Hill:

It is our privilege to transmitherewith our report on the ComprehensiveSurvey of the Metropolitan School Systemof Nashville and Davidson County,Tennessee. In our work we have beenimpressed by the opportunities affordedby the combin- ation of the two school systems, not somuch for immediate gains, butbecause of the potential it offers for efficientlybuilding better educational services forthe people of Nashville and DavidsonCounty.

This report is hence but a point ofdeparture for the creativethinking and able stewardship needed for years to come inprovkiing soundly appropriate educa- tional opportunities for the citizensof Metro. Surveys cannotbuild school systems. Mechanisms areneeded to assure prudent leadershipand enthusiastic support to avoid the manypotential pitfalls and disappointmentswhich lie ahead.

The process of unification of the two systemsshould be completed as soon as possible, not only to equalize educationalopportunity and increase efficiency in management, but also toconsolidate purposes and goals andattitudes" of unity needed to work towardthem. it has been a pleasure to share inthe aspirations of the Board,staff and citizens in this undertaking. The prospectfor success in creating aneducationally sound and economically defensible school systemfor Metro is encouraging.

We express our appreciation for theexcellent cooperation we have hadfrom the Board, staff and many others.

Respectful su itted,

Francis G. Cornell President TABLE OF CONTENTS

Page

INTRODUCTION 1

II MAJOR PROVISIONS OF THE CHARTER 5

III PROJECTED ENROLLMENT TO 1972 10

IV PURPOSES AND GOALS FOR GOODEDUCATION 19

V SUBJECT MATTER ACHIEVEMENT LEVELS 26

VI THE ELEMENTARY SCHOOL PROGRAM 41

VII THE SECONDARY SCHOOLPROGRAM 67

VIII VOCATIONAL-TECHNICAL, ADULT EVENING SCHOOL AND COMMUNITYCOLLEGE EDUCATION 80

IX PUPIL PERSONNEL SERVICES 92

X SPECIAL EDUCATION SERVICES FOREXCEPTIONAL CHILDREN 106

XI PERSONNEL 128

XII EVALUATION OF PHYSICAL PLANT 157

XIII PROJECTED BUILDING REQUIREMENTS 179

XIV BUSINESS MANAGEMENT 198

XV ADMINISTRATIVE ORGANIZATION 232

XVI FINANCIAL IMPLICATIONS 263

Appendix A: BASIC INFORMATIONON SCHOOL BUILDINGS IN NASHVILLE-DAVIDSONCOUNTY SCHOOL SYSTEM AS OF MARCH 1963 273

- vi TABLES

Page

1 BIRTHS TO RESIDENTS IN NASHVILLEAND DAVIDSON COUNTY AND CORRESPONDING1960CENSUS ENUMERATION BY AGE 12

2 ACTUAL AND PROJECTED OCTOBERMEMBERSHIP, NASHVILLE-DAVIDSON COUNTY METROPOLITAN SYSTEM,1957-1972 15

3 "ACCELERATION-RETARDATION" SCORES IN GRADES1-8 OF METRO SCHOOLS, BY RACE OFENROLLEE AND BY SOCIO-ECONOMIC STATUS OF THE SCHOOLCOMMUNITY OF INDIVIDUAL SCHOOLS,1961-62 27

4 COMPARISON OF HIGHEST AND LOWESTSCHOOLS ON COMPOSITE SCORES ON METROPOLITANACHIEVEMENT BATTERIES BY GRADE LEVEL AND BY SCHOOLSYSTEM, 19'1 -62 28

5 A COMPARISON OF "BEST" AND"POOREST" PERFORMANCE IN VARIOUS METROPOLITANACHIEVEMENT TEST CATEGORIES IN THE DAVIDSON COUNTYAND NASHVILLE SCHOOL SYSTEM, GRADES 1-8,1961-62 31

6 MEAN PERFORMANCES ON INDICATED TESTSBY HIGH SCHOOL ENROLLEES IN SPECIFIEDGRADES ,1962 33

7 MEAN PERCENTILE SCORES ON THE ESSENTIALHIGH SCHOOL CONTENT TEST, BY SEX AND RACE OFTENTH GRADE ENROLLEES AND BY SOCIO-ECONOMICSTATUS OF THE SCHOOL COMMUNITY OF INDIVIDUAL NASHVILLE SCHOOLS, FEBRUARY,1962 35

8 PERCENTAGE COMPARISON OF THREE GROUPSAS BASED ON THE DISTRIBUTION OF METROPOLITANREADINESS TOTAL SCORES AMONG "SUPERIOV"HIGH NORMAL," "AVERAGE," "LOW NORMAL," AND "POORRISK" CATEGORIES OF EXAMINEES, NASHVILLECITY SCHOOLS 36

9 MEAN PERFORMANCES ON THE VARIOUSCATEGORIES OF THE DIFFERENTIAL APTITUDE TEST: BYRACE AND SEX OF NINTH AND ELEVENTH GRADE ENROLLEESAND BY SOCIO-ECONOMIC STATUS OF THE SCHOOLCOMMUNITY OF !NDIVIDUAL NASHVILLE SCHOOLS,1961-62 37 TABLES (continued)

Page

10 RESULTS OF STUDENTPERCEPTION INVENTORY ON 49 CLASSROOM PRACTICES INGRADES FOUR AND SIX

GRADES 1-6, IN 11 DISTRIBUTION OF CLASS SIZES, NASHVILLE AND DAVIDSONCOUNTY, FALL 1962 52

12 MEDIAN CLASS SIZES INNASHVILLE AND DAVIDSON 53 COUNTY ELEMENTARYCLASSES, 1962

13 NUMBER OF HUMANINTERACTIONS IN CLASSES OF VARIOUS SIZE EXPRESSED ASRATIOS TO VALUES 57 FOR CLASS OF 25

14 SPECIAL EDUCATION SERVICES FOREXCEPTIONAL CHILDREN IN NASHVILLE ANDDAVIDSON COUNTY SCHOOLS 108 1962-63

15 ESTIMATED EXTENT TO WHICHEXCEPTIONAL CHILDREN ARE NOW SERVED BY METROSCHOOLS 109

16 COMPARISONS OF ENROLLMENTS INSPECIAL EDUCATION PROGRAMS IN SELECTED LOCALSCHOOL SYSTEMS THROUGHOUT THE UNITED STATES,FEBRUARY 1958 111

17 LIMITS IN SALARY SCHEDULESFOR SELECTED SCHOOL SYSTEMS, 1962-63 131

18 COMPARISON OF 1962-63 SALARIESIN NASHVILLE CITY SCHOOLS AND DAVIDSONCOUNTY PUBLIC 133 SCHOOLS

19 SALARY SCHEDULE ADAPTED BYTRANSITIONAL BOARD FOR 1963-64 135

137 20 SUGGESTED SALARY SCHEDULE FOR1968-69

21 SALARY LIMITS AND NUMBEROF STEPS FOR FIVE-YEAR CONVERSION TO PROGRESSIVEINDEX SALARY STRUCTURE RECOMMENDED BY 1968-69 139 TABLES (continued)

Page

22 ADMINISTRATIVE SALARY RATIOS TO MAXIMUM M.A. TEACHERS' SALARIES IN USE IN 1962-63 INNASHVILLE CITY SCHOOLS 141

23 RELATIONSHIP OF ADMINISTRATIVE MAXIMUM SALARIES TO MAXIMUM SALARIES OFCLASSROOM TEACHERS WITH M. A. DEGREES, 1962-63 143

24 ILLUSTRATIVE ADMINISTRATIVE AND SUPERVISORY SALARY RATIOS TO MAXIMUM M. A. TEACHERS' SALARY AT FIVE-STEP PROGRESSION 144

25 NUMBER OF SCHOOLS IN THEMETROPOLITAN SCHOOL SYSTEM OF NASHVILLE AND DAVIDSONCOUNTY, TENNESSEE AS OF MARCH 1963, BY TYPEOF SCHOOL 158

26 CAPACITY OF SCHOOLS. IN THE METROPOLITANSCHOOL SYSTEM OF NASHVILLE AND DAVIDSONCOUNTY AS OF MARCH 1963 159

27 YEAR OF INITIAL CONSTRUCTION, YEARSOF ADDITIONS TO BUILDINGS AND ADDITIONS BY YEAROF INITIAL CONSTRUCTION, BUILDINGS EXISTING AND UNDER CONSTRUCTION 163

28 PERCENT OF ALL RATINGS ON ALL ASPECTSOF SAMPLE OF 40 BUILDINGS BY RATING CATEGORY 166

29 COMPARISON OF ACTUAL AND DESIRED SITEACREAGE, COUNTY AND CITY ELEMENTARY SCHOOLS,DAVIDSON COUNTY, TENNESSEE 167

30 COMPARISON OF ACTUAL AND. DESIRED SITEACREAGE, COUNTY AND CITY JUNIOR AND SENIOR HIGH SCHOOLS, DAVIDSON COUNTY, TENNESSEE 168

31 PERCENT OF RATINGS ABOVE AVERAGE BYASPECT OF BUILDING, 40 BUILDINGS 169

32 DISTRIBUTION OF METROPOLITAN DISTRICTSECONDARY SCHOOLS WITH REFERENCE TO ADEQUACY OF A NUMBER OF SPECIALIZED TEACHING STATIONS AS DETERMINED BY EXISTING PROGRAMS 175 - ix _ _

TABLES (continued)

Page

33 EXISTING OR PLANNED BUILDINGS IN SCHOOL CONSTRUCTION PLANNING AREAS 180

34 PROJECTED ENROLLMENT TO 1972 AND AVAILABLE CAPACITY IN EXISTING BUILDINGS, GRADES 1-6, BY SCHOOL CONSTRUCTION PLANNING AREAS 181

35 PROJECTED ENROLLMENT TO 1972 AND AVAILABLE CAPACITY IN EXISTING BUILDINGS, GRADES 7-9, BY SCHOOL CONSTRUCTION PLANNING AREAS 182

36 PROJECTED ENROLLMENT TO 1972 AND AVAILABLE CAPACITY IN EXISTING BUILDINGS, GRADES 10-12, BY SCHOOL CONSTRUCTION P.LANNING AREAS 183

37 AVERAGE DAILY HOURS WORKED BY DAVIDSON COUNTY SCHOOL CUSTODIANS, MARCH 1963 206

38 PUPIL TRANSPORTATION IN DAVIDSON COUNTY, TENNESSEE, 1957-63 216

39 NUMBER OF SCHOOLS AND EMPLOYEES IN SCHOOL LUNCH PROGRAMS, NASHVILLE CITY AND DAVIDSON COUNTY SCHOOLS, 1962-63 219

40 DOLLAR VOLUME OF SCHOOL LUNCH PROGRAM IN NASHVILLE CITY AND DAVIDSON COUNTY, 1962-63 220

41 CENTRAL OFFICE STAFFING IN CITIES OF APPROXIMATELY 100,000 ENROLLMENT AS OF OCTOBER 1961 237

42 EXISTING AND PROJECTED NUMBER OF CENTRAL OFFICE ADMINISTRATIVE STAFF BY FUNCTION 239

43 ACTUAL 1963-64 METROPOLITAN SCHOOL CURRENT EXPENSE BUDGET AND ESTIMATED MINIMUM NEEDED HAD ALL RECOMMENDATIONS OF THIS REPORT BEEN IN EFFECT ( in thousands) 269

,

-x ILLUSTRATIONS

Page

BIRTHS TO RESIDENTS OF NASHVILLE AND DAVIDSON COUNTY 13

ACTUAL AND PROJECTED ENROLLMENT 15

NASHVILLE-DAVIDSON COUNTY SCHOOL CONSTRUCTION PLANNING AREAS 17

COMPARISON OF HIGHEST AND LOWEST METROPOLITAN SCHOOLS IN ACHIEVEMENT AT EACH GRADE 30

HOW 39 SAMPLE ELEMENTARY SCHOOL CLASSROOMS RATED ON QUALITY OF CLASSROOM PRACTICES 50

DISTRIBUTION OF CLASS SIZE IN ELEMENTARY SCHOOLS 54

GROWTH OF VOLUME OF HUMAN INTERACTIONS WITH INCREASES IN CLASS SIZE 58

PERCENTAGE CHANGE BY OCCUPATION, NASHVILLE AREA, 1950-1960 82

PERCENTAGE CHANGE BY EMPLOYMENT CLASSIFICATION, NASHVILLE AREA, 1950-1960 83

NASHVILLE-DAVIDSON COUNTY: LOCATION OF EXISTING SCHOOLS 161

RECOMMENDED ORGANIZATION, METROPOLITAN SCHOOL SYSTEM 240

CURRENT EXPENSE PER PUPIL, 1957-58 to 1962-63, UNITED STATES AND NASHVILLE AND DAVIDSON COUNTY 266 I

INTRODUCTION'

This is the report of a comprehensive survey ofthe Nashville and Davidson County school systems now becoming unified asthe Metropolitan School System of Nashville and Davidson County, Tennessee,under a Charter creating a newMetropolitan Government for Nashville and Davidson County.

The Charter creating the new Metropolitan Governmentprovides for the independent operation of the two previous school systemsunder a Transitional Board of Education until June 30, 1964 and chargesthe Transitional Board as fol lows:

"During the transitional period the Board shall cause cicomprehen- sive survey to be made of the two school systems, tothe end that, not later than July 1, 1964:

(1) a completeconsolidation of the physical properties thereof may be effected.

(2) the consolidation of personnel and employees thereof may beeffected."

Occasion for the Survey

The occasion for this survey is the necessity of layinggroundwork for the consolidation of two school systems.In no small degree it appears that the Metropolitan Government was brought about because of expectedeffects that this would have upon educational programs. A review of thebackground leading to the formation of the Metropolitan Government indicates concern onthe part of many citizens and professional education people for the fortunesof the two school systems.

Nashville City system possesses characteristics of thetypical educa- tional post-World War II adjustments to rapidly deteriorating,densely populated central city areas.Nashville has faced problems of redesigning andreconstructing its educational programs to meet continuouslychanging conditions in a mobile population not too much unlike that of most large cities inthe United States -- Atlanta, Memphis, Detroit, Chicago, New York, Baltimoreand Philadelphia. The problem in the County has been an increase inenrollment as it has become the suburban area supporting the Metropolitan commercial andindustrial complex. With tapid growth in total population following increasesin numbers of residences in the County, school enrollment has outstripped the taxbase. The County is newer and growing. The City is older and changing.

Characteristics of the Community

The Nashville-Davidson County Metropolitan area of 533square miles will have a total population by 1980 of over a halfa million people. Located in approximately the geographic center of the state of Tennessee, itserves as one of the large metropolitan areas of the southeastern part of the United States, with such centers as Memphis on the west; Charlotte; North Carolinaon the east; and Atlanta at its south.Nashville is the seat of the capital of Tennessee.

The Metropolitan community has considerable assets with which to support the development of an excellent public education program.The prospects of continued growth are good. Manufacturing is diversified, ranging from clinical thermometers to massive seagoing steel barges. Employment opportunities continue to develop with increasing employment in manufacturing,wholesale and retail trade, finance, insurance, various service occupations and government.In less densely populated parts of the County there is productive farming.

The community is a cultural center of considerable renown.It has 14 universities and colleges and some 21 preparatory and denominational schools. Among the institutions of learning are Vanderbilt University, George Peabody College for Teachers, Scarritt College for Christian Workers, Belmont College, David Lipscomb College, Fisk University, the Meharry Medical College, the Tennessee Agricultural and Industrial State University and Trevecca NazareneCollege.

The Perspective of the Survey

In view of the mandate in the Charter to the Transitional Board, it is apparent that this survey is not a survey of two systems. To be sure, to understand problems of uniting the two systems it is necessary to recognizesome of the great differences between them. These will be brought out in the report. The main emphasis, however, is not in the past, but on what the Metropolitan School System should be becoming.The perspective of this survey is thus toward the future.It is hence to be expected that recommendations in this reportmay imply major departures from current practices in the educational systems of either of the two districts.

Work of the survey team has been directed to making recommendations for action, taking into account:

(a) steps needing immediate attention

(b) steps for long-term consideration (c) possible economies (savings) to be derived from consolidation

(d) Feasibility with respect to financial resources of the Nashville-Davidson County Metropolitan area.

The survey staff has been particularly mindful of the scope of the new combined educational system. As is shown later in this report, in the not too distant future this school system will represent a total enrollment of over 100,000 pupils and staff of possibly 4,000 to 5,000 workers. There is no existing school system which can be used as a model for it.It is hoped that there never will bethat the leader- ship in the community will attempt to design it to fit the unique requirements of the Metropolitan Governmentand education for the people in the area. However, because of the many features of organization, management and the provision of instruction in large school systems, there is practically no standard that can be taken within the State of Tennessee with the exception of the school system of Memphis.

In dealing with school systems of over 100,000 population, the designers and planners of this new venture must look to such school systems as San Diego, Cali- fornia; Washington, D.C.; Duval County (Jacksonville), Florida; Atlanta, Georgia; St. Louis, Missouri; Dallas, Texas; Seattle, Washington; Milwaukee, Wisconsin; Denver, Colorado; Indianapolis, Indiana; New Orleans, Louisiana; Baltimore County, Maryland; and Boston, Massachusetts.

It is comforting to use a reference group or model which is close to home. But in the final analysis, the sociology and the economics of this vigorous area are not isolated and regional. The trade andthe commerce and the cultural diffusion eminating from the Nashville-Davidson County Metropolitan area speaks of its national significance and justifies a broader view in searching for its reference group.

This does not mean that its problems and its school systems should be like those in.Seattle, Denver, Boston, New Orleans, Atlanta or Memphis.

There are high hopes and aspirations embedded in the Charter which creates the new school system.Steps to make these hopes a reality is a huge under- taking.A narrow perspective completely disregarding the magnitude of the task would inevitably lead to failure.

Means Versus Ends

It is very easy to lose sight of goals and purposes in designing details of procedures, processes, and mechanisms to be used for accomplishing results. The nature of the mission of this survey team has been interpreted as one ofemphasizing the goals, the purposes, the performance requirements and not the mechanisms. There is no perfect school system in the United States today. The accumulatingknowledge about learning and teaching and organizing and managing public education has not been digested and has not been brought to bear to provide an ideal education. Much of what goes on in schools today we do simply because we started doing it that way.

Many of the details of how to achieve the goals in Nashville and Davidson County must be developed by Nashville and Davidson County, not by a survey team. There are many alternative courses of action, some of which will be apparent only as events occur year by year in the future of the newschool system. The major directions which are outlined in this report should be helpful, whether they are followed in meticulous detail or not, in the major purpose of a rapid unification of the two school systems. II

MAJOR PROVISIONS OF THE CHARTER

As noted previously, the two school systems of Nashville and Davidson County are operating within the framework of the Metropolitan Government under a Transitional Board, but separately with separate administrations and separtrte budgets.Beginning the school year 1964-65, the unification of the two systems is to be administratively effected. The following paragraphs outline the major aspects of the legal structure as provided in the Metropolitan Charter for the new Metropolitan School System.

The Board of Education

The Board of Education is to consist of nine members appointed by the Mayor of the Metropolitan Government with the approval ofa two-thirds majority of the Metropolitan Council. The first Board is to be appointed at-least 60 days prior to July. 1, 1964. One member is to be appointed from each of nine areas consisting of councilmanic districts, as set up by the Charter. Members must vacate their offices if they move from the area in which they were living at the time of their appointment.

In the framing of the Charter, consideration was given toan elected Board of Education.In theory, approval by the elected Council by appointments by the Mayor is themeans by which membership of the Board will be kept close to the people. The system of geographic representation is feared bysome as restricting the choice for new Board members and engendering Board practices in which there would be competing local vested interests.Regardless of method of selection, the community and governmental bodies and officials must accept the principle that the ob'ective is to have appointed the most qualified, eligible individual and that whether or not chosen froma geographic segment or the community at large, a Board member's responsibility is to the community at large-- not to a constituency.

Membership. Three members are to be appointed for terms of six years; three for terms of fouryears; and three for terms of two years. Upon the expiration of the beginning terms,successors are to be appointed for full six-year terms. Vacancies are to be filled for the remainder of the term of the former member.

Membershipon the Board of Education of any school district represents the highest type of public service.Board members should be responsible to the people of the community and shoulduse their best judgment to help develop and main- tain the best education possible for the children and youth of the entire school district. Whether or not this can be done by anappointed Board will depend upon thecaliber of the members appointed. Some otherschool districts in the United States are doing it and therefore it should bepossible in this new Metropolitan school district if the members are carefully selected.

Powers and Duties. The Board of the new districthas all the powers and duties conferred county boards ofeducation and city boaids of education in- cluding, but not limited to, Tennessee CodeAnnotated, Sections 49-214 which out- lines duties of county boards and 49-215 which statesdiscretionary power of boards, excepting only as specified in the newMetropolitan Charter.

Under the Charter, the Board is authorized todo all things necessary or proper for theestablishment, operation and maintenance of anefficient and accredited consolidated school system includingthe following actions, upon recommendation of the Director of Schools:

1. The employment and fixing of the compensationof all persons necessary for the properconduct of the public schools

2. The maintenance and preservation of school property,the management and safeguarding ofschool funds

3. The acquisition of school sites

4. The erection, maintenance and improvementof school buildings and additions thereto

5. The purchase of school equipment, furniture, apparatus, supplies and the like

6. The provision of group insurance of not lessthan Five Hundred Dollars ($500) each on its employees andteachers

7. The promulgation of plans, rules and regulationsfor the administration, operation and maintenance of apublic school system

8. The adoption of approved rules andregulations concerning purchasing, including the establishment andenforcement of standard specifications for all supplies,materials and equip- ment required by the Boardand which it has authority to purchase or lease

9. The continuance of furnishing free textbooks inthe public schools

-6 10. Receiving and accepting State Aid in effect at the time of the adoption of the Charter, unless and until changed by ordinance of the Council upon the recommendation of the Board

In addition to other duties imposed by the Charter or by general law, the Board must:

1. Hold regular monthly meetings open to the public

2. Adopt and make available for distribution rules, regulations and a statement of policies including:

a. The manner and method of operating the Metropolitan School System and its properties

b. The manner and method of employing personnel

c. The rules and regulations relating to all personnel .: policies and any requirements with reference to teaching personnel or non-teaching personnel, salaries, vacations, sick leave, job security and retirement policy

3. Hold public hearings on the operational budget prior to its approval by the Board and thereafter to submit it to the Mayor through the Director of Finance for subsequent consideration by the Council.

Fiscal Dependence

Since the operational budget of the school system is to be a part of the Metropolitan Government's budget, the school system is to be a fiscally dependent system.Fiscally independent boards of education prepare budgets within various prescribed limitations and levy taxes directly -- with accountability only to voters in the school district.

There are advantages to the fiscally dependent system. Most important is the opportunity it offers for sound public administration to balance all public service financial requirements against all potential revenues so that all government finance is coordinated as a whole. This is particularly important where mounting demands for public services-- education,health and welfare, law enforcement, public works, etc. -- outstrip potential sources of revenue. The situation in Nashville-Davidson County is of this nature.

From the standpoint of developing an educational program, there are ---

these dangers:

1. That determination of educational expendituresbecomes locked in the hands of a political machine

2. That control of the educational operationbecomes too far re- moved from the voice of the people

3. That decision-making processes in the formation ofpolicy and operation of schools become bogged down in too manylayers of a bureaucracy

Wisely the framers of the Charter have placed safeguardsagainst these hazards.For instance, by a two-thirds majority the Board ofEducation can request a special referendum to vote upon anincrease in school budget funds over the amount adopted by the Council.

There is ample latitude in the provisions of the Charter forthe develop- ment of a level of educational servicedemanded by the inhabitants of Metro at a level of efficiency required by the amount of money the people arewilling to spend. This can come about only if there is constant vigilance onthe part of all concerned in working toward those wholesome conditions of school governmentwhich will make the Metropolitan System work. Among the imperatives discussedelsewhere in this report are:

1. Provision for intra-governmental communications and public information operations within the new school system which will enable officials and the public to have enough factual information about the schools to exercise intelligently their relBonsibilities as public servants or their franchises as voters. This is a function for which adequate funds should be budgeted. The need for this has been apparent during the entire courseof work on this survey.

2. Avoidance of bureaucratic layering by the earliest possible establishment of highly competent central administrative staff under a highly cualliecl Metropolitan Director ofSchools so that a maximum of school management decisions can emanate under the control of the Board of Education with a minimumof dependence upon other branches of the MetropolitanGovernment.

3. Development of an administrative structure for the schooLystem with safeguards against the dangers of becoming toobig. The recent experiences in New York Cityillustrate this point. A survey of schools therehas found lack of top-level coordination,

-8 insufficient internal communication, duplication of efforts, no delegation of authority and overlapping responsibilities. Mainly by good management will the Board of Education and the staff of the school system in Metro command the respect of the rest of Metro Government and the people so as to avoid bureaucratic stagnation. Ill

PROJECTED ENROLLMENT TO 1972

For purposes of visualizing the scope of the newschool system and in order to make recommendations for quantitiesof staff and facilities required as the school system grows, it is necessary to make projectionsof enrollments. Basically, it is the number of pupils to be educated thatdetermines the magnitude of the task.

Bases for Projecting Enrollments

There are several methods common in use for theprojection of enroll- ments in school districts. An idealfoundation for such work in a district as large as this with its varyingcommunities, neighborhoods and sub-neighborhoodsis a complete and accurate school census. Unfortunately, there was not aschool cen- sus of the two areas.For that matter, the kinds of information in the two separate systems were so different thatstatistical operations for projection of enrollment were severelyrestricted. Since the t pes of anal ses which are made inthis survey are to become increasinI im ortant in the annin and ef icient deve oent o the new school system, it is recommended that at any earlydate there be conducted a thoroughschool census, and that this be done on modern electronicdata ro cessin.e.Ul.ment which will.ermit with facilitthe thorou.h analsis necessar to plan efficiently.

Lacking information on census which gives area by areaschool pop- ulation data over several successive years, it is necessary to resort toapproxima- tions.The term "projection" is used here advisedly rather than"prediction" because these data are merely statistical benchmarks, notforecasts. There are many assumptionsinvolved in these numbers. There are unforeseeableworld-wide, national and local events that can change the situation rapidly.They are based largely upon a projection into the future of trends of recent years.

Statistics in the present analysis were assembled fromthe 1960 cen- sus, fromlocal government sources and from the two school systems,showing the number of births to residents over c: period of years and thebacklog of pre-school children plus the numbers of children in schools by grade,treitiraseparately the white and non-white populations within the City and County systems.The method of projection used was a standard method which deeminesthe ratios of survival over a period of recent years,first from the crop of new children born in the district to those six years later entering the first grade, thenthe survival ratios of the number of pupils in the second grade to the number in thefirst grade in the

-10 previous year, and so on. On thebasis of these ratios, births as of a given date are converted toexpected first grade enrollments six years later.This group is then at the observed rate of survivalcarried through the second, the third, the fourth grade and so on.

For purposes of redistributing this set of data togeographical areas within the County, a statistical device wasused in lieu of census information which, in short, takes into account the possiblefuture additional families or dwellings in parts of the total area and applies tothis expected additional number anticipated densities of school population in termsof numbers of children of school age per family. As a base forthis, the survey team had at hand a popula- tion report of the Nashville City andDavidson County Planning Commissions prepared in 1962 and in which this identical process wasused, not for purposes of projecting school population, but totalpopulation. By means of the best avail- able information in the hands of the PlanningCommissions and the seasoned judgment on totalpopulation developed.by the staff preparing that report,it was possible to deduce, along with 1960 census information,anticipated total numbers of dwellings in various areas of the entire Countyand ratios of numbers of school children per dwelling. On this basis total enrollments asprojected in 1972 were redistributed by 22 planning areas used in the current survey.1

1 See Nashville City and Davidson CountyPlanning Commissions. Population Report #5 -- The Estimated Distribution ofPopulation of Davidson cCiiinb,-77 Tennessee, 1950-1960 with Forecasts to 1980.December 1962.

Growth in Enrollment to 1972

The initial source for an increase in enrollment isthe new crop of babies corning into an area each year. Nashvilleand Davidson County are sharing with other parts of the United States the continuationof the population explosion which has had some peaks and declines, but has more orless continued since the conclusion of World War II.In Table 1 and in the accompanying.chart we seethat the births over the past 10 years or so havecontinuously increasedlo residents of the area. This is confirmed by highly relatedbut somewhat different statistics availaWe from the 1960 census. On the basis of thesedata, it is reasonable to expect a continuation of a new sourceof supply of school children in Metro at the rate of approximately 9,500 annually.

Analysis of detailed tabulations reveals clearly thatthe school system now is feeling the impactof the first peak in births during the years 1946and 1947, since the two districts have a marked increase in11th grade and 12th grade chil!..; dren. To begin school next year these 11th and 12th graderswill be completing

-11 TABLE 1

BIRTHS TO RESIDENTS IN NASHVILLE AND DAVIDSON COUNTY

AND CORRESPONDING 1960 CENSUS

ENUMERATION BY AGE

Year Number 1960 Census of of Birth Births Age Number

1951 8,331 9 7,527

1952 8,359 8 7,875

1953 8,318 7 8,112

1954 8,936 6 8,259

1955 9,165 5 8,816

1956 9,339 4 8,798

1957 9,577 3 9,128

1958 9,559 2 9,022

1959 9,684 1 9,017

1960 9,759 Under 1 9,344

1961 9,532 12,000 10,000 8,000 6,000 4,000 2,000 0 1951 1952 1953 1954 1955 1956 1957 1958 1959 1960 1961 BIRTHS TO RESIDENTS OF NASHVILLE AND Year of Birth DAVIDSON COUNTY their educationas the initial crop of the bulge in births. As Table 1 and the ac- companying diagram show, there was a slowingup of this increased birth rate during the Korean War. At its cessation, beginning in about 1954, thecrops of new potential school children picked up again. The peak reached in new school children entering the world in 1959 and 1960 will be reflectedin increased en- rollments through the next decade beginning about 1965.

For planning purposes, the projection shown in Table 2 is used in this report.This shows the projected number of children enrolledas of October at the beginning of each schoolyear. This projection is mor6 conservative than others prepared. For instance,one method will show a total by 1972 of over 104,000. When statistically related to the population projections of the Planning Commis- sions cited previously, this carried to 1980 would representover 107,000 school children. The school system is, therefore, ina matter of time clearly becoming one that will join the class of large school districts in the United States of school population of over 100,000.

A breakdown of the projections indicates that between 1962 and 1972 the major part of the growth will be in what isnow the County system. As a matter of fact, the school population in the City has been declining and from in- formation obtained from planning experts, it will continueto decline on into the next decade or longer. The school population in the City isnow approximately 54 percent white and 46 percent non-white. By 1972 thisratio will be reversed. If the trend continues, by 1972 the non-white school population within theCity will represent 57 percent and the white population 43percent of the total.Some increase in non-white population in what isnow the County district is to be ex- pected. However, the non-white population in the Countysystem is slightly more than five percent of the total.

There is no evidence that Nashville will be experiencing the rapid transition from white to non-white school population that has been ofserious con- sequences in many large school systems throughout the United States. Theexper- ience of Manhattan, New York City; Washington, D.C.; and Baltimore,Maryland, for example, has been difficult for those administering schoolsystems in their efforts to adjust to interpretations of the United States Supreme Court relativeto the prop- er racial distribution of pupils in schools.Instead of 75 percent non-white,as is now the approximate proportion in Manhattan in New York City cind in Washington, D.C., the new school system in Nashville and Davidson Countywill not likely have more ,than one-fifth of its population non-white.It will demand, nevertheless, serious study, since a large proportion of the non-white populationis concentrated in small areas of thenew Metropolitan school district.

During the course of thesurvey, the leadership in the Metropolitan Government has taken forward steps to handle unemotionally and.intelI igently problems of racial relations which have been active duringthe period. The ways

- 14 TABLE 2

ACTUAL AND PROJECTED OCTOBER MEMBERSHIP

NASHVILLE - DAVIDSON COUNTY

METROPOLITAN SYSTEM, 1957-1972

Grades Year 1-6 7-9 10-12 1-12 Special** Total

1957* 42,099 14,505 9,354 65,958 (a) 65,958

1958* 44,301 15,304 10,253 69,858 (a) 69,858

1959* 45,381 17,049 10,707 73,137 (a) 73,137

1960* 46,327 18,808 10,759 75,894 854 76,748

1961* 47,052 19,874 11,575 78,501 1,055 79,556

1962* 48,110 20,004 13,335 81,449 1,209 82,658

1963 49,556 20,084 14,791 84,431 1,393 85,824

1964 50,714 20,429 15,454 86,597 1,576 88,173

1965 51,800 20,931 15,344 88,075 1,753 89,828

1966 52,626 21,651 15,412 89,689 1,937 91,626

1967 53,157 22,175 15,690 91,022 2,121 93,143

1968 53,209 22,973 16,079 92,261 2,307 94,568

1969 53,134 23,592 16,637 93,363 2,334 95,697

1970 53,077 24,113 17,029 94,219 2,355 96,574

1971 52,908 24,326 17,653 94,887 2,372 97,259

1972 52,680 24,484 18,128 95,292 2,382 -97,674

* Actual ** Based on trend in ratio to total up to ratio in city in 1962 (a) Not available - 15 in which, over the past years,the City school district and the Countyschool dis- trict have taken action onthe school integration issue arecommendable and speak for a continued satisfactoryresolution of problems in this regard.

Distribution of 1972 Projection by PlanningAreas

In order to redistribute the 1972projected population by parts of the district, studies were made of schoolenrollments as of 1962-63 by zones or attend- ance areasfor both elementary and secondaryschools, United States census infor- mation by census tracts, anddata at hand from the Planning Commission.The possible combinations of informationpermitted the formation of the 22 school con- struction planning areas. Theobjective was not to ascertain perfect communities orsub-communities or neighborhoods, but toestablish sub-areas from available data in which there was sufficientinformation on present school populations, present existing facilities and possiblefuture school population to be useful inplanning. It was possible to makeindependent survival ratio projections inseveral of these areas inwhich there was sufficient information onenrollment.In: the main, de- pendence was placed primarily uponthe population studies of the PlanningCom- missions. The objective was todetermine the 1.972 target date possibleenrollment in these areas.Statistics arerreported in the chapter onthe projection of school plant requirements derived from thisanalysis.

On the basis of census informationshowing the median years of schooling of the population, the percentageof employed persons in professional and managerial occupations, themedian family income, the percentageof owner-occupied homes and similar information,the 22 areas rank in socio-economic level approximately as follows:

XIX Greenhills XXI West Meade - Hillwood III Pennington - Donelson Hills V Sevenmile Creek Growth Area XVIII West End IX Joywood - Inglewood X Madison Growth Area II Bluefields - Cloverhill VI Glenbine XII Maplewood iV Southeast Rural (Part) XI Goodl ettsvi I le XX Southwest

I Old Hickory Growth Area XIII Northwest XIV White's Creek

-16 r 9 ' I t ,... 1 , I ,,,, . d , \ prt i ,. . \ 11 ilIA 1 1 1411 IL 4 i ' :1,11,7. MID alki% Ird :0. LA 04441 4 ' 7 .. 4 ...0.1" 0 &AI f 1q11;11:1111111* 1h Z4 \ '4' '...1111114,f,\ 4743311.2:. , or- MIL N e itgarr ell,rri,:,- if/Lik-tt.fiktal 1:11... IN".11.1 Aiw' pigti, i.t...,v,...4:40-- AN witxP. P '..II .,1,e1:15!:51 zwor ,4-k,-=zA-...:,,lir ,i-' vinbp,-1 rd714 't T i.t.A. 4. ?1,-- vilibmw.,.0 ATivrak. ,,,, eirill .1r 4w4.4 , - 46.__41-liaLmill=0=4._ iltlw_ANO, ' ordati, 0 It* $ ir ILar. maMNI. mown irlIDAigi ZZAair.AIP r . ../ it.-2.1 I, ...al:4 .70= , I V11110-47. '- 1 4511- la: ;11s5"tir. ..I . ;. i . ',..,,IrOP,,, F5;1E1 * inimi1.... MI% ' "'" ,1 .44,1 k , , ....,,,,, an*. 1,14,1!.._..Pe 1-40.-4,1-1111-mm- ' 4g.NA:1111111:a __Eg_ .111EIP ...,,, 1,44I sw.Pa 11..,-...; ,..-7,4edisfk os...r*Scii IN,.-grr, - .1.3.....,...... g--__,Aelittt, a- itAlt,* '4.m. .emVs 41- nt gt,-: Alk -1:: :t... 'go& 0/.6 , ,. 1 ei. ost% ..7)...-... Illi .210Ar- 4rap IN44-.'t "9 II : \CU ' .4 , 1 11 ,: I 4 .-- 1 i r4t44) r-p4.- ?AIM 4"4: fun , . II"' 22',..Ti?-.0; ..$1/e.'*. %: t tvo...eo *%% t 'M7 4. NP V. U11111110ftuglIlloot verivIlL11111111/V5,0**app =An , /is e. An +at -04 tu 1.4k* 40;:-.41111760 11115 4.1virs los, v.; 14 0ikife1111,::::-.: 1:.4111111Pli H...... rza. 41111=% / I f al maw VW110. agile 410_ ,714maa=-;r4moSt.-t, ,"? sik, 4,0 Caw itc- *p.n. -44,w 11-- i i0.,?*`01-1111113; 11111E114 1811.. I mai 4- 0' I --mit.4111111Mr b . ' ITCIp- 4110111811 %1111;1.7.:-- -41 r, El 7tA telaw4b,., !Fps 'I 11111 Imr -,111?-11 4:40.1! 11 01 06-11.42lipM/V4 "Ruara. Nil .11.° 1 = '7-ia P. . ? 1 tia 41,11r . 1 ..10 4111 I vki, ... aimitrum.,,t_11 qfr sez 1 11,44444 V f N off6 kPl11117.11".910P s'lli11;1 "' 47, V " ,.'-' .1 Le° Milleinr1W ;119.; Ati alb 41114111 t°k.":1-- '41; e r - fit\ -.0.14-$.;;14.4..riirgrAIO PainN 4 0101$ ths1 V -N cog S. n A rskr,__/641_11,11,dor pealsiliartiN 1:11 Ninrak N AREA NO. AND DESIGNATION PLANNING COMMISSION UNITS INCLUDED

1 Old Hickory Growth Area 1 Old Hickory 80 Hermitoge Hills

11 Bluefield: - Cloverhill 74 Clovethill 75 Bluefields

III Pennington - Done !son Hills 76 Merry Oaks 77 Knapp Farm 78 Donelson Hills 79 Pennington Bend

IV Southeast Rural (Part) Southeast Rural Planning Area (Part)

V Sevenmile Creek 62 Crieve Hall Growth Area 63 Tusculum 64 Antioch 65 Beverly Heights

VI Glenbine 66 Glencliff 67 Radnor 68 Woodbine 72 Glenview 73 Airport

VII Berry Hill - Elm Hill 69 Radnor Yards 70 Berry Hill 71 Elm Hill

VIIIEast Nashville 17 Greenwood 18 Eastland 19 Lockeland 20 Boscobel Heights 21 Edgefield 22 Douglas Park' 23 Northeast Nashville 24 Highland Heights 26 East Industrial

IX Joywood - Inglewood 11 North Inglewood 12 South Inglewood 13 Dalewood 14 Rosebank 15 Riverside 16 Burchwood 25 Joywood

X Madison Growth 4 Amqui rea 5 Neely's Bend 6 Madison 7 Old Center 8 Graycraft

X1 Goodlettsville 2 Edenwold 3 Goodlettsville

XII Maplewood 9 Bellshire 10 Maplewood

XIIINorthwest Northwest Rural Planning Area

XIV White's Creek V Haynes Heights 28 Bordeaux

XV North Nashville 29 Bush Lake 30 Northwest Industrial 32 Buena Vista 33 Early 34 North Fisher Park

XVISouth Nashville 48 West Commercial 49 Sulphur Dell 50 Central Business 51 Howard Park 52 Napier Park 53 Edgehi I I 54 Waverly - Belmont

XVII Hadley Park 35 South Fisk Park 36 Watkins Park 37 College Heights

XVIII West. End 38 Elkins Park 39 Sylvon Park 45 Cherokee Park 46 Fairfax 47 University Center 55 Hillsboro - Belmont 57 Woodmont

XIX Greenhills 56 Greenhills 58 Tyne Meade 59 Seven Hills C e*Pc " H

Or' fr

' -11..

r!

1 c /

Va t

MVP. \t, a Attv...iitsoll ' otair, 141;66p, 4..411.,-.... 4 ejaias at (Ph" r416.441: ._ if'. aux I *c, Af'4" 4ri ft_ vV:4014

Ida toaor Nip 49 r visp /41.1. ILII)112%-z: 3 .111 NM Ea ler 4z=j... I_iiiim HOW ;:t.r; rztir---- 1EIIIIIIE 1-.711 Vit.tvW"! .-, .:'S.1 a NterVidr%own, rz.-1.-y To A ,.... ,,,,_, mr,14, 'Flortfo,,,I1t Itilt;',1 1%. I'lf"-rAr...; :-..r-:.?: ip---.11MIllilma.A;II,,,olhk AsO 04ttlr'*Pt , if 1 p5.--,0 7flertirii IR mu. . ..: °:. hi....o.111MIAAVzrit - *.0"4-*.W' # ...... D....4- , w ka, . urn-=: eri-,,,,,.4,4. v. ... ,..... ' 711114 414: jarrn''''-_-_! :e.,::,, ;r11.- ,00 ,,A,r..._,,oi4,, e, I A.. tlestib.r.liti Ifjmn..., agli i:--.-.:::.---.1==s trys$ '',...4.,\ IN:tvd :,.., - 14 4.1,6Nigyar=4:111, UNEh _ 15)- 0011111111 P --111! - I ICI Figt%&.,.u- 4h r N.,41 f GI 1 staTihur 11# , gni a=lt ow. toe' - Agt .,eft===b1W* 4 1...,4",,,v; N IA al selh ..ra01r4 ' 4:4%i 4:Win 111111 .a-111 orgivi I Wi I PI ..,*.04, wa.9111E" : "rtft/4 001 -lea .:" 411/1 rft r s, ,= 7040111i=;i7 ausI..let . It,A 34,411 A 41:16.1P. nii"tompa- Arrarafr 11:4IArm iv Tula mai III 114; ...;t1.1P *fez too& 52'"441"4* 1 Blur 11 IA 9466. ! %Ire . it 14,4 44 Vf 40144 tke.f . % I-4 4- .40141 4 to th , IF; ON/ ;its I Oh 4,3 ! .- 14 Rosebank 15 Riverside 16 Burchwood 25 Jormood

X Madison Growth 4 Amqui Area 5 Neely's Bend 6 Madison 7 Old Center 8 Groycroft

Xi Goodlettsville 2 Edenwold 3 Goodlettsville

XII Maplewood 9 Bellshire 10 Maplewood

XIIINorthwest Northwest Rural Planning rea

XIV White's Creek 27 Haynes Heights 28 Bordeaux

XV North Nashville 29 Bush Lake 30 Northwest Industrial 32 Buena Vista 33 Early 34 North Fisher Park

XVISouth Nashville 48 West Commercial 49 Sulphur Dell 50 Central Business 51 Howard Park 52 Napier Park 53 Edgehi I I 54 Waverly - Belmont

XVII Hadley Park 35 South Fisk Park 36 Watkins Park 37 College Heights

XVIII West End Elkins Park Sylvan Park Cherokee Park Fairfax University Center Hillsboro - Belmont Woodmont

XIX Greenhills 56 Greenhills 58 Tyne Meade 59 Seven Hills 60 Glendale 61 Lealand 81 Forest Hills

XX Southwest Southwest Rural Planning Area

XXI West Meade - Hillwood 42 H i I !wood 43 West Meade 44 Belle Meade

XXII Richland - Centennial 31 Centennial 40 West Park 41 Richland

COUNTY PLANNING AREAS Educational Research Services, Inc. 1963

4 XVI South Nashville XXII Richland - Centennial VIII East Nashville VII Berry Hill - Elm Hill XVII Hadley Park XV North Nashville IV

PURPOSES AND GOALS FOR GOOD EDUCATION

Different judges of schools have different values orcriteria. How an individual evaluates an educational program depends uponwhat he expects a school to accomplish.

This chapter is a backdrop to otherswhich follow by reviewing some of the essential purposes of educationby which it is assumed the new Metro School System will be guided in its development.

Many of the points made here are implied orexpressly stated in curric- ulum materials and other documents of the two existingschool systems. To state a philosophy or set of goals is one thing; to reachthem is another. The major message of this chapter is that there is a long road to gobefore the generally accepted philosophy is to materialize in practice.

Desirable Curriculum Goals

Providing a satisfactory curriculum in twentieth centuryNashville and Davidson County is much more complex than manypeople realize. Some people consider the curriculum problem to be merely theestablishment of a list of subjects which children take at different grade levels. The termcurriculum as used in this report covers the entire organizationof educational experiences of aschool.

Unless one has looked into the matter in somedetail, he is not likely to see that the kind of educationalexperience, required in schools todayneeds to be very different from a generation or two ago.The increasing complexity of living in modern America is continuously producing pressures uponthe schools for new things to be included in the curriculum.

Schools in the United States are unique in thatthey are a direct product of the ideals of the American people undertheir form of democratic govern- ment. Many nations in the past and somein the present have systems ofeducation justified only insofar as they make directcontributions to the service of the nation. The educational systems of aggressor nations,for instance, become highly developed in the technical and scientific areas. A corpsof highly skilled engineers and tech- nicians in various industrial trades is essential to anation anticipating international conquest.

Societies need education to perpetuate themselves inother respects.

-19 The records of history show that nationsdo not flourish and surviveexclusively on the strength of their military conquests. Thestrength of a society is measured as well in the development of its intellectualactivities.This includes such areas as the fine arts, the humanities, and other aspectsof a culture which have to do with the way human beings behave and organizethemselves in relation to one another.

It is true also in American society that wehave provided schools through public taxation for all to attend notonly for the service to each state and the nation, but also for the generalbenefit of the democracy and the rights and freedoms to which we are dedicated.It has been recognized that democracies cannot survive with an illiterateelectorate.It is equally clear that the inter- national situation is such that the free world is nowcompeting with forms of govern- ment which can exploit tothe fullest the intellectual capacities ofthe people.In military terms, therefore, the defense of oursociety depends, as with aggressor nations, on our ability to develop tothe fullest our human resources.

In the language of the economist,education is tnus a productive good. That is to say,t pa s citizens to spend moneyfor education because there are definiie returns tobe derived. Citizens of Nashville andDavi-dson County vote funds for schools because they see that educatingchildren, their own children and children of other people as well, pays off inthe long run. When these children grow up and votethey will make more intelligent decisions.When they are old enough to earn a living they will be more productiveif they are educated up to their capacities. As more productive workers,they will add to the total value ofgoods and services of the community, the state,and the nation, and will contribute to general economic welfare. More educatedpeople have more complex wants.They prefer more sophisticated items of food,clothing and shelter. Moreover, they choose to purchase books, listen to fine music,take trips to points of interest and engage in a greatervariety of recreational interests. They arebetter consumers of the products of commerce from which a large portionof our population earns a living.

So we are willing to support educationfinancially because it pays, but this overlooks the most important reasonfor free public education in Metro.In a democraticsociety, it is one of the privilegesdemanded by the American people. We insist that education up to a certainlevel -- the opportunity to learn how to read and to write and to find outabout our human physical environment --is some- thing the dignity of the individual inAmerican democracy demands. Theright to an education isthus akin to some of the other rights which wecherish, such as the right of freedom of speech or the right totrial by jury.

In looking back over the developmentof education in Nashville and Davidson County and in other school systems inthe United States, it is notsurprising to find changes coming from the pressuresof a vigorously developing society.For example, strong reactions against childlabor at the turn of the centuryresulted in compulsory school attendance laws.This brought more children intothe schools.

-20 As more and more children stayed on through the first eight years of the elementary schools, there were pressures for the admission of different types of students to the secondary school. Whereas the high school in America began as a college pre- paratory institution, many youth not intending to go to college now go through high schools taking the agriculture, the home economics, the vocational trades and industrial education, or business education courses added in the past half century.

The curriculum of our schools is complicated by. the emerging tech- nology of education itself. A science of education has been developing since 1900. For instance, intensive studies have been made of vocabularies and the frequency with which words are used in day-to-day reading, speaking, and writing. A generation or two ago textbooks prepared in schools included many words which were beyond the experience of the children using them in school. Now textbooks are prepared against word lists based on studies of frequency of use and level of difficulty of words, making learning and teaching more efficient.

There are many similar examples showing how a "technology" or a "science" of education is being established. A generation or two ago there were no scientific instruments for measuring the mental capacities ofsckool childrenor objectively measuring their achievement in various subjects. We now have such instruments and better ones are being constructed every year. The area of child study has become a scientific field only during recent years. The currkulum becomes complicated partly, therefore, because we know more about what can be done to provide more efficient learning experiences.In short, the currkulum of our schools is highly complicated because (1) it must cover an accumulating mass of knowledge, (2) our people are demanding more and more of it, ond (3) modern understanding of the teaching process itself shows that effective learning situations in a school need more than a textbook, desks for pupils, and a teacher.

The following five items define the major weaknesses of our schools in curriculum, for its major shortcomings can be classified in these areas. At the same time they may be viewed as goals or objectives, since they are ends which never are attained with complete satisfaction.Solutions to the problems whkh arise in attaining them are complex and change as time moves on.In a third sense these items may be considered as criteria or earmarks from which to judge our educa- tional programs, for to the degree that a school program satisfies these needs, to that extent may it be judged to have an adequate curriculum.

1.The neea to adapt to today's world. The basic skills of reading, writing and arithmetic will no longer suffice.It is necessary to lift the level of training not only to improve the preparation of persons for such professional occu- pations as engineering, law and medicine, but also to prepare technicians, workers, managers, and others at all levels to adjust in earning a living in a changing world. It is becoming more and more important to counteract the narrowness of professional and vocational education.For example, professional training for engineers, doctors

-21 and lawyers is emphasizing more and more the necessity of broad, liberal education so that the specialist willbe more effective by relating his special talents to the broader problems of society.

In colonial America, communities were more or less isolated, occu- pations were simple, consumer goods were simple, and man's contact with the social and material world was simple. We live in a period when rural America is disappearing; radio and television have put everyone in ccmmunication with the rest of the world and soon in communication with outer space.The high-powered automobile and the air- plane have made us a mobile population. Few of us live our lives in the same county in which we were born.Educational needs in Nashville and Davidson County relate not only to the local community, but also to the entireState of Tennessee, the national community, and the world community. Mechanical contrivances continuously change what we do to earn a living and the things we do in our homes. When man is harnessing the electron and the atom, he changes the pattern of living for people in all walks of life, on the farms, in the factories, and in the market places with the products of a rapidly developing science.

It is not only the concrete and the material aspects of civilization with which our .curriculums must keep pace. Schools must respond to changes in the spiritual, artistic, and social aspects of human affairs.It is increasingly recognized that the curriculum of a school should provide opportunity not only for learning facts but alio for learning how to get along with people and how to develop as an individual. It is important to learn in school how to live as a satisfactory individual in a democratic society, as well as to learn history, geography, or arithmetic.In a questionnaire to Nashville and Davidson-County teachers, only 18 percent rated their schools top in this criterion.

2. The need for emphasis upon intelligent behavior. The real mark of the educated person is his ability to think and to understand -- not just to know. To many people the time-honored "assign-study-recite"method of initruction seems entirely adequate. Some school systems attempt to organize their curriculums by making up courses of study, to outline in syllabus form the subjects to be covered at each grade level, and to specify the textbooks to be used.Under the standardized asSign-study-recite plan it is assumed that children will learn all they need to learn. The difficulty with this is well known by most trained educators and teachers.The learning of isolated facts, the memorization of data, or simple rote learning is not eductition. The severest critics of our schools are those who claim that our graduates cannot think. This is a danger of instructional methods which do not givechildren and youth an opportunity for original experiences in the solution of real problems. It takes a carefully worked out curriculum plan for a school system and a veryable teacher to provide a learning situation which emphasizes intelligent behavior as the main objective ot the school.

Studies show that isolated facts are rapidly forgotten.It is important

-22

NIMINIIIIPAMPIIPPIN, that facts and knowledge be acquired in a manner which relates them significantly to some end and which contributes to learning how facts may be useful in intelli- gent human behavior. This means that holding school simply for the purpose of creating the ability to recall certain things is not enough.It does not mean that the tool.; of knowledge, skills in the use of numbers, and ability to read are not essential.

Twenty-nine percent of Nashville and Davidson County teachers rated their schools "excellent" on this criterion.Fifteen percent rated schools "fair to poor" on this item.

3. The need to recognize variation in humans. Most education takes place as though all human beings were alike in their intellectual makeup.It is easily demonstrated that just as children in the sixth grade differ in height and weight, they also differ greatly in what should be expected of them, let us say, in learning such phenomena as how it is possible to place a man-made satellite in space.

This basic consideration has been one of the most explored contributions of twentieth century educational psychology. Many types of educational devices have been introduced to accommodate instruction to the greatly varying interests, needs, and capacities of school children.Unhappily, in many schools little is done about it, or simple solutions are undertaken which do not work.In the vast majority of sixth grades, for instance, boys and girls are assigned most of the time the same learning experiences, completely disregarding the knowledge of the great variation in their needs. This target, this imperative need of a curriculum, is an exceedingly critical one because failure to accommodate it results in considerable waste. We only recently have begun to realize that we are not developing some of the talent of our potential doctors, lawyers, scientists, engineers, and other highly skilled persons. We must, on the one hand, find potential scientists and engineers and equip them,for instance, with much of the mathematics now taught in the first two years of college. This is a prescription which, on "the other hand, would make little sense for the vast majority of high school students. Many students are being exposed to standard doses of algebra and geometry not needed as a foundation for further studies they will pursue, not useful in practical aspects of daily living, and which do not give them some in- sight into the order and system of mathematical thought.

The gearing of the curriculum and the instructional program to the average can lead only to mediocrity. Time is wasted of those above average and those below average in aptitude and abHity. The perfect solution to the variation of human capacities is the designing of a curriculum for each individual child -- for no two of them are alike. There is no reason why the youngster who is not going to college cannot have a learning situation geared to his needs, and at the same time, why the unusually gifted child cannot be found and given the types of learning tasks suited to his needs.

-23 Only 15 percent of Nashville and Davidson County teachers consider "excellence"to have been reached on this goal. More than oneteacher in four rated their schools "fair to poor" on this item.

4. The need to provide proper conditions of learning. One of the great needs of our instructional programs is to provide thekind of environment con- ducive to genuine learning. A continuously dull and repetitive textbook recitation situation, as all experienced teachers well know, is like a vaccination -- sometimes it does not take.It is not sugar-coating education to set the stage properly so that children are motivated and develop an eagerness for learning.

An effective curriculum is one in which boys and girls are eager, enthu- siastic as they look forward to the learning experiences of the coming period orschool day. This situation requires a great deal of professional skill on the part of the personnel of a school.In such schools, it is recognized that learning takes place at its greatest rate where there is proper motivation. There is also a balancebetween the necessity of control in the mass education situation and the need for freedom of children to develop both as individuals and as members of a group.Neither an over- regimented nor an over-relaxed environment results in efficient learning.

Of the five principles, this was rated lowest by teachers. Only 13 percent of teachers in Nashville and Davidson County feel thatthe learning environ- ment in their schools is as good as it should be in motivating pupils andstudents and maintaining and stimulating interest.

5. The need to provide adequate learning facilities.Observations made above lead to the conclusion that an effective curriculum is one whichmakes use of a variety of devices forlearning. Youngsters in elementary and in secondary schools can best learn scientific phenomena when they have access to materials of the natural sciences -- plants, animals, chemicals, electricity, pulleys, models, etc. Yet the bulk of science instruction up through the ninth grade in American schools denies boys and girls the privilege of examining by themselves how some of the prin- ciples of science work. A typical ninth-grade general science instruction program is primarily devoted to studying and reciting out of a textbook with occasional demon- strations by the instructor. The only remedy is the provision of materials. The situation is similar in other fields of learning.

In recent years, a wealth of teaching aids has accumulated - visual aids on all subjects from the electron to the opera. Some schools in teachingsocial studies actually have on file copies of state legislation, local ordinances andcharts and diagrams showing the organization of state, local and federal government. Many classes in social studies conduct opinion polls in their community. A good measure of the enrichment of the curriculum is the degree to which physical facilities forteaching depart from the exclusive dependence on the textbook.

-24 With the impetus of the NDEA programboth school systems have moved forward in providing more visual aidsfor teaching. Also the ChannelNo. 2 ETV program is a stepforward in this area. Almost a thirdof teachers in Nashville and Davidson County considered theirschools "excellent" on this criterion.Yet even here, there is much more progress tobe made.

-25 V

SUBJECT MATTER ACHIEVEMENT LEVELS

One (and only one) of the evidences ofthe effectiveness of an educa- tional program is results of standardizedachievement tests.This section of the report covers an analysis ofsuch data in the Davidson County andNashville City systems.

Measures of Academic Achievement:Elementary Schools

Both the Davidson County and theNashville City school systems administered the Metropolitan Achievement Testin grades 1-8 during the school year 1961-62.Inasmuch as the date of test administrationfor the Metropolitan Achievement Test batteries varied from grade tograde and from one school system to the other, it was necessary to convertall of the "grade placement" scores into corresponding "acceleration" or"retardation" scores for each particularsubgroup "as of the date of testing" for that particularsubgroup.

Composite Achievement Scores. Table 3 containscomposite (i.e., average of all schoolsubjects) achievement scores in the elementaryschools of the Nashville (N) and Davidson County (D) school systems.The conversion of grade placement averages into "acceleration" or"retardation" scores (expressed in units of one-tenth of a grade) permits meaningfulintergroup comparisons asrelated to (a) race, (b) school system, (c) socio-economic statusof the school community of individual schools, and (d) "best" and "poorest"total performance in individual schools in both school systems (Table 4)0

Achievement in Relation to Race, School S stem,and Socio-Economic Status. The data in Table 3 warrant, amongothers, the following conclusions:

a. With one exception (i.e., sixth-gradeNegro enrollees in both systems are equally retarded --1.3 grades each) white and Negro enrollees in the Davidson Countyschools have more favorable achievement test scores than doNashville enrollees of the same race and grade level. The amountof comparative test superiority of Countyenrollees (i.e., as compared with City enrollees of the same gradelevel) tends to be much greater among whitesthan among Negroes, especially ingrades 5, 6,7 and 8.

b. With one exception (i.e., first-gradeNashville enrollees of

-26 AND"ACCELERATION-RETARDATION"* BY SOCIO-ECONOMIC STATUS SCORES OF IN GRADES 1-8 THE SCHOOL COMMUNITY OF INDIVIDUAL SCHOOLS, TABLE 3 OF METRO SCHOOLS, BY RACE OF ENROLLEE 1961-62 compared Groups systemSchool 1 2 3 4 Grade 5 6 7 8 Race of enrolleeWhite County (D) .2 .4 .5 .5 .6 .6 .8 .5 Negro CountyD-NCity difference(N) (D) -.1 .3 0 .3.1 0 -.1 .6.1 -.1-.6 .6 -1.3 -.3-.8 .9 -1.3 -.1 .7 -2.0-1.5 -.71.5 -1.7-2.2 -.61.1 White-Negro difference CityCityCountyD-N (N) difference(N) (D) -.1 .1.2 0 -.1 .1.2.4 -.7 .8.6.4 -1.2 1.11.1 .6 1.0! .4 .5 1.21.9 0 2.31.3 .5 2.21.6 .5 Socio-economicUpperof status school community County (D) .5 .6 .9 .9 1.1 .7 .8 .4 Middle CityCityCounty (N) (N) (D) .2.2 0 .7.2.3 -.2 .7.3 .7.1.4 -.21.0 .3 -.2 .8.5 .3 .1 TABLE 3 (Continued) comparedGroups systemSchool 1 2 3 4 Grade 5 6 7 8 LowerUpper-Lower difference CityCountyCityCounty (N) (N) (D) (D) -.1-.1 .3.6 .7.6 00 -.51.2 .9 0 -.1-.21 .1 .8 -1.0 -.72.01.8 -1.0 -.81.81 .5 -1.5 2.3 -2.1 2.5 given group.* These Use A-R of (Acceleration-Retardation)the negative sign scores ("-") before the number indicates retardation. show the mean amount of "acceleration" or "retardation" for the TABLE 4

COMPARISON OF HIGHEST ANDLOWEST SCHOOLS

ON COMPOSITE SCORES* ONMETROPOLITAN ACHIEVEMENTBATTERIES

BY GRADE LEVEL AND BY SCHOOLSYSTEM, 1961-62

Nashville City Davidson County Both systems Grade High Low Diff. High Low Diff. High Low Diff.

- r - .3 1.1- .8 .5 1.3 1 .6 .., 1.1 .8 2.0 2 1.5 - .5 2.0 1.1 - .3 1.4 1.5 -.5 2.7 3 1.0 -.9 1.9 1.8 - .4 2.2 1.8 - .9

4 1.3 -1.7 3.0 1.5 -1.5 3.0 1.5 -1.7 3.2

5 1.6 -1.3 2.9 2.0 -1.5 3.5 2.0 -1.5 3.5

6 1.6 -1.1 2.7 2.2 -2.1 4.3 2.2 -2.1 4.3 4.6 7 .9 -2.4 3.3 2.2 -2.4 4.6 2.2 -2.4

8 1.0 -2.5 3.5 1.7 -3.2 4.9 1.7 -3.2 4.9

* Performance as here measured is expressedin terms of "acceleration" or "retardation" scores in units of one-tenth (.1) of a gradelevel. Scores preceded by a minus ("-") sign represents "retardation."

- 28

.. . both races are equally retarded --.1 grade) white enrollees in both school systemshave more favorable achievementtest scores than doNegroes of the same grade level inthe same school system.For grades 5, 6, 7 and 8 thecompqrative amount of test superiority of white enrollees(as compared with Negro enrollees of the same level andschool system) is noticeably greater in the County systemthan in the City system.

c. Among both school systems the level ofsocio-economic status of the school community ofindividual schools is positively associated with the mean level of testachievement of enrollees in such schools.For each grade level reported,City and County enrollees attendingschools located in communities rated as being of "upper"socio-economic status have consis- tently superior achievement test scores ascompared with enrollees attending schools incommunities rated as having "lower" socio-economic status.

School Differences in "Best" and"Poorest" Achievement Scores. "Composite" (i.e., average of allsubtest categories) scores in theseveral grades of selected individual schools in theDavidson County and Nashville systems areshown in Table 4. The meandifferences between the highestcomposite score and the lowest composite score schools in theDavidson County system increase ateach successive grade level. There isalmost five years of difference inachievement by the eighth grade between the averagesof the highest achievingschool and the lowest achieving school in the County.Among Nashville schools there is acomparable general tendency for the grossmagnitude of the difference(in test performance of "best" versus "poorest" schools) toincrease at successive gradelevels from grade 1 (difference of 1.1 grades) through grade8 (difference of 3.5grades).It is thus clear that the mean pupil achievement, asherein measured, varies greatly among the individual schools of each system.These interschool diffemnces, aswell as similar ones of lesser magnitude,deserve detailed study to determinecausative factors involved and such remedial actionby school authorities as maybe indicated. To cite one example of animplication of rh m. present findings,it is obvious that the problem of transfer of an eighth gradestudent to a high school maydiffer greatly according to whether his eighthgrade (and total pre-secondaryschobling) reflected a markedly"accelerated" or a markedly"retarded" achievement status.

"Best" and "Poorest" Performancesin Elementary SchoolSubjects.In further analysis of test results, acomparison was made betweenacceleration-retar- dation scores at each grade levelfor each of the subtests of theMetropolitan is Achievement Battery.This permits an examinationof areas in which performance highest and lowest at each gradelevel.For instance, in the DavidsonCounty system pupils in grade 1 are achievinghighest in "arithmetic computation"and lowest in "word knowledge", as shown inTable 5. 2 3 4 5 6 7 8 COMPARISON OF HIGHEST AND LOWEST METROPOLITAN SCHOOLS Grade in School When Tested IN ACHIEVEMENT AT EACH GRADE TABLE 5 IN THE INDAVIDSON VARIOUSA COMPARISON COUNTYMETROPOLITAN OF AND "BEST" NASHVILLE ACHIEVEMENT AND "POOREST" SCHOOL TEST SYSTEMS,PERFORMANCE* CATEGORIES Grade School "Best" performance GRADES 1-8, 1961-62 "Poorest" performance "Best"-"Poorest" Grade 1 level Davidsonsystem Arith. compt. Subtest Score( .3) Word knowledge Subtest Score( .1) difference .2 Grade 2 DavidsonNashville WordSpelling discrim. ( .6) 0) Word knowledge ( -.1) .2) .4.1 Nashville Arith.Spelling compt.probl. ( .2) Word knowledge ( -.2) .4 Grade 3 NashvilleDavidson SpellingLanguage (1.0)( .1) Arith.WordArith. probl knowledgecompt. . (( -.5) .2).2) .8.6 1 Arith. compt. ( .1) c.) Grade 4 DavidsonNashville Arith.Reading compt. ((-.1) .9) WordReading knowledgediscrim. (( -.8) .1) .7.8 TABLE 5 (Continued) Grade level systemSchool Subtest "Best" performance Score Subtest "Poorest" performance Score "Best"-"Poorest" difference Grade 5 DavidsonNashvil le Arith.Lang.Language studycompt. skills ( (-.1).8) .8) WordSoc. st.knowledge st. skills ((-1.1) .3) 1 .0 .5 Grade 6 Nashv iDavidson I le Arith.Spelling compt. ((-.1) .9) ReadingWord knowledge ((-1.0) .4) .5.9 Grade 7 DavidsonNashvil le Arith.Lang.Arith. studyprobl. probl. skills (((- .4) .6) ReadingSoc. st.st. skills ((-1.6) .1) 1.2 .5 Grade 8 DavidsonNashvi I le SpelArith. I ing probl. ( (-.5).6) ReadingScience (-1( -.3) .7) 1 .9. 2 Mean A-R score DavidsonNashville SpellingArith.Lang. compt.study skills ((-( .6).2) .6) WordSoc. knowledgediscrim. st st. skills (-1( .1) .3).3) .9.9 (A) tenth* Performance, (.1) of a gradeas here level. measured, Scores preceded by a minus ("-") sign represent is expressed in terms of "acceleration" or "retardation" scores in "retardation". units of one ',t,t,...1LIft.twsi,a.444"314VA:" It is noted in Table 5that Davidson Countyenrollees have "best" test 5), and performances in spelling(grades 2, 6, and 8),language (grades 3 and "best" language study skills(grades 5 and 7). Conversely,Nashville enrollees have (grades 2, 3, 4, 5, and6), arithmetic test performancesin arithmetic computation spelling (grades 2, 3, and6). problems and concepts(grades 2, 7, and 8), and

"Poorest" test performances amongDavidson County enrollees were arithmetic in reading (grades 6, 7,and 8), word knowledge(grades 1 and 2), the two skills subtests (grade 3), worddiscrimination (grade 4) andsocial studies study performances were in word (grade 5). Among Nashvilleenrollees the "poorest" test knowledge (grades 1, 2, 3, 4, 5,and 6), reading(grade 4), social studies study skills (grade 7) and science(grade 8).

These differences in testperformance are attributable to one or more instructional time devoted to of the following factors:(a) variations in amount of staff as the given school subject;(b) variations in competenceof the instructional environmental stimuli which related to the various schoolsubjects; (c) variations in have in a might influence the amountof interest whichelementary students may particular school subject.As part of the task ofdirecting the instructional program differences. in the new system,thorough stucly_silA beinstituted to reconcile these Where they are found due toconditions be ond controlof the school s stem, an undesirable adequate demonstration ofthis is needed.If differences are due to imbalances in the instructionaleffort, such deficienciesshould be corrected.

Measures of AcademicAchievement: Secondary Schools

Achievement test data for theDavidson County secondaryschools are enrollees available from the severalsubtests of the CooperativeEnglish Test, 2A for problems and in both grades 9 and11. Arithmetic subscores incomputation and in concepts are available onDavidson County enrollees ingrade 10. On all categories Davidson of the CooperativeEnglish Test, ninth and eleventhgrade enrollees in On County schools fell 10 or morepercentile points abovenational median scores. County enrollees each of the arithmeticsubtests the performance oftenth grade Davidson closely approximated thenational norms (Table 6).

For the Nashville secondaryschools the availableachievement test High School Content aata consist of theIowa Silent ReadingTest and the Essential tenth grade enrollees.On all of the categoriesof the Test -- both administered to fell Essential High School ContentTest, the performanceof Nashville enrollees approximately 10 percentile pointsbelow the correspondingnational medians. Since performance the "spring" administrationof the Iowa SilentReading Test gave a mean enrollees fell several months score of only10.0, it is evident thattetith grade Nashville below the national norm(Table 6).

-32 TABLE 6

MEAN PERFORMANCESON INDICATED TESTS

BY HIGH SCHOOLENROLLEES IN SPECIFIEDGRADES, 1962

Mean Percentile Rank Test Grade School System

Coop. English, 2A 60 Vocabulary 9 County 11 County 63

60 Level of Comprehension 9 County 11 County 65

64 Speed of Comprehension 9 County 11 County 68

61 Total Reading 9 County 11 County 68

59 Expression 9 County 11 County 65

60 Total English 9 County 11 County 65

Arithmetic (10.4)2/ Computation 10 County

Problems and Concepts 10 County (10.5);/

High School Content 42 Math 10 City 39 Science 10 City

37 Social Studies 10 City

38 Eng I ish 10 City

38 Battery Composite 10 City

(1 0.051/ Iowa Silent Reading 10 City

a/ Grade placement score - 33 It is shown in Table 7 thatwhite enrollees of both sexes earned mean percentile scores in all categoriesof the Essential High School Content Testwhich approximated the national medians.In contrast, Negro enrollees of both sexes earned corresponding meanpercentile scores which fell near the firstquartile on national norms.

As might be anticipated, enrollees attendingschools in communities of "upper" socio-economic statusearned markedly higher mean percentilesin all subtest categories than did enrolleesattendirg schools in communities of"lower" socio-economic status.

School "Readiness". Analyses of thedata relative to the Metropolitan Readiness Test (Table 8) indicatethat both white and Negro enrollees inthe first grades of Nashville City schools comparesomewhat unfavorably with national sub- norms.For example, there is appreciablyhigher percentage in the Nashville populations than in the norm group of firstgraders categorized as "low normal" (excess -- whites, 4 percent; Negroes,9 percent) and as "poor risks"(excess -- whites, 7 percent; Negroes, 21percent). Comparison of the Nashvillewhite and Negro first graders shows a higher percentof whites than Negroes in thefavored categories ("superior" -- whites, 6 percent;Negroes, 4 percent; "high normal" -- whites, 19 percent; Negroes, 9percent) and vice versa in the unfavoredcategories (i.e., "low normal" and "poor risk").These findings are consistent withsimilar findings reported in the literature.

Average Intelligence Quotients. Asmight be anticipated from the inter-system differences in achievement test scoresdiscussed in a previous section of this report, the sub-populations inthe Davidson County system haveaptitude scores slightlyabove the theoretical norm(i.e., IQ of 100) whereas the Nashville sub-populations have mean aptitude scores veryslightly below this theoretical norm. For grades 5 and 8 (on which roughlycomparable data are available), the magni- tude of the inter-system differences(grade 5, 9 IQ points; grade 8, 11 IQpoints) is about what might have beenanticipated on the basis of the inter-systemdifferences in measured achievement at thesegrade levels, as previously reported.It should be noted that the comparativelyunfavorable status of aptitude scores amongthe Nashville sub-populations may be attributedpartly to a much higher ratio ofNegro enrollees in the Nashville system than inthe Davidson County system.The high positive correlations which are typicallyfound between standardized measuresof aptitude and achievement may be presumed toexist in the present situation.

Differential Aptitude Tests. The data onthe Differential Aptitude Tests administered in Nashvillegrades 9 and 11 (Table 9) areinterpreted as warranting the following generalizations:

1. When enrollees in both white andNegro schools are considered separately, the Nashville sub-populationsin grades 9 and 11 each

-34 TABLE 7

MEAN PERCENTILE SCORES

ON THE ESSENTIAL HIGHSCHOOL CONTENT TEST,

BY SEX AND RACE OFTENTH GRADE ENROLLEES

AND BY SOCIO-ECONOMICSTATUS OF THE SCHOOLCOMMUNITY

OF INDIVIDUAL NASHVILLESCHOOLS,

FEBRUARY, 1962

Battery vroupse. Social Engl ish composite compared Sex Math Science studies

Racial status

White M 55 49 48 40 47 F 49 46 44 52 48

Negro M 27 30 26 22 25 F 28 30 23 32 30

White-Negro difference M 28 29 22 18 22 F 21 26 21 20 18

Socio-economic status

Upper M 67 60 58 54 60 F 70 65 59 74 70

Middle M 57 51 51 47 50 F 46 48 42 50 46

Lower M 33 34 30 27 29 F 36 33 30 37 33

Upper-lower difference M 34 26 28 27 31 F 34 32 29 37 37

-35 TABLE 8

PERCENTAGE COMPARISON OF THREEGROUPS AS BASED

ON THE DISTRIBUTION OF METROPOLITANREADINESS TOTAL SCORES

AMONG "SUPERIOR," "HIGH NORMAL,""AVERAGE," "LOW NORMAL,"

AND "POOR RISK" CATEGORIESOF EXAMINEES,

NASHVILLE CITY SCHOOLS

Metropolitan Readiness categories Test Group High Low Poor Superiors normal Average normal risk Total

Norm (National) 5 25 35 30 5 100

White (Nashville) 6 19 29 34 12 100

Negro (Nashville) 4 9 22 39 26 100

Norm - White diff. -1 6 6 -4 -7

-21 Norm - Negro diff. 1 16 13 -9

White - Negro diff. 2 10 7 -5 -4

* The basic data were obtained from Reportof City-wide Testing Program,1961-62, prePared by the Division of Psychological Services,City Public Schools, Nashville, Teninessee. TABLE 9

MEAN PERFORMANCES ON THEVARIOUS CATEGORIES

OF THE DIFFERENTIAL APTITUDETEST: BY RACE AND SEX

ON NINTH AND ELEVENTHGRADE ENROLLEES AND BYSOCIO-ECONOMIC STATUS

OF THE SCHOOL COMMUNITYOF INDIVIDUAL

NASHVILLE SCHOOLS, 1961-62

Verbal Numerical Abstract Composite reasoning abil ity reasoning score imam. Grade Grade Groups Grade Grade Grade Grade Grade Grade 9 11 9 11 compared Sex 9 11 9 11

Racial Status

43 38 42 42 White M 42 43 42 47 42 43 F 42 40 42 48 41 38

26 20 22 17 Negro M 20 15 19 15 18 20 F 14 14 15 18 26 27

20 25 White-Negro difference M 22 28 23 32 17 18 24 23 F 28 26 27 30 15 11

Socio-Economic Status

50 57 58 Upper M 57 65 60 60 53 60 57 F 63 55 63 60 55 55

40 38 47 Middle M 37 50 37 50 40 42 41 F 41 43 42 45 41 35

22 28 25 26. Lower M 23 24 22 27 21 26 F 17 20 17 28 28 30

32 32 Upper-Lower difference M 34 41 38 33 31 22 39 31 F 46 35 46 32 27 25

- 37 compare unfavorablywith the norm groups on theverbal reasoning, numecidal ability, and abstract reasoning categoriesof the Differential Aptitude Test. The mean performancesof white enrollees of both sexes fall bbout 10percentile points below the national norm, whereas the mean performancesof Negro enrollees of both sexes fall near the second or thirddeciles of the national norms.

2. Sex and grade differences in the three DATcategories are of slight magnitude and are considered to be ofinconsequential predictive significance.

3. Among both sexes, enrollees in schools rated asof "upper" socio- economic status earned notablyhigher mean percentile scores on each of the three DAT categories thandid enrollees in schools rated as of "lower" socio-economic status.

Summary

Generalizations from test results are as follows:

1. Achievement in the Davidson County schools(both races combined) is above the norms consistently atall grade levels and beComes slightly greater up through grade 6. Atgrades 7 and 8 there is a tapeying off.This is to be explained by the markeddecline in Negro achievement in the upper grades.White pupils continue to exceed the norms by progressively greater amountsright through grade 8.

2. Achievement in the Nashville schools isprogressively farther below the norms grade by grade for bothwhite and Negro pupils, but lower for the Negro than for the whitepupils.For both groups the drop was sharpest in grades 7 and 8.

3. In both districts the achievement isstrongly correlated with mental ability.In turn, both achievement andmental ability are correlated with socio-economic conditions in theneighborhood.

4. The data on differences among schools suggestthe even greater differences which prevail everywhere withinschools, and within grades and classrooms within schools.It is not unusual to find within a given sixth grade in a single school as many aseight years of difference in achievement levels ofpupilsin some subjects. Some of this is due to under-achievement and someis not. Where

-38

ll: it is under-achievement,there should be staff time ofteachers and psychologists when necessaT,first to identify under- achievers and second to launch the appropriateremedial program. Aptitudes, interests and needs of humans differ.Pupils should not be expected to learnall the same things in the same amount. However, to the degree that importantlevels of learning fall far short of ca abilities and needs of pusils, to that extent there is waste of human resources.Because of the vast observable differencein achievement levels, particularlyin the upper grades, which is in part attributable to differences inthe nature of human beings, schools generally have a continuousstruggle in finding ways to get to the learner as anindividual.Differentiated curricula, small classes, homogeneous grouping,techniques for individualized learning, psychological services andspecial schools are but a few of the ways in which schools attempt to counteractthe effects of mass educationtypical of large school systems.

5. One cannot escape the impressionthat the schools of both Nashville and Davidson County set great storeby drilled learning. Excellence in spelling and in arithmeticcomputation predominate atall grade levels in both systems and amongboth white and Nogro pupils. Relative excellence in these areas isgenerally ymptomatic of memoliter teaching and learning.The highest levels of learning go far beyondacquisition of basic skills, as important asthey may be. Education for effective citizenshipentails the development of conce ts andunderstandings, powers of reasoning andthinking, and other skills and knowledge enablinsindividuals to ada t to a changing world. This level of excellencein education is not to be ex ected in schools not ade uatelstaffed withroperl qualified teachers, or in schools withlarge classes and insufficient facilities and services to assist teachers intheir tasks. This carries considerable implications for future budgetaryrequirements of the new MetroSchool System, as well as for a type ofadministration which, through research and development,curriculum planning, instructional management, in-service trainingand the like can produce highest returns for expenditure.

6. The relationship between lowachievement and low neighborhood socio-economic level is not a recentdiscovery. There is consider- able experimentation throughout the countrywith doing something for "culturally deprived" schoolchildren.High rates of delinquency and low levels of employability inthe labor force represent an undesirable burden to a communityeconomically and socially:A program ofamelioration of conditions in theNashville-Davidson County Metropolitan School System ispartly a problem beyond thescope of the school system. However,the school system must

-39 assume an importantrole in the work of communitydevelopment, since education is a strategic aspectof any type of improve- ment in any society. This meansgood working relationships with all departments of the MetroGovernment concerned with urban renewal and other aspects of communitydevelopment. One conclusion is evident; namel: the newMetro School S stem will most certainlfail in its goal of "- ual educational opportunity" to the extent that the problemof low-achieving pupils in less fortunate neighborhoods isattributable to (a) sub- standard facilities and services or(b) educational practices not adapted to the peculiar requirements ofsuch schools. vl

THE ELEMENTARY SCHOOLPROGRAM

The elementary school programs asobserved in Nashville and Davidson County give evidence of thefollowing strengths which arecommendable:

1. The principles of child growthand development are recognized as thebasis for curricular planning andimprovement.

2. The individual differences amongchildren are generally recog- nezed and provisions frequentlymade for them.

3. The program of instructionincludes the language arts,mathe- matics, social studies, science,health, safety, physical education, music and art.

4. Instruction in the basic skills,including reading and theother language arts as well as mathematics,is comprehensiveand effective.

5. Considerable attention is given toinstruction in the social studies.

6. A variety of creative activitiesobserved by the survey staff is evidence of a desirable trend inexpanding types of learning experience.

7. Children are learning and practicingappropriate, courteous behavior.

8. Children have opportunities towork to9ether, plan, accept responsibility, make decisions, andevaluate work done -- all important in a democratic society.

9. Field trips, resource persons, centersof interest, collections, books, and audio-visualmaterials are generally usedeffectively.

The Curriculum and Instruction

The educational philosophyof each system has beenclearly stated and consistent with the purposes ofeducation in a democracy.Certain techniques, mentioned in the Davidson County statement,such as "strong discipline,ability

-41 grouping and a reasonable amount ofhomework" need to be clarified.Observations in the schools indicated a wholesome,pleasant atmosphere based on positive approach -- guidance in developing self-direction anddiscipline.

Ability grouping, while mentioned in the philosophyof only one of the systems, seems to 6e practiced in both theCity and County systems.Research evidence indicates that no one pattern of organizationresults in a higher degree of academic achievement for ail children.In order to attain the values stated in the philosophies, it is important, therefore,that the schools evaluate grouping practices and different plans of organizationfor evidence of growth in all areas as well as academicachievement.

In merging the two systems, one philosophyshould be developed and stated.It is urged that such a statement be used as thebasis for giving direction io and evaluating the school program.As indicated in Chapter IV, stating a philosophy is one thing; putting it into practice isanother.

Subject Matter Areas. The content of subject matter areasin the elementary schools of both systems seems to be similar,appropriate, and organized effectively. There are two exceptions which requireconsideration.

The social studies program in both the County andCity seems to be strong. The elementary curriculum guidesin social studies for the County were developed in 1954 while those in the City are more recent --completed in 1961. Especially helpful are the materials developed for use instudying Nashville, Davidson.County and Tennessee. There is evidence alsothat the work at various grade levels is not confined to the "themes" onceused widely, especially at the primary level.

The social studies in both systems seem tofollow a similar pattern except at the sixth-grade level.In the City system the theme is,"The World, Emphasizing Neighbors Across the Atlantic Ocean."The cradkes of civilization in the Middle East, Greece and Rome, Europe inthe Middle Ages as well as modern Europe and Africa are included.In the County these topics are, ingeneral, delayed until the seventh grade and the theme,"Neighbors on the American Continent" used in the sixth grade. The content atthe sixth-grade level in turn effects the seventh grade content.

According to the topics listed, the themes usedby both the City and County are appropriate.It is important, however,that consideration be given to this situation and a decision made as to the content tobe used in the Metropolitan School System.

The second subject area in which there is now adifference is in arith- metic. The County system has alreadyintroduced the "new mathematics" in some

-42 of the grades and has secured new textbooks.In the City, plans have been made to introduce the "new mathematics" in thefall, yet textbooks have not been made available. With the current emphasis on mathematics, the systems are tobe commended for introducing the newer methods.It is important, however, that plans be made for the systematic introduction of "new mathematics" intograde levels where it is not now used and that provision be made fortextbooks using this approach.

Special Areas. In terms of special teachers employed, different areas have been selected by the two systems.In the City system special music teachers are employed forthe schools as well as four music supervisors. There 13 one super- visor for the system in physical education and a coordinator ofhealth.In the County system, physkal education teachers are employed for theschools along with a supervisor of health and physical education. Two music supervisors servethe system. The elementary teacher needs thehelp of special teachers, but the area of help and plan for using the special teccher varies from school toschool.It may well be that faculty members in one school feel adequate in musk andprefer a special teacher in physical education.

Rather than either system adopting the plan of the other, it is recommended that consideration be given to the followingplan: Allocation of a certain number of service units (teaching positions) to aschool or group of schools on the basis of thenumber of teachers; designation of subject matter areas inwhich the units ma be used (for exam le, music, art, ph sicaleducation); permission for the school under direction of District AssistantSuperintendents to determine the area in which the serviceunit or units will be used.In this way the special teachers may be utilized tostrengthen the program in each school in areas wherethe need is the greatest.

Instructional Materials.Audio-visual services and materials seem to be effectively administered and used in both systems.Every effort should be made to maintain the high quality of this serviceand to provide new instructional media as they becomeavailable.

The textbook situation appears to be quite different inthe two systems. In the City the textbooks seem to be used aslong as possible.This policy has resulted in the use of some out-dated textbooks. When the rapidchanges and progress in areas such as science,mathematics and social studies ale considered, it is not wise for children to be studying from textsthat are out-of-date. Such a practice results not only in waste of time, but inmisinformation. Funds for text- books in both systems are inadequate even though local sources areused to supple- ment state allocations.

The County system seems to have been able toprovide more adequately for newer textbooks.In merging the two systems, it will be necessary tomake

-43 provision for an adequatesupply of current textbooks.

Elementary Libraries.The library is consideredthe heart of a good instructional program. Yet, inneither the County or the City isprovision made but for elementary librarians.In some of the Countyschools there is a librarian, the salary is paid by thelocal school community. Otherthan in these schools, teachers assume the responsibilitiesof a librurian. Some ofthe teachers are trained responsibility aslibrarians while others are not. Theseteacher librarians must assume for their own classrooms and dothe library work when time permits.This means that the mechanics of thelibrary may be cared for inafter-school hours, but during the school day thelibrary is available on aself-service basis. Teachers may bring pupils to the library andhelp them, but if students comefor committee or individual assignments, there is no one toguide them.In some of the schools, parents assist with clericalwork in the libraries.Full-time, trained librarians are of teaching the use needed to develop planned programsof reading guidance and of the library.

The City system employs aDirector of Library Servicewhile the County County Librarian for the pro- employs a Supervisor of Materialsof Instruction and a of space for fessional library.Both systems are to becommended on the provision elementary libraries and the encouragementgiven to teachers torender library service. Centralized processingof books is done by theCity,which relieves the teacher librarians of this task.Such a service is not availablein the County.

Library funds are not adequate topurchase all the materialsneeded. materials. Each school has a mblorprolect, annually, in order toraise money for the into such projects. Much time and effort on the partof the school and community go Dependence upon this type of fundraising causes variation inthe quantity and better quality of materials among theschools.Financially, some aommunities are then budgetary able to support projects thanothers.If such funds are justified, provisions should be made andthe schools relieved ofthis responsibility.

Increasing public demands onpupils and teachers forquality academic services achievement are furtherindications of the need forincreased professional children or for slow learners, as from librarians in schools.In providing for gifted library materials and services are a well as for the average inthe schools, adequate necessity.

It is recommendedthat plans be made toprovide trained, full-time Southern elementary librarians. TheCooperative Program inElementary Education, Schools, recommends a part-timelibrarian or instruc- Association of Colleges and full- tional materials person inschools with seven to 14full-time teachers and a time such person in schoolswith 15 or more full-timeteachers.

Centralized purchasing andprocessing of materials forlocal school

-44 consideration of needed library use should be considered.There should be realistic personnel, materials and services to support anadequate instructional program. There must be recognition thatthese services cost money,and there must be commun- for this ity understanding of theneed for these expendituresand willingness to pay essential port of a good school program aspart of the regularschool budget.

Educational Television. The two systems areto be commendedfor out- general standing work in educationaltelevision. The cooperativeplanning done by the resulted in an manager ofETV and the committee representingboth school systems has ETV program which is ofhigh quality and is responsive tothe needs of the schools. There is evidence of thefollowing strengths:

1. ETV is accepted as a meansof supplementing theinstructional program.It is not the program.

2. Emphasis is placed vpon therole of the teacher in preparing the students for the ETV program,viewing the programwith the students, arranging forfollow-up activities andinstruction, and in evaluating the programs.

3. Instructional materials and guides aremade available to the teachers.

4. Scheduling is planned in such a way asto facilitateutilization of ETV as a part of the regular program..Science, for example, is not taught everyday.This provides time foradditional instruc- tion by the teacher which maybe needed by some groupsand for creative activities related tothe topic.For the first two grades, the programs are not keyed to aspecific subject area,but provide learning experiences of a moregeneral nature. The teacher can utilize this enrichingbackground information in variousaspects of the program withoutfeeling that she must"keep up" with ETV.

In the continued developmentof ETV it is recommendedthat the same should high quality of work and thecooperative planningbe maintained. -Consideration heights of the be given to the use of ETV inthe classroom, especiallyin regard to the during ETV, the development TV sets for younger children,the climate of "listening" instructional of listening and viewingskills, and the improvedutilization of ETV as an , medium.

Organization for CurriculumDevelopment

The systems are to be commended onthe plans for curriculumdevelopment Curriculum Council or which are in use and whichutilize the following processes: of local committees with representationfrom professional andlay groups; committees

-45 teachers and a consultant for development ofcurriculum guides and resource units; supervisors designated as coordinators ofthe Curriculum Council; meetingsfor discussing new curriculum guides with principals,experienced teachers andteachers new to the system; in-servicemeetings using outstanding speakers;general elementary supervisors; and supervisors in areas such asmusic, art, and physical education aswell as consultants inspecial subject areas in the City system.

The use of such techniques and processeshas resulted in a strong elemen- tary school program; the productionof many curriculum guides and resourceunits; well- organized and planned In-Service EducationDays and meetings; and the involvement of people.It is important, however, to examinefeatures of the program in terms of coordinated effort, the use of time, andthe degree of involvement of manypeople.

Production of Curriculum Materials. In order toproduce curriculum materials of the quality and quantity necessaryfor a good instructional program, cohsiderable time is required. The process is continuous,and in order to keep the material current and up to date, a largeschool system must produce considerable amounts of its own printed curriculummaterials. Even with all the efforts and activity, some of the guides in the Cityhave not been revised recently.For example, the Instructional Guide in Language,Number Work and Reading GradesOne, Two and Three carries the date1943.A Cumulative Course of Study in theLanguage Arts (Intermediate Grades) was produced in1956.The social studies materials are more recent, but with the rapidchanges in society, revisions will soonbe necessary. According to the list of curriculum study guides forthe County, most of them carry dates from1954 - 1957.The science guides have been revisedrecently, but in order to keep abreast of changethis revision will soon be outdated.

The participation of teachers in theproduction' of curriculum materials is generally recommended as atechnique for involving teachers andhelping them to understand the purposes and plan for thecurriculum and to facilitate the usesof the guides. When the total number of teachers inthe systems is considered, the percentage participating in the production of materials is verysmall. The involvement,then, for the large majority of teachers E....comes a processof being introduced tocurriculum guides and instructed in their use -- inother words, passive rather than activeinvolve- ment. Too often, theteacher and principal are involved in usingthe guides and units expected, rather than studying the children inthe classroom and the immediateschool community, as well as the latestcurriculum developments, andplanning for instruction which best meets the particular needs.All too often this has resulted inthe same curriculum for all without due consideration forvariations in the needs of each group of children -- gifted, slow, or average.

Role of Supervisors and Consultants.When the supervisors or consultants serve as consultantsfor the various curriculum productioncommittees, their other supervisory functions are seriouslycurtailed.Participation in the writing, editing, and producing of materials requiresconsiderable time which tends to divertattention

-46 from keeping abreast of latest developments, visiting in classrooms,and working with individual schools in undertaking and evaluating innovationsand adaptations in curriculum development.

This situation is especially true in view of the load carriedby super- visors and consultants.In the City schools one person serves as consultantin mathe- matics and science, both subjects of great concerntoday. Another serves as con- sultant in English, and as executive secretary for the CurriculumCouncil and the In-Service Education Program,In the County, where there are no consultantsfor special subjects, the elementary supervisors must assume thisresponsibility along with the supervisor for grades 7 - 8, who also serves ascurriculum coordinator.

With the number of supervisors and consultantsavailable and the load which must be carried in a system of 2,980 teachers, the reasonsfor such procedures as described are readily apparent.The supervisory personnel are to be commended on the very finejob which has been done with very heavyresponsibilities. More active participation by more teachers and principals will requirethe consultant help of additional personnel with time to perform this function.

Impact of the Learning Situation on Pupils

One method of checking on the conditions for learning in aschool is to obtain responses from pupils themselvesregarding the things they do, the things expected of them, and their general activities duringformal schooling periods.In the present survey the sample of fourth- andsixth-gradeclassrooms, involving 1,201 pupils, was covered by means of a paper and pencil device.The device permitted four scales characterising the general learning situationof classrooms as reflected by the reports of students themselves.

One of these scales relates to the extent to which(as seen by pupils' daily experience) instruction is varied for different pupiils.A second scale deals with the degree to which classes are organized in various ways toprovide various types of learning situations. A high score isachieved on this scale by a class in which there is not only a teacher-recitation situation, butalso opportunities for pupils to work with one another, and geneially procedureswhich are not entirely regimented. A third scale relates to opportunity for studentmotivation.It reflects the degree to which pupils have an opportunity to participatein making strategic decisions about what is to be accomplished in their work, insteadof slavishly follow- ing instructions determined by the teacher. The lastscale reflects the degree to which learning experiences in a class are not dependentsolely upon a single text book. 1

1 Based upon techniques reported in Francis G.Cornell, Carl M. Lindvall,

-47 Joe t. Saupe. An Exploratory Measurement of Individualties ofSchools and Class- rooms.University of Illinois: Bureau of Educational Research, 1953. 71p.

The results show that, although there is considerable variationfrom class to class in the Nashville City school system and in the Davidson County school system, schook are in general above average of other schools inwhich this technique.has been used in the degree to which the classroom situationshave departed from the rigidity and sterility associated with schoolingof one or two generations ago.It is to be 'observed that schools scoring high on these measures tend to be schools scoring high on many other aspects of quality ineducation in its comprehensive sense. Classes in which this measurement tookplace showed average or better learning conditions onthe scales used.

Table 10 summarizes the scores of the 39 classrooms in whichthe measurements were made. The 19 fourth-gradeclassrooms and the 20 sixth-grade classrooms are grouped according to how they rank with other classrooms in quarters. For instance, one-fourth of the 39 classes would be expected tobe classed in the highest group, if there were proportionately no more and no fewerhigh scoring classes than in other schools. The first column of figures shows that wewould expect approximately an even number of classes in each of the quarters.However, as may readily be seen, the Nashville and Davidson County classes tended tofall dispropor- tionately high in the upper quarters.For example, there were 29 of the 39 classes, or approximately 75 percent ofthem, in the two above-average groups in which only 50 percent would normally be expected. The distributions forboth the fourth grades and the sixth grades follow this pattern as shown in the table.

.A sidelight of this measurement is that this characteristic of classroom learning environment is unrelated to class size, at least within the range ofenroll- ments of classes in this sample. The veryhighest score was achieved in a fourth- grade class with 32 pupils. The very lowest score was encounteredin a class enrolling only 25.

Both large-sized classes and small-sized classes attainedabove-average scores.In other words, there was practically no relationship between sizeof class and measures by this device. The sub'ect ofualitof instruction is therefore attributable to other factors than class size, such as the experience, mgenuit ,skill and ersonalit of the individual teacher and perhaps otherfactors such as the nature of supervision and amount of assistance teachers receive inplanning and conducting their instructional programs.

The Subject of Class Size in Elementary Schools

The size of classes in elementary schools is of considerable pertinence

-48 TABLE 10

RESULTS OF STUDENT PERCEPTION INVENTORY

ON CLASSROOM PRACTICES IN GRADES FOUR AND SIX

Number of classes Quarter Both grades As measured ExpectedMeasured 4th grade6th grade

Highest (above Q3) 9.75 19 8 11

Next highest (Md-Q3) 9.75 10 5 5

Next lowest (Q1 - Md) 9.75 6 3 3

Lowest (Below Qi) 9.75 4 3 1

Total 39.00 39 19 20 Number of classrooms

0 5 10 15 20

Highest Fourth

Next Highest Fourth

Next Lowest Fourth INorm or I expected number

Actual number

Lowest Fourth

HOW 39 SAMPLEELEMENTARY SCHOOL CLASSROOMS RATED ON QUALITY OFCLASSROOM PRACTICES not only with reference to the quality of the instructional program, but with reference also to the financial implications of number of teachers required.

The Situation in the Metro District. The situation in the Nashville and Davidson County school systems is summarized in Tables 11 and 12.In Table 11 we notice that of 1,542 classes in Nashville and Davidson County thereare many between 25 and 39, but also some with 14or fewer pupils and some with more than 44 pupils. We also note in Table 11 thatover 25 percent of these classes enroll 35 or more pupils. As a matter of fact, the bulk of these are in the Davidson County system.This is also evident from Table 12, which shows median class size by grades in the two systems. At each grade level the median in Davidson County exceeds that of Nashville.

Rational Limits to Class Size. The professional literatureon size of class in elementary and secondary schools is of two major types-- that depending upon the judgment of educational groups or individuals, and that based upon objective analysis. By far the majority of reports based upon considered judgment emphasize small classes.However, this is not by any means a clear-cut issue.

It is generally considered desirable to have classes ofno larger than 25 and a maximum of 30 in both elementary and secondary schools.Because of the almost constant supervision required ofyounger children, kindergarten classes of not more than 20 under one teacher (25 maximum) are usually recommended. Because of the greater amount of individual work in art, home economics and shopcourses, classes of 20 to 25 are usually recommended for these subjects. Modernprograms of physical education are said to be possible only in classes of about 35. The bulk of the justification for these optimum class sizes restson certain assumptions regarding what good ethication is.

It is reasoned that the best school is one in which the emphasis is on providing the environment for learning rather thanon providing conditions for teaching. One of the most impressive accomplishments of twentieth century psychology has been the exploration by scientific means of the vast differences which human beings possess in ability to learn, and the great variety ofways in which humans learn best.Efficiency in teaching is thus viewed assuccess in understanding the differences in the equipment that ',Oils have for tackling each learning task and the different learning environments which pupils require to develop their potentialities best.

This centers attention on individual pupils and not upon the class as one single aggregate.This is in contrast to the mass education which the American ideal of free public education for all children and youth brought about--largely by force of necessity rather than through choice.Because of individual differences the regimented, mass-education methods of large classes havecome into disrepute.

It has been demonstrated that the lecture method is ivitable insome

-51 TABLE 11

DISTRIBUTION OF CLASS SIZES,

GRADES 1-6, IN NASHVILLE AND DAVIDSON COUNTY,

FALL 1962

Nashville Davidson County Total Enrollment NumberPercent NumberPercent NumberPercent

45 - 49 3 0.5 3 0 .3 6 0.4

40- 44 2 0.3 40 4.2 42 2.7

35 - 39 57 9.7 286 29.9 343 22.2

30 - 34 223 38.1 442 46.2 665 43.1

25 - 29 255 43.6 149 15,6 404 26.2

20- 24 43 7.4 22 2.3 65 4.2

15 - 19 2 0.3 5 0.5 7 0.5

14 or less - 0 .0 10 1 .0 10 0.6

Total 585 100 .0 957 100.0 1,542 100.0 TABLE 12

MEDIAN CLASS SIZES

IN NASHVILLE AND DAVIDSON COUNTYELEMENTARY CLASSES,

FALL 1962

Nashville Davidson County Grade Number ofMedian Number ofMedian classes classes

1 120 28.3 181 32.3

2 106 28.3 167 32.4

3 94 30.5 159 33.3

159 32.8 g. 4 88 31.0

5 92 30.6 150 33.2

6 85 28.4 141 33.4

All grades 585 29.4 957 32.8

- 53 50 30 20 IO Nashville Under 30 Class Size30 - 34 35 and Over r .A Davidson County DISMIBUTION OF CLASS SIZE IN ELEMENTARY , SCHOOLS learning situations and not in others.Learning is an individual thing, in that no two pupils arrive at a given stage of development at the same time.A routine of assigning such different learners the same lesson at the same time means over- shooting the mark for some and falling far short of the mark for others.Under- standing individual needs of pupils and administering almost as many different learning situations as there are pupils in a class set a limit to class size where mass methods do not.

The Class as a Unit and Organization for Instruction. In view of the teacher shortage there has been some experimentation with methods of handling large classes.Both schools and colleges have used public address systems and closed-circuit television to deliver lectures and to present demonstrations to very large classes or several classes at one time. An experiment at Hagerstown, Maryland undertook to explore the use of closed-circuit television for an entire county school system.For individual pupil diagnosis and remedial teaching, the sound speaker or the video screen is too impersonal and too automatic to account for individual differences.

Many school systems since encouragement of the National Defense Education Act have resources for visual aids, projectors, motion pictures,models, mock-ups, ETV and the like to supplement the textbook and other resources within the classroom. There is every reason to believe that devices for teaching large groups should be freely exploited in situations where classes are large and may be justified in view of curricularobjectives.

Various plans in current vogue for providing good education with large dlasses, such as "team teaching" and "ungraded schools," recognize the necessity of compensating teacher-time activities.Large class instruction to be effective requires more preparation; it must be supplemented by small-group instruction, guidance, etc. These plans, therefore, call for a reorganizationof instruction, a rearrangement ini pupil grouping -- not a reduction in number of pupils per professional staff member.

Another educational development of the current century has supported a limit to class size.It is the recognitibn of the importance of other persons in the learning situation. Manydesirable learning situations are group or team situations where children workcooperatively on a project. Also, many of the individual achievement situations in the school involve the relation of one pupil to another.Pupils perceive their reciting in terms of how other children are perceiving it, as well as how the teacher reacts to it.Our traditional marking and grading system is competitive, so that children measure their success with howothers are doing.

In short, it is reasoned with considerable validity that a teacher is really not concerned with only the single mass communication channel of the

-55 approach, or even justthe X teacher-pupil one-sided,lecture-demonstration channels of therecitation-individual-pupil-study-with-teacher- communication pupil-to-pupil as well as help approach, butwith many humaninteractions of teacher-to-pupil andteacher-to-group. of the teacher were toincrease If the channels ofhuman relationship increased, then aclass of 30 would represent only in proportion asX (size of class) responsibility for theteacher than a classof 25. He would only 20 percent more 20 percent more grades have, indeed, only20 percent more reportcards to make out, individual pupils tounderstand, etc.But he would to determine,20 percent more account. The possible combinationsof pupils to take into have considerably more be understood by a and the humanrelation channels which must groupings of pupils of pupils. The teacher increase far outof proportion tothe increase in number computations in Table13 and the waythis works may bedemonstrated by the accompanying chart. the The Complexity ofEvaluating Class SizeEffects. Unfortunately largely because ofthe complexity research literature isindecisive in many respects, achievement of class size.For example, astudy comparing of evaluating effects classes in large third-grade classesand small third-grade in long division in in a differentarith- California might nothave a bearing onteaching long division The outcomes ofsuch an metic programwith different objectivesin Nashville. how large third-gradeclasses should experiment wouldhave no known bearing on other aspects ofarithmetic or other be in California oranywhere else for teaching apply to other thingsexpected of third-grade subjects.Certainly it would not children or subjectstaught at other gradelevels. things into account. Clearly the class sizedecision must take many Some of these have beenconsidered in experiments:: measured by standard tests(which 1. The achievementof pupils as usually determineonly how much wasremembered). ability to think 2. Progress of pupils inunderstanding ideas and aswell as to learnfacts.

3. Differences in theattitude of pupils. understanding of 4. The extent towhich the teacher possesses an the pupils in theclass. enthusiasm of pupils intheir 5. The differences inattention and work.

6. Problem. of discipline.

-56 TABLE 13

NUMBER OF HUMAN INTERACTIONS IN CLASSES OF VARIOUS SIZE

EXPRESSED AS RATIOS TO VALUES FOR CLASS OF 25

Number of Teacher-pupil Pupil-pupil Groups of three Groups of four relationships pupils in relationships Possible Possible Ratio Ratio class Number Ratio Number Ratio number number

25 25 1.00 300 1.00 2,300 1.00 12,650 1.00

30 30 1.20 435 1.45 4,060 1.77 27,405 2.17

35 35 1.40 595 1.98 6,545 2.85 52.347 4.14

40 40 1.60 780 2.60 9,880 4.30 91,390 7.22

45 45 1.80 990 3.30 14,190 6.17 148,995 11.78

50 50 2.00 1,225 4.08 18,600 8.09 230,300 18.21 GROWTH OF VOLUMEOF HUMANINTERACTIONS WITH INCREASES INCLASS SIZE

a

1 / 41---.---, / / / / / / / / // / // / / // // // ///

...... - ...... «.---

30 35 40 45 50 class size teacher - pupil relationships pupil - pupil relationships possible group of three possible group of four 7. Development of self-reliance,

8. Development of proper work habits.

9. Degree of individual pupil participation (e.g., in smallclasses pupils should have more chance to recite and askquestions).

The above items suggest the gamut of yardsticks which need to be con- sidered in deciding whether a large or a small class will do.In experimental work it is necessary to control certain factors such as:

1. Differences in objectives of teaching.

2. Availability of teachers to handle classes of a given size.

3. The amount and kind of building space.

4. The variety of courses and problems of scheduling in high schools. (Some small classes are inevitable.)

5. The characteristics of pupils.(Some pupils might do some things better in small classes or vice versa.)

Factors least commonly considered in research studies are:

1. Effect of class size on degree to which teacher can individualize instruction to needs of pupils.

2. Pupil development in human relationships as well as achievement in academic subjects.

3. Extent to which a variety of activities may be provided.

Some Conclusions

The following conclusions seem to be applicable to theNashville- Davidson County situation:

1. There is no research basis for claiming that large classes themselves will result in a reduction in subject-matter attainment.

2. Similarly, there is little evidence of a relationship of size of class to such matters as student attention, discipline,self-reliance, attitudes and work habits.

-59 3. Educational quality is likely to result more from characteristics of the curriculum, the program of instruction, skills of teachers and utilization of personnel and facilities in support of the teacher.

4. Considerable uestion can be raised as to the desirabilitof one- fourth of classes in the area in elementarschools with 35 or more pupils under one teacher.

5. A tenable average level to be maintained is 30. This assumes team teaching, flexible scheduling, varied grouping and teacher assistance in handling the many classes over this number in maintaining this average.

6. Without well-planned reorganization of instruction a maximum class size of 30 is a tenable standard in self-contained elemen- tary classrooms with a single teacher.

7. To study this and similar problems requires a specially trained staff of research personnel working with specialists in curriculum and teaching. Such a staff is recommended elsewhere in this report.Funds to help support research on such problems are available from various sources.It can be money well spent, resulting in possible ways of better use of staff time and more effective instruction.

The Question of Kindergartens

Need for Kindergartens. A consideration of the need for kindergartens is important with reference to the children to be served, the changing population of certain school areas, the quality of the instructional program and the financial implications of the number of teachers and classrooms required.

Kindergartens, on a pilot basis, have been maintained in five schools in Nashville during the school term 1962-1963, each school center having two groups of kindergarten children. Summer kindergartens, of eight weeks duration, are also maintained. During the summer of 1962 one kindergarten was operated in each elementary school in Nashville and approximately one-half of the children who enrolled later as first graders attended.In the County, 400 children out of 6,000 first graders enrolled in the fall of 1962 participated in the program. During the summer of 1963, there will be 43 teachers in30 schools.

The summer kindergarten program does make use of teachers and rooms when not in use, and this is a commendable feature of the program. Some teachers, however, are not trained for this work and tend to do a "watered-down" first grade

, -60 program rather than a rich kindergarten program. EqUipment needed for kindergarten children is not always available in first grade classrooms.

Results of the Metropolitan Reading Readiness test, administered in the fall of 1962. to entering first graders in Nashville, indicated that 52 percent of the children were in the two lowest categories as contrasted with 35 percent for the national distribution.This percentage seems to suggest a skewed curve with a dis- proportionately large number in the lower groups. Thescores for Davidson County indicated a more normal distribution.Results of the Metropolitan Achievement tests, administered in the spring, indicate that more than 50 percent of the children were above the average as judged by national norms. Obviously, much had been accomplished.It seems probable, however, that considerable time was spent with pre-first-grade activities in order to help these children develop to the point at which reading could be undertaken. While the first-grade teachers are to be commended for the work they are doing in reading instruction, a question might well be raised regarding two facets of the situation, namely: What might have been accomplished had the children been "more ready" as measured by the test, and what undesirable pressures on children have been necessary to achieve such results?

It is also important to examine the number of first grade failures. The total for 1960-1961 is summafized:

Grade.-- -Nashville Davidson County Total Negro White Negro White

1 265 279 63 517 1,124

From these figures it is interesting to note that, assuming a class size of 30 pupils, this loss to 1,124 pupils is equivalent to the loss of time of at least 37 first grade teachers.This is costly not only in money but in terms of human resources when the shortage of teachers is considered.It is important also to con- sider the effect of failure on the child so early in his school career.In addition, most authorities agree that the kindergarten has positive values in regard to the child's personality development.

Values of Kindergartens. Much has been written regarding the value of kindergartens.Studies on the subject invariably show advantages in first-grade achievement and reduction in number of failures, non-promotion anti retardation.

The following conclusions seem to be applicable to the Nashvil le- Davidson County situation:

1. Both systems are to be commended on the start which has been made in providing kindergarten experiences for the five-year-olds.

-61 2. Kindergarten education is athoroughly justified part ofci It should be included for allchildren in the rapidly newMetropolitan System. However,how soon and how the kinderanbe expanded must depend upon available funds.

Althou h no lar e-scale kinder artendevelo ment is recommended in the immediate future,in making lon_g-rangebuilding plans, the situation indicates the needfor expanded kindergartenfacilities durinthe school term ade uate forthe entire fiveearold Eo

3. The advantages okindergarten ex eriences need tobeubli- cized both to parents and thepublic.

4. Summer kinder artens utilizeboth teachers and classroom space which are not available in allschools during the regular term. As an interim measure, thenumber should be expandedin order to accommodate alarger percentage of thepupil popu ation. Teachers who are empLoyed and whohave not had specialized training in kindergarteneducation should be expected totake college work in this field.Additional eqyjpment, appropriate for a well-equieped kinderara_t_ai-1.2y1cLbe provided.In-service education and sOpervision areneeded.

Policy Considerations

Promotion Policy. An examinationof the number of failuresindicates considerable variation between the two systems.Almost twice as many failures were Nashville. reported in the white schools ofDavidson County at firstgrade level as in The number of failures reportedfor both Negro andwhite schools in the City are approximately the same.In both systems,throughout the elementarygrades, the largest number of nonpromotions seems tobe concentrated in the firstgrades.

While retention is often practicedin order to raise standardsof achieve- does not ment, researchfindings indicate that this procedureis questionable and recommended because of the tend to accomplish thisyurpose.Retention may also be work kick of continuity between gradelevels and the unwillingness toaccept and with a child at his level ofachievement.

The following recommendations aremade:

determine 1. A study of retentions shouldbe made in the schools to the causes of failures and toplan appropriate proceduresfor

-62 reducing them.

2. Attention should be given to reorganization of the firstgrade program to providemeaningful experiences in keeping with the child's level of maturity and development. Whereexcessive retention occurs at other grade levels, appropriateaction should be taken to eliminate contributing factors.

3. Consideration should be given to including kindergarten programs as part of thepublic school system.

4. A uniform promotion polky based upon a recognitionof individual differences in instruction and evaluation and of theenvironmental factors which affect dchievement should be developedand practiced.

5. Consideration should be given to development of someplan for continuous progress through the elementaryschool.

Records and Reporting to Parents. The title of oneof the Davidson County publications, "Communicating With Parents,"implies a two-way-process between the schools and the parents. This processinvolves a sharing of information in order that parents may have a betterunderstanding of a good education and whatthe schools are trying to do for their child; and that theteacher and the parents may have a better understandingof what children are like.

Both systems are to be commended for acceptingand implementing this philosophy through the development of guides for parentsof kindergarten and first- grade children; use of parent-teacher conferences;participation in the Parent- Teacher Organization; participation of parents inschool activities; and the cooper- ative planning, by parents, teachers, andsupervisors, for the report cards now in use. All of these efforts should be continued.

Present day educational philosophy and practice stressthe importance of providing a curriculum in keeping with theability, growth and development of the children involved. The teacher must, at alltimes, know a great deal about and understand the motivations of the children sheteaches. This implies, then, the need for consultation with parents; tests; interpretationand use of test data; and psychological services.

It is recommended that attention be given tothe following:

1. Increasing the number of parent-teacherconferences held with each parent during the year. At least one foreach reporting period is desirable.

-63 2. Encouraging teachers to make visits tothe homes of pupils.

3. Keeping and using more accurateinformation about children as the basis for checking the reportcards. The decision as to whether the child is "doing his best" isoften left to teacher judgment and may not be supportedby reliable evidence of the child's ability.

4. Increasing the staff equipped torender psychological services. Teachers and parents need thehelp of ps chologists in order to understand andevaluate some children, The services now available are not adequate to meetthe needs of so large a system. Two psychologists areavailable in the Nashville system and two in theDavidson County schools.When referrals are made by the principaland there is not staff time for psychologists and teachers towork with parents, the full value of such services is notrealized. ,.

General Recommendations

In the merging of the twoschool districts, it is recommendedthat consideration be given to the following:

1. As rovided elsewhere in this reportestablish staff under an Associate Superintendent, Instruction, towork regularly in support of classroom instruction;and under an Associate Superintendent, Professional Services, a separatestaff not primarily responsible for day-by-dayoperation of the school program, butassigned to research, curriculumdevelopment, development of instructional materialsand similar work in designing new and improvedmaterials and methods. Systems of relationshi s will need tobe worked out so that exerimental and developmental workwill feed back into classroomteaching through coordination at theAssociate Superintendentlevel.

2. Establish a Curriculum AdvisoryCouncil consisting of represen- tatives from among teachers,specialists, administrators andthe lay public to work closelywith the recommended Associate 10 Superintendent, Professional Services,whose duties and respon- sibilities consist of developmentof curriculum, methods and materials as distinct from thefunctions of the AssociateSuper- intendent, Instruction, whoseiesponsibility is putting such developments into use and operatingthe instructional program. The organization structure isdiscussed fullin a later cha ter.

764

* 3. Insofar as possible, utilize curiculum guides of the Tennessee State Department of Education or some other reputable group or agency. Such guides maybe used to establish the frame- work for the system-wide curriculum, under supervision of the Curriculum Advisory Council which has been described.In areas where guides are notavailable, the Metropolitan School System should develop its own. This situation may be es ecialltrue with res ect to social studies materialsrelated to the study of Nashville and Davidson County and toETV guides. The system, however, should be somewhat relieved of the tre- mendous burden for production of materials which it now carries. The development of resource units for use throughout the system can be discontinued.With additional consultative help, teachers may develop their own units which can be more appro- priate for the local school.

4. Continue the practice of using general elementary supervisors to give over-all direction to the elementaryschool program, to evaluate the curriculum in order to maintainbalance among the various areas and in order to determine the appropriateness of it in terms of child needs and development. Because of the size of the system, it is desirable.to assign a generalelementary supervisor to each one of the three Administrative Districts as recommended elsewhere in this report.

5. It is also recommended that "Helping Teachers" be assigned to work under the direction of each general elementarysupervisOr. Such teachers should be selected from among classroomteachers and work in classrooms, upon request of principals, to assist teachers in the instructional program. Some may be designated for the primary grades and some for the intermediate grades.The ratio of one to 50 teachers is highly desirable.In the beginning, however, one to 100 may be necessary.

6. There should be continued use of specialists in the varioussubject areas. Consultants now carring several res onsibilities should be relieved and be free to devote full time to one area.There could well be one specialist each in the following areas:science, mathematics, language arts, music, art, social studies,health and physical education. They would be accountable to theDirector of the Division of Supervisory Services; and under thecoordination of the Associate Superintendent, Instruction and asrequested by Assistant Superintendents, work in the three AdministrativeDistricts as needed.(See sections of this report on Administrative Organ- ization.)

-65 7. Adequate staff should be assignedappropriate Administrative Divisions to provide supervisory,consultative and other special services to insure continuedimprovement in and maintenance of quality standards of curriculumand teaching on all grade levels, kindergarten throughsecondary school. Suchactivities as thefollowing should be contemplated:

a. Teamwork of people in audio-visualand library services with supervisors, consultants andsubject area specialists in reviewing, locating,recommending and producing materials needed for curriculumdevelopment. .11

b. Development of materials andmethods for use of princi- pals and supervisors inevaluating curriculum practices and plans.

c. Programs of orientation forprincipals and teachers such as workshops tostudy new curriculum guidesand materials so that they maybecome familiar with instruc- tional resources; study theimplications of the principles of human growth and developmentfor classroom activities and management; explore waysof determining the needs of a community, a class,and a child; and make needed adaptations in the curriculum.

d. Conduct grade-level meetings tostudy needs and tasks of children at the age levelinvolved; to study and make recommendations regardingtextbooks and audio- visual materials; and to recommendgoals to be achieved.

e. Research projects with faculty groups, aswell as with individual teachers, in analysisand use of test results, community study, experimentationwith curriculum innovations, and in use andevaluation of new guides, books and materials.Precise and scientificmethods are recommended so asto insuredependable knowledge on whatworks best, under which conditionsand why in all research of this type.

f. Curriculum committees to studyand make recommendations to the CurriculumAdvisory Council, to work ontopics designated by the Council, and todevelop needed curric- ulum guides and materials.

-66 VII

THE SECONDARY SCHOOLPROGRAM

Generalizations about the secondary schools ofNashville and of Davidson County with respect to their offeringsand services are difficult and danger- 6usly misleading. The history of the developmentof these two school systems accounts for a wide variety of practices andorganizational forms.

The Secondary School Product

One method of looking at secondary education is toexamine the pro- portion of youth served and whatbecomes of those who graduate. An excellent device for evaluating and redirecting asecondary program is a sample follow-up study of graduates to see what they doafter graduation and how what theyhad in school matches their needs. Such studies can andshould be instituted in the new Metro system, if recommendations madelater in this report are followed in adequately staffing research and development personnel tohelp keep the new school system on course.

No such follow-up study was available atthe time of this survey. However, estimates of dropouts and a canvass ofall seniors in the spring of 1963 concerning plans after graduation haveconsiderable bearing on the adequocy of educational services to youth in the two systemscombined.

1. Of every 10 pupils in the sixth grade,only six stay through the twelfth grade. Without complicatedfollow-up studies, it is not possible to determineexactly how many students leave high school and why. An approximationis nevertheless possible by following enrollments byclasses through successive grades.For instance, the followingshows the attrition to the senior class which graduated in1963 from the time students in this class were seventh-gradepupils in 1957-58:

Percent of Year Grade Enrollment 7th grade

1957-58 7 5,017 100.0 1958-59 8 4,824 96.2 1959-60 9 4,352 86.7 1960-61 10 3,956 78.9 1961-62 11 3,514 70.0 1962-63 12 3,083 61.4

-67 Some of the above attrition maybe due to transfers of some children to private schoolsand some to out-migrationof families with secondary-school-agechildren.In the main, however, this is the result ofdropouts, youth who do not complete high school. Innumbers it amounts to about2,000 of the June 1963 graduatingclass who were lost alongthe way.

2. With projected increases inenrollments, by 1972-73 the number of dropouts for eachgraduating class will exceed 3,000 unless the holding powerof the schools is increased.

3. High school dropout rates varyconsiderably among neighbor- hoods of the Metro system,approaching 50 percent inboth white and non-white areas inthe City and holding toless than 30 percent in Countywhite areas.

4. Of graduates not planning to go toschool beyond high school, the vast majorityintend to look for a job orhave no plansfor the year after graduation.Of an estimated 5,000 job or moregraduates by 1972-73, onlyabout 430 will have a and some 250 will expect to entermilitary service if conditions continue as they now are.Over 1,100 will neitherbe planning to attend college, norhave definite plans foremployment or other use of time at graduation.

large 5. Of graduates expected to go toschool after high school, numbers will not seek a four-yeardegree college programand the majority will not haveassured means of financingtheir post-high school education.If responses in 1973 aresimilar to those in 1963 toquestionnaires to seniors,3,200 will expect to study after highschool graduation and ofthese --

860 would not intend to gothrough a full four-year program;

1,300 would anticipateattending school orcollege at or nearhome;

2,300 would not be able todepend upon full costsof such study from family supportexclusively.

There will thus be manyhundreds of youth expecting tocontinue education after high schoolfor which there might notbe locally appropriate post-highschool opportunities in thecommunity.

-68 The implications of this arediscussed in the followingchapter of this report.

be Some of the expectedannual potential crop of3,000 dropouts can development of induced to stay throughhigh school.This will require continued discussed secondary programs, andextension of programs ofpupil personnel services as will find their way elsewhere in this report.Of the remainder of the dropouts, some adults. into the labor force andsubsequently will need retrainingfor employment as The implication is a typeof post-high school,full-time, evening and part-time education needed to serveliterally thousands of youth inthe community. An addi- tional implication is thedesirability of continuing summerschool, both for able student students who may acceleratetheir secondary educationby this method and the who needs this opportunity tomake up work and stay inschool with his class group. that the The recommendations inthis and subsequent chapters assume the entire obligation of the new MetroSchool System will be towork toward serving annual crop of youth inthe community -- the 3,200 or sowho will go to school beyond high school andthe remaining 5,000 whowill not plan further education, Since including the 3,000 or morewho will not even havefinished the 12th grade. be noted that the full the foregoing analysis isbased upon a single year, it is to by year. impact is much greater asthese educational gaps areallowed to build up year

Differences to be Reconciled orEliminated

There are marked differencesin secondary school programsin Metro. First, for grades the County junior-seniorhigh schools generally have a core program In some cases the core program seven andeight, while the Cityschools do not. do not. includes some mathematics and somescience while other core programs

Secondly, there is a wide varietyof types of schools housingsecondary students, such as:

grades 10 - 12:two in the City, nonein the County grades 7 - 12:four in the City, eleven inthe County grades 9 - 1 2:one inthe City, three in the County grades 7 -9:five in the City, none inthe County grades 7 - 10:none inthe City, two in the County grades 7 - 11:none inthe City, one in the County grades1 -9:two in the City, nonein the County grades1 - 10:one inthe City, none in the County grades1 - 12: one in the City, onein the County

Thirdly, the number of studentsgoing on to college variesfrom 10

- 69 percent to some 90 percent.

Fourthly, the number of studentstaking business subjects variesfrom 6.3 percent to 43.9 percent.

Finally, classes are much too large in someschools due to lack of teachers and facilities and too small inothers with too few students tofill advanced and specialized classes.

It is evident, however, that certainconclusions can be reached regarding the two systems:

1. In the County schools verylittle, if any, emphasis is given to art as indicated by thelow percentage of enrollmenttaking this subject.

2. Music is also very much less electedin the County than in the . City. 3. Enrollment in homemaking in secondaryschools varies from 18.9 percent of the totalenrollment to 25.0 percent inthe City, whereas this varies from 11.8 percent to27.3 percent in the County. This shows up in theanalysis of the actual needs inthe County, where there are 10high schools with more spacethan needed.In the City, on the otherhand, there are only five high schools with more space thanneeded.

4. In industrial arts there are sixhigh schools in the City and seven highschools in the County with more spacethan is needed for present enrollment inthis area.

5. In the County there are 15 highschools with not enough science rooms for the enrollmentsin this subject, while inthe City there are 11.

6. In foreign language the percentagetaking these subjects varies from 1.5 percent to 28.9 percentin the City, while inthe County it varies from 6.0 percent to71.5 percent. A larger percentage planning on going tocollege would tend to produce a larger percentageof enrollment in this field.

7. There is little vocational workbeing offered in the County. This will be treated in another sectionof the report.

-70 Subject-Matter Areas in the Secondary Schools

Examination of the reports of 2,700 high school seniors regarding their post-high school plans; a review of some 20 titles concerning curriculum in the Davidson County schools, some 30 such titles from the Nashville City schools, and some five titles from the State Department of Education; observation in a sample of junior and senior high school classrooms; discussions with building principals, teachers, and central office personnel, including directors, coordinators, supervisors and con- sultants; all of these activities lead to the following generalized conclusions concerning both the City and County systems:

1. In the general fields of instruction in the junior and senior high schools, there is a commendable alertness to modern appropri- ate content for most children and youth. Language arts, physical and life sciences, mathematics and modern language instruction are apparently developed on a sound basis with sensitivity to the need of continuing review of content. There are no major "" or extreme trends apparent -- on the contrary, there is the not unusual difficulty of system-wide up-grading of all work, but this difficulty is recognized and being dealt with.It is anti- cipated that this will continue as a constant operation within the structure of the new school system.(See the following section on Supervision and Curriculum Development.)

2. There is a problem in the important and challenging field of the social studies.This is not a problem unique to these schools. Rather, the study of the social sciences and their interrelation- ships has not been satisfactorily resolved on a national scale, and thoughtful teachers and leading scholars in these fields are dis- satisfied with the general results to date. Attempts to "bridge some gaps in the curriculum" have emerged under such curriculum materials titles as "Social Living." Excellent resource guides on the History of the United States and on the Tennessee Heritage have recently been prepared in the Nashville City system.Just as there is a nation-wide search for more meaningful and purposeful programs in the social studies, so the local system must conduct parallel inquiry. Alertness to national trends and requirements is necessary. Classroom teachers must be released for meetings with su ervisors, consultants and other resource persons, and for attendance at the state and national conferences on this vitally important phase of the curriculum.

3. A surprising variety of stress is placed on such subjects as the fine arts and other elective areas in the separate schools.This variety may be attributable in part to the pressure for completion

-71 of programs leading to college admission and in part to the frequent assumption that such subjects are of relatively little importance. To some degree this is attributable to simplelack of facilities.Enrollments are so remarkably varied, however, that it is worthwhile considering the relative importance of some knowledge of and appreciation of major elements within the several fine arts, for instance, and the desirability of building a stronger understanding of the importanceof these elements of our cultural heritage throughout our school staffs and general citizenry.Neither art, nor homemakin, norchoral music, nor drama can be termed "frill"by any well-educated and thoughtful person. On the contrary, these are important aspects of a sound education in the latter quarter of the twentieth century, and each school system has a real responsi- bility for awakening those who would deny them to the import of such subjects in the lives of modern Americans.

4. The range of elective subjects, their quality and their relevance to modern needs in modern life, are all symptoms ofthe compre- hensive character of a good secondary school.By and large, h schools of the City and the County have a good list of elective offerings for the more academically motivated and able student.It is suggested that certain system-wide inven- tories of these offerings could be fruitful as a means of identi- fying needs for further elective offerings not now available. True, the size of the student body and staff must necessarily constitute a major determinant of the rangeof electives which should be considered prudent. The possibility of offering several advanced courses in traditional subjectfields, plus adoption of some electives which us to the present have arbitrarilbeen considered of "college level," needs further exploration in all of the senior high schools.Further exploratory experiences of a less formal type may be well justified in the larger juniorhigh schools. Earth sciences, various forms of (substantial) consumer mathe- matics, creative writing, modern American literature, economic theory and more intensive and realistic approaches to geography are examples of this type ofelective.

5. In common with most school s stems in modern America, the schools which will constitute the Metropolitan system are seriously deficient in providing meaningful and appealing pro- grams for the young people who areof less-than-average academic motivation and promise.Despite our record of constant improve- ment of offerings for the young people who are ofabove-average academic potential, the large number of youth for whom these

-72 programs aresomething to be tolerated or to escapefrom is the greatest of challenges tothose responsible for the operationof our schools.At the present time some DavidsonCounty and Nashville City schools are providingcommendablesagm_ns for marich outh; yet as notedpreviously, only about 60_ percent of pupils inthese schools entering the 7t12.2Eacle survive to graduate. Furthermore,the frank statements of expectation by present seniors clearly revealthat more than a third of those who have survived into the senior yearof high school have no plans for further formal education,thatose on to furtherformal stud 27 ercent ilan to do so for lessthan four years, and that of those who do notplan further formal education, over half ex ect to"look for a 'ob." The wisdom of strengthening present guidance programs,curriculum offerings and other opportunities forthis significant number of Metro olitan youth is all tooclear.This is not an easy task nor a minorresponsibilk.

The large body of worthy and able youngpeople for whom the world of scholarship as such has little appealis a major segment of thisnation's potential for greatness.Far more important than lr;rningprescribed segments of classical scholarly discourse is the importance ofdeveloping in the minds andhearts of these the desire young peoplethe skills of honest objectivity indealing with all problems, to continue to learnsocially desirable thingsthroughout life, and the commitment to making meaningfulcontributions to the welfare of ourpeople and of all people wherever they may live or work or study.This report does not offer a neatcurricu- lum guide to the accomplishment ofthis difficult goal; rather, it remindsthose ro- res ons:ble forthe schools of the Metro olitan s stemof the unfulfilled task of viding meaningful and worthyeducational opportunity of an appropriatequality for all Nashville and DavidsonCotintuot.,th.

Organization for Supervision andCurriculum Development

Determination of the optimum organizationfor accomplishing the important business of developingthe best possible program ofofferings calls for careful consideration of the resourcesavailable, the legal and situationaldemands and the estimates of future trends;all in the light of clear statementsof the very purposes to beserved.

Certain clear similarities haveexisted between the organization to accomplish these purposes within theNashville City schools and thoseof Davidson County. Clearly, differences haveexisted as well. The finaldecisions, however, as to theorganization of the Metro district mustlead to an organizationwhich will be educationally and economicallysound.

-73 At one end of the organizational structuremust be the governingBoard, will be as legally constitutedwithin the framework of statelaw. At the other end found the children and youth to be served.lt is appropriate to examinethe :neans whereby the intervening elements will beidentified, related and assigned.Certain issues must be resolved. On thebasis of examination of the situation asit existed in May 1963, these issues maybe classified under headingswhich follow.

Centralization versus Decentralization.What is to be taught and what is learned is largely -- in fact,almost exclusively -- a functionof the indi- vidual teacher in the classroom.Here, working with students,the ultimate success or failure ofthe educational program hinges uponthe teacher's skill,knowledge, and acceptance of the task tobe done.Skill as a teacher,knowledge of subject matter and of the nature of youngpeople, and acceptance ofthe assignment are all characteristics which may vary inquality with the passing of time.The extreme decentralization of a school system wouldallow each teacher to remair. in anauton- omous andinsulated setting, unaffected by theinfluence of administrators, super- visors, or other teachers exceptthrough the students themselves..No self-respecting extreme. The opposite extremeplaces 4. teacher would welcome or tolerate such an the teacher in the role of an automaton,dutifully transmitting to studentsthe items ordained. as orderedfrom on high, in a manner andwith a method also externally Innocent of mature ideas or enthusiasm,such a role can be filled bythe least talented, unthinking clerk, or in fact acarefully programmed computer.No self- respecting person would claim tobe a teacher under this extreme.

Moreover, as is noted time and againin this report, there are vast cultural differences amongneighborhoods within the Metro systempointing clearly Furthermore, to keep to needed adaptation tovariations in student populations. schools properly related to the communityand to compensate for the remotenessand impersonality inherent in large school systems,there must be an optimumbalance between the uniformity, order andcontrol of centralization andthe responsiveness to community needsafforded by localized responsibility.

So a balance of responsibilitybetween the superintendentand his staff, the building principal andhis staff, and the classroomteachers as individuals and as members of a faculty andof grade-level groups,subject-matter departments fully in a later and other groupings must beachieved. This will be discussed more chapter.

Coordination, Creativity and Conformity.A school system, large or small, requires coordinative activities,the responsibility for which mustbe central development to the system and tothe work to be accomplished.This is Js true of the of constantly improving curricula as itis of efficient purchaseof supplies or budget development. Yet the sources of ideasabout the curriculum will notbe found in throughout any onelocation; rather, as is well known toexperienced administrators, faculties will be found people withideas of major significance tothe growth and

-7 4

4.

,-..-,,,...,,N...y.,--4...... -1.71.11....yr improvement of all aspects of the school program. Such ideas may be of such value that they must not be lost or limited in use.

Thus, a means for the channeling of opinion, ideas, and newer know- ledge into the life stream of the whole school system must be guaranteed.Further, provision for pilot enterprises applying the findings of new research to the local school system must be an integral part of the organization for program development. The world of scholarship is far frOm static; it is changing at an exponential rate. The Metro district must take full advantage of every source of relevant new know- ledge and this must extend into the day-by-day activities of each teacher in each classroom.

An occupational hazard exists within every teaching situation; it is well known to experienced observers,There is a temptation for all teachers to lose the enthusiasm with which they entered their first assignment, to fail to find the personal satisfactions which should be present in every attractive profession, and to become settled in a routine and mechanical type of daily and yearly activity which leads to the enjoyment of what has become known as a comfortable rut.

The challenge to every teacher, administrator and other person active in the life of the school system is clear. There must be meaningful and attractive opportunity to experience warm and sincere recognition for the effective use of worthy talents. There must be an opportunity to extend the scope of these talents, to explore fresh ideas, to dream and to design. This is aproblem faced in every known school building and only the rarest is able to avoid frequent losses to the tempting threat of this hazard.

Substitute Loyalties.Inherent in the formation of the Metropolitan School System is a conflict in established and reasonable loyalties to persons, to agencies, to institutions and to customs. A local, long-established andhonored high school inevitably has enjoyed a worthy degree of autonomy. A committee of supervisors has been responsible for the planning for in-service education of a segment of the staff. A leader has enjoyed the deserved admiration, respectand affection of a large number of persons within and without the school system. Such siutations are natural and desirable.

Yet with the substitution of a Metropolitan School System, some major loyalties are threatened, some customs jeopardized, some personal popularity subject to ero5ion. These threats to the established order canlead to chaos or to significant improvement; certainly the status quo cannot persist. It is here that some of the best thinking must be applied to take full advantage of the opportunitiesavailable, to exploit the unique and new relationships which can and mustlead to better education for more boys and girls.There must be a willing and sincere sacrifice of some prestige and power to the end that all involved may benefit from the new relationships.

-75 It is unnecessary to stress the remarkable accomplishments which have already been realized in this respect. A visitor to the two school systems, as of May 1963, is deeply impressed with the forward-looking and confident attitudeof practically all responsible members of the central office staffs as well as building principals, classroom teachers and other workers. There is clearly a reservoir of good will and an honest desire to assist in making the new organization as effective in serving the youth and children of the City and County as can possibly berealized.

It is therefore strongly recommended that early and fre uent confer- ences be arranged between supervisorsand other central office staff members in discussion of the resources, responsibilities and authority realized by eachindividual and group, committee or commission to the end that they may develop soundand meaningful proposals for the best accomplishment of the increased tasks which will be faced in the large and growing new school system.There must, in turn, be frequent conferences among the building principals and other unit administrative officers to develop comparable plans which are in harmony with not only thebest interests of the individual school and its students, but even more important,in harmony with the ultimate purposes of a unified educational program for thewhole Metropolitan School System.Steps to redirection of att;tudes, as well as unifi- cation of purposes and loyalties,should be undertaken during the school year1963-64.

Instructional Materials

The selection, procurement and replacement of suchmaterials as text- books, audio-visual materials and library books have become increasinglydifficult and expensive activities.In both the County and City school systems there is a clear and commendable effort to provide adequate materials and services.There are major and supplementary assignments of responsibilities forsuch provision. Yet there are limitations on funds available, and such will always be the case.

A minor revolution concerning teaching materials has takenplace in the past two decades and the situation remains dynamic, to saythe least. The difficulty with which these schools must contend is that investment in a setof adopted texts may be a major item of expense, and althoughthese texts may be obsolete by the time they are placed in use in the classroom, the investment can- not be overlooked or written off.Best use must be made of the materialsavailable within the reasonable limitations of funds available, the time necessary toobtain texts, and the skill on the part of the teacher intheir use.

It is strongly urged that the Metropolitan School System drawfrom the valuable experience of the central office staffs and the presentschool faculties in encouraging the use of multiple textbook adoptions, ofpaper-bound texts and supplementary materials, and of the increasing supply of goodteaching materials found in fugitive form in a host of places.Further study must be made of the methods

-76 whereby adoptions of major textbooks shall be accomplished inthe new district; there are, at present,several people well-qualified to conduct such studies,and to extend the findings of these studies to the day-by-day work ofteachers in the various schools.

Generally speaking, the library and other instructionalmaterials services of the present school systems are good. As is truein every aspect of the modern program of education, they can be madebetter.One-fifth of the teachers who responded to the questionnaire on staff relationsreported that the library services and availability of textbooks and teachingsupplies were unsatisfactory. This fraction can and must be reduced. Through carefulplanning, the Metropolitan School System, sensing those factors which promote afeeling of satisfaction, will reduce the number of dissatisfied teachersappreciably, if skill, good will and mature judgment are the needed ingredients.

Of course, new media and devices for instructionalactivities are appearing in impressive number and variety. A strongand active system-wide study of the effectiveness of these newer media is urged.Leadership for this study should rest with full-time specialists inthe field of instructional media, but teachers, supervisors, principals, research specialists,psychologists and others should be included. The world of technology is knocking on theschoolhouse door; not all of its products should necessarily be welcomed with open arms.Thoughtful evaluation of every proposed medium and device will separate thegood from the gadget.

Records and Reporting to Parents

There is no known school system which enjoys completeconfidence in and satisfaction with its use of student personnelrecords or in the plan, policies and practices of reporting to parents and students.The survey finds no serious deficiencies in the Nashville and Davidson County schoolsother than those which seem to be a common deterrent to moreeffective educational programs in most of the better school systems. Yet there remain somerecommendations which are certainly worthy of consideration.

There is ample reason to suspect that in thebusy demands placed on most teachers, close attention to and useof the data which are available about the potential, the problems, the accomplishments and the failuresof each individual student are almost impossible.However, the data which are available -- in personnel folders, in class roll books, in guidanceoffices and in permanent records -- should be used or not collected and maintained. A two-prongedeffort is needed:

1. It is recommended that responsible personnel,probably starting with the administrative staffs of each separateschool and in- cluding those responsible for the guidance program,be assigned

_77

...... ,,,,....--+C the task of carefully reviewingthe methods of collectingdata, of maintaining recordeddata and of destroyingold data when nolonger needed.In each school, too,there should be a staff-wide study of the use of pertinentdata information and the transmission ofinformation and records toteachers, between schools and from offices to otheragencies. There is nodenying the reluctance of ableteachers to seek out studentrecords if they are poorly organized andawkwardly located in thehidden recesses ofbusy offices. of 2. As part of the in-service programof professional upgrading all the professional staff, timeshotild be devoted to anorganized study of modern methodsof measuring and recordingrelevant in- formation about each studentwhich make possible a moreefficient program ofinstruction appropriate tothat student's best interest. This point is stressed due tothe too-common superficial accep- tance of roughreference to "John's I.Q. is110," or "Mary is a gradebelow her right level inreading," as specificdetermin- ants of the student'sfuture career or anexplanation for success or failure inachievement. Such concepts asachievement grade norms,percentiles and measurementsof central tendency are often forgotten by conscientiousteachers and assumptionsabout students based upon lack ofunderstanding of such terms may weaken the whole program ofguidance of the student, aswell as detract markedly from theeffectiveness of a giventeacher'. s relationship with students.It is not proposed thateach teacher become an expert in statistics norin psychometry;rather it is stressed that long-establishedconcepts of understandinghuman qualities need to be reviewedand newer concepts,practices and instruments be madeknown to all professionalworkers for whom their use hassignificance.

With the advent of dataprocessing equipment,there is a serious possi- addressing bility that certain humanrelationships may beoverlooked. Although the be of envelopes and the recordingof the total list ofgrades for a given student may entitled rapidly and efficiently doneby machine, the parentand the student are of at least one to some evidenceof personal interestand recognition on the part simple formula for the teacher with whom the studentworks. Again, there is no when development of a "better" systemof reporting to parents.It is suggested that "machined" report cards are widelyused, a more frequentinformal note from a teacher or counselor to thehome of each youthincluding occasional, sincere most appro- messages ofcommendation, rather thanexclusively of blame, will seem priate.

-78 The High School Diploma

The significance of a high schooldiploma, the purposes fordistinction between types of diplomas (if morethan one is to be used) andthe requirements for graduation from high school are all matterswhich should be related tosystem-wide policies. Certain practices whichhave gained recognition within oneschool and are stoutlydefended by the staff of thatschool may seem wrong andindefensible when viewed as part of the practiceand policies of a largerschool system.

For this reason, it is wise toplan for a system-wide reviewof diver- gent practices; athoughtful reconsideration ofthe real significance of a high school diploma in the light ofthe trend toward making thehigh school an upward extension of the commonschool; and the development ofcertain minimal statements of policy to be approved by theBoard of Education and to governthe requirements for, and symbolism associatedwith, graduation from highschools within this school be system. Diplomas shouldbe within the reach of anystudent; their award should the made in this sirit rather than one of ahighlselectiverogram inwhich onl moreacademically gifted may survive. 4.

Special recognition for remarkableaccomplishment may appear in various forms.It may consist of a seal on thediploma, a separate document or other symbol, or in the publicationof a list of honored students.It will lend dignity and meaning to the diplomaitself, however, if its physical appearance and neat. as well asthe textual material containedtherein are simple, modest, The important message which itshould convey is that theholder has satisfactorily completed the best educational programwhich the staff of thisschool system has been able to provide for him.It cannot guaranteehigh intelligence nor specific accomplishment. Employers andcollege officials must be urged toseek more detailed information about the studentfrom specific informedmembers of the school staff.

-79 VOCATIONAL - TECHNICAL, ADULT EVENING SCHOOL AND COMMUNITY COLLEGE EDUCATION

As the previous chapter pointed out, there are large numbers of youth whose education is not completed, either because they leave school before gradua- tion from high school, or because of continued education and training needed after high school. Some of the observations in this chapter pose the question of just how seriously this unmet need burdens the Nashville - DavidsonCounty econ- omy and ways in which education and training programs maybe designed to salvage some of the human waste indicated.Economic well-being is one of the important goals of public education.It is of interest to ponder the question of how much would need to be invested in this salvage operation to yield manifold returns in increased productivity, earning power, purchasing power, taxpaying ability and improved living of inhabitants of Metro.

A Brief Resume of the Em lo ment Situation in the United StatesNashville and Davidson County

Observations, comments and recommendations contained in this report are made after a review of local and nationaldata pertinent to the labor market out- look for youth now in the Nashville - Davidson schools. Some of these data are included in order to place the report in its proper perspective.

The United States has about five percent to six percent of itslabor force now unemployed. During the years between 1960-1970, 26 million more young workers will enter the labor force. Thisnumber of new entrants into the labor force is a 50 percent increase over any previous decade.In contrast to the increas- ingly large numbers of people available for employment are the alarming reports that thousands of jobs are disappearing each week due to technological changes.

An analysis of national occupational trends reveals that the most sig- nificant over-all change in the nation's occupational structure has been theshift toward white-collar jobs."Professional, technical, managerial, office and sales workers outnumbered craftsmen, operatives and laborers for the first time in 1956. By 1970 they will number one quarter more."1 The number of professional and

1 U.S. Department of Labor, Bureau of Labor Statistics. Employment and

-80 Unemployment Among YoungWorkers.1961. p. 21.

than technical workers needed in1970is estimated to beabout 40 percent greater the number employed in1960.

This growth will not beconfined to traditionalprofessions, however, faster than those as"opportunities for technicians areincreasing in numbers even demand for medicaland for engineers and scientists.These and an ever increasing labor other health speclists willresult in a rate of growthabout twice that of the force as a whole."

2Ibid, p. 21

sales- It has been estimatedthat by 1970 theemployment of clerks and will increase 26 percent, serviceworkers up 25 percent,skilled workers up persons workers 23 percent, semiskilledworkers up 18 percent.Opportunities for unskilled will be about the same but theneed for farmers willdecrease 16 percent.

The importance of educationand training becomesobvious if one occupational oppor- compares thenumber of persons seekingjobs to the kinds of plentiful during tunities that are nowavailable and those thatwill be increasingly These same the rest of this decade.The market for brawn israpidly disappearing. vocational statistics also show clearly theneed for a re-evaluationof the kinds of preparation available toyouth and adults in thecommunity. compiled by A review of employmentcharacteristics in Nashville, similar trend began here the Metropolitan PlanningCommi.icion, revealed that a professional, tech- between1950-1960.These statistic: !ndicatethat training for nical, clerical, sales, andservke occupations mustbe given every consideration in any plans far vocationaleducation in the Nashville area.

An Anal sis of Previous Attem ts toSolve the Problem ofProviding Vocational Education for High SchoolStudents the United Various organizational planshave been tried throughout trade States and each has been foundwanting in one way oranother. The separate by the tech- school concept came intobeing after the turn ofthe century, followed has had nical high school and morerecently the comprehensivehigh school. Each built-in shortcomings, as evidencedby the fact that noneof these philosophical promotions (with approaches hassolved problems such asschool dropouts, automatic resulting dissatisfaction on the partof both students andsociety) and inadequate

-81 11: \kof114.e:A401,7''...,}:LIVAtektV.M, 1'. nin iL Professional and Technical - up 41.5% 40%30% Service Workers (except private househoild help) - up 23.9% 20% Clerical and Sales - up 22.9% Managers, Officials and Proprietors - up 8.6% 10% *otremyl-rtry, Private Household - up 7.8% 1 1111111111Operators - up 6.7% Craftsmen and Foremen - up 2.2% IIIMMUTM111 1950 LEVEL -10% Labor - down 6.5% PERCENTAGE CHANGE BY OCCUPATIONNASHVILLE AREA 1950 - 1960 Professional and Related - up 55.6% 40%50% Finance, Insurance R. E. - up 44.5% Wholesale - up 33.2% 30%20% oh W ...... Communication and Utilities - up32.3% Manufacturing - up 23.2% Public Administration - up 22.9% Business and Personnel - up 17.7% 1950 LEVEL 10% ammolowmen Construction - down 2.3% Retail Trade.- up 7.9% -20%-10% ow Transportation - down 15.6% Ahimm.ma, -30%-40% ... No' Agriculture, Forestry, Fishing, and Mining - down 38.3% PERCENTAGE CHANGE BY EMPLOYMENT CLASSIFICATION, NASHVILLE AREA, 1950 - 1960 vocational preparation for jobs in achanging society. The goal ofall curriculum changes shouid be the maximumsatisfaction of all students and society.Although this objective will never beachieved, all successful aspects ofprevious attempts should be incorporated into any newplans for the Metro SchoolSystem as a part of a continuous effort to make progresstoward this goal.

The Trade or Technical HighSchool. The concept of separationof accaiemic from trade or technicalhigh schools was conceived sothat students vocationally committed to an occupationrequiring the traditionalcollege education beyond the high school could pursue thehigh school caege preparatory program without the handicap of having otherstudents in these classes withdifferent voca- tional objectives. Theoreticallythis provided a more homogeneousgrouping of students, with those havingblue-collar vocational objectivesattending a separate school for an instructional program morein accord with their needs.

Failure of this system stems from atleast two sociological factors. Parents want only the best for theirchildren and have the idea that iftheir off- s ring attend a separatetrade or technical high schoolthe are getting less than the best. The possibility that theirchild might not be considered asgood as a neighbor's child if he went to this separateschool has created pressures toattend the academic high school even thoughthe boy or girl lacks interestand motivation for the curriculum. High schoolyouth themselves, conscious of peer groupopinions as well asparental pressures, have rebelledagainst the separate school concept as it made them appear different inthe eyes of other students.The gradual outcome has been that students who attendedthe so-called vocational school were,in the eyes of peer groupsand adult society, individualsunable to compete academically or socially.

The trade or technical highschool experienced limited successfor still another reason. The programofferings were a splinteredpatchwork of courses which, except in only a few schools,failed to give a rich realistic and compre- hensive experience for more than asmall fraction of the studentbody. Offerings were too fewand not based upon occupationalopportunities in a changingtechno- logical societu on empymentconditions as they were in the past.Curricula in agriculture, sheet metal orwoodworking were still offered evenwhen job oppor- tunities in these fields wererapidly decreasing.

The nature and scope of manyother occupations also changedbut the educational program did not keep pace.In the past, for example, theelectrical industry consisted of lighting and powertransmission and a curriculum inelectricity could be found in almost all vocationalhigh schools. Most schools stillteach this type of an electricity coursewith some added radio andtelevision repair work. Occupational opportunities in the electricalfield have broadened, however, and now include thetraditional wiring, power transmissionand radio-television repair plus such areas as communicationelectronics, industrial electronics, andelectronic

-84 but uirements havechanged considerabl computermaintenance. Educational re have failed to reflectthese changes intheir most existingeducational institutions programs. high school The ComprehensiveHigh School.The comprehensive of the separatetrade or came intobeing because of thesociological handicaps provide opportunitiesfor technical high school.Philosophically its goal was to everybody. each student to develop tohis potential -- sortof an everything to unable to meet theneed for many andvaried Actually these new institutions are the limitations of space,students and money;they suffer from curricula because of trade or technical roblem of limitedrogramofferings even morethan the se..rate total enrollment, costs Unless such schools wereexcessively large in high school. offerings required, became excessive toprovide facilities forthe multifarious course available, they becamelittle more often in small classgroupings.If funds were not schools. than conventional,academic,college preparatory another type of Cooperative Education.Cooperative education, with a great dealof success in vocationakeducation, wasdeveloped and has met this type of education was areali- The philosophicalreasoning behind inany areas. be provided in aschool zation that allrealistic vocationalexperiences cannot be utilized as aclassroom. Techniques situation and thatthe community itself can opportunity to obtainexperience and developed in these programsallow students an situations whilethey continuetheir develop occupationalskills in actual work school. A criticismof this programin general educationclasses in the high numbers of studentsserved. Another Nashville and elsewherehas been the limited in the program tothose criticism has beenthe barriers whichrestrict participation in the regularhigh school students who havebeen able to competesuccessful! saleable skills aeededfor entry into subjects and havedeveloped the necessary select, relative! yhigh-level occupations.

Shop Experiences forJunior High School An Analysis of PreviousAttempts to Provide Students throughout the countryin the Considerable progresshas been made level. The generaleducation development of industrial artscoursesfor youth at this than developmentof skills and concept ofexploration andexperimentation, rather goals, is the basisfor these courses. knowledge for narrowspecific occupational abilities been developedthat capitalize onthe interests and Successful programs have For example, provide experiencesin !ine withtheir capabilities. of this age group and its working partsand of how to takesomething apart; examine the natural curiosity equipment simpleenough then reassemble and operateit is satisfiedby working with of this age. to be understoodand in accordwith interest patterns bicycles, motorbikes,model In these programsstudents work with

-85 airplane engines, outboard motors, powerlawn mowers, etc., rather than automo- bile engines and chassis.This smaller equipment allowseach boy to have something of his own to work on and operatewhen it is reassembled. These programshave also capitalized upon youths' naturaldesire to make something while directingtheir talents toward creating things of gooddesign in keeping with their interestand abilities, rather than just developingskills necessary for an occupation.

Many schools with programslike these have their industrial andfine arts teachers workingtogether so that the principles ofgood design correlate with good craftsmanship and proper useof tools and materials.

An Appropriate Junior High SchoolCurriculum

Industrial arts courses of one hourea6 &,five c<, for at least one semester ineach of three sho areas, shouldbe an inte ralrt of the general education of all male students.Opportunities should be made available for students to elect subsequent coursesin the shop of their greatestinterest.This provision would enable individuals,including those with limited academicability and motivation, to obtain additionaltime in the exploration ofshop processes and materia is.

The physical arrangement of the shop areawould include a general materials shop, electrical shop, and a powermechanics shop. Equipment and scope of eachshop and course of study should be asbroad and varied as money, space andinstructor talents will permit.Objectives of these curricula should not be vocational preparation, but exploratoryexperiences into many fields ofwork as well as hobby and leisure time activities.To illustrate, these three shop areasmight include the following:

General Materials Shop: Exploratoryexperiences working with wrought iron, art metal, plastics, pipe andtubing, wood, ceramics, etc.;

Electrical Shop: Exploratory experienceworking with electrical appliances, simple circuits, radios,T.V. sets, etc.;

Power Mechanics Shop: Exploratoryexperiences working with bicycles, model airplane engines,outboard motors, power motors and other mechanical gadgets.

Recommendations for a Vocational EducationProgram

The overriding objective of thefollowing recommendations is to get students into educational programs inaccord with their vocationalcommitments. -86 A single sim le solution or organizational patternwill not accomplish this goal. These recommendations, therefore, include acombination of old and new programs and techniques.

Comprehensive High School.This organizational pattern will provide the college preparatory program for the largenumber of students committed to tradi- tional professional occupations requiring four or more yearsof college. Some schools may also wish tooffer occupationally oriented curriculafor employment after high school graduation. These, however, should belimited to a curriculum in which the number of students committed to an occupationis large, and the cost, t pe of equipment and space requirements can bejustified.For example, a large comprehen- sive high school might include abusiness curriculum. Such a school mighthave enough girls vocationally committed to office occupationsto justify such a cur- riculum.Equipment needed in this program could alsobe used by students in other curricula for enrichment purposes and thushelp to justify the large expenditureof money. Othercurricula might also be justified on this basis,but it is important to note that not allcomprehensive high schools would offer the same programs, as the needs of students will vary in differentsections of the City and County.

An industrial arts program, more advancedthan in the junior high school, should be included in the secondaryschool. This curriculum, however, should have broad general objectivesrather than narrow vocational goals.Students not yet committed to an occupationshould enroll in these exploratory courses seeking an area of work in accord with their aptitudesand interests. Other students might take these courses, not for vocational reasonsbut for enrichment of their program of studies.For example, students vocationallycommitted to engineering, dentistry, medicine, etc. could profitby these experiences for futurehobby or leisure time activities, or for thedevelopment of manipulative skills andthe acqui- sition of knowledge valuable in their ownfuture vocations.

The comprehensive high schoolshould also include an expanded cooperative education program to meetthe vocational commitments ofanother segment of the studentbody. Students would be allowed toenroll in this program after they have demonstrated a level ofproficiency in the productive skillsneeded for entry into the occupation andwhen training stations are availablewhich provide the necessary well-rounded experiences.If properly nurtured and administered, the cooperative education programwill continue to meet the needs of manystudents.

These programs will not, however, meetthe needs of all students in the secondary schools. Many wHI not be committed to the occupationsthat require traditional college preparatory classes northose areas served by the cooperative education program. They do not possessthe aptitude, ability or motivation to profit by these educational experiences.The cooperative education conceptof the community as a classroom,however, can be continued so as to meetthe needs of still another group of students.

-87 interests and aptitudes The less academicallytalented youngster whose lie in the expanding serviceoccupations could alsoprofit from opportunities to learn on the job in a realisticsituation.This could be called awork experience Although similar in format tothe cooperative education program,students program. in a in this program should notbe required to possessskills before being placed the same training station, norshould the school demandthat an employer provide be a vocational breadth of experiences in thatstation.Instead the criteria should commitment to the occupationand ability commensuratewith the needs of that occupation.

With the great increase inthe number and breadthof oep_aitunities laboratories in service jobs it wouldbe impossible for aschool to provide shops and such a for the diversity oflearning siluations needed todevelop saleable skills in training stations in the variety of occupations.Individuals could be placed in washers, community as bus boys,waitresses, bell hops,short order cooks, car and instilled withthe service station attendants,janitors, shoe repair men, etc., desire to be superiorworkmen in those occupations.These siudents would continue make them aware of their in school part-time andparticipate in classes designed to responsibilities as citizens and todevelop abilities in the artof living with other of people. The key to success inthis type of program is arecognition on the part prepared to society and the schoolsthat no matter what thejob, someone must be fill it.

An adoption of this philosophyby the new school systemshould go far in eliminating the manydropouts to which referencehas been made previously. recognizes that Increased interest in the dropoutproblem indicates that society now in order it is better for schools toprovide realistic trainingfor workers at this level have an to keep them inschool,.By remaining in schoolthese individuals will other- opportunity to obtain asmuch general education asthey can absorb. To do situations in othervocational wise wiH cause thesestudents to drop out, or create occupation and desire classes to the detriment of thosewho are committed to an all the preparation they can getprior.to entering into it.

Community Col lege

This type of an institutionis primarily post-highschool and for adults. It has five functions,namely: work, 1. To provide the first two yearsof baccalaureate degree and to provide remedialhigh school classes forthe late bloomer or thosewhose objectives changedafter high school and are now desirousof a second chance.

people 2. Occupationally oriented coursesdesigned to prepare

-88 for entry into jobs in technical andskilled occupations, either aspre-employment training for full-time students, orfor indi- viduals already employed who wish tochange into another occupation.

3. Community service programs for (a) thebusiness and industrial community whose employees wish to update orupgrade their educational background to keep current with rapidtechnological advances, (b) apprentices indentured in theskilled trades who need related instruction to accompanyskill development exper- iences received on the job, and(c) management and supervisory personnel whose knowledge, skills and understandingsin the field of management must be broadened concurrentwith the increased competitiveness of modern business.

4. Continuing education to meet adult needs forclasses in general education, literacy, high school credit,leisure and hobby activity, citizenship for the foreign, etc.

5. Counseling and guidance services for the adultsin the community.

Although this type of school is normally thought tobe only for adults and of a post-high school nature, thisdefinition should be altered. Somehigh school age youthvocationally committed to an occupation(and, as a result, vitally inter- ested in educational experiences related tothat occupation) can compete succe ,s- fully with older adults.This is now an accepted fact as manyhigh school students, vocationally committed to one of the professions,have successfully completed subject matter courses formerly considered tobe on the collegiate level. Maturity and ability are not highly correlated withchronological age. Success often depends, however, upon a commitment to an occupationalgoal and the desire to succeed in it.High school students age 16 or older, oncethey have made a commitment to an occupation,should be encouraged to attend classesdesigned to prepare for entry into that occupation.

This means that an institution organizedlike a community college, designed to meet the diverse occupational needsof adults, can also serve the needs of these select, vocationally committedhigh school students. These studentswould still retain identity with their highschool by taking the required generaleducation classes with their high school friends and go tothe community college for their occupationally oriented classes.

The advantages of an institutionorganized along these lines are:

1. The sociological problems inherent inthe separate trade or vocational school are eliminated, as thehigh school students

-89

-, selected to go would represent many levels of abilities and prepare for "status" occupations aswell as those considered "lower" in the occupational hierarchy.

2. The high school students would make up only a minority of each class, thus providing them the psychological stimulus of acting and achieving like the adult members of the class.

3. Only those students vocationally committed to a particular occupation and able to profit from the instruction would be allowed to enroll, thus making for a more interested homogeneous group.

4. By combining adults and high school students in pre-employment training programs the resulting size of the student body would enable the institution economically to provide a wide diversity of curricular offerings.

5. Buildings and equipment could be utilized both day and night and thus provide for more economy of operation. Classrooms, laboratories and shops could be used for upgrading and up- dating the skills of employed workers as well as pre-employment training. Adult high school credit classes for a diploma, remedial classes needed prior to enrolling in an occupationally oriented or liberal arts curriculum, literacy classes for the disadvantaged, and leisure time and hobby classes for non-credit could all be offered under this organizational pattern.

6. All adult education would thus be under one administrative structure, thus preventing unnecessary and expensiveduplication of effort. This institution would not undertake to duplicate services already being furnished by other educational and community institutions whose offerings now meet community needs.Instead it would permit a consolidation of the local ;.- effort to work cooperatively with these other educational institutions and organizations.

Summary of Recommendations

A. A strong three-shop industrial arts program as a part of general education for all junior high schools.

B. A comprehensive high school organizational pattern withcurricular offerings in each school depending upon student need and economy

-90 of operation. Opportunities in these high schools to include:

1. College preparatory program.

2. Industrial arts program oriented to general education and not vocational preparation.

3. Cooperative education program for those students who have developed the necessary entry skills and are vocationally committed to the occupations where these skills can be used.

4. Work experience programs for those students whose interests, aptitudes and motivations are directed to an expandin9 number of service occupations so diverse as to make the offering of realistic vocational experiences impossible within the school.

5. Vocational education programs limited to those areas where the number of students committed to a specific vocation is great enough to justify the high cost of equipment and operation.

6. Pre-employment training in the community college for those students vocationally committed to one of the occupationally- oriented curricula offered in that institution.

C. A comprehensive community college created, dedicated and administered to meet the adult education needs of the entire community -- as well as the needs of select, vocationally committedhigh school students.

-91 IX

PUPIL PERSONNEL SERVICES

Pupil personnel services is a term for a great number of supporting services in school systems which have as their focus helpingchildren achieve the greatest benefit for themselves from the schools provided forthem, through specially trained persons who are able to diagnose or analyze background factors that influence children's behavior. Taking the time a regular classroom teacher cannot give from his or her duties of teaching and using professional techniquesacquired in their training, these specialists-study children's learning ability, scholastic achievement, emotional stability, social adaptability, home and family conditions, health, developing vocational interests, etc., in order to help plan and conduct activities designed to correct or enhance conditions in the children that affect their ability to learn in school.

Action may take the form of either special services performed directly or, more often, advice and help to teachers and school administrators in accomplishing desired changes. Action may be taken individually or through group programs.

Pupil personnel services include:(1) psychological services of a clinical sort,(2) school social work services,(3) attendance services, (4) guidance services (secondary),(5) school health services,(6) group testing services,(7) remedial services,(8) adjustment teacher services (elementary). In some systems, the conduct of special education for handicapped children isalso included, but in the school districts being merged in Metro the more typical practice of allocating this function to those in charge of instructional services is recommended.

General Observations

Before discussing proposals for a program of pupil personnel services for Metro, three general observations seem appropriate.

First, pupil personnel services find their justification in the degree to which they further the primary purpose of the schools of helpingchildren learn. Consequently, proposals for these services need to be judged in that light.

Second, the need for particular types and amounts of services should be analyzed and determined without regard to the agency that will perform them. Those proposed here are so proposed becouse they contribute to the effectiveness of schools in helping children learn.But child needs for health

-92 services, psychological services,welfare services, etc., are community responsibilities and should be viewed assuch regardless of how they areaccomplished. Once these needs have been assessed,they should be held before the publicmind until they are properly fulfilled.It will be a waste of funds and timedevoted to surveying these needs if considerationof them is allowed to degenerate into a debate as to whether the services needed are proper yschool functions.

Third, there was wide agreement inschools visited that present pupil personnel services furnished are of highquality, but limited and therefore often delayed by lack of personnel.It was also widely agreed that theindividual staff members performing the services werepeople of good will, ready and willing to cooperate with one anotherin helping the schools, butlimited in achieving the desired level of integrated functioningby lack of a coordinating leadership at the top. To get fullest returnsfrom the person employed as directorof this service, he should be recruitedfrom those with strong psychological training (doctoral level) and understanding ofschool problems.It may be true that, for administrative purposes, top directionof this function might be given to a person with a background of success ineducational administration and a sympathetic understanding of the values of such servicesacquired from school experience. A background of psychological training,however, is to be given priority.

Psychological Services

At present, the central staffs ofthe two merging systems each contain two persons rendering yeomanservice in both individual and grouptesting. They areuniformly well regarded by their respectivesuperintendents and by the school principals they serve. However, their services are sread so thin that thecannot keep up with the full demand of theschools for advice on individual and grou problems, including the testing of individualchildren for the evaluations basic to the crucial decisionsregarding lacement and continuation inclasses for educable mentally retarded.

It is recommended that theybe freed of responsibility for the group testing program cul serve asrnembers of the staff of a Ps chological Services Department, headed by a person withdoctoral training in school psychology. The total staff might best include fourothers trained at the master's or educational specialist's level in school psychology, and twoothers with doctoral training in school psychology.

It is assumed that this staff wouldneed close liaison and coordination to permit specialization withinthe staff in dealing with children withparticular characteristics.It would be the responsibility of this staff(1) to diagnose and make recommendations concerning childrenreferred for learning difficulties, poorlearning ability, emotional instability and behaviorproblems and (2) to

-93 promote understanding of the causes and treatment ofsuch difficulties in the schools through in-service programs of case conferences, general instrucHon, etc.

The doctorally trained persons would take primary responsibility for evaluating emotionally disturbed children and those with severe learning disability, but would also serve as consultants to those less fully trained onan cases that reached them.One or two of those trained at lower levels might be assigned to work in and from the offices of each of the three District Assistant Superintendents responsible for the decentralized administrative centers.These persons would beadministratively responsible to their respective district superintendents and serve their districts, but would be professionally underthe direction of the Head of the Psychological Services Department in the central office and with ready access to his central staff for consultation, including provisionfor regular staff meetings.

Wherever stationed, each staff member should have adequate facilities -- use of a private, soundproof office of 60 square feet or more, plus desk, low table and files.Mileage allowances for travel to schools should be regularly budgeted.

It is recommended that at least two of the members of thePsychological Services Department staff be Negroes, in order to take advantage of theirability to obtain rapport in cases involving Negro children.

Regular consultant service should be arranged with a psychiatrist actively concerned with children. He should be expected (1) to provide didactic and consultant service to the staff on their work with cases and(2) to facilitate referrals to other psychiatrists.Local psychiatrists should be consulted to see whether they would prefer to have this consultantdisqualify himself from handling cases on referral from the staff in order to place himself in a freer working relation with other psychiatrists to whom cases would be referred. Much would depend on how adequately the total referral load could be handled by public and agency clinical services in the community.

School Social Work Services

The school social work services of the Nashville system are provided by a staff of eight -- six white and two Negro. Separate attendance services are provided by another staff of eight.These services were formerly coordinated by a supervisor who resigned only a year or so ago. They continue an effective liaison with each other, the principle that governs differentiation of functions being that the attendance workers take responsibility for enforcement of school attendance, including court action when necessary, while theschool social workers are thereby freed to deal with chiidren and their families without authoritarian complications. These services are very well received by the schools,

- 94 praise being freely given,but always with the added notethat more would be services carries useful.In particular, the person atthe head of each of these full case loads that leave him onlborrowed time to use forcoordination. have a sub- The Davidson Countyschools, tending as they do to stantial suburban element, havefelt less pressure toemploy school social workers. of several services in The County system includesattendance work cis just one Statistical Reports. a two-manDepartment of Zoning,Welfare, Attendance and There are no social workers assuch. Recognizing thatsocio-economically nevertheless there is some need favored districts have less needfor school social work, equally favored. even in suchdistricts and the whole Countyterritory is by no means

It is recommended thatMetro build upon the presentschool social work services a Departmentof Social Work Serviceswith a head and a staff of 11 white and fiveNegro social workers.The staff would be decentralized, assigned to the districtoffices cs needed,the needbeing of greatest inunderprivileged areas. As withthe staff of the Department Psychological Services, the schoolsocial workers would beadministratively responsible to their districtsuperintendent, but professionallyunder the direction of the Head of theDepartment of Social WorkServices in the central office.

The basic criterion ofemployment should be a master'sdegree in social work. The dutiesshould be primarily home visitationand case reports for referral to the Departmentof Psychological Serviceswherever the initial referral of the case from theschool involves more thanexploration of reasons for non-attendance. Participation in caseconferences in the schools,designed to disability, would be part ofthis help teachers understandhome factors in school directly to work.Initial referrals for non-attendanceonly might well still go attendance workers, but bereferred by them to the Departmentof Social Work Services whenever economicwelfare is a factor.School social workers would analyze financial needs forreferral to appropriate welfareagencies, public or workers to the private. Non-attendance caseswould be referred by attendance joint attention of the Deparimentof Psychological Servicesand the Department indicated factors in thehome, of Social Work Serviceswhen the initial home visit other than economic, calculated toaffect school achievement.

Negro staff members inthe numbers suggested seemessential because of the problem of obtaining entreeand rapport in home visiting.

The Head of the Departmentof Social Work Servicesshould hold the M.S.W. degree andbe otherwise qualified by experiencein school social work and by administrativeability.

-95 Attendance Services

Attendance work in the Nashville schools is accomplished by a staff of eight -- five white and three Negro attendance workers.Schools report that attendance work is handled in good spirit by a staff of competent persons who work under a heavy overload. The person in charge carries as heavy a load as any, as each serves a geographical zone. The man in charge has a bachelor's degree in social work and shows a grasp of the social work viewpoint that lends credence to reports of the fine work of his staff from the schools and from the school social workers.

The limited service of two men in Davidson County was noted in the previous section.

The primary consideration seems largely the same as in the area of school social work services: namely, a need for more.

It is recommended that Metro build upon the framework of attendance services now available in Nashville a Department of Attendance Services with a head and a staff of 11 white and five Negro attendance workers. Administrative decentralization of staff, assigned to districts as needed, but professionally under the direction of the Head of the Department of Attendance Services in the central office is recommended.

Attendance workers may best be taken from school staffs, but may also include police officers with special training in dealing with juvenile problems if they show a proper combination of authoritative and persuasive qualities.

The Head of the Department of Attendance Services should hold the B.S.W. degree and preferably the M.S.W. Beyond this the requirements would be experience in school attendance work and evidence of administrative ability.

As soon as possible, a central Statistical Service Department should be set up, preferably under a specialist in statistical reporting and data pro- cessing in a Division of Research and Development, to service all statistical and reporting functions of the new Metro School System. This department would be responsible for processing and maintaining cumulative attendance records. The Department of Attendtinte Services should not be bogged down with record keeping. Whatever system for processing attendance statistics is finally established, the flow of attendance information should be such that the Head of the Department of Alqnndance Services receives weekly and monthly reports directly from the schools of children admitted, dismissed or transferred.Each such report should provide as full an explanation as possible of where new admissions previously attended school and where those leaving have gone, including specific mention of the names of schools to which transcripts have been sent. New record cards

-96 should be made out in connectionwith summer round-up andshould contain date of birth entered from thebirth certificate at time ofadmission. Suchrecords have value not only as the basisfor reports of attendance toStott: authorities, but as a source of reference instudying the histories ofindividual children referred for diagnosis, in predictingand following up dropouts, and inawarding work permits at and after the timestudents reach the age limit ofcompulsory school attendance. The systemof processing attendancerecords should be such that the Head of the Departmentof Attendance Services canhave the responsibility for maintaining such records on anup-to-the- minute basis because oftheir ramifying uses within the staffof the Director of PupilPersonnel Services.

Group Testing Services

The two school systems havesubstantial group testing programs.This work is currently under the directionof school psychologists inboth systems.It is recommended that the be relievedof this activity in order toprovide more adequate individual testing services andconsultation to school faculties onthecasesttlez_ diagnose.

The group testing program is important,however.It should continue to be the function ofthe saff associated with theDirector of Pupil Personnel Services not only because of thereference use of such data inindividual cases diagnosed, but also because of theneed for centralized study ofsuch records.

Itis recommended that a Head ofthe Department of Testing and Evaluation Services be appointed withadequate staff to coordinate the system- wide group testing program, withassistance in each schoolfrom the couweior (high school) and adjustment teacher(elementary school). Advice on thedesign of this program should be theresponsibility of a system-wide committeeof teachers, counselors and principals. This staffshould take responsibility for seeing notonly that tests are administered and scoredproperly, but also that maximum use is made of the results by teachers inplanning group and individual instruction,by counselors in guiding students incurriculum choices and career planning,and by administrators in analyzing progress intheir schools and in reporting tothe commu- nity.These latter functions need to be performed as"helping" functions, but they require positive.promotion intheir execution.

The Head of the Department of Testingand Evaluation Servicesshould have a background of training at thelevel of educational specialist orhigher in the field of educational measurementand have rich teaching experienceand in- sight into the instructional program ofthe school system, as well asability to communicate ideas and interpretations toothers in a constructive spirit.

It is strongly recommended thatscheduling of the system-wide group

IMO 97 testing program be reviewed with a view tolacing achievement testing at the beginning of the school year.At this point the results are fresh information tothe teacher about allnew pupils.Thus, the information becomes available at a time when its use in the year ahead is promoted,while any hint of use of the results for administrative evaluation of individualteachers is at a minimum. Results become available for immediate use ratherthan for filing, while subsequent use for individualguidance purposes or for general administrativeappraisal and "quality control" can be based on data summarizedcentrally at the convenience of all concerned.

Data processing equipment should be used toimplement this servke and especially to accelerate the process sothat even the summaries come early in the year. Depending upon the ultimate natureof organization of the new system, this function may need tobe allocated to the Division of Research and Development with the Associate Superintendent,Professional Services, responsible for coordination with other services and instruction.(See Chapter XV.)

Guidance Services (Secondary)

Guidance services have been an accepted function insecondary schools the country over for the past decade or more.Their operation has been the object of substantial federal support for the past five years.

The pattern in Nashville is largely a part-time arrangement,each school being allowed to release a teacher for one period ofcounseling per day for every 100 students.With the varied size of the junior and seniorhigh schools, this means the amount of service varies from one personhalf-time to as many as five persons part-time giving the equivalent in periods perday of three full-time . counselors. The ratio of full-time counselors or equivalent tostudents is one to, 600, which should be compared with the widelyrecommended one to 250..or-300 found in reports of professional groups and in suchgeneral commentaries as Conant's "The American High School Tod:.7y."

Coordination is provided in Nashville by a separateCoordinator of Guidance Services.In Davidson County coordination is an incidentalfunction of the School Psychologist in the central office.

In view of the growing need for guidance inmaking curriculum choices and career planning in secondary schools, the needfor stemming the tide of early dropouts, and the need for smooth articulationbetween schools in Metro and between colleges and employment, it is recommendedthat steps be taken to put in each high school one full-timeguidance counselor for every 400 students.

It is further recommended that at least one man and atleast one

-98 woman be assigned tocounseling in each school. Toaccomplish this, one or both persons may servepart-time until the number ofstudents warrants two full-time persons. Theabove recommendations are inkeeping with current practice in large cities and represent only a step towardthe more adequate staffingrecommended by Conant and others.

Training requirements for positions ashigh school guidance counselors should be set so that the minimum is themaster's degree in guidance andcounseling, with additional work leading to thedegree of educational specialistbeing indi- cated as desirable.Provisional certification while acquiringtraining may be necessary, but it isrecommended that a system-wide prcgramof identifying and recruiting potential counselors beinstituted so that teachers may preparethem- selves for this service in advance ofappointment, with knowledge thatthey will be given first consideration for suchappointment when openings occur.

It is recommended that a Departmentof Guidance Services be established in the central office staff,the head of which should be atthe level of educational specialist with atleast a master's degree in guidance andcounsel- ing and be in the process of acquiringadvanced training leading to thehigher degree at the earliest possible moment.The guidance counselors in thehigh schools should continue to be administrativelyresponsible to their principals, but be under the professional directionof the Head of the Departmentof Guidance Services.

There should be two system-widestaff members in guidance services. First, there should be a coordinator ofplacement services. One high school currently enjoys the benefits of avirtually full-time counselor withresponSibility for placement, with excellentresults.This service should be madesystem-wide and bedisseminated through the counselors inthe respective high schools.

Second, there should be a coordinatorof school-college relations whose function would be to coordinatethe visits of college representativeswith the needs and interests of students inall the high schools.it is most inefficient to have all the negotiatingregarding special opportunity foradmission and scholarship aid done separately by thecounselors in the several highschools.

Remedial Services

As a matter of efficiency, alarge school system should have a specialist who stands squarelybetween the office of Pupil PersonnelServices and instructional administrative staff inthe matter of cocrective or remedialservices. Instructional supervisors, specializing invarious subject fields, have animportant function. There is a need, however,for a specialized competencethat goes beyond the skills of corrective instruction tocapabilities on a high level for

-99 differential diagnosis and treatment. The remedial specialist must be qualified both in psychology and education at a high level. He should hold a doctorate in educa- tional and/or school psychology. He should have a special responsibility for serving as a consultant to the staffs in the administrative structure responsible for coordinating the work of the helping teacher services described in Chapter VI and adjustment teacher services described hereafter.

Adhstment Teacher Services

For the past decade there has been talk of counseling and guidance in the elementary school, but no clearly defined pattern has emerged. Meanwhile, the elementary school curriculum has been stepped up to such a degree that it carries a great part of the instructional load formerly borne by the..high school. In what we call the self-contained classroom it has been hardly fair to expect the elementary school teacher to remain self-contained.In most cases, as in the districts comprising Metro, she has carried on without even the free period granted junior and senior high school teachers each day. Nor has she had the assistance or professional advice of a guidance counselor to help her with special problems arising from such factors as differences in homes and neighbor- hoods.

The most promising model of assistance, with a history dating back to 1936, is the so-called "adjustment teacher service" in the Chicago public schools. Along the lines of that model, it is recommended that aniAdjustment Teacher be provided in every elementary school and that a second such teacher be provided if the school has an elementary school enrollment of over 600 children (or 20 regular teachers).

Duties of these Adjustment Teachers should include (1) diagnosis of learning difficulties, (2) remedial teaching of individuals and groups, (3) co- ordination of the school's group testing, (4) coordination of referrals to the Department of Psychological Services and/or the Department of Social Work Services, (5) consultant service to classroom teachers on learning and behavior problems, (6) consultation and coordination of plans for grouping children for instruction.

There are now several new models of elementary school organization vying for favor as ways of meeting the new situation in the elementary schools, varying from complete departmentalization in one or more grades to ungraded classes to plans that involve only regrouping of pupils in one or more special periods, with many intermediate designs to choose from.It remains for each school to consider carefully the often forgotten variable, individual differences among teachers, and to adapt the pattern of operation tothem and the unique needs of the school's population.

-100 This new staff member will notalways represent an addition.There could be brought are manysmall elementary and juniorhigh schools in Metro that this function for one under unified administrativedirection and simply substitute of the principals.(There would appear to be no reasonwhy two small schools, especially when they are on contiguousproperty like CovertJunior High School and Eakin Elementary School,could not be administeredby a single principal, thus freeing a position forthis Adjustment Teacher functionin the elementary school. The junior high schoolalready enjoys counselorservice.)

A warning: The AdjustmentTeacher should not be used forsubsti- tute work or the purposesof the position will bedefeated.The Adjustment Teacher must remain a "pupilpersonnel associate" on theschool staff and administratively responsible to theprincipal like any other teacher,but professionally under the direction of thehead of this service.

A Head or Supervisor ofAdjustment Teacher Servicesshould be specialist on thecentral staff with training atleast at the level of educational and be working for thedoctorate in educationaland/or school psychology. Successful teaching experience and someprevious administrative orsupervisory experience are desirable.Adjustment Teachers should besuccessful teachers, trained at least at the master'slevel in educationaland/os school psychology, with special attention to diagno.ricand remedial work. Aswith guidance counselors, a system-wide programof identifying and recruitingpotential Adjustment Teachers should be set in motion at once sothat classroom teachers may preparethemselves for this service in advance andbe assured of priority inplacement in such positions.

The nature of this function is soclosely related to theRemedial Services function that administrativelythey may be directed bythe same central administrative staff member.This and other Pupil PersonnelServices, in any event, must be special serviceswith specialized personnelcarefully woven into the operating fabric of theinstructional program.

School Health Services

School health services in largemetropolitan school districtsfollow operated by the nosingle pattern. They vary fromthose completely staffed and school system (Chicago) tothose completely staffed andoperated by health departments (Detroit). Acompromise that has developedin various metropolitan Education systems placeshigh school nurses under thejurisdiction of the Boa:d of and provides similar servicefor elementary schoolsby means of itinerant nurses from a health department.

Surveys indicate that a great majorityof school systems inestablished communities have eithersole or joint responsibility foroperation of school health

-101 services. Moreover, a recent surveyof plans of large city systems,regarding con- solidation of various pupil personnel servicesunder the direction of ahigh-level administrative office, shows asubstantial majority planning toinclude school health services under that head.

The local situation presents a sharp contrastbetween the Nashville program ofschool-operated health services andthe Davidson County practice of depending completely on what wasforMerly the County Health Department.The city employs nine white andfour Negro nurses; the CountyHealth Department employed 32 white and six Negro nursesfor its total program.It is quite evident in both the City and theCounty system that service is morereadily available in the school-operated program.(A third more home visits were madeby the 13 City school nurses than were madeby the 38 County nurses in behalfof children from one to 17 years of age.)This is generally true in other systemsand the matter of how such services are to berendered must be based onweighing a large number of considerations, including adequacyand cost.

The question of adequacy loomslargest.Also, it applies to many services rendered children partly orwholly by agencies outside ofschools. Agencies, public or private, that serveseveral different clienteles --adults as well within aschildren, industrial as well as school groups --face the task of operating a totalbudget and a staff with dividedresponsibilities and loyalties.Service is provided up to a limit set by the staff,facilities and time available.Long waiting lists are a commonphenomenon. As much is done as canbe done and choices have to be made. Programs forother groups compete with theschools for staff time, sometimes in blocksthat mean that only the most urgentschool cases can be seenuntil "Project X" is completed.

There are considerations on theother side.Schools may become pre- occupied with intellectual development tothe detriment of a properhealth emphasis; demands of the athletic program maybe allowed to eat into funds forhealth and physical education that are meant forthe health program, etc.What is required is a decision as towhat health services are neededand how much they will cost and then a decision as to what agency oragencies can be depended upon toperform them best.Schools are often given responsibilitiessuch as these because they have an ongoing concern with thechildren as individuals in theirclasses and Other can bedepended upon to maintain a continuinginterest stemming from this. agencies may close a case; theschools seldom do, short of the upperlimit of compulsory school age, and often not eventhen. Without closing the door to other arrangements, our proposals are givenbelow

lt is recommended that theSchool Health Services be put underthe direction of a Registered Nurse.This person should be specializedin child health, preferably with experience as a school nurse,with advanced training in nursing education. There should be a staff of22 white and eight Negro school nurses,all

-102 admin- Registered Nurses. Theyshould serve local districtsfrom the decentralized include istrative centers as the demandsof the districts dictate.Their duties should hearing tests, (2) (1) scheduling general physicalexaminations and vision and visiting where assisting physicians in theconduct of physicalexaminations, (3) home for (4) assistance in healtheducation, includingin-service programs necessary, and/or teachers, (5) referral service tophysicians when needed in an emergency family when family resources andinterest fail to bringcorrective action via physicians.

The nurses should be boundby codes prepared bythe Davidson County rform directl Medical Societregarding services theshould feel suatified to and services services theyshould perform only undersupervision of physicians, they should refer tophysicians for performance. physicians for (1) con- Contractual arrangementsshould be made with examinations, and (4) sultation, (2) emergency service,(3) conducting physical in-service development inbasic and new paramedicaltechniques.

Health education should bethe primary function ofthe instructional the Associate Super- staff under the AssociateSuperintendent, Instruction,((not schools, intendent, ProfessionalServices) as discussed inChapter XV. In high first-aid training; should teachers of health educationshould have certification for teach in rooms adjacent tohealth clinics to whichthey would be available on addition to their emergencycall; and should be scheduledfor a period a day in regular free period for maintenanceof records and supplies.They should have by immediate access to nursingand medical help througharrangements monitored the Head of SchoolHealth Services.

In every elementaryschool, at least onetencher should hold certi- fication in first aid, beavailable for emergencycalls and have immediate access monitored by the Head of to nursing andmedical help through arrangements preferably School Health Services. Aclinic should be maintainedin each school, adjacent to the principal'soffice, with records andsupplies kept up by the princi- pal's office personnel inaccordance with arrangementsmade by the school nurse responsible for service to thatschool and approved by theHead of School Health Services.

Dental health,ehy±alexaminations of teachersand school sanita- County tion inspections shouldbe left to arrangementsapproved by the Davidson would Health Department and theDavidson County MedicalSociety. School nurses take responsibility forreferral of cases requiringdental treatment to private main- dentists, or to dentalclinics if family finances orinterest proved unequal to taining dental health throughprivate arrangements.

It must be obvious thatthis report cannot be expected tospell out

-103

; all the details of a program of school healthservices.It is submitted that full details can be worked out by all concerned inkeeping with the broad outline indicated here, if the task is approached inthe spirit of meeting child needs with proper medical safeguards. A s ecialadvisory council on school health services may be desirable.

Pupil Personnel Council

A major function of pupil pers.)nnel services isliaison with and referrals to community agencies, public and private,in the areas of mental health, physical health, and welfare. An advisorycouncil to the Director of Pupil Personnel Services should be considered.Its membership should consist equallyof school and agency personnel -- all types andlevels of administrative and instruc- tional personnel in the schools -- and personnelfrom all types of agencies, public and private, that are concerned with childrenand their development.

Footnotes and Implications

As stated at the beginning, pupil personnel servicesin the schools have their justification in the extent to which theyfacilitate and support the primary function of schools, instruction.But, as noted in discussion of the require- ments of personnel for these services,they have a unique contribution to make to the educational process. Analysis of thefunctioning of the present-day elementary school is one such contribution, as cited underAdjustment Teacher Services. What to do about elementary school organizational arrangementsto meet the implications of individual differences and the increasingdemands of the curriculum is a continuing problem to which thoserendering pupil personnel services are trained to contribute.In the Metro district a basic grade patternand plan of organization for instruction needs to be established.Then all can discuss the ungraded primary, the dual progress pian, theJoplin plan, departmentalization, team teaching, the Baltimora Plan ofstratified grouping and the like, as possible ways of coping with the elementaryschool's problems.

At the secondary school level, as noted in theprevious chapter, there is a clearcut need for curriculum arrangements topermit part-time work and part-time study as a transition from the school tothe world of adult life and work. Such considerations grow more naturally out of theexperiences of school social workers, .-,igh school counselors and schoolpsychologists who deal with the problems of maturing children than out of purelycurricular or instructional planning.

The place of televised instruction in thetotal pattern of instruction is an aspect of curricular planning whichwill undoubtedly come under study.But new learning patterns --their advantages and disadvantages andhow to relate them

-104 to maturing pre-adolescents and adolescents -- are subjects which require careful examination.Persons trained in educational and/or school psychology and coping with adolescent problems have understandings to share and research techniques to use in such investigations.

Pupil personnel service staffs should be freed so far as possible of administrative and disciplinary functions.Discipline should be administered by the regular administrative chain of command, running from school principal to District Superintendent to Associate Superintendent, Instruction. The staff in the pupil personnel administrative component should be used to diagnose and recommend on such cases and thereby reduce the number of cases requiring direct disciplinary action, but disciplinary action, when required, is an administrative function. The functions of school census, zoning and location of new schools should be assigned to a separate administrative component.

1

-105 X

SPECIAL EDUCATIONSERVICES FOR EXCEPTIONALCHILDREN

In response to growingpublic demand, public schoolsin recent years have rapidly expanded theirspecial education services forexceptional children. Davidson County is no exception. The Metropolitan schooldistrict of Nashville and This community was among thefirst in the nation to provideadditional help to spreading into the pupils with learningdifficulties.Beginning with the City and County, progress in recent yearshas been especially good.Rapid population growth in Davidson County, aswell as other factors such asthe shortage of qualified teachers, andfinancial and housing problems,have hindered serving all the of the children who needhelp, even though the desirehas been present among community, school board, andprofessional staff. The yearsahead will see a increase greater population inthis community and veryprobably an even more rapid Wise planning at this in the number of exceptionalchildren requiring services. talents.and stage can insure moreadequate services for futurepupils with unusual problems.

In General

Abel Special Education?Exceptional children arethose boys and girls who are so different inpsychological or physicalcharacteristics that they Intluded need different educational programsin order to work up totheir capacities. with highly in this broad category areboth the gifted and thehandicapped. Children well as those who have superior scholastic capacity andthose with special talents, as special the potential to become theinnovators and evaluatorsof our society, are a challenge to us since from theirranks will come leaders ofall types. The field of the handicapped includes thespeech and hearing impaired,those with non-sensory physical impairments (including thecrippled and specialhealth cases), the mentally retarded, the visuallylimited, and the emotionallydisturbed.

In an era of mass educationand teacher shortage, itis not surprising full that many children who aremarkedly different areunable to work up to their potential in the regular grades.Special education refers tothe additional school services provided exceptionalchildren over and abovethose "usually available to and averagechildren.Included are special day schoolsand classes; hospitalized homebound instruction; periodicalinstruction from especiallytrained itinerant teachers or therapists; specializedequipment, housing andsupplies including enriched library facilities for thegifted; special transportationarrangements; and consultants, supervisors and teachingpersonnel with trainingbeyond that required for the regular classroomteacher. -106 The provision for such servicesin Nashville and DavidsonCounty has been brought about by manyforces.Not the least of these hasbeen the growing recognition that handicapped persons canbecome contributing members ofsociety and that our very survivaldepends upon the optimaldevelopment of those with unusually high talents andabilities. Other forces havefosrered education for have exceptional children.In this communityespecially, large sums of money been secured by private groupsthrough public drives, funds sogathered being for used in pump-priming operationsto demonstratethe effectiveness of education the handicapped.

In recent years an even morepowerful impetus has come fromthe parents of exceptionalchildren. These energetic peoplehave pressed their cause alike. to school boards,superintendents, principals,teachers, legislators'and public Still other factors have affectedthe growth of the field, includingthe compulsory laws for all children to attendschool; our increased attempt tolive up to the ideal of equal educational opportunitiesfor all; rapid popu;ationincreases; growing medical advances creating anincreased number of multiplyhandicapped and chron- ically disabled children; andthe need for the reduction ofthe range of individual differences within any oneclassroom. There is every indicationthat this growth Nashville in school services willaccelerate in the years ahead.It behooves the Metropolitan area at this time to planand prepare to meet a growingneed and demand.

An Overview of Services. Duringthe school year1962-63, 109 teachers and speech therapists wereemployed by the NashvilleMetropolitan schools. u- These persons served 3,204 children(or_.ust over thiij_ee.aer-cerof the school lotion of the community). An overviewof services is outlined inTable 14. A more detailed discussion of services forthe various areas ofexceptionality will follow. In recent years both theNashville and DavidsonCounty public schools have employed a full-time supervisorof special education toadminister the program. Other valued services have comefrom the schooi psychology program.

An Overview of Unmet Needs.To what extent are theNashville Metropolitan schools providingspecial services for theirhandicapped and gifted pupils? Table 15 is an attempt toarrive at this.It is difficult to estimate accurately the prevalence ofexceptionai children in thevarious areas of exceptionality. The ercentagesused in this re ort are comrised of various estimates found in therofessional literaturesome ofwhich varwide Thus figures. theshould be regarded asardsticks forfanning and not as precise

It is usually estimatedthat between eight and 10 percentof all children three percent of the arehandicapped and/or gifted. Wehave pointed out that only Thus, it pupils io this community receivedspecial education services in1962-63. and would appear that over60percent of theexceptional children in Nashville Davidson County were without suchservices.In no case were as many as70 percent

-107

"7-." TABLE 14

SPECIAL EDUCATIONSERVICES FOR EXCEPTIONALCHILDREN

IN NASHVILLE ANDDAVIDSON COUNTY SCHOOLS

1962-63*

Total White Negro Area of exceptionality Teachers Pupils TeachersPupils TeachersPupils

15 (a) 3 Gifted 1 18 1

Speech and mildly hearing 2 209 impaired 11 1,219 9 1,010 -_ --- Severely hearing impaired 5 50 5 50 Llon-sensosicall impaired 2 20 Homebound 10 189 8b 169 1 223 Hospital ized 5 406 4 183 Special classes for ce- -_ MO NW MD rebral palsy 3 36 3 36

295 Educable mentally retarded 58 1,036 40 741 18

2 30 Trainable mentally retarded 6 126 4 96

1 13 Visually limited 4 55 3 42 79c -- ...... Emotionally disturbed 6c 6 79

* Of a total public andprivate school population ofapproximately 93,000 of which 20 percent are Negro.

Integrated.

In addition, five part-timeteachers of the homebound wereemployed, three by the City and two by the County.Pupils served by them areincluded in the enrollments.

Two teachers of the emotionallydisturbed serving 44 pupils in theCounty are at Central State Hospital .While classified as teachers ofthe hospitalized, they are not included under that category in thistable because they serve thedisturbed child. Included are three teachers at the WillsCenter, Vanderbilt University,employed by the City system. - 108 TABLE 15

ESTIMATED EXTENT TO WHICHEXCEPTIONAL CHILDREN ARENOW SERVED

BY METRO SCHOOLS

(Based on school population of 93,000in 1962-63)

Pupils Needing service Receiving service Area of exceptionality Percent Percent Number of Numberof number 93,000 needing

Gifted° 1,860 2.0 18 (a) Speech and1mildly hearing 37 impaired 3,255 3.5 1,219 Severely hearingimpaired2 93 0.1 50 54 Non-sensory physical I y impairedi 930 1.0 631 68 Educable mentally retarded 1,860 2.0 1,036 56 68 Trainable mental lyretarded4 186 0.2 126 65 Visuallylimited5 84 0.1 55 79 42 Emotional lydisturbed° 186 0.2

ONIMMINI111.11.11

grouped together in a a Less than one percent.Gifted children have been number of schools in boththe County and City for sometime, so the per- cent served is notmeaningful.

1 The usual case load does notexceed 100 when pupils areseen.twice a loads week.In Davidson County twospeech therapists had average case of 181 seen once perweek.

2In addition, a total of 39children from Davidson County wereenrolled at the Tennessee School for theDeaf.

3Remarkably large numbers ofchildren were enrolled in thehospital pro- thus the gram forshort periods of time, oneteacher seeing 223 pupils; percent served isinflated.

4In addition, a total of 73children from Davidson County wereenrolled at Clover Bottom Home.

5A total of 36 children fromDavidson Court?), wereenrolled at the Tennessee School for the Blind

6These figures are confoundedbecause some of the 79 childrenserved in this community came fromsurrounding counties. Anadditional 29 pupils wereenrolled at Project Re-Ed and 12 atthe Fairfax Academy. -109 !

of the estimated children served. Thearea of greatest neglect is that of the gifted, where only a small beginning has been made at providing special. classes for such youngsters. Again, more details on the unmet needs by areas of exceptionality follow.

How do the services in the Nashville Metropolitan school district compare with those in selected local school systems throughout the United States? lt is possible to get some comparative data by examining the moit recently published U.S. Office of Education figures for February, 1958 (including the 1958 figures for Davidson County and Nashville). There isno reason to believe that the rate of expansion of the cities selected in the past five years would not be comparable.

As shown in Table 16, of the nine cities contrasted with Nashville, the majority were making greater efforts in almost allareas of exceptionality. This table again demonstrates that while considerable has been accomplished, much more

remains to be done. .

Of even greater importance than the quantitative data in Tables 14, 15 and 16 is the quality of services as contrasted with their quantity. With critical shortages of teachers, it has been difficult in all education to foiter quality of instruction. The problems have been tenfold in special education, for there are very few teachers, especially of the handicapped, so dedkated.and interested that they choose to leave regular instruction to get specialized preparation to work in an area of disability.This community has been remarkably fortunate in finding many able educators to serve.However, unless highly trained ond competent additional teachers can be employed, it will not be possible to _meet future needs.

Nationally recognized administrators and supervisors in special education with quality teachers and therapists will do an outstanding job under less than ideal conditions. Thus recommendations on personnel should take precedence over those on housing, equipment, and transportation. While it is recognized that a truly outstanding program of services can be achieved only by comprehensive, well-balanced programs with adequate housing, equipment, etc. providing the tools needed by the educators to do the job, one cannot compromiseon teacher competence. Quality leadership is needed to coordinate and supervise the special education services. No one or two administrators of special educationcan have competence in all areas of exceptionality. With a community the size of the Nashville-Davidson Metro system, specialized consultants and supervisors %should be provided for teachers in each area because of the rapidity of change in specialized teaching procedures. Thus our major recommendation is that top flight central office supervisory staff be secured at the earliest possible moment. COMPARISONS OF ENROLLMENTS IN SPECIAL EDUCATION PROGRAMS IN SELECTED LOCAL SCHOOL SYSTEMS THROUGHOUT THE UNITED STATES, FEBRUARY 1958 TABLE 16 Total population - all exceptionality Area of METRO. NASH'. 300 Oakland Calif. 300 Dade Co., Florida 284 Indianapolis Indiana 469 C. Mo.Kansas 473 NewRochester York 316 Cincinnati Ohio 484 Okla.Tulsa 257 PortlandOregon 371 Columbus Ohio 468 Gifted ages (in 1,000's) 18 84 49: 360 615 772 SpeechSeverely and hearing mildly hearingimpaired impaired 1,140 38 3,456 207 3,270 753 1,799 188 3,290 - 1,600 93 1,089 120 1,426 33 1,863 56 84 Non-sensoryEducable mentally physically retardedimpaired 689158 1,110 688 1,1431,062 1,371 359 1,610 641 967238 1,536 290 2,098 257 927442 525283 VisuallyTrainable limited mentally retarded 4018 89 152157 85 1111111 43 65 IND 82 3018 148 38 Source:°AnEmotionally additional U.S.O.E. disturbed 965 Bulletin problem 0E-35027: youth were Special in a special Education program. Enrollments in Local School Systems. 177° 46 76 40 208 Gifted Pupils

There is a strong demand nationally and locally to providespecial services for the gifted.Nashville City schools have had a study commission working in this area for some time which resulted in the establishment, on anintegrated basis, of one class for the gifted last year. As we understand it, there is aplan to add one more special class in the City and three inthe County in 1963-64. Ability grouping has been a practice in a number of schools in both the City and County for some time. Thus Table 15, showing that less than one percent ofthe gifted are served through services other than the regular grades, is probably inaccurate. There is little doubt that the estimate of 1,860 children withI.Q .'s of 125 and above in this community is a conservative one; however, we believe we can justify our two percentprevalence estimate in Table 15 as gifted children in need of special education. These are the siudents who are not working up to their capacity in the regular grades and need either to have this program supple- mented, or to be placed in another program more in keeping with their needs. There are many types of programs for the gifted which fill this purpOse, with special schools and classes being among the most popular.

Programs labeled as enrichment are becoming more and more untenable. We believe a gifted child should be allowed to advance at his own pace both in depth and breadth. We need to do a much better job of early identification of the gifted.This is probably only going to come about when we find a way of giving individual intelligence tests and tests of creativity and other unusual talents toall children. With this information, planning can begin immediately for a school program geared to the needs of theunusually able.Here again, the key is to obtain the services of a knowledgeable consultant in this area.

For the foreseeable future, most of the services for the gifted willbe provided by general education in the various forms of grouping and enrichment activities.Special education has a role to play only for the gifted who require services over and above those which jt is reasonable to provide inthe regular school program. This will largelytake the form of special schools and classes and such specialists as itinerant teachers of the gifted and especially trained consultants. Thus we see education of the gifted as a joint responsibility of general andspecial education. This is an area, among many others discussed in this report, inwhich there is need for research and experimentation.

Speech and Mildly Hearing Impaired Pupils

The Nashville and Davidson County schools employ 11 public school speech and hearing therapists, seven in the City and four in the County. Of this number, two are Negroes, both being employed by the City school system.In our view, the seven speech therapists in the City are able to provide an adequate

-112 program for thechildren they serve, This is not to saythat the Nashville City schools have not had a waitinglist; however, the unmet needs inthe County have been much greater.Probably the biggest problemwhich has faced the Nashville City schools is in keepingqualified speech and hearing therapists,the turnover being rather sizeable. The speechcorrection program in the largerDavidson County area should be brought up tothe level of that of the City.Here, two of the therapists have been seeing181 children, but only once aweek. This is an inadequate speech therapy program.There is an immediate need for atleast double or triple the number oftherapisis now employed by theCounty.In our view, adding one Negro and four whitetherapists at the outset would at leastbegin to equalize the two programs.Here again it should be pointed outthat the State reimburses approximately two-thirdsof salaries of speech therapists onthe State salary schedule, including the provisionof a State increment.

Severely Hearing Impaired Pupils

This category includes the severelyhard of hearing and near deafwho need to be in a special dayclass program. Such pupils do not getsufficient special- ized help from an itinerantspeech and hearing therapistworking with them once or twice a week for thirty minutes.The community has had specialclasses for the hearing impaired, operated as a cooperative program,since approximately 1952. For some years these werelocated at Murphy School inNashville.In approximately 1956, the program was transferred toJulia Andrews in the County,'and in 1962 was shifted to Jere Baxter in theCounty. Throughout, this hasbeen a cooperative program betweenNashville and Davidson County.This past year, five teachers have served 50 children. This represents54 percent of such childrenwith homes in the County and City who neededsuch services. Most of theremaining 46 per- cent are enrolled at theTennessee School for the Deaf inKnoxville.

As far as we can see, there is nosubstantial waiting list for children to the Jere Baxter program.Furthermore, it is not likely thatthis program will increase to any marked degree inthe immediate years ahead, except tothe extent that the population increases.In fact, it is likely thatthere will be a growing number of multiply handicappedchildren whose parents willprobably want them enrolled at the Tennessee School forthe Deaf or some other specialfacility.

Non-Sensory Physically HandicappedPupils

Included in this category arethe children on the hospitalizedand homebound programs, as well as thechildren enrolled at the specialclasses for the cerebral palsied and other cripplingconditions at Buena VistaSchool in the City. The special classes at Buena Vistahave served children fromboth the County and the City cooperatively since the1940's.

-113 The Tennessee hospitalized programis an unusual one.The salaries by the of these teachers (onthe local salary schedulefigures) are borne 100 percent State, since many of thechildren on the hospitalized program comefrom counties keep outside of this community.In this case, DavidsonCounty has tended to hospitalized teachers on itsrolls, even though theseteachers may be working at the City. There are five such hospitals asVanderbilt, Baptist, and General in teachers of the hospitalized onthe City rolls, two working atthe Junior League Wills Home and three in theexperimental program for theemotionally disturbed at Center, Vanderbilt UniversityHospital.It is extremely importantthat the State of and local school officialscontinue to utilize theirprerogative in the supervision these public school teacherswho are working in privateagencies.

It is probably moredifficult to discern futuretrends in the area of the indication non-sensoryphysically handicapped thanin any other. There is some but that more and more that the absolute number mayhold steady or even decrease, This will involve of these children willhave congenital andmultiple handicaps. their needs are to be ade- truly creative and imaginativeteaching arrangements if quately met. This past year, twomultiply handicappedchildren in the County the State has provided have availed themselves of newState legislation wherein school for the multiply $1,000 toward the cost of theireducation at a special private handicapped -- one in Texas,and another inPennsylvania.

The hospitalized andhomebound programs areprobably among the While the strongest in the nationand a fine job is beingdone at Buena Vista. palsied number of teaching positionsapproved for specialclasses for the cerebral being has remained the same forthe past several years,the number of children sizeable expansion of services served has been steadilydecreasing. Therefore, no the is envisioned. However,the changing population inthe special classes for cerebral palsied toward moreand more who are alsomentally retarded demands severely major overhaul andchange. Half of the children atBuena Vista are now learners; mentally retarded; many ofthe remaining areeducablesetarded and slow This and not more than half adozen children are ofnormal or above intelligence. receive latter grous should beintegrated more into theublic schools, but continue to the ancillary services ofthe physical therapist andspeech correctionist.

We are not sure howbest to serve the half ofthe 36 children out at of 65 and above. Buena Vista who are ofeducable mind, namely having class or A number of plans shouldbe explored. Onewould be to retain a special centrally located school.Another would be to thinkseriously about two in some with building one school in eachof the three proposeddistricts of the school system small number a wing to serve avariety of handicappedchildren and to service a enrolled in of cerebral palsied ateach of these. Some ofthe children might be retarded. the regular grades, andothers in special classesfor the educable mentally children could We do believe than anincreased number ofbrighter, less-involved be enrolled in regular gradesand have theoccupationo'ol therapist, physical

-114 therapist and speech correctionist work with them on anitinerant basis.

Mentally Retarded Pupils

This is by far the most extensive programin both Nashville andDavid- son County in termsof teachers employed.In fact, 58 of the 109 specialeduca- tion teachers in the systems are specialclass teachers of the educablementally retarded.In addition there are six teachers oftrainable children.

Over the years, as services in both communitieshave increased, the emphasis has tended to be on quantity ratherthan quality, with special classes being established primarily to provide relief forthe regular classroom teacher. Furthermore, children have not been placed inspecial classes until they havehad two or three years of failure inthe regular grades.This has created an impossible task for the special teacher. While we see thenumber of special classes for such pupils increasing still further in the yearsahead, we believe the challenge nowis to move toward quality. As ourrecommendations show, this canbest be done by employing one or two full-time trainedconsultants in this area; by skirting pre- school services for the culturally disadvantaged;and by developing a strong occu- pational-training (study-work) program for theadolescent educable mentally retarded, including placement service.

While special classes for the "educable"retardate have been operated separately by the County andCity, the special class services forthe "trainable" retarded have been a cooperativeendeavor, the City schoolsunder- taking to serve such children. Most of the remainingchildren in this category are enrolled at Cloverbottom Home, at privateresidential facilities, or remain at home unable to attend school. Thus there isprobably not a very extensive waiting list in this area.

In the past, the State has reimbursed on aformula of 60 percent of State and 40 percent of local funds, not toexceed $360 per child of 60 percentof approved expenditures. The TennesseeMiscellaneous Appropriation Bill of1963 has made it possible for an additional amount tobe given to match the salary in- crease for teachers inthe regular program.Pre-approved expenditures may provide for the teacher's salary, attendant services,special transportation and equipment, materials and supplies.

Visually Limited Pupils

Children in this category havebeen grouped into those that ar,.:blind and those that are partially seeing.With improved optical aids andlighting, most of the marginally visually-limitedchildren are fitting into the regulargrades and

-115 the division line between theblind and the partially seeingis fading. Thus, we trend, now speakof the group as the visuallylimited.In keeping with this teachers who specialize in this area are moreand more developingcompetencies to work with both theinkprint and braille-type child.This community has four teachers serving 55 of the estimated84 children in need ofservice. An additional 36 children from Davidson County areenrolled at the TennesseeSchool for the Blind located in Donelson as day orresident students. Thus weknow of no waiting list in this area and can onlyanticipate that any increase inthe field will be pri- marily due to a population increase.

The greatest need is for anitinerant teacher oftheiteen-aged visually limited, who couldprobably also serve as coordinatorof the program. Another probiem is that therewill be more and moremultiply handicapped visually limited, includingthose who are mentally retarded.Ev"ery attem t should continue to be made to integrate,if not enroll, theintellectually able visually limited who make up the largemajority of pupils in this areainto the regular established at Howard grades.In this regard,".arrexcellentrecord has aiready been School. However, we see a needfor at least three types ofservices: (1) residenticd school services for some blindchildren, (2) the existing programin the public day schools augmented by types ofplans and services other thanthe predominant resource room nowprovided, and (3) provisionfor the multiply handicapped visually limited pupils, who often arementally retarded.

Emotionally Disturbed ILE21.1

In the past two years, this areahas mushroomed in thecommunity as remain no other. Weestimate that 186 children are sodisturbed that they cannot in the regular grades, but mustbe provided some specialservice. Now available Included are three in the community is anincreasingly wide range of services. teachers on the rolls of theNashville City schoolsworking in the Wills Center at special the Vanderbilt School ofMedirine with disturbedchildren. There is one teachers class at Warner School for theemotionally disturbed.In the County, two In addition, on thehospitalized payroll are assigned toCentral State Hospital. Peabody College and the TennesseeState Department ofMental Health are co- operating in an eight-yearexperimental boarding schoolknown as Cumberland children. There is also House, a part of Project Re-Ed,for emotionally disturbed Fairfax Academy, a private facilityin the community,serving 12 disturbed children. There is an unusual need for acoordinating council in order toutilize these facilities to the maximum.

There is a good possibilitythan an increasing publicschool service for the emotionally disturbedwill need to be established.As yet, services which now existshould be viewed as experimental programsbecause we have little evi- dence as to their effectiveness.Too, we are not sure ofthe role we can expect teachers to play on the mentalhealth team made up ofpsychiatrists, clinical -116 psychologists and social workers.

Summary of Recommendations

An extensive report, filed bythe team of experts who worked on this aspect of the report, contains detailedrecommendations which are to be made available in full to the new MetropolitanBoard of Education. The major recom- mendations of this chapter are summarized inoutline form as follows:

1. Personnel

a. A Director of a Division of SpecialEducation at a level com- parable to the Director of Pupil Personnel Services.

b. Four or five central office supervisors in aDivision of Special Education in the areas of: mental retardation,speech and heciri , non-semor h siccALindicapped and education of the gifted.

c. Part-time coordinators in the areas of thevisually limited and the emotionally disturbed.

2. Program

a. Availability of all s ecial education programsimmediatel to all exceotional children, reardless of race.

b. Establishment of a strong program of in-serviceeducation for teachers of the handicapped andgifted children to upgrade the quality of instructors, andutilization of the resources ofthe State Department of-Education and insti- tutes of higher learning inthe community.

c. Coordination of special education personnel withhealth, psychological, social and educational personnel to1;c7T-m a comprehensiveevaluation team to work on the early identification and placement and continuousevaluation of all pupils.

d. In the interests of economy andefficiency, utilization by the Metropolitan School System of services ofother com- munity agencies or programs such as the StateVocational Rehabilitation Program, Bill Wilkerson Hearing andSpeech

-117 Center, the MiddleTennessee Mental HealthCenter, hos- pitals, Junior Leaguehomes, parent-sponsoredschools, State facilities, etc.

e. A close liaisonbetween the parochial andpublic schools to assure thesmooth referral andplacement of handicapped parochial school pupils,when need for publicspecial education facilities is.indicated for such pupils.

f. A study to beundertaken to determinewhether general or special educationshould take responsibilityfor slow learning pupils, who make upapproximately 20 percentof the school population, whohave IQ's between 75and, 90 and who come from the mostculturally disadvantagedhomes and neighborhoods of the community.

3. Housing of a. Proper attention to thespecial facility requirements handicapped childrenand/or adults in all schoolbuildings.

of speech b. Spcial spaces in allschool buildings for use and hearing therapists,itinerant teachersand other services to specialized personneloccasionally providing one or morepupils in a school .

c. Geographic location ofspecial schools andclasses or service centers tominimize transportationinconvenience and cost.

d. Adequate centraloffice facilities foradministrative,su- pervisory and secretarialstaff, including specialeducation curriculum and materialsla oratory.

4. Services for GiftedChildren

Continuation of thestudy and planning whichhave led to a. of the initial efforts toprovide a differentiated program instruction.

b. Formulation of a clear statementof specific educational goals prior to theestablishment of any special program for the gifted becauseof the experimentaland deve op- mental stage of thisfield. -118 c. A consideration of various typesof grouping and enrichment which will improve o?purfunitiesfor the gifted as a part of the general program of instruction.

d. Consideration of s ecial schoolsand/or classes as part of the programfpecialeducation.

e. A continuous and criticalevaluation of instructional pro- cedures and content materials usedin the special programs devised to serve the gifted.

f. The placing of staff assigned inthis area within the ad- ministrative structure in such a way as to serveboth gen- eral and special education andhave well-established working relationships withpersonnel services and research special ists.

5. Speech and Mildly HearingImpaired Pupils

a. Employment of at least five additionaltherapists, four white and one Negro, as soon aspossible so that all schools in the Metropolitan system canhave services for pupils who need it at least twice aweek, maintaining the State case load requirementof 75 children seen twice a week.

b. An extension of the hearingand speech testing programs as carried outin the Nashville City systemduring recent years to coverthe entire MetropolitanSchool System.

c. Extension and strengthening ofthe program of cooperation with the Bill Wilkerson Hearingand Speech Center, par- ticularly with regard to referrals.

d. Adequate provision for appropriatehealth services for children with speech and hearingdisorders whose families areunable to provide it.

6. Severely Hearing Impaired Pupils

a. Relocation of the special class programprovided by five teachers at Jere Baxter School inDavidson County for 47 deaf and very hard ofhearing pupils from both the

-119 County and the City s stem.The Jere Baxter School is locatecl2ELAT_Dois eastern outskirts of thecommunity. Therefore, it is nec- essary that the programbe moved to a more desirable, more suitable,quiet and traffic-free regularelementary school nearer the Bill WilkersonHearing and'Speech Center and the Peabod Colle e campus.Student teachers of the deaf, consultants and secialized hearing, testing and other services wouldthen be more accessible. b. The provision of improved hearingreferral and diagnostic services to identify allseverelylieatigt al aired children at a very young age,and certainlbefore the age of three. c. The provision in the publicschools of a pre-school program for severely hearing-impairedchildren, or the develop- ment of a cooperative programwith the Bill Wilkerson Hearing and Speech Center(which has provided such ser- vices in recent years), theschools employing the teachers with State reimbursement. d. The designation of awell-trained, public-school-oriented teacher of the deaf(3-5171teacher for the specialclasses in the public schools.The superv;sor of-speec recommended a ove wouldbe a public school speechtRera- pist, not necessarily atrained teacher of the deaf. e. Addition of teachers of thedeaf -- probably not morethan one or twoadditional teachers of the deafwill be needed for the present. f. As in other areas, aconcerted effort by the school system for the provision of astaff of full-time, permanent,trained, gualitty_2..c_!id_lersin this program. g. The provision of an in-serviceeducation program for regular classroom teachers who havechildren with severe impair- ments to enable them towork effectively withhearing handicapped. h. Adequate attention tokeeping the mechanical equipment used for amplification purposesin the program in good working order.

-120 7. Non-Sensory, Physically Handicapped Pupils

Concerning the special class program for cerebral palsied children at Buena Vista:

a. The establishment of a special school or center to serve the trainable retarded, and severely retarded cerebral palsied.

b. A continuation of the Buena Vista type of program for cerebral palsied children of educable mind. Those who are educable mental! y retarded should probably continue in the self-contained special classes now operating. A more integrated program is needed for the cerebral pal- sied pupils who have more intellectual potential, by lacin them in the regular grades for as much of their school program as possible.Brighter cerebral palsied students probably should be enrolled in the regular grades, with the special class teacher serving as a resource person to them.

c. An expansion of ancillary services especially to provide adequate screening, placement and programming. Speech andphysical therapy for cerebral palsied pupils in all settings should be continuously available.

Concerning the homebound program:

a. .A maximum effil load for homebound teachers of 10 to 12 pupils.

b. Three hours of instruction time per pu il per week, con- sisting of at least twoperiods of one and one-half hours each.

c. A division of pupil load to allow both an elementary and a secondary home instruction teacher to teach in the same geographical area.

d. Screening of pupils for scholastic capacit who have never been enrolled in a classroom and are being p aced on a homebound program for the first time.

e. A requirement that children, in order to be placed on home instruction, are expected to have a minimum home-13; period of six weeks.

- 121 f. Provision of a substitute teacher upon the absence of a homebound teacher.

g. Utilization of the neighborhood school in providing a well-rounded school rogram for the homebound child.

h. Availabilitof school services (visiting teacher, p chological examination, etc. when needed.

i. Permission for the homebound teacher to transport pupils on field trips or visits tothe school, since the chroni- cally ill, homebound child is even more in need of this type of experience than the child in school.

Concerning the hospitalized program:

a. A continuation of the present plan of the Statereimbursing fully the salaries of all teachers of the hospitalized, since many pupils on the rolls are from outside the local school system.

b. A continuation of supervision of all teachers of the hos- pitalized, especially those working in private agencies, by State and local supervisory personnel in special education.

8. Mentally Retarded Pupils

Concerning mental retardation generally:

a. A re-examination and a redefinition of the classification system for the mentally retarded inkeeping with national trends and recent experimentation.

b. More extensive psychological services available to men- tally retarded pupils and their parents.This should in- volve professional help in the form of counseling and other guidance services in addition to the conventional one of diagnosis.

c. Additional classes for the retarded, to be started only after trained teachers are available.

-122 d. The reorganizationof special classes blevels -- pre-school, primary, intermediateand junior and senior highschoo levels. of e. Proper steps forward onthe badly needed programs in-service training forteachers of the mentallyretarded and a coordinatedcurriculum for the educable and traina le pupils.

Concerning the programfor educable retarded pupils:

a. The establishment of aspecial high school forthe mentally_ retarded and possibly slowlearner with emphasis upon oc- cupational training, sincewith a growing emphasis on academic excellence, theneeds of the educable rrientaly retarded cannotge met in existing high schools.This should not be a technical ortrade school for thesechildren, since information onoccupational changeindicates that retar ates ot e uture wiI not e emp oyein t etradi- tional trades, but rather inthe service areas andunskilled jobs in the community,including factories wherespecific trade training is notrequired. This programwould need to be coordinated with the StateVocationalRehabilitation services an e u IC SC 00vacationa antec nica programsdiscussed in Chapter VIIIof this repaft.

artenro- b. Establishing public pre-school nurserancxIL._gE_inder Ftrams in poorneighborhoods where largenumbers of the culturally deprived, mentallyretarded are located.

c. The screening andspecial class placementof all children entering school not laterthan at the outset oftheir school careersrather than after two or more yearsof failure. it may befound necessarto train teacherswith basic back- ground in tests and measurementsto be employed on 12-month contracts to domuch of this during summermonths.

d. A program ofexperimentation anddevelopment on methods uro o i of e du ca tintl.gm2nc2IJi_-easo-ccgjEera_e mentally retardeho from a bove- ayeligi ehomes and have beenvariously labeledbrain-liajtimil hyper-kinetic and perceptuallyimpaired.It is unlikely that these childrenwill get an adequate educationin our

-123 existing special classes,which serve primarilythe re- tarded from inadequatehomes. signa- e. Abandonment of the practiceof requiring a parent's ture beforelacement of a retardedchild in a s.ecial ain class.In lieu thereof, attemts should bemade to the oral consent andunderstanding of the parentbefore such a move is madewhenever possible,retairiing the final decision on schoolplacement with the school system. f. The rovision ofabove-avera e housinfor s ecial classes for the mentally retarded,since they spend tiro tothree years inthe same class.In many cases,classrooms for these children are the mostsub-standard, noiss;r, poorly lighted and ventilated inthe school, and toooften located in basements.

Initiation of a studyof the best type ofspecial-class plant and equipment for theEMR at the primary,intermediate and secondary levels. regions of h. A clustering of specialclasses into districts or the school system sothat at least two or moreclasses are available in the same sChool aslong as such classes are to continue to be housed inthe regular publicschools. Such classes when housed in relar sublic schoolsshould be laced in schools wheretherincial and staff acce the retarded as an interalart of the schoolcommunit and where retarded pupils haveregularly available tothem the benefits of the entire school oerationsuch as educational TV, physical education,music, art, dentalexamination, school lunch, assembly, etc. i. Experimentation with teamteaching,_programmed instruc- tion and other aproadies for servinglarger numbers of children in this area moreeffectively.

j. A thorough studyof class size requirementsin special classes. On the onehand, teachers with anumber of hyper-active, distractiblechildren probably shouldhave substantially lowerenrollments than thoseworking with the culturallydisadvantaged, who shouldbe able to serve as manypupils as in a regularclassroom. On the other hand, some wayshould be found to increaseenroll- ments in otherclasses, perhaps throughsuch innovations

-124 asteacher assistants, team teaching, etc.

Concerning the program for trainable pupils:

a. The establishment of one special schoolfor multiply han- dicapped children (including a shelteredworkshop and recreational training program) in a centrallocation in the community to serve approximately 100children, with apossibility of expansion to double that amount inthe future.It should serve, at the outset,the trairiable children now enrolled in the six specialclasses'pperated for them, as well as the non-educablecerebral palsied (1Q's below 65) enrolled at Buena Vistasc-hool.(Speech and physical therapy must be providedthese latter pupils.) It should also serve other types ofseverely retarded, mul- tiply handicapped children. ThisundoUbtedly should be an experimentalfacility, including a boarding school arrangement, supported in partif not in large measure by Federal and State funds. A cooperative programwith Clover Bottom Home may be desirable.While this should be a community boarding and dayschool, it *haps should serve children in a broader areathan simply the Metropolitan school district.It should therefore be de- veloped cooperatively with the State government.

b. A thorough evaluation of the present programfor the trainable mentally retarded.It is possible that this is oneof the weakest programs operated in the Metro system.

c. The development of an integratedcurriculum with well-estab- lished goals leading to occupationalproductivity in a sheltered environment.

d. A consideration of the possibility of serving sometrainable children at the Clover Bottom Hospital andSchool and Donelson as boarding pupils Monday throughFriday.

9. Visually Limited Pupils

a. The employment of an experiencedspeck! teacher to serve asconsultant and part-time itinerant teacherof high school visually-limited students of average orabove intellect.

d -125 b. A consideration of the necessity of augmenting the present "resource room plan" by providing an itinerant teacher service reaching down into the elementary school. c.i: Because of increased numbers of multiply-handicapped, visually-limited children; including those who are mentally retarded, establishment of procedures for enrolling non-educable, visual! special day schools for the multiply handicapped as re- commended above. The Tennessee School for the Blindi_ it is indkated, may establish a department for the multiply-hondkapped( blind child at the present site for the Negro students on Lebanon Road, whkh could serve the community's children in this category on a day ov residential basis. d. Consideration for the establishment of a self-contained special class for the visually limited, or the enrollment of some childrenfull-time in the resource room. These pupils would be largely the visually limited who are unable to mike ro ress in the re and may be slow learners, educable mentally retarded, or remedial edu- cation cases. e. Establishment of qualifications of teachers for the visually limited such that they have competence in teaching both blind and partially seeing together in the same education setting. f. Establishment of a more effective liaison between referral agencies, the physicians and the schook, with a view to more adequate and earlier screening toidentify visually limited pupils.

Establishment of volunteer services for brai II ing textbooks and recording instructional materials otherwise not avail- able to these children.

If integration of the races in special education cannot be immediately attained, consideration of the establishment of a teaching position which would be a resource room plan for the elementary schook in the morning, and an itinerant teacher plan for the high schools in the afternoon. A fully integrated program regardless of race would removethe need for this recommendation.

-126 i. A study of the possible advantages of locating all special class and resource room services for the visually handicapped .uils in the Donelson schools. This would permit merging into a total program the services of the Tennessee School for the Blind. The Metro schools would be expected to enroll a number of the more able blind children at the resi- dential school on a day basis.

10. Emotionally Disturbed Pupils

a. The employment of a part-time consultant (or team of con- sultants) to make a special study in the area of the emotion- ally disturbed.This area cuts across all of the mental health fields.

b. The establishment of an advisory committee, to be chaired by the Director of Special Education and to include heads of such facilities as Project Re-Ed, the Wills Center at Vanderbilt, Fairfax Academy, the Nashville Mental Health Center, the State Department of Special Education and so forth, so as to avoid gaps and duplication with the sudden proliferation of school programs, public and private, for the emotionally disturbed.

c. The preparation of a manual of operations, including defi- nitions of pupils to be served and methods of identification and referral, insofar as special classes for the emotionally disturbed are to be conducted.

d. Exploration of the desirability of contracting for services for the emotionally disturbed as an a ternative to esta lishing additional, expensive special classes. Xl

PERSONNEL

This chapter covers major mattersof personnel administrationwhich should be considered by the newMetropolitan School System.

Bases for Determination ofSalaries to Teachers

The primary objective of asalary policy for any school systemis to provide needed staff with suitablepersonal and professionalqualifications and in sufficient numbers to perform thework of the school system. The processesof the educational operation are, inthe main, those undertakenby classroom teachers. The quality of the educational programin a school system mustthus depend in great part upon thequality of personnel in classrooms.

In order to accomplishthis end, salary plans mustcontribute to attracting and holding requiredteaching, supervisory andadministrative staff and encouraging continuedprofessional development.

There are several factorswhich are usually discussed inconsidera- tions for the variation ofsalaries paid individual teachers in aschool system. Attempts have been made from time totime in school systems tomake allowances for one or more of the following:

1. Degree of responsibility ofassignment

2. Amount of professional trainingrequired for assignment

3. Amount of training individualsactually possess

4. The diligence with whichindividuals exert effort in performance of work in theirassignments

5. How well individualsperform work in their assignments

6. Amounts needed to attract andhold staff in various assignments

7. Amount of time required ordifficulty of assignments of 8. The real or traditionallyassumed importance or level sophistication of various positions

-128 9. Attractiveness of assignments, particularly as to working conditions

10. Years of service

It is not feasible, by virtue of difficultyof measurements and con- tradictions, in principle, to design a salary plan whichtakes all of such elements objectively into account. Moreover, even with asimplified set of salary ob- jectives, it should be clearly understood thatsalary inequities may be minimized, but not eliminated.

Some Basic Considerations

In the analysis which has been made by the surveystaff, there are certain basic premises or assumptions whichmight or might not be accepted in principle by the Metropolitan Board of Education,but which it should seriously consider.

Importance of Salaries. The success of the newconsolidated school system of Metropolitan. Nashvie-Davidson County will undoubtedly depend heavily upon the quality of teachers attracted tothe growing system over the years ahead andthe level of morale that is maintained. Salarieswill have much to do with this.

Cooperative Development of Salary Plans.In order to maintain a properprofessiTirTIJ atmosphere with respect to scTlal-TI'l-Tanning, the Boardof Education, as a matter of policy, should formally maintainsystematic communi- cation between its own membership andrepresehtatives of organizations of teachers. Some of the most successful methodsof developing salaries and making salary adjustments have resulted from representativesof those concerned sitting in committee with outside independentconsultants as necessary in working out teacher-salaries. An atmosphere of"labor-versus-management" in the school situation. does not generate the kinds ofdecisions on salaries and other aspects of the work of teabhers that induce a harmoniouslyoperating system.The Board of Education should officially and formally recognizeappropriate representatives of teachers in working out these and similardecisions.

Non-Monetary Factors. A rational salary plan atadequate levels is not of itself sufficient to produce aprofessionally motivated organization of educational personnel and supporting staff capable Of copingwith the educational readjustments which the Metropolitan School System willbe up against for many years to come.Questionnaires.to teachers in. the Davidson Countyand Nashville City school systems have shown many areas, non-monetaryin nature, contributing

-129 to low teacher morale. Low teacher morale, even when manifested by dissatisfac- tion with monetary rewards:, is often attributable to such other factors. On the other hand, withouta reasonable salary program, there is no basis upon which to build job satisfaction and the kind of motivation essential to successful service in the educational profession.

Importance of Salary Levels. Experience in school systems throughout the country indicates that dissatisfaction with differentials and comparative salary levels of personnel on various steps and schedules is greatest where general levels are low.In this connection it is worth noting the following information obtained in the questionnaire to teachers in Nashville and in Davidson County: Of approxi- mately 3,000 teachers, over 1,000 indicated that their present salarywas unsatis- factory, and almost half considered maximum salaries for classroom teachers in the system unsatisfactory. Most of these teachers are employed in the Davidson County system, in which the salary level was considerably less than in the City system. This no doubt has been ameliorated by the increases since made by the commendable action of the Transitional Board in its 1963-64 budget. The first step in creating a financial if centive to accept employment and to continue employment ina school system is to provide adequate funds for reasonable salary levels throughout the entire range, from minimum to maximum.

Anticipating Change. A satisfactory salary plan must be projected into the future, taking real istica5 into account the increases likely to be required both by maturing of staff and changes in costs. Throughout the salaryrange, salaries should keep up with earning levels of professionals in theeconomy in general.

Comparative Standing of Teacher Salaries

A gross check upon the salary requirements to meet the competitive situation may be obtained by looking at salaries paid in school systems about the size of the new Metro School System.For this purpose, a group of school systems have been selected, most of which are in. the Southern part of the United States. A summary of beginning salaries and maximum salaries in these systems in 1962-63 appears as Table 17.

The average beginning salary for these school systems was higher than that of the Nashville City system and considerably higher than that of the Davidson County system. Among the larger school systems, only Birmingham and Mobile had beginning salaries lower than those in the two systemsas of 1962-63. Also, maximum salaries in 1962-63 in the two Metro school systemswere below the average for this group of selected school systems, with the exception of the maximum with the doctorate in the City of Nashville system, whichwas about the same as the median but short of the actual arithmetic average of maximum salaries

- 130 TABLE 17

LIMITS IN SALARY SCHEDULES FOR SELECTED SCHOOL SYSTEMS, 1962-63

Maximum salary School system Beginning Maximum Maximum possible and salary, B.S. salary, B.S.salary, M.A. degree necessary

Boston, Mass. $4,740 $7,380 $7,860 $7,860 M.A.

Baltimore County, Md. 4,600 7,900 8,440 9,520 Dr.

Prince George County, Md. 4,800 7,900 8,200 8,800 Dr.

Indianapolis, Ind. 4,700 7,600 8,200 8,900 Dr.

Kansas City, Mo. 4,600 7,000 8,000 8,500 Dr.

Birmingham, Ala. 3,300 5,060 5,500 5,800 6 yr.

Jefferson County, Ala. 3,900 5,088 5,268 5,268 M.A.

Mobile, Ala. 3,600 4,700 5,000 5,000 M.A.

Broward County, Fla. 4,100 7,050 7,650 8,160 Dr.

Hillsborough, Fla. 4,000 5,680 6,140 6,590 Dr.

Memphis, Tenn. 3,850 6,250 6,500 6,810 Dr.

Fairfax County, Va. 4,600 7,000 7,300 7,600 Dr.

Kanawha County, W. Va. 4,000 5,135 5,700 6,000 Dr.

Forth Worth, Texas 4,660 6,460 6,660 6,920 Dr.

San Antonio, Texas 4,500 6,300 6,750 6,750 M.A.

Average 4,263 6,434 6,878 7,232

Median 4,500 6,460 6,750 6,920 Dr. 1962-63 Nashville 4,000 5,960 6,320 7,040 Dr.

1962-63 Davidson County 3,785 . 5,819 6,100 6,125 M.A.+ 1963-64NEWMETRO SCHEDULE4,272 6,365 6,750 7,519 Dr. Source: National Education Association, Research Division. Classroom Teacher Salary Schedules, 1962-63, Districts Having 6,000 or More Pupils.Research Report 1962 - R11. Washington, D.C.: 'the Association, October 1962. 112p. -131 shown in Table 17.

The last row of figures in Table 17shows the beginning salary and the maximum salaries for1963-64 as submitted by the Board ofEducation in its budget for that year. This showsthat the adjustment made by the Boardof Edu- cation just about brings the salarylimits for next year up to the averagefor school systems chosen.

There is no such thing as comparablecommunities for such compari- sons. Oneof the factors contributing to salarylevels is size of community. Another factor of significance is economic resourcesof the community. For this purpose, astatistical operation is required to makeallowances for differences among thecommunities in financial resources.

Information on per capita income inthe 15 school systems shown in Table 17 was compared withbeginning salaries. A statistical operationknown as "regression" wasundertaken to make adjustments in thesecommunities for differences in income per capita to seehow Nashville and Davidson County would stand in beginning B.S.salary if inhabitants of the communitieshad the same per capita income.This device showed that beginningsalaries in the Metro s stemswould have been approximately$4,300 for the year 1962-63 had they been ineeping with the income level of taxpayersin the community.

Similar information indicates that in termsof the economic base in the new Metropolitan SchoolSystem, the adjustments of 1963-64 arein line with what is to be expected inschool systems of this size.This means that the recommendation bthe Transiticnal Board for 1963-64has just about brought tgla aryunits up to where they shouldhave seen in 1962-63. Advance in- ormation on salary schedules for next yearshows that school systems throughout the country are increasing theirbeginning salaries and their maximumsalaries, so thatfor the year 1963-64 it is to beexpected that the Metro salaries will fall somewhat behind a table such asTable 17, when made for the year1963-64.

Existing Salary Structure

As of the time of this survey,during the school year 1962-63, the sa- lary structure in the two school systems was asbriefly shown in Table 18. As this table indicates, the County system waslower at all levels of preparation in both minimum and maximum salariesand required more steps, that is more years, to reach maximum .Moreover, in the City there was a fourthlevel of preparation with an additional differential forthe doctorate, a preparation level whichdid not exist for the County.

Both systems used an index type ofsalary schedule. By action of

-132 TABLE 18

COMPARISON OF 1962-63 SALARIES IN

NASHVILLE CITY SCHOOLS AND DAVIDSONCOUNTY PUBLIC SCHOOLS

Salary Preparation Number of teacher Minimum Maximum of steps

B. S. City $4,000 $5,960 16 County 3,785 5,819 20

M. A. City 4,360 6,320 16 County 4,030 6,100 20

M. A. + City 4,720 6,680 16 County 4,055 6,125 20

Doctorate

City. 5,080 7,040 16 County ...- the Transitional Board of Education in itsbudget for 1963-64, anticipated increases in State funds computed on the basisof teachers' salaries were applied to raising the levels in the Nashville City systemand bringing Davidson County teachers up to that schedule. Theresulting schedule for 1963-64 appears as Table 19.

In reviewing this schedule, the specialists onthe survey staff dealing with salaries made the followingobservations:

1. There is no salary increment on either preparationlevel TifiWThe first year of service. This practice is undoubtedly related to the theory that a probationary teachershould not receive an increase in payuntil she has been in the district long enough to prove herself.

2. After the second year of service there is an increment, but it is a nominal one amounting to only a one percent increase after the second year.

3. In the years ahead, it should be expectedthat career teachers will move during the course of their careers over to at least the master'slevel, in which case it is recommended that the number of steps on the B.S. schedule bereduced through a transitional adjustment, since ittakes too. long in 16 years to get to the maximum of B.S.and teachers moreover shouldbe encouraged to move over to higher levels of training.

The 1963-64 schedule is partially a "progressiveindex" plan. That is to say, increments inabsolute terms become a littlelarger at the upper end of this scale so. that per- centage increases are somewhatcomparable. However, since the index base is the beginningB.S. teacher's salary of $4,272 as shown in Table 19, anindex differen- tial of four percent between the fifteenthand sixteenth steps, for example, onthe doctorate level is no greater than the four percent index differentialbetween the sev- enth and eighth steps on the B.S. teacher'slevel.Insofar as the purposeof the salary structure is partly incentwe and encouragement for teachers to look tofuture salary levels, it is noted that the increment of$171 is propor- tionately a greater incentive for the teacher on step seven of the B.S. schedule than. for the teacher on stepfourteen or fifteenof the doctorate schedule. The type ofschedule shown in Table 19 is common in the UnitedStates, where pressures offinancing have tended to Jiff the bottomof the

-134 TABLE 19

SALARY SCHEDULE ADOPTED BYTRANSITIONAL BOARD

FOR 1963-64

B.S. M.A. M. A. + Doctorate teachers teachers teachers teachers Step Index Salary Index Salary Index Salary Index Salary

1.18 $5,041 1.27 $5,425 1 1.00 $4,272: 1.09 $4,656

5,425 2 1.00 4,272 1.09 4,656 1.18 5,041 1.27

3 1.01 4,315 1.10 4,699 1.19 5,084 1.28 5,468

4 1.04 4,443 1.13 4,827 1.22 5,212 1.31 5,596

5,724 5 1.07 4,571 1.16 4,956 1.25 5,340 1.34

5,853 6 1.10 4,699 1.19 5,084 1.28 5,468 1.37

7 1.13 4,827 1.22 5,212 1.31 5,596 1.40 5,981

8 1.17 4,998 1,26 5,383 1.35 5,767 1.44 6,152

9 1.21 5,169 1.30 5,554 1.39 5,938 1.48 6,323

10 1.25 5,340 1.34 5,724 1.43 6,109 1.52 6,493

6,286 1:56 6,664 11 1.29 5,511 1.38 5,895 1.47

12 1.33 5,682 1.42 6,066 1.51 6,451.1..60 6,835

1.64 7,006 13 1.37 5,853 1.46 6,237 1.55 6,622

7,177' 14 1.41 6,024 1.50 6,408 1.59 6,792 1.68

7,348 15 1.45 6,194 1.54 6,579 1.63 6,973 1.72

16 1.49 6,365 1.58 6,750 1.67 7,134 1.76 7,519

-135 scale to assist in recruiting newteachers, but have over- looked the career incentive.

5. In view of the relative positionof beginning and maximum salaries, as shown in Table 17, and inview of the expecta- tions of future increases in beginningand maximum salaries for the year 1964-65 and later, theMetropolitan Board of Education should consider lifting bothbeginning and maximum salaries.

A Recommended Five-YearSalary Adjustment Plan

In order to overcome someof the limitations noted above, itis be- lieved possible to implementfurther basic salary policy alreadyincorporated into the plan shown in Table 19and move towards salarylevels which will be equitable and appropriate for attractingand holding professional staff inthe new Metropol- itan School System.

The schedule shown in Table20 could be attainable in aperiod of five years. This schedule wasderived as an index.schedule onthe following basis:

1. To provide what appear tobe desirable beginning and maximum salaries at eachpreparation.level as compared to other school systems

2. To provide the appropriatenumber of steps and incre- ments progressing fromthe beginning salary to the maxi- mum at eachpreparation. level

3. To provide a progressiveindex based upon the beginning B.S. teacher's salary, such.thatincrements would move from three percent of this salary to asmuch as seven.per- cent of this salary,depending upon the salary level

In deriving this schedule,the beginning salary wasincreased at each of the step by threeand a half percent, thenrounded to the nearest even percent base salary for beginning B.S.teachers.

This would be a desirablelevel for salaries in the year1964-65. However, the practical economicsof the situation.wouldundoubtedlynot permit this to be achieved that soon, or evenin. 1965-66. For this reason, itis recom- mended that the Metro olitanBoard of Education stud such aplan as a five-year goal and work toward it in,what appears to be a feasie series otransitiona steps

-136 TA:3LE 20

SUGGESTED SALARY SCHEDULE

FOR 1968-69

Doctorate B. S. M. A. M. A. +. teachers teachers teachers teachers Step Salary Index Salary Index Salary Index Salary Index

1.16$5,104 1.24$5,456 1 1.00 $4,400 1.08$4,752

1.20 5,280 1.28 5,632 2 1.03 4,532 1.12 4,928

1.32 5,808 3 1.06 4,664 1.16 5,104 1.24 5,456.

6,028 4 1.10 4,840 1.20 5,280 1.28 5,632 1.37

1.42 6,248 5 1.14 5,016 1.24 5,456 1.33 5,852

1.47 6,468 6 1.18 5,192 1.28 5,632 1.38 6,072

1.52 6,688 7 1.22 5,368 1.32 5,808 1.43 6,292

1.57 6,908 8 1.26 5,544 1.37 6,028 1.48 6,512

1.63 7,172 9 1.30 5,720 1.42 6,248 1.53 6,732

1.69 7,436 10 1.35 5,940 1.47 6,468 1.58 6,952

7;172 1.75 7,700 11 1.40 6,160 1.52 6,688 1.63

7,436 1.81 7,964 12 1.45 6,380 1.57 6,908 1.69

7,700 1.87 8,228 13 1.50 6,600 1.63 7,172 1.75

1.94 8,536 14 ---- 1.69 7,436 1.81 7,964

8,272 2.01 8,844 15 _--- 1.88

2.08 9,152 16 -_--

-137 over five years. Thesewould be as described in the following paragraphs.

1. Continue the salary schedule adopted for 1963-64 intothe year 1964-65.In 1965-66 adopt a minimum salary of $4,400 for beginning B.S. teachers, $4,752 for beginning M.A. teachers, a beginning $5,104 for beginning M.A.+ teachers and $5,456 for beginning doctorate level teachers. In 1965-66 provide increments based on an index increasing ai the rate of two and three-quarters percent per year:of each step to the next.

2. In 1966-67, step this up to three percent per year; in 1967-68 step:- this up to three and one-quarter percent at each step; and in 1968-69 step the increment increase up to three and one-half percent ateach step.

3. Included also are gradual reductions in the number of steps for B.S. teachers from 16 to 13, a reduction. inthe number of steps for M.A.- teachers from 16 to 14,and for M.A.+ teachers from 16 to 15.

In brief, the transitional scheme would be asshown in Table 21. Whether -the plan suggested in Tables 20 and 21 isadopted or not, the Metropolitan Board should plan within at least a- five-yearperiod to move toward-the end achieved by this proposal, namely, to arrange for adefensible beginning salary --which will need to be in the neighborhood of$4,400 -- and an",opportunity for teachers to a vance with adequate training to the point w ere in areasonable number of years they may at least double theirsalary.

The suggestion:Of Table 20 for the year 1968-69and the suggested transitional steps in the intervening years beginning with1965-66:represent a complete index system in which the relativerelationship of one step to the next is readily determined and from one preparationlevel to the next is readily deter- mined. For instance, at any point on, theschedule in Table 20, an:M.A. teacher is approximately eight percent higher insalary than. the B.S. teacher; the M.A.+ teacher 16 percent above the B.S. teacher; and thedoctorate teacher 24 percent above the B.S. teacher.

Estimated Cost. The cost of this transitional plan asoutlined in Tables 20 and 21 can be estimated in a relative senseby carrying through to that date all teachers now employed iin the system oranticipated to be employed in the system in:1964-65, carryingeach through on the assumption that there wouldbe no change inpreparation level and no turnover. ., ,If the schedulefor 1963-64 -is carried through without change and teachers progressthrough this schedule, there TABLE 21

SALARY LIMITS AND NUMBEROF STEPS FOR FIVE-YEAR CONVERSION

TO PROGRESSIVE INDEX SALARYSTRUCTURE RECOMMENDED BY 1968-69

Minimum Maximum Preparation level Number of and year Amount Index Amount Index steps

B. S. teacher

1964-65 $4,272 1.00 $6,365 1.49 16 1965-66 4,400 1.00 6,600 1.50 16 a/ 1966-67 4,400 1.00 6,600 1.50 15 b/ 1967-68 4,400 1.00 6,600 1.50 14 '/ 1968-69 4,400 1.00 6,600 1.50 13 TI/

M.. A. teacher

1964-65 4,656 1.09 6,750 1.58 16 1965-66 4,752 1.08 7,128 1.62 16 a/ 1966-67 4,752 1.08 7,172 1.63 151/ 1967-68 4752 1.08 7,216 1.64 14 -c7 1968-69 4,752 1.08 7,436 1.69 14 TI/

M. A. + teacher

1964-65 5,041 1.18 7,134 1.67 16 1965-66 5;104 1.16 7,656 1.74 16 a/ 1966-67 5,104 1.16 7,700 1.75 15 13/ 1967-68 5;104 1.16 8,008 1.82 15 -c7 1.88 15 --ci/ 1968-69 5,104. 1.16 8,272

Doctorate

1964-65 5,425 1.27 7,519 1.76 16 1965-66 5,456 1.24 8,184 1.86 16 a/ 1966-67 5,456 1.24 8,492 1.93 16.13/ 1967-68 .5,456 1.24 8,800 2.00 16 -c-/ 1968-69 5,456 1.24 9,152 2.08 .16 a/ Increments of 2-3/4 percent- of each step to next. b/ Increments of 3 percent of each step to next. c/ Increments of 3-1/4 percent of each step to next. d/ Increments of 3-1/2 percent of each step to next.

, would be an increase of 8.8 percentby 1968-69. For the 3,200 teachersthe in- creased cost of the suggested plan overthe five-year period, including1968-69, would be $1,817,000. Thiswould be approximately 3.9 percent per yearincrease in teachers' salaries. Thecomparative data are asfollows:

Salary cost, adopted schedulefor 1963-64 $17,154,752

Salary cost, same teachers,1963-64 schedule, by 1968769 $18,668,000

Salary cost by 1968-69,five-step transition $20,485,000

Administrative Salaries.

The Nashville City school systemhas used a salary index or ratio system for determinationof administrative salaries, apractice which is becoming more and more commonin larger school systems.The index system, or ratios, which were in use this year,1962-63, appear as Table 22.

There are several comments tomake regarding the system inTable 22.In the first place, this scheduleis a considerableadvancement over the schedule in the County systemand, as with teachers' salaries,should become the basis for future development. Onthe other hand, it must berecognized that the schedule as adopted was for theCity system, the smaller ofthe two school systems. For the new Metropolitan s stem,which will be moving toward anenrollment of adminis- over 100,000pupils in a community of over500,000 population, greater trative responsibilities are tobe expected, so that thescaling of salaries on the administrative level should besomewhat comparable to thatexpected in the larger schoo systems in. the UnitedStates.

The position of Superintendentin the City system wouldbe, in level of responsibility anddifficulty, somewhat comparable tothe second-ranking ad- ministrator in the district,who normally would be called anAssistant Superintendent. Since the Charter callsfor the head of the new system tobe a Director of Schools, such as "Associate the second-ranking administratorsprobably should take on a title Superintendent" so that the rankand level of their position isunderstood through- officer out the country,despite the fact that the titleof the chief administrative of the school system willbe, as provided in the Charter,Director.

Another observation with regard toTable 22 is that in all caseseight steps are providedin these positions. Somecareful study is desirable of how many administra- steps there shouldbe involved in a person'sreacNing the maximum in an tive position. The practicein many systems is tolimit the steps for administrative positions such as these tofour or five. This is a matterwhich must be determined

-140 TABLE 22

ADMINISTRATIVE SALARY RATIOS

TO MAXIMUM M. A. TEACHERS' SALARIES

IN USE 1962-63 IN NASHVILLE CITY SCHOOLS

Position and Ratio Number months of service Minimum Maximum of steps

Superintendent (12) 2.3165 2.3165 none Assistant Superintendent (12) 1.69 1.85 8 General Supervisors (12) 1.56 1.72 8 Departmental Directors (12) 1.44 1.52 8 Departmental Supervisors (12) 1.29 1.37 8 Departmental Supervisors (10) 1.10 1.18 8 Elementary Principals 0 - 300 pupils 1.15 1.23 8 301 - 499 pupils 1.17 1.25 8 500 - 699 pupils 1.19 1.27 8 700 - 899 pupils 1.21 1.29 8 900 -1099 pupils 1.23 1.31 8 1100 -more pupils 1.25 1.33 8 Junior High Principals 0 - 300 pupils 1.22 1.30 8 301 - 499 pupils 1.24 1.32 8 500 - 699 pupils 1.26 1.34 8 700 - 899 pupils 1.28 1.36 8 900 -1099 pupils 1.30 1.38 8 1100-more pupils 1.32 1.40 8 Senior High Principals 0 - 300 pupils 1.375 1.455 8 301 - 499 pupils 1.385 1.465 8 500 - 699 pupils 1.395 1.475 8 700 - 899 pupils 1.405 1.485 8 900 -1099 pupils 1.415 1.495 8 1100 -more pupils 1.425 1.505 8 Assistant Senior High Principals 500 - 699 pupils 1.147 1.227 8 700 - 899 pupils 1.157 1.237 8 900 -1099 pupils 1.167 1.247 8 1100 -more pupils 1.177 1.257 8 by the Board.

Another element in thesituation which has come tothe attention of school for the de- the survey staff is thenumber of degrees ofgradation on size of that more work, more respon- termination of principals'salaries.It can be argued large school than in asmall one, but sibility and morecapabilities are required in a of knowing that a juniorhigh school to say that there isreally any significant way than a junior high of, for example, 500 isgoing to require aless salaried principal been the policy in the past tomake these school of 700 isuntenable. Since it has continue with such apol- differentials as to size, itprobably will be necessary to in any school is asimpottant icy.it could be argued,however, that a principal equal, the same salary) as anyother. (and should be receiving,other things being be eased Such excess workloads as may exist inlarge schools should principals according to somepattern. For by systematicallyproviding assistant would not need an assistantprin- instance, an elementaryschool as small as 300 would hardly need theattention of a full-gimeprincipal . cipal.A school of that size would have a part-time orteaching Any school with 300 orfewer pupils probably would have a full-timeprincipal principal.A school withbetween 400 and 800 Elementary schools of 800 or morewould have, and a half-time assistantprincipal. This means that as far as under such a plan, afull-time assistantprincipal. concerned, some of it canbe offset additional work loadsand responsibility are staff in the schools.In addition by providing an adequatenumber of administrative clerical staff for adminis- throughout the systemthere should be adequate to this, personnel staff to trative work in theschools and sufficientguidance and pupil relieve the work load ofthe principalship.

This being the case, wewould urge graduallycontracting the salary be suf- differentials for principals.At most, two sizecategories would seem to effort should be ficient. When it comes tojunior and seniorhigh schools, every and made to eliminate, as issuggested in other sectionsof this report, small size demarcation pointcould expensive secondaryschools. Roughly speaking, a differential for principal'ssalary be established, such as600 or 700, so that a schools would be paid only for twoclasses of school as tosize -- one for large schools over 700) and onefor (such as secondary schools over1,000 or elementary those smaller. which The data in Table23 suggest the typesof index relationships is in prevail in other systemsof compdrable size.The new Metropolitan system largest class. R will benoted the process of becoming aschool system in ,the generally paid on an indexbasis a maxi- here that superintendentsof schools are maximum M.A. degreesalary. mum salaryin the neighborhoodof 3.40 times the Table 23 and in Table 22,showing the A study of theinformation such as that in shown in existing indexrelationship, has led to the typeof salary relationship although when the Board Table 24.In this table a five-stepschedule was assumed,

-142 TABLE 23

RELATIONSHIP OF ADMINISTRATIVE MAXIMUM SALARIES

TO MAXIMUM SALARIES OF CLASSROOM TEACHERS WITH M. A. DEGREES,

1962-63

Population of district

500,000 and over 100,000- 499,999 Position Mean Mean salary Ratio* salary Ratio

.Classroom teacher $ 7,912 1.00 $ 7,453 1.00

Superintendent 27,450 3.47 19,958 2.68

Assistant superintendent 18,049 2.28 14,666 1.97

Director 14,518 1.83 11,748 1.58

Supervisor 11,596 1.47 10,235 1.37

Counselor 8,840 1.12 8,581 1.15

Senior high principal 12,676 1.60 11,503 1.54

Junior high principal 11,992 1.52 10,584 1.42

Elementary principal 11,457 1.45 9,947 1.33

f.e Ratio to mean classroom teacher M. A. maximum Source: Derived from the National Education Association, Research Division. Salary Schedule Maximums for Administrators, 1962-63, School Systems Having6A00 or More Resenrch, Report, 1963 - R2. Washington, The Association, February 1963. TABLE 24

ILLUSTRATIVE ADMINISTRATIVE ANDSUPERVISORY SALARY RATIOS

TO MAXIMUM M. A. TEACHERS' SALARY

AT FIVE-STEP PROGRESSION *

Ratio to M.A. maximum Administrative Positions schedule to which First Fifth step number apply step

3.40 I Director of schools 2.96

II Associate superintendent 2.27 2.60

III Assistant superintendent 1.74 2.00

IV Departmental directors 1.42 1.63

V Large senior or junicr-senior high principal 1.31 1.50

VI Small senior or junior-senior or large junior high principal 1,22 1.40

VII Departmental supervisors 1.19 1.36

VIII Small junior high school or large elementary principal 1.13 1.30

IX Small elementary principal or assistant secondary school principal 1.09 1.25 0.

X Assistant departmental supervisors or assistantelementary principal 1.02 1.17

* Steps progress at 3-1/2 percent per year.

-14 finally gets into staffing its new administration it may need toestablish some po- sitions at eight steps, as previously.

The progression of the indices in the five steps inTable 24 are the same as forteachers' salaries contemplated in Table 20. That is to say,they pro- gress at the rateof 3-1/2 percent per year.It is proposed that administrative schedules be established and that as people are assigned positions,they be put on the schedule commensuratewith the responsibility of their positions.len such administrative schedules are shown in Table 24.In this scheme a principal of a small junior high school would be on the same schedule,VIII, asthe principal of a largeelementary school.We have assumed here reducing the differentialbe- tween principals' salaries on accountof size of school to two categories, as noted previously. Similarly, it ivill be noted that an assistantelementary school prin- cipal would be on schedule X, the same as thatfor an assistant departmental supervisor. This proposal would meansalary maximums ranging from $8,700 for assistant departmental supervisors and assistantelementary principals to $25,000 or more forthe Director of Schools, if the master's level maximumis brought up to $7,436 as it should be.

These are appropriate salary levels for the positions, asdiscussed elsewhere in this report.

There is one aspect of such a proposal which needs tobe carefully watched. There are not now many people in the systemwith doctorate level training. As soon as possible, the school systemshould attract in key positions personnel with doctorate level training. As proposed inTable 20, the maximum salary for a teacher on the doctorate level wouldbear a ratio of 1.23 to the M.A. maximum. All of the administrative schedules inTable 24, except X, have maximums which exceed this. All positions inTable 24, except possibly those on schedule X, are at a level of responsibilitydemanding doctorate level preparation or better, despite the fact that the ratios arebased on the top master's salary.

An upgrading of administrative personnelthrough employment of new personnel andWough in-service training and furtherpreparation of those now on the staff is urgently recommended as anessential step of high priority needed to equip the new system to meet its task. Thesalary schedule along the lines ofthat illown fr37Ele 24 is reasonagiTcTricTis clearly essential to attractthe kind of leadership necessary for all of the organization and managementwork required to keep the new Metropolitan School System on its course.

Retirement Provisions

It is in the best interests of the new Metropolitanschool district to

-145

- maintain as professional a workingrelationship as possible with its employees.The majority of its employees are professionalpeople, yet they are inclined to look for the same types of benefits associated with theirwork that employees in industry seek.in industry and government considerableadvance has come about over the years inso-called fringe benefits for employees. Thesebenefits include health insurance, income protection duringdisability, group life insurance, personal time off for self-improvement,and retirement.

The Metropolitan Charter specifiesthat the Board must establish an actuariallsound pension ancf retirement plan forteachers em lo ed bit after Lly 1, 1964 and make provisionsfor the transfer over to the new .system o t ose either in the County or in the City retirement system.who apply for such transfer. The new system may be integratedwith the Federal Insurance Contributions Act or otherapplicable State and Federal legislation.

The Existing City System. The Cityestablished a pension system for its teachers in 1939 which possesses,in general, the following.features:

Teachers contribute two percent of theirsalaries for a period of 25 years.

The balance needed in any one year to payall pensions as they accrue is amandatory tax levy on the valuation inthe City.

A teacher is eligible for a pension at any age uponcompletion of 30 years of creditable service, or at. age60 with 25 years of service.

A teacher who has 10 years of serviceand becomes disabled is eligible for a pension with full benefits.

Pension payments are made monthly atthe rate of 50 percent of a member's monthly salary at the timeof retirement. Since salary at time of employment is on a10-month basis, the effective rote is 60 percent ofannual salary.

No refunds are made to employeeswho leave the service after having received permanent tenure orCivil Service-status. Full refunds are made to teacherswithout such status upon separation.

Whereas the County system coversall employees of the Davidson County Board whose salaries, wages orcompensation are a charge against and pay- able from school funds except "casual or temporaryemployees," the City system

-146 applies only to teachers, otheremployees in the system coming underother plans. In the City, secretarial staff,custodians and others who are non-teaching person- nel are all classified CivilService, with a separate pension plan as a partof the City system.

The Existing Davidson CountySystem. Davidson County established a pension systemfor its employees in 1949, which ingeneral has the following features:

Employees contribute three percent oftheir salaries for 24 years.

The County matches thecontribution made by the employees.A mandatory tax is levied in amountssuffiaient to pay the County's contributions and suchadditional amounts as may be necessary to meet all accruedbenefits as they occur.

An employee is eligible for a maximumpension at any age after completion of 30 years of service, or at age60 with 24 years of service.

At age 60, an employee isentitled to a pension of 30 percentof his highest annual salary duringservice in the system with 15 years of service, or anadditional two percent for each successive year's service(if more than 15 years) up to 24 years of service.Employees with 15 years of service or more whohave separated before 60 may continuecontribu- tions until retirement age isreached and receive full bene- fits, or may elect to defer compensationpending re-employ- ment and restoration tofull compensation rights.

Employees who are permanentlydisabled while perf(irming their duties as employees with lessthan five years of service receive $150 per month under terms asprovided in the Workmen's Compensation Law ofTennessee. Employees with five years or more-ofservice are:eligible forbenefits asfollows:

Five to 10 years-30 percent of salary 10 to 15 years -35 percent of salary .15 to 20 years -40 percent of salary 20 to 24 years 45 percent of salary 24 or more years-50 percent of salary

An accidental death benefitof $1,000 is paid to dependents on the member's estate in fourinstallments.

-147 The maximum pensionfor which a member maybe eligible is 50 percent of the annualsalary. Until recently this was limited to $3,000 per year.

A refund of 75 percentof all contributions is given anemployee separated from service for any reasonother than delin- quency ormisconduct.

A refund of allcontributions is given an employeewho is invol- untarily separated from service exceptfor cause of mis- conduct if he has served forless than five years.

A refund of 85 percentof all contributions madeis given an employee who is involuntarilyseparated from service except for cause orcharges of misconductif he has served for more thanfive years but less than 15 years.

beyond the age The State Teacher'sRetirement System. Teachers fuli-Ca-riFeTisation in either the City plan which wouldencWuai y or Tennessee Teachers Retirement or theCounty plan are eligibleonly for the State of participation in the Federal System.lt has two classes ofmembers, those electing After 15 years of creditable Insurance ContributionsAct and those who do not. Benefits service, a member iseligible for a deferredbenefit, payable at age 60. creditable service. arenormally payable on attaining age60 with 30 years of and options There are provisions fordisability, return ofaccumulated contributions, to for survivor benefits. Aminimum of $2.50 permonth for each year of service up actuarial 20 years, or $50 per month,is provided. Otherwise,the payment is an accumulated contri- benefit determined approximately asthe value of a member's the member's life expectancy. butions and contributionsmatched by the State and by Teachers' contributions arethree percent for thatportion of salary covered Social Security benefitsand five percent otherwise.

The plan is actuariallysound, with desirableprovisions which, in existing County or amount of benefit,fall considerably shortof those in either the of teachers in the local the City system .The State annuity accruesto the interest contribution or retirement funds. Whenmembers of local systemsretire, the State been a participant State annuity (whichwould have beenpayable had the member system) is in the State system and atsuch time as he iseligible under the State the State paid to the local fund whenthe local benefit isequal to or greater than directly benefit. Any excess of the Statepayment oCier thelocal payment is made to the teacher.

Since payments in the twolocal systems generallyexceed the State by benefit, the State system ineffect is equivalent to afive percent contribution personnel are not the State to the local retirementplan. However, non-teaching

-148 covered in the State system so that inthe County plan, for instance,the effective local contribution is greater byfive percent than for teachers.

In 1961-62, the State annuitiescredited the County fundamounted to $75,687 of the$303,796 in pension payments andrefunds, or about 25 perceni . in 1962-63 the Statecontributions are estimated to be$131,508 or 21 percent oi $615,128 in pension payments and refundsin the City system .

The Problem. Though the twolocal plans differ in several respects, they both have provisionswhich, on the one hand, areinequitable and unattractive to some employeesand, on the other, too generousfor the amounts of contributions made. Unsatisfactory provisions inthese plans include:

1. Both are l!unfunded" orpartially unfunded plans, requiring mandatory tax levies necessary to meetaccrued benefits through cash disbursement. Anactuarially sound plan is "funded," that is, a cash reservefund is maintained so that amounts contributedby employer and/or employee to this fund are sufficient atall times to keep it capableof meeting the actuariallyanticipated benefit payments.The practice of deferringobligations such as future benefit payments in unknown amountsto future tax revenuesin future years is unsound financing atbest and can build up toserious proportions.In the City system's pensionplan annual 'payments have increasedfrom $117,771 in 1946-47 to an estimated$695,428 or about six times asmuch for 1963-64. During the sameperiod the normal contribution rate less thandoubled.

A report by an actuary onthe Davidson County plan asof June 30, 1960 showed thatfunds in hand, future employee contributions and employercontributions at three percent each, plus receipts from theTennessee Teachers' Retirement system, fell shortof meeting payments tomembers now in:re- tirement and prospective paymentsto active members atthat time by about 42 percent.Total liabilities were$28,700,000. Funds in hand and prospectivecontributions represented assets of only$16,800,000.1

1 Valuation of the Geo. B. Buck, ConsultingActuary. Report on an Actuarial Employees' Pension and InsuranceFund of the Davidson CountyBoard of Edu- cation. New York, NewYork.May 26, 1961.

-149 2. There are no withdrawalbenefits on separation after three years of servicein the City system. A teacher cancontrib- ute 29 years and separatebefore age 60 and receive no refund on his contribution.This is a serious inequitywhich should be corrected.In the County, after five yearsof service but less than 15, ateacher separating involuntarily cancollect only 85 percent ofcontributions, thereafter only 75 percent.

3. There are no provisions ineither system for benefits to sur- vivors. This is a seriouslack.

4. The only death benefit is a minor oneprovided in the County plan.

5. In the County, employees maycontinue to contribute and accrue serviceafter separation from servicebut prior to re- tirement.It is a much too generousprovision to permit employees to participate inthe plan for years which are not years that canhonestly be classed in any sense as yearsof service for which creditshould be given and receivefunds allocated and contributed bythe employer.

6. In the County system,members continue contributionsafter retirement until completionof 24 years of payment.This is inconsistent withthe basic purposes of retirementbenefits. If in equity, a plan shouldbe less generous to a member on retirement who has hadfewer years of service, thisshould show in the amount of hisretirement benefit and should not be revealed by his having tocontribute while on a pension.

7. In one system, membersmake contributions for 24 years,in the other for 25 years. Apreferable plan requires participa- tion of members forthe entire period of service.There are no inequitiesin this method as long asthe benefits are based onactuarially equivalent payments.

Recommendations. The volumeof work and myriad ofdetails neces- retirement system sary todevelop and install a newactuarially sound pension and dictate early decisions onthe part of the Board ofEducation. At the earliest pos- be sible moment an actuaryshould be engaged, somebasic policy decisions should the made and a le al counselshould be involved with othersin order to determine legislation which is required tountangle this very unsatisfactory aspectof teachin9 personnel provisions for the newMetropolitan system.

-150, An early decision needs to be made as to whichemployees are to be covered in the plan.It is much preferable from the standpoint of maintainingthe integrity of an educational operation to have allof the personnel provisions, par- ticularly in a system as large as this one, handled within theframework of the Board of Education. The survey staff does not favor systemsof classification, assign- ment and retirement that are notdirectly under the control of the Board of Education. The Charter does not charge the Board of Educationwith responsibility for preparing pension and retirement plans for non-teachingpersonnel in the school system. Personnel costs to the school system should be withinthe span of control of the Board of Education. At present, the County retirement system encompassesboth teaching arid non-teaching personnel. The problem ofsynchronizing salaries and benefits of non-teaching personnel with those of similarlyclassified personnel in other departments of the Metropolitan Government andwith those of teachers and reconciling the two former methods of covering non-teachingpersonnel in schools must be studied carefully.

The basic plan should be patterned after the State retirement system and should have incorporated into it the Social SecuritySystem. The basic pattern of the State retirement system is sound. The mainobjective of designing the new retirement system should be to arrive at a planwhich is, as near y as possib e, compatible with the two existing systems as different asthey are from one another) to encourage a rnaximumnumber of teachers now existing in service to choose a conversion to the new plan.

Features of the plan should follow approximatelythese guidelines:

1. Amount of normal benefit. This should be anannual, actuarially determined payment equivalent to abenefit to the drierage teacher ofone-half of the highest annual compensation received during service (or averageof the highest five years) after 30 years of service,payable at age 60. However,the amount should be actuarially determined.

2. Retirement age. Retirement age should beconsidered EC;Tc-c-illyas 30 yearsof service and retirement at age 60. With 30 years of service at age 60,continued employ- ment should be at the optionof the Board. With 30 years of service, a member should be eligiblefor retirement prior to age 60 at an actuariallydetermined benefit. Pay- ments and benefits should continue as aninducement.. to continue in service to age60 and over. However, con- tinued service after 65 for any teacher shouldbe at the option of the Board of Education up to a maximumof age 70.

- 151 3. Pre-retirement separation. Separation from service after some substantial number of years of service(such as 20 years) but less than 30, and at age less than 60, should entitle a teacher to have an option of receiving a refund of his contributions with interest or a deferred benefit, actuarially determined and payable at age 60 to the mem- ber, if living, or to his survivors or his estate. Members separating under age 60 with fewer than the specified years of service should be entitled to receive employee contributions with interest.

4. Disability retirement. Provide a minimum monthly allow- ance and after a specified number ofcreditable service years (such as five years as now in the County plan and 10 years in the City plan and State plan), an actuarially determined amount based upon accumulated contributions and a percentage of the local (and State) contribution which would have been payable at 60, or full retirement benefit if 60 or over.

5. Death and survivors' benefits.In the event of death be- fore retirement, members' survivors or estates should re- ceive payment of the employees' contributions plus interest. At the time of retirement, members should have such options for receiving benefits as the following:

a. A normal maximum monthly benefit payment without designation of survivor benefits. However, if ben- efits under this option are less than the accrued contributions with interest, the balance should be payable to a survivor or the member's estate.

b. A reduced monthly payment to a retired member for life and an actuarially determined payment for life of his designated beneficiary.

c. A reduced monthly payment to the retired member and an actuarially deteimined lump sum to a bene- ficiary or an estate.

6. Financing.It will be necessary to synchronize the financing elements as nearly as possible with the State retirement sys- tem, including the Social Security options and the two existing systems. This will require thorough actuarial study. Contri- butions of members will necessarily exceed the two percent

- 152 and three percent now in existence in view of the accrued liabilities of the existing systems and in view of some of the added benefits contemplated. With Social Security, the State annuity and matching by local funds, the new system would probably require over six percent of compen- sation as employee contributions.

Other provisions for financing which will need detailing include:

a. Combining the system with Social Security to provide level retirement income when retiring at 60 or earlier and adjustments for disability allowances as provided in the State system.

b. A method of financing and courses of financing ac- crued liabilities of the two existing systems, both for those remaining in the two existing systems and for those transferring into the new one. By whatever meth- od, it should be funded and probably amortized over a period of years to avoid a build-up in later years. A rectification of the defects of the two unsound existing systems must be made initially or the whole planwill be jeopardized.

7. Miscellaneous. Other considerations include: service allow- ances for employment elsewhereand military service; deter- mination of time and method of transfer of members of existing systems to the new plan (a good time wouldbe July 1, 1965); accidental death or injury benefits; selection of provisions which should appropriately be handled by insurance, such as accident insurance; adjustments necessary for adequate cov- erage of non-teachingpersonnel, including those not classified as full-timepersonnel; provisions protecting the funds, such as ruling asineligible for retirement payments those retired teachers who are employed elsewhere in the State (since, under these conditions, the State annuity goes to the local system where the teacher is last employed).

The Charter specifies that the pension rights to be providedby the Board of Education plan may include medical insurance and life insurancebenefits. It is recommended that the Board consider these in light of a prior requirementof developing basically sound provisions as outlined above for retirement.District contributions to health insurance and life insurance should be considered only with respect to the primary requirement of providing an adequatebasic salary and pension

-153 program for teachersand a sound system of financing same. Whether or not the school system contributes to such insurance plans, group plans shouldbe provided so teachers cantake full advantage of reduced rates.

Sick Leave

The number of days of sick leave in the former City ofNashville sys- tem was five days a yearcumulative up to a total of 50 days.In Davidson County the sick. fe7fe was five days a year cumulative up to atotal of 40 days.

It is recommended that the new Metro Boardof Education adopt a sick leave policy giving 10 days a year cumulative to 80days, a practice comparable to the average in. large systems.In starting, each employee should receive a10-day allotment. This allotment will be reduced by anysick. leave during the first year of service and if there is any left at the end ofthe first year, then each month's ser- vice adds another day to the cumulativetotal.Any sick leave charged to an em- ployee over and above his accumulated days shouldbe charged against his monthly payment for the monthduring which such leave goes beyond his accumulation.Any accumulation outstanding at the termination of employmentshould be terminated without additional compensation.

Selection and Recruitment of Teachers

In the City, teachers are selected upon thebasis of three main points, namely the academic and professional training, thepersonality and the teaching experience of the individual .All teacher candidates to be considered are to hold a validbachelor's degree from a standard college or university.They must file an official transcript of their college work and present apicture taken within six months of the date of the application.In addition, they must file for record a State certificate showing,they are qualified to teachand, if selected, before entering upon their duties must pass:a properphysical examination given by the City Health Officer., In considering teaching experience,experience in Nashville and Davidson County schools is given firstconsideration.

In the County schools the selection of teachers isbased upon.some- what comparable items, but in addition eachteacher is required to present accept- able scores on the National Teachers examinations,the commons and one option. In case a teacher is employed and has nottaken these examinations, he will be re- quired to take them the next time they are givenlocally or his contract may become void.

In general there are three classes of teachers.In the first class are those who are appointed and continue teaching overthe three-year probationary

-154 period and who are reappointed afterthis period; these are called CivilService teachers, or teachers on permanent tenure.In the second class are thosewho are appointed annually by the Board ofEducation. This varies somewhat inthe two systems -- in the Citythe age at which yearly appointments aremade is 41 or over,whereas this age is 46 for the County. These arecalled temporary teachers. The third group is made up ofthose who teach day by day; these arecalled substi- tute teachers.

As discussed in Chapter XV, it isrecommended that a Division of Personnel be established with functionsincluding the recruitment and selection of necessary teachers for the system.During the year 1962-63, theCity system employed a total of 168 additions andreplacements, while the Countyemployed a totalof 447 for the same reasons. Thus atotal of 615 new people had tobe obtained to staff the two systems. Thisshows that a lot- of time andeffort will be required to obtain all the necessaryinformation concerning such a large group of new people.

Clerical and Secretarial Personnel

The provision, of secretarialpersonnel to assist professionalstaff members in performance of theirwork is one way of getting moreresults at lower costs. DavidsonCcunty's school system for the year1962-63 had 19 high school secretaries and one substituteclerk used by other schools. However, mostschools in the County do have someclerical help, with salaries paidby the local P.T.A. or someother local community agency. Thepayroll records show that there are 21 other clerical and secretarialpersonnel allocated for the centraladministration staff.

The salary scale in the County starts at$170 per month for a school of an enrollment of 400 or lessand goes up to a maximum of$250 per month for school a schoolwith an enrollment of more than800 students. Nine of the 19 secretaries receive an additionalannual State supplement of$250. The salary scale for central administrationclerical personnel ranges from a minimumof $200 per monthfor a classified Clerk I to amaximum of $425 per month for aChief Secretary II. Seven of the 21central administration clerical personnelreceive, in addition, a State annualsupplement of $250, .

The City of Nashville school systemhas at least one clerical person in each school, plus studenttrainees who spend half a day inclerical and secre- tarial training. The existingclassifications for the City office,excluding trainees, are asfollows:

-155

.4 Position Number Steno-Clerks III 2 .6 Steno-Clerks II 16 Steno-Clerks I 15 Information Clerk and Telephone Op. 1 Typist-Clerks I 21 Office Assistant 1 Machine Operator 1

Total 57

The City system has an additionalclerical title for personnel in 12 schools, called registrar-clerks.These are paid salaries equivalent tobeginning teachers.In total, according to the1962-63 Directory of the NashvilleCity schools, 91 full-time clericalassistants were employed.

In order to bring the Countyschool system up to a staffing ratio equal to that of the City school system,117 additional clericalemployees would need to be hired. To bring the newMetro School System to astaffing ratio gen- erally acceptable for school systemsof similar size, based on1962-63 enrollments, 150 additional clerical personnelshould be employed.

The cost of these additionalemployees would run between$500,000 and $540,000 for 12-monthemployment.

Salaries paid to present school secretaries arelow compared to those paid by other institutions andbusinesses.In order to attract and hold newand present employees, salariesand retirement and other fringebenefits should be raised to meet levels nowbeing paid by private enterprise inthe Nashville-Davidson County area.

School princi als and otheradministrators should not spend their time typing an I ing.T e time s ou e spent on matters re ate. tot elr training in areas of instructionand supervision. z

-156 XII

EVALUATION OF PHYSICALPLANT

The Nashville-DavidsonCounty Metropolitan SchoolSystem had, in March 1963, 135 school plants inoperation, os shown inTable 25, and additional temporary facilities consistingof the Ford Greene Annex(a four-classroom ele- mentary school formerlyabandoned) and 80 portableclassrooms. Together, these had a total capacity of82,099 pupils in grades 1 through12, as summarized in Table 26.

Although this is but slightlyshort of the Octoberenrollment total of 82,658, the distribution ofpupils among schools is suchthat many are overcrowded by as much as 20 to 25 percent.One difficulty in planningfacilities for future growth of enrollments in the areais that much of thegrowth will be in areas where schools are already overcrowdedand schools with excess space arein areas in which school enrollments areexpected to decline.

The above does not includeother physical facilities notschools as such. The City system houses itsadministrative offices in theHume-Fogg school . The County system has anadministrative building located onthe Julia Andrews maintenance shops. Also a school site.In addition, both systems have separate part of the facilityof the new Metropolitan district isStation WDCN-TV, the educational television station operatedjointly by the two districts.

General Information on ExistingFacilities

The capacity figures shown inTable 26 were computed forelementary schools on the basis of 30 pupils perclassroom and for secondaryschools on the allowances for samebasis for regular interchangeableclassrooms, plus varying special classrooms and a schedulingdeduction based upon 85 percentutilization.

In short, the allowances were asfollows:

Type of teaching station Capacity allowance General classrooms 30 Small classrooms 15 Physical education (double) 80 Physical education (single) 40 Science laboratories 24 Shops 24 Homemaking 24 Art 30 Music 40

-157 TABLE 25

NUMBER OF SCHOOLS IN THEMETROPOLITAN SCHOOL SYSTEM

OF NASHVILLE AND DAVIDSONCOUNTY, TENNESSEE

AS OF MARCH 1963, BY TYPE OFSCHOOL

Type City County Total

High schools (grades 9-12, 10-12) 2 3 5

Junior-senior high schools (grades 7-12) 5 11 16

Junior high schools (grades7-9) 5 5

Elementary schools (grades 1-3, 4-8, 1-6, 1-8) 28 73 101

Other types of schools (grades 1-9, 1-12, 7-10, 7-11) 4 4 8

Grand total 44 91 135 TABLE 26

CAPACITY OF SCHOOLS IN THE METROPOLITANSCHOOL

SYSTEM OF NASHVILLE AND DAVIDSON COUNTY

AS OF MARCH 1963

Type of school City County . Total

High school (grades 9-12, 10-12) 3,819 2,281 6,100

Junior-senior high school (grades 7-12) 3,768 12,506 16,274

Junior high school (grades 7-9) 3,778 none 3,778

Elementary (grades 1-6, 1-8) 19,565° 31,013° 50,578°

Other types of school (grades 1-9, 1-12, 7-10, 7-11) 2,065b 3,304b 5,369b

Grand total 32,995 49,104 82,099

°Includes elementary capacity, grades 1-6 ofother types of schools (grades 1-9 and 1-12). b Includes secondary grade capacity (grades 7-12) only.

-159

_ The determination of building capacity is atbest arbitrary. There are several methodscommonly used. The foregoing was chosen asgenerally suitable to the situation now existing and tobe anticipated in the foreseeable future in the Metro district.

The economics of the area, as discussedelsewhere, are not likely to justify reducing maximumclass size below 30, as justifiable as this maybe for educational reasons. Even though for this reason acapacity allowance of 30 seemsdefensible for planning purposes, it is tobe emphasized that there are many school districts in the United States inwhich an average class size of 25 to 27 is general policy, The capaci data used in this analysis are thus tobe considered maximum rather than optimum. oreover, it must e recognizet at t e capacity OTCM-tiJiding depends upon many factors: theclasses to be held in it; the nature of the curriculum; the organization ofinstruction; grouping of pupils for instruc- tion; the number of periods per day,where periods are used in scheduling; and the efficiency of scheduling ofclasses or groups in spaces.

A list of the 135 schools showing gradeshoused, dates of construction, size of site, capacity andenrollment as of fall 1962 appears as AppendixA. The geographic distribution of the schools in theCity and County systems is shown in the accompanying chart.

Approach of the Building Evaluation

In addition to statistical analysis,field inspections by the survey staff of selected buildings wereundertaken as a part of their evaluation.

Schools selected for inspection were of three categories.The first was a randomsample of 40 schools used to obtain anover-all evaluation. The second consisted of new buildings andlarge additions constructed in recent years, to ascertain thequality of recent work. The third comprisedall buildings likely to be too obsolete foreconomical and effective modernization andincluded both those initially constructed approximately50 Years ago and those to which more than three additions had been made.

A team of four consultants evaluatedbuildings in all three categories. In addition, 24 buildingsconsidered critical for the above and other reasons were examined at the suggestion of the schooladministration. Of these last, 16 were inspected in one or more of the three categoriesdescribed above.

The purposes of such evaluation include notonly determining how suitable physical facilities now are, butalso what the requirements are in the long-range future and how suitable existingphysical plant standards are for future use. The lastis by far the most importantconsideration, since the value of a survey

-160 Name Grades Green, Julia -8 28 Cotton 1 - 6 55 Allen, Margaret 1 - 6 Greene 1-6 29 Crieve Hall 1 - 6 56 Amqui 1 - 6 Glenn 1-6 30 Cumberland High 7 - 12 57 Andrews, Julia 1 - 6 Hamilton 1-6 31 Dalewood 1 - 6 58 4 Antioch High 7 - 12 Harpeth Valley 1-8 32 Dodson 1 - 6 59 5 Bailey 1 - 9 - 12 33 Donelsor: Elementary 1 - 6 60 Haynes 6 Baxter, Jere 1 - 6 1-6 34 Donelson High 7 - 12 61 Haywood 7 Bellevue Elementary 1 - 8 1-6 35 Dupont Primary 1 - 3 62 Head 8 Bellevue High 9 - 12 1-6 36 Dupont Elementary 4 - 8 63 Hermitage 9 Bel !shire 1 - 6 1 - 6 37 Dupont High 9 - 12 64 Hickman 10 Berry 1 - 6 7 - 9 38 Eakin 1 - 6 65 Highland Heights 11 Binkley, Norman 1 - 6 1 - 6 39 Early, John 1 - 8 66 Hill, H. G. 12 Bordeaux 1 - 6 Hillsboro High 9 - 12 40 East Nashville Jr. High 7 - 9 67 13 Brick Church 1 - 6 Hillwood High 7 - 11 41 East Nashville Sr. High 10 - 12 68 14 Brookmeade 1 - 6 1 - 12 42 Elliott 1 - 6 69 Howard 15 Buena Vista 1 - 6 10- 12 43 Fall 1 - 6 70 Hume - Fogg 16 Burton 1 - 8 1 - 6 44 Fehr 1 - 6 71 Inglewood 17 Caldwell 1 - 6 1 - 8 45 Glencliff Elementary 1 - 6 72 Jackson, Andrew 18 Cameron 7 - 12 1 - 6 Glencliff High 7 - 12 73 Joelton Elementary 19 Carter - Lawrence 1 - 6 46 7 - 12 1 - 6 74 Joeltan High 20 Covert 7 - 9 47 Glendale 1 - 6 1 - 6 75 Johnson 21 Central High 7 - 12 48 Glengarry 1 - 6 76 Johnson, Charles 1 - 8 22 Chadwell 1 - 6 49 Glenview 1 - 6 1 - 6 77 Jones Charlotte Park 1 - 6 50 Goodlettsville Elem. 23 7 - 12 78 Jordonia 1 - 6 24 Clemons 1 - 6 51 Goodlettsville High 1 - 8 79 Joy, Tom 1 - 6 25 Cockrill 1 - 6 52 Gower 1 - 6 80 King's Lane 1 - 6 26 Cohn 7 - 12 53 Gra - Mar 1 - 6 1 - 6 81 Kirkpatrick 27 Cole 1 - 6 54 Green, Alex

le 0 MOGETO. 109 Richland 1 - 6 1 - 8 82 Litton, Isaac Jr.-Sr. High7-12 110 Robertson Academy 1 - 6 - 6 83 Lockeland 1 - 6 111 Rosebank 1 - 6 1 - 6 84 McCann 1 - 6 112 Ross 1-6 1 - 6 85 McGavock 1 - 6 113 Schwab 1 - 6 1 - 8 86 McK issack 1 - 6 114 Stanford 1 - 6 1 - 12 87 Madison High 7 - 12 115 Stateland 1 - 8 1 - 6 88 Maplewood High 7 - 12 116 Stokes, Walter 1 - 8 1 - 6 89 Meigs 1 - 10 117 Stratford High 7 10 1 - 6 90 Mills, Dan 1 - 6 118 Stratton 1 - 6 1 - 6 91 Morny 1-6 119 Sylvan Park 1 - 6 92 Mt. View 1 - 6 7 - 9 120 Turner. 1-6 1 - 6 93 Mt. Zeno 1 - 8 121 Tusculum 1 - 6 9 - 12 94 Murphy 1 - 6 122 Two Rivers High 7 - 10 7 - 11 95 Murrell 1 - 6 123 Una 1 - 6 96 Napier 1 - 6 - 12 124 Union Hill 1 - 8 97 Neely's Bend 1 - 6 10- 12 125 Vaught, Martha - 6 98 North Nashville 7 - 12 1 - 6 126 Wade 1 - 6 99 Old Center 1 - 6 1 - 8 127 Warner 1 - 6 100 Overton High 7 -12 - 6 128 Washington 7 - 9 101 Park Avenue 1 - 6 7 - 12 129 Waverly - Belmont 7 - 9 102 Partner 1 - 8 - 6 130 West End 7 - 12 103 Pearl Elementary 1 - 6 1 - 8 131 Westmeade 1 - 6 104 Pearl High 7 - 12 1 - 6 132 Wharton 1 - 9 105 Pennington 1 - 6 1 - 6 133 Whitsitt 1 - 6 106 Priest, Percy 1 - 8 1 - 6 134 Woodbine 1 - 6 107 Providence 1 - 8 1 - 6 135 Woodmont 1 - 8 1 - 6 108 Ranson 1 - 6

114%

MG( T OP Nik ...

C.

NORTH

C.

4.

11,0 101061 1111611,11 I Wien

6.

NAme wean IftWAbleft......

... V . WO6--., 1

1. A .. ."/ S 0 ,/,Z k C e 0 ci / 1 ,. ,, / The reproduced copy of this map/drawing i / may be such that legibility isquestioned. Le' We feel the total document to be of sig- nificant importance to reproduce,taking this fact into consideration. NASHVILLE DAVIDSON LOCATION OF EXIST :\; Welill ,,,

C

\ 0 i

0 r...... ;!..%,------4 0

r--%

I

4 4

.1 0 to"N 0 N, 4

0 %...... 41...... * ri r 0 r

41

4, rs3 "ft.... 1 II L $ J \ .4 I ,/ bN COUNTY STING SCHOOLS lies in its service as a guide tofuture action, not in its documentationof the record of the past. This is the moreimportantin the present case, since the vast majority of schoolbuildings in the Metropolitan district wereconstructed more than 10 years ago.

School buildings of the vintageof 1940 or earlier can no morebe expected to meet modern standardsthan can other products of that period -- home appliances, automobiles,airplanes, family residences and thelike. The Hume-Fogg school is a case in point.Several decades ago it was a secondary school structure of which theCity of Nashville could justly havebeen proud. Even today, its basic structure isof high quality.However, school population changes, changes in high schooleducational programs and advances inefficiency of school building design preventits receiving high ratings on moderncriteria.

Table 27 shows that only 48 ofthe 139 structures existing or now under construction initiated since1950. Due to the rapid popdationgrowth in the area, largely in the Countydistrict, there ins been since 1950 alarge number of additions to buildings, as shownin column (3) of Table 27. As seenin column (4), this has been necessary to adaptand rehabilitate older buildingsand also to add to 43 relatively new buildingsconstructed since 1951.

A large number of additions isunavoidable in a rapidly changing situation, but the excessivenumber of such projects is to beavoided. This has been necessary partly because oflimited funds for construction.Capital budgets in the County system have beenstrictly minimum. This has resultedin piecing out of limited funds tomake do in the best manner.Construction of schools piecemeal usually is more expensive in thelong run.

Individual buildings were evaluated inthe survey on the basis of detailed standards covering, briefly,the following:

The site: its location, adequacy,physical characteristics, organization and utilization

Structure and finishes: the structural system(framing, etc.), exterior and interior surfaces oflearning spaces and cir- culation areas, with considerationof visual and auditory environment, acoustical properties,safety, sanitation, etc.

3. Space relations: the organization of spacesin the over-all plan, zoning of areas requiring separation,the relationship of special areas to their functioning,circulation and access 'convenience, etc.

4. Lighting and electrical systems: the qualityof natural and artificial lighting as related to visual requirementsof

-162 fABLE 27

YEAR OF INITIALCONSTRUCTION, YEARS OFADDITIONS TO BUILDINGS

AND ADDITIONS BY YEAROF INITIAL CONSTRUCTION,

BUILDINGS EXISTING ANDUNDER CONSTRUCTION

Number of building projects

Additions

Initial By year of By year of initial Year construction addition construction-- (4) (1) (2) (3)

Before 1901 2 - 2

1901-1910 4 - 4

1911-1920 7 1 10

1921-1930 18 2 40

1931-1940 38 9 73

1941-1950 22 54 22

43 1951-1960 36 92 - ._ Since 1960 12 36

Total 139 194 194 various tasks, the adequacyof electric power distribu- tion and electrical systemssuch as time clocks, com- munication, etc.

5.Mechanical and maintenance: theefficiency and effect- tiveness of heating and ventilating systemsfrom the stand- point of required thermalenvironment, suitability of plumbing, facilities for plant operationand conditions conducive to economical upkeep andmaintenance

6. General classrooms: their size andshape, appropriate- ness andadequacy of furnishings and equipment,and general state of environmental conditionsfor learning and health and safety ofinhabitants

7. Special classrooms (such as shopsand laboratories): size, shape, physical features, specialequipment and furnish- ings, special environmentalrequirements

8. Library: location, reading and studyfacilities, storage To71-cias and other media, special facilitiesand environ- mental conditions required

9. Assembly and auditorium spaces:adequacy and suitability for school and utheruse-,-FihYsTc-al features and appoint- ments of presentation or stage areasand viewing and listen- ing arecs and viewing andlistening characteristics

10. Physical education: adequacy of space,special physical features of spaces and theirsuitability, appointments and environmental conditions

kitchen 11. School lunch: adequacy forpupils served, quality of and dining facilities, organizationand location of spaces, environmental conditions

12. Administration: adequacy and qualityof spaces for general offices, guidance facilities,health facilities, teachers' rooms and storage

QualityLe-verof Existing Buildings

In the random sample of40 of the 135 existing buildings, afive-point scale was used for rating three tofive sub-items under eachof the 12 aspects listed

-164 above. A summary of all such ratings appears in Table 28. Although some newer buildings would rate over-all good to superior, fewer than 10 percent of all value hidgments by the survey team, coverinic-TiremT7v0d be in the superior cate- goric Theseresults lead to the following conclusions:

1. From the standpoint of a broad range of quality considera- tions, existing school buildings in the Metropolitan district are to be viewed asabout two-thirds average or mediocre or worse.

2. Existing school buildings in the Metropolitan district rate only about one-tiTcrof all quality counts in the "good" ro "superior" categories.

A good case in point is the subject of size of school sites. Tables 29 and 30 show a comparison of elementary and secondary school site sizeswith State minimum requirements. All told, there is now adeficiencof 456 acres of land for school sites -- 268for-7-elmf.----or secon ary sc oo s in t e existing 135ui dings. On_y a vigorousand imaginative program o p anning will a leviate this situation and prevent its development in future construction to E;-1"--eci. Noting t at this ana ysis covers a Iuilings, oan new, t e out- come is not surprising.Site standards, for example, of a generation_ago did not allow adequate land for educational use or off-street automobfleparking.

Similarly, only in recent years has it been considered desirable to construct schools of safe, fire-resistive materials or toprovide modern, sanitary equipment for preparation of school lunches.In this sense, therefore, the efforts of both the City system and the County system are to be commendedfor the areas in which high quality of school construction has been reached, particularlyin recent structures.

However, the many deficiencies now existing in schoolfacilities should be overcome in the long-range planning of the newMetropolitan system. Some of these can be avoided or eliminated;7eic ien tp-71'.------1-11.Inir71:47-'iewconstruc- tion and remodeling projects, but not withoutlarge additional capital expenditures.

Areas of Strength and Weakness

A breakdown of Table 28 appears in Table 31, showing the percent- age of ratings of the 40sample school buildings above average for each of the 12 areas. The rankingsof the 12 areas in this table reflect the commendable school lunch programs in the two systems, a more or less standard library requirement met in recent buildings and relatively good results in material consideratIons oflighting and electrical work and structure and finishes. Outside of the I ibrar , areasof greatest educational significance rank low.In order to bring the quality levels of

-165 TABLE 28

PERCENT OF ALL RATINGSON ALL ASPECTS OFSAMPLE

OF 40 BUILDINGS BYRATING CATEGORY

Percent of Rating ratings

Superior 8.6

Good 25.9

Average 30.2

Poor 23.8

Unsatisfactory 11.5

Total 100.0 TABLE 29

COMPARISON OF ACTUALAND DESIRED SITEACREAGE,

COUNTY AND CITYELEMENTARY SCHOOLS,

DAVIDSON COUNTY,TENNESSEE

,11.1111 Desired size Acreage No. of Actual size Site size Total siteAverage Total siteAverage shortor in acres schools acreage acreage acreage acreage over required

(4) (5) (6) (1) (2) (3)

25 8 + 29 16-20 3 54 18 9 + 48 11-15 15 180 12 132 :.

1,0 -77 6-10 37 299 8 376 414 9 -268 1-5 46 146 3

947 9 -268 Total 101 679 7

additional acre for Based on Tennessee minimumof four acres perschool plus one each 100 students ofbuilding capacity forelementary schools. TABLE 30

COUNTY AND CITY COMPARISON OF ACTUALAND DESIREDSITE ACREAGE,

JUNIOR ANDSENIOP HIGHSCHOOLS,

DAVIDSON COUNTY,TENNESSEE

Desired size Actual size Acreage Site size No. of Total site Average Total site Average short or in acres schools acreage acreage acreage acreage over required (6) (1) (2) (3) (4) (5)

20 20 + 18 36-40 I 38 38 - 31-35 - - -

77 19 + 35 26-30 4 112 28

117 23 - 6 21-25 5 111 22 72 18 - 3 16-20 4 69 17

120 20 -47 11-15 6 73 12

18 -111 6-10 10 72 7 183

84 21 - 74 1-5 4 10 3

4E7, 14 673 20 -188 Total 34 485

school plu: one Based on Tennesseeminimum standardsof eight acres per capacity for secondaryschools. additional acre for each100. students of building TABLE 31

PERCENT OF RATINGS ABOVEAVERAGE BY

ASPECT OF BUILDING, 40BUILDINGS

Percent of ratings above average

Amount Rank

1. Site 34.4 5

2. Structure and finishes 37.5 4

3. Space relations 32.2 6

4. Lighting and electrical 38.3 3

5. Mechanical and maintenance 30.8 10

6. General classrooms 31.7 8

7. Specialclassrooms1 31.5 9

8. Library 45.0 2

9. Assembly and auditorium2 31.8 7

10. Physicaleducation3 29.4 11

11. School lunch 47.5 1

12. Administration 22.9 12

INNEN...

1Suchrooms as science rooms,shops, home economic rooms usually found in high schools only. Elementary schoolbuildings generally were not rated on this aspect.

2Only buildings with auditoriums included. Seven high schools andeleven elementary schools did not have auditoriums and were notrated.

3Only applicable to secondary schools. Elementary schools are generallywithout indoor physical education facilities. -169 buildings up to acceptable standards attention inthe future must be given to better facilities for: General classrooms Special classrooms Physical education Assembly and auditorium Administration The mechanical and maintenance category ratedlow for several reasons, namely: excessive heating due to unprotected largeglass areas with southern exposures in some schools; poor tounsatisfactory plumbing fixtures in olderschools; inadequate custodial facilities, particularly in County schools;and lack of easily maintained materials for wainscots and floors even in newestbuildings.

The more important specific observationsresulting from this evaluation are included inlater sections of this report.

School Cost and Efficiency

In the recent past, school plantplanning in Nashville and Davidson County has resulted in low costs per squarefoot, the average being under $10 for new buildings oradditions of all sizes.But cost per square foot can be misleading. Efficiency of the buHding plan must also betaken into account, since in an inef- ficient building a large proportion of space noteducationally useful can bring the total unit cost down, although the cost of useful spaceis high.

A typical recent 12-classroom, two-story,City elementary school was builtinitiJily in 1958. The initial constructioncon;ained 12,772 net square feet of educationally useful area, excludingboiler room, circuloi ion and construction space. The gross squarefootage (initial) was 31,416 square feet. Theratio of net to gross was thus 41 percent.A well-planned, two-story schoolshoul-d be near 65 percent efficient in plan.CareiD educational and architectural p anning have pro- duced buildings with 70 percent or moreusable space.

A typical recent one-story, 14-classroomCounty school built in 1960 has net educationally useful area,excluding boiler room, circulation and construc- tion space, of 13,512 square feet. The gross areais 27,969 square feet. The ratio of net to gross is 48 percent. A well-planned, one-storybuilding should be-We-7;7J percent efficient.

Thus, though the cost of both buildings wasbelow $9 per square foot of gross area, in one case 24 percent of the gross,and in the other 22 percent, need not have been built.

A two-story junior-senior high schoolbuilt in 1962 has a higher

-170 efficiency, 58 percent. This is typical of manysecondary schools throughoutthe country, but is still below thedesirable 65 percent for a well-planned, two-story secondary school.

It has been administrative and,formerly, Board policy in the County to plan both elementary andsecondary schools to meet immediateneeds and to be expansible to eventual predetermined capacities.For elementary schools the ultimate maximum has been set at 600pupils. Ultimate maxima for secondaryschools have varied according to type of schooland local needs, but the sameprinciple has been followed.

The County administration hasrecently followed the practice in elementary schools of providing in initialconstruction the full amount ofcertain facilities that will be needed for 600 pupils,although initial capacity maybe 240 or less.Facilities falling into this category arethe library, cafeteria, kitchen, administrative offices and health spaces.The standard required librarydimensions have been 24 by 40 feet (960 squarefeet); for cafeteria seating space,40 by 60 feet (2,400 square feet); for kitchens, area requiredby the State for 600 pupils(1,320 these squarefeet).In actual recent buildings therehas been some departure from standards due to design evolution andneed for economy. Kitchens,for example, have been substantially smaller.In theory, the intent has been toreduce long-term capital outlay because adding to such spaces, orplanning them in advance for ex- pansion, has been considereddifficult and excessively expensive.In practice, it it doubtful whether there is anadvantage to this approach. Notonlis cost per pupior a 2,pupi schooincreased y t e excessive area ofiraries and ca e- teria seating space, but to comewithin a reasonable budget constructionquality and sometimes space have had tobe sacrificed.

The major observation to be made onconstruction of schoolbuildings is that the pressure of economyhas resulted in construction justshort of good-quality per dollar. Afew dollars more in recent buildingswould have permitted just enough better materials, just enough more materialsfor better environment and justenough more space toyield considerably better facilities.Moreover, a relatively small additional amount spent on school plantplanning could yield measurable returnsin moreeducationally usable facilities per dollarof construction cost.

The net result of the foregoingconclusion is that, even thoughthere plan may be savings inschool building cost by an investmentin creative talents to moreefficient buildings, this is offset by therequirements of increasing the amount of space and improving the qualityof construction.

Plant Planning Procedures

In the recent past, schoolplants constructed in both Nashvilleand

-171 Davidson County have in effectfollowed standard plans,closely similar in both representatives systems.In the County, a committeecomposed of administration and selected teachersdeveloped requirements and astandard plan for a typical "self-contained" classroom forgrades 1-3 with a toilet inthe classroom; another similar committee developedrequirements and a standardplan without classroom toilets for grades 4-6; andcomparable standards weredeveloped for secondary school spaces following, ingeneral, State requirements.Comparable standards weredeveloped for City schools. Architectural Services andPlant Planning.In the City, architects and wereformerlyilan 'c'T-Committeeof the Board of Education their recommendations wereforwarded by the Board tothe office of the Mayor, recommended, on who made the actualselection.In the County, architects were Plants to the basis of past performancein local school work,by the Supervisor of recommendations to the former the Superintendent ofSchools, who in turn made County Board of Education,which selected thearchitects.

For City schools thearchitect was given amimeographed document heads prepared by the Director ofSchool Plants from datasupplied by department architect worked with the and administrative officials.During design stages the from, Director of School Plantsand department heads,and obtained approvals Prior first, the Superintendent ofSchools and second, theBoard of Education. approvals were also necessaryfrom five other public agencies:the State Depart- Planning Com- ment of Education,the City Director ofPublic Works, the City Health mission, the City Bureauof Inspection and Permitsand the Davidson County Department (cafeterias,etc.)

For County schools theprocedure during design wasapproximately him the same, the architectworking with the Supervisorof Plants, who supplied with brief mimeographed notes on spacerequirements, standard plans, etc.In addition to Board approval,the approval of only twoother public agencies was County Health necessary:the State Department ofEducation and the Davidson Department.

The County procedure,with fullest authorityvested in the Board of Education, is Tr-lore

Educational Requirements.Programs of educationalrequirements or elementary specifications given architectsshould be improved in severalrespects. For schools, the standard classroomsresulting from the describedprocedures were often satisfactory as self-containedclassrooms, but the brief spacerequirements included classrooms which are no provisionsfor adaptations of spacesother than standard needed in some of the newer typesof elementary educationand the work of special- and ists.For secondary schools,information supplied by theCity, well organized descriptions of titled "Tentative EducationalSpecifications," contained concise

-172 the educational and physicalplan desired, capacity,budget, approvals required equipment and finishes, and space requirements indetail including not only area, schools the data but in many cases roomdimensions as well .For County secondary each) consisting of werecontained in brief documents(two or three typed pages lists of required spaces,reference to State standardsand statement of required capacity.

Content of Countydocuments of this type variedwidely. One, for preventing drip- a newelementary school, forexample, contained cautions as to disposal fa- page ofpitch from built-up roofs,detailed specifications for sewage cilities, materials specificationsfor site work, flooringmaterials, painting and decoration, water service, etc.While some of this mayhave been necessary due because of the lack of aCounty building department,much was undoubtedly The City to unsavory pastexperience and much iscovered by State requirements. to specific documents contained many moredetailed specifications, often even type of structural system, ortrade or brand names. dealt with tech- In manres ects,both Ci and Count documents and design or which arci nical and professional aspectsof school construction architect should tects should be givenprimarresponsibili A pro erly ualified of materials, not be restrictedby specific dimensionsof spaces or specific t pes efficiency and since this can preventthe full use of histalents in creating greater should specify the educa- other improvements in design.The school administration of the tional activities anticiated in the school andperformance re uirements lighting, several materials and t esof e uient as structureinterior finishes heating, ventilation and or airconditioning, acousticalmaterials, plumbing fix- needs to know tures (includingnumbers of fixtures) and thelike. The architect well as type what kind of environmentis to be enclosedand for what purposes, as of school, spaces requiredand budget. lists of items The school administrationmcIL...2*.f_clesirable, maintain be permitted to and details which haveproved satisfactory,but these should not the program limit introduction of otheritems and details andshould not form part of of educational requirements orspecifications.

The volume of constructionin Nashville and inthe County system has justified and willcontinue to justify morespecialized school administrative systematic organization struc- staff on school plant planningand development of a individuals and ture for coordinating,managing and controllingthe work of many In Baltimore agencies involved in the many...M.29sof planning a schoolbuilding. procedural County, Maryland, whichhas a similar schoolconstruction situation, a alone. document lists 16decision-making steps forschool site selection

, -173 Additional SpecificConclusions and Recommendations

Concerning specificfeatures of buildings, theitems which follow should be given attention: in buildings. 1. There is generally notenough educational space classrooms are too schools and secondaryschools, most general In both elementary them. small, particularly forclasses of 30 and morepupils commonly assigned to library space Although library and study spacemeet TennesseeState requirements, considered good and shouldbe increased. in some schools isbelow standards generally of industrial arts andhome- Although many secondaryschools have an oversupply secondary schools in making facilities fornumber of class hours of use,too many music rooms, art roomsand physi- the area have fewerfully equipped science rooms, school program. The datain Table 32 cal education stationsthan needed in the and weekly studentclass arebased upon a comparisonof the number of such rooms periods of scheduledteaching.

2. The present temporary,movable classrooms shouldbe torn commercial-type down at theearliest7;;;i le rr-F--)-o7--nentand replaced by good The latter shouldbe movable structures where permanenthousing is not feasible. the next fT ve to 10 years, used wherever attendanceof pupils will decline over additional housing. but where present requirementsof enrollment demand of all schools 3. Design requirementsshould lead to improvement corridors; with respect to such matters as:avoiding excessivelylong and unattractive providing wall bases of a typeconducive to maintenanceof sanitary conditions; standards of the Illuminating maintaining lightinglevels conforming to recent Engineering Society; andproviding more suitableheating and ventilating systems, including hot waterheating systems as well asair conditioning. should 4. A general rehabilitation programfor all older buildings emphasis on wainscots,walls, floor surfacing,non-comgt-gibre be instituted, with electrical acoustic treatment,lighting, painting,chalkboards, mechanical and educational usefulness, systems, to bringall buildings up tomodern standards of attractiveness, safetyand low maintenance cost. minimum of 5. The practice in newconstruction of providing a 900 square feet perelementary classroom shouldbe continued.

6. Cafeteria seating spaceand kitchens shouldbe planned in capacity, with provisionsfor en- future construction inrelation to initial school should be given to oneschool larging kitchens and servicelines. Consideration methods of transportinghot kitchen serving three tofour schools, with appropriate and cold foods.

-174 TABLE 32

DISTRIBUTION OF METROPOLITANDISTRICT SECONDARYSCHOOLS

OF SPECIALIZED WITH REFERENCE TOADEQUACY OF A NUMBER

TEACHING STATIONS ASDETERMINED BY EXISTINGPROGRAMS

Number of secondaryschools with Type of teaching station More stations Same number Fewer stations than needed as needed than needed

26 Science 1 7

5 Industrial arts 13 16

2 Home economics 16 15

19 Music 3 12

Art 3 15 16

22 Physical education 6 6 be pro- 7. Indoor physical educationand recreation spaceeshould vided in all elementary schools.

8. Separate auditoriums,although desirable for community use, education spaces should are not anecessity in elementaryschools. Indoor physical be designed to serve this purpose.

9. General classrooms for secondaryeducation should be 800 enough for large-group squarefeet.However, there shouldbe some spaces large instruction and some spacesfor seminar and small-groupwork.

(grades 10. Ph sical education stationsfor se'nior high schools seating, 10-12) should include spacefor a regularion basketballcourt and spectator with this space dividedby a movable barrier into twoteaching stations. Junior interschool sports and mahave high schools (grades7-9) should not em hasize smaller basketball courts withminimum or no spectatorseating. There should e all stations in all secondaryschools sufficient stationsfor a full program, but not dressing need be planned aroundbasketball courts.Provision for lockers, showers, designed capacity of the rooms andother needed spacesshould be in proportion to sanitary condi- school, and all such spacesshould be designed to maintain proper tions at low cost. Auditoriums 11. Large auditoriums are noteducational spaces. (grades seating no more than600-700 should be includedin senior high schools Auditoriums, 10-12). These should bedesigned to serve educational purposes. (grades 7-9).In all secondary as such,need not be included injunior high schools should be used for occasion- schools, other spaces such ascafeterias or gymnasiums al assembling of groupsof 50 or more students. of 12. The evaluation of existingbuildings has been made in terms grades and pupils now assigned tothem.In none of theschools have provisions of deficiencies to bemade been made for kindergartens.In view of the backlog immediate system-wide up inexisting programs, norecommendation is made for been accepted in introduction of kindergartens.Kindergartens have long since Reference is made school systems as an essential partof public education. many Without elsewhere in this report to theirneed and importance inthe Metro system. form. doubt, the people of Metrowill in time desire toadd this service in some kinder- For this reason, allelementary school buildingsshould be planned so thai part o the schoo gartens cal be accommoated when they eventuay ecome a program . cler- 13. Administrative spaces areinadequate for the supervisory, personnel, plarming andother administrativefunctions char- ical, guidance, pupil health fa- acteristic of bothelementary and secondaryschools. Spaces are small; good where they exist; cilities rate about average;guidance spaces are average to

-176 storage space is lacking in most schools and teachers' work space islimited. The general office space in only one school in 40 was rated superior.

Concerning the planning process and organization for future facilities, the following items should be given consideration:

1. The Metro Government should assume the full costs of school construction, including site development. This will insure (a) close contro , now lacking, and responsibility placed on the schools for their share of site develop-. ment; (b) relieving the individual school principal of duties notconnected directly with his major functions; and (c) relieving local individuals and community groups of responsibilities which they should not be asked or expected to assume.if gifts of money, time or materials are spontaneously offered, they should be accepted, but there should be no implied or express pressure for such contributions.

2. Special rooms such as science laboratories, shops, homemaking laboratories and art rooms require different kinds of space and special equipment. They are more costiy than general classroom spaces. For this reason, they should be lanned onl uon the basis of a thorough anal sis of the resent and1 ikelfu- ture educational rogram or eac school and rovided in t peand numer to meet as nearly as possi e t eneeds o the scheduling requirements o t e anticipate student population. As noted previously in this report, school populations differ greatly from neighborhood to neighborhood. Facilities should vary accordingly. Standard plans for buildings do not necessarily contribute to economy or suitable educational environment. 3. There should be more exploration in new types of space allo- cations for both elementary and secondary schools which can provideflexibility for new ways of organizing instruction and greater use of multi-purpose spaces to reduce low utilization, on the one hand, and to accommodate better both teaching and learning on the other. For instance, large music rooms can be designedfor large-group lecture and demonstration purposes.

4. A close working relationship should be established between the staffs of the Metropolitan Planning Commission and the Metropolitan Board of Parks and Recreation. Such a cooperative arrangement would benefit-both theschool system and Metro in general. Objectives shouldbe: to plan for school and park sites to be jointly used and developed as a defensible economy measure; toplan for and start acquisition of sites farther in advance of need, in furtherance of an accepted long-range program; to explore possible savings in capital outlayfor schools and other functions of Metro Government; to explore possibilities of im- proving existing faulty school site conditions, lack of acreage, etc.,by developing adjacent land for park purposes.

- 177 design should be ascarefully studied,for 5. Site layout and site building design. Thisrequires the servicesof a competent the entire site, as staff may be either: partof the planner, Such anindividual and the necessary working under thearchitect of the school administration, anoutside organization by the by him, or anoutside organizationengaged directly building and employed is used, no new with the architect.Whichever arrangement Board and cooperating Existing site faults should be undertakenwithout this type ofstudy. school project The school site ispari7Tri:Fe to bealleviated will also reuire this t pe ofstud facility and itsdevelopment is partof the total cost. but unit cost should 6. Low construction costshould be required, relation to buildingefficiency, the not be thesole criterion; lowunit cost in effect on educationalfunction and long-termmaintenance over-all budget, the architect's work should govern.Such bases forjudgment of an and operating cost, the program ofeducational should be clearlystated in advance,either as part of supplement thereto.Low cost and economyof construction requirements or as a during confused. The goalshould be maximumeducational usefulness should not be (including future operation expected useful lifeof the structure perdollar of cost initial capital outlay.In planning offa- and maintenance), notminimum possible of school, sincesmall schools, asindicated, cilities, economydemands optimum size unde- schools too large mayrequire expensivetransportation and areexpensive and entire Metro education. Geographiccharacteristics of the sirable features of mass be met -- the sizeof each district are suchthat no arbitrary,single stcmdard can depend upon itsrelationship to otherexisting and planned single building must and many facilities in the vicinity,population density,transportation requirements possible an elementaryschool size of near other matters.Nevertheless, as far as of 700 toapproximately 1,200;and senior 600 is desirable;junior high schools expected to hold 1,200 to 1,800.These size standardscannot be high schools of of expensive fa- rigidly. Also, for purposesof economy, toreduce the cmount should adhere asclosely as possible cilities required insenior highschools, planning of organization. to the 6-3-3and eventuallythe K-6-3-3 plan

g XIII

PROJECTED BUILDING REQUIREMENTS

The purpose of this chapter is to develop a long-range viewof con- struction of educational facilities required for the Metropolitan SchoolSystem. School buildings are difficult to change once steel and bricks and mortarhave been put in place. The decisions involved in placing facilities of theright kind, in the right amounts, in the right places, constitute a verycomplicated process which must be carefully undertaken to avoid many types of error leading toinef- ficient utilization of space and inadequate educational facilities in the years ahead.

Buildings constructed now will undoubtedly last 50 or 60 years. Their mid-life will be 30 years hence, in the year 1993.It is imperative, there- fore, that as much vision, study and sophisticated planning as possible gointo capital budgets.

It is to be observed that, although amounts of money forbuildings appear large, spread over aperiod of time costs of school buildings are a rela- tively small proportion of the total cost of education.

During the course of the preparation of this report, theMetropolitan Planning Commission was in the process also of preparing a long-termschool building plan for the Metropolitan Government. The material whichfollows and that to become available through the Planning Commission shouldbe used as a backdrop by the new Board of Education and its staff for continuous capitalbudget planning and school construction administration.

School Construction Planning Areas

As mentioned in Chapter III of this report,enrollment projections on several bases for the new Metropolitan school district weredistributed among 22 school construction planning areas. The schools contained inthese areas are shown in Table 33.

As an initial step for determining a long-range pictureof require- ments, tables such as Tables 34, 35 and 36 wereprepared on various assumptions related to projected enrollment, capacity of usable existingbuildings and buildings which are now under construction.

In the computation of existing capacity somebuildings which are

-179 TABLE 33

EXISTING OR PLANNED BUILDINGS

IN SCHOOL CONSTRUCTION PLANNING AREAS

Area Existing buildings

I Old Hickory Growth Area Dupont High, Dupont Primary, Dupont Elementary, Andrew Jackson, State land, Hermitage

II Bluefields-Cloverhill Done (son High, Done (son Elementary, McGavock (Part), Hickman, Dodson

Ill Pennington-Donelson Two Rivers High, Pennington, Stanford Hills Elementary, McGavock (Part), Margaret Allen (Part)

IV Southeast Rural (Part) Mt. View, Una, Antioch High

V Sevenmile Creek Norman Binkley, Crieve Hall, Providence, Growth Area Tusculum, Haywood, Cole

VIGlenbine Glencliff High, Glencliff Elementary, Turner, Whitsitt, Woodbine, Glenvif...-w, Glengarry

VIIBerry Hill-Elm Hill Margaret Allen (Part), Mt. Zeno, Berry, Hamilton, Julia Andrews, Central High

VIIIEast Nashville East Nashville Sr. High, East Nashville Jr. High, Highland Heights, Cotton, Bailey, Locke land, Caldwell, Meigs, Kirkpatrick, Glenn, Ross, Warner

IXJoywood-Inglewood Isaac Litton Jr. High, Isaac Litton Sr. High, Strafford High, Shwab, Tom Joy, Jere Baxter, Dalewood, Inglewood, Rosebank, Dan Mills

X Madison Growth Area Madison High, Neely's Bend, Stratton, Amqui -180 TABLE 33 (Continued)

Area Existing buildings

XIGoodlettsville Goodlettsville High, Goodlettsville Elementary, Charles Johnson, Old Center

XIIMaplewood Maplewood High, Gra-Mar, Chadwell, Brick Church, Bellshire

XIII Northwest Joe Iton High, Joe Iton Elementary, Union Hill, Morny, Alex Green, Jordonia, King's Lane, Wade

XIV White's Creek Cumberland High, Haynes, Bordeaux

XV North Nashville Jdin Early, North Nashville, Buena Vista, Jones, Fehr, Wharton

XVI South Nashville Howard, Hume-Fogg, Cameron, Napier Johnson, Rose Park (under construction), Carter-Lawrence, Murrell, Clemons, Waverly-Belmont, Fall

XVII Hadley Park Pearl Elementary, Pearl High, Washington, Head, McKissack, Elliott, Murphy, Greene

XVIII West End Woodmont, Cohn, Park Avenue, Sylvan Park, West End, Ransom, Covert, Eakin

XIX Greenhills Hillsboro High, Julia Green, Walter Stokes, Glendale, Burton, Overton High, Robertson Academy, Percy Priest

XX Southwest Bellevue High, Harpeth Valley

XXI West Mead-Hillwood Hil !wood High, H.G. Hill, Brookmeade, Gower, Bellevue Elementary, Westmeade, Parmer, Martha Vaught

XXII Richland-Centennial Charlotte Park, Richland, McCann, Cockrill, West Nashville Junior High (under construction)

-180a

_ TABLE 34

PROJECTED ENROLLMENT TO 1972

AND AVAILABLE CAPACITY INEXISTING BUILDINGS,

GRADES 1 - 6,

BY SCHOOL CONSTRUCTIONPLANNING AREAS

Planning Projected Existing Additional areas enrol lment capacity needed

I Old Hickory Growth 2,800 2,000 800 II Bluefields-Cloverhill 3,400 1,700 1,700 III Pennington-Donelson Hills 2,800 1,800 1,000 IV Southeast Rural (Part) 2,000 600 1,400 V Sevenmile Creek Growth 3,700 3,000 700 VI Glenbine 2,900 2,800 100 VII Berry Hill-Elm Hill 1,000 1,000 VIII East Nashville 3,500 4,500 (1,000) IX Joywood-Inglewood 4,000 4,350 (350) X Madison Growth 2,500 1,800 700 XI Goodlettsville 800 1,000 (200) XII Maplewood 2,200 1,700 500 XIII Northwest 3,900 1,500 2,400 XIV White's Creek 1,900 1,000 900 XV North Nashville 2,200 3,000 (800) XVI South Nashville 2,100* 3,700 .(1,600) XVII Hadley-Park 1,900* 3,100 (1,200) XVIII West End 1,700 2,500 (800) XIX Greenhills 2,100 2,500 (400) XX Southwest 1,300 240 1,060 XXI West Meade-Hillwood 2,200 2,550 (350) XXII Richland-Centennial 1,500 2,750 (1,250)

*Actual rate of growth greater

-181 TABLE 35

PROJECTED ENROLLMENT TO 1972

AND AVAILABLE CAPACITY INEXISTING BUILDINGS,

GRADES 7 - 9

BY SCHOOL CONSTRUCTIONPLANNING AREAS

Planning Projected Existing Additional areas enrol I ment capacity needed

I Old Hickory Growth 1,300 1,300 1,600 H BI uefiel ds-Cloverhi I I 1,600 III Pennington-Donelson Hills 1,300 1,300 IV Southeast Rural (Part) 900 900 V Sevenmile Creek Growth 1,700 500 1,200 VI Glenbine 1,300 1,300 VII Berry Hill-Elm Hill 500 500 VIII East Nashville 1,600 2,200a/ (600) 300 IX Joywood-Inglewood 1,900 1,600b,/, X Madison Growth 1,200 1,200 c/ XI Goodiettsville 400 IMOd/ (600) XII Maplewood 1,000 1,000 XIII Northwest 1,800 1,800 XIV White's Creek 900 1,400 e/ (500) XV North Nashville 1,000 700 300 XVI South Nashville 1,000 1,200 (200) XVII Hadley Park 900 1,100 (200) XVIII West End 800 1,750 f/ (950) XIX Greenhills 1,000 1,000 9/ XX Southwest 600 600 XXI West Meade-Hillwood 1,000 1,600h/ (600) XXII Richland-Centennial 700 (100)

aiIn Bailey, East Jr. and Highland ilCumberland and part of Haynes Heights f/Covert and Cohn b/Isaac Litton 9/Overton c/Madison Jr.-Sr. 11/Hillwood d/Goddlettsville High

-182 TABLE 36

PROJECTED ENROLLMENT TO 1972

AND AVAILABLE CAPACITY INEXISTING BUILDINGS,

GRADES 10 - 12

BY SCHOOL CONSTRUCTIONPLANNING AREAS

.111111MarNOINI..., Planning Projected Existing Additional areas enroll ment capacity needed

700 300 I Old Hickory Growth 1,000 1,300 11 Bluefields-Cloverhill 1,200 (100) III Pennington-Donelson Hills 1,000 1,000 IV Southeast Rural (Part) 700 1,200 (500) V Sevenmile Creek Growth 1,300 1,300 VI Glenbine 1,000 1,300 (300) VII Berry Hill-Elm Hill 340 340 VIII East Nashville 1,200 1,000 200 IX Joywood-Inglewood 1,400 1,200 200 X Madsion Growth 900 500 400 XI Goodlettsville 300 300 XII Maplewood 800 1,200 (400) 700 X111 Northwest 1,300 600 XIV White's Creek 700 700 XV North Nashville 700 1,000 (300) XVI South Nashville 700 2,100 (1,400) XVII Hadley Park 700 1,300 (600) XVIII West End 600 850 (250) XIX Greenhills 700 1,200 (500) XX Southwest 400 400 XXI West Meade-Hil !wood 800 800 XXII Richland-Centennial 500 500 sub-standard were not counted sub-standard and parts of somebuildings which are abandoned over the 10-yearperiod.It was on the assumptionthat they would be budget requests made bythe assumed that all facilitiescontemplated in capital for construction Transitional Board as ofApril 1963 andbuildings already authorized capacity for school would be available bythe end of theplanning period. Added building prolects not in usein 1962-63,including those under construction, Transitional authorized for construction, orin the capitalbudget request of the Margaret Allen, Amqui,Antioch Board as of April 1963,includes the following: Hillwood High, Norman Binkley,Bordeaux, Cavert,Charlotte Park, Hickman, Monticello, High, Inglewood,McGavock, McMurrayHigh, Maplewood High, Stratford High, West End,West Neely's Bend High, PearlHigh, Rose Park Junior, entirely new schools; some are Nashville Junior andWharton. Some of these are additions.

Sub-Standard Space to beEliminated

The following schools, or partsof schools, wereeliminated for instructional use in thelong-range program:

School Portion to be adandoned

Elliott (1-6) Entire Fall (1-6) Entire Glenn (1-6) 11 c lassrooms Napier (1-6) 10 classrooms Pearl Elementary (1-6) Entire Ross (1-6) 10 classrooms Ford Greene Annex(1-6) Entire Julia Andrews (1-6) Entire Stratton (1-6) 2 classrooms Hume-Fogg (10-12) Entire Bellevue High (9-12) Entire Central (7-12) Entire 2,820 and the The capacity of the nineelementary school buildings is three secondarybuildings 2,794.

This three-storyelementary school wasbuilt in 1916 and Elliott. all When inspected it wasrated poor orunsatisfactory on almost never added to. (all slightly aspects, receiving agood rating only on oneitem: size of classrooms exceeded exceeded 800 square feetnet). The October,1962 enrollment slightly has no off-street parking orservice capacity (see AppendixA). The site, 0.9 acres, the building is mostlypaved and access tothe building.Land not occupied by education or recreation. seriously overcrowdedwhen used for physical

-184 Building construction is of a typewhich, by modern standards, requires enclosed stairwells for fire safety for athree-story school. However, thebuilding plan is such that to enclose stairwellswould be prohibitively costly ifachievable. Interior condition of the building is poor,due to faulty maintenance andlack of repairs or replacement of manyelements.Fluorescent lighting has been installed in classrooms but classroomfurniture, equipment andgeneral environment were rated unsatisfactory. Whilecleaning up and repainting wouldsomewhat alleviate these conditions, the cost ofreplacing many items of equipmentwould be excessive. The coal-fired steam heating system wasrated poor.

The school has no space for indoorphysical education in bad weather. Administrative spaces are inadequate inquantity and unsatisfactory inquality.

Fall.This is another three-story schoolhaving essentially the same characteristics as Ef iott, and in addition a greaterproportion of the structure is wood framed.!nitial construction date is 1898.A large addition was erected in 1926. The site contains 1.3 acres andhas a 42 by 84 foot paved court asthe only physical recreation area, indoors or out.This school was rated generallylower than Elliott.

Glenn.This elementary school was built in two stages,dating from 1903 and 1949 respectively. The 1903portion has the same characteristics asthe two preceding schools andcontains 11 classrooms, administrative space,cafeteria and boiler rooms. The old portion isthree stories tall and, althoughcomparatively well maintained, was neverthelessconsidered to be extremelyhazardous in case of fire due to wood framing, unprotectedstairwells, wood flooring, etc. Thecafeteria It was ratedunsatisfactory in most respects.Administrative space was inadequate. is recommended that this portionof the building be razed andreplaced.

Napier. This school was initially built in 1898and doubled in capacity by a 1949 addition. Theold portion contains 10classrooms (eight general, one science, onespecial education) and a teachers'rounge.lt has masonry walls, wood floor and roof framing and isthree stories tall.This portion was rated poor or unsatisfactory, asin the case of the precedingschools and for the same reasons. Also, the roof leaks and glass in theold wood sash has been blown inby the wind in the past. Although many aspectsof the 1949 portion received poor orunsatis- factory ratings, these conditions couldbe remedied by renovation andmodernization in most cases.

lt is recommended that the old portionbe razed and replaced, and that in the process the administrative spacesand the library be increased in area.If Napier Park continues in school use, noadditional acreage should be needed.

Pearl Elementary.Built in 1917 and added to in1923, this school is in perhaps the worst condition of any,and should be razed. Three storiestall, the

-185 school is a firetrap.It was rated unsatisfactory on mostaspects, poor onothers, It good on none.Its site contains 0.96 acresand is virtually allblacktopped. has less than 600 has no indoor physical education space;the library reading room the coal-fired square feet;the administrative officeshave only 189 square feet; in the steam heating system wasrated unsatisfactory; andthe only pupil toilets are basement, inadequate in number offixtures and impossible tomaintain in sanitary condition.

Ross. The older pottion ofthis school was built in1907, a large addition in 1951. The 1907 portioncontains all the classrooms(10), two science rooms, a smalllibrary and administrative spaces.The old portion, three stories high, is wood framed and has abrick veneer exterior.Floors are wood surfaced, stairs are not enclosed,although by modern fire safetystandards they should be, and the entire old portion,much like other old schoolsdescribed above, would be costly to renovate.It was rated poor orunsatisfactory in all respects.The new portion contains anauditorium-playroom and cafeteria.These were rated average to good. The sitehas 1.3 acres, of whichroughly half is available forphysical education and recreation.It is recommended that theentire building beabandoned for school use.

Julia Andrews.. Built in 1942and enlarged in 1953,this school shares a 9.3 acre site with the existingCounty school administrationbuilding. Four former classrooms in JuliaAndrews were in 1962-63 Countyadministrative of offices.Construction of the building isbasically soured, but many items finish and equipment need repair orreplacement due to normal wearand tear as well as minimum initial quality.Construction of a reitricted-accessdivided highway, with an interchangeewarby, will reduce the site inthe near future and limit accessibility of the school.A more recently built school,Berry, is approxi- mately half a mile away andothers are reasonably close.Julia Andrews is to be abandoned for instructional purposes.It should be used temporarilyfor housing additional administrative personnel.

Stratton. The original Strattcnelementary school is atwo-classroom, wood-framed building with outdoortoilets, built in 1910. Theremainder of the school is a separate, fire-resistive,two-story structurebuilt in 1936 and added to in 1951 and 1954. Theold portion, though wellmaintained and in fairly good repair, is unsatisfactory in manyrespects and subject toincreasingly severe attack site will by termites.It should be demolished and notreplaced, since the 7.3 acre structure. Con- be somewhat below requirements,though usable, for the remaining struction of other schoolselsewhere in the area shouldtake care of enrollment needs.

Hume-Fogg. Built well in1912 and substantiallyenlarged in 1917, and extending virtually fromcurb to curb of its downtownNashville site of 2.0 has acres, Hume-Foggremains entirely soundstructurally.It is four stories high and maximum numerousbasement rooms. The part nowallocated to instruction has a

-186 capacity of 1,071 secondary pupils.However, the October 1962 enrollmentof vocational high school students was 714.It is no longer located properlyfor regular senior high school use.Its layout is such that for vocational purposesits utilization is exceedingly inefficient.Its large 1,500-capacity auditorium israrely used to capacity. Thus for school use or administrative use thebuilding will have waste space.

The Hume-Fogg school in its location in the mainbusiness district is not well situated with respect to potentialpupils.Business traffic on adjacent streets is exceedingly heavy.Parking facilities are so limited as to bevirtually non- existent or at best makeshift.For all these reasons, it is recommendedthat Hume-Fogg be abandoned for any school use.

Bellevue High. Built in 1931 and enlarged in 1950 andagain in 1956, this secondary school (9-12) is a two-storybuilding. Some basement areas are in use.Construction is wood frame with masonry walls; firehazards are severe, but stairwells are not enclosed; floors are wood-surfacedin many rooms.Several classrooms have less than 400 square feet each. The single sciencelaboratory is too narrow to permit installation ofadequate equipment. Education storage space of all types is almost non-existent. The electrical system isoverloaded.Noise problems are severe. Water penetration is periodically aproblem. The wood window sash are expensive to maintain. Some ceilings arefiber board, in poor condition, and the plaster in others is falling.Planning for circulation has been poor, so that access to some areasis extremely inconvenient.For these reasons, it is recommended that Bellevue High be razed.

Central High.This two-story junior-senior high(7-12) was built in 1917 and added to in several stages in 1942, 1948, 1950and 1951.In the past 20 years little has been done to the 1917 building,which has wood framing between masonry walls. The additions areof fire-resistive construction. The school siteof 13.8 acres,shared with the Hamilton elementaryschool, is too small.

The entire building has suffered for lack of repairs,replacements and modernization. There are several places wherethe roof leaks. Some serious fire hazards exist, although there are fire escapes fromthe second story.Several classrooms are small. One of the three sciencelaboratories has only 550 square feet, the two others 736 square feet each.Except for one machine shop of 1,539 square feet, all otherspecial rooms are too small to accommodateadequate equip- ment. School population in the area isexpected to increase only slightly,and Central High is now poorly located with respect to pupils'homes.

It is recommended that Central High beabandoned for school use and that secondary pupils be transported to other schools.

-187 Further Assumptions and Limitations

In future planning, it isrecommended that the 6-3-3 plan of organi- zation be followed as far asthis is possible, taking all factors into account.This is what has been done to formthe conclusions on future requirements inthis chapter. This recommendation is madeprimarily on the basis of administrativeconvenience and economy, not on educationalmerits of the junior high school ideaitself.There are manyadaptations of the method ofcombining grades other than this which are producing superior education.The kind of teaching and the character ofactivities within the school are far moreimportant than known advantages of 8-4 over7-5 over 6-6,5-3-4, 6-3-3 or other grade organizations.

The main advantage of 6-3-3 isthat utilization of expensive stadia, gymnasiums, special classroomsand laboratories can be maximizedif only grades 10, 11 and 12 have them. The 6-6plan inevitably calls for more suchcostly facilities, even though students in grades7-9 do not need them andprobably should be without them.

Statistics for capacity of school buildings mustbe interpreted flexibly. For instance, a building for 600 in an areaof declining population wouldbe a better building with only 500. Class sizes. canbe reduced. Spare rooms canbe adapted to special uses. Throughoutcomputations in this report, requirementshave been determined on the conservative ornear-minimum side.In computing capacities of buildings at 30 per room, it is tobe remembered that in buildingswithout extrav- agantspaceallocations enrollments at 25 pupils perclassroom would be better. The pressure of financing the programdictates the practical, conservativeestimating used in this report.If funds were known to be readilyavailable, a more generous spaceallocation for buildings and a less generousallowance for capacity of buildings would have been used.

There is no rigid formula for sizeof school. Excessivelysmall school buildings cost more per pupil andshould be avoided. Excessivelylarge schools generally become overwhelmingly toomassive for close contactbetween teaching staff and pupil. However,where factors of population density,availability of land for school sites and otherconsiderations dictate large schools,there are ways of planning the school programand the facility to fit it sothat disadvantages of size can be overcome to aconsiderable extent. Small schools areoften necessary where transportation distancesand costs are excessive inisolated neighborhoods.

Recognizing the necessity of varyingsize of school according to factors of existing buildings,population distribution and the like,the following approximate school-size guideshave been used:

Elementary school - 600 Junior high school - 700 - 1,200 Senior high school ... 1,200 - 1,800 -188 Neither grade organization nor size-of-schoolguides as above should be used rigidland mechanical!infanning s.-cific buildings. There are too many variations inthe demographic characteristics ofthis large school system to permit such hard and fast standards.It is a simple mathematical truththat the farther into the future projections are made,the greater the inaccuracies.The purpose oflong-range projections, even though it isrecognized that many imponder- able and unforeseeable circumstances will occur, is toguide in making decisions closer at hand.

Long-Range Requirements to 1972

Since it must be noted that the boundarylines of the planning areas are arbitrary, inthe sense that they necessarily followedlines used by the U.S. Census and the Planning Commission and notnecessarily school attendance areas, the recommendations contained herein areapproximate and do not apply exactly to the areas described andshown on the map elsewhere in this report.

Area 1 - Old Hickory Growth.In the school population to be served approximately by this area,there should be in the next 10 yearsenough pupils to justify adding to and convertingDupont to a senior high school, grades 10-12. A preferable solution is a new seniorhigh school in this area for 1,000 to 1,400 students and converting Dupont tojunior high school use.It will be necessary to build either one new juniorhigh school of approximately 1,300 capacity ortwo junior high schools of approximately 700.One of these could be a conversionof Dupont. One new elementary school of 600capacity will be needed, as well as additions to existing elementary schools tohandle approximately 200 elementary pupils. Beyond the planning periodantadditional elementary school maybe needed.

Area II - Bluefields - Cloverhill. Two newelementary schools of approximately 650 each are suggested forthis area, plus additions of capacityfor 400 additional pupils in existingelementary schools. One new juniorhigh school to accommodate1,200 pupils also should serve, withthe conversion of Donelson to a seniorhigh school, grades 10-12, which willaccommodate the future population here. Geographic conditions mightnecessitate a 7-12 school as thesolution in this area.

Area III - Pennington - Donelson Hills.Build two new elementary schools in this area, with approximately400 capacity each. Add as required to the Margaret Allen school. Also build one newjunior high school (or two new junior high schools) to provide 1,300capacity and convert Two Rivers to asenior high school.

Area IV - Southeast Rural (Part).This area needs to be watched. The judgment of some with whom populationdevelopment has been discussed suggests

-189 that growth may be greaterthan the statistics indicate.The minimum to be antici- pated is the construction cf two newelementary schools ofapproximately 500 capacity each and addition of spacefor 400 pupils to existingelementary schools; the construction of one new juniorhigh school of approximately1,300 capacity, drawing not only upon this area,but also upon PlanningArea II; and the conver- sion of Antioch to a seniorhigh school serving, as it nowdoes, both areas IV and V.

Area V - Sevenmile CreekGrowth. Build one newelementary school of approximately 600 capacity.Add approximately 100 capacity toexisting ele- mentary buildings.Build one new junior highschool, increase capacity of McMurray and convert to juniorhigh school use. Seniorhigh school students can be handled in Antioch,Glencliff and Overton.

Area VI -- Glenbine. There are twopossible alternatives to consider here, to be pursued as moreinformation is available onthe direction of future development. One of these wouldbe to convert Glencliff HighSchool to a junior high school and build a new seniorhigh school which would serveboth areas VI and VII. Another alternativewould be to make Glencliff asenior high school and be to constructadditional junior high schoolfacilities. The alternatives should chosen on the basis of the futurepopulation distribution in the areawhen census information and land use information are moredefinite and after carefulweighing of the relative costs of the twomethods of providing facilitieshere. The elementary schools are near the expected futureenrollment in the area.

Area VII - Berry Hill-ElmHill. Elementary schools inthis area Students in may beexpected to handle ultimateelementary school population. grades 7-12 can be served inother areas.

Area VIII - East Nashville.This area may be expected tohave a facilities in terms surplus of elementary schoolfacilities and junior high school of buildings now in use. This suggests nomewconstruction, but a conversionand rehabilitation of spaces to accommodatethe changing population at variousgrade Highland levels as this comes about.For example, to usefacilities maximally, the Heights Junior High School andEastNashville Senior High Schoolshould draw from residences in PlanningArea IX. Considerationshould be given to the conver- sion of Bailey to a juniorhigh school and Meigs to ajunior high school-. and conver- ;ing East Nashville Junior tosenior high school usealong with East Senior, depending upon the population movementsin this area. Thecentral portion of replaced by the next Meigs is wood framed andprobably should be eliminated or decade. Highland Heights JuniorHigh is poorly located andeventually should be eliminated. Attendance zones forall schools in this area willundoubtedly spill over into bothPlanning Areas IX and XIV.

Area IX - Joywood-Inglewood.For reasons of efficiency, itwould be desirable to convert one ofthe junior-senior highschools in this area to a junior

7190 high school and make of theother a senior high school.The logical choice, from the standpoint of geographiclocation, for the junior highschool would be the Isaac Litton school, which is lessthan two miles from the MaplewoodHigh School in Area XII.In any event, the twoschools, the Isaac Litton complexand the Stratford school together, shouldaccommodate secondary pupils in grades7-12 with the attendance of students onthis level living near Area VIII atschools there. The decision concerning the assignmentof grades to the two secondaryschools in this area should be based upon theeducational program and convenience in serving the pupils as this programdevelops. Elementary schools inthis area should serve expectedfuture elementary schoolpopulation through grade 6.

Area X - Madison Growth.Add space for additional pupils to Neely's Bend Elementary School andthe new Monticello school.This assumes that some of theelementary pupils in the area canbe accommodated by spaceavailable in Area Xl. The secondaryschooling needs to be studied carefullyin relationship to Area XII. MadisonHigh is closely associated toelementary schools in such of 4- areas as theChadwel I and Gra-Mar zones.Some transitional combinations achieve year seniorhigh schools and 5-year highschools might be necessary to good programs efficiently.Depending upon populationdistribution, it might be necessary tomake Madison High a 9-12, 4-year seniorhigh school and Neely's Bend High a 7-8 junior highschool.

Area XlGoodlettsville. No increase in capacityis indicated for this area. The Goodlettsville HighSchool probably will need to remain as a7-12 secondary school.

Area XII - Maplewood.Elementary increases in enrollment canbe accommodated by adding space for 300pupils to existing elementaryschools and rezoning to accommodate anadditional 200. The secondary programin Area XII needs to be studied carefully inrelationship to Area X, with respect toMadison High School and the Neely's Bendsecondary school.If the balance between junior high school age populationand senior high school agepopulation is heavy, it may be desirable to convertMaplewood High to a junior highschool. However, its facilities have been expandedby the provision of shops forindustrial arts and vocational work so it probably shouldbe retained as a senior highschool.In this event, it would be appropriate toconsider retaining Maplewood as afour-year, 9-12 senior high school and building inthis area an intermediateschool or a 7-8 grade junior high school with capacityof about 700.If pupils on the secondary level can be accommodated insufficient numbers in adjoining areas,it might not be necessary to construct new secondaryfacilities in this area.

Area XIII - Northwest. The projectionsfor this area on the basisof assumed use of available land forresidential purposes are muchhigher than indicated by the current rate of growth. Howrapidly the area builds up cannotbe foretold. If it does build up in terms of theprojections, at least one newelementary school

-191 7L".7k Ww*Vs e .

schools in this area are at 600 capacitywill be required.All existing elementary buildings to accom- small, so if possible andif suitably located,additions to these modate as many of theincrease in elementaryschool population as necessary small, but because ofthe should be planned. Also,Joe Iton High School is too However, if geographic isolation ofthe area, it may have tocontinue to be so. high school the population distributionis such that it canproperly serve the senior approximately population, it should beincreased to a capacity of1,200 or so, or doubled in facilities. Asthe area grows, it should serve as atransitional secondary of the school, perhaps moving fromgrades 7-12 to 8.-12, to9-12 over the course should be closely related todevelopments years.Planning for this area, of course, in Areas Xl, X, XII andXIV.

Area XIV - White'sCreek. The critical school tobe watched in this of the County. area isHaynes.It now receives studentstransported from various parts be advis- With the merging of theCity and County districts,it undoubtedly would nearby secondary able to reassign the students nowtransported great distances to eliminated.It will be needed schools.In time, much or all ofHaynes should be In time a new secondary for a few years toaccommodate pupils in grades7-12. be school will be needed inthis area. Cumberlandwill undoubtedly need to schools of retained as a 7-12 secondaryschool. The equivalentof two elementary 600 capacity each wouldthen be required in this area.

Area XV - North Nashville.If projections hold truein this area, that it would be desirable to convertWharton entirely to asecondary school, so population in this area can along with North NashvilleHigh School, the secondary It mcr,- be possible tomake one of these a seniorhigh school and be accommodated. will initially one a juniorhigh school. As the areadevelops, these probably will be necessary tobuild become junior-senior highschools. With this change it the equivalent of one newelementary school at 600capacity.

Area XVI - South Nashville.This is a critical area,representing populated part of the city the central business districtand the older, densely be which is now under study by variousdepartments of Metro.Its future may indicates, expected to changeconsiderably. As anticipatedland use in the area However, at present,the rate ft in the long run, populationshould decline here. than of growth of school populationindicates that by 1972there would be more units twice as many schoolchildren, as projected in termsof available residential the one anticipated by the PlanningCommission. The situationis one in which, on whereas the long-term hand, there is continued increasein school enrollments, in objective., on the other hand,indicates that urbanrenewal and other changes children. the area will reduce thenumber of dwellings andthe number of school and every The solution here must befound by continuousstudy, year to year, children and at effort on the one hand toprovide suitablefacilities for the school facilities or the addition the same time avoid at all timesthe construction of new Anticipated to existingfacilities without a claar viewof the long-term future use.

-192 e 4

future population indkates one solution would require converting Cameron to a 7-9 junior high school, eliminating Howard, making Waverly-Belmont an ele- mentary school and retaining Rose Park as a junior high school.In this or Area XVII a new senior high school should be constructed for the central City.

Area XVII-Hadley Park.This area, too, is a part of the deter- iorating central core of the City of Nashville, the future of which is uncertain. The rate of population increase in this area, mostly non-white, would produce -- if continued to 1970 or 1980-- as many as8,000 pupils.However, in view of desired future land use a good part of this area would be redeveloped. There would be many fewer dwellings and many fewer pupils.This area has been under study by the school authorities and staff of the Planning Commission.It is quite evident that the proposed interstate highway system passing through this area will result in demolitions and removals of many sub-standard dwellings. The scope of this is hard to anticipate. A rezoning of attendance areas will be necessary year by year and every effort should be made to find temporary orportable facilities in areas whkh are clearly supporting temporary enrollment loads on facilities.Both in this area and .Orea XVI conditions are presently overcrowded,. To avoid construction of expensive buildings that might not be needed many years in advance, it might be desirable to transport some children in nearby facilities where portable or temporary arrangements are not feasible.Pearl High will ultimately need to become a 7-9 junior high school.In time, Washington can be eliminated.

Area XVIII- West End.If projections of the Planning Commission hold true on future population, it may be necessary to make West End a 7-9 junior high school. Cohn may need temporarily to move to 9-12 and maybe to 10-12.Eventually it will need to be replaced.This area is also one in which school population growth is at variance with projected total population on assump- tions of urban redevelopment and changes in dwelling units.

Area XIX-Greenhills. Property has been purchased for the con- struction of a junior high school in this area.If this comes about, it may be possible to convert both Overton and Hillsboro either to 9-12 or 10-12 senior high schools. At present, Hillsboro High is a 9-12 senior high school and Overton High a junior-senior high school, grades 7-12.In any event, the schools in this area serve populations outside of the area,which needs to be taken into account in their future. However, this planning needs to be watched to avoid, as far as possible, an excessive number of senior high schools, particularly if some wind up with small enrollments.

Area XX - Southwest.Bellevue High is a small and sub-standard school and should be scheduled for replacement.It should be replaced only as indi- cations are that enrollments will produce a school of larger size. Additions to the existing elementary school of at least capacity for 100 additional pupils and the

-193 in this area. equivalent of one newelementary schoolprobably will be required facil- Area XXI - WestMeade-Hillwood. Noadditional elementary here. However, tohandle the junior andsenior high school ities are indicated facilities for 1,600secondary population, in this area and partsof adjoining areas, junior-senior highschool, but students are needed.Hillwood should serve as a enrollments may exceed itscapacity of 1,000. in- Area XXII -Richland-Centennial. Noadditional facilities are dicated for this area. by the school system The foregoing does notinclude facilities needed community college centerand central officeadminis- for the vocational-technical, that should be planned at trative space. These are twohighly desirable facilities is of utmost importance so the earliest possible moment.The administrative center build the new system canhave that the team of centraladministrators needed to will be necessary to adequate space fortheir important work.In the meantime, it the Julia Andrews continue use of theHume-Fogg school andimprovise space in school and the existingCounty administrativebuilding.

Estimated Construction-Costs

Assuming construction costs per squarefoot only moderatelyhigher somewhat higher than have been experiencedin the 'past inthe area, anticipating design over the quality of constructio.nand more efficiencyin planning and of classrooms is period between nowand 1972, theadditional construction and modernization areestimated estimated to amountto.$47,000,000. Remodeling buildings is estimated additional $9,600,000.Site acquisition for new to cost an college center at $1,125,000. Allowing for avocational-echnical and junior at estimated total cost $3,500,000 and $1,200,000for an administrativecenter, the of these facilities willbe $62,425,000. contemplated and could This construction is overand above that now Construction would have tobe completed not be authorizedbefore the year 1964-65. be completed.This means and bonds issued by1971 in order forthe facilities all to be that there exists only a seven- oreight-year period forthis construction to therefore, of over completed. This means an averageannual ca ital outla , $8,000,000.

In view of the factthat there are criticalshortages, serious overcrowding junior college center and needs for suchfacilities as thevocational-technical and in order to permit asmooth development ofthe new and the administrative center, ahead for capital educational system, large sums areneeded in the immediate years studies of improvements. These sumsshould be justified onthe basis of thorough

-194 immediate conditions as they relate to long-range plans such as this andthe one pre- pared by the Planning Commission brought up to date.

The foregoing isnot beyond the capabilities of the areaand is not greatly in excess of the sums which have been contemplatedby the two districts combined in recent years. Some of the estimates above, which areadmittedly gross, may be offsetby properties to be sold on which schools now located are tobe abandoned.

Recommendations

What follows supplements specific observations and recommendations in Chapter XII concerning quality of educationalfacilities in the two school systems which should be taken into account in future schoolplanning.

1. Adequate research staff should be added to the administrative structure of the new system to work withinstructional staff, operation and maintenance staff, the Metropolitan Planning Commission and others to provide acontinuous review of future requirements of schoolyopulations.Special studies in critical areas should be undertaken, including spot school census studies andschool population density studies where necessary. School information thusassembled is useful to the Planning Commission and the other Metropolitan agencies and this typeof work should be conducted in close cooperation with agencies thus concerned.

2. There should be a full-time, properly qualified, building con- struction staff in a division se orate from the o erationand maintenance division. This staff should have engineering background and be freedfull-time to work con- tinuously with architects, contractors and other schooladministrators and to super- vise construction and control and schedule constructionprojects. A construction oper- ation of $8,000,000 a year or more can benefitconsiderably from a full-time, competent staff.This staff should have responsibility for maintainingcomplete and up-to-date inventories of available spaces and acomplete file of drawings, cost records, educational requirements,specifications and similar information of basic record.It should not be necessary for the PlanningCommission to prepare inventories of educational spaces.

3. There should be formally establishedthrough Metropolitan Government a site acquisition committee, consisting of appropriatedesignated staff from the Planning Commission and agenciesresponsible for public works and recreation, tis well as the Board of Education, for purposesof recommending future schools and their locations to the Board of Education.A clearly-defined set of working relationships should govern the work of this committee sothat its functions and the responsibility of participating representatives areclear. The Board of Education must be assured that the resources and pertinentconsiderations of agencies

-195 of Metropolitan Government arefully taken into account by somesuch formal pro- cedure. However, regardlessof such review and approvalauthority as may be vested by the Mayor or theCouncil in such agencies asthe Planning Commission, resnsibility for planning neededfacilities, maintaining inventoriesof sacss and ro'ection of enrollments inneighborhoods and reparation of caital budgets Agencies such as the for the school system must restwith the Board of Education. Planning Commission should befully utilized in this process,but should not be responsible for location of futureschool facilities or determinationof need for such facilities.

4. In futurelannin the construction of rts of schoolsshould be minimized as much as possible.All buildings should beplanned for expansibility, but planning should attempt toavoid additions of wingsyear-by-year. Incomplete buildings are makeshift and provide pooreducational environment. Rezoningand temporary transportation in someinstances would result in betterschool housing, less cost and confusion andbetter-planned, long-range facilities.

5. In future planning, uncertainty mustbe anticipated. There will continut. to be neighborhoods inthe community for which decisionsabout facilities will depend uponunforeseeable circumstances -- withregard to both amounts and kinds of spaceneeded in advance of the time aschool population and better than ignoring aneducational program are there.Planning for the unknown is the fact that there is uncertainty.Flexibility in planning can be achievedin a number of ways, for example:

a. Have good portable classroomsfor rapidly changing areas. Some portable classrooms in some partsof the school district will continue to be needed asthey have been needed in the past.This is therefore a more or less permanentsituation and justifies investment inquality facilities of this type, not sub-standard facilities as now inexistence.

b. Use temporary facilities as alast resort.These are costly, since suitable temporarybuildings are not inexpensive and may, over along period of time, actually cost more.

c. Plan adaptable facilities.For example, many highschools and junior-senior-ragh schools are belowrequirements for senior high school use, but can beconverted to junior high school use.Secondary school buildings maybe planned, as in the past, for transitional usefrom 7-12 to 9-12 to 10;12, etc.

cl. Provide temporary convertiblefacilities.Schools in areas likely to have declining populationsdue to urban redevelopment and so forth could be temporarilyhoused in sound and educationally 77-471,-1

suitable structures designed ultimately for usefor light industry, commercial, office, community center, recreation orother purposes. Thiswould be less costly in the long run than temporary schools as such.Temporary use of dwellings in rapidly growing housing developments hasbeen used success- fully in some school systems. BUSINESS MANAGEMENT

Business administration is not only concernedwith safeguarding and accounting public monies in thebest interest of all taxpayers, but it pervades all the educational objectives, goals and activitiesof a school system. Therefore, business administration and other educational operations areinevitably interwoven and interlocked, especially in such areasof the school budget as purchasing of supplies and equipment, maintenance and operationof school buildings and the development of plans and specifications forschool buildings.Planning construc- tion of new buildings is discussedelsewhere in this report.

The school business procedures, recordsand accounting must be set up andmaintained not only so that they areunderstood by various specialists such as accountants,but also so that they are understoodby teachers, school staff, the Board of Education and the generalpublic.

Accounting and Financial Reporting

School accounting and financial reportinghelp determine short- and long-range planning for school systems. Therefore,financial accounting should be designed to serve as a basis for bothadministrative decisions and control of re- ceipts and expenditures.

Both the City and County school systems usethe accounting system set up by the Tennessee StateDepartment of Education. This is anexcellent fi- nancial accounting and reporting, structure.Both systems should therefore be able to combine their accounts with aminimum of modification. The accounts inboth systems include accountsreceivable, accounts payable, budgetcontrol, expendi- ture distribution and payrolls.The major difference.between themlies in the fact that each system has a different accountingmachine, which makes for somedifferent reporting practices.

The Nashville City district uses anN.C.R. accounting machine for all posting, checkwriting and payrolls exceptfor internal cafeteria accounts. A similar, smaller N.C.R. machine is used forall cafeteria record keeping.

The Davidson .County system uses twoBurroughs accounting machines for its financial transactions, with theexception of the cafeterici operations,which are entirelyhandled by individual local schools. of work and In the County systemthere has been some duplication of record keeping, since theCounty government alsokeeps a separate account all school financial transactions.In fact, the main accountbooks and records continued have been kept at the CourtHouse. This practice,however, will not be under the new Metro Charter.

In no small measure,the success of the newschool system will depend The development of amodern, upon theeffectiveness of its financial management. $30,000,000 opera- efficient accounting system commensuratewith the scope of a In fact, Hon must be one of thefirst projects to be undertakenby the new system. preparation o steps shou d initiated during t e year 163-64 to imp ement t e aconsolidated and well-justified1964-65 school budget.

Since the school system is a partof Metro Government,accounting require- must conform both tothe requirements of schoolfinance practices and to be headed ments of publicadministration. A Division ofAccounting and Finance to by a Director qualified inmodern accounting methods isrecommended.

A school system as large asthe new Metro system canbenefit greatly by establishing a data processingcenter. Most reportsrequired by the State and installation. other agencies couldeasily be programmed in agood data processing well adapted for machine ac- The State of Tennesseeschool accounting system is counting and data processing.By adequately programmingall financial reports, information can easily manymanual operations can beminimized and requests for data be filled. The new systemcould well benefit frommaterial developed on programmed processing by the Memphis,Tennessee school system.This district has its entire business operationfor data processing.

In developing its accountingoperation the MetroSchool System should take into considerationthe following: -Encumbrance reporting as set upin the AccountingManual for Tennessee PublicSchool Systems.

-An inventory of property tobe taken at least once a year and kept in subsidiaryrecords.

-Provision for budgetarycontrol for all receipts andexpenditures.

-Monthly financial statements tothe Board of Education, and to each Division orDepartment of the school system, detailed enough to show majorcategory expenditures, en- cumbrances and balances, amongother budgetary information.

-Major category accounts toreflect (among otherfunctions) costs for Elementary,Junior High and HighSchool classifications. -199 -A general financial statement and report,prepared yearly, to show the fiscalconditions of all budgetary accounts, combined and redistributed in various ways topermit ex- tensive analysis.

-A periodic audit by an independentaccounting agency. -Sufficient flexibility-to permit costaccounting, trend studies, projections of costs andanalyses of expenditures by various functions and objects.

Purchasing and Supply Management

Detailed policies and procedures mustbe set up to control the large operation in the new Metro SchoolSystem. The new Metro Charterspecifies that the Board of Education establishprocedures, rules and regulations"concerning purchasing, including the establishmentand enforcement of standardspecifica- tions for all supplies, materialsand equipment..." needed to operatethe school system. The Charterspecifically. states that competitivebids are to be obtained for expenditures of $1,000 or more.The regulations are in keepingwith sound fiscal governmental operation.

Present Practices. The two school systems now procuretheir supplies in different, yet similar ways.The Nashville City district hasstandard lists of items and equipment which arerequisitioned from the teacher tothe principal, to the department heads, who writethe specifications, to the AssistantSuperintendent, who checks all specifications andsends them out for bid. Whenbids are received, the various department heads(with the Assistant Superintendent'sapproval) recom- mend to the Board of Education items tobe purchased. A similar operationis fol- lowed by the Director of Plant inprocuring maintenance and operationsupplies and equipment.If an item requisitioned is lessthan. $100, the AssistantSuperintendent obtains three prices from vendors andawards the items to the vendorquoting the lowest price as specified.

The Davidson County districthas followed a similar pattern, except that all purchases and bids arereceived and awarded by theCounty purchasing agent, who usuallyrecommends awards as proposedby the Assistant Superintendent of Schools and the various schoolsupervisors.

Recommendations. The followingconsiderations should be taken into account in establishingbusiness management operationsfor the new Metro School System:

-A Division of Purchasing andSupply should be established

-200 of the AssociateSuper- under theimmediate supervision Director serving intendent, BusinessAffairs, and with a for the school system. aspurchasing agent lists should beprepared Standard supplyand equipment - acceptable and kept upby methods whichwill assure standards ofquality. written in detail, or amanu- Specifications forbid should be - minimum acceptable facturer's numbershould be listed as a standard. be made to -A list of duedates for allrequisitions should allow foroff-season buying. account for inventory recordshould be kept to -A financial and expendi- department'sbudgetary allotments each school their financial that administrators canbe assisted in tures so that management and sothat it can readilybe determined within policy supplies andequipment arebeing purchased and budgetlimitations.

control should beimplemented. in order -Supply management the following to have abetter basis onwhich to purchase year's supplies . established for allpurchases Written proceduresshould be - include explanations and supply management.These would and used. as tohow a requisitionis initiated Affairs, shouldbe -The AssociateSuperintendent, Business awarding bidsunder $1,000. delegated theresponsibility of receipt of goods. -Payment forsupplies shouldbe made upon and advantage canbe This builds goodwill with vendors taken of early-paymentdiscounts. be set up to testthe quality of -A testinglaboratory should items submittedby bidders.

inspection ofschools, storeroomsand classrooms -A periodic needs and to assist should be made todetermine additional personnel in using newequipment andsupplies. whole year, totake -Purchases should bemade during the

-201 advantage of market buying and toallow the purchasing department to spread its workload over a12-month period.

-Plans should be developed for centralwarehousing. The warehouse should be located near arailroad, to take advan- tage of car load buying,and have ample provision for truck loading and unloading.

-Provisions for cold storage should be set up tohandle perish- able items.

-A running inventory of all itemsshould be kept by means of modern electronic data processing equipment.

The purchasing and supply management programshould assure quality, economy,reliability and service for all items procured.The primary goal of the program shouldbe in terms of the educational service itwill afford the children of fie school system and the manner inwhich tools and equipment willenhance the effiCiency of theecrucational process.

School Insurance

At present both Nashville City andDavidson County have adequate insurance for buildings and their contents.

Existing Practice. The City districthas a three-year policy schedule of fire insuraicTIDased on 100 percent coverage.Most of the policies are written with stock companies. The question as towhich agent will receive a new policyhas in the past been determinedby the Board of Education, with someguidance from the Mayor's office. The City districthas approximately 250different policies.In the case of claims under $2,000, theGeneral Adjustment Bureau handlesadjustment. Any claims over this amount could meanthat the school system would receivechecks from 50 or more policy writers. Allschool employees are coveredby a blanket bond in the amount of $2,500 and theTreasurer is covered by a$10,000 surety bond.

The Davidson County insurance coverageis handled by an insurance consultant employed by the QuarterlyCourt. The school system reports new equipment and buildings to theconsultant. The school system hasfire insurance policies on buildings based on 90 percentco-insurance and written for afive-year period. Records of insurance are keptby the County government and copies are kept by the school business department.

Recommendations. Consideration by theMetro Board of Education should be given to the following points: -All policies should be writtenfor a five-year period to obtain the lowest possible rates.

-A register should be made upfor both the City and the County districts showing the nameof the insuring company, agent, policy number, amountof insurance, type, rate per thousand, amount of premium, term,dates of coverage and expiration dates.

-An appraisal of buildings andequipment should be madeby a competentand qualified appraisal company. .This ap- praisal should be kept up to date sothat factual information will be readily available to supportpossible claims.

-The Board of Education must setpolicy in determining de- sired protection and methods ofallocating insurance poli- cies. Thought should be given tobidding insurance policies.

-One person should be in chargeof all insurance, among other responsibilities, with majorduties to see that policies are kept up todate and that insurance is writtenaccording to school Board policy.

-All new buildings should be reviewedby an underwriter in determining lowest insurance rates.

Ample surety coverage should be given(under a blanket bond) to all employees who deal withfinancial responsibil- ities of the5:school system.

-In selecting insurance companies,consideration-should be given to policy rating, net resourcesof a company, reputa- tion and claim services, for eitherstock or mutual companies.

-A school system as large asMetro should consider the possi- bilities of a self-insurance program.Either an insurance re- serve plan or apartial insurance plan could havesound value to the Metro district.This type of plow has saved many large school districts large sums of money over aperiod of years.

.Plant Operation

Plant operation refers to those day-to-dayservices required to keep educational purposes.These services schools open andusable for their intended grounds, minor ad- include dailyhousekeeping, operationof utilities, care of safety, sanitary justments and repairsand other servicesthat are essential for The maintenance conditions and comfortof those who occupythe school facilities. effect upon the physicaluseful life of a and operational programhas considerable keep school plants neat,clean, school plant.It is a goodfinancial investment to sanitary and in topoperating condition . spending about $28 As of 1962-63 theNashville City system was $20 per for operation ofplant and the DavidsonCounty system about per pupil United States, but This averages aboutthe same as schoolsin the Southeast pupil. is.corifirmed considerably less than thenational average forlarge city systems. This budget figures and useof the Cost of by statistical computationsbased on 1962-63 1963. Education. Index publishedin SchoolManagement in January, County In view of thegenerally unsuitablecondition of the Davidson but also from the stand- buildings, not only fromthe standpoint ofi appearance, view of the factthat point of desirablephysical environmentfor learning, and in meeting acceptablestandards, the Nashville City systemprovides custodial service that the new Metrodistrict develop a programof bringing opera- .it is recommended City district. tion:of plant up tothe standards alreadyexisting in the-Nashville

Altliough there may be someeconomies as the plantoperation man- although economies may agements of the twosystems arecompletely merged, and (in-service be expected.fromcontinually developingplant operation programs methods to reduce introduction.of newmaterials, equipment and training, the justification.for a reduction,in labor costs, etc.), theconsultants do not foresee experienced in the Cityof Nashville. total expenditure underthe level now Observations which follow supportthis conclusion:.

Present Practices.Generally, thoughsomewhat under-staffed, quite well and the Nashville district'splant operation. ismanaged and operated buildings, with minorexceptions, are clean,sanitary and conducive its school staff a learning situation. TheCity system hasthis year added to its to a good each week. Supervisor of Custodianswho makes routinechecks on each building the standards ofcleanliness within This has evidentlybeen effective in raising school buildings. standards of managementof The practice meetsgenerally accepted school buildings is a plant operation. Theformula used forcustodial staffing of Federal, State andprofessional good "factoring formula"recommended by many allows for each school onecustodian (or fraction agencies.In brief, this formula for each 10 acres ofground, thereof) for each 1,225pupils enrolled, plus one and one for each plus one for each40,teachers, plus one foreach 55 classrooms be continued and 75,000 square feet offloor area. This levelof service should

-204 extended throughout the new Metropolitan system including particularly older buildings and those with coal furnaces.

The Nashville district now has the following custodial staff:

9 Senior High School Custodians 40 School Custodians I 7 F iremen 65 Custodial Worker's II 7 Custodial Workers II, part-time extras 29 Maids 5 Maids, part-time 156 Total, including part-time as one-half

The equipment and supplies being used in the City are generally adequate and of good quality, except that more floor scrubbing and wet-dry vacuum cleaner machines could be used togood advantage.

The County distrkt plant operation differs markedly from that of the City district. The local school principal is responsible for assigning duties and work loads to the school custodian. There seems .to be little or no supervision from the County central administrative staff.This is understandable, since the central administration.itself is under-staffed. The local school plants, with varied exceptions, are poorly kept, poorly cleaned and a handicap for the educational program. This problem is mainly due to a very unfavorablecustodial-employee-plant ratio. A sample study of custodial service in County schools indicates that there would need to be about double the number of custodial employees in the County to come up ti) .the City district standards.

For 91 schools in the County there are only 129 school custodians. They are assigned work loads which by acceptable standards are most unreasonable. Individual work loads of 40,000 to 70,000 square feet of cleaning, plus care of coal furnaces, are not uncommon. In order to do aminimum of cleaning, these custodians work from 10 to 15 hours a day plus Saturdays and Sundays. Many use their families to assist in daily housekeeping of the school buildings.This is evi- dent in Table 37, which is based on reports from 107 County school custodians. Daily work load varies from nine to 15 hours; the average is 11.5 hours worked. In addition, it should be noted that no extra compensation is given for overtime work, Saturday or Sunday work, or for assistance by the custodian's family.

It is to be noted that some custodians in the County receive housing in school grounds, so that salaries in the County as shown in budget data do not indicate the full salary equivalent. Nevertheless, custodian salaries in the County -- even considering this -- arelow. This, combined with the fact that there are too few of these employees,explains the magnitude of the deficiency in County

-205 TABLE 37

AVERAGE DAILY HOURSWORKED

BY DAVIDSONCOUNTY SCHOOLCUSTODIANS

MARCH 1963

Hours Number of 1 worked custodians ..11...... m...ww.

9 1

10 23

11 33

12 32

13 13

14 4

15 1

TOTAL 107

IMMINIIMIN

1 In addition, 68 custodians worked onSaturdays and 47 on Sundays outof the 107 respondents.Thirty-five custodians responded yes tothe question: "Do you have family help?" custodial services. schools toilet roomsand The survey teamfound in many County floors, undustedclassrooms, un- dressing rooms reekingwith bad odor, unswept yards and many otherevidences of poorhousekeeping, unsan- sightly and cluttered equipment itary conditions andundesirable environmentfor learning. Custodial schools visited andcustodial storage is and supplies arebarely adequate in most generally lacking. the standards ofschool plant Recommendations.In order to raise Metro system, thefollowing operation and toallow for a smoothtransition to the recommendations are made:

-The school plantoperation programsof the two former systems ackninistration at should be consolidatedunder one central supervision and manage- the earliest possibledate, under the maintaining a single ment of aCompetent head, td assure plant operationstandard throughoutthe Metro system . working as rapidly as pos- A program shouldbe developed for - operation program sible toward adequatestaffing of the plant City school formula or for all schools accordingto the former anyother acceptablestandard. equalized for the -Salaries of operationalemployees should be City and Countyand maintained at alevel which will attract men ofgood mechanicalability. training for all -An intensive andcomprehensive in-service custodial personnelshould be established on asystem-wide handle minor basis. School custodiansshould be trained to maintenance problems amongtheir other duties(such as re- placement of windowsand lights). of plant op- -Approved proceduresfor efficient management eration shouldbe instituted, includingthe provision of custodians with a written workschedules for all school detailed list of daily,weekly, monthly andyearly opera- work loads among tional requirements,plus equally divided the various employees. custodian in eachschool Provision should bemade for a head - and building to beresponsible for the operationof the plant maintaining highstandards of cleanliness.

-207 -Provision should be made for adequate supervision ofall school plants by supervising custodians andother central office administrators.

-Adequate supplies and cleaning equipment ofhigh quality should be provided.

-A manual should be prepared describingpolicies, standards of operation, duties and pertinent information asrelated to a particular building foreaCh custodian.

Plant Maintenance

The types of building maintenance required aregenerally classified into the following three categories:

1. A long-range preventative programwhich includes renovation, remodeling and rehabilitation -- e.g., adistrict painting program, replacementof flooring and replacement of boilers, among other majorprojects.

2. Annual safety and preventative programwhich includes such items as annual boiler cleaningand inspection, replacement of venetian. blinds and shades,patching of roads, etc.

3. An emergency or unanticipatedmaintenance program which is for the purpose of taking careof repairs needing immediate attention, such as a waterbreak, leaking roof, repair of windows, etc.

The problem of pkint maintenancebegins as soon as the Board of Edu- cation approves plans for a newbuilding.

There are several rules of thumb which canbe used in budgeting suf- ficient money for the maintenance program.One generally accepted standard is that five percent of the total currentexpenditure budget should be earmarkedfor maintenance. A second way of arriving at anestimated maintenance expenditure is that one to two percent of currentreplacement costs of buildings shouldbe put in the maintenance budget.It is difficult to determinegenerally the exact figure to budget for maintenance. However, aclose approximation can be givenby careful inspection of all buildings plus a studyof past experience of major maintenance costs, translated into long-rangeand annual budget figures. Viewedfrom various points of vantage, it is the judgment ofthe survey staff that maintenanceservices-.of

-208 the two systems combined fall short of acceptable criteria, largely because of in- sufficient funds.In fact, the County system is really spending still les:: than finan- cial reports show, since approximately 10 employees are spending a major share of their time making new furniture.

The consultants found that many school buildings need such major repairs as complete roof renovation, planting of site and grounds, grading and blacktopping, replacement of foundations due to termite conditions and major restorations.

Existing Practices. According to the City school budget, there are 33 maintenance employees who work as electricians, carpenters, plumbers, painters, heating engineers, pipefitters, etc. Although major rehabilitation and renovation in the City is done by private contractors, the maintenance employees do an excellent job of upkeep in the schools.

Some of the types of equipment for which repair and maintenance work are performed by the City staff include: projectors, radios, public address systems, all stokers, motors, pumps, clock systems, lawnmowers, furniture, glass and fluorescent fixtures, .Minor remodeling and painting are also done. The men employed to do maintenance work are well qualified and show a responsibility for their work. Excellent records for all jobs are kept showing type of work com- pleted, work time and project description. The maintenance shop has adequate tools and equipment to handle most required jobs. The policy of the City district to have major maintenance work done by private contractors seems to work quite satisfactorily..

Improvements in the City maintenance work would result from: keeping a cost inventory of each school; recording on a large chart the whereabouts of all maintenance employees so that in emergencies they can be located quickly; and inspections by the maintenance supervisor and the school principal of main" tenance conditions each year.

In Davidson County, the supervisor of maintenance is responsible for 88 employees (some of whom are temporary) who maintain 91 school plants and 35 vehicles and make a major portion of school furniture, among other tasks.During the summer months more employees are added to help paint the school buildings. The County has 14 carpenters, eight plumbers, six electricians and 10 painters, plus roofers, block layers, plasterers, glaziers, mechanics and laborers.

The maintenance staff does all of the minor repairing of school buildings, plus some major rehabilitation. A good share of the summer work for these employees includes the moving and erecting of portable buildings, repairing and cleaning of heating plants, repairing of plumbing, etc.

-209 There is no planned inspection ofbuildings in determining mainte- nance work requiredfor the ensuing year. However,informal checks are made by the supervisor of maintenance.

In general, the County MaintenanceDepartment is run quite effi- ciently.However, more efficient operationis possible, particularly with reference to the following:

-The making of furniture is an expensive arrangementfor the quality of product. A study should bemade to determine the desirability of continuing this work.

-The arrangement whereby all employeespunch a time card in the central maintenanceshop means as many as two hours a daylost due to travel time for employees.

-The whereabouts during the day ofemployees are often not known in the central office and notreadily determined.

-More supervision is necessary to assurequality of work.

-Many of the maintenance men arewell-qualified in their particular trade. However, there are too manyunskilled and untrained maintenance.employees onthe payroll. The situation should be remedied.

Recommendations. The following observations ofthe survey staff should be helpful in setting the course ofthe maintenance program of the new Metro School System.

-A major difficulty in attractingqualified maintenance em- ployees is matching the competitive pay scalesof private industry. A maintenance program is only as good asits employees. Therefore, the Board of Education,should raise the wage scale to make possible the hiringof capable and qualified personnel.The organization of school plant main- tenance should be under aDirector of Operation and Main- tenance, with one person incharge of all maintenance and one in charge ofall operations.

-The ratio of supervision to maintenanceemplo, ees depends on the variousfunctions of trades. A rule of thumb which can be used is asfollows: 5 - 8 Supervisors report to one director 5 - 10 Craftsmen report to one foreman

-210 10 - 15 Semi-skilled craftsmen report to one foreman 10 - 20 Laborers report to one work foreman

It should be noted that in many situationsthe foreman might also be the master craftsman andwould do his share of work.

- Thelabor market being what it is in DavidsonCounty, it would seem feasible and economicalfor the Board of Education to adopt a policy of having a majorshare of all the main- tenance work performed by school systememployees. This would mean employing and staffing in areasof painting, masonry,plumbing, pipefitting, electricity, carpentry, heating and ventilation, glazing, landscapingand ground work, general mechanical work and others asneeded.

-The maintenance shop should be centrallylocated, with the essential equipment for performing maintenanceservice and with several smaller shops located in strategicgeographic areas. Withadequate supervision, it should not be necessary for employees to come each day to a centralshop. Instead, they could receive a weekly work load and report to aplace of assignment, with the foremen beingresponsible for seeing that adequate tools and materials are availableand that a time schedule is kept.

- Inprogramming maintenance on a long-rangebasis, yearly, periodical and emergency requests shouldbe considered. Each school should be inspected by the supervisorof mainte- nance, the schoolprincipal and other personnel andestimated costs should be listed with priorityratings assigned to each need. This will allow periodic planning for along-term maintenance program for each school .

-A master schedule of yearly maintenance requirements should be established and work should becompleted before the start of a new year (e.g., boil& cleaning,light replace- ment, care of specializedmechanical equipment, replacing of furniture).

-Vehicles which are to be used by maintenancepersonnel should have two-way radio communications systemsinstalled. This is important for several reasons.It saves time in emer- gencies and if additional equipment isneeded it can be called forimmediately.

-211 -Under coordination of the Associate Superintendent, Business Affairs, the Division of School Plant Operation and Main- tenance and other divisions under his direction should make cost studies showing variations of cost of custodial and main- tenance services in relation to variations in structural features of school buildings. The objective of this is to feed back into school plant planning of new buildings information which will avoid false economies through use of inferior grades of finishes, mechanical systems and the like and inadequate provision of conveniences needed to simplify custodial services and reduce the volume of repairs and maintenance.

Pupil Transportation

Transportation of school children is the means by which small, costly and ineffective schools can be replaced in sparsely populated areas by larger school units equipped with staff and facilities to offer a full range of educational services to children and youth. Children remote from their schools are denied aneducation- al opportunity if a safe and convenient method of getting them to school is not provided.

Scope of Transportation at Present.In densely populated areas, such as in most of the City of Nashville, it isgenerally possible to locate schools of economical size within walking distance of pupils' homes. Oh ly in the case of special schools serving pupils or students whose homes are widely distributed in a city is transportation necessary in such areas.

Free public transportation in the Nashville City system has been pro- vided only for handicapped children. This has been in keeping with practices in Tennessee,which does not encourage transportation by allocation of State aid for transportation to cities. Under the new Metro School System it is assumed that transportafion where necessary, either in the former City limits or elsewhere, will be provided under a uniform policy.In the budget request for the City schools for 1963-64, $120,000 has been included for transporting approximately 4,000 children in the City area.

During the 1961-62 fiscal school year, 25,110 pupils were enrolled for transportation in Davidson County. This is approximately 50 percent of all pupils enrolled in the County school system.The policy of the County has been to provide transportafion to those students living one and one-quarter miles from the nearest school .State aid is given to those pupils living one and one-half miles from the nearett school.It is most common practice throughout the State and country to transport children living less than a mile and a half from the nearestschool.

-212 To provide transportation servicesthe County contracts for transporting most of the handicappedchildren and operates 106 buses for regular runs, seven spares and three reserves,for a total of 116 district-ownedvehicles.Inspection of these buses indicates that they meetState specifications and the late vintage buses go beyond State standards.

The seating capacity of the buses rangesfrom 62 to 82. The age of the buses ranges from vehicles manufacturedin 1947 to those made in 1963.Through good planning and staggered school opening,each regular bus runs three to four trips. The average that each bus transportsdaily is approximately 210 pupils. This is obviously a high utilization ofbuses and is possible only by using thelarge capacity vehicles. The bus fleet coversapproximately 8,500 miles daily and 1,500,000 miles per year. This averagesabout 80 miles per bus daily. The range is from 26 to 175 miles for a sampleof 78 buses.

With normal pick-ups a school bus can cover20 miles in an hour. In scheduling of bus routes, the maximumtime a student spends riding on abus should, under normal conditions,be less than 35 minutes. Thirteen of 78sample bus runs are longer than 35 minutes.However, 83 percent of the runs areless than a half hour from pick-up toarrival at school and the school systemshould be commended for this practice. Aneffort should be made that all bus runsbe less than 35 minutes in future scheduling.

Educational field trips are recognized as avaluable function of the learning process. Arrangements to go onfield trips can be made by requesting a bus through normal channels. A $5 feefor the driver has to be paid bythe class or classes requestingthe bus.

Quality of Service.. The qualityof service of the County transpor- tation system is high.Buses beyond the one-and-one-quartermile !imit stop as frequently as 600 feet from stop to stop.Most students ride less than onehour on the buses.

The management of the buses isperformed by a Supervisor of Transpor- tation, whose main functions are to routebuses, handle all grievances, supervise the bus operation and maintenance,fill out the multiple State and localforms, keep records, write specifications forbiddfng supplies and equipment andcontrol the transportation budget. Othertransportation employees are: an assistant supervisor, who is in charge of themaintenance of the bus fleet, abus garage foreman, a storeroom clerk, a gasdistributor operator, seven bus mechanics,106 drivers and approximately 19 substitutedrivers, plus one part-time secretarywho is shared with the school lunch operation.

All bus drivers are required to attend athree-day, in-service workshop in the late summer and one dayduring the spring vacation. Newdrivers, as well

-213 as driverswho are assigned new routes, are required tomake several dry runs with their buses on their particular assigned routebefore school opens.

District-Owned Buses.All buses are maintained inthe district-owned bus garage. During the school year theschedule calls for monthly preventative maintenance checks for all vehicles. Thisincludes a lubrication, brakeand tire adjustment, etc. Most buses are based either onschool grounds or near thedriver's place of residence.

During the summer months buses areclecined, painted and given major repairs. The magnitude of the summerwork can be illustrated by thefact that during the summer of 1962,35 buses werepainted.

During the school year buses receivetheir gasoline supply through a tank truck which meets a particular bus at apredetermined place, usually at a school.

New vehicles are pusher-type transitbuses with seating capacityof 79 pupils. The chassis.and bodies arebid separately. The specifications areclear and detailed. With better methods ofrouting and more pupils to transportthe trend nationally is towards using transit-typebuses, because larger and fewervehicles will transport pupils more efficientlyand economically. However,although the larger capacity buses which are beingpurchased by the school district areof sound economic value in the operation ofthe transportation system, smallercapacity buses could, under present routing, alsobe used to good advantage. They areless costly in initial purchase, less costly to operate,easier to manage andwill pro- vide sufficient seating capacity forapproximately 20 percent of the present routes. Gasoline is bid every three months, thusgiving local vendors an opportunity to bid three or four times a year on this majoritem.

Insurance for buses is carried in the amountof $10,000 property damage, $200,000 individual liability,and $1,000,000 total liability.This coverage isbeyond the State required minimum andthe Davidson County school district should be commended for carryinginsurance which is in keepingwith present-day requirements.

Bus Routing. School bus routing isperformed by the Super Visorof Transportation and this is a full-time summerjob for him. He knows every route and new area in the County and from memory,with the aid of a large map,writes up allthe new routes. He does anexceptionally good job of routing.The only major criticism the survey team couldfind with this method of routing wasthat no single map or several maps had bus routeslocated.In other words, there was not a record, exceptin the mind of a most capableSupervisor of Transportation.

There are many good ways of routingbuses. One way is to have a

-214 spot map showing thelocation of students and routingaccording to school location. A second method is to outline ageographic area beyond the oneand one-quarter mile and route by havingoverlays on a map. A thirdmethod is to have an aerial photograph of the County made upinto a single mosaic, whichis then outlined by within a a grid system.Routing could be based onthe number of students living particular grid point, afterlocation of all possible transportingroads. This system could be utilized with dataprocessing by locating eachpupil by a grid number, and each run in each areacould be located and couldbe routed by grid number stops.

Personnel.Bus drivers are required tohave annual physicals and full after the age of 55 twophysicals are required. Theschool bus drivers have responsibility for children ridingtheir buses and are authorized tosuspend students transported on school busestemporarily for a discipline orsafety violation. The bus drivers work closelywith the local schoolprincipals in disciplinary cases During the and a generally good relationshiphas been built up over the years. last seven years it has beendifficult to obtain driversof the high caliber that consideration should be given to the school system wouldlike to employ. Some buses, espe- womendrivers, since many housewivescould well qualify to drive cially since the new vehicleshave power steering, powerbrakes and automatic transmission.

Bus drivers are paid$197 to $255 per month andsubstitute drivers of some of the are paid$9 per day. There isconsiderable concern on the part drivers relative to the payschedule and amount of supervision.This is a matter which should be looked intofurther.

Bus drivers work, on the average,four hours and 50 minutesfrom hogs the time they leave home tothe final parking of thebus. The number of worked ranges from three hoursand 20 minutes to a maximumof seven hours. Yet the pay scale for all drivers isthe same.In remuneration of busdrivers, consid- be eration must be givenfor hours worked, if afair compensation plan is to initiated.It is grossly unfair for abus driver who drivesfor seven hours and a works distance of over 140 miles tobe paid a salary equal tothat of a driver who only three or four hours andwho drives less than 40miles a day. A change in . and the present pay scheduleshould consider a basicschedule for all drivers additional compensation for thosedrivers who workadditional hours. available on Transportation Costs.Definitive information was not in evaluating return in transpor- costs perpupil-mile or similar measures useful record tation service per dollar spent.On a cost per pupilbasis, however, the school shown in Table 38 is tobe considered well withinthe range of reasonable transportation costs forcomparable school districts.This is attributable in part and in part to the neces- to a commendablyoperated and well-managed program standards of condition of sity in some respects tofollow too closely minimum

-215 TABLE 38

PUPIL TRANSPORTATION

IN DAVIDSON COUNTY,TENNESSEE

1957-63

Average no. Per pupil cost Per pupil cost Total number Total cost of pupils of pupils of transportation of transportation of based on based on average enrol led for transported transportation transportation daily enrollment no. transported

1957-58 19,105 16,106 $388,273.56 $20.32 $24.26

23.22 1958-59 20,641 . 17,866 414,854.56 20.10

1959-60 22,755 19,837 463,524.59 20.37 23.37

1960-61 24,287 21,233 595,243.37 24.51 28.03

1961-62 25,110 21,917 658,564.40 26.23 30.05

1962-63 26,500* 22,042* 652,600.00* 24.63* 29.61*

* Estimated equipment and pupil load tocapacity ratios.

Since 1954 the number ofpupils transported in the Countyhas increased by 63 percent. Duringthe same period, costs ofoperating buses, maintenance, gas, oil, etc.have risen only 57 percent.Expenditures for equipment replacementand purchase of new equipmenthave not kept pace in cost with the increase inpupils transported. The majoritem reflecting increases is cost of drivers' salaries -- a95 percent increase since1954. This increase is a combination of additions ofdrivers and increases in payscales.

The County transportation systemwilrhave to serve as thenucleus 26 buses which have of the new Metro schooldistrict's system. There are now been in service for over 12 yearsand now or soon willreach a condition requiring about eight replacement. Since 1950,the County system hasadded an average of buses per year. This has notbeen a sufficient number toaccommodate replacements should plan needed and additions for new routes.Therefore, the new Metro system to main- to replace busesduring the next 10 years atthe rate of about 10 per year purchased in recent years. tain a fleet up to standardsof the newer equipment

This will cost in theneighborhood of $150,000 per yearat present been only about price levels.In recent years, fundsfor purchase of buses have two-thirds this level .In addition, newbuses will be required toaccommodate both purposes, replacementof vehicles and purchaseof increased enrollment. For will for new routes, outlaysof between $210,000and $240,000 per year new buses will need to be antici- be required during the nextdecdde.In addition, increases efficient pated for operating costsof school transportation.Even with exceedingly management, the requirementsfor operating expenditureswill- exceed $1,000,000 by 1972. in future Further Considerations. Thefollowing should be considered transportation planning:

- ADivision of Transportationwith full-time clericalassis- tance and adequatesupervisory staff.

-The purchasing of smallervehicles including nine-and 12-passenger suburbans to transportthe handicappedchildren.

-The installation of tachometers onall buses. This is another device which would promotepunctuality and safety.

-The bidding of all majorsupplies and equipment once a year, to save time and money overthe present arrangements.

-The rezoning of someschool district boundaries toallow

-217 more efficientrouting and enable many bus runs tobe less than one hour in travel .

-Specifications on chassis and body written so as topermit more competitivebidding.

-Written records of all bus routesavailable for all schools and interested personnel, including asmall map for each showing all runs to be made by a particularbus. On this map should be entered stops and approximate timesof various stops.

-A large map prepared by the TransportationDivision, showing all bus routes by school district andlimits of mandatory transportation.

-The planning of a grid systemwith the aid of data processing for future transportation routing.

MO Daily reports by bus drivers on thecondition of their vehicles.

GPO Arrangement to have the Citypupils transported by the City transit line, until additionalbuses can be added to theschool fleet.

Food Service Program

In the Metropolitan area,the two separate school systems were op- erating 138 school cafeteriasin the school year 1962-63,45 in the City system and 93 in the County system .This represented in dollars anoperation of approximately $4,500,000 in the year 1962-63(see Tables 39 and 40). TheNashville City and Davidson County districts inthe new Metro system are operating to alarge degree on two completelydifferent bases.

Nashville. The Nashville City systemoperates under acentralized lunch departmSupervisorof the school lunch programdirectly responsible to the AssistantSuperintendent of Schools for BusinessAffairs. The duties of the Supervisor of the school lunch programinclude the following:

-To supervise the planningof menusi, which involves:

Approving and revising menussubmitted by cafeteria managers. Furnishing managers with suggested menus; Setting up policy of using standardrecipes.

-218 TABLE 39

NUMBER OF SCHOOLS ANDEMPLOYEES

IN SCHOOL LUNCH PROGRAMS,

NASHVILLE CITY AND DAVIDSONCOUNTY SCHOOLS,

1962-63

City County Combined

Schools with cafeterias 45 93 138

Operating under a-la-carte 45 62 107

Operating under national school lunch program 0 31 31

Participating under the national milk program 45 93 138

Full time employees 391 680 1,071 TABLE 40

DOLLAR VOLUME OF SCHOOL LUNCH PROGRAM

IN NASHVILLE CITY AND DAVIDSON COUNTY,

1962-63

Employee Total operating System payrol I income

Nashville City $ 631,935 $1,970,710

Davidson County 758,485 2,543,631

Both $1,390,420 $4,514,341 Standardizing portions andprices in similarschool groups. Devising means of gettingchildren more interestedin hot plate lunches,such as running aspecial plate, etc. Drawing up forms of menurecords, employee record cards, etc. and supervisingthe maintenance of those reports andrecords.

-To supervise thepurchasing, receipt,weighing, inspection, storage anddistribution of food andsupplies according to general plan approvedby the Board of Education. directed. -To spot-check inventoriesof stocks for accuracy, as and to make recom- -To nominate forappointment all personnel mendations with respect toassignment andtransfer.

and repairs, and -To make recommendationsfor new equipment to insure proper careand use of equipment.

-To prepare specificationsfor purchase offoods, supplies and equipment and send outbids.

and sanitation, -To establish uniformstandards of cleanliness with proper and inspect cafeteriafacilities for conformance functional and sanitarystandards.

-To make a monthly report onthe operation of theschool cafeterias, personnel, etc.and maintain necessaryoperating records. donated by the Federal -To insure maximumutilization of food Government and insuremaintenance of properrecords of all U .S.D.A. foods. of cash receipts -To supervise thecollection and accounting and audit register tapes.

-To review invoicesand delivery ticketsfor food, supplies insure that they meet and equipmentdelivered to schools to specifications. principals, teachers, -To interpret schoollunch objectives to students and parents.

-221 -To develop and conduct coursesof instruction in cafeteria operation and management, nutrition,personnel training and sanitation.

- Toperform such other duties as mayfrom time to time be assigned by the Nashville Board ofEducation.' 1", /1= Nashville City Schools Lunchroom Assoc:ation.Handbook of Organization and Administration. August 1961. p. 6-7.

The local school principal "is chargedwith the discipline and general control of the school His main duties for the lunchroomoperation are:

-To maintain proper discipline inthe school cafeteria .

-To arrange a lunch schedulefor students.

-To cooperate with the localcafeteria manager for maxi- mum efficiency.

-To keep the local cafeteria managerinformed on any change in school procedures andpolicies that may affect the lunch- room operation.

The local school cafeteria manager,directly accountable to the Supervisor of the Lunch Program, hasthese main duties:

-To manage, control and operatethe cafeteria and cafeteria personnel.

-To keep the cafeteria in sanitarycondition at all times.

-To take care of all cafeteriaequipment and to train person- nel in proper use of equipment.

-To supervise and direct thecollection of school lunch funds and to render proper accountingof such funds to the Super- visor of the Lunch Program.

-To requisition all foods forcafeteria use, to prepare menus and to maintain a nutritious andeconomical cafeteria.

-To report on the conditionsand need of equipment for the

-222 properfunction of the cafeteria to theSupervisor of the school lunch program.

Davidson County. TheDavidson County school lunch facilities are handled in a dirfj--ent manner. They areoperated by the school principalswith somegeneral supervision by the CountySupervisor of Cafeterias.

The County Supervisor ofCafeterias has general supervisory responsi- bility in seeing that all Federal,State and Board of Educationdirectives and policies are carried out. She spends amajor share of her time in reviewingfinan- cial and other reports. She isresponsible for approving the hiringof school lunch personnel, takes leadership inproviding in-service workshops and assiststhe local cafeteria managers in any way topromote a better localfood service opera- tion. She is directlyresponsible to the Superintendentof Schools for her defined functions.

The local school principal isresponsible for the total operationof the school cafeteria, includingthe fiscal and accounting requirements asset forth by directives from the County Boardof Education. The principalselects his own cafeteria manager, with priorapproval by the Superintendent ofSchools and the Supervisor of Cafeterias. All othercafeteria personnel are hired in asimilar manner.

Since the principal is responsiblefor the fiscal managementof the local school program, he alsospecifies in detail hours ofwork, wages, etc. Therefore, contracts may varyfrom one school to another inthe County system.

The local school cafeteria manager,directly accountable to the principal of the school, reports to him onall matters concerning thecafeteria operation, with these duties:

-To prepare nutritious menus.

-To purehase all food andsupplies, mainly from localfirms.

-To manage, control and operatethe cafeteria and the caf- eteria personnel.

-To supervise and direct thecollection of all school lunch funds and to render proper accountingof such funds to the school principal and any otherauditing agencies.

Advantages and Disadvantages.Much could be writtenabout the superb job in City and Countyscho-Orlunch programs, 6-citTof which are doing a operating their cafeterias.Both staffs are extraordinarilywell-qualified and should

-223 service programs.The plant facilities, be commended fortheir excellent food well equipped and most equipment and supplies are,for the major portion, satisfactory. lunch programs havegood The centralizedand locally-operated features of alocally-operated schoollunch and poor features.Some of the good program are asfollows: needs and desires. -Food can be selectedfor local community management to operate -There are certainincentives for local alocal program . is dependent onthe -The responsibilityof fiscal management local district. supply tlie school -Local merchantshave an opportunity to district with produce, etc.Thus, some goodwill is built between the localcommunity and theschool. school lunch employ- -Labor costs can bekept down, since not on CivilService, ees inlocally-operated cafeterias are do not share inpension plans otherthan Social Security, wage and are not likely tobecome organized to promote increases and other costs.

their own schoollunch If local schools areenabled to operate - available for program tomake a profit,additional funds are extra helpand needed materialsand supplies. lunch program Some of the poorfeatures of alocally-operated school are asfollows: in large -It is not set upfor buying ofproduce and supplies , quantities. serving a -There is no real assurancethat each school is well-balanced meal .

funds -It is difficult tosupervise andcontrol use of public in the program . duplicated in each Many clerical andother operations are - purchasing, etc.) local school (e.g.,payrolls, accounting,

-224 -If profits are made fromschool lunch to be used for school purposes,this places an unjustbwden on some parents and may deny somechildren the food and nutrition theyneed.

Some of the good featuresof a centralized food serviceoperation are: -Quality control of produce isuniformly available to all schools. -Competitive bidding of allproduce, materials and supplies on a quantitybasis saves money.

-Food purchasing is aspecialized field and can be accom- plished on a more scientificbasis in a central operation.

-Uniform salaries for equal service areestablished and controlled.

-Planning of menus by speciallytrained personnel assures a morecomplete and nutritiouslunch.

-Fiscal management in acentral office relieves localschools of this burden andresponsibility.

-Long-range planning of a foodservice program is more feasible.

Some of the poor featuresof a centralized food serviceoperation are asfollows:

-There is a tendency in anylarge operation to become over- formalized and complicatedwith "red tape."

-The differences in localcommunities are not alwaysconsidered.

-Local merchants cannot competewith quantity buying on competitive bids.

-Local initiative canbecome stymied.

Recommendations.It is recommendedthat the new Metro school district operate its school lunch program on abasis which is designed to preserve, However, the as far aspossible, the merits of each ofthe two existing systems. program shouldbe Board of Education managed,financed and controlled with

-225 Protection against suitable adaptation tolocal school and community reuirements. administrative evi $ o centramotion can e assure. y aocating to centra office personnel only those functionswhich can most effectivelybe handled on a following func- syttem-wide basis.In phasing thedevelopment of the program, the tions should be centralizedin order of importance:.

a. Accounting and fiscalcontrol.

b. Supervision.

c. Personnel administration,including job specifications, selection, assignment, andin-service training.

d. Management and control ofpurchasing and warehousing.

e. Establishment of systems, asrequired, of non-local school food preparationof some foods (e.g., meatcutting, preparation of dressings)either in area or satellitekitch- ens or incentral, system-widekitchens.

An optimum centralizationof the food service programis justified by the following: -A principal of a schoolshould devote all of hiseffort toward the educational programof the school and anytime which is taken from this main functiondeprives the school childrenof their education.

-Food service for a school systemof 100,000 children or more becomes a highly technicaland specialized field.A central operation can havetrained personnel and theentire school district could benefit fromtheir services. The costof providing such services in eachlocal school would beprohibitive. -Competitive purchasing will save moneyfor the entire district. A study made by theNashville City district forSeptember, October and November,1962, reveals that savings canbe realized by competitivebidding.

-The palatability andpreparation of food willstill depend foods upon thelocal school personnel;therefore, cooking of will still be a mainincentive to meet localneeds and desires.

-There is more assurancethat each school willhave a similar high quality supplyof foods, produce, etc., torequisition from. -226 -With over $4,500,000 being spent in theMetro school dis- trict for food service, a sound,centrally-controlled fiscal management procedure mustbe put into effect to protect the school personnel, the public and the Board ofEducation.

Some additional recommendations, as viewedby the survey team, which might help for an orderly transition to aunified school lunch program are as follows:

-The National Lunch Program can reduce coststhrough taking advantage of surplus commodities, but it has certaindisad- vantages and is not a meansby which the school system is relieved of funds for purposes of providing freelunches. There needs to be a study of just how this program canbest be worked into the new Metro district's school lunch program. Without doubt it will have a place, but there are many parents in the community who have gravedoubts that the over- all advantages might be accepted at the price of somechildren being denied the food they want and need. This matter must be thoroughly explored and results of suchexploration explained to all colicerned.

-The methods of determination of eligibilityfor free lunches should be established on a system-widebasis under central con- trol with proper coordination between theschool administra- tion and the appropriate welfare agencies inthe communi In this matter, the appropriate schoolstaff are the specialists recommended for pupil personnel serviceselsewhere in this report, not cafeteria managers nor evenin many instances school principals.

-The school lunch program should benon-profit.If schools need supp les, equipment, or extrae p to operate t e e uca- tional program, this should be a partof the regular -budget of the school system, supported by appropriate revenues.Public education is not public education if notsupported out of public funds.Profits from school lunch are funds deriveddirectly from parents and children, and as such are more inthe nature of hidden capitation taxes or tuition thanpublic funds. This is not the way to finance freepublic education.

-There is a dire need of additional professionaland clerical help for central administration of the lunch program.The professional staff should have sufficient time tomake routine stops at each schoolcafeteria, and to supervise adequately

-227 local school cafeteria personnel .

-Thought. should be given to obtaining cashregisters with locked-in tctals for more efficient control offood funds re- ceived in the local cafeterias.

-All items, including perishables, shouldbe bought on compet- itive bidding. Some of these itemscould be bid on a cost-Plus basis.

-All payrolls, accounting and reportsshould be handled central- ly by machine accounting and through acentral data processing center. .

- Anauditor selected by the Board of EducationalAould care- fully check all local financial reportsfor the protection of all personnel concerned.

-The workshops and monthly cafeteriamanagers' meetings now conducted in both systems should be continuedin the new Metro system. - Acareful analysis should be made of all reports tominimize unnecessaryclerical work.

-The princ;pals of County schoolsshould welcome the relief from the necessary accounting responsibilities;however, under a new systemall principals should continue tohave:major re- sponsibilities and cooperate in the planningof an adequate local lunch program.

- Atthe Metro School System unifies itsfood service operations, it must consider the building ofwarehouses in strategically located areas. This, of course, is aninitial capital expense and should be phased over aperiod of several years. This capital expense should pay for itself inlarge-quantity buying.

- Inschool building construction infuture, the Board of Education should consider ways of reducingcapital costs of expensive kitchens in each and every school .Networks of school lunch services in neighborhoods couldbe established in some areas such that some food preparation and storagecould be undertaken in only the largest of three orfour buildings, thus eliminating duplication both in facilities and operating costs.

-228 Through such a program, theBoard of Education will have more direct control and should be able to assureits community of a sound andvaluable service in the provision of nutritiousschool lunches.

School Budget

The school budget is the coreof financial management and an instru- ment of policy.It should present a pictureof revenue and spending plans for a fiscal year, as well as theeducational plans upon which the revenueand spending plans are based. A budgetshould enable the general public tounderstand (1) what programs and operations areto be attempted;(2) what these programs and opera- tions will cost in terms ofpersonnel and monies; (3) how each programwill contrib- ute to realization of theeducational objectives; and (4) the revenue sourcesused for support of the educational program.

The budget document shouldbe the educational programenvisioned by school policy makers in terms ofdollars and cents.

The process by which a budget ismade generally stems from theneed of individuals requesting certain items to manageand operate a program.

The school budget is compiledand prepared in both the Cityand County systems by the school businessstaff. Both systems now use theaccounting and classification system as set upby the Tennessee Department ofEducation, and therefore should have little trouble incombining this information and accountsinto onebudget.

Nashvil le.The City of Nashville school system preparesits budget through requests made by the variousdepartment supervisors. Thedepartment supervisors make up their requestsfrom conferences with individualschool prin- cipals and general needs as they envisiontheir special program and special projects for the coming year.Each request which is boundinto a departmental budget requires justification forplanned expenditures.(The department heads also make up from these requestsstandard lists of items, which aresubmitted to the Assistant Superintendent foradvertising and requestingfor bids.) The next step includes astudy of the department budgetplus a study of needed personnel, salaries, and other requested itemsby the Assistant Superintendentand Superintendent of Schools.

From this a Superintendent'sbudget is made up, which is thenpresented to the Board ofEducation, which reviews, edits,deletes, changes, or adds certain by the Mayor items.It was formerly submitted tothe City government for approval and other committees, but morerecently, for the 1963-64 budget, tothe Metro Mayor and Council .

-229

_ The Nashville City districtbudget is a document withexplanations, justifications and analysis of allmajor categorieswithin the various accounts. The Nashville City districtshould be commended for itsfine budget and should continue a similar type ofpresentation under the newMetro Board of Education.

The only major criticism asviewed by the consultants isthat in the process of making up abudget, individual schoolprincipals should be allowed This would permit to present their needs asrequired for their particular program. individual school accountingof major expenditures, apractice of considerable use infinancial analysis.

Davidson County. DavidsonCounty prepares its budgetby requests from Individual principals.This is done by conferencesand by written letters to the Assistant Superintendentfor Business Affairs. These areall compiled with A total other requests such as transportation, newpersonnel, maintenance, etc. budget is prepared by the AssistantSuperintendent, who in turnanalyzes the proposed requests in conferencewith the Superintendent.Formerly, it was then and to the Board ofEducation, which usually set afigure of budget expenditures adopted,category by category,major accountsin meetings with theSuperintendent then sub- and his staff.After adoption by the Boardof Education the budget was requested mitted for approval to theCounty government, whichin turn approved or that certain amounts bedeleted from the budget.

The budget document ofthe Davidson County school systemshows information considered in the the major account categoriesand some pertinent of survey preparation of the proposedschool budget.However, in the judgment justifica- staff, a major criticism ofthe Davidson Countybudget is that written by the tion and analysis are notshown, even though suchanalysis has been made business department.

Conclusions and Recommendations.In analyzing bothschool systems' budget administration, there areseveral items which shouldbe considered in the new Metrooperation:

-A budget calendarshould be made up each yearwith due dates for requestedinformation.

-Standard forms for requestedinformation should be filled out by pertinentpersonnel such as supervisors,principals and department heads.

-A budget documentshould have ample writtendescription and thorough justificationfor proposed expenditures.This is a matter which demandsattention in 1963-64for the 1964-65 budget. This willbe a difficult task forthe Transi- tional Board, since it will go outof existence and the new -230 Board and Director will not take overuntil the new year begins. The taxpayer and the public will need toknow as clearly aspossible what the price tag is and whatthey will get with it,

-A proposed and adopted budget shouldbe printed and made available to the general public inabbreviated and popular- ized form.

-The budget document should include:

a) The educational philbsophy of theszhool system as as generalintroduction.

b) Graphs, charts and tables to showcomparative fig- ures ofexpenditures and re4;eipts.

c) Student accounting data and information.

-Principals, department heads, etc., shouldbe notified of any deletion from their budget requests and shouldhave a say as to what items should be deleted. XV

ADMINISTRATIVE ORGANIZATION

It should be apparent from theanalyses of previous chapters that a major task of the Metropolitan Boardof Education is that of designing andstaffing an effectiveorganization so that unification canbe effected, adequate services provided and effective management assured.

LiEiales of Organization -- Theory and Practice

The designing of the administrative organizationof a school system depends upon the kinds of yardsticks or criteriaused. An important aspect ofthe development of any type of human organization isthe creation of understandings of all concerned of the conceptualframework or set of guiding principles upon which it is based. Words such as "administration,"%anagement, " "direct," Hsuperv ise, ""control, " and "organization" have many differentmeanings.

The essential ideas which have controlledthe thinking of the survey staff in its examination of the.Metro SchoolSystem's administrative organization requirements are briefly outlined in thefollowing:

-Administrative organization is primarily a matterof creating an

,environment for work, the performance ofwhich is required in order to accomplishpurEn.

Organization includes people and the structuringaf positions into organization components.It is customary to think about organ- ization structures as organizationof work into individual positions which can be staffed with normallyavailable persons.

In designing individual positions,all of the work of an organi- zation should be designed into someposition or positions in the form of responsibility for results.This includes, on the adminis- trative level, managerialwork and relationships or teamwork responsibilities in addition to functionalwork.

Small school systems can adopt anauthoritarian approach where the major decisions are made at the topand other persons carry out wishes of the leader.This was common a generation or two ago in most school systems.As education has developed and has become more complex, it has become impracticalfor any one

-232 knowledge to make allthe best decisions, person tohave sufficient with assistants, togive or tohave time, evenwhen surrounded adequate attention toall matters. function -shouldbe Complete responsibilityfor the work of a - organization com- assigned either to anindividual position or to an expected to be ponent. Theincumbent in such aposition is then objectives accountable for resultsin accomplishingpre-determined standards withwhatever authority heneeds to at agreed-upon policies and by conduct suchwork, limited onlyby identifiable specifically statedwithheld authorities. responsibility for -Decentralization, maximizingthe assumption of the sharing ofresponsi- individual decision-makingand minimizing individuals and resultsin bility,develops leadershipand growth of Decentralization builds effective utilizationof human resources. supply of leaders tofill strong organizationswith a continuing vacancies and tobuild an expandingorganization. accountability so thateach -Measures shouldbe established for work. On the assumption person can measurethe results of his responsibilities that people are given aclear understandingof their their positions, an organ- for accomplishingobjectives assigned to effectiveness of thework ization must haveevidence of the obligation accomplished by eochindividual.It is a duty and an take stock of theiraccomplish- of all personnel in aschool system to should be ments and to reportthem to the nextlevel up. Aperson accountable only to oneother Derson.

to showhow the Relationships should bedesigned into positions - interference work of one impinges onthe work ofanother without in work progress. operation, at anyposition, Organization should besuch that each - of the work.The should come as near aspossible to completion by which time maybe principle of "completedwork" is one means Decision-making kept asclose as saved indecision-making. knowledge is possible to the pointof action where necessary normally available isdesirable. Charter, Within the frameworkof Tennessee lawsand the Metro - individuals with legal relating to education,there are many about schools. authority to participate to somedegree in decisions both local and State govern- The importance ofthe public and saying mental agencies is not tobe overlooked.It goes without

-233 that the foregoing principlesconcerning organization forwork cannot be put into practiceunless there is an effective systemof communications, not only for purposesof informing staff, but also for purposes of keeping theschool system in tune withthe community which it serves.

Present Organization

It is of little moment to reviewthe organization of the two separate school districts now operatingunder the Transitional Board.The major purpose here is a development of guidesfor establishing the new organizationwhich, at least in skeleton form, must be inoperation by July 1, 1964.It is thus essential that some of the recommendationscontained herein be taken into accountb the Transitional Board in tentativeform so that a budget can beprepared and defended for next year and so that there canbe some minimal consolidationsof staffs to enable school operations to function assmoothly as possible as the newBoard and the new Director take over. Thetask will consist of determiningwhat personnel are for to be combined andhow, and deciding uponadditional positions to be filled work which must be accomplished next year.

There has been some confusionduring the transitional period.This is to be expected.In part, however, presentweaknesses in the administrative organ- ization for the Nashville-DavidsonCounty combination are due tothe necessity of operating under two quitedissimilar systems with differingpolicies and adminis- trative practices, neither ofwhich has been geared to therequirements of the new system.

Though the Transitional Board andthe two administrationshave per- formed with diligence and sincerityduring the current year underprovisions of the Charter, there are aspects of the presentsituation which areacceptable neither as goodorganization in principle nor di meansby which to implement the objectives of establishing aMetropolitan School System. We notethe following:

-There is no single executivehead and will not be untilthe Director of Schools is appointed. Thisinevitably places a burden of exec- utive decision-making onthe current TransitionalBoard, which as apolicy-making body must depend uponthe voluntary and cooperative coordination ofthe two superintendents andtheir staffs.

-There is no written policy forthe new system.Policies, rules and regulations of the two systemsdiffer considerably. There is now no-oneresponsible, other than the Boarditself, for changing this as occasions arise.

-234 for ade- -There are few provisionsin the administrative structure responsibility in public quate work oncommunity relations, a education underdemocratic governmentwhich consumes much time of a Boardof Education andothers in the administrative staff of a school system. how they -There is a great variation amongstaff and principals in their time among nowdivide their time andwould prefer to divide different types ofintellectual activityrelated to administration. overlaod of the Super- There is evidence, onthe one hand, of an - the intendents and theBoard of Education inthe management of school system and, onthe other hand, of notenough utilization authority by of second-echelonpositions and delegating more fixing moreresponsibility in these positions. goals and -The school administration nowlacks emphasis upon making provisional objectives,It has of necessitybeen restricted to should be stop-gap decisionsawaiting the newBoard, etc. There paramount in thedevelopment of Boardpolicies and in job speci- fications clear statementsconcerning each aspectof the work of the school system as tothe purposes to whichadministrative oper- ations are directed. few There is a concentrationof responsibility inthe hands of too - by and not a sufficientdivision of labor.This should be corrected positions alifting of the level ofresponsibility in second-echelon work of the necessaryfor effective productionof administrative central office withadequate authority to carrythis through and that this authority clear understanding onthe part of all concerned School principals shouldbe relieved of muchadministra- exists. of super- tive routine sothey can get on withtheir prime responsibility vision of instruction. regulations, as - Any statementof policy or statementsof rules and well as all efforts toclarify functions, dutiesand responsibilities of personnel in theschools, are uselessunless such basic guides to accepted, administeredand followed performance and behavior are of rigidly. Recommendationsfor the solidifyingand strengthening overlap and waste the administrative structureand avoidance of be only a token contri- in the operationof the school program can System unless ways bution to the developmentof the Metro School of communicating are foundof communicatingpolicies and practices, such that undesir- duties and responsibilitiesand modes of operation the able pressures and influencesof groups and individuals upon

-235

, eliminated. Board of Educationand itsadministration are and all staffof the As a majorvehicle by whichthe community - the plan whichit represents, school system can seeand understand should becomethis year abetter tl-r.,, Ladgetdocument itself than were the twoseparatebudgets for medium ofcommunication pertm2nceloucigel -- oneempha- It shouldbecome a 1963-64. implemented ineach sizing purposes,how th:se purposes are This should gofar in function, andwhy it costswhat it does. with the educationalgoals assisting theBoard to match revenues, of the citizensof Metro. Thisis particularly and aspirations dependent sinceit important inschool systemswhich are fiscally the people. facilitates the Boardrole of representing effectiveness of anorganization, no -In the finalanalysis, the depends uponthe capabilitiesof the matter howwell designed, assigned to positionsin it. Aclear statement personnel who are recruitment of should be includedin futurepolicies concerning Procedures shouldrequire candidates foradministrative positions. each levelabove andapproval by the recommendations from consider- above for eachsuch position.The ultimate second level qualified available be filling positionswith best ation should guard againstthe intro- candidates.It is essentialthat procedures considerations.Under nocircumstances duction ofirrelevant because of candidate bedisqualified simply should a local he be school system.Neither should existingemployment in the of experiencein theschool given preferencesolely on grounds system. of the schoolsystem The recordkeeping andinformation services - the amount oftime and should be improved so asto minimize personnel at alllevels on clericaltasks and energyof professional concerning all oper- needed evaluativeinformation to provide have different school system.The two districts ations of the reporting. Theseshould accounting,attendance and systems for careful planning. be consolidated as soonaspossible with

is seriousdoubt that thereis Even if completelyreorganized, there do all of theplanning, directing, sufficient centraladministrative staff to now coordinating to getthe new schoolsystemestablished supervising,organizing and combined there arepresently 63 in order.In the twoschool systems and to keep it few school systemsof the 90,000 professionalpersonnel. Very central administrative staff as small asthis. The data enrollment class operatewith a central to 110,000 staffing practicesof someschool summarize centraloffice administrative number of in Table 41 For this group,the average systems inthe UnitedStates in this category.

-236 TABLE 41

CENTRAL OFFICE STAFFINGIN CITIES

OF APPROXIMATELY 100,000ENROLLMENT

AS OF OCTOBER 1961

Superintendent Other. Total Pupil School deputies, associates, central central membership system ass't supts., etc. administratiorsadministration

167 San Diego 109,737 11 156

Washington, D. C. 127,268 11 92 103

86 New Orleans 91,415 10 76

341 347 Baltimore 175,042 6

82 89 St. Louis 105,858 _ 7

173 Cleveland 138,474 5 168 39 46 Dallas 131,566 7

147 Seattle 100,678 6 141

293 Milwaukee 106,755 9 284

180 Denver 93,555 11 169 84 Atlanta 98,006 11 73 72 Indianapol is 91,485 7 65

40 45 Memphis 103,462 5

Median 7 92 103

Source:National F.ducation Association, ResearchDivision.Professional Staffing Ratios, 1961-62. Urban Research Series. Washington, D.C.: the Association. August 1962. -

-237 central administrative positions is over100.It is thus not unreasonable toexpect this number of central staff inthe Metro school district.

In the final analysis,how many administrators areneeded will depend on how the new Boardand the Director of Schoolsdivide the administra- tive work of the school system,how well staff is recruited andassigned to do the work, and availability of funds todo the work. The survey teamhas nevertheless established a suggested staffing patternwhich will be needed toimplement the recommendations of this report.This appears in Table 42. Thetotal of 101 is con- sistent with staffing-to-enrollemntratios practiced throughoutthe country.

Suggested Reorganization

The statements which follow arespecific recommendationswhich Metro- must be consideredmerely as guidelines fordecisions to be made by the politan Board of Education andstaff of the Metro schools.The nature of organi- zation is such that an organizationstructure which willwork in Nashville- Davidson County must be developedand put into practiceby people in Nashville- Davidson County. The recommendationsmade in this report are notexpected to be adopted in every detail, nor is itexpected that a completereorganization of the two school systems cantake place immediately.

However, it is urged that boththe Transitional Board andthe perman- contained herein and ent Metropolitan Boardconsider the major recommendations institute procedures for continuousre-examination of the administrativepolicies and structure of the newschool system. Some of thefeatures of the following suggested organization are animplementation of this recommendation.

Proposed Basic Structure. Theproposed basic structurewhich is re- commended for the MetroSchoOr Sy-stem is shown schematically inthe accompany- ing diagram. As a means ofup-grading the central administrativeorganization and permitting a better reallocationof functions under theprinciple of decentralization, this plan shows three majoradministrative branches. Eachof the administrative branches is headed by an AssociateSuperintendent. The threebranches are respec- tively Professional Services, Instructionand Business Administration.

It is proposed that therebe a reasonably clean-cutcompartmentali- Divisions are indi- zation of functions assigned tothese organization conponents. cated as second-level units ineach branch, each headedby a Divisional Director. Components of staff in most of thesedivisions are now in existence.

The function of work assigned tothe Associate Superintendent, Instruction, is mainly the managementof the instructional operationof the school be composed system.This branch has a Division ofSupervisory Services which will

-238 TABLE 42

EXISTING AND PROJECTED NUMBER

OF CENTRAL OFFICE ADMINISTRATIVE STAFF

BY FUNCTION

Existing Needed Function by City County Total 1972

General administration* 2 3 5 7

Instruction

Elementary and secondary 16 10 26 30

Special education 1 1 2 12 Adult and vocational 2 -- 2 4

Services

Personnel 2 2 4 6 Pupil personnel _._ -- 2 Reseurch and development 6 4 10 14 Instructional materials 1 1 2 10 E T V -- -- 4 4 Business affairs 3 5 8 121 Total 33 26 63 101

* Superintendent (or Director of Schools), Associate Superintendents, Assistant Superintendents sf, BOARD OF EDUCATIONDirector of Education Assoc.ProfessiOnal Superintendent, Services Assoc.Instruction Superintendent, Assoc.Business Superintendent, Affairs DivisionPersonnel of SupervisoryDivision of Services ...... {. SpecialDivision Education of AccountingDivisionFinance of and DivisionResearch of and 1 AdultDivisionEducation and of Vocational SupplyPurchasingDivision of and DevelopmentMaterialsDivisionInstructional of SchoolDivision Transportation of Ass't Superintendent, IAss't Superintendent, 1 1 Ass't Superintendent, ServicesDivisionPupil-Personnel of District I ,. District II 1 1. Principals District III Principals LunchSchoolDivision of PublicDivisionHealth School Servicesof Teachers T 'Teachers DivisionConstructionBuilding o GeneralETV, Channel Manager, 2 RECOMMENDED ORGANIZATION, METROPOLITAN SCHOOL SYSTEM iDivision ofandSchool Maintenance Plant Operatiori teaching, in-servicetraining of of staff whose mainresponsibility will be itinerant This staff of specialistsis teachers and supervision inspecial subject areas. the Associate different from those whowould be assigned tothe Divisions under staff would be those Services.Professional Services Superintendent, Professional research, capabilities required forassignment toexperimentation, with the special operation of the curriculum development andspecial serviceswhich support the Superintendent level andrelation- school system. Relationships onthe Associate the desired co- ships built into all jobposition guides are necessaryto produce specialists and specialistsin subject matter operation betweenprofessional services areas whoseduties are mainlyworkin.,, with the on-going program. pupils and others inthe Metro Since the number ofschools, teachers, channel, threenadministra- School System is too great for onesingle coordinating Superintendent responsiblefor tive districts"are proposed,each with an Assistant instructional program of anassigned group the administration andsupervision of the and staffs assigned tothem regularly of schools. TheseAssistant Superintendents offices of the school systemfor should be housed in thecentral administrative from time to time to servein their ready access tospecialized personnel needed The practice ofsplitting up large schoolsystems respective administrative areas. and New York in this way is common.For example, Atlantahas f!ve field offices Philadelphia, City 25. Other citieswith field offices areChicago, Los Angeles, Detroit, St. Louis, Baltimoreand San Diego.

Responsibilities for theseadministrative districtheadquarters or worked out carefully sothat each of theAssistant Superin- field offices should be office in all tendents will be able towork directly withprincipals and the central and community- aspects of in-serviceeducation programs,improvement of instruction accountable for theadministration school relationships,,and cangenerally be held Organization forrelationships of these and supervision ofall the schools in his area. offices with central officestaff -- subject matterspecialists, pupil-personnel research personnel, andothers -- will be ofcritical specialists, testing and be facilitated. importance so thatintercommunication andcooperative planning may established in such a way as These administrativedistricts should be regional pressures inimicalto the not to serve toengender divisive competitive interests of theMetropolitan School System as awhole. strengthen the businessad- The suggested schemeis also intended to under an Associate ministration aspects ofthe school system,creating six divisions people in the Superintendent for BusinessAffairs. The intenthere is to permit their responsibilites area ofinstruction to concentrate ontheir tasks by minimizing cafeteria management, etc. in the area of schoolplant, custodial services, working closely with Additional functionsdemanding special staff do not appear onthe diagram. Becauseof the level of the the Director of Schools with him in work of the Director ofSchools, he must havestaff to work closely -241 expediting the work of the Boardof Education and coordinatingthe work of others in of the large school system.Because of the majorresponsibility which the Director Schools and the Board of Educationhave, as has been notedpreviously, of keeping in close harmony with the communityand of developing throughoutthe school system the Director an adequate systemof communication, there mayneed to be,reporting to of Schools directly,a Director ofInformation Services. A budgetallocation needs the to be made for thesepositions, but their titles andassignments should be left to Director of Schools upon his appointment.

Proposed Plan of Staffing. Underthis plan, the staffing in more detail would be as follows:

BOARD OF EDUCATION

Director of Schools Administrative Assistant or Director,Community Relations Administrative Assistant or Director(to be determined)

Associate Su erintendent, Instruction 3 Assistant Superintendents,Districts I,II and Ill Clerical staff Assigned teachers Assigned specialists Principals Teachers Director, Division of SupervisoryServices Supervisor of Elementary Education Supervisor of Secondary Education Supervisors of subject matter areas Consultants, helping teachers,itinerant teachers, etc. Director, Division of SpecialEducation Supervisor of Educable andTrainable Mentally Retarded Supervisor for Secondary SchoolRetardates Supervisor for Speech and Hearing Supervisor for Non-SensoryPhysically Handicapped Part-time Supervisor(emotionally disturbed, visually limited, etc.) Head teachers Therapists Teachers Director, Division of Adult andVocational Education Principals Teachers

-242 Associate Su erintendent, ProfessionalServices Director, Division of Personnel Staff Director, Division of Research andDevelopment Specialists, statistical methods, testing andevaluation, data processing, experimental methods Research consultants, assigned teachers Director, Division of Instructional Materials Educational media specialist Curriculum specialists School librarians Director, Division of Pupil Personnel Services Supervisors, Departments of PsychologicalServices, Social Work Services, Attendance, Guidance Services, Remedial Services Director, Division of Public School HealthServices School physician School nurses General Manager, ETV, Channel/2 Staff

Associate Superintendent, Business Affairs Director, Division of Accounting and Finance Staff Director, Division of Purchasing and Supply Staff Director, Division of School Transportation Staff Director, Division of School Lunch Staff Director, Division of Building Construction Staff Director, Division of School Plant Operation andMaintenance Staff

Position Guides for Key Positions

It should be part of the responsibility ofindividuals in a properly organized administrative staff to determinethe kinds of organization neededwithin their areas of responsibility and to determinespecifications of the positions report- ing to them.It is for this reason that, once the Directorof Schools and the respec- tive three Associate Superintendents are appointedin the proposed organization, their study of the management of their areas should beexpected to result in modi- fications of what has been recommended here.For this reason it is of little meaning

-243 to have each and every position ateach level described in detail.

One feature of the charterrelating to the selection of membersof the Metropolitan Board of Education needscareful watching. This is the provision that they be chosen from districts made upof Councilmanic districts.This limits the Mayor and the Council in a way whichmight prevent selection from amongthe community at large in order tochoose the ablest and best in the interestsof the school services to the entire community.Early in the formulation of policiesby the Metropolitan Board of Education itshould establish the principle thatresponsi- bilities of all Board members are to serve thebest interests of the community at large and under no circumstances to furtherthe exclusive vested interest of any segment thereof, geographic orotherwise.

In the following pages position guides arepresented for the key positions in the proposed organization.

FUNCTIONS OF THE BOARD OF EDUCATION

Provide public elementary, secondary andadult educational opportunities for residents of the Metropolitan SchoolSystem.

Establish general policies best to serve the commoninterests of the residents of the Metropolitan School System withreference to public education.

Select and appoint a competent Director ofSchools as a chief executive officer, holding same responsible for the operationof the school system.

Interpret to the Director of Schools the standardsfor education acceptable to the community.

Review and approve annual budgets forthe school system and supportthem before agencies of the Metropolitan Government.

Approve financial reports.

Initiate action to provide funds foreducational needs.

Maintain liaison with appropriate governmentalagencies.

Appraise results of the work of the Directorof Schools.

Initiate audits of performance whenadvisable.

Approve appointments and removals of personsreporting direct to the Director of Schools.

-244 Review long-rangeplanning.

POSITION GUIDE --DIRECTOR OF SCHOOLS

Broad Functions

Accountable to theMetropolitan Board of Education,the Director of Schools, for the operation ofthe as chiefexecutive officer forthe Board, is responsible the school system within thegeneral policies establishedby the Board and within authority withheld by law. for the The Director of Schoolsis responsible andhas commensurate authority standards optimum utilization of resourcesto provideeducational opportunities at acceptable to the community.

Principal Responsibilities

Interpret and communicategeneral policies establishedby the Metropolitan Board of Education to theschool system and thecommunity.

Determine the objectives,policies, plans and programsfor the short- and long-term successful conductof the school system as awhole. School Assure that educationalopportunities and standardsin the Metropolitan comparable communities, or, System are maintained on alevel at least equal to in- if funds are inadequate tothis end, that theresidents of Metro are fully formed of the reasons forlower standards.

Recommend facility planning toanticipate educationalneeds of the community

Plan utilization of resourcesfor the system as awhole and convey such planning to those persons reportingdirect.

Take timely action, asappropriate, foraccomplishment of objectives.

Promote proper balancebetween long- andshort-term objectives.

Hold those reporting directaccountable for results in order to: Maintain high standards ofeducation, ,responsibility cnd citizenship amongpupils and students. Maintain leadership in educationand citizenship.

-245 Build and maintain goodrelationships with the community served. Earn the respect of thecommunity for professionaland ethical leadership.

Select, appoint and remove personsin positions reportingdirect, with approval of the Board of Education.

Approve appointments to andremovals from positions twolevels down in the organization structure.

Approve budgets for those functionsreporting direct.

Recommend annual and long-rangebudgets for the school system tothe Board of Education.

Review over-all short- andlong-range plans for functionsreporting direct.

Recommend salaries for those positionsreporting direct.

Determine salaries for positions twolevels down in the organization structure and recommendfor Board adoption salarypolicy for the entire school system.

Approve the organization structure twolevels down.

Attend all meetings of the Boardof Education and süch" meetingsof Board committees as may be,deemeddesirable, except when the Director's own status or salary isunder consideration.

Exercise other duties andre.sponsibil ities that will assistthe Board of Education in fulfilling itslegislative function.

Relationships Responsibilities

Provide a climate which will encouragethose reporting direct todiscuss their plans and problems and receiveadvice and counsel withoutaffecting their decision-makingresponsibility.

Keep the Board of Educationinformed on over-all short-andlong-range plans for the school system.

Refer matters which have a major orunusual effect upon the progress, success,

-246 informa- orrelationships of the school system tothe Board of Education for tion, advice, guidance, orapproval, as appropriate.

Interpret Board of Educationpolicies to those persons reportingdirect.

Encourage those persons reportingdirect to assume fully theresponsibilities of their positions.

Give careful consideration torecommendations of those personsreporting direct.

Counsel those persons reportingdirect on theirself-development planning.

Encourage informal channels of contactbetween all personsthroughout the organization.

Provide leadership byexample and suggestion inmaintaining good public relations throughout the organizationby developing a reputationfor: The professional compeienceof employees. The fair and equitable treatmentof all personnel. The quality and timelinessof the educational programs. The contribution -o advancementof the educationprofession. The contribution to thelevel of education in thecommunity. The contribution to theadvancement of the Americanform of democratic society.

Participate personally inappropriate affairs of thecommunity, industry, government and theprofession of education.

Reservation of Authority forDecision Making

(To be completed by the Boardof Education)

POSITION GUIDE -- DIRECTOROFINFORMATION SERVICES

Broad Functions

Accountable to the Director ofSchools, the Director ofInformation Services communications is responsible forcoordinating the entire programof information, and reports for the school system, tothe ends of:

Informing the public on the needs,plans and accomplishmentsof the entire

-247 educational enterprise ofthe school system.

Identifying the policiesand procedures of theschools with the public interest.

PrirEip_IZesponsibil ities

Schools and various organ- Recommend appropriatemedia to the Director of izational components of theschool system for informingthe public concern- ing progress of theeducational program.

Undertake continuous inventoriesof the exteu t. of publicunderstanding and interest in school affairs for purposesof determining characterand amount of public informationrequired.

Counsel persons throughoutthe organization on improvingtheir relationships with the public to the endof a more effectiveeducational program in the public interest.

Maintain liaison with suchagencies as the press,radio and television stations and others.

Advise the Director of Schoolsand the Board of Education onpublic relations opportunities available tothem.

Prepare inclusive plans formaintaining continuinggood public relations.

Recommend budgets for information,communications and communityrelations operations. information purposes Prepare appropriate communicationdevices for internal such as newsletters, circulars, etc. media as press, radio, Prepare such communicationsand reports over such television and school publications as maybe required to accomplishthe objectives of the function. education, Develop a continuous program ofanalysis of community opinion on activities of groups as assessmentof citizen complaints,and the interests and and organizations relative toeducation.

-248 Relationsonsibilities

Utilize fully the services of the Divisionof Research and Developmentin the undertaking of community studies and in resourcesof that division in the area ofcommunications media.

Keep personnel of other functions inthe school system informed of plansand activities of the information, communicationsand school-community work, as appropriate.

Refer matters which have a major orunusual effect upon the progress, success orrelationships of the school system tothe Director of Schools for the purpose of informing, securingadvice, guidance, authorization or approval, as appropriate.

Keep in close contact with al;phases of the school system operation asit might affect or be affected by theInformation Services work.

Participate personally in appropriateaffairs of the community andprofession and occasionally represent theMetropolitan School System In important situations affecting publicrelations, without diminishingthe status or importance of other positions orwithout relieving them of theirresponsi- bility for public relations.

Review with the Director ofSchools over-all results and progressof the work of the Information Services operation.

Reservation of Authority for DecisionMaking

(To be completed by the Director ofSchools)

POSITION GUIDE DIRECTOR OF PERSONNEL

Broad Functions

Accountable to the Associate Superintendent,Professional Services, the Director of Personnel is responsible for maintaining aninventory, consolidatingrequirements for and recruiting personnel. He isresponsible for formulating salaryadministration scheduling and planning and systems cifjob analysis and specification.

-249 Principal Responsibilities for Maintain an inventory ofpersonnel includingappraisals of qualifications promotion. retention of all employees Plan and coordinate a programof recruitment and of the school system,including such specificfunctions as: Interviewing. Investigation of references. Initiation, continuation andtermination of contracts. Adjustment of personnelproblems. Preparation of positionguides, job specificationsand classification. Administration of wage andsalary policies of the Boardof Education.

Prepare statistical reportsand studies related topersonnel as required. informed of salary Keep the Associate Superintendent,Professional Services School System as they schedules and welfare provisionsin the Metropolitan compare toother school systems andsimilar types of work.

Recruit, interview andevaluate candidates forpositions as required.

Rey, t ior_IslilsiIs i 1::$iliti es and Assist other personnel inthe school system onproblems of organization

.determining personnelrequirements. the Director of Assist such committees andorganizations as designated ty Schools to study aspects ofpersonnel in the system. informed of plans, Keep personnel of otherfunctions in the school system appropriate. activities and requirementsof the personnelplanning operation as

Consult with ilssociate.superintendents, assistantsuperintendents, directors, principals and other administratorsin the school system onrecruiting, classification, assignment andretention of personnel.

Refer matters which have amajor or unusualeffect upon the progress, success, Superintendent, Pro- orrelationships of the school system tothe Associate fessional Services for the purposeof informing, securingadvice, guidance, authorization, or approval, asappropriate.

Initiate actions for theemployment of persons, when sorequested by re- sponsible administrators.

-250 _ Participate with others, as appropriate,in the development of programs of induction and orientation of newemployees.

Keep informed of organizing plans ofother functions to be able toanti- cipate their personnel requirements.

Maintain liaison with other school systems,-teacher training institutions and other agencies to provide a sourceof trained personnel and to provide leads for those who desiretransfers eisewhere.

Review with the Associate Superintendent,Professional Services, over- all progress and results of thework of personnel planning.

Participate personally in appropriateaffairs of the community and pro- fession.

Reservation of Authority for DecisionMaking OMMIM

(To be completed by the AssociateSuperintendent, ProfessionalServices)

POSITION GUIDE -- ASSOCIATESUPERINTENDENT, INSTRUCTION

Broad Functions

Accountable to the Director of Schools,the Associate Superintendentfor Instruc- tion is responsible for the supervisionand administration of theinstructional programs of the school system.

Principal Responsibilities

Keep informed as to the operationof the instructional program inall schools for purposes of evaluating theinstructional program and for improvingteach- ing procedures through conferences,demonstrations and other supervisory techniques.

Coordinate the work of all administrativedistrict offices, special areasubject matter specialists and consultantshaving to do directly with instructionin the regular classroom.

Establish and maintain programs of supervisionand in-service education of classroom teachers in the school system.

-251 Determine the objectives, policies, pionsand programs for the short- and long-term successful operation of the instructionai program.

Formulate proposals for Board policies onthe various aspects of the instruc- tional program of the school system.

Report to the Director of Schools onthe condition d progress of the instructional program in the several schoolsand recom nd changes and improvements which should be made.

Keep informed on latest developments inteaching and the adminiskition and organization of instruction.

Interpret and communicate policiesof the school system to those persons reporting direct.

Recommend the next lower levelorganizational structure to accomplishthe objectives of the instructional operations.

Approve the organizational structure twolevels down.

Assure that educational opportunities andinstruction standards in the Metropolitan School System are maintained atleast equal to comparable communities in the United States.

Recommend facilities necessary to provideinstructional needs.

Take timely action, as appropriate, foraccomplishment of objectives.

Hold those reporting direct accountablefor results in order to: Maintain high standards of instruction. Maintain leadership in instruction andeducation. Build and maintain good relationshipswith the community served. Build and maintain a "climate forlearning", encouraging curiosity, questioning, search andanalysis and observation. Encourage extra-curricular activities tobuild pupil character, broad educational interests, highethical standards and good citizenship. Earn the respect of the communityfor professional and ethical leadership and for the level of instructionand educational opportunities available in theMetropolitan community.

Select and appoint and remove persons inpositions reporting direct, with approval of the Director of Schools.

-252 Approve appointments to and removals from positionstwo levels down in the organizational structure.

Approve budgets for those positions reporting direct.

Recommend budgets for the instructional operation.

Review over-all short- and long-range plans for functionsreporting direct.

Recommend salaries for those positions reporting direct.

Approve salaries for positions two levels down in theorganizational structure.

ReIationshi s Resoonsibilities

Keep personnel of other functions in the schoolsystem informed of plans, activities and requirements of the instructional operation,as appropriate.

Refer matters which havea major or unusual effect upon the progress, success, or relationships of the school system to the Director of Schools for the purpose of informing, securing advice, guidance, authorization,or approval, as appropriate.

Interpret school system policies to thosepersons reporting direct.

Provide a "climate" which willencourage those reporting direct to discuss their plans and problems and receive advice and counsel withoutaffecting their decision-making responsibility.

Maintain a "climate" within the instructional operation in whichpersonnel interchange ideas and experiences and keep each otherinformed of the progress and results of their work.

Keep in close touch with Professional Services personnelto keep them in- formed of needs and to be continuously informedon psychological services, guidance services, pupil welfare and pupil personnelmatters, health programs, research development and experimental work, developments in instructional media and methods and reportingsystems developed by such personnel as theymay affect instructional planning.

Contribute to the development of pupil personnelservices and programs of research and experimentation in education,as requested.

Participate personally in appropriate affairs of thecommunity and profession

-253 and provide leadership in encouragingthose reporting direct todo likewise.

Represent the MetropolitanSchool System in importantsituations affecting the instructional standards andteacher-pupil-parent relationships,without diminishing the status or importanceof other positions in theoperation.

Review with the Director ofSchools over-all progress andresults of the work of the instructional program.

Encourage those persons reportingdirect to assume theresponsibilities of their poSitions.

Give careful consideration tothe recommendations ofthose persons reporting direct.

Counsel those persons reportingdirect on theirself-development planning and review such plans for positionsat the nextlower level in theorganizational structure.

Encourage informal channels of contactbetween all personsthroughout the organization component.

Provide leadership by exampleand suggestion inmaintaining good public relations throughout theorganization by developing areputation for: The professional competenceof employees of the operation. The fair and equitable treatmentof persons reporting.direct. The quality of instruction. The contribution of the operationto advancementof the educa- tional profession. The contribution to thelevel of education in theMetropolitan community. The contribution to theadvancement of the Americanform of democratic society. The interest and desire to acceptparticipation of citizensof the community.

Reservation of Authority forDecision Making

(To be completed by theDirector of Schools)

-254

.111 /4.1 POSITION GU/DE-- ASSOCIATE SUPERINTENDENT, PROFESSIONALSERVICES

Broad Functions

Accountable to the Director of Schools, the Associate Superintendent, Professional Services, is responsible for the development of all professional fkinctions related to instruc:Ion, the curriculum, pupils, research and statistics, supportive but not immediately an aspect of regular classroom instruction. The two majdr functions are (1) pupil personnel services, including health, welfare, psychological services and education of the handicapped, and (2) research and development, including work of non-teaching staff assigned to curriculum development, experi- mental design statistical analysis, testing and evaluation and instructional materials.

The Associate Superintendent, Professional Services, is responsible for main- taining a "clearinghouse" of information on latest developments in the field of education, available to any person in the school system, and for adding to that fund of knowledge through research on specific applications of improved methods of teaching and organization of the curriculum in the Metropolitan School System.

.: Principal Responsibilities

Recommend standards of curriculum organization and instructional programs for the entire school system, within the broad policies determined by the Board of Education.

Design and develop records, reports, forms and systems of data processing appropriate to the information requirements of the school system.

Provide audio-visual services, including audio-visual materials and equip- ment and assistance in their use for the entire system.

Develop plans for most effective use of educational television in learning and teaching in the school system.

Prepare and compile statistical reports on pupil enrollment, attendance, promotion, retention, class size, teacher load, enrollment by subjects, follow-up studies of graduates and special reports required by other organ- izational components of the system and local, State and Federal agencies.

Keep informed on latest research and new practices in the field of education.

Maintain a "clearinghouse" of information in the field of education, making such information available to any person in the school system, on request.

-255 -

coordinating the systemof Manage the programof textbook selection, fcreening, evaluationand recommendationfor the entire system.

Establish standards for measurementof results of theeducational program, within the broad policiesdetermined by the Boardof Education. psychological testing Conduct system-wide programsof educational and and educational measurement. under the Provide for safeguardingthe health of pupilsand employees while jurisdiction of theschool system.

Provide for a programof pupil guidanceand counseling.

Provide a library serviceadequate to supportthe educational program.

those persons Interpret and communicatepolicies of the school system to reporting direct. for the successful Determine the objectives,policies, plans and programs operation of theProfessional Services componentof the organization. of the Recommend the organizationalstructure toaccomplish the objectives Professional Services operation. operation. Recommend facilities necessaryto accomplishthe objectives of the

Promote proper balancebetween short- andlong-term objectives.

Hold those reportingdirect accountable forresults in crder to: Maintain high standardsof education. Maintain leadership ineducation. served. Build and maintain goodrelationships with the community Earn the respect of thecommunity for professionaland ethical leadership and for thelevel of educationalopportunities available in Metro. direct, with approval Select, appoint and remove personsin positions reporting of the Director ofSchools.

Approva budgets for thosepositions reportingdirect.

Recommend budgets forthe Professional Servicesoperation.

Review over-all plansfor functions reportingdirect.

-256 Recommend salaries for thosepositions reporting direct.

Relationships Responsibilities.

Keep the instructional operationand the Board of Educationpersonnel in- formed on curriculumdevelopment and planning, as appropriate.

interpret school system polici6 tothose persons reporting direct.

Provide a "climate" whichwill encourage those reportingdirect to discuss their plans and problems:andreceive advice and counselwithout affecting their decision-makingresponsibility.

Maintain a "climate" within theProfessional Services component.ofthe school system in which personnelinterchange ideas and keep eachother informed of the progress andresults of their work.

Keep in close contact withprincipals and teachers to becontinuously aware of their needs in connectionwith their instructional programsand to get their ideas in support of researchand curriculum design.

Participate personally in appropriateaffairs of the community andprofession and provide leadership inencouraging those reportingdirect to do likewise.

Represent the MetropolitanSchool System in important situationsaffecting future special programs and theirdevelopment and educationalstandards, without diminishing the status orimportance of other professionalpersonnel in the school system.

Refer all unusual or major mattersimportant to the successfuloperation of the school system to the Director ofSchools for the purpose ofinforming, secur- ing advice, guidance,authorization, or approval, asappropriate.

Review with the Director ofSchools over-all progress andresults of the work of the PrOfessional Servicesoperation.

Encourage those persons reportingdirect to assume theresponsibilities of their positions.

Establish channels whereby allprofessional staff of the school system may express their concernsregarding problems requiringresearch. component of the Encourage experimental programsin the instructional school system, in classroomsand schools at alllevels, and provide the

-257 evaluation and measure- necessarytechnical services inexperimental design,- ment to determineeffectively the outcomes ofexperimental programs. reporting Give careful consideration torecommendations of those persons direct.

Counsel those personsreporting direct on theirself-development planning. the Encourage informalchannels of contact betweenall persons throughout organization component. maintaining good public Provide leadership byexample and suggestion in reputation for: relations throughout theorganization by developing a The professional competenceof employees of theoperation. The fair and equitable treatmentof persons reportingdirect. The quality and timelinessin the provisionof adequate programs of research anddevelopment Sand pupilpersonnel services. The contribution ofthe operation to theadvancement of the education profession. The contribution tothe level of education inMetro.

Reservation of Authorityfor Decision Making

(To be completed by theDirector of Schools)

AFFAIRS POSITION GUIDE --ASSOCIATESUPERINTENDENT,BUSINESS

Broad Functions

Accountable to the Directorof Schools, theAssociate Superintendent, the opera- Business Affairs, isresponsible for planning,organizing and directing of the school tion and administrationof the major businessand financial affairs financial planning, pur- system. Thebusiness responsibilitiesinclude budgeting and construction, operationand chasing and supply management,plant planning and and maintenance of plant,transportation, food service,financial accounting reporting and centralwarehousing management.

Principal Responsibilities

Serve as budget officer forthe school system.

-258..: Conduct finance studies and analyses forthe Board of Education, in order that proper funds be allocated for operationof the school system.

Provide liaison between the Boardof Education and the Metropolitanand State governments on all financial matters.

Maintain familiarity with Stateschool laws and regulations pertaining to the business and financial affairs ofthe school system.

Advise the Director of Schools onfinancing the school system.

Advise all administrators, includingassociate :Superintendents, assistant superintendents, directors and principals onthe preparation of their budgets.

Establish uniform budgeting procedures tofacilitate the consolidating of budgets.

Compile a budget for the school systemthrough consolklating the separate departmental budgets.

Provide for necessary accountingand arrange for the of accounts.

Provide transportation for students.

Provide food service for the school system.

Provide a purchasing service for allsupplies including texts, providingsuch purchasing service to other departments.

Maintain supply warehousing as necessary.

Provide facilities necessary forfulfilling the objectives of the school system.

Prepare long-range building andfacilities plans.

Direct the maintenance and operationof the entire school plant,composed school purposes including Board ofEducation y of all land and buildings used for facilities not used for instruction.

Assign personnel, within the limits approvedby the Board of Education, to operate buildings and maintainsatisfactory standards of heating,lighting, cleanliness and sanitation.

Execute construction and purchase contractsand assure compliance.

-259 Contract for insurance andcompensation.

Keep informed on latest practicesin the field within theresponsibilities of the operation.

Interpret and communicatepolicies of the school system tothose persons reporting direct.

Determine the objectives,policies, plans and programsfor the successful operation of the functionof Business Affairs.

Recommend the next lowerlevel organization structure toaccomplish the objectives of Business Affairs operations.

Approve the organizational structuretwo levels down.

Promote proper balancebetween short- and long-termobjectives.

Take timely action, as appropriate,for accomplishment ofobjectives.

Select, appoint and remove personsin positions reportingdirect, with approval of the Director ofSchools.

Approve appointments to andremovals from positions twolevels down in the organization structure.

Approve budgets for those positionsreporting direct.

Recommend budgets for theBusiness Affairs operation.

Review plans for functionsreporting direct.

Recommend salaries for thosepositions reporting direct.

Approve salaries for poiifions twolevels down in the organizationstructure.

Maintain a program ofevaluation of the efficiency ofthe reCord-keeping functions of the component, tothe end that financialinformation is ex- peditiously available through properutilization of modern equipmentfor the use ofother administrators in the entireschool system.

Provide a monthly report onthe condition of the schoolbud6et.

Arrange for the in-service trainingof maintenance, custodial,clerical and other employees of thisorganizational component as necessary.

-260 Conduct studies and plans for assuringthe maintenance of efficientand economical business operations ofthe school district.

Relationships Responsibilities

Supervise the performance of trainedclerical workers, custodians,cafeteria workers, mechanics, maintenanceworkers and others as necessary forthe Business Affairs program of theschool system in cooperation with super- visory personnel such asprincipals of schools in other componentsof the school system, and prepare an annualevaluation of the work of such employees.

Provide regulations which clearlydefine the manner in which custodians, maintenance personnel and food servicepersonnel of this organizational component are to cooperateand be responsible to principalsdur!ng all hours when schools are in use foreducational activities.

Keep personnel of other functions inthe school system informed ofplans, activities and requirements ofthe business operation, as appropriate.

Refer matters which have a malor orunusual effect upon the progress, success, orrelationships of the school system tothe Director of Schools for the purpose of informing, securingadvice, guidance, authorization or approval, as appropriates

Interpret and communicateschool system policies to those personsreporting direct.

Provide a "climate" which will encouragethose reporting direct to discuss their plans and problems and receiveadvice and counsel, withoutaffecting their dec ision-mak ing responsibi 1 ity.

Maintain a "climate" within thebusiness operation in whichpersonnel inter- change ideas and experiences andkeep each other informed of the progress and results of their work, asappropriate.

Keep in close touch with theProfessional Services and theInstructional personnel of the school system tobe continuously informed ontheir planning as it might affectplant and facilities and otherservices planning.

Provide budget and financial statements toall components as aids to ad- ministrators in budgeting andfinancial control.

Participate personally in appropriateaffairs of the community andprofession

-261 and provide leadership in encouraging those reporting direct to do likewise, representing the Metropolitan School System in important situations within the area of responsibility, without diminishing the status or importance of other positions in the operation.

Review with the Director of Schools over-all results and progress of the work of the Business Affairs operation.

Encourage those persons reporting direct to assume the responsibilities of their positions.

Give careful consideration to recommendations of those persons reporting direct.

Counsel those persons reporting direct on their self-development planning and review such plans for positions at the next lower level of the organi- zation structure.

Encourage informal channels of contact between all persons throughout the organization.

Provide leadership by example and suggestion in maintaining goodpublic relations throughout the organization by developing a reputation for: The professional competence of employees of the operation. The fair and equitable treatment of persons reporting direct. The quality of the work of the operation.

Reservation of Authority for Decision Making

(To be completed by Director of Schools) XVI

FINANCIAL IMPLICATIONS

Reference has been made throughout this report to the great care needed in planning the development of the new school system because of the limi- tations of financial resources. One of the first steps taken by the survey staff in its work was a comparison of expenditures in Nashville and Davidson County with other school systems of similar size and economic resources.It thus became ap- parent early in the course of the survey that:

-Expenditure levels per pupil:, though higher in the City system, were not high in either of the two systems.Roughly speaking, the City system was about average for systems of its size and about average for schools in the Southeastern part of the United States, while the County system was below average on such comparisons.

-Both school systems were considerably lower in per pupil ex- penditure than the-United States average.

-Both systems combined were spending for public education about the same ratio to income of inhabitants as other school systems of similar size and per capita income.

-More public funds for education in Metro, if wisely spent to assure improvededucational services, would not therefore be out of line with what other communities aredoing, but this would undoubtedly require a higher than average finsT3r=1 effort of taxpayers in the community.

At the outset, therefore, the prospect of financing the improvements in educational service contemplated in this report seemed to the survey staff dis- couraging, particularly as it became apparent that there is and will cohtinue tobe unrelenting pressure from some quarters to keep tax rates down at all costs.

On the face of it, then, it is clear that the Transitional Board, the new Metropolitan Board and the administrativestaff of the Metro School System must be prepared to:

-Clearly define educational goals and objectives.

- 263 -Evaluate alternative means ofachieving goals and objectives. -Establish courses of action in orderof priority. -Select courses of action with dueconsideration of both (1) the educational requirement and (2) the efficiencyand economy of operation.

- Derivethereby a justifiable educatiwal program, adefen- sible means of providing it and afeasible dollar price tag ..

-Communicate this to appropriategovernmental agencies and the public so that the community can seewhat it is offered for a price and decide on the meritsof the case.

The duty and obligation ofofficials of the new school system is not to keep taxes down,but rather to delineate aneducational service suitable to the needs of the community at large, atreasonable cost and commensurate withthe the resources ofthe community and the apparentwishes of citizens; and to permit public, by whatever mechanismof government, to decide whether it wantsit or not.

Comparative Statistics

A word of caution on the useof school cost data -- validcomparisons of school systems can be madeonly after considerable adjustmentof statistics usu- ally reported in budgets and financial statements,and often not at all .For example, here are reasons why it was not even easy to comparecosts of the twoschool systems making up Metro:

-Each system in differing amounts hadCounty Trustee's Com- missions included as costs.These funds had no bearing on support of the school program.

-The City, with centrally-operatedschool lunch programs, has expenditures related to same appearingin the 1963-64 budget. This is not so for the County,which does not op- erate school lunchescentrally.

-The County must transport pupils;the City does not. Trans- portation and capital outlayalong with other accounts are included in some reports, but havelittle direct bearing on amount spent for the currenteducational program in the class- room, where mostlearning and teaching takeplace.

-264 the -The County healthservice expenselooks low because County Health Department, County schoolsdepended upon the while the City did not. and did not Insurance cost waspaid by County government, - Such appear asschool expense forthe County school system. reports, not inthe City costs appearedin the City system government accounts. considerably. This reflects -The two retirementplans differ differently in reports. projects in localschools Untold sums derivedfrom fund raising - are unre- godirectly into supportof the educational program, of school costs. corded and prevent anyrealistic determination misleads the the considerationthat this practice In addition to the public on the true costof education, it isin conflict with principle of freepublic educationand counteractsthe provision of equal educationalopportunity. with other systemsby means In making comparisonsof costs per pupil Bulletins, it is necessary totake care of State reports orU.S.Office of Education items, but also todivide these by com- not only toinclude only comparable expense enrolled, per pupilmembership as of a given parable pupil figures.Costs p,er pupil and per pupil in averagedaily member- date, per pupil in averagedaily attendance ship can differby relativelyincredible margins. System with time toanalyze There must be staff inthe Metro School statistics can bepresented in enough waysto make these problems ofreporting so that school system stands. it clear justhow the financialsituation of the developed as ob- Taking the foregoinginto account,the survey staff financial situation inthe Metropolitan jective a picture aspossible of the current relevant to determinationof the feasi- School System. Thefollowing findings are recommendations of this report. bility of implementingfinancially the computed ascomparably as Per pupil currentexpenditure figures, current expense perpupil Office of Educationstatistics, show that possible to U.S. from $251 in1957-58 to the two school systemscombined increased in A.D.A. in pictorially on theaccompanying chart $297 in 1962-63. Theseresults are shown expenditure figures overthe same periodof along with UnitedStates average in the UnitedStates as a whole rep- years.Roughly speaking,the trend of increase education. As thechart portrays,there have been resents theincrease in cost of and in DavidsonCounty, but this increases in expenditures perpupil in Nashville in cost and overthe years theeTqier-Tdirtures increase has notkept up with the increase

-265

*40 Nashville and Davidson County United States $500 $400 $432 $300 $200 $100 1957-58 CURRENT EXPENSE PER PUPIL, 1957-58 to 1962-63,1958-59 UNITED STATES AND NASHVILLE AND DAVIDSON COUNTY 1959-60 1960-61 1961-62 1962-63 per pupilin the two systemshave lagged behind thenational average.

The costs of education haveincreased, as most everythingelse in the $304 per past sevenyears.1It is estimated that itwould have cost, in 1962-63,

1 See the January1963 issue of SchoolManagement.

$262 in 1959-60. pupil to provide the sameeducational services which cost

Between 1957-58 and1962-63, expenditures perpupil, the country the average expenditures over,increased by 27 percent.During the same period only 18 percent. perpupil in Nashville andDavidson County increased debt It is to be notedthat these data do notinclude Capital outlay, service, community services,tuition paid to otherschool systems, expenditures for summer and adult educa- for services to non-publicschool children, expenditures tion classes, and expendituresfor food services andstudent body activities.

In 1959-60 the combinedcurrent expense perpupil in A.D.A. for effort to support schools the two systems was$262. At that time, about average class was amongschool systems in the80,000-enrollment to 100,000-enrollment income in the Metropolitan being exerted in theMetropolitan area. The per capita had district was then. $1,706.By 1962-63 the per capitaincome in the district reached $1,960. The expectedcurrent expenditure perpupil in 1962 at yerage $317. The effort to support schools(on the basis of income.in..the district) was

2 From analyses of school systems in the Metropolitansystem size class, ithas been found that the averageexpected expenditure perpupil on the basis of per capitaincome is .23 times percapita income, less$134.

attendance in 1962-63 actual combined current expense perpupil in average daily was$297. expenditure levels of the two It may be concludedthat the coMbined daily Jtendance districts would have had to average$20 more per pupil in average inhabitants to the sup- to representthe average expectedallocation of income of size. port of schoolsfrom the experience ofschool systems of comparable

With 77,250 pupils in averagedaily attendance in 1962-63,this which would have been spent represents, at$20 each, a total of $1,545,000 more for schools in the area tomatch the income levelin the area.

-267 It is to be concluded,therefore, that in the two systemscombined:

a. Increases in current expenditureshave not kept up with expected:levels in terms of increasesin income of inhab- itants in the area.

b. Current expenditure levels in1962-63 have not kept up With purchasing powerof expenditures in 1959-60. Amounts in 1962-63 wereless in purchasing value than amounts spent in1959-60. In terms of financial support, therefore, the school programs inthe area have virtually been standing still .

Tax rates are not toouseful as evidences oflevel of community sup- because assessment ratios are notknown and because funds invarying port, largely It amounts in supportof education come throughState and Federal governments. complicated by the tax is to be emphasized thatthe financial picture is in part structure in thecommunity. Changes inTennessee methods ofallocating Stati funds, local action whichwould derive revenues in supportof schools from taxes other than the property tax, orincreases in Federal supportof education could change the picture considerably.

Costs of Implementing theProgram

It is futile to project expensesinto the future indetail without the many policydecisions which need to bemade in organizing for the new program. will Just how, in detail,recommendations such as thosecontained in this report what it would cost to be followed is unpredictable,but a rough -. method of seeing implement this program is to examinethe budget for 1963-64 in termsof what it might have been had theMetropolitan School Systembeen in existence for some time and had all of therecommendations of this reportbeen in effect as of the with the actual budget year1963-64. A minimum budgetalong these lines compared for 1963-64 for the two separate systems appearsin Table 43.

For 1963-64, the combinedbudget for current expensedefined as in daily attendance the foregoing analysis is$26,400,000. With an estimated average for 1963-64 of 80,245 the current expenseper pupil inA.D.A. is estimated at $329. As Table 43 shows, ifall the new services andall of the improvements recommended in this report hadbeen in effect, thebudget for the current year 1963-64 would have been *eaterin the amount of over$5,300,000.

This does not include some newservices which would distortthe com- of parison. For example,there are no assumptionsabout system-wide adoption should kindergartens.It is estimated that in time,if a full kindergarten program

-268 TABLE 43

ACTUAL 1963-64

METROPOLITAN SCHOOL CURRENT EXPENSE BUDGET

AND ESTIMATED MINIMUM NEEDED

HAD ALL RECOMMENDATIONS OF THIS REPORT BEEN IN EFFECT

( in thousands )

Major account Actual Needed

Administration $ 303.6 $ 716.0

Instruction 20,705.8 24,283.0

Attendance and health 287.8 434.0

Transportation 883.3 900.0

Operation 2,076.6 2,297.0

Maintenance 904.5 1,223.0

Fixed charges 554.9 1,163.0

Miscellaneous 681.4 700.0

Total current expense $26,397.9 $31,716.0 alone be adopted, an additional costof well over $3,000,000in current expense vocational-teehnical program and could be expected for that.Also costs of the included. community college overand above services nowprovided have not been

It is of note that thetheoretical cost needed hadMetro been in United States average. effect averages about$395 per pupil.This is still below the expected in It is also to be notedthat this does not makeallowances for increases this re- the future due only to increasesin enrollments, asdiscussed elsewhere in in expenditure (1) tokeep In other words, theschool system faces increases port. and (3) to elim- up withincreases in enrollements,(2) to meet increases in costs, inate deficiencies andimprove the quality ofthe educational program.

The major items whichwould have hypotheticallyincreased expendi- tures as shown inTable 43 are as follows: -Professional-staff-per-1,000-pupil ratioof about 40, which is less than the ratioof 50 used by the UnitedStates Office of Education and others instudies of staffing requirements of quality education.

-An upgrading and reorganizationof administration: approxi- mately 38 additional centraladministrative professional per- sonnel would have beenadded to the payroll invarious divisions, as discussed inthe previous chapter andelswhere in this report.

-Additional teachers, principalsand/or other instructional personnel to reduce pupil-teacherratios and class size, or the equivalent, in the amouhtof about 68 more peoplethan 1962-63 wereadded in the 1963-64budget over positions in the budgets, and salaries at alevel recommended to bereached by about 1968 earlier in this report.

-Additional supplies andmaterials for instruction.

-A system-wide, school-Toperatedschool health program. -Transportation at about the samestandard.

-Operation and maintenanceof plant brought upto-about the standard now maintained inthe City system .

-Some accounting recognitionin fixed chargesof costs of a pension and otherbenefits for teachers.

-270 Outlook for the Future

The foregoing can be interpreted only in terms of thevalue judgments of the people of the Metropolitan School System.If the decision is defeatist, one to continue merely along lines of averageeffort and simply maintaining the status quo, there will be no encouragement to those who aspire tohave better educationa ser- vices. On the other hand, if the body politicfeels optimistic about the economic future of the area cind the contribution whicheducation can make to increasing pro- ductivity of its citizens and reducing costs ofwelfare through drop-outs, juvenile delinquency and unemployment, an effort can beexerted and the future will not be inexorably futile..

The assessment of the survey staff, lacking economicitudies which are now under way, is oneof considerable encouragement for the future economicwel- fare of the Metropolitan school district. .lf,therefore, the needed increases in costs are systematicallyand objectively determined and presented, as hasbeen suggested above, the apparent interest ineducation in the community is likely to lead to a willingness to support throughpublic revenues a, substantial improvement of ediscational services im the area.

Without question, prudent management willbe demanded of many in the community who will support increases in costsof public education only if they have feelings that it will be put to good use.The school administraiic as concernedwith the revenue situation as the spending planof its budget, even though it iS a fiscally dependent system. The Metropolitandistrict will not be alone among school systems in the United Stateswhich will find the conflict of increasing demands for educational service onthe one hand, and pressures against increase in taxes, on the other.

A few final thoughts on ways to help financethe program are as follows:

- Ten or15 years ago, funds were scarce fordeveloping new ideas in education. The picture has recentlychanged mark- edly. For purposes of research and experimentationwhich can lead to theelimination of some of the outmoded prac- tices of education and the developmentof improved practices, grants are now availablethrough the U.S. Office of Educa- tion, Cooperative Research program andfunds from many foundations interested in a frontal attack on someof our preseing educational problems.

-Educational officials must join with other governmentoffi- cials in the Metropolitan Government to studycontinuously the bearing of the State tax structure andschool finance

- 271 picture upon the outlook of metropolitan school systems such as that in Nashville and Davidson County. State school finance systems are such, generally, as toallocate funds in varying amounts to local school systems. The State of Tennessee has a State aid apportionment plan among the more defensible in the United States, but it shouldbe looked upon in terms of its equity, not for purposes of seeking a.special advantage for the Metropolitan School System. However, it apparently, in some respects,is working at a disadvantage to the Metropolitan School System.

-It is not unusual that the financing of schoolsbecomes an issue of burden on the property. tax. As is wellknown, this is an anachronism in the support of schools towhich there has been generally too little adjustment.In addition to sources of funds through State and Federal aid, coming from taxes other than the property taxes, there is always the opportunity of taxes other than property taxes locally.

- Inthe interests of economy, the school system should seek to the fullest the services of the manycapable public and pri- vate organizations and agencies in theMetropolitan commun- ity.This includes not only welfare agencies, but higher educational institutions such as Peabody and Vanderbilt University.It certainly would be to the advantage of the school system, for instance, to cooperate fully with Peabody College in its program of student teaching. Moreover, the research facilities of Peabody College and Vanderbilt should be used to their fullest in a manner which would minimize costs of the many studies which need tobe made continuously in order to Make the mott improvement at optimum cost. There have been conversations related to the possibilityof locating one school in close proximity to Peabody College so that it could be used forteacher training, laboratory school purposes and experimentaland demonstration work. Such matters certainly should be.consideredregularly. -Plan current expense budgets in gross terms over a five- or six-year period, as has been suggested in parts of this report, very much as capitalbudgets are regularly prepared, so that the year-to-year shock is not so great, so that there is some view of where the program is leading and so as tophase it in to the growth of the economic base ofthe community.

-272 APPENDIX A

BASIC INFORMATION ON SCHOOL BUILDINGS IN NASHVILLE-DAVIDSON COUNTY SCHOOL SYSTEM AS OF MARCH 1963

Site Grades Dates of construction size Enrol lment Name of school housed Initial Additions (acres) Capacity Fall1962

Allen, Margaret 1-6 1950 5.5 300 477 Amqui 1-6 1948 1950 4.9 495 584 Andrews, Julia 1-6 1942 1953 9.3 390 176 Antioch High 7-12 1935 1949-50-54-55-5930.5 1,022 1,344 Bailey 1-9 1929 1939-49 8.2 698 639 Baxter, Jere 1-6 1 910 1941-54 3.4 615 719 Bellevue Elementary 1-8 1 958 4.1 90 71 Bellevue High 9-12 1931 1950-56 16.2 itoo 313 Bellshire 1-6 1962 13.5 360 328 Berry 1-6 1947 1954 6.6 450 492 Binkley, Norman 1-6 1 960 1961 9.9 540 696 Bordeaux 1-6 1955 1962 3.9 450 481 Brick Church 1-6 1 949 1950-56-61 10.5 645 600 Brookmeade 1-6 1957 1961 10.4 360 376 Buena Vista 1-6 1 931 3.0 700 398 450 597 Burton, 1-8 1 941 1950-5T 7.9 Caldwell 1-6 1 937 1952 3.2 930 586 Camerpn 71,12 1939 1948-54-59-61 7.8 1,402 1,742 Carter-Lawrence 1-6 1939 1949-52 4.9 900 1,010 Covert. 7-9 1928 1936 5.6 303 347 Central High 7-12 1917 1942-48-50-51 9.2 1,323 1,273 Chadwell 1-6 1956 1959 13.6 480 505 Charlotte Park 1-6 1 960 10.4 420 549 Clemons 1-6 1916 1954 2.4 600 489 Cockrill 1-6 1939 1954 7.5 645 _428 Cohn 7-12 1928 1936-49 6.2 1,293 1,486 Cole 14 1 962 10.6 360 393 Cotton 1-6 1949 5.9 495 -358 Crieve Hall 1-6 1954 1957 18.3 540 654 Cumberland High 7-12 1929 1949-50-51-61 18.5 840 774 Dalewood 1-6 1949 1951-54 9.7 540 543 Dodson 1-6 1936 1950-55 7.1 210 283 Donelspn Elementary 1-6 1924 1941-49 6.9 585 673

273 APPENDIX A (CONT'D)

Site Grades Dates of construction size Enrollment Name of school housed Initial Additions (acres) Capacity Fall 1962

Donelson High 7-12 1928 1953-54-56- 17.8 1,287 1,447 59 Dupont Primary 1-3 1951 1954 9.7 360 378 Dupont. Elementary 4-8 1926 1944 7.1 953 616 Dupont High 9-12 1930 1937-50-53- 9.2 716 548 55 Eakin 1-6 1936 1954 3.8 580 478 Early, John 1-8 1940 1950-62 3.7 630 660 East Nashville Jr. High 7-9 1937 1949 10.8 998 1,038 East Nashville Sr. High 10-12 1932 10.9 1,021 807 Elliott 1-6 1916 .9 510 559 Fall 1-6 1898 1926 1.3 390 420 Fehr 1-6 1924 1949 2.2 390 360 Glencliff Elementary 1-6 1954 1956-59 10.2 480 535 Glencliff High 7-12 1956 1959-61 20.5 1,328 1,514 Glen,$ale '1-6 1951 1953 10.8 420 351 Glengarry 1-6 1962 9.8 360 378 Glenview 1-6 1954 1957 9.6 540 523 Glenn 1-6 1903 1949 4.0 510 426 Goodlettsville Elementary 1-6 1954 18.8 540 762 Gdodlettsville High 7-12 1936 1937-45-50- 8.0 1,021 841 51-56-61 Gower 1-8 1941 1950-53 9.9 360 374 Gra-Mar 1-6 1961 11.2 240 292 Green, Alex 1-6 1936 1952 5.0 270 271 Green, Julia 1-8 1948 1950 7.5 495 543 Greene, Ford 1-6 1939 1961 7.2 1,050 1,240 Hamilton 1-6 1926 1952-60 4.6 210 289 Harpeth Valley 1-8 1938. 1950 6.3 240 275 Haynes 1-12 1940 1947-50-53- 16.7 942 1,121 54-62 Haywood 1-6 1959 1962 11.4 600 596 Head 1-6 1952 3.1 810 820 Hermitage 1-6 1962 10.0 300 279 Hickman 1-6 1957 1960 12.3 540 556 Highland Heights 7-9 1930 1935-39-62 5.9 930 577 Hill, H.G. 1-6 1953 1956-59 15.5 600 557

-274 APPENDIX A (CONT'D)

Site Grades Dates of construction size Enrollment housed Initial Additions (acres) Capacity Fall 1962

1,108.)3 Hillsboro High 9-12 1955 1958 21.5 1,165 1,282 Hil !wood High 7-11 1959 1961 15.5 1,086 1,226 Howard 1-12 1940 1961 12.9 1,535 714 Hume-Fogg 10-12 1912 1917 2.0 1,071 , 712 Inglewood 1-6 1929 1948-58 5.2 585 185 Jackson, Andrew 1-8 1928 1957 9.2 180 318 Joelton Elementary 1-6 1932 1950 2.2 270 537 Joe Iton High 7;12 1950 1951-55 13.9 605 630 633 Johnson 1-6 1954 2.9 60 54 Johnson, Charles 1-8 1958 4.8 480 445 Jones.. 1-6 1936 2.8 210 163 Jordonia 1-6 1936 1959 2.8 690 664 Joy, Tom 1-6 1937 1947-53-55- 6.8 56 202 King's Lane 1-6 1961 9.8 240 466 Kirkpatrick 1-6 1952 3.8 510 1,638 Litton,Isaac,Jr.-Sr.High7-12 1930 1938-52-54 21.0 1,642 630 612 Locke land 1-6 1939 1948-61 . 3.4 690 596 McCann 1-6 1936 1950-54-61 . 2.3 383 McGavock 1-6 1955 11.2 390 990 1,066 McKissack 1-6 1954 1958 4.6 1,511 Madison High 7-12 1951 1953-56-59 24.5 1,227 1,461 Maplewood High 7-12 1955 1959-60-61 33.3 1,167 1,034 803 Meigs 1-12 1934 1953-57 2.5 588 Mills, Dan 1-6 1937 1950-54-60 5.8 570 188 Morny 1-6 1947 2.8 150 Mt. View 1-6 1948 5.5 120 181 153 Mt. Zeno 1-8 1947 2.2 150 270 281 Murphy 1-6 1908 .7 546 Murrell 1-6 1958 1960 2.5 510 604 Napier 1-6 1898 1949 1.7 585 393 Neely's Bend 1-6 1953 1956 12.5 300 644 North Nashville High 7-12 1940 1950 8.2 1,073 293 Old Center 1-6 1936 1958-60-62 6.7 360 1,044 1,482 Overton High 7-12 1958 1961 37.9 420 41.3 Park Avenue 1-6 1916 1949 2.8 600 555 Parmer 1-8 1929 1948-51 7.8 532 Pearl Elementary 1-6 1917 1923 1.0 540

-275

...,...... ,,,,,.,...y... APPENDIX A (CONT'D)

Site Grades Dates of construction size Enrollment (acres) Capacity Fall 1962 Name of school housed Initial Additions

1,225 Pearl High 10-12 1936 1945 1,033 600 510 Pennington 1-6 1959 1962 10.8 425 Priest, Percy 1-8 1 956 1 961 9.1 420 240 263 Providence 1-8 1950 7.7 420 360 Ransom 1-6 1925 1 932-51-55 2.0 810 543 Richland 1-6 1940 1 946-48-54 4.6 270 331 Robertson Academy 1-6 1936 1948-54 2.9 720 591 Rosebank 1-6 1954 1956-59 6.6 300 215 Ross 1-6 1907 1951 1.3 510 634 Shwab 1-6 1941 1 951 9.3 660 731 Stanford 1-6 1951 1953-58 15.4 210 211 Stateland 1-8 1955 6.3 450 Stokes, Walter 1-8 1936 1949-50 4.7 480 700 875 Stratford High 7-10 1962 27.2 852 Stratton, Taylor 1-6 1910 1936-51-54 7.3 690 660 460 Sylvan Park 1-6 1935 1950-54 4.6 570 526 Turner 1-6 1925 1950 2.5 540 695 Tusculum 1-6 1936 1952-56-59 13.7 966 865 Two Rivers High 7-10 1960 1961-62 26.3 480 525 Una 1-6 1942 1951 10.6 191 Union Hill 1-8 1941 1 957 5.3 180 309 295 Vaught, Martha 1950 1952 8.7 6.3 210 187 Wade 1-6 1937 1952 2.4 990 592 Warner 1-6 1916 1 941-48 1,138 1,481 Washington 7-9 1928 1 939-49-62 3.4 409 318 Waverly-Belmont 7-9 1935 5.8 694 587 West End 9-12 1939 13.0 240 306 West Meade 1-6 1961 12.5 1,228 1,417 Wharton 1-9 1958 7.1 390 535 Whitsitt 1-6 1950 1953 6.5 420 534 Woodbine 1-6 1922 1950-57 390 447 Woodmont 1-8 1931 1950 3.2 82,624 TOTALS, 135 Schools 1,164.3 82,099

-276