Srekvav High School Building E Ducation
Total Page:16
File Type:pdf, Size:1020Kb
B roadening A ccess to S ustainable Srekvav High School Building E ducation Facts Description In spite of its flourishing tourism, Cambodia is still one of the poorest and least developed countries in Name Srekvav High School Southeast Asia. Development is not evenly distributed in the country and many rural communities Type of facility School Building remain poverty-stricken as corruption and self-interest impedes the country’s growth. Srekvav Village is Number of students 451 (256 girls and 195 boys) located in Srekvav Commune, Angkor Chum District, Siem Reap Province, Cambodia. The village currently Number of teachers 11 (4 female and 7 male) has a population of 10,036 residents from 2,018 households. The residents of the village rely solely on Number of 1 school building with 6 rice farming for their livelihood. Srekvav High School was established in 2005 and caters to students aged classrooms to be fully-furnished classrooms 12 to 18 years of age. The school currently serves 451 students (256 girls and 195 boys) and employs 11 built by us and 4 toilets teachers (4 females and 7 males). The school consists of two concrete buildings and three zinc classrooms, which are interspersed around the school grounds. The concrete buildings, with a total of Size of buildings 432 m2 eight classrooms, are in good condition, but they cannot comfortably fit the increasing student Total budget USD 70,063 population. The community constructed three zinc classrooms to alleviate the overcrowding, but these Construction period February 2021 - September rooms become unbearably hot therefore students cannot concentrate on their studies. The school 2021 currently caters up to grade 11, but in the next academic year they will be accepting grade 12 students Project manager Mr. Se Jane Sik thus the overcrowding is only expected to get worse. The students clearly lack a suitable environment to Location Srekvav Village, focus on their learning. To address this situation, we will support Srekvav Village with the construction Srekvav Commune, of one new concrete school building with six fully-furnished classrooms. The new school building will Angkor Chum District, emphasize the importance of education to Srekvav Village and the surrounding communities and provide Siem Reap Province, an incentive for the students to complete their higher secondary education. The new building will create Cambodia a motivating learning environment in which students can reach their full potential. The project will also Map include four new toilets, which will improve sanitation standards and thus prevent hygiene-related illnesses. This will bring the total number of toilets to 10. Implementation Srekvav High School is a government registered school. The teachers’ salaries and training are supported and managed by the government. Our approach as always is to involve the community to instil a sense of pride and ownership in the project. For this project the villagers will contribute by filling up the land for the school foundation and organizing the school opening ceremony when construction is completed. The school staff and the community will be responsible for the operation and maintenance of the new school building. We will select a trusted local contractor to coordinate all phases of construction and to purchase materials as well as to arrange for the required furniture locally. The foreman will be in charge of selecting the construction team and will be responsible for covering all labour costs, transport costs, and construction materials. The contractor will be paid in four instalments based on the construction progress, with 5% of the total cost held back for six months as a guarantee for the quality of the work. We consider this a low risk project. Construction is scheduled to commence in February 2021 and is targeted to be completed by September 2021. Photos Construction Budget Item USD In % Construction Materials 44,000 63 Interior Equipment & Furniture 3,157 4 Labour Cost 15,318 22 Transportation Cost 729 1 Project Implementation & Monitoring Costs 1,955 3 Administration Overhead 4,904 7 One of the concrete buildings at Total Budget 70,063 100 Srekvav High School These temporary classrooms become overheated and create an atmosphere that is uncomfortable for With the student population increasing teachers and students unabatedly, a new school building is urgently required .