WSP Celebration

Total Page:16

File Type:pdf, Size:1020Kb

WSP Celebration Contact: Jodi Tinson Valerie Oehmke Pressing into the Future: Warren Stamping Plant Celebrates Production Start of New State-of- the-Art Press New press increases capacity at 65-year-old Michigan facility $63 million investment brings latest technology to stamping operation First new press installed in 15 years Nearly 84 million parts produced annually Plant supports production at seven North American assembly plants Employees participated in 2,200 hours of training to prepare for new press January 22, 2016, Warren, MICH. - FCA US celebrated the start of production of its newest stamping press during an event today at the Warren Stamping Plant (Mich.). The Company invested $63 million to bring the latest state-of-the- art stamping technology to the 65-year-old facility. FCA North America's Vice President of Manufacturing Brian Harlow, joined by Assistant Director of the UAW Chrysler Department Troy Davis, Plant Manager Dominic Costantini, UAW Local 869 President Romaine McKinney and about 400 employees, acknowledged that it had been more than 15 years since the last press line was installed and that this investment was needed in order to keep up with demand. "The good news is that we needed to increase our stamping capacity because FCA keeps selling more cars and trucks," said Harlow, referencing the 69 straight months of year-over-years sales increases in the U.S. and the best year of sales in the 90-year history of FCA Canada. "All of this is great for the Company, our workers and everyone associated with FCA. From the standpoint of our manufacturing operations, the new Servo Tandem line will help us meet this upsurge in demand." The high-speed Servo Tandem Press technology (a 180-inch press line) is the first press of its kind at Warren Stamping and the only one currently in operation in the Company's North American stamping operations. Construction for the new press line began in the spring of 2014 and production launched in December 2015. The new press line will increase capacity by up to 12,000 hits per day or approximately 3.6 million parts per year. In addition to the new press, Warren Stamping also operates 12 major press lines and three large progressive press lines*, bringing total plant capacity to nearly 84 million parts annually. More than 2,000 employees work at the plant. The new Servo Tandem Press increases the output rate, reduces complexity of the press, and improves reliability and maintainability, while also reducing energy usage. The press's servo drive allows for 100 percent programmable control and movement of the ram speed at any position in the press stroke unlike a mechanical press that operates at a fixed speed. This advanced technology also allows for maximum flexibility by allowing die changes more frequently and more quickly, in about 4 minutes as compared to 20 minutes with older presses. The Tandem Press is multiple presses in line in series, under which a single die is positioned in each press to perform an incremental function to make the stamped part. World Class Manufacturing (WCM) principles were implemented to ensure a successful production launch, including engaging employees involved in the operation of the new press in its design and installation from the beginning. WCM is a methodology that focuses on eliminating waste, increasing productivity, and improving quality and safety in a systematic and organized way. WCM engages the workforce to provide and implement suggestions on how to improve their jobs and their plants, promoting a sense of ownership. WCM was first implemented by Fiat in 2006 and introduced to Chrysler Group as part of the alliance between the two companies in June 2009. More than 100 employees went through 2,200 hours of training at the World Class Manufacturing Academy, also in Warren, Mich., and at the plant in preparation for launch. "Installing a new press line is always a major undertaking," said Harlow. "However, completing installation of this new press line while continuing to run the plant at peak capacity was an exceptional challenge and a tremendous accomplishment." Harlow commended the employees for safely and successfully completing the installation while sustaining production at such a high level throughout the rest of the plant. He also acknowledged their commitment to the implementation of WCM, which resulted in the plant receiving the bronze designation in October 2014. "You have taken an active role in implementing WCM, a system that could not succeed without your personal commitment," said Harlow. "It is because of you that Warren Stamping became the first stamping plant to achieve bronze status, which is an important WCM milestone." A WCM bronze award is given to a plant after completing a two-day audit during which it earned a minimum of 50 points in 10 technical and 10 managerial pillars by demonstrating clear WCM know-how and competence through employee-conducted pillar presentations and a review of projects that have been implemented across the shop floor. The Warren Stamping Plant, which has been in operation since 1949, provides parts stamped from sheet metal, including hoods, roofs, liftgates, side apertures, fenders and floor pans, for a variety of vehicles built at several of the Company's U.S., Canadian and Mexican facilities including: Dodge Grand Caravan and Chrysler Town & Country, Windsor Assembly Plant (Ont.) Dodge Durango and Jeep Grand Cherokee, Jefferson North Assembly Plant (Detroit) Dodge Dart, Belvidere Assembly Plant (Ill.) Jeep Cherokee, Toledo Assembly Complex (Ohio) Ram Trucks, Warren Truck Assembly Plant (Mich.) Chrysler 200, Sterling Heights Assembly (Mich.) Ram Trucks, Heavy Duty and Light Duty, Saltillo Truck (Mexico) These parts are delivered to the assembly plants, then welded together in the body shops to form the frame of the vehicle. Warren Stamping will also support the launch of the all-new 2017 Chrysler Pacifica, which is scheduled to start production in the first quarter at the Windsor Assembly Plant. Since June 2009, FCA US has invested over $5.3 billion in its U.S. manufacturing operations to upgrade facilities and increase capacity. Of that amount, more than $1.8 billion has been spent in Michigan. *A progressive press line is a single press with one slide in which a single die with multiple "progressive" stations produce parts at high speed from a single coil of steel directly. About FCA US LLC FCA US LLC is a North American automaker based in Auburn Hills, Michigan. It designs, manufactures, and sells or distributes vehicles under the Chrysler, Dodge, Jeep®, Ram, FIAT and Alfa Romeo brands, as well as the SRT performance designation. The Company also distributes Mopar and Alfa Romeo parts and accessories. FCA US is building upon the historic foundations of Chrysler Corp., established in 1925 by industry visionary Walter P. Chrysler and Fabbrica Italiana Automobili Torino (F.I.A.T.), founded in Italy in 1899 by pioneering entrepreneurs, including Giovanni Agnelli. FCA US is a member of the Fiat Chrysler Automobiles N.V. (FCA) family of companies. (NYSE: FCAU/ MTA: FCA). FCA is an international automotive group listed on the New York Stock Exchange under the symbol “FCAU” and on the Mercato Telematico Azionario under the symbol “FCA.” Follow FCA US news and video on: Company blog: blog.fcanorthamerica.com Facebook: https://www.facebook.com/FiatChrysler.NorthAmerica/ Instagram: www.instagram.com/FiatChrysler_NA Twitter: www.twitter.com/FiatChrysler_NA Twitter (Spanish): www.twitter.com/fcausespanol YouTube: www.youtube.com/fcanorthamerica Media website: media.fcanorthamerica.com -###- Additional information and news from Stellantis are available at: https://media.stellantisnorthamerica.com .
Recommended publications
  • North American Manufacturing Operations
    Contact: Jodi Tinson North American Manufacturing Operations UNITED STATES, CANADA and MEXICO ASSEMBLY OPERATIONS* Manufacturing Facility Location Products Belvidere Assembly Belvidere, Ill. Jeep® Cherokee Brampton Assembly Brampton, Ont. Chrysler 300, Dodge Challenger, (Canada) Dodge Charger Detroit Assembly Complex - Detroit Jeep Grand Cherokee, Jeep Grand Jefferson Cherokee SRT, Dodge Durango Detroit Assembly Complex - Detroit Jeep Grand Cherokee L Mack Saltillo Truck Assembly Saltillo (Mexico) Ram 1500 Classic (Regular Cab and Crew Cab); Ram 2500, 3500, 4500 and 5500 Heavy Duty; DX Chassis Cab (Mexico Market) Saltillo Van Assembly Saltillo (Mexico) Ram ProMaster Sterling Heights Assembly Sterling Heights, Ram 1500 (Quad Cab and Crew Cab) Mich. Toledo Assembly Complex Toledo, Ohio Jeep Gladiator (South plant); Jeep Wrangler (2 plants) (North plant) Toluca Assembly Toluca (Mexico) Jeep Compass Warren Truck Assembly Warren, Mich. Ram 1500 Classic (Quad Cab and Crew Cab) Windsor Assembly Windsor, Ont. Chrysler Pacifica (Chrysler Pacifica Hybrid), (Canada) Chrysler Voyager and Chrysler Grand Caravan (Canadian market only) *Conner Avenue Assembly Plant (Detroit) ceased production in August 2017. Currently being used as the Conner Event Center. POWERTRAIN OPERATIONS Manufacturing Facility Location Products Dundee Engine Plant Dundee, Mich. 2.4-liter (I-4) Tigershark; 3.6-liter (V-6) Pentastar Upgrade Kokomo Engine Plant (formerly Kokomo, Ind. Being converted to a production site for Indiana Transmission Plant II) the GMET4 engine Saltillo Engine Saltillo (Mexico) 2.0-liter (I-4) Tigershark; 2.0-liter (I-4) E-100 Tigershark; 2.4-liter (I-4) Tigershark; 2.4-liter (I-4) E-100 Tigershark; 5.7-liter (V-8) HEMI®;6.2-liter (V-8) Supercharged Hellcat HEMI; 6.4- liter (V-8) Apache SRT HEMI; 6.4-liter (V- 8) BGE HEMI Saltillo South Engine Saltillo (Mexico) 3.6-liter (V-6) Pentastar Upgrade; 3.6- liter (V-6) Pentastar PHEV Trenton Engine Complex (2 Trenton, Mich.
    [Show full text]
  • Michigan Auto Project Progress Report - December 2000 I Inaugural Progress Report Michigan Automotive Pollution Prevention Project
    A VOLUNTARY POLLUTION PREVENTION AND RESOURCE CONSERVATION PARTNERSHIP ADMINISTERED BY: Michigan Department of Environmental Quality Environmental Assistance Division DECEMBER, 2000: 1st ISSUE John Engler, Governor • Russell J. Harding, Director www.deq.state.mi.us ACKNOWLEDGMENTS DaimlerChrysler Corporation, Ford Motor Company, General Motors Corporation and the Michigan Department of Environmental Quality (MDEQ) thank the Auto Project Stakeholder Group members for providing advice to the Auto Project partners and facilitating public information exchange. The Auto Companies and MDEQ also acknowledge the guidance and counsel provided by the US EPA Region V. CONTACTS FOR ADDITIONAL INFORMATION For information regarding the Michigan Automotive Pollution Prevention Project Progress Report, contact DaimlerChrysler, Ford, or General Motors at the addresses listed below or the Environmental Assistance Division of the Michigan Department of Environmental Quality at 1-800-662-9278. DaimlerChrysler Ford Doug Orf, CIMS 482-00-51 Sue Rokosz DaimlerChrysler Corporation Ford Motor Company 800 Chrysler Drive One Parklane Blvd., Suite 1400 Auburn Hills, MI 48326-2757 Dearborn, MI 48126 [email protected] [email protected] General Motors MDEQ Sandra Brewer, 482-303-300 Anita Singh Welch General Motors Corporation Environmental Assistance Division 465 W. Milwaukee Ave. Michigan Department of Environmental Quality Detroit, MI 48202 P.O. Box 30457 [email protected] Lansing, MI 48909 [email protected] Michigan Auto Project Progress Report - December 2000 i Inaugural Progress Report Michigan Automotive Pollution Prevention Project TABLE OF CONTENTS Page Foreward iv I. Executive Summary Project Overview 1 Activities and Accomplishments 4 Focus on Michigan 11 Auto Company Profiles II. DaimlerChrysler Corporation Project Status 12 Activities and Accomplishments 14 Focus on Michigan 16 III.
    [Show full text]
  • Fiat Chrysler Automobiles
    FIAT CHRYSLER AUTOMOBILES VISIT OUR WEBSITE (HTTPS://WWW.FCAGROUP.COM/EN- US/GROUP/REGIONS/PAGES/NORTHAMERICA.ASPX) Fiat Chrysler Automobiles (FCA) is a global automaker that designs, engineers, manufactures and sells vehicles in a portfolio of exciting brands, including Abarth, Alfa Romeo, Chrysler, Dodge, Fiat, Fiat Professional, Jeep®, Lancia, Ram and Maserati. It also sells parts and services under the Mopar name and operates in the components and production systems sectors under the Comau and Teksid brands. FCA employs nearly 200,000 people around the globe. For more details regarding FCA (NYSE: FCAU/ MTA: FCA), please visit www.fcagroup.com. FCA Location Employees FCA US Headquarters & Technology Center Auburn 1,335 Hills MI Belvidere Assembly Plant and Belvidere Satellite Stamping Plant Belvidere IL Under construction Dundee Engine Plant Dundee MI 4,027 Indiana Transmission Plant Kokomo IN Under construction Jefferson North Assembly Plant Detroit MI 37 Kokomo Casting Plant Kokomo IN 7,659 Kokomo Engine Plant Kokomo IN 2,269 / FCA Location Employees Kokomo Transmission Plant Kokomo IN 964 Mack Avenue Engine Complex Detroit MI 6,759 Mt. Elliott Tool & Die Detroit MI 669 Sterling Heights Assembly Plant Sterling 1,796 Heights MI Sterling Stamping Plant Sterling 2,002 Heights MI Tipton Transmission Plant Tipton IN 2,613 Toledo Assembly Complex Toledo OH 68 Toledo Machining Plant Perrysburg 79 OH Trenton Engine Complex Trenton MI 67 Warren Stamping Plant Warren MI 54 Warren Truck Assembly Plant Warern MI 72 Midwest (Chicago) Business
    [Show full text]
  • Warren Truck Assembly Plant (B2767) A.K.A. Warren Dodge Truck Plant FCA US, LLC 21500 Mound Road Warren, Michigan 48091-4840
    MACES- Activity Report Page 1 of 65 DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION ACTIVITY REPORT: On-site Inspection B276755426 FACILITY: FCA US LLC WARREN TRUCK ASSEMBLY PLANT SRN / ID: B2767 LOCATION: 21500 Mound Road, WARREN DISTRICT: Warren CITY: WARREN COUNTY: MACOMB CONTACT: ACTIVITY DATE: 07/30/2020 STAFF: Iranna Konanahalli I COMPLIANCE STATUS: Compliance SOURCE CLASS: MAJOR SUBJECT: FY 2020 scheduled ROP CMS inspection of FCA US Chrysler’s Warren Truck Assembly Plant RESOLVED COMPLAINTS: Warren Truck Assembly Plant (B2767) a.k.a. Warren Dodge Truck Plant FCA US, LLC 21500 Mound Road Warren, Michigan 48091-4840 North American Industry Classification System (NAICS) Code: 336112 (SIC; 3711) CAA Sec. 114(a): FCA received CAA Sec. 114(a) letter dated May 15, 2018. FCA (Mathew Read, Office of General Counsel) responded to this request on July 10, 2018, with an electronic document copies package (first installment) to Jillian Rountree, Esq. Regional Counsel, US EPA 5. 2015 ROP Renewal: Application No. 201500086 received on June 08, 2015 RO Permit Number: MI-ROP-B2767-2016, Effective December 6, 2016, Expires December 6, 2021. ROP Renewal Application is Due Between June 6, 2020 and June 6, 2021 Auto Protocol: “Protocol for Determining the Daily Volatile Organic Compound Emission Rate of Automobile and Light Duty Truck Topcoat Operations”, EPA- 450/3-88-018 or as amended. FCA US (Chrysler) follows the protocol procedures for both NSPS MM (2M: prime coat, guide coat [aka primer surfacer] and topcoat operations installed / modified after October 5, 1979; the LAER permits were issued in 1984) and RACT Rule 336.1610.
    [Show full text]
  • Chrysler Group LLC 2015 Truck / MPV Vehicle Identification Number Code Guide Revised June 30, 2015
    Chrysler Group LLC 2015 Truck / MPV Vehicle Identification Number Code Guide Revised June 30, 2015 Position 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 Typical VIN 1 C 6 R D 3 C L 6 F S 1 0 0 9 8 9 Positions 1-3: World Manufacturer Identifier Position 11: Assembly Plant 1 2 3 Manufacturer Vehicle Type Positions 5-7: Brand, Marketing Name, Drive Wheels, Code Plant 1 C 4 FCA US LLC MPV Cab/Body Type, Drive Position, and Price Series A CTC Pre-Production & Pilot 1 C 6 FCA US LLC Truck (details on next page) C Jefferson North Assembly 1 C 7 FCA US LLC Incomplete Vehicle D Belvidere Assembly 2 C 4 FCA Canada Inc MPV Position 9: Check Digit E Saltillo Van/Truck Assembly Plant 2 C 6 FCA Canada Inc Truck Calculated from formula in Part 565 G Saltillo Truck Assembly 2 C 7 FCA Canada Inc Incomplete Vehicle H Brampton Assembly 3 C 4 Chrysler de Mexico Toluca MPV Position 10: Model Year L Toledo Supplier Park 3 C 6 Chrysler de Mexico Toluca Truck 2015 = F N Sterling Heights Assembly 3 C 7 Chrysler de Mexico Toluca Incomplete Vehicle P Melfi, Italy Positions 12-17: Plant Sequence Number R Windsor Assembly S Warren Truck Assembly NOTE for Position 11: Vehicles manufactured outside of the NAFTA region, as designated in position 11 of the VIN, T Toluca Assembly do not use a NAFTA Region WMI in positions 1 thru 3 of the VIN.
    [Show full text]
  • Manufacturing Operations
    2016 FCA CANADA INC. MANUFACTURING OPERATIONS 2016 FCA Canada Inc. MANUFACTURING OPERATIONS CANADA, UNITED STATES and MEXICO ASSEMBLY OPERATIONS Manufacturing Facility Location Products Belvidere Assembly Belvidere, Ill. (U.S.A.) Dodge Dart, Jeep® Patriot, Jeep Compass Brampton Assembly Brampton, Ont. Chrysler 300, Dodge Challenger, Dodge Charger Conner Avenue Assembly Plant Detroit, Mich. (U.S.A.) Dodge Viper SRT Jefferson North Assembly Detroit, Mich. (U.S.A.) Jeep Grand Cherokee, Jeep Grand Cherokee SRT, Dodge Durango Saltillo Truck Assembly Saltillo (Mexico) Ram 1500, Ram Mega Cab, Ram 2500/3500, DX Chassis Cab (Mexico Market), Ram 4500/5500 Saltillo Van Assembly Saltillo (Mexico) Ram ProMaster Sterling Heights Assembly Sterling Heights, Mich. Chrysler 200 (U.S.A.) Toledo Assembly Complex Toledo, Ohio (U.S.A.) Jeep Wrangler, Jeep Wrangler Unlimited, (2 plants) Jeep Cherokee Toluca Assembly Toluca (Mexico) Dodge Journey, Fiat 500, Fiat Freemont Warren Truck Assembly Warren, Mich. (U.S.A.) Ram 1500 (Quad Cab and Crew Cab) Windsor Assembly Windsor, Ont. Chrysler Town & Country, Dodge Grand Caravan INTERNATIONAL MANUFACTURING OPERATIONS SOUTH AMERICA Manufacturing Facility Location Products Carabobo Assembly Plant Valencia, Venezuela Jeep Cherokee (Liberty), Chrysler de Venezuela, S.A. Jeep Grand Cherokee, Dodge Caliber POWERTRAIN OPERATIONS Manufacturing Facility Location Products Dundee Engine Plant Dundee, Mich. (U.S.A.) 1.4-litre (I-4) Fully Integrated Robotized Engine (FIRE) and 1.4-litre (I-4) Fully Integrated Robotized Engine (FIRE) Turbocharged; 2.0-litre (I-4) and 2.4-litre (I-4) World Gas Engines; 2.0-litre (I-4) and 2.4-litre (I-4) Tigershark Mack Avenue Engine (2 plants)* Detroit, Mich.
    [Show full text]
  • Chrysler Group's Warren Stamping Plant Latest to Earn World Class
    Contact: Jodi Tinson Chrysler Group’s Warren Stamping Plant Latest to Earn World Class Manufacturing Bronze Designation; First Stamping Plant to Achieve Milestone Warren Stamping becomes seventh North American Plant to earn bronze Ranking rewards improvements in safety, quality and productivity WCM implementation has saved the Company more than $1 billion since June 2009 October 31, 2014, Auburn Hills, Mich. - Chrysler Group LLC’s Warren Stamping Plant (WSP) has been awarded bronze status for its results in implementing World Class Manufacturing (WCM). The Warren, Mich., stamping plant becomes Chrysler Group’s first stamping plant and the seventh North American facility to achieve the WCM award milestone. WSP, which has been stamping sheet metal into vehicle body panels for 65 years, received the bronze designation just over four years after adopting the WCM operating system following a two-day audit Oct. 30-31, 2014. Bronze is awarded after earning a minimum of 50 points in 10 technical and 10 managerial pillars by demonstrating clear WCM know-how and competence through employee-conducted pillar presentations and a review of projects that have been expanded across the shop floor. WSP earned a score of 51. “The employees at Warren Stamping are to be commended for their commitment to implementing World Class Manufacturing and taking an active role in supporting the plant’s goal of achieving bronze,” said Brian Harlow, Vice President and Head of NAFTA Manufacturing, Chrysler Group LLC. “Employee involvement is vital to the success of WCM, so having our UAW partners at both the local and international level fully engaged in this effort has been critical in making Chrysler Group’s manufacturing facilities among the best in the world.” World Class Manufacturing is a methodology that focuses on reducing waste, increasing productivity, and improving quality and safety in a systematic and organized way.
    [Show full text]
  • FCA US LLC 2022 Truck / MPV Vehicle Identification Number Code Guide June 4, 2021
    FCA US LLC 2022 Truck / MPV Vehicle Identification Number Code Guide June 4, 2021 Position 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 Typical VIN 1 C 6 H J X A G 1 N S 1 0 0 9 8 9 Positions 1-3: World Manufacturer Identifier NOTE for Position 11: Vehicles manufactured outside of the NAFTA region, as designated in position 11 of the VIN, 1 2 3 Manufacturer Vehicle Type do not use a NAFTA Region WMI in positions 1 thru 3 of the VIN. 1 C 4 FCA US LLC MPV NOTE: Cannot use letters I, O, or Q for VIN Characters Position 11: Assembly Plant 1 C 6 FCA US LLC Truck Code Plant City State Country 1 C 7 FCA US LLC Incomplete Vehicle Positions 5-7: Brand, Marketing Name, Drive Wheels, C Jefferson North Assembly Detroit MI USA 2 C 4 FCA Canada Inc MPV Cab/Body Type, Drive Position, and Trim Level D Belvidere Assembly Belvidere IL USA 2 C 6 FCA Canada Inc Truck (details on next page) E Saltillo Van/Truck Assembly Plant Saltillo Coahuila Mexico 2 C 7 FCA Canada Inc Incomplete Vehicle G Saltillo Truck Assembly Saltillo Coahuila Mexico 3 C 4 FCA Mexico S.A. de C.V. MPV Position 9: Check Digit L Toledo Supplier Park Toledo OH USA 3 C 6 FCA Mexico S.A. de C.V. Truck Calculated from formula in Part 565 N Sterling Heights Assembly Plant Sterling Heights MI USA 3 C 7 FCA Mexico S.A.
    [Show full text]
  • Warren Stamping Plant, Warren, Michigan
    Contact: Jodi Tinson Mike McElrath Warren Stamping Plant 22800 Mound Road , Warren, Michigan, United States Floor Space: 2.1 million square feet Acreage: 78 acres Products: Stampings and assemblies including hoods, roofs, liftgates, side apertures, fenders and floor pans.Stampings/assemblies provided for the Dodge Durango, Chrysler Pacifica, Chrysler Voyager, Chrysler Grand Caravan (Canada only), Jeep® Grand Cherokee, Jeep Cherokee and Ram Trucks (Light Duty and Heavy Duty). Employment: 1,626 (1,446 hourly; 180 salaried) Union Local: UAW Local 869, 889 and 412 Plant History: Facility was completed in 1948 and production began in 1949. Major expansions were implemented in 1952, 1964, 1965 and 1986. FCA confirmed on June 25, 2014, that it would invest $63 million to expand capacity at the facility. The investment was used to purchase and install the latest high-speed Servo Tandem Press technology (a 180- inch press line). The new press line has increased capacity by up to 12,000 hits per day or approximately 3.6 million parts per year. On Feb. 26, 2019,FCA announced that it would invest $245 million in the facility to support additional production of Jeep® and Ram vehicles being created as part of a $4.5 billion investment announcement that will impact five existing Michigan facilities and build a new assembly plant within the city of Detroit. In total, the proposed projects will create nearly 6,500 new jobs. World Class Manufacturing Accomplishments Warren Stamping was designated a silver plant for its results in implementing World Class Manufacturing (WCM) on March 28, 2018. The Warren, Michigan, stamping plant becomes the Company's first stamping plant to achieve the WCM award milestone.
    [Show full text]
  • PTI No. 13-19B
    FCA US LLC Page 1 Proposed Permit No. 13-19B April 28, 2021 TECHNICAL FACT SHEET April 28, 2021 Purpose and Summary The Michigan Department of Environment, Great Lakes, and Energy (EGLE), Air Quality Division (AQD), is proposing to act on Permit to Install (PTI) application No. 13-19B from FCA US LLC (FCA). The permit application is for proposed modifications to a previously permitted project involving a new automotive paint shop and changes to the existing automotive assembly line at the Warren Truck Assembly Plant (Warren Truck). Construction of the project is underway, as allowed under PTI No. 13-19A. The proposed modifications are subject to permitting requirements of the Department’s Rules for Air Pollution Control and state and federal Nonattainment New Source Review (NNSR) regulations. Prior to acting on this application, the AQD is holding a public comment period and a public hearing, if requested in writing, to allow all interested parties the opportunity to comment on the proposed PTI. All relevant information received during the comment period and hearing, if held, will be considered by the decision maker prior to taking final action on the application. Background Information FCA owns and operates the existing Warren Truck Assembly Plant (Warren Truck), which consists of a body shop, a paint shop (with an additional paint shop currently under construction), and a final assembly operation, located at 21500 Mound Road, Warren, Macomb County, Michigan. Warren Truck operates under Renewable Operating Permit (ROP) No. MI-ROP-B2767-2016. Proposed Project FCA is proposing to modify an already approved, but not completely installed, project on an existing automotive assembly line at Warren Truck.
    [Show full text]
  • “L'accordo Fiat – Chrysler”
    Luiss Guido Carli Libera Università Internazionale degli Studi sociali Economia Aziendale Economia Industriale Prof. Carlo Luigi Scognamiglio Pasini Lucrezia Quarta 137571 Anno Accademico 2008/2009 Lucrezia Quarta 1 “L'ACCORDO FIAT – CHRYSLER” Lucrezia Quarta 2 INDICE Premessa Pag. 5 PARTE PRIMA Pag. 7 Chrysler Lcc Pag. 8 Fusione Daimler-Benz Pag. 12 Fiat Group Pag. 16 Alleanza GM Fiat Pag.23 PARTE SECONDA Pag. 28 Diversificazione Pag. 29 PARTE TERZA Pag. 36 Accordo Pag. 37 Procedura Fallimentare Americana Pag. 51 Conclusioni Pag. 64 Bibliografia Pag. 68 Lucrezia Quarta 3 a Cinzia e Gianfranco Lucrezia Quarta 4 Premessa L'intento di questo elaborato é quello di fornire gli elementi necessari per la comprensione, con contestuale illustrazione, delle cause che hanno spinto la nota casa automobilistica torinese Fiat, e uno dei più grandi colossi industriali americani nel settore automobilistico, la Chrysler, ad unirsi in un'alleanza, e soprattutto sarà scopo di questo lavoro, quello di individuare le conseguenze attese da questo accordo. Al fine di consentire una facile comprensione dei fatti e degli argomenti trattati, il lavoro sarà suddiviso in tre parti: una prima parte in cui verrà presentata la singola storia di entrambe le case automobilistiche, prestando particolare attenzione ai punti salienti che caratterizzano la vita di un'impresa, quindi il settore, o i settori in cui essa opera, i prodotti e le innovazioni tecnologiche ad essi inerenti, le scelte strategiche e politiche di diversificazione o di espansione all'estero e i personaggi che hanno assunto nel corso del tempo un ruolo importante riguardo alle sorti dell'azienda. La seconda parte dell'elaborato sarà invece dedicata al tema della diversificazione, dove, con questo termine si intende “il processo per cui un'impresa caratterizzata da un particolare tipo di attività produttiva avvia attività economiche diverse da quelle tradizionali, pur mantenendo la propria presenza nell'ambito originale”.
    [Show full text]
  • On December 10, 2019, I Conducted a Level 2 Inspection at FCA US Warren Stamping Plant
    MACES- Activity Report Page 1 of2 DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION ACTIVITY REPORT: Scheduled Inspection B275752784 FACILITY: FCA US LLC WARREN STAMPING PLANT SRN / ID: B2757 LOCATION: 22800 MOUND RD., WARREN DISTRICT: Southeast Michi □ an CITY: WARREN COUNTY: MACOMB CONTACT: Grea Karaaeozian Environmental Enaineer ACTIVITY DATE: 12/10/2019 STAFF: Rem Pinga I COMPLIANCE STATUS: Compliance SOURCE CLASS: MAJOR SUBJECT: Level 2 Target Inspection RESOLVED COMPLAINTS: On December 10, 2019, I conducted a level 2 inspection at FCA US Warren Stamping Plant. The facility is located at 22800 Mound Road, Warren, Michigan 48091. The purpose of the inspection was to determine the facility's compliance with the requirements of the federal Clean Air Act; Part 55, Air Pollution Control, of the Natural Resources and Environmental Protection Act, 1994 PA 451, as amended (Act· 451 ), the administrative rules, the facility's Renewable Operating Permit (ROP) No. MI-ROP-82757-2019. During the inspection, I was accompanied by Mr. Greg Karageozian, facility contact person. Prior to conducting the walk-through inspection, I initially showed my credentials and stated the purpose of the inspection. The facility is considered a major source under the Clean Air Act of 1990, and operates under a Title V permit, ROP No. MI-ROP-82757-2019 because it is adjacent to FCA US Warren Truck Assembly Plant and both are under common ownership and control of FCA US (Chrysler). Moreover, as an evidence of interconnected manufacturing operations, there is a tunnel to Warren Truck Assembly Plant from the stamping plant for transport of the stamped auto parts.
    [Show full text]