Brazeau River Gas Complex
Total Page:16
File Type:pdf, Size:1020Kb
BRAZEAU RIVER GAS COMPLEX Main: (780) 894-3601 24-hour emergency: (780) 621-2531 Headquartered in Calgary with operations in Alberta, B.C. and Saskatchewan, KEYERA operates one of the largest natural gas midstream businesses in Canada. Our business consists of natural gas gathering and processing as well as the processing, transportation, storage and marketing of natural gas liquids (NGLs), the production of iso-octane and crude oil midstream activities. The Brazeau River gas plant, located approximately 170 kilometres southwest of Edmonton, Alberta, has the capability and flexibility to process a wide range of sweet and sour gas streams with varying levels of NGL content. Its process includes inlet compression, sour gas sweetening, dehydration, NGL recovery and acid gas injection. FACILITY SPECIFICATIONS PROJECT HISTORY Raw inlet volume: 6,180 103m3/day Built in 1968 following discovery of the Brazeau River Inlet pressure: High: 7,500 kPa Low: 300 kPa Gas Unit #1 Sales gas: 2,300 103m3/day July 2004, commissioned Brazeau northeast gas Natural gas liquids: 250 m3/day gathering system (BNEGGS) Condensate: 600 m3/day Acid gas injection system was commissioned in late Acid gas injection: 300 103m3/day 2002, reducing sulphur emissions and increasing sour Sulphur maximum inlet: 466 tonnes/day gas handling capacity H2S maximum concentration: 33 percent In 2007, acquired 38 km, 8 inch sales gas pipeline Connected Keyera gathering pipelines: running northeast of the plant for low pressure sweet Brazeau North East Gas Gathering System (BNEGGS) gas Brazeau North 2008 Keyera purchases Spectra Energy’s interest in Brazeau North ICONN the plant and gathering system (Brazeau River Gas Gathering System) Brazeau River Gas Gathering System Product delivery points: In 2011, Keyera completed project to improve NGL recoveries at the plant. Sales gas: NOVA Pipeline Meter Station, Brazeau East #1947 Last turnaround 2011, next turnaround 2015 Natural gas liquids: Trucked WORKING INTEREST Condensate: Pembina Pipeline Keyera Corp. 92.9% INDUSTRY AWARDS Hamel Energy Inc 0.1% Emerald Award Finalist 2003 ARC Resources 0.6% Husky Oil Operations 6.4% FACILITY CONTACTS Maintenance Supervisor: Lyle Mears Contact number: (780) 894-3601 ext. 140 Operations Supervisor: Al Winters Contact number: (780) 894-7023 ext. 7023 Director of Operations: Kevin Thebeau Contact number: (780) 542-3770 ext. 26 Facility Administrator: Katrina Gile Contact number: (780) 894-3601 ext. 128 PLANT LOCATION GPS: Decimal - N 52.94722761 W 115.90260601 Degrees - 52° 56' 50.0208", 115° 54' 9.3816" Legal Site Description: 03-12-46-14 W5M Mailing Address: c/o Bobdale Oilfield Construction, 5459-55 Street, Drayton Valley, AB T7A 1S7 .