<<

NEW YORK–AREA WORLDWIDE ENGINEERS ENGINEERS 2019 FIRMWIDE COMPANY/ PHONE NUMBER/ 2019/ 2019/ REVENUE NEW YORK–AREA SERVICE MIX RANK ADDRESS WEBSITE SENIOR EXECUTIVE(S) 2018 2018 (IN MILLIONS) (PORTION OF BILLINGS) RECENT PROJECTS/CLIENTS

WSP USA 212-465-5000 Lou Cornell 797 27,058 $6,954.4 Construction mgmt.: 15% Kosciuszko Bridge for the state 1 Penn Plaza wsp.com Chief executive 819 26,950 Engineering: 83% Department of Transportation; 1 New York, NY 10119 Facility assessment: 2% 55 Hudson Yards for Related Cos.

Thornton Tomasetti Inc. 917-661-7800 Peter DiMaggio, 336 980 $285.0 Architecture: 12% LaGuardia Airport Terminal B; 51 Madison Ave. thorntontomasetti.com Michael Squarzini 324 980 Engineering: 48% Sunnyside Yard New York, NY 10010 Co-chief executives Facility assessment: 35% 2 Thomas Scarangello Other:5% Executive chairman

Langan 212-479-5400 David Gockel 313 571 $307.0 Engineering: 100%4 Hudson Square; Bronx Point 21 Penn Plaza langan.com President, chief executive 287 525 3 New York, NY 10001 STV 212-777-4400 Dominick Servedio 225 586 $582.5 Architecture: 30% Highbridge Interchange 225 Park Ave. South stvinc.com Executive chairman 229 440 Construction inspection: 5% rehabilitation design-build for New York, NY 10003 Construction mgmt.: 20% Posillico Civil Inc. and the state Engineering: 45% Department of Transportation; South Beach Psychiatric Center 4 new residential building for Dormitory Authority of the State of New York

GPI Greenman-Pedersen Inc. 646-791-8800 Denise Carter 212 395 $300.8 Construction inspection: 25% George 21 W. 38th St. gpinet.com Executive vice president, 207 381 Construction mgmt.: 35% rehabilitation construction New York, NY 10018 metro-area branch manager Engineering: 35% management; 5 Facility assessment: 5% navigational clearance program construction management

AECOM 212-973-2900 Denise Berger 200 10,750 $20,200.0 Architecture: 12% n/d 605 Third Ave. aecom.com Chief operating of cer, 209 12,280 Construction inspection: 1% New York, NY 10158 Northeast Construction mgmt.: 17% John Cardoni Engineering: 70% 6 Executive vice president, Northeast

Jacobs 908-646-6550 Julie Chang 183 11,866 $12,737.9 Architecture: 7% Major Deegan Expressway 500 Seventh Ave. jacobs.com Vice president, director of 148 13,941 Construction inspection: 7% rehabilitation for the state New York, NY 10018 New York operations Construction mgmt.: 34% Department of Transportation; Engineering: 47% OMNY for the Metropolitan 7 Facility assessment: 5% Transportation Authority

Hardesty & Hanover 212-944-1150 Sean Bluni 154 248 $113.0 Construction inspection: 7% Kew Gardens Interchange; 1501 hardestyhanover.com Chief executive 148 237 Construction mgmt.: 8% Unionport Bridge 8 New York, NY 10036 Engineering: 85%

Stantec Consulting Services Inc. 212-366-5600 TomWalsh 145 3,381 $3,638.6 Architecture: 7% Lower coastal 475 Fifth Ave. stantec.com Vice president 141 3,407 Engineering: 93% resiliency in 9 New York, NY 10017 HNTB New York Engineering and 212-594-9717 Stephen Dilts 137 1,200 $1,362.1 Architecture: 1% Project and construction Architecture hntb.com Senior vice president 138 1,000 Construction inspection: 5% management services for the 350 Fifth Ave. Construction mgmt.: 14% Department of Design and New York, NY 10118 Engineering: 80% Construction's coastal resiliency 10 projects; Penn Station access design

Dewberry 212-685-0900 John Boulé 128 589 $470.9 Construction inspection: 20% Hunts Point interstate access 132 W. 31st St. dewberry.com Senior vice president 123 659 Engineering: 80% improvement for the state New York, NY 10001 Craig Johnson Department of Transportation; Executive vice president civil, utilities and waterfront 11 upgrades for the Made in NY campus at Bush Terminal

Arup 212-896-3000 NigelNicolls 120 590 $2,400.0 Engineering: 82% Coney Island green infrastructure 77 Water St. arup.com Principal New York group 123 595 Other:18% for city Economic Development New York, NY 10005 leader Corp.; Solar Carve Tower for 12 Studio Gang

H2M Architects & Engineers 631-756-8000 Richard Humann 92 92 $84.0 Architecture: 36% Navy Yard resiliency 538 Broad Hollow Road h2m.com President, chief executive 83 83 Construction inspection: 8% program; Water Authority of THE LIST Melville, NY 11747 Construction mgmt.: 7% Western Nassau County wellhead Engineering: 44% treatment system 13 Facility assessment: 3% Other:2%

LARGEST ENGINEERING FIRMS McLaren Engineering Group 212-324-6300 Malcolm McLaren 85 95 $48.5 Construction inspection: 8% 420 Kent; marine engineering of Ranked by number of New York–area engineers 131 W. 35th St. mgmclaren.com Chief executive 75 79 Construction mgmt.: 5% NYC Ferry landings New York, NY 10001 Engineering: 60% 14 Facility assessment: 15% Other:12% NEW YORK–AREA WORLDWIDE NEW YORK–AREA WORLDWIDE ENGINEERS ENGINEERS 2019 FIRMWIDE DeSimone Consulting Engineers 212-532-2211 Stephen DeSimone ENGINEERS75 ENGINEERS111 2019 FIRMWIDE$52.0 Engineering: 97% 77 Greenwich and One Willoughby COMPANY/ PHONE NUMBER/ 2019/ 2019/ REVENUE NEW YORK–AREA SERVICE MIX 140COMPANY/ Broadway de-simone.comPHONE NUMBER/ President, chief executive 2019/68 2019/106 REVENUE NEWFacility YORK–AREA assessment: SERVICE 3%MIX Square for FXCollaborative RANK ADDRESS WEBSITE SENIOR EXECUTIVE(S) 2018 2018 (IN MILLIONS) (PORTION OF BILLINGS) RECENT PROJECTS/CLIENTS 15RANK NewADDRESS York, NY 10005 WEBSITE SENIOR EXECUTIVE(S) 2018 2018 (IN MILLIONS) (PORTION OF BILLINGS) RECENT PROJECTS/CLIENTS WSP USA 212-465-5000 Lou Cornell 797 27,058 $6,954.4 Construction mgmt.: 15% Kosciuszko Bridge for the state MueserWSP USA Rutledge Consulting 917-339-9300212-465-5000 PeterLou Cornell Deming 79772 27,05872 $6,954.4$37.5 Construction Engineering: mgmt.: 100% 15% LittleKosciuszko Island Bridat Pierge for55 the for stateHudson 1 Penn Plaza wsp.com Chief executive 819 26,950 Engineering: 83% Department of Transportation; Engineers1 Penn Plaza mrce.comwsp.com SeniorChief executive partner 81977 26,95077 Engineering: 83% RiverDepa Parkrtment Trust; of Transportation; 207th Street yard New York, NY 10119 Facility assessment: 2% 55 Hudson Yards for Related Cos. 14New Penn York, Plaza NY 10119 Facility assessment: 2% ood55 Hudson protection Yards for for the Related city Transit Cos. 1 161 New York, NY 10122 Authority and Walsh Construction

Thornton Tomasetti Inc. 917-661-7800 Peter DiMaggio, 336 980 $285.0 Architecture: 12% LaGuardia Airport Terminal B; SavinThornton Engineers Tomasetti Inc. 914-769-3200917-661-7800 RengachariPeter DiMaggio, Srinivasaraghavan 33670 98080 $285.0$41.0 Architecture:Architecture: 12% 5% PlaylandLaGuardia in AirportRye, NY; Te Warminalrds IslandB; 51 Madison Ave. thorntontomasetti.com Michael Squarzini 324 980 Engineering: 48% Sunnyside Yard 351 Campus Madison Drive Ave. savinengineers.comthorntontomasetti.com PresidentMichael Squarzini 32465 98075 ConstructionEngineering: inspection: 20%48% wastewaterSunnyside Yard treatment plant New York, NY 10010 Co-chief executives Facility assessment: 35% Pleasantville,New York, NY 10010NY 10570 Co-chief executives ConstructionFacility assessment: mgmt.:23% 35% 2 Thomas Scarangello Other:5% 2 Thomas Scarangello Engineering:Other 50%:5% 17 Executive chairman Facility assessment: 2% Executive chairman

Langan 212-479-5400 David Gockel 313 571 $307.0 Engineering: 100%4 Hudson Square; Bronx Point Langan 212-479-5400 David Gockel 313 571 $307.0 Engineering: 100%4 Hudson Square; Bronx Point 21 Penn Plaza langan.com President, chief executive 287 525 Tetra21 Penn Tech/Cosentini Plaza 212-615-3600langan.com DouglasPresident, Mass chief executive 28768 416525 $3,100.0 Engineering: 100% 66 Hudson Blvd. for Tishman 3 New York, NY 10001 3 498New SeventhYork, NY Ave. 10001 tetratech.com President, Cosentini 73 493 Speyer Properties; 76 11th Ave. 18 New York, NY 10018 cosentini.com Associates for HFZ Capital Group STV 212-777-4400 Dominick Servedio 225 586 $582.5 Architecture: 30% Highbridge Interchange STV 212-777-4400 Dominick Servedio 225 586 $582.5 Architecture: 30% Highbridge Interchange 225 Park Ave. South stvinc.com Executive chairman 229 440 Construction inspection: 5% rehabilitation design-build for Tectonic225 Park Engineering Ave. South Consultants, 718-391-9200stvinc.com DonaldExecutive Benvie chairman 22965 44076 $93.8 ConstructionConstruction inspection: inspection: 27% 5% Borough-basedrehabilitation design-build jails program for for New York, NY 10003 Construction mgmt.: 20% Posillico Civil Inc. and the state GeologistsNew York, NY & 10003Land Surveyors tectonicengineering.com President, chief executive 60 76 Construction mgmt.: 33%20% cityPosillico Department Civil Inc. of and Design the stateand Engineering: 45% Department of Transportation; 118-35 Blvd. Engineering: 40%45% Construction;Department of 207th Transportation; Street yard South Beach Psychiatric Center 19 Forest Hills, NY 11375 oodSouth mitigation Beach Psychiatric for the city Center 4 new residential building for 4 Transitnew residential Authority building for Dormitory Authority of the Dormitory Authority of the State of New York Boswell Engineering 201-641-0770 Stephen Boswell 62 63 $40.1 Construction inspection: 51% GardenState of State New YorkParkway median 330 Phillips Ave. boswellengineering.com President, chief executive 58 58 Construction mgmt.: 10% barrier design for New Jersey GPI Greenman-Pedersen Inc. 646-791-8800 Denise Carter 212 395 $300.8 Construction inspection: 25% SouthGPI Greenman-Pedersen Hackensack, NJ 07606 Inc. 646-791-8800 Denise Carter 212 395 $300.8 ConstructionEngineering: inspection: 39%25% TuGeorgernpike Washington Authority; New Brid Yorkge 21 W. 38th St. gpinet.com Executive vice president, 207 381 Construction mgmt.: 35% rehabilitation construction 20 21 W. 38th St. gpinet.com Executive vice president, 207 381 Construction mgmt.: 35% Harborrehabilitation for Port construction Authority of New York, NY 10018 metro-area branch manager Engineering: 35% management; Bayonne Bridge New York, NY 10018 metro-area branch manager Engineering: 35% Newmanagement; York and NewBayonne Jersey Bridge 5 Facility assessment: 5% navigational clearance program 5 Facility assessment: 5% navigational clearance program construction management construction management                                    AECOM 212-973-2900 Denise Berger 200 10,750 $20,200.0 Architecture: 12% n/d   AECOM       212-973-2900      Denise   Berger         200  10,750   $20,200.0    ­ Architecture:    12% n/d     €‚  605 Third Ave. aecom.com Chief operating of cer, 209 12,280 Construction inspection: 1% ƒ„ ƒƒ ƒ   605 Third Ave. aecom.com Chief operating of cer, 209 12,280 Construction inspection: 1% New York, NY 10158 Northeast Construction mgmt.: 17% New York, NY 10158 Northeast Construction mgmt.: 17% John Cardoni Engineering: 70% John Cardoni Engineering: 70% 6 Executive vice president, 6 Executive vice president, Northeast Northeast

Jacobs 908-646-6550 Julie Chang 183 11,866 $12,737.9 Architecture: 7% Major Deegan Expressway Jacobs 908-646-6550 Julie Chang 183 11,866 $12,737.9 Architecture: 7% Major Deegan Expressway 500 Seventh Ave. jacobs.com Vice president, director of 148 13,941 Construction inspection: 7% rehabilitation for the state 500 Seventh Ave. jacobs.com Vice president, director of 148 13,941 Construction inspection: 7% rehabilitation for the state New York, NY 10018 New York operations Construction mgmt.: 34% Department of Transportation; New York, NY 10018 New York operations Construction mgmt.: 34% Department of Transportation; Engineering: 47% OMNY for the Metropolitan Engineering: 47% OMNY for the Metropolitan 7 Facility assessment: 5% Transportation Authority 7 Facility assessment: 5% Transportation Authority

Hardesty & Hanover 212-944-1150 Sean Bluni 154 248 $113.0 Construction inspection: 7% Kew Gardens Interchange; Hardesty & Hanover 212-944-1150 Sean Bluni 154 248 $113.0 Construction inspection: 7% Kew Gardens Interchange; hardestyhanover.com Chief executive 148 237 Construction mgmt.: 8% Unionport Bridge 1501 Broadway hardestyhanover.com Chief executive 148 237 Construction mgmt.: 8% Unionport Bridge 8 New York, NY 10036 Engineering: 85% 8 New York, NY 10036 Engineering: 85%

Stantec Consulting Services Inc. 212-366-5600 TomWalsh 145 3,381 $3,638.6 Architecture: 7% Lower Manhattan coastal Stantec Consulting Services Inc. 212-366-5600 TomWalsh 145 3,381 $3,638.6 Architecture: 7% Lower Manhattan coastal 475 Fifth Ave. stantec.com Vice president 141 3,407 Engineering: 93% resiliency in the Battery 475 Fifth Ave. stantec.com Vice president 141 3,407 Engineering: 93% resiliency in the Battery 9 New York, NY 10017 9 New York, NY 10017 HNTB New York Engineering and 212-594-9717 Stephen Dilts 137 1,200 $1,362.1 Architecture: 1% Project and construction HNTB New York Engineering and 212-594-9717 Stephen Dilts 137 1,200 $1,362.1 Architecture: 1% Project and construction Architecture hntb.com Senior vice president 138 1,000 Construction inspection: 5% management services for the Architecture hntb.com Senior vice president 138 1,000 Construction inspection: 5% management services for the 350 Fifth Ave. Construction mgmt.: 14% Department of Design and 350 Fifth Ave. Construction mgmt.: 14% Department of Design and New York, NY 10118 Engineering: 80% Construction's coastal resiliency New York, NY 10118 Engineering: 80% Construction's coastal resiliency 10 projects; Penn Station access 10 projects; Penn Station access design Congratulations to Dr. designRache

Dewberry 212-685-0900 John Boulé 128 589 $470.9 Construction inspection: 20% Hunts Point interstate access Dewberry 212-685-0900 John Boulé 128 589 $470.9 Construction inspection: 20% Hunts Point interstate access 132 W. 31st St. dewberry.com Senior vice president 123 659 Engineering: 80% improvement for the state 132 W. 31st St. dewberry.com Senior vice president 123 Simmons659 for beingEngineering: named 80% improvement for the state New York, NY 10001 Craig Johnson Department of Transportation; New York, NY 10001 Craig Johnson Department of Transportation; Executive vice president civil, utilities and waterfront Executive vice president civil, utilities and waterfront 11 upgrades for the Made in NY 11 one of Crain’s inauguralupgrades for the Made in NY campus at Bush Terminal campus at Bush Terminal Arup 212-896-3000 NigelNicolls 120 590 $2,400.0 Engineering: 82% Coney Island green infrastructure Arup 212-896-3000 NigelNicolls 120 Notable590 Women$2,400.0 Engineering:in Talent. 82% Coney Island green infrastructure 77 Water St. arup.com Principal New York group 123 595 Other:18% for city Economic Development Rache77 Water St. Simmons,arup.com MD, FACS Principal New York group 123 595 Other:18% for city Economic Development New York, NY 10005 leader Corp.; Solar Carve Tower for New York, NY 10005 leader Corp.; Solar Carve Tower for 12 Studio Gang 12 Breast Surgeon Studio Gang We commend Dr. Simmons’ commitment to leadership H2M Architects & Engineers 631-756-8000 Richard Humann 92 92 $84.0 Architecture: 36% Brooklyn Navy Yard resiliency WeiskopfH2M Architects Professor & Engineers of Surgical631-756-8000 Oncology Richard Humann 92 92 $84.0 Architecture: 36% Brooklyn Navy Yard resiliency 538 Broad Hollow Road h2m.com President, chief executive 83 and equity83 for women in Constructionthe sciences. inspection: 8%Herprogram; continued Water Authority of 538 Broad Hollow Road h2m.com President, chief executive 83 83 Construction inspection: 8% program; Water Authority of Associate Dean of Diversity and Inclusion Melville, NY 11747 Construction mgmt.: 7% Western Nassau County wellhead Melville, NY 11747 Construction mgmt.: 7% Western Nassau County wellhead Engineering: 44% treatment system Director, Office of Women work on initiatives like job satisfaction,Engineering: 44% promotions,treatment system 13 Facility assessment: 3% 13 Facility assessment: 3% Other:2% Co-Director Women Physicians of NewYork-Presbyterian and compensation equity will allowOther women:2% physicians

McLaren Engineering Group 212-324-6300 Malcolm McLaren 85 95 $48.5 Construction inspection: 8% 420 Kent; marine engineering of McLaren Engineering Group 212-324-6300 Malcolm McLaren 85 to reach95 their full potentials.$48.5 Construction inspection: 8% 420 Kent; marine engineering of 131 W. 35th St. mgmclaren.com Chief executive 75 79 Construction mgmt.: 5% NYC Ferry landings 131 W. 35th St. mgmclaren.com Chief executive 75 79 Construction mgmt.: 5% NYC Ferry landings New York, NY 10001 Engineering: 60% New York, NY 10001 Engineering: 60% 14 Facility assessment: 15% 14 Facility assessment: 15% Other:12% Other:12% weillcornell.org DeSimone Consulting Engineers 212-532-2211 Stephen DeSimone 75 111 $52.0 Engineering: 97% 77 Greenwich and One Willoughby DeSimone Consulting Engineers 212-532-2211 Stephen DeSimone 75 111 $52.0 Engineering: 97% 77 Greenwich and One Willoughby 140 Broadway de-simone.com President, chief executive 68 106 Facility assessment: 3% Square for FXCollaborative 140 Broadway de-simone.com President, chief executive 68 106 Facility assessment: 3% Square for FXCollaborative 15 New York, NY 10005 15 New York, NY 10005 Mueser Rutledge Consulting 917-339-9300 Peter Deming 72 72 $37.5 Engineering: 100% Little Island at Pier 55 for Hudson Mueser Rutledge Consulting 917-339-9300 Peter Deming 72 72 $37.5 Engineering: 100% Little Island at Pier 55 for Hudson 10 | CRAIN’SEngineers NEW YORK BUSINESS | AUGUST 10,mrce.com 2020 Senior partner 77 77 River Park Trust; 207th Street yard Engineers mrce.com Senior partner 77 77 River Park Trust; 207th Street yard 14 Penn Plaza ood protection for the city Transit 14 Penn Plaza ood protection for the city Transit 16 New York, NY 10122 Authority and Walsh Construction 16 New York, NY 10122 Authority and Walsh Construction

Savin Engineers 914-769-3200 Rengachari Srinivasaraghavan 70 80 $41.0 Architecture: 5% Playland in Rye, NY; Wards Island Savin Engineers 914-769-3200 Rengachari Srinivasaraghavan 70 80 $41.0 Architecture: 5% Playland in Rye, NY; Wards Island P010_P011_CN_20200810.indd3 Campus Drive 10 savinengineers.com President 65 75 Construction inspection: 20% wastewater treatment plant8/6/20 10:32 AM 3 Campus Drive savinengineers.com President 65 75 Construction inspection: 20% wastewater treatment plant Pleasantville, NY 10570 Construction mgmt.: 23% Pleasantville, NY 10570 Construction mgmt.: 23% Engineering: 50% Engineering: 50% 17 Facility assessment: 2% 17 Facility assessment: 2%

Tetra Tech/Cosentini 212-615-3600 Douglas Mass 68 416 $3,100.0 Engineering: 100% 66 Hudson Blvd. for Tishman Tetra Tech/Cosentini 212-615-3600 Douglas Mass 68 416 $3,100.0 Engineering: 100% 66 Hudson Blvd. for Tishman 498 Seventh Ave. tetratech.com President, Cosentini 73 493 Speyer Properties; 76 11th Ave. 498 Seventh Ave. tetratech.com President, Cosentini 73 493 Speyer Properties; 76 11th Ave. 18 New York, NY 10018 cosentini.com Associates for HFZ Capital Group 18 New York, NY 10018 cosentini.com Associates for HFZ Capital Group Tectonic Engineering Consultants, 718-391-9200 Donald Benvie 65 76 $93.8 Construction inspection: 27% Borough-based jails program for Tectonic Engineering Consultants, 718-391-9200 Donald Benvie 65 76 $93.8 Construction inspection: 27% Borough-based jails program for Geologists & Land Surveyors tectonicengineering.com President, chief executive 60 76 Construction mgmt.: 33% city Department of Design and Geologists & Land Surveyors tectonicengineering.com President, chief executive 60 76 Construction mgmt.: 33% city Department of Design and 118-35 Queens Blvd. Engineering: 40% Construction; 207th Street yard 118-35 Queens Blvd. Engineering: 40% Construction; 207th Street yard 19 Forest Hills, NY 11375 ood mitigation for the city 19 Forest Hills, NY 11375 ood mitigation for the city Transit Authority Transit Authority

Boswell Engineering 201-641-0770 Stephen Boswell 62 63 $40.1 Construction inspection: 51% Garden State Parkway median Boswell Engineering 201-641-0770 Stephen Boswell 62 63 $40.1 Construction inspection: 51% Garden State Parkway median 330 Phillips Ave. boswellengineering.com President, chief executive 58 58 Construction mgmt.: 10% barrier design for New Jersey 330 Phillips Ave. boswellengineering.com President, chief executive 58 58 Construction mgmt.: 10% barrier design for New Jersey South Hackensack, NJ 07606 Engineering: 39% Turnpike Authority; New York South Hackensack, NJ 07606 Engineering: 39% Turnpike Authority; New York 20 Harbor for Port Authority of 20 Harbor for Port Authority of New York and New Jersey New York and New Jersey

                                                                                                           ­          €‚                                     ­          €‚  ƒ„ ƒƒ ƒ    ƒ„ ƒƒ ƒ    NEW YORK–AREA WORLDWIDE ENGINEERS ENGINEERS 2019 FIRMWIDE COMPANY/ PHONE NUMBER/ 2019/ 2019/ REVENUE NEW YORK–AREA SERVICE MIX RANK ADDRESS WEBSITE SENIOR EXECUTIVE(S) 2018 2018 (IN MILLIONS) (PORTION OF BILLINGS) RECENT PROJECTS/CLIENTS

WSP USA 212-465-5000 Lou Cornell 797 27,058 $6,954.4 Construction mgmt.: 15% Kosciuszko Bridge for the state 1 Penn Plaza wsp.com Chief executive 819 26,950 Engineering: 83% Department of Transportation; 1 New York, NY 10119 Facility assessment: 2% 55 Hudson Yards for Related Cos.

Thornton Tomasetti Inc. 917-661-7800 Peter DiMaggio, 336 980 $285.0 Architecture: 12% LaGuardia Airport Terminal B; 51 Madison Ave. thorntontomasetti.com Michael Squarzini 324 980 Engineering: 48% Sunnyside Yard New York, NY 10010 Co-chief executives Facility assessment: 35% 2 Thomas Scarangello Other:5% Executive chairman

Langan 212-479-5400 David Gockel 313 571 $307.0 Engineering: 100%4 Hudson Square; Bronx Point 21 Penn Plaza langan.com President, chief executive 287 525 3 New York, NY 10001 STV 212-777-4400 Dominick Servedio 225 586 $582.5 Architecture: 30% Highbridge Interchange 225 Park Ave. South stvinc.com Executive chairman 229 440 Construction inspection: 5% rehabilitation design-build for New York, NY 10003 Construction mgmt.: 20% Posillico Civil Inc. and the state Engineering: 45% Department of Transportation; South Beach Psychiatric Center 4 new residential building for Dormitory Authority of the State of New York

GPI Greenman-Pedersen Inc. 646-791-8800 Denise Carter 212 395 $300.8 Construction inspection: 25% George Washington Bridge 21 W. 38th St. gpinet.com Executive vice president, 207 381 Construction mgmt.: 35% rehabilitation construction New York, NY 10018 metro-area branch manager Engineering: 35% management; Bayonne Bridge 5 Facility assessment: 5% navigational clearance program construction management

AECOM 212-973-2900 Denise Berger 200 10,750 $20,200.0 Architecture: 12% n/d 605 Third Ave. aecom.com Chief operating of cer, 209 12,280 Construction inspection: 1% New York, NY 10158 Northeast Construction mgmt.: 17% John Cardoni Engineering: 70% 6 Executive vice president, Northeast

Jacobs 908-646-6550 Julie Chang 183 11,866 $12,737.9 Architecture: 7% Major Deegan Expressway 500 Seventh Ave. jacobs.com Vice president, director of 148 13,941 Construction inspection: 7% rehabilitation for the state New York, NY 10018 New York operations Construction mgmt.: 34% Department of Transportation; Engineering: 47% OMNY for the Metropolitan 7 Facility assessment: 5% Transportation Authority

Hardesty & Hanover 212-944-1150 Sean Bluni 154 248 $113.0 Construction inspection: 7% Kew Gardens Interchange; 1501 Broadway hardestyhanover.com Chief executive 148 237 Construction mgmt.: 8% Unionport Bridge 8 New York, NY 10036 Engineering: 85%

Stantec Consulting Services Inc. 212-366-5600 TomWalsh 145 3,381 $3,638.6 Architecture: 7% Lower Manhattan coastal 475 Fifth Ave. stantec.com Vice president 141 3,407 Engineering: 93% resiliency in the Battery 9 New York, NY 10017 HNTB New York Engineering and 212-594-9717 Stephen Dilts 137 1,200 $1,362.1 Architecture: 1% Project and construction Architecture hntb.com Senior vice president 138 1,000 Construction inspection: 5% management services for the 350 Fifth Ave. Construction mgmt.: 14% Department of Design and New York, NY 10118 Engineering: 80% Construction's coastal resiliency 10 projects; Penn Station access design

Dewberry 212-685-0900 John Boulé 128 589 $470.9 Construction inspection: 20% Hunts Point interstate access 132 W. 31st St. dewberry.com Senior vice president 123 659 Engineering: 80% improvement for the state New York, NY 10001 Craig Johnson Department of Transportation; Executive vice president civil, utilities and waterfront 11 upgrades for the Made in NY campus at Bush Terminal

Arup 212-896-3000 NigelNicolls 120 590 $2,400.0 Engineering: 82% Coney Island green infrastructure 77 Water St. arup.com Principal New York group 123 595 Other:18% for city Economic Development New York, NY 10005 leader Corp.; Solar Carve Tower for 12 Studio Gang

H2M Architects & Engineers 631-756-8000 Richard Humann 92 92 $84.0 Architecture: 36% Brooklyn Navy Yard resiliency 538 Broad Hollow Road h2m.com President, chief executive 83 83 Construction inspection: 8% program; Water Authority of Melville, NY 11747 Construction mgmt.: 7% Western Nassau County wellhead Engineering: 44% treatment system 13 Facility assessment: 3% Other:2%

McLaren Engineering Group 212-324-6300 Malcolm McLaren 85 95 $48.5 Construction inspection: 8% 420 Kent; marine engineering of 131 W. 35th St. mgmclaren.com Chief executive 75 79 Construction mgmt.: 5% NYC Ferry landings New York, NY 10001 Engineering: 60% 14 Facility assessment: 15% Other:12% NEW YORK–AREA WORLDWIDE NEW YORK–AREA WORLDWIDE ENGINEERS ENGINEERS 2019 FIRMWIDE DeSimone Consulting Engineers 212-532-2211 Stephen DeSimone ENGINEERS75 ENGINEERS111 2019 FIRMWIDE$52.0 Engineering: 97% 77 Greenwich and One Willoughby COMPANY/ PHONE NUMBER/ 2019/ 2019/ REVENUE NEW YORK–AREA SERVICE MIX 140COMPANY/ Broadway de-simone.comPHONE NUMBER/ President, chief executive 2019/68 2019/106 REVENUE NEWFacility YORK–AREA assessment: SERVICE 3%MIX Square for FXCollaborative RANK ADDRESS WEBSITE SENIOR EXECUTIVE(S) 2018 2018 (IN MILLIONS) (PORTION OF BILLINGS) RECENT PROJECTS/CLIENTS 15RANK NewADDRESS York, NY 10005 WEBSITE SENIOR EXECUTIVE(S) 2018 2018 (IN MILLIONS) (PORTION OF BILLINGS) RECENT PROJECTS/CLIENTS WSP USA 212-465-5000 Lou Cornell 797 27,058 $6,954.4 Construction mgmt.: 15% Kosciuszko Bridge for the state MueserWSP USA Rutledge Consulting 917-339-9300212-465-5000 PeterLou Cornell Deming 79772 27,05872 $6,954.4$37.5 Construction Engineering: mgmt.: 100% 15% LittleKosciuszko Island Bridat Pierge for55 the for stateHudson 1 Penn Plaza wsp.com Chief executive 819 26,950 Engineering: 83% Department of Transportation; Engineers1 Penn Plaza mrce.comwsp.com SeniorChief executive partner 81977 26,95077 Engineering: 83% RiverDepa Parkrtment Trust; of Transportation; 207th Street yard New York, NY 10119 Facility assessment: 2% 55 Hudson Yards for Related Cos. 14New Penn York, Plaza NY 10119 Facility assessment: 2% ood55 Hudson protection Yards for for the Related city Transit Cos. 1 161 New York, NY 10122 Authority and Walsh Construction

Thornton Tomasetti Inc. 917-661-7800 Peter DiMaggio, 336 980 $285.0 Architecture: 12% LaGuardia Airport Terminal B; SavinThornton Engineers Tomasetti Inc. 914-769-3200917-661-7800 RengachariPeter DiMaggio, Srinivasaraghavan 33670 98080 $285.0$41.0 Architecture:Architecture: 12% 5% PlaylandLaGuardia in AirportRye, NY; Te Warminalrds IslandB; 51 Madison Ave. thorntontomasetti.com Michael Squarzini 324 980 Engineering: 48% Sunnyside Yard 351 Campus Madison Drive Ave. savinengineers.comthorntontomasetti.com PresidentMichael Squarzini 32465 98075 ConstructionEngineering: inspection: 20%48% wastewaterSunnyside Yard treatment plant New York, NY 10010 Co-chief executives Facility assessment: 35% Pleasantville,New York, NY 10010NY 10570 Co-chief executives ConstructionFacility assessment: mgmt.:23% 35% 2 Thomas Scarangello Other:5% 2 Thomas Scarangello Engineering:Other 50%:5% 17 Executive chairman Facility assessment: 2% Executive chairman

Langan 212-479-5400 David Gockel 313 571 $307.0 Engineering: 100%4 Hudson Square; Bronx Point Langan 212-479-5400 David Gockel 313 571 $307.0 Engineering: 100%4 Hudson Square; Bronx Point 21 Penn Plaza langan.com President, chief executive 287 525 Tetra21 Penn Tech/Cosentini Plaza 212-615-3600langan.com DouglasPresident, Mass chief executive 28768 416525 $3,100.0 Engineering: 100% 66 Hudson Blvd. for Tishman 3 New York, NY 10001 3 498New SeventhYork, NY Ave. 10001 tetratech.com President, Cosentini 73 493 Speyer Properties; 76 11th Ave. 18 New York, NY 10018 cosentini.com Associates for HFZ Capital Group STV 212-777-4400 Dominick Servedio 225 586 $582.5 Architecture: 30% Highbridge Interchange STV 212-777-4400 Dominick Servedio 225 586 $582.5 Architecture: 30% Highbridge Interchange 225 Park Ave. South stvinc.com Executive chairman 229 440 Construction inspection: 5% rehabilitation design-build for Tectonic225 Park Engineering Ave. South Consultants, 718-391-9200stvinc.com DonaldExecutive Benvie chairman 22965 44076 $93.8 ConstructionConstruction inspection: inspection: 27% 5% Borough-basedrehabilitation design-build jails program for for New York, NY 10003 Construction mgmt.: 20% Posillico Civil Inc. and the state GeologistsNew York, NY & 10003Land Surveyors tectonicengineering.com President, chief executive 60 76 Construction mgmt.: 33%20% cityPosillico Department Civil Inc. of and Design the stateand Engineering: 45% Department of Transportation; 118-35 Queens Blvd. Engineering: 40%45% Construction;Department of 207th Transportation; Street yard South Beach Psychiatric Center 19 Forest Hills, NY 11375 oodSouth mitigation Beach Psychiatric for the city Center 4 new residential building for 4 Transitnew residential Authority building for Dormitory Authority of the Dormitory Authority of the State of New York Boswell Engineering 201-641-0770 Stephen Boswell 62 63 $40.1 Construction inspection: 51% GardenState of State New YorkParkway median 330 Phillips Ave. boswellengineering.com President, chief executive 58 58 Construction mgmt.: 10% barrier design for New Jersey GPI Greenman-Pedersen Inc. 646-791-8800 Denise Carter 212 395 $300.8 Construction inspection: 25% George Washington Bridge SouthGPI Greenman-Pedersen Hackensack, NJ 07606 Inc. 646-791-8800 Denise Carter 212 395 $300.8 ConstructionEngineering: inspection: 39%25% TuGeorgernpike Washington Authority; New Brid Yorkge 21 W. 38th St. gpinet.com Executive vice president, 207 381 Construction mgmt.: 35% rehabilitation construction 20 21 W. 38th St. gpinet.com Executive vice president, 207 381 Construction mgmt.: 35% Harborrehabilitation for Port construction Authority of New York, NY 10018 metro-area branch manager Engineering: 35% management; Bayonne Bridge New York, NY 10018 metro-area branch manager Engineering: 35% Newmanagement; York and NewBayonne Jersey Bridge 5 Facility assessment: 5% navigational clearance program 5 Facility assessment: 5% navigational clearance program construction management construction management                                     AECOM 212-973-2900 Denise Berger 200 10,750 $20,200.0 Architecture: 12% n/d   AECOM       212-973-2900      Denise   Berger         200  10,750   $20,200.0    ­ Architecture:    12% n/d     €‚  605 Third Ave. aecom.com Chief operating of cer, 209 12,280 Construction inspection: 1% ƒ„ ƒƒ ƒ   605 Third Ave. aecom.com Chief operating of cer, 209 12,280 Construction inspection: 1% New York, NY 10158 Northeast Construction mgmt.: 17% New York, NY 10158 Northeast Construction mgmt.: 17% John Cardoni Engineering: 70% John Cardoni Engineering: 70% 6 Executive vice president, 6 Executive vice president, Northeast Northeast

Jacobs 908-646-6550 Julie Chang 183 11,866 $12,737.9 Architecture: 7% Major Deegan Expressway Jacobs 908-646-6550 Julie Chang 183 11,866 $12,737.9 Architecture: 7% Major Deegan Expressway 500 Seventh Ave. jacobs.com Vice president, director of 148 13,941 Construction inspection: 7% rehabilitation for the state 500 Seventh Ave. jacobs.com Vice president, director of 148 13,941 Construction inspection: 7% rehabilitation for the state New York, NY 10018 New York operations Construction mgmt.: 34% Department of Transportation; New York, NY 10018 New York operations Construction mgmt.: 34% Department of Transportation; Engineering: 47% OMNY for the Metropolitan Engineering: 47% OMNY for the Metropolitan 7 Facility assessment: 5% Transportation Authority 7 Facility assessment: 5% Transportation Authority

Hardesty & Hanover 212-944-1150 Sean Bluni 154 248 $113.0 Construction inspection: 7% Kew Gardens Interchange; Hardesty & Hanover 212-944-1150 Sean Bluni 154 248 $113.0 Construction inspection: 7% Kew Gardens Interchange; 1501 Broadway hardestyhanover.com Chief executive 148 237 Construction mgmt.: 8% Unionport Bridge 1501 Broadway hardestyhanover.com Chief executive 148 237 Construction mgmt.: 8% Unionport Bridge 8 New York, NY 10036 Engineering: 85% 8 New York, NY 10036 Engineering: 85%

Stantec Consulting Services Inc. 212-366-5600 TomWalsh 145 3,381 $3,638.6 Architecture: 7% Lower Manhattan coastal Stantec Consulting Services Inc. 212-366-5600 TomWalsh 145 3,381 $3,638.6 Architecture: 7% Lower Manhattan coastal 475 Fifth Ave. stantec.com Vice president 141 3,407 Engineering: 93% resiliency in the Battery 475 Fifth Ave. stantec.com Vice president 141 3,407 Engineering: 93% resiliency in the Battery 9 New York, NY 10017 9 New York, NY 10017 HNTB New York Engineering and 212-594-9717 Stephen Dilts 137 1,200 $1,362.1 Architecture: 1% Project and construction HNTB New York Engineering and 212-594-9717 Stephen Dilts 137 1,200 $1,362.1 Architecture: 1% Project and construction Architecture hntb.com Senior vice president 138 1,000 Construction inspection: 5% management services for the Architecture hntb.com Senior vice president 138 1,000 Construction inspection: 5% management services for the 350 Fifth Ave. Construction mgmt.: 14% Department of Design and 350 Fifth Ave. Construction mgmt.: 14% Department of Design and New York, NY 10118 Engineering: 80% Construction's coastal resiliency New York, NY 10118 Engineering: 80% Construction's coastal resiliency 10 projects; Penn Station access 10 projects; Penn Station access design Congratulations to Dr. designRache

Dewberry 212-685-0900 John Boulé 128 589 $470.9 Construction inspection: 20% Hunts Point interstate access Dewberry 212-685-0900 John Boulé 128 589 $470.9 Construction inspection: 20% Hunts Point interstate access 132 W. 31st St. dewberry.com Senior vice president 123 659 Engineering: 80% improvement for the state 132 W. 31st St. dewberry.com Senior vice president 123 Simmons659 for beingEngineering: named 80% improvement for the state New York, NY 10001 Craig Johnson Department of Transportation; New York, NY 10001 Craig Johnson Department of Transportation; Executive vice president civil, utilities and waterfront Executive vice president civil, utilities and waterfront 11 upgrades for the Made in NY 11 one of Crain’s inauguralupgrades for the Made in NY campus at Bush Terminal campus at Bush Terminal Arup 212-896-3000 NigelNicolls 120 590 $2,400.0 Engineering: 82% Coney Island green infrastructure Arup 212-896-3000 NigelNicolls 120 Notable590 Women$2,400.0 Engineering:in Talent. 82% Coney Island green infrastructure 77 Water St. arup.com Principal New York group 123 595 Other:18% for city Economic Development Rache77 Water St. Simmons,arup.com MD, FACS Principal New York group 123 595 Other:18% for city Economic Development New York, NY 10005 leader Corp.; Solar Carve Tower for New York, NY 10005 leader Corp.; Solar Carve Tower for 12 Studio Gang 12 Breast Surgeon Studio Gang We commend Dr. Simmons’ commitment to leadership H2M Architects & Engineers 631-756-8000 Richard Humann 92 92 $84.0 Architecture: 36% Brooklyn Navy Yard resiliency WeiskopfH2M Architects Professor & Engineers of Surgical631-756-8000 Oncology Richard Humann 92 92 $84.0 Architecture: 36% Brooklyn Navy Yard resiliency 538 Broad Hollow Road h2m.com President, chief executive 83 and equity83 for women in Constructionthe sciences. inspection: 8%Herprogram; continued Water Authority of 538 Broad Hollow Road h2m.com President, chief executive 83 83 Construction inspection: 8% program; Water Authority of Associate Dean of Diversity and Inclusion Melville, NY 11747 Construction mgmt.: 7% Western Nassau County wellhead Melville, NY 11747 Construction mgmt.: 7% Western Nassau County wellhead Engineering: 44% treatment system Director, Office of Women work on initiatives like job satisfaction,Engineering: 44% promotions,treatment system 13 Facility assessment: 3% 13 Facility assessment: 3% Other:2% Co-Director Women Physicians of NewYork-Presbyterian and compensation equity will allowOther women:2% physicians

McLaren Engineering Group 212-324-6300 Malcolm McLaren 85 95 $48.5 Construction inspection: 8% 420 Kent; marine engineering of McLaren Engineering Group 212-324-6300 Malcolm McLaren 85 to reach95 their full potentials.$48.5 Construction inspection: 8% 420 Kent; marine engineering of 131 W. 35th St. mgmclaren.com Chief executive 75 79 Construction mgmt.: 5% NYC Ferry landings 131 W. 35th St. mgmclaren.com Chief executive 75 79 Construction mgmt.: 5% NYC Ferry landings New York, NY 10001 Engineering: 60% New York, NY 10001 Engineering: 60% 14 Facility assessment: 15% 14 Facility assessment: 15% Other:12% Other:12% weillcornell.org DeSimone Consulting Engineers 212-532-2211 Stephen DeSimone 75 111 $52.0 Engineering: 97% 77 Greenwich and One Willoughby DeSimone Consulting Engineers 212-532-2211 Stephen DeSimone 75 111 $52.0 Engineering: 97% 77 Greenwich and One Willoughby 140 Broadway de-simone.com President, chief executive 68 106 Facility assessment: 3% Square for FXCollaborative 140 Broadway de-simone.com President, chief executive 68 106 Facility assessment: 3% Square for FXCollaborative 15 New York, NY 10005 15 New York, NY 10005 Mueser Rutledge Consulting 917-339-9300 Peter Deming 72 72 $37.5 Engineering: 100% Little Island at Pier 55 for Hudson Mueser Rutledge Consulting 917-339-9300 Peter Deming 72 72 $37.5 Engineering: 100% Little Island at Pier 55 for Hudson Engineers mrce.com Senior partner 77 77 River Park Trust; 207th Street yard Engineers mrce.com Senior partner 77 77 AUGUST 10, 2020 | CRAIN’RiverS Park NEW Tr ust;YORK 207th BUSINESS Street ya | rd 11 14 Penn Plaza ood protection for the city Transit 14 Penn Plaza ood protection for the city Transit 16 New York, NY 10122 Authority and Walsh Construction 16 New York, NY 10122 Authority and Walsh Construction

Savin Engineers 914-769-3200 Rengachari Srinivasaraghavan 70 80 $41.0 Architecture: 5% Playland in Rye, NY; Wards Island Savin Engineers 914-769-3200 Rengachari Srinivasaraghavan 70 80 $41.0 Architecture: 5% Playland in Rye, NY; Wards Island 3 Campus Drive savinengineers.com President 65 75 Construction inspection: 20% wastewater treatment plant P010_P011_CN_20200810.indd3 Campus Drive 11 savinengineers.com President 65 75 Construction inspection: 20% wastewater treatment plant8/6/20 10:32 AM Pleasantville, NY 10570 Construction mgmt.: 23% Pleasantville, NY 10570 Construction mgmt.: 23% Engineering: 50% Engineering: 50% 17 Facility assessment: 2% 17 Facility assessment: 2%

Tetra Tech/Cosentini 212-615-3600 Douglas Mass 68 416 $3,100.0 Engineering: 100% 66 Hudson Blvd. for Tishman Tetra Tech/Cosentini 212-615-3600 Douglas Mass 68 416 $3,100.0 Engineering: 100% 66 Hudson Blvd. for Tishman 498 Seventh Ave. tetratech.com President, Cosentini 73 493 Speyer Properties; 76 11th Ave. 498 Seventh Ave. tetratech.com President, Cosentini 73 493 Speyer Properties; 76 11th Ave. 18 New York, NY 10018 cosentini.com Associates for HFZ Capital Group 18 New York, NY 10018 cosentini.com Associates for HFZ Capital Group Tectonic Engineering Consultants, 718-391-9200 Donald Benvie 65 76 $93.8 Construction inspection: 27% Borough-based jails program for Tectonic Engineering Consultants, 718-391-9200 Donald Benvie 65 76 $93.8 Construction inspection: 27% Borough-based jails program for Geologists & Land Surveyors tectonicengineering.com President, chief executive 60 76 Construction mgmt.: 33% city Department of Design and Geologists & Land Surveyors tectonicengineering.com President, chief executive 60 76 Construction mgmt.: 33% city Department of Design and 118-35 Queens Blvd. Engineering: 40% Construction; 207th Street yard 118-35 Queens Blvd. Engineering: 40% Construction; 207th Street yard 19 Forest Hills, NY 11375 ood mitigation for the city 19 Forest Hills, NY 11375 ood mitigation for the city Transit Authority Transit Authority

Boswell Engineering 201-641-0770 Stephen Boswell 62 63 $40.1 Construction inspection: 51% Garden State Parkway median Boswell Engineering 201-641-0770 Stephen Boswell 62 63 $40.1 Construction inspection: 51% Garden State Parkway median 330 Phillips Ave. boswellengineering.com President, chief executive 58 58 Construction mgmt.: 10% barrier design for New Jersey 330 Phillips Ave. boswellengineering.com President, chief executive 58 58 Construction mgmt.: 10% barrier design for New Jersey South Hackensack, NJ 07606 Engineering: 39% Turnpike Authority; New York South Hackensack, NJ 07606 Engineering: 39% Turnpike Authority; New York 20 Harbor for Port Authority of 20 Harbor for Port Authority of New York and New Jersey New York and New Jersey

                                                                                                           ­          €‚                                     ­          €‚  ƒ„ ƒƒ ƒ    ƒ„ ƒƒ ƒ   