Warren Stamping Plant, Warren, Michigan

Total Page:16

File Type:pdf, Size:1020Kb

Warren Stamping Plant, Warren, Michigan Contact: Jodi Tinson Mike McElrath Warren Stamping Plant 22800 Mound Road , Warren, Michigan, United States Floor Space: 2.1 million square feet Acreage: 78 acres Products: Stampings and assemblies including hoods, roofs, liftgates, side apertures, fenders and floor pans.Stampings/assemblies provided for the Dodge Durango, Chrysler Pacifica, Chrysler Voyager, Chrysler Grand Caravan (Canada only), Jeep® Grand Cherokee, Jeep Cherokee and Ram Trucks (Light Duty and Heavy Duty). Employment: 1,626 (1,446 hourly; 180 salaried) Union Local: UAW Local 869, 889 and 412 Plant History: Facility was completed in 1948 and production began in 1949. Major expansions were implemented in 1952, 1964, 1965 and 1986. FCA confirmed on June 25, 2014, that it would invest $63 million to expand capacity at the facility. The investment was used to purchase and install the latest high-speed Servo Tandem Press technology (a 180- inch press line). The new press line has increased capacity by up to 12,000 hits per day or approximately 3.6 million parts per year. On Feb. 26, 2019,FCA announced that it would invest $245 million in the facility to support additional production of Jeep® and Ram vehicles being created as part of a $4.5 billion investment announcement that will impact five existing Michigan facilities and build a new assembly plant within the city of Detroit. In total, the proposed projects will create nearly 6,500 new jobs. World Class Manufacturing Accomplishments Warren Stamping was designated a silver plant for its results in implementing World Class Manufacturing (WCM) on March 28, 2018. The Warren, Michigan, stamping plant becomes the Company's first stamping plant to achieve the WCM award milestone. WCM is a methodology that focuses on eliminating waste, increasing productivity, and improving quality and safety in a systematic and organized way. It engages the workforce to provide and implement suggestions on how to improve their jobs and their plants, promoting a sense of ownership. Warren Stamping earned bronze, the first WCM award level, in October 2014 (Updated: August 2021) -###- Additional information and news from Stellantis are available at: https://media.stellantisnorthamerica.com .
Recommended publications
  • Fiat Chrysler Automobiles
    FIAT CHRYSLER AUTOMOBILES VISIT OUR WEBSITE (HTTPS://WWW.FCAGROUP.COM/EN- US/GROUP/REGIONS/PAGES/NORTHAMERICA.ASPX) Fiat Chrysler Automobiles (FCA) is a global automaker that designs, engineers, manufactures and sells vehicles in a portfolio of exciting brands, including Abarth, Alfa Romeo, Chrysler, Dodge, Fiat, Fiat Professional, Jeep®, Lancia, Ram and Maserati. It also sells parts and services under the Mopar name and operates in the components and production systems sectors under the Comau and Teksid brands. FCA employs nearly 200,000 people around the globe. For more details regarding FCA (NYSE: FCAU/ MTA: FCA), please visit www.fcagroup.com. FCA Location Employees FCA US Headquarters & Technology Center Auburn 1,335 Hills MI Belvidere Assembly Plant and Belvidere Satellite Stamping Plant Belvidere IL Under construction Dundee Engine Plant Dundee MI 4,027 Indiana Transmission Plant Kokomo IN Under construction Jefferson North Assembly Plant Detroit MI 37 Kokomo Casting Plant Kokomo IN 7,659 Kokomo Engine Plant Kokomo IN 2,269 / FCA Location Employees Kokomo Transmission Plant Kokomo IN 964 Mack Avenue Engine Complex Detroit MI 6,759 Mt. Elliott Tool & Die Detroit MI 669 Sterling Heights Assembly Plant Sterling 1,796 Heights MI Sterling Stamping Plant Sterling 2,002 Heights MI Tipton Transmission Plant Tipton IN 2,613 Toledo Assembly Complex Toledo OH 68 Toledo Machining Plant Perrysburg 79 OH Trenton Engine Complex Trenton MI 67 Warren Stamping Plant Warren MI 54 Warren Truck Assembly Plant Warern MI 72 Midwest (Chicago) Business
    [Show full text]
  • Warren Truck Assembly Plant (B2767) A.K.A. Warren Dodge Truck Plant FCA US, LLC 21500 Mound Road Warren, Michigan 48091-4840
    MACES- Activity Report Page 1 of 65 DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION ACTIVITY REPORT: On-site Inspection B276755426 FACILITY: FCA US LLC WARREN TRUCK ASSEMBLY PLANT SRN / ID: B2767 LOCATION: 21500 Mound Road, WARREN DISTRICT: Warren CITY: WARREN COUNTY: MACOMB CONTACT: ACTIVITY DATE: 07/30/2020 STAFF: Iranna Konanahalli I COMPLIANCE STATUS: Compliance SOURCE CLASS: MAJOR SUBJECT: FY 2020 scheduled ROP CMS inspection of FCA US Chrysler’s Warren Truck Assembly Plant RESOLVED COMPLAINTS: Warren Truck Assembly Plant (B2767) a.k.a. Warren Dodge Truck Plant FCA US, LLC 21500 Mound Road Warren, Michigan 48091-4840 North American Industry Classification System (NAICS) Code: 336112 (SIC; 3711) CAA Sec. 114(a): FCA received CAA Sec. 114(a) letter dated May 15, 2018. FCA (Mathew Read, Office of General Counsel) responded to this request on July 10, 2018, with an electronic document copies package (first installment) to Jillian Rountree, Esq. Regional Counsel, US EPA 5. 2015 ROP Renewal: Application No. 201500086 received on June 08, 2015 RO Permit Number: MI-ROP-B2767-2016, Effective December 6, 2016, Expires December 6, 2021. ROP Renewal Application is Due Between June 6, 2020 and June 6, 2021 Auto Protocol: “Protocol for Determining the Daily Volatile Organic Compound Emission Rate of Automobile and Light Duty Truck Topcoat Operations”, EPA- 450/3-88-018 or as amended. FCA US (Chrysler) follows the protocol procedures for both NSPS MM (2M: prime coat, guide coat [aka primer surfacer] and topcoat operations installed / modified after October 5, 1979; the LAER permits were issued in 1984) and RACT Rule 336.1610.
    [Show full text]
  • Chrysler Group's Warren Stamping Plant Latest to Earn World Class
    Contact: Jodi Tinson Chrysler Group’s Warren Stamping Plant Latest to Earn World Class Manufacturing Bronze Designation; First Stamping Plant to Achieve Milestone Warren Stamping becomes seventh North American Plant to earn bronze Ranking rewards improvements in safety, quality and productivity WCM implementation has saved the Company more than $1 billion since June 2009 October 31, 2014, Auburn Hills, Mich. - Chrysler Group LLC’s Warren Stamping Plant (WSP) has been awarded bronze status for its results in implementing World Class Manufacturing (WCM). The Warren, Mich., stamping plant becomes Chrysler Group’s first stamping plant and the seventh North American facility to achieve the WCM award milestone. WSP, which has been stamping sheet metal into vehicle body panels for 65 years, received the bronze designation just over four years after adopting the WCM operating system following a two-day audit Oct. 30-31, 2014. Bronze is awarded after earning a minimum of 50 points in 10 technical and 10 managerial pillars by demonstrating clear WCM know-how and competence through employee-conducted pillar presentations and a review of projects that have been expanded across the shop floor. WSP earned a score of 51. “The employees at Warren Stamping are to be commended for their commitment to implementing World Class Manufacturing and taking an active role in supporting the plant’s goal of achieving bronze,” said Brian Harlow, Vice President and Head of NAFTA Manufacturing, Chrysler Group LLC. “Employee involvement is vital to the success of WCM, so having our UAW partners at both the local and international level fully engaged in this effort has been critical in making Chrysler Group’s manufacturing facilities among the best in the world.” World Class Manufacturing is a methodology that focuses on reducing waste, increasing productivity, and improving quality and safety in a systematic and organized way.
    [Show full text]
  • PTI No. 13-19B
    FCA US LLC Page 1 Proposed Permit No. 13-19B April 28, 2021 TECHNICAL FACT SHEET April 28, 2021 Purpose and Summary The Michigan Department of Environment, Great Lakes, and Energy (EGLE), Air Quality Division (AQD), is proposing to act on Permit to Install (PTI) application No. 13-19B from FCA US LLC (FCA). The permit application is for proposed modifications to a previously permitted project involving a new automotive paint shop and changes to the existing automotive assembly line at the Warren Truck Assembly Plant (Warren Truck). Construction of the project is underway, as allowed under PTI No. 13-19A. The proposed modifications are subject to permitting requirements of the Department’s Rules for Air Pollution Control and state and federal Nonattainment New Source Review (NNSR) regulations. Prior to acting on this application, the AQD is holding a public comment period and a public hearing, if requested in writing, to allow all interested parties the opportunity to comment on the proposed PTI. All relevant information received during the comment period and hearing, if held, will be considered by the decision maker prior to taking final action on the application. Background Information FCA owns and operates the existing Warren Truck Assembly Plant (Warren Truck), which consists of a body shop, a paint shop (with an additional paint shop currently under construction), and a final assembly operation, located at 21500 Mound Road, Warren, Macomb County, Michigan. Warren Truck operates under Renewable Operating Permit (ROP) No. MI-ROP-B2767-2016. Proposed Project FCA is proposing to modify an already approved, but not completely installed, project on an existing automotive assembly line at Warren Truck.
    [Show full text]
  • On December 10, 2019, I Conducted a Level 2 Inspection at FCA US Warren Stamping Plant
    MACES- Activity Report Page 1 of2 DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION ACTIVITY REPORT: Scheduled Inspection B275752784 FACILITY: FCA US LLC WARREN STAMPING PLANT SRN / ID: B2757 LOCATION: 22800 MOUND RD., WARREN DISTRICT: Southeast Michi □ an CITY: WARREN COUNTY: MACOMB CONTACT: Grea Karaaeozian Environmental Enaineer ACTIVITY DATE: 12/10/2019 STAFF: Rem Pinga I COMPLIANCE STATUS: Compliance SOURCE CLASS: MAJOR SUBJECT: Level 2 Target Inspection RESOLVED COMPLAINTS: On December 10, 2019, I conducted a level 2 inspection at FCA US Warren Stamping Plant. The facility is located at 22800 Mound Road, Warren, Michigan 48091. The purpose of the inspection was to determine the facility's compliance with the requirements of the federal Clean Air Act; Part 55, Air Pollution Control, of the Natural Resources and Environmental Protection Act, 1994 PA 451, as amended (Act· 451 ), the administrative rules, the facility's Renewable Operating Permit (ROP) No. MI-ROP-82757-2019. During the inspection, I was accompanied by Mr. Greg Karageozian, facility contact person. Prior to conducting the walk-through inspection, I initially showed my credentials and stated the purpose of the inspection. The facility is considered a major source under the Clean Air Act of 1990, and operates under a Title V permit, ROP No. MI-ROP-82757-2019 because it is adjacent to FCA US Warren Truck Assembly Plant and both are under common ownership and control of FCA US (Chrysler). Moreover, as an evidence of interconnected manufacturing operations, there is a tunnel to Warren Truck Assembly Plant from the stamping plant for transport of the stamped auto parts.
    [Show full text]
  • President Trump's Jobs Plan for Michigan
    President Trump’s Jobs Plan for Michigan: All Job Creation is Local A Special Report by the White House Office of Trade and Manufacturing Policy October 15, 2020 1 Introduction The Obama-Biden administration raised taxes, increased regulations, suppressed the development of America’s petroleum sector, slashed the defense budget, and failed to crack down on the unfair trade practices of countries from Canada and Mexico to Japan, South Korea, and Communist China. The Trump-Pence administration has pursued just the opposite policies while following an “all job creation is local” approach to stimulating economic growth. Let’s see how this strategy has worked at the community level in Michigan. Tax Cuts and Opportunity Zones Boost Michigan Income Critics of President Trump’s historic Tax Cuts and Jobs Act of 2017 have tried to fool the American people into thinking these were tax cuts for the rich. But nothing could be further from the truth. Consider that real, inflation-adjusted median household income in Michigan increased by $5,292 or 9% in just two years following the passage of the Trump tax cuts.1 Compare that to a decline of more than $2,000 during the entire eight years of the higher tax regime of the Obama administration.2 At $64,119, Michiganders are now enjoying the highest real median household income level since Communist China entered the World Trade Organization in 2001 and began devastating Michigan’s manufacturing base.3 And the Trump tax cuts are family-friendly. Nearly 650,000 Michigan households are benefitting from the doubling of the child tax credit;4 and nearly 3.5 million Michigan households are benefitting from doubling the standard tax deduction.5 A key provision in the Trump tax bill related to mortgage eligibility and financing likewise has helped raise the rate of homeownership in Michigan by 3.0 percent.6 Compare that to the eight years of the Obama-Biden administration where the homeownership rate contracted by 2.4 percent.7 2 On the opportunity zone front, Michigan is home to 288 such zones.
    [Show full text]
  • Environmental, Health, & Safety
    Environmental, Health, & Safety General Safety Standard for Industrial Equipment Summary 4/22/2015 General Safety Standard for Industrial Equipment Current State – Many safety standards and requirements w/ no guidance on their use Problem Form Team Solution Improvements Key Changes Feedback Canadian Standards Association (CSA) Association Standards Canadian AME Do’s & Don’t’s International Standards Organization (ISO) National Fire Protection Agency (NFPA) American National Standards Institute (ANSI) International Electrotechnical Committee (IEC) US Department of Labor Ministry of Labor Ontario Health and Safety Act (OHSA) 4/22/2015 2 General Safety Standard for Industrial Equipment Current State - Issues and Concerns Problem Form Team Solution Improvements Key Changes Feedback . Scope creep of the Do’s and Don’ts Section 16 Safety written for assembly tools pushed into all manufacturing. Breeding ground for: ● Unclear requirements. ● Redundancy of requirements. ● Conflicts between different applicable standards. ● Incorrect interpretations of standards & requirements. ● Inconsistent and misapplication. ● Safety myths and resistance to change. Goal – Develop a NAFTA safety standard to replace the Do’s and Don’ts Section 16 that meets safety requirements for use in all equipment and reduce the weaknesses above. 4/22/2015 3 General Safety Standard for Industrial Equipment FCA – NAFTA Locations Affected Problem Form Team Solution Improvements Key Changes Feedback (BVAP) Belvidere Stamping and Assembly Plant (DEP) Dundee Engine Plant (CAAP) Conner Avenue Assembly Plant (ITP1) Indiana Transmission Plant 1 (JNAP) Jefferson North Assembly Plant (ITP2) Indiana Transmission Plant 2 (SHAP) Sterling Heights Assembly Plant (KTP) Kokomo Transmission Plant (SSP) Sterling Stamping Plant (KCP) Kokomo Casting Plant (TAC) Toledo Assembly Complex (MEC) Mack Engine Complex (WTAP) Warren Truck Assembly Plant (TTP) Tipton Transmission Plant (WSP) Warren Stamping Plant (TEC) Trenton Engine Complex (ATD) Autodie Tool and Die (TMP) Toledo Machining Plant (METD) Mt.
    [Show full text]
  • Thank You for Your Interest in FCA!
    Thank you for your interest in FCA! Review this packet for details and resources to prepare for your FCA Application This packet includes: – Over view of the Application Process – Cop y of the Pre-screen Questions – Resources to Help You Prepare Requirements to work at FCA are: FCA is hiring at 6 locations in Metro Detroit! 1. Be 18 years old 2. Have a valid state or federal ID Sterling Heights Assembly Plant 3. Have a High School Diploma Sterling Heights Stamping Plant (or equivalent, such as GED or HiSET) Warren Stamping Plant 4. Pass a Mechanical Reasoning and Behavioral Assessment Warren Truck Assembly Plant 5. Complete an interview and dexterity Jefferson North Assembly Plant exercise AND Detroit Assembly Complex Mack 6. Pass a drug screen, physical and background check FCA is hiring for 3 positions: 1. Production Operator ($15.78/hr) 2. Repair Technician ($15.96/hr) 3. Truck Driver ($17.82/hr) All positions are for Supplemental Employees Supplemental Employees are on-call Monday through Friday (potential Saturday, Sunday and/or holidays). This position can be scheduled up to 40 hours per week and may require overtime depending on production needs. Applications are for ALL 6 locations - candidates who receive a conditional offer will be assigned to a plant based on production needs. You will not have the option to select which plant you want to work at. Once hired, transfers to different plants are approved in order of seniority. 1 The FCA Application is a 5-Step process and you must complete all five to be hired.
    [Show full text]
  • A Message to UAW Members At
    FCA CONTRACT SUMMARY: SALARIED WORKERS DECEMBER 2019 HIGHLIGHTS Wages - Progression to max in all grades, based on 3% annual increase A Message to UAW Members ● Employees at max of pay grade get 3% lump-sum payments each year, based on qualified at FCA earnings ● Employees below max of pay Dear Brothers and Sisters: grade get 3% annual wage increase until reaching max of FCA has had a remarkable four-year run. Because of your hard work grade and dedication, sales are high, quality is up and FCA’s UAW-made ● Elimination of merit (PLM) portion of the pay scale products are among the most coveted on the market. As a result, over the last four years FCA has added nearly 6,500 workers, promoted over ● Phase-ups and promotions remain 6,750 temporary workers to permanent status and announced the build- Signing Bonus - $9,000 signing ing of a new plant here in the United States. This round of collective bar- bonus; $3,500 for temps gaining builds on those successes and provides you with a greater share Vacation/Paternity Leave - Added of FCA’s gains. benefits Your UAW FCA Bargaining Team has done tremendous work on your ● Added vacation carryover behalf and appreciates your patience and sacrifice during the General language and subject to Motors strike and subsequent negotiations at Ford. Through pattern grievance procedures bargaining, we successfully negotiated pathways for all members to full- ● Negotiated unpaid paternity time, full-pay status; held the line on costs for quality health care; protect- leave not to exceed one year ed bonuses and increased profit sharing, and protected our job security Bargaining unit work assignment review and resolution process and secured new investments for the future.
    [Show full text]
  • 4/21/2016 FCA US LLC Plant Code List 7:47 AM Plant Name Order 1 Of
    4/21/2016 FCA US LLC Plant Code List 7:47 AM PLANT PLANTNAME ADDRESS CITY STATE ZIPCODE COUNTRY 4595 AK6 Transformation Center 1301 Chesapeake Ave Baltimore MD 21226 US 1257 ARIZONA PROVING GROUNDS - YUCC 1 PROVING GROUND ROAD YUCCA AZ 86438 US 2771 CA Business Center Suite 400 7700 Irvine Center D Irvine CA 92618-2924 US 2909 CANADA SERVICE CONTRACT One Riverside Dr West Windsor ON N9A 5K3 CA 4199 CG AME Process Verification Ct 850 Chrysler Dr E/N DOC Auburn Hills MI 48326 US 3163 CG Atlanta Parts Depot 1149 Citizens Parkway Morrow GA 30260 US 4015 CG Belvidere Assy Plant 3000 W.Chrysler Dr Belvidere IL 61008 US 6224 CG Belvidere Stmpg & Fascia Op Chrysler Co LLC, 3000 W Chrysl Belvidere IL 61008-6094 US 3133 CG Boston PDC 550 Forbes Boulevard Mansfield MA 02048-2038 US 9127 CG Bramco Satellite Inc 2000 Williams Parkway Bramalea ON L6T 4T6 CA 9126 CG Brampton Assembly Plant 2000 Williams Parkway E. Brampton ON L6T 4Y6 CA 9301 CG Canada Service Parts Divisi One Riverside Dr West Windsor ON N9A 5K3 CA 9210 CG Canadian Dealership Realty 2450 CHRYSLER CENTER P O BOX 1 Windsor ON N9A 4H6 CA 3118 CG Center Line Kit Packaging 26311 Lawrence Avenue Center Line MI 48015-1201 US 3110 CG Center Line Natl Prts Depot 26311 Lawrence Avenue Center Line MI 48015-1201 US 3119 CG Center Line Packaging 26311 Lawrence Avenue Center Line MI 48015-1201 US 3173 CG CEVA Mopar Export Consolida 24450 Glendale Ave Redford MI 48239 US 3195 CG Chicago Parts Depot - Naper 1980 High Grove Lane naperville IL 60540 US 4518 CG Chrysler Atlantic Port Oper 2901 Childs Street Baltimore MD 21226 US 4523 CG Chrysler Atlantic Port Oper 1600 east terminal way Aberdeen WA 98520 US 8068 CG Chrysler De Venezuala LLC AV.
    [Show full text]
  • On April 29, 2021, I Conducted a Level 2 Inspection at FCA US LLC Warren Stamping Plant
    MACES- Activity Report Page 1 of 3 DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION ACTIVITY REPORT: On-site Inspection B275757894 FACILITY: FCA US LLC WARREN STAMPING PLANT SRN / ID: B2757 LOCATION: 22800 MOUND RD., WARREN DISTRICT: Warren CITY: WARREN COUNTY: MACOMB CONTACT: Audrey Joslin , Environmental Specialist ACTIVITY DATE: 04/29/2021 STAFF: Rem Pinga I COMPLIANCE STATUS: Compliance SOURCE CLASS: MAJOR SUBJECT: Scheduled On-site Inspection RESOLVED COMPLAINTS: On April 29, 2021, I conducted a level 2 inspection at FCA US LLC Warren Stamping Plant. The facility is located at 22800 Mound Road, Warren, Michigan 48091. The purpose of the inspection was to determine the facility’s compliance with the requirements of the federal Clean Air Act; Part 55, Air Pollution Control, of the Natural Resources and Environmental Protection Act, 1994 PA 451, as amended (Act 451), the administrative rules, the facility’s Renewable Operating Permit (ROP) No. MI-ROP-B2757- 2019. During the inspection, I was accompanied by Ms. Audrey Joslin, new facility contact person. Prior to conducting the walk-through inspection, I initially showed my credentials and stated the purpose of the inspection. To comply with the COVID-19 Emergency AQD Field Inspection Guidance Update (June 2020), the inspection was announced and scheduled. I set up the inspection via telephone call to Ms. Joslin. Ms. Joslin emailed me an electronic copy of the facility’s Visitor Health Screening Form that I am supposed to fill out and submit online the same day prior to entering the facility. At the site, I was met by Ms. Joslin at the front entrance and the protocol temperature check was conducted via a remote temperature scanner.
    [Show full text]
  • FCA US Manufacturing Investments Timeline
    Contact: Jodi Tinson FCA U.S. Manufacturing Investments Timeline (June 2009-March 2020) Since June 2009, FCA has committed investments of more than $14 billion and added nearly 30,000 new jobs (including more than 22,500 hourly) in the U.S. Those committed investments include: March 5, 2020 - $400 million to repurpose an idled transmission plant in Kokomo, Ind., to build the GMET4 engine – the Company’s 2.0-liter Global Medium Engine inline four-cylinder turbo, retaining 1,000 jobs and adding nearly 200 more. February 26, 2019 – $4.5 billion in five existing Michigan plants, and work with the city of Detroit and state of Michigan on building a new assembly plant within city limits. The proposed projects would create nearly 6,500 new jobs. Details of the investment: $1.6 billion to convert the two plants that comprise the Mack Avenue Engine Complex into the future assembly site for the next generation Jeep® Grand Cherokee as well as an all-new 3-row full-size Jeep SUV and plug-in hybrid (PHEV) models, adding 3,850 new jobs to support production. Jefferson North Assembly Plant to receive an investment of $900 million to retool and modernize the facility to build the Dodge Durango and next generation Jeep Grand Cherokee with 1,100 new jobs expected. The Pentastar engines – the 3.6-, 3.2- and 3.0-liter – currently built at Mack I relocated to the Dundee Engine Plant as part of a $119 million investment. The investment at Warren Truck to retool for production of the all-new Jeep Wagoneer and Grand Wagoneer, announced in 2017, along with their electrified counterparts, to increase to $1.5 billion, adding 1,400 new jobs.
    [Show full text]