Download the List

Total Page:16

File Type:pdf, Size:1020Kb

Download the List NEW YORK–AREA WORLDWIDE ENGINEERS ENGINEERS 2019 FIRMWIDE COMPANY/ PHONE NUMBER/ 2019/ 2019/ REVENUE NEW YORK–AREA SERVICE MIX RANK ADDRESS WEBSITE SENIOR EXECUTIVE(S) 2018 2018 (IN MILLIONS) (PORTION OF BILLINGS) RECENT PROJECTS/CLIENTS WSP USA 212-465-5000 Lou Cornell 797 27,058 $6,954.4 Construction mgmt.: 15% Kosciuszko Bridge for the state 1 Penn Plaza wsp.com Chief executive 819 26,950 Engineering: 83% Department of Transportation; 1 New York, NY 10119 Facility assessment: 2% 55 Hudson Yards for Related Cos. Thornton Tomasetti Inc. 917-661-7800 Peter DiMaggio, 336 980 $285.0 Architecture: 12% LaGuardia Airport Terminal B; 51 Madison Ave. thorntontomasetti.com Michael Squarzini 324 980 Engineering: 48% Sunnyside Yard New York, NY 10010 Co-chief executives Facility assessment: 35% 2 Thomas Scarangello Other:5% Executive chairman Langan 212-479-5400 David Gockel 313 571 $307.0 Engineering: 100%4 Hudson Square; Bronx Point 21 Penn Plaza langan.com President, chief executive 287 525 3 New York, NY 10001 STV 212-777-4400 Dominick Servedio 225 586 $582.5 Architecture: 30% Highbridge Interchange 225 Park Ave. South stvinc.com Executive chairman 229 440 Construction inspection: 5% rehabilitation design-build for New York, NY 10003 Construction mgmt.: 20% Posillico Civil Inc. and the state Engineering: 45% Department of Transportation; South Beach Psychiatric Center 4 new residential building for Dormitory Authority of the State of New York GPI Greenman-Pedersen Inc. 646-791-8800 Denise Carter 212 395 $300.8 Construction inspection: 25% George Washington Bridge 21 W. 38th St. gpinet.com Executive vice president, 207 381 Construction mgmt.: 35% rehabilitation construction New York, NY 10018 metro-area branch manager Engineering: 35% management; Bayonne Bridge 5 Facility assessment: 5% navigational clearance program construction management AECOM 212-973-2900 Denise Berger 200 10,750 $20,200.0 Architecture: 12% n/d 605 Third Ave. aecom.com Chief operating ofcer, 209 12,280 Construction inspection: 1% New York, NY 10158 Northeast Construction mgmt.: 17% John Cardoni Engineering: 70% 6 Executive vice president, Northeast Jacobs 908-646-6550 Julie Chang 183 11,866 $12,737.9 Architecture: 7% Major Deegan Expressway 500 Seventh Ave. jacobs.com Vice president, director of 148 13,941 Construction inspection: 7% rehabilitation for the state New York, NY 10018 New York operations Construction mgmt.: 34% Department of Transportation; Engineering: 47% OMNY for the Metropolitan 7 Facility assessment: 5% Transportation Authority Hardesty & Hanover 212-944-1150 Sean Bluni 154 248 $113.0 Construction inspection: 7% Kew Gardens Interchange; 1501 Broadway hardestyhanover.com Chief executive 148 237 Construction mgmt.: 8% Unionport Bridge 8 New York, NY 10036 Engineering: 85% Stantec Consulting Services Inc. 212-366-5600 TomWalsh 145 3,381 $3,638.6 Architecture: 7% Lower Manhattan coastal 475 Fifth Ave. stantec.com Vice president 141 3,407 Engineering: 93% resiliency in the Battery 9 New York, NY 10017 HNTB New York Engineering and 212-594-9717 Stephen Dilts 137 1,200 $1,362.1 Architecture: 1% Project and construction Architecture hntb.com Senior vice president 138 1,000 Construction inspection: 5% management services for the 350 Fifth Ave. Construction mgmt.: 14% Department of Design and New York, NY 10118 Engineering: 80% Construction's coastal resiliency 10 projects; Penn Station access design Dewberry 212-685-0900 John Boulé 128 589 $470.9 Construction inspection: 20% Hunts Point interstate access 132 W. 31st St. dewberry.com Senior vice president 123 659 Engineering: 80% improvement for the state New York, NY 10001 Craig Johnson Department of Transportation; Executive vice president civil, utilities and waterfront 11 upgrades for the Made in NY campus at Bush Terminal Arup 212-896-3000 NigelNicolls 120 590 $2,400.0 Engineering: 82% Coney Island green infrastructure 77 Water St. arup.com Principal New York group 123 595 Other:18% for city Economic Development New York, NY 10005 leader Corp.; Solar Carve Tower for 12 Studio Gang H2M Architects & Engineers 631-756-8000 Richard Humann 92 92 $84.0 Architecture: 36% Brooklyn Navy Yard resiliency 538 Broad Hollow Road h2m.com President, chief executive 83 83 Construction inspection: 8% program; Water Authority of THE LIST Melville, NY 11747 Construction mgmt.: 7% Western Nassau County wellhead Engineering: 44% treatment system 13 Facility assessment: 3% Other:2% LARGEST ENGINEERING FIRMS McLaren Engineering Group 212-324-6300 Malcolm McLaren 85 95 $48.5 Construction inspection: 8% 420 Kent; marine engineering of Ranked by number of New York–area engineers 131 W. 35th St. mgmclaren.com Chief executive 75 79 Construction mgmt.: 5% NYC Ferry landings New York, NY 10001 Engineering: 60% 14 Facility assessment: 15% Other:12% NEW YORK–AREA WORLDWIDE NEW YORK–AREA WORLDWIDE ENGINEERS ENGINEERS 2019 FIRMWIDE DeSimone Consulting Engineers 212-532-2211 Stephen DeSimone ENGINEERS75 ENGINEERS111 2019 FIRMWIDE$52.0 Engineering: 97% 77 Greenwich and One Willoughby COMPANY/ PHONE NUMBER/ 2019/ 2019/ REVENUE NEW YORK–AREA SERVICE MIX 140COMPANY/ Broadway de-simone.comPHONE NUMBER/ President, chief executive 2019/68 2019/106 REVENUE NEWFacility YORK–AREA assessment: SERVICE 3%MIX Square for FXCollaborative RANK ADDRESS WEBSITE SENIOR EXECUTIVE(S) 2018 2018 (IN MILLIONS) (PORTION OF BILLINGS) RECENT PROJECTS/CLIENTS 15RANK NewADDRESS York, NY 10005 WEBSITE SENIOR EXECUTIVE(S) 2018 2018 (IN MILLIONS) (PORTION OF BILLINGS) RECENT PROJECTS/CLIENTS WSP USA 212-465-5000 Lou Cornell 797 27,058 $6,954.4 Construction mgmt.: 15% Kosciuszko Bridge for the state MueserWSP USA Rutledge Consulting 917-339-9300212-465-5000 PeterLou Cornell Deming 79772 27,05872 $6,954.4$37.5 Construction Engineering: mgmt.: 100% 15% LittleKosciuszko Island Bridat Pierge for55 the for stateHudson 1 Penn Plaza wsp.com Chief executive 819 26,950 Engineering: 83% Department of Transportation; Engineers1 Penn Plaza mrce.comwsp.com SeniorChief executive partner 81977 26,95077 Engineering: 83% RiverDepa Parkrtment Trust; of Transportation; 207th Street yard New York, NY 10119 Facility assessment: 2% 55 Hudson Yards for Related Cos. 14New Penn York, Plaza NY 10119 Facility assessment: 2% ood55 Hudson protection Yards for for the Related city Transit Cos. 1 161 New York, NY 10122 Authority and Walsh Construction Thornton Tomasetti Inc. 917-661-7800 Peter DiMaggio, 336 980 $285.0 Architecture: 12% LaGuardia Airport Terminal B; SavinThornton Engineers Tomasetti Inc. 914-769-3200917-661-7800 RengachariPeter DiMaggio, Srinivasaraghavan 33670 98080 $285.0$41.0 Architecture:Architecture: 12% 5% PlaylandLaGuardia in AirportRye, NY; Te Warminalrds IslandB; 51 Madison Ave. thorntontomasetti.com Michael Squarzini 324 980 Engineering: 48% Sunnyside Yard 351 Campus Madison Drive Ave. savinengineers.comthorntontomasetti.com PresidentMichael Squarzini 32465 98075 ConstructionEngineering: inspection: 20%48% wastewaterSunnyside Yard treatment plant New York, NY 10010 Co-chief executives Facility assessment: 35% Pleasantville,New York, NY 10010NY 10570 Co-chief executives ConstructionFacility assessment: mgmt.:23% 35% 2 Thomas Scarangello Other:5% 2 Thomas Scarangello Engineering:Other 50%:5% 17 Executive chairman Facility assessment: 2% Executive chairman Langan 212-479-5400 David Gockel 313 571 $307.0 Engineering: 100%4 Hudson Square; Bronx Point Langan 212-479-5400 David Gockel 313 571 $307.0 Engineering: 100%4 Hudson Square; Bronx Point 21 Penn Plaza langan.com President, chief executive 287 525 Tetra21 Penn Tech/Cosentini Plaza 212-615-3600langan.com DouglasPresident, Mass chief executive 28768 416525 $3,100.0 Engineering: 100% 66 Hudson Blvd. for Tishman 3 New York, NY 10001 3 498New SeventhYork, NY Ave. 10001 tetratech.com President, Cosentini 73 493 Speyer Properties; 76 11th Ave. 18 New York, NY 10018 cosentini.com Associates for HFZ Capital Group STV 212-777-4400 Dominick Servedio 225 586 $582.5 Architecture: 30% Highbridge Interchange STV 212-777-4400 Dominick Servedio 225 586 $582.5 Architecture: 30% Highbridge Interchange 225 Park Ave. South stvinc.com Executive chairman 229 440 Construction inspection: 5% rehabilitation design-build for Tectonic225 Park Engineering Ave. South Consultants, 718-391-9200stvinc.com DonaldExecutive Benvie chairman 22965 44076 $93.8 ConstructionConstruction inspection: inspection: 27% 5% Borough-basedrehabilitation design-build jails program for for New York, NY 10003 Construction mgmt.: 20% Posillico Civil Inc. and the state GeologistsNew York, NY & 10003Land Surveyors tectonicengineering.com President, chief executive 60 76 Construction mgmt.: 33%20% cityPosillico Department Civil Inc. of and Design the stateand Engineering: 45% Department of Transportation; 118-35 Queens Blvd. Engineering: 40%45% Construction;Department of 207th Transportation; Street yard South Beach Psychiatric Center 19 Forest Hills, NY 11375 oodSouth mitigation Beach Psychiatric for the city Center 4 new residential building for 4 Transitnew residential Authority building for Dormitory Authority of the Dormitory Authority of the State of New York Boswell Engineering 201-641-0770 Stephen Boswell 62 63 $40.1 Construction inspection: 51% GardenState of State New YorkParkway median 330 Phillips Ave. boswellengineering.com President, chief executive 58 58 Construction mgmt.: 10% barrier design for New Jersey GPI Greenman-Pedersen Inc. 646-791-8800 Denise Carter 212 395 $300.8 Construction inspection: 25% George Washington Bridge SouthGPI Greenman-Pedersen Hackensack,
Recommended publications
  • Lower Manhattan
    WASHINGTON STREET IS 131/ CANAL STREETCanal Street M1 bus Chinatown M103 bus M YMCA M NQRW (weekday extension) HESTER STREET M20 bus Canal St Canal to W 147 St via to E 125 St via 103 20 Post Office 3 & Lexington Avs VESTRY STREET to W 63 St/Bway via Street 5 & Madison Avs 7 & 8 Avs VARICK STREET B= YORK ST AVENUE OF THE AMERICAS 6 only6 Canal Street Firehouse ACE LISPENARD STREET Canal Street D= LAIGHT STREET HOLLAND AT&T Building Chinatown JMZ CANAL STREET TUNNEL Most Precious EXIT Health Clinic Blood Church COLLISTER STREET CANAL STREET WEST STREET Beach NY Chinese B BEACH STStreet Baptist Church 51 Park WALKER STREET St Barbara Eldridge St Manhattan Express Bus Service Chinese Greek Orthodox Synagogue HUDSON STREET ®0= Merchants’ Fifth Police Church Precinct FORSYTH STREET 94 Association MOTT STREET First N œ0= to Lower Manhattan ERICSSON PolicePL Chinese BOWERY Confucius M Precinct ∑0= 140 Community Plaza Center 22 WHITE ST M HUBERT STREET M9 bus to M PIKE STREET X Grand Central Terminal to Chinatown84 Eastern States CHURCH STREET Buddhist Temple Union Square 9 15 BEACH STREET Franklin Civic of America 25 Furnace Center NY Chinatown M15 bus NORTH MOORE STREET WEST BROADWAY World Financial Center Synagogue BAXTER STREET Transfiguration Franklin Archive BROADWAY NY City Senior Center Kindergarten to E 126 St FINN Civil & BAYARD STREET Asian Arts School FRANKLIN PL Municipal via 1 & 2 Avs SQUARE STREET CENTRE Center X Street Courthouse Upper East Side to FRANKLIN STREET CORTLANDT ALLEY 1 Buddhist Temple PS 124 90 Criminal Kuan Yin World
    [Show full text]
  • New York City Comprehensive Waterfront Plan
    NEW YORK CITY CoMPREHENSWE WATERFRONT PLAN Reclaiming the City's Edge For Public Discussion Summer 1992 DAVID N. DINKINS, Mayor City of New lVrk RICHARD L. SCHAFFER, Director Department of City Planning NYC DCP 92-27 NEW YORK CITY COMPREHENSIVE WATERFRONT PLAN CONTENTS EXECUTIVE SUMMA RY 1 INTRODUCTION: SETTING THE COURSE 1 2 PLANNING FRA MEWORK 5 HISTORICAL CONTEXT 5 LEGAL CONTEXT 7 REGULATORY CONTEXT 10 3 THE NATURAL WATERFRONT 17 WATERFRONT RESOURCES AND THEIR SIGNIFICANCE 17 Wetlands 18 Significant Coastal Habitats 21 Beaches and Coastal Erosion Areas 22 Water Quality 26 THE PLAN FOR THE NATURAL WATERFRONT 33 Citywide Strategy 33 Special Natural Waterfront Areas 35 4 THE PUBLIC WATERFRONT 51 THE EXISTING PUBLIC WATERFRONT 52 THE ACCESSIBLE WATERFRONT: ISSUES AND OPPORTUNITIES 63 THE PLAN FOR THE PUBLIC WATERFRONT 70 Regulatory Strategy 70 Public Access Opportunities 71 5 THE WORKING WATERFRONT 83 HISTORY 83 THE WORKING WATERFRONT TODAY 85 WORKING WATERFRONT ISSUES 101 THE PLAN FOR THE WORKING WATERFRONT 106 Designation Significant Maritime and Industrial Areas 107 JFK and LaGuardia Airport Areas 114 Citywide Strategy fo r the Wo rking Waterfront 115 6 THE REDEVELOPING WATER FRONT 119 THE REDEVELOPING WATERFRONT TODAY 119 THE IMPORTANCE OF REDEVELOPMENT 122 WATERFRONT DEVELOPMENT ISSUES 125 REDEVELOPMENT CRITERIA 127 THE PLAN FOR THE REDEVELOPING WATERFRONT 128 7 WATER FRONT ZONING PROPOSAL 145 WATERFRONT AREA 146 ZONING LOTS 147 CALCULATING FLOOR AREA ON WATERFRONTAGE loTS 148 DEFINITION OF WATER DEPENDENT & WATERFRONT ENHANCING USES
    [Show full text]
  • Appendix E: History and Projection of Traffic, Toll Revenues And
    APPENDIX E HISTORY AND PROJECTION OF TRAFFIC, TOLL REVENUES AND EXPENSES and Review of Physical Conditions of the Facilities of Triborough Bridge and Tunnel Authority April 26, 2013 Prepared for the Triborough Bridge and Tunnel Authority A Constituent Agency of the Metropolitan Transportation Authority By TABLE OF CONTENTS Page TRANSPORTATION INFRASTRUCTURE ............................................................................. E-1 Triborough Bridge and Tunnel Authority (TBTA) .......................................................... E-1 Metropolitan Area Arterial Network ............................................................................... E-3 Other Regional Toll Facilities .......................................................................................... E-4 Regional Public Transportation ....................................................................................... E-5 TOLL COLLECTION ON THE TBTA FACILITIES ................................................................ E-5 Present and Proposed Toll Structures and Operation ...................................................... E-5 E-ZPass Electronic Toll Collection System ..................................................................... E-8 TBTA‘s Role in E-ZPass ............................................................................................... E-10 Passenger Car Toll Rate Trends and Inflation ............................................................... E-11 HISTORICAL TRAFFIC, REVENUES AND EXPENSES AND ESTIMATED/BUDGETED NUMBERS
    [Show full text]
  • $223,355,000 Triborough Bridge and TUNNEL Authority Lehman
    NEW ISSUE BOOK-ENTRY-ONLY $223,355,000 TRIBOROUGH BRIDGE AND TUNNEL AutHORITY (MTA Bridges and Tunnels) General Revenue Bonds, Series 2007A DATED: Date of Delivery DUE: November 15, as shown on the inside cover The Series 2007A Bonds are being issued to finance bridge and tunnel projects. The Series 2007A Bonds – • are general obligations of MTA Bridges and Tunnels, payable generally from the net revenues collected on the bridges and tunnels operated by MTA Bridges and Tunnels as described herein, and • are not a debt of the State or The City of New York or any other local government unit. MTA Bridges and Tunnels has no taxing power. In the opinion of Hawkins Delafield & Wood LLP, Bond Counsel to MTA Bridges and Tunnels, under existing law and relying on certain representations by MTA Bridges and Tunnels and assuming the compliance by MTA Bridges and Tunnels with certain covenants, interest on the Series 2007A Bonds is • excluded from a bondholder’s federal gross income under the Internal Revenue Code of 1986, • not a preference item for a bondholder under the federal alternative minimum tax, and • included in the adjusted current earnings of a corporation under the federal corporate alternative minimum tax. Also in Bond Counsel’s opinion, under existing law, interest on the Series 2007A Bonds is exempt from personal income taxes of New York State or any political subdivisions of the State, including The City of New York. The Series 2007A Bonds are subject to redemption prior to maturity as described herein. The Series 2007A Bonds are offered when, as, and if issued, subject to certain conditions, and are expected to be delivered through the facilities of The Depository Trust Company, on or about June 20, 2007.
    [Show full text]
  • Manhattan Year BA-NY H&R Original Purchaser Sold Address(Es)
    Manhattan Year BA-NY H&R Original Purchaser Sold Address(es) Location Remains UN Plaza Hotel (Park Hyatt) 1981 1 UN Plaza Manhattan N Reader's Digest 1981 28 West 23rd Street Manhattan Y NYC Dept of General Services 1981 NYC West Manhattan * Summit Hotel 1981 51 & LEX Manhattan N Schieffelin and Company 1981 2 Park Avenue Manhattan Y Ernst and Company 1981 1 Battery Park Plaza Manhattan Y Reeves Brothers, Inc. 1981 104 W 40th Street Manhattan Y Alpine Hotel 1981 NYC West Manhattan * Care 1982 660 1st Ave. Manhattan Y Brooks Brothers 1982 1120 Ave of Amer. Manhattan Y Care 1982 660 1st Ave. Manhattan Y Sanwa Bank 1982 220 Park Avenue Manhattan Y City Miday Club 1982 140 Broadway Manhattan Y Royal Business Machines 1982 Manhattan Manhattan * Billboard Publications 1982 1515 Broadway Manhattan Y U.N. Development Program 1982 1 United Nations Plaza Manhattan N Population Council 1982 1 Dag Hammarskjold Plaza Manhattan Y Park Lane Hotel 1983 36 Central Park South Manhattan Y U.S. Trust Company 1983 770 Broadway Manhattan Y Ford Foundation 1983 320 43rd Street Manhattan Y The Shoreham 1983 33 W 52nd Street Manhattan Y MacMillen & Co 1983 Manhattan Manhattan * Solomon R Gugenheim 1983 1071 5th Avenue Manhattan * Museum American Bell (ATTIS) 1983 1 Penn Plaza, 2nd Floor Manhattan Y NYC Office of Prosecution 1983 80 Center Street, 6th Floor Manhattan Y Mc Hugh, Leonard & O'Connor 1983 Manhattan Manhattan * Keene Corporation 1983 757 3rd Avenue Manhattan Y Melhado, Flynn & Assocs. 1983 530 5th Avenue Manhattan Y Argentine Consulate 1983 12 W 56th Street Manhattan Y Carol Management 1983 122 E42nd St Manhattan Y Chemical Bank 1983 277 Park Avenue, 2nd Floor Manhattan Y Merrill Lynch 1983 55 Water Street, Floors 36 & 37 Manhattan Y WNET Channel 13 1983 356 W 58th Street Manhattan Y Hotel President (Best Western) 1983 234 W 48th Street Manhattan Y First Boston Corp 1983 5 World Trade Center Manhattan Y Ruffa & Hanover, P.C.
    [Show full text]
  • TM 3.1 Inventory of Affected Businesses
    N E W Y O R K M E T R O P O L I T A N T R A N S P O R T A T I O N C O U N C I L D E M O G R A P H I C A N D S O C I O E C O N O M I C F O R E C A S T I N G POST SEPTEMBER 11TH IMPACTS T E C H N I C A L M E M O R A N D U M NO. 3.1 INVENTORY OF AFFECTED BUSINESSES: THEIR CHARACTERISTICS AND AFTERMATH This study is funded by a matching grant from the Federal Highway Administration, under NYSDOT PIN PT 1949911. PRIME CONSULTANT: URBANOMICS 115 5TH AVENUE 3RD FLOOR NEW YORK, NEW YORK 10003 The preparation of this report was financed in part through funds from the Federal Highway Administration and FTA. This document is disseminated under the sponsorship of the U.S. Department of Transportation in the interest of information exchange. The contents of this report reflect the views of the author who is responsible for the facts and the accuracy of the data presented herein. The contents do no necessarily reflect the official views or policies of the Federal Highway Administration, FTA, nor of the New York Metropolitan Transportation Council. This report does not constitute a standard, specification or regulation. T E C H N I C A L M E M O R A N D U M NO.
    [Show full text]
  • The Case of New York City's Financial District
    INFORMATION TECHNOWGY AND WORLD CITY RESTRUCTURING: THE CASE OF NEW YORK CITY'S FINANCIAL DISTRICT by Travis R. Longcore A thesis submitted to the Faculty of the University of Delaware in partial fulfillment of the requirements for the degree of Honors Bachelor of Arts in Geography May 1993 Copyright 1993 Travis R. Longcore All Rights Reserved INFORMATION TECHNOWGY AND WORLD CITY RESTRUCTURING: THE CASE OF NEW YORK CITY'S FINANCIAL DISTRICT by Travis R. Longcore Approved: Peter W. Rees, Ph.D. Professor in charge of thesis on behalf of the Advisory Committee Approved: Robert Warren, Ph.D. Committee Member from the College of Urban Affairs Approved: Francis X. Tannian, Ph.D. Committee Member from the University Honors Program Approved: Robert F. Brown, Ph.D. Director, University Honors Program "Staccato signals of constant information, A loose affiliation of millionaires and billionaires and baby, These are the days of miracle and wonder. This is a long distance call. " Paul Simon, Graceland iii ACKNOWLEDGEMENTS The author would like to recognize and thank Dr. Peter Rees for his guidance on this project. Without the patient hours of discussion, insightful editorial comments, and firm schedule, this thesis would have never reached completion. The author also thanks the University Honors Program, the Undergraduate Research Program and the Department of Geography at the University of Delaware for their financial support. Many thanks are due to the Water Resources Agency for New Castle County for the use of their automated mapping system. IV TABLE OF CONTENTS LIST OFTABLES .................................... viii LIST OF FIGURES ix ABSTRACT ....................................... .. x Chapter 1 THE CITY IN A WORLD ECONOMY ...................
    [Show full text]
  • February 1, 2018 Hon. Meenakshi Srinivasan, Chair New York City
    February 1, 2018 Hon. Meenakshi Srinivasan, Chair New York City Landmarks Preservation Commission One Centre Street, 9th Floor New York, NY 10007 Re: 140 Broadway, Marine Midland Building; LPC-19-20734; Block 48 - Lot 1 Dear Chair Srinivasan, I write on behalf of The Cultura Landscape Foundation (TCLF) to express strong opposition to the proposed changes to the plaza at 140 Broadway and, by extension, the Marine Midland Building. Having reviewed details and renderings of the proposal now under review by the Landmarks Preservation Commission, it is clear that the redesign of the plaza would adversely affect the integrity of what has been designated a New York City Landmark. In fact, pending the outcome of your deliberations, TCLF has officially recognized the site as now being at risk. As you know, 140 Broadway was designed between 1960 and 1964 by Skidmore, Owings & Merrill under the direction of Gordon Bunshaft, the firm’s chief architect, and was one of the first projects to conform to the 1961 Zoning Resolution that incentivized developers to incorporate public plazas into their office-building plans. To complete the design for the 80-foot-wide plaza fronting Broadway on the site’s western flank, Bunshaft turned to celebrated artist Isamu Noguchi, with whom he would collaborate many times. The result was the iconic Red Cube, the 28-foot-tall vermillion sculpture that seems to defy gravity as it teeters on one edge, meant to be the solitary feature on the otherwise uninterrupted ground plane. While five low planters were placed along Cedar Street, to the south, the plaza facing Broadway was left free of any landscape embellishments or site furnishings, making it, in effect, an expansive travertine plinth for the minimalist sculpture.
    [Show full text]
  • Client Service and Attention Drive Carl Schipfmann's
    CLIENT SERVICE AND ATTENTION DRIVE CARL SCHIPFMANN’S LEADERSHIP Schipfmann takes responsibility for HNTB’s reputation when delivering bridge projects to clients. Whether you are his client, supervisor, coworker or friend, Carl Schipfmann is going to present you with his genuine self. With a reputation as a dynamic leader, Schipfmann dedicates himself to his projects by embedding himself into their intricate, day-to-day details. Schipfmann is a veteran bridge project manager in the Kansas City office whose expertise includes bridge design, inspection and construction administration. He currently serves on the Kansas City design team that is working on the cable-stayed unit of the Kosciuszko Bridge Replacement, a New York City design-build project replacing the bridge spanning New Town Creek between Brooklyn and Queens. He has served HNTB on many bridge-related design projects over the past 22 years, and has provided shop drawing review and answered requests for information to provide clarification on numerous projects, all within schedule constraints. “Carl loves to get in and get his hands dirty with the design,” said Marc Whitmore, project CARL schipFMANN PROJECT MANAGER manager in the Kansas City office. “He thrives on the challenge of figuring out how to KANSAS CITY OFFICE design and build different components of his projects and really shines when handling technical issues.” DETAIL-ORIENTED LEADERSHIP Schipfmann’s bridge teams seem to respond well to his leadership style, which is as much relationship-oriented as anything else. Rather than listening to him bark out orders, his teams become closely knit while learning from the example of his attention to detail and dedication to client service.
    [Show full text]
  • Bfm:978-1-56898-652-4/1.Pdf
    Manhattan Skyscrapers Manhattan Skyscrapers REVISED AND EXPANDED EDITION Eric P. Nash PHOTOGRAPHS BY Norman McGrath INTRODUCTION BY Carol Willis PRINCETON ARCHITECTURAL PRESS NEW YORK PUBLISHED BY Princeton Architectural Press 37 East 7th Street New York, NY 10003 For a free catalog of books, call 1.800.722.6657 Visit our website at www.papress.com © 2005 Princeton Architectural Press All rights reserved Printed and bound in China 08 07 06 05 4 3 2 1 No part of this book may be used or reproduced in any manner without written permission from the publisher, except in the context of reviews. The publisher gratefully acknowledges all of the individuals and organizations that provided photographs for this publi- cation. Every effort has been made to contact the owners of copyright for the photographs herein. Any omissions will be corrected in subsequent printings. FIRST EDITION DESIGNER: Sara E. Stemen PROJECT EDITOR: Beth Harrison PHOTO RESEARCHERS: Eugenia Bell and Beth Harrison REVISED AND UPDATED EDITION PROJECT EDITOR: Clare Jacobson ASSISTANTS: John McGill, Lauren Nelson, and Dorothy Ball SPECIAL THANKS TO: Nettie Aljian, Nicola Bednarek, Janet Behning, Penny (Yuen Pik) Chu, Russell Fernandez, Jan Haux, Clare Jacobson, John King, Mark Lamster, Nancy Eklund Later, Linda Lee, Katharine Myers, Jane Sheinman, Scott Tennent, Jennifer Thompson, Paul G. Wagner, Joe Weston, and Deb Wood of Princeton Architectural Press —Kevin Lippert, Publisher LIBRARY OF CONGRESS CATALOGING-IN-PUBLICATION DATA Nash, Eric Peter. Manhattan skyscrapers / Eric P. Nash ; photographs by Norman McGrath ; introduction by Carol Willis.—Rev. and expanded ed. p. cm. Includes bibliographical references. ISBN 1-56898-545-2 (alk.
    [Show full text]
  • Q1 2015 Downtown Manhattan Office Leasing: CBRE Group
    MARKETVIEW SNAPSHOT Downtown Manhattan Office, April 2015 Downtown rents continue to soar as a new all-time high of $56.94 per sq. ft. is set in March Figure 1: Downtown Market Activity Mar. 2015 Feb. 2015 Mar. 2014 YTD 2014 YTD 2015 Leasing Activity 0.39 MSF 0.42 MSF 0.59 MSF 1.62 MSF 1.15 MSF Absorption 0.26 MSF 0.23 MSF 0.43 MSF (1.08) MSF (1.50) MSF Availability Rate 12.6% 12.9% 14.0% Vacancy Rate 9.3% 9.6% 10.6% Average Asking Rent $56.94 PSF $55.28 PSF $48.70 PSF Taking Rent Index 92.7% 91.5% 90.2% Source: CBRE Research, April 2015. MARKET HIGHLIGHTS • During the month of March, Downtown leasing activity totaled 0.39 million sq. ft., 13% lower than the five-year monthly average of 0.44 million sq. ft. • For the first time in 2015, four of the top five transactions contained a renewal component. • Monthly absorption continues to remain in positive territory, ending the month of March at 0.26 million sq. ft. • The availability rate decreased an additional 30 basis points (bps) compared to February, and dropped 140 bps from one year ago. • Despite quiet leasing activity, the rents in Downtown continue to soar, again breaking the all-time record in March with a new high of $56.94. This is up 3% from February and up 17% from a year ago. Figure 2: Top Lease Transactions Size (Sq. Ft.) Tenant Address 79,740 (R) Ambac Financial Group Inc.
    [Show full text]
  • 2016 New York City Bridge Traffic Volumes
    2016 New York City Bridge Traffic Volumes TM NEW YORK CITY Bill de Blasio Polly Trottenberg Mayor Commissioner A member of the New York Metropolitan Transportation Council 2016 New York City Bridge Traffic Volumes Contract C033467 2014-2015: PTDT14D00.E01 2015-2016: PTDT15D00.E01 2016-2017: PTDT16D00.E02 2017-2018: PTDT17D00.E02 The preparation of this report has been financed through the U.S. Department of Transportation’s Federal Transit Administration and Federal Highway Administration. This document is disseminated under the sponsorship of the New York Metropolitan Transportation Council in the interest of information exchange. The contents of this report reflect the views of the authors who are responsible for the facts and accuracy of the data presented herein. The contents do not necessarily reflect the official views or policies of the Federal Transit Administration, Federal Highway Administration or the State of New York. This report does not constitute a standard, specification or regulation. NYCDOT is grateful to the Metropolitan Transportation Authority Bridges and Tunnels (MTABT), the Port Authority of New York and New Jersey (PANYNJ), and the New York Metropolitan Transportation Council (NYMTC) for providing data used to develop this report. This 2016 New York City Bridge Traffic Volumes Report was funded through the New York Metropolitan Transportation Council SFY 2017 Unified Planning Work Program project, Data Management PTDT17D00.E02, which was funded through matching grants from the Federal Transit Administration and from the Federal Highway Administration. Title VI Statement The New York Metropolitan Transportation Council is committed to compliance with Title VI of the Civil Rights Act of 1964, the Civil Rights Restoration Act of 1987, and all related rules and statutes.
    [Show full text]