Prime Description Estimate Bureau Buyer Award Amt Contractor

Total Page:16

File Type:pdf, Size:1020Kb

Prime Description Estimate Bureau Buyer Award Amt Contractor PRIME DESCRIPTION ESTIMATE BUREAU BUYER AWARD AMT CONTRACTOR PIONEER TOWER FIBER STANDARD UTILITY OPTIC CONSTRUCTION $24,000 BTS NJM $37,775 CONTRACTORS INC HEARING OFFICE SECURITY SBS IMPROVEMENTS $23,500 FAC KED $32,315 CONSTRUCTION LLC 1900 BLDG CARPET & INTERIOR PAINT GREENLIFE PROJECT $93,000 FAC KED $48,242 CONSTRUCTION INC REPAIR & RECOAT PIONEER CONCRETE DRIVES AT WATERPROOFING SMARTPARKS $2,500,000 FAC MP $1,234,100 CO INC JC/CENTRAL PRECINCT LOCKER ROOM HOOD TO COAST IMPROVMENTS $45,000 FAC KED $40,800 RESTORATION TPB COMPUTER SERVER ROOM GREENLIFE INSTALLATION $24,000 FAC KED $18,938 CONSTRUCTION INC CITY HALL SECURITY ENHANCEMENTS, SUITE SBS 230 $56,000 FAC KED $46,850 CONSTRUCTION LLC PORTLAND BUILDING DOMESTIC WATER RELIANT PLUMBING PUMP UPGRADE $46,800 FAC NJM $69,072 & MECHANICAL, INC. EMERGENCY SEWER REPAIR AT YAMHILL RELIANT PLUMBING GARAGE $6,419 FAC MP $13,498 & MECHANICAL, INC. STREETCAR LOOP CM/GC - WATER MAIN WERBIN WEST WORK $6,700,000 PDOT MP $5,498,765 CONTRACTING INC ROOF MEMBRANE WATERPROOFING & SNYDER ROOFING REPAIR - REBID $375,000 FAC MP $461,051 OF OREGON LLC SEWER LEVEL REMOTE TRIAD MECHANICAL TELEMETRY PHASE 4 $80,000 BES KED $54,216.22 INC RESOURCE ACCESS WALSH CENTER $28,000,000 PHB $28,750,000 CONSTRUCTION REDSIDE RIVERPLACE DOCKS $300,700 PKS MP $278,827.11 CONSTRUCTION LLC GROUNDWATER PUMP STATION LIGHTENING ARRESTERS $22,000 WTR KED $17,066 EC COMPANY CBWTP DIGESTER EXPANSION PROJECT $22,500,000 BES KBM $15,703,918 STELLAR J CORP CBWTP SLUDGE GRINDER TRIAD MECHANICAL INSTALLATION $150,000 BES KED $135,826 INC CBWTP SLUDGE PROCESSING BOILER TRIAD MECHANICAL STACK RPLMT $100,000 BES KED $29,120 INC BULL RUN DAM 1 OUTLET WORKS GLOBAL DIVING & IMPROVEMENTS PH 2 $620,000 WTR KBM $786,506 SALVAGE 911 CALL CENTER HVAC COLLINS UPGRADE $150,000 FAC KED $93,045 MECHANICAL INC BALCH CONSOLIDATED CONDUIT JAMES W FOWLER CONSTRUCTION PH $50,000,000 BES DNJ $57,314,607 CO VACUUM RELIEF VALVE MOORE PROJECT AT BULL RUN $1,000,000 WTR KED $782,000 EXCAVATION INC PORTSMOUTH FORCEMAIN SEGMENT MICHELS 2 $35,000,000 BES DNJ $19,353,144 CORPORATION PORTSMOUTH FORCE MOUNTAIN MAIN SEGMENT 1 $34,000,000 BES KBM $28,149,491 CASCADE INC WET WEATHER TRIAD MECHANICAL SCREENING FACILITY $9,500,000 BES KBM $6,401,667 INC SWAN ISLAND PUMP STATION $10,000,000 BES KBM $6,889,945 STELLAR J CORP PORTSMOUTH FORCE MAIN TEMPORARY KEVIN COOPER PARKING LOT $10,000 BES KED $8,549 EXCAVATING INC BALCH PROJECT OFFICE FIBER OPTIC NORTH SKY INSTALLATION $13,500 BTS NJM $10,498 COMMUNICATIONS NE 112TH AVE AND NE DUKE HOLMAN ST STORM CONSTRUCTION & SEWER $210,000 BES KBM $86,712 EXCAVATION MARINE DRIVE PUMP STETTLER SUPPLY STATION UPGRADE $600,000 BES JVN $507,400 CO INC REMOVAL OF UNIVERSAL STRUCTURES AT 3733 & EXCAVATION 3741 SE 100TH $80,000 FAC KED $36,000 CONTRACTORS INC NE 122ND ST AT AIRPORT WAY STREET DIRT & AGGREGATE IMPROVEMENT $480,000 PDOT KBM $479,641.16 INTERCHANGE INC GILBERT HEIGHTS SILCO COMMERCIAL PARK IMPROVEMENTS $466,000 PKS MP $387,900 CONSTRUCTION SILCO COMMERCIAL TERRACE TRAILS PARK $395,250 PKS MP $374,000 CONSTRUCTION LEACH BOTANICAL HOOD TO COAST GARDEN ANNEX ROOF $10,000 PKS KED $8,875 RESTORATION POWELL BUTTE M&M MAINTENANCE - CONSTRUCTION STORMWATER $220,000 WTR KBM $125,842 SERVICES INC POWELL BUTTE RESERVOIR NO 2 SITE NUTTER DEVELOPMENT $13,200,000 WTR KBM $3,707,777 CORPORATION FENWICK BASIN SEWER REHABILITATION $750,000 BES KBM $404,220 CIVILWORKS NW LINE EXTENSION MOVEMENT OF SVCS PORTLAND BASINAVE/MOCK $7,200 BES KED $7,200.12 GENERAL ELECTRIC COLUMBIA SLOUGH CONFLUENCE HABITAT NUTTER ENHANCEMEN $250,000 BES KBM $262,262 CORPORATION EMERGENCY PORTSMOUTH LATERAL UNITED PARCEL AT UPS PROPERTY $24,100 BES MP $24,100 SERVICE EMERSON DRIVE STEP SYSTEM DENALI IMPROVEMENTS $35,000 BES KED $26,100 STONEWORKS, INC. N FOWLER SEWER UNIVERSAL REPLACEMENT EXCAVATION PROJECT $140,000 BES NJM $138,797 CONTRACTORS INC N FOWLER SEWER UNIVERSAL REPLACEMENT EXCAVATION PROJECT $23,870 BES NJM $138,797 CONTRACTORS INC EMERGENCY NORTHWEST STRUCTURAL REPAIRS DEMOLITION & AT TERMINAL ONE $75,000 FAC MP $72,500 DISMANTLING KERBY GARAGE EXTERIOR PRECISION 1 WATERPROOFING $230,000 FAC MP $148,327 COATINGS OREGON STATE N LEADBETTER BRIDGE EXTENSION CONSTRUCTION, OVERCROSSING -FED $8,645,000 TRN KBM $5,441,721.25 INC. N. DENVER AVE R&R GENERAL IMPROVEMENTS $1,800,000 TRN KBM $1,195,629.10 CONTRACTORS INC NE SUMNER ST & NE KILLINGSWORTH ST NW KODIAK SWR REPLAC $450,000 BES KBM $220,928 CONSTRUCTION LLC NE 32ND AVE AT WEIDLER ST SEWER NUTTER REPLACEMENT $400,000 BES LP $261,914.22 CORPORATION NE PRECINCT - MEN'S LOCKER ROOM FLOOR SBS UPGRADE $14,000 FAC KED $10,200 CONSTRUCTION LLC STREET IMPROVEMENTS NE 87TH AVE AND TRI STATE COLUMBIA BOULEVARD $1,200,000 PBOT KBM $671,641 CONSTRUCTION INC NE 92ND DRIVE ROADWAY EXENSION FROM COLUMBIA SLOUGH TO NE TRI STATE ALDERWOOD ROAD $1,200,000 PBOT KBM $671,641 CONSTRUCTION INC NE 87TH AND COLUMBIA BOULVARD INTERSECTION TRI STATE IMPROVEMENT $1,200,000 TRN KBM $671,641 CONSTRUCTION INC E BURNSIDE/NE COUCH NUTTER - FED $11,000,000 PDOT KBM $6,800,300.22 CORPORATION PARKER NE ALDERWOOD ROAD NORTHWEST SIGNALS $3,000,000 TRAN KBM $2,017,733.71 PAVING CO UNIVERSAL EAST HOLLADAY PARK EXCAVATION IMPROVMENTS $70,500 PKS KED $36,800 CONTRACTORS INC S AIRPORT SANITARY SEWER SYSTEM PHASE CANBY EXCAVATING 5 $1,650,000 BES DNJ $1,288,900 INC NE SANDY BLVD TRAFFIC SAFETY IMPROVMTS - FED $460,000 TRN KBM $399,138.60 TICE ELECTRIC CO NW IRVING ST & I-405 NUTTER SEWER REPLACEMENT $1,000,000 BES KBM $505,000 CORPORATION PITTOCK MANSION WEST ENTRY & SBS TERRACE REPAIR $45,000 PKS KED $37,732 CONSTRUCTION LLC TANNER SPRINGS PAYNE RAINWATER PAVILION $125,000 PKS MP $145,947 CONSTRUCTION INC OAK B BASIN SEWER RELIEF & JOHN L JERSEY & RECONSTRUCTION $12,300,000 BES KBM $6,377,221 SON INC FOSTER SEWER WESTECH REPLACEMENT $2,000,000 BES KBM $1,098,945 CONSTRUCTION INC ERROL CREEK D&T CONFLUENCE PROJECT $310,000 BES KBM $217,682.03 EXCAVATION,INC SELLWOOD MOORE INTERCEPTOR SEWER $3,330,000 BES KBM $1,973,370 EXCAVATION INC UNIVERSAL SUMP REHABILITATION EXCAVATION PROJECT, PHASE 1 $140,000 BES KED $85,075 CONTRACTORS INC SE CLAY-TAYLOR RECONSTRUCTION & EMERY & SONS GREEN STREETS $4,000,000 BES KED $2,391,886.50 CONSTRUCTION INC SE BYBEE SEWER DUNN REHABILITATION $2,600,000 BES KED $1,678,400 CONSTRUCTION INC REMOVAL OF UNIVERSAL STRUCTURES AT 6631 EXCAVATION SE 110th DRIVE $30,000 FAC JAB $9,963 CONTRACTORS INC REMOVAL OF STRUCTURES & DENNIS SNYDER IMPROVEMENTS $30,000 FAC NJM $25,350 CONTRACTORS EMERGENCY HOUSE DEMOLITION 4923 SE DENNIS SNYDER 174TH AVE $25,000 FAC KED $23,000 CONTRACTORS REMOVAL OF STRUCTURES AT 6645 & 6725 SE 106TH $40,000 FAC KED $25,915 INTERLAKEN INC REPLACE ROOF @ 1300 ARELLANOS SE GIDEON $80,000 FIR KED $68,450 CONSTRUCTION LLC LENTS PARK ELECTRICAL SERVICE PORTLAND EXTENSION $5,200 PKS KED $5,181.16 GENERAL ELECTRIC CIRCLE AVE BRIDGE PARTIAL REPLACEMENT& ALL CONCRETE REPAIR $195,000 PKS MP $236,150 SPECIALTIES INC POWELL PARK FENCE ARELLANOS REPLACEMENT $18,000 PKS NJM $18,750 CONSTRUCTION LLC FOUR WAY BEACON AT BARBARA WELCH @ SE 52ND AV $15,000 TRN KED $26,365 EC COMPANY K&R PLUMBING EMERGENCY SW PARK CONSTRUCTION CO SEWER REPLACEMENT $218,449 BES MP $150,020 INC EMERGENCY SW CORBETT SEWER KEVIN COOPER REPLACEMENT $102,000 BES MP $88,286 EXCAVATING INC THOMAS & WOODS UNIVERSAL WASTEWATER PUMP EXCAVATION STATION DECOMM $90,000 BES NJM $424,450 CONTRACTORS INC ARROWOOD TOWER AC SCHOMMER & IMPROVEMENTS $15,000 BTS KED $7,993 SONS INC SUNSTONE MONTESSORI SCH ROBERT LLOYD HVAC UPGRADE $205,000 PKS MP $198,000 SHEET METAL INC SOUTH WATERFRONT NUTTER PARK IMPROVMNTS $2,600,000 PKS MP $2,166,610 CORPORATION EXTERIOR PAINTING PPCC & MULT ART CTR BOANERGES GROUP ANNEX $95,000 PKS KED $48,000 LLC METRO AREA MARSHALL PARK CONSTRUCTION PEDESTRIAN BRIDGE $56,000 PKS KED $44,980 SERVICES SWCC POOL ANDERSON REPLASTERING $170,000 PKS LP $110,884 POOLWORKS SW CARDINELL DRIVE WATER WORK $550,000 WTR KBM $291,210 CIVILWORKS NW WEST SIDE HEADER MOORE RELOCATION - PHASE 1 $4,272,000 WTR LP $1,963,045 EXCAVATION INC BURLINGAME TANKS IMPROVEMENTS SHEARER & ASSOC PROJECT $450,000 WTR JVN $638,045 INC BERTHA TANK NO. 1 POLYUREA LINER INSTALLATION $130,000 WTR NJM $138,000 LONG PAINTING CO TOTAL $284,867,48 $218,154,375 .
Recommended publications
  • District Background
    DRAFT SOUTHEAST LIAISON DISTRICT PROFILE DRAFT Introduction In 2004 the Bureau of Planning launched the District Liaison Program which assigns a City Planner to each of Portland’s designated liaison districts. Each planner acts as the Bureau’s primary contact between community residents, nonprofit groups and other government agencies on planning and development matters within their assigned district. As part of this program, District Profiles were compiled to provide a survey of the existing conditions, issues and neighborhood/community plans within each of the liaison districts. The Profiles will form a base of information for communities to make informed decisions about future development. This report is also intended to serve as a tool for planners and decision-makers to monitor the implementation of existing plans and facilitate future planning. The Profiles will also contribute to the ongoing dialogue and exchange of information between the Bureau of Planning, the community, and other City Bureaus regarding district planning issues and priorities. PLEASE NOTE: The content of this document remains a work-in-progress of the Bureau of Planning’s District Liaison Program. Feedback is appreciated. Area Description Boundaries The Southeast District lies just east of downtown covering roughly 17,600 acres. The District is bordered by the Willamette River to the west, the Banfield Freeway (I-84) to the north, SE 82nd and I- 205 to the east, and Clackamas County to the south. Bureau of Planning - 08/03/05 Southeast District Page 1 Profile Demographic Data Population Southeast Portland experienced modest population growth (3.1%) compared to the City as a whole (8.7%).
    [Show full text]
  • Sub-Area: Southeast
    PARKS 2020 VISION OUTHEAST Distinctive Features Studio in the Laurelhurst Park annex is a satellite of the Montavilla Community Center. I Aquatic facilities include Sellwood, Mt. Scott, Description: The Southeast sub-area (see map at the Buckman, Montavilla and Creston. end of this section) contains many of the city's older, I established neighborhoods. This area is a patchwork of The Community Music Center is in this sub-area. older, mainly single-family neighborhoods divided by I The Southeast sub-area has three Community linear commercial corridors. The Central Eastside Schools and 45 school sites. Industrial District, which borders the east bank of the I There are lighted baseball stadiums at Willamette, separates some residential neighborhoods Westmoreland and Lents Parks. from the river. Resources and Facilities: Southeast has 898 acres Population – Current and Future: The Southeast of parkland, ranking third in total amount of park sub-area ranks first in population with 154,000 and acreage. Most parks are developed, well distributed, is projected to grow to 157,830 by 2020, an increase in good condition, and can accommodate a range of of 2%. recreational uses. I Southeast has the City’s largest combined acreage DISTRIBUTION OF SUBAREA ACRES BY PARK TYPE of neighborhood and community parks. I Southeast has a variety of habitat parks, including Oaks Bottom Wildlife Refuge, Tideman Johnson Park, and Johnson Creek Park that are popular sites for hiking, birding, walking, and general recreation use. I This sub-area includes part of the I-205 Bike Trail and about 4.6 miles of the Springwater Corridor, a 195-acre 16.5 mile-long regional trailway that includes many natural resources.
    [Show full text]
  • MAKING HISTORY 50 Years of Trimet and Transit in the Portland Region MAKING HISTORY
    MAKING HISTORY 50 Years of TriMet and Transit in the Portland Region MAKING HISTORY 50 YEARS OF TRIMET AND TRANSIT IN THE PORTLAND REGION CONTENTS Foreword: 50 Years of Transit Creating Livable Communities . 1 Setting the Stage for Doing Things Differently . 2 Portland, Oregon’s Legacy of Transit . 4 Beginnings ............................................................................4 Twentieth Century .....................................................................6 Transit’s Decline. 8 Bucking National Trends in the Dynamic 1970s . 11 New Institutions for a New Vision .......................................................12 TriMet Is Born .........................................................................14 Shifting Gears .........................................................................17 The Freeway Revolt ....................................................................18 Sidebar: The TriMet and City of Portland Partnership .......................................19 TriMet Turbulence .....................................................................22 Setting a Course . 24 Capital Program ......................................................................25 Sidebar: TriMet Early Years and the Mount Hood Freeway ...................................29 The Banfield Project ...................................................................30 Sidebar: The Transportation Managers Advisory Committee ................................34 Sidebar: Return to Sender ..............................................................36
    [Show full text]
  • Histortrees! Trees Are
    activities. Ask them how old they think those Histortrees! trees are. When do they think they were Grade Level planted? Who do they think planted them? 1st - 5th grade What do they think the neighborhood looked Time Frame like when they were planted? Were there cars 1 - 2 hours or did people ride around on horses? Were the Curriculum Areas roads paved yet? Can they imagine what Social studies, history, art, language arts, Portland looked like 100 years ago? 200 years reading comprehension ago? Tell the students that they are going to be learning about heritage trees. Ask them if The Project anyone knows what a Heritage Tree is. Ask Think about the trees we saw in the first activity. them if they know what heritage is. Some Who planted those trees? What did the words related to heritage are: tradition, history, neighborhood look like when those trees were historic meaning, or ‘handed down from the planted? How has it changed? The City of past.’ These words and phrases may help the Portland’s Parks and Recreation Heritage Tree students understand that heritage is something Program protects trees that are special for their with historical value or historical meaning. “age size, type, historical associations and Inform the students that there are hundreds of horticultural value.” Do you know any trees heritage trees in Portland. Can they think of that fit this description? This project will any reason why a tree would become a introduce historical knowledge and the heritage tree? Hint: A heritage tree is a tree concept of heritage trees.
    [Show full text]
  • Pedestrian/Bicycle Overcrossings: Lessons Learned
    Pedestrian/Bicycle Overcrossings: Lessons Learned Prepared by: Rory Renfro Portland State University Masters of Urban and Regional Planning Field Area Paper June 2007 Acknowledgements Todd Boulanger, City of Vancouver, Washington Basil Christopher, Oregon Department of Transportation Jennifer Dill, Portland State University (first FAP reader) Carley Francis, Washington State Department of Transportation Young Park, TriMet David Roth, City of Eugene, Oregon Jim Strathman, Portland State University (second FAP reader) Steve Yates, City of Portland, Oregon ii Table of Contents Introduction: Why are pedestrian/bicycle overcrossings important?.......... 1 Purpose of this Study……………………………………………………………………. 2 Background Literature................................................................................. 2 Federal Publications……………………………………………………………………... 2 State Publications………………………………………………………………………... 2 Other Publications……………………………………………………………................ 3 Overcrossings Evaluated for this Study……………………………………………. 3 Overcrossing Inventory Process…………………………………………………………. 3 Data Collection Challenges……………………………………………………………... 3 Location Elements……………………………………………………………………….. 4 Pedestrian/Bicycle Destinations and Desired Routes…………………………………... 4 Pedestrian and Bicycle Destinations………………………………………………... 4 Walking and Bicycling Routes………………………………………………………. 7 Using an Overcrossing versus Crossing At-Grade……………………………………... 8 Overcrossings within the Overall Pedestrian/Bicycle Network………………………... 9 Shared Use Paths…………………………………………………………………….
    [Show full text]
  • Park Tree Inventory Findings
    Tree Summit 2019 PORTLANDPARKS.ORG | Commissioner Nick Fish | Director Adena Long PORTLANDPARKS.ORG | Commissioner Nick Fish | Director Adena Long Agenda 9:00am – 9:10am Welcome Jeff Ramsey, Science and Policy Specialist, PP&R Urban Forestry 9:15 am – 10:00 am Results from Portland’s First Inventory of Neighborhood Park Trees Bryn Davis and Bianca Dolan, PP&R Urban Forestry 10:05 am – 10:20 am Canaries in the Coal Mine: Studying urban trees reveals climate impacts on native forests Aaron Ramirez, Professor of Biology, Reed College 10:25 am – 10:40 am Thuja plicata, Hakuna Matata? The Mystery of Western Redcedar Decline in the Pacific Northwest Christine Buhl, Forest Entomologist, Oregon Department of Forestry 10:45 am – 11:00 am Break 11:00 am – 11:15 am Art and Activism in the Urban Forest: The Tree Emergency Response Team Ashley Meyer, Elisabeth Art Center 11:15 am – 11:30 am Film Screening: 82nd and Verdant Filmmaker James Krzmarzick and Dave Hedberg of the Canopy Stories Film Project 11:35 am – 11:45 am Bill Naito Community Trees Award Ceremony Jenn Cairo, City Forester, PP&R Urban Forestry 11:50 am – Noon Growing Portland’s Future Forest Together Angie DiSalvo, Science and Outreach Supervisor, PP&R Urban Forestry Noon – 1:00pm LunchPORTLANDPARKS.ORG and Breakout | Commissioner Session Nick Fish | Director Adena Long Hamilton Park PORTLANDPARKS.ORG | Commissioner Nick Fish | Director Adena Long PORTLANDPARKS.ORG | Commissioner Nick Fish | Director Adena Long Alberta Park PORTLANDPARKS.ORG | Commissioner Nick Fish | Director Adena
    [Show full text]
  • Reserve a Park for Your Picnic
    Reserve a Park for Your Picnic Making reservations, policies, insurance, and more Prices and policies within are valid for permits booked from February 18 - June 30, 2020. GENERAL INFORMATION Picnic permits allow you to bring in the following items Portland Parks & Recreation (PP&R) has 200+ parks and for your event - gardens, and many of these locations have individual • 1-2 tables and/or 1-2 pop-up canopies (no larger picnic tables available for use on a first-come, first-served than 10’x10’, no stakes are allowed in a park) basis. When there is a grouping of three or more tables, • a residential-style barbecue grill they are often reservable. To guarantee your picnic • small speakers heard only within immediate date and location, it is recommended that you make a picnic area picnic reservation in advance. For your convenience, this Special Use Permits are required when - brochure lists picnic sites and fees. Parks not included in • there is BYOB beer and wine present and more than 49 this brochure may be reserved under a Special Use Permit. people of any age • you’d like to provide alcohol (hosted, catered, kegs, etc.) Picnic permits cover the following type of events - • you’d like to bring items not included above (i.e. • A gathering of family/friends or company/ volleyball nets, inflatables/bounce house, additional organization tables or canopies) • A single reserved picnic facility without exceeding • you’d like to drive a vehicle on the sidewalk to pick up or the stated site capacity drop off items for your event • When event attendance is free.
    [Show full text]
  • 2016 Park System Development Charge 20-Year Capital Plan (Summary)
    187770 Exhibit A 2016 PARK SYSTEM DEVELOPMENT CHARGE 20-YEAR CAPITAL PLAN (SUMMARY) As required by ORS 223.309 Portland Parks and Recreation maintains a list of capacity increasing projects intended to address the need created by growth. These projects are eligible to be funded with Park SDC revenue. The total value of projects summarized below exceeds the potential revenue of $552 million estimated by the 2015 Park SDC Methodology and the funding from non-SDC revenue targeted for growth projects. The project list and capital plan is a "living" document that, per ORS 223.309 (2), may be modified at any time. Changes to this list will not affect the SDC rates, unless the Council holds a public hearing and authorizes the changes, as provided in ORS 223.309(2). TYPES OF PROJECTS THAT INCREASE CAPACITY: Land acquisition Develop new parks on new land Expand existing recreation facilities, trails, play areas, picnic areas, etc Increase playability, durability and life of facilities Natural area restoration Develop and improve parks to withstand more intense and extended use Construct new or expand existing community centers, aquatic facilities, and maintenance facilities Increase capacity of existing community centers, aquatic facilities, and maintenance facilities SDC Zone Program Site Project Name % Growth Years 1 - 5 Years 6 - 10 Years 11 -10 Total 20 Years Total * Growth % Central City Acquisitions Central City Unidentified Central City Acquisitions 100% $ 5,000,000 $ 5,000,000 $ 5,000,000 Central City Acquisition Placeholder Downtown 100%
    [Show full text]
  • Healthy Connected Neighborhoods Mapping Survey Results Citywide Summary
    Portland Plan Fairs: Healthy Connected Neighborhoods Mapping Survey Results Citywide Summary During the Portland Plan fairs in March 2011, in addition to speaking with staff, writing ideas down on chart packs, and providing feedback via two surveys (a general survey and a quick start actions survey), attendees were provided with the opportunity to share ideas and comments through two mapping exercises: a group mapping exercise during breakout discussion sessions and an individual mapping exercise (89 collected). The two mapping exercises were based on five Portland geographies (Central City, North-Northwest, Southwest, Northeast-Southeast, and East Portland). Group Mapping Exercise at Breakout Sessions Individual Mapping Exercise The citywide results summarized below are from the both the group and individual Healthy Connected Neighborhoods Mapping Exercises distributed and collected during the Portland Plan fairs. Summary results for each of the five geographies can be found in separate documents, which also include comments received from a Healthy Connected Neighborhoods questionnaire. GROUP MAPPING In both types of mapping exercises, participants identified existing and desired greenway connections (walk, bike, and/or transit focused) and neighborhood hubs. A mapped compilation of responses from these exercises can be found on the last page of this document. For the group exercises, in addition to the geography-specific maps, participants chose from a collection of images to help define the look, experience, and composition of greenways and neighborhood hubs. The images on the following pages represent the most frequently placed images for Hubs and Greenways citywide. Overall, 19 Group Mapping Exercises were collected (SW-3; SE/NE-5; NNW-4; East-4; and CC-3).
    [Show full text]
  • Ordinance No
    AS AMENDED 5/18/16 Exhibit A substituted ORDINANCE NO. Amend Park System Development Charge Capital Improvements Plan to update the project list (Ordinance, amend Ordinance No. 187150) The City of Portland ordains: Section 1. The Council finds: 1. Ordinance No. 172614, passed by the Council on August 19, 1998 authorized establishment of a Parks and Recreation System Development Charge (SDC) and created a new City Code Chapter 17.13. 2. In October 1998 the City established a Parks SDC program. City Code required that the program be updated every two years to ensure that programgoals were being met. An update was implemented on July 1, 2005 pursuant to Ordinance No. 179008, as amended. The required update reviewed the Parks SDC Program to determine that sufficientmoney will be available to fund capacity-increasing facilities identifiedby the Parks System Development Charge Capital Improvement Plan (Parks SDC-CIP); to determine whether the adopted and indexed SDC rate has kept pace with inflation; to determine whether the Parks SDC-CIP should be modified; and to ensure that SDC receipts will not over-fund such facilities. 3. Ordinance No. 181669, passed by the Council on March 12, 2008 updated Parks and Recreation System Development Charge, increased the calculated Park SDC recovery rate to 75%, established a Non-Residential Parks SDC fee, and implemented a two tiered SDC feestructure consisting of the Central City and the non-Central City areas, and created a new City Code Chapter 17.13. 4. Ordinance No. 187150, passed by the Council on May 27, 2015 adopted the updated Portland Parksand Recreation System Development Charge Methodology Update Report dated April 15, 2015 establishing both a residential and non-residential Parks SDC beginning July 1, 2016, adopted the Parks SDC­ CIP, and adopted an Amendment to Portland City Code Chapter 1 7.13, effective July 1, 2016.
    [Show full text]
  • Summary of Public Comments on Skatepark Sites
    Summary of Public Comments on Skatepark Sites This document is a summary of the public comments received during the November 2004 public comments on potential skatepark sites around the City. They are a compilation of handwritten and web-based comment forms, as well as comments from people who attended the series of three public workshops on the project. Members of the Skatepark Leadership Advisory Team (SPLAT) read and reviewed the comments on each site. Each wrote up a few of the site summaries below. Basic Details about the Meetings: Three Public Workshops were held on Wednesday 11/10/04 and Saturday 11/13/04. • Total attendance at these three workshops was roughly 75 people. Staffing details: • Twelve committee members, including each of the representatives for the Neighborhood Coalitions joined us for at least one of the meetings. • A total of eleven PP&R staff volunteered time (some for several meetings) to help staff the events. • The noise control office had a staff person join us for two out of the three meetings. • Neighborhood Association members, school principals, users, parents and concerned citizens were in attendance On-Line Survey Comments from the Public • The majority of folks who attended the meetings chose to fill out their comment forms on-line, as we received very few paper comment forms back from those in attendance at our meetings. • A total of 654 comments were received on 35 potential sites. • 103 people responded to the general questions about use of skateparks and demographic information. • Of those that filled
    [Show full text]
  • Campsite Report 17-23 February 2020
    CITY OF PORTLAND WEEKLY CAMPSITE REPORT February 17 – February 23, 2020 Last week, the Homelessness and Urban Camping Impact Reduction Program (HUCIRP): • Posted and cleaned 68 campsites. • Completed approximately 396 assessments—engaging with people living in camps, collecting garbage and biohazardous materials, and coordinating with service providers. This week we received: 943 new campsite reports identifying 277 active campsites throughout the City. Of these reports: • 68 were reports of people living in vehicles. CLICK ON THE MAP BELOW TO SEE ALL LOCATIONS REPORTED IN THE LAST 12 WEEKS CLICK ON THE MAP ABOVE TO SEE ALL LOCATIONS REPORTED LAST WEEK **Special note: due to the possibility of severe weather conditions, campsite postings and cleanup will be delayed if any of the severe weather criteria below are met. 1. Forecasted temperature of 25° F (-3.9° C) or below. 2. Forecasted snow accumulations of 1.0 inch or more sticking to the ground in most locations. 3. Forecasted temperature at or below 32° F (0° C) with driving rain of 1.0 inch or more overnight. 4. Other conditions, including severe wind chills or extreme temperature fluctuations. Homelessness/Urban Camping Impact Reduction Program Update: Last week we cleaned the following posted locations*: • I-5 -N Marine Dr/MLK Clover Leaf • Columbia Buffer • N Wheeler/Williams/Winning Way • NW 29th and Roosevelt • N Kirby and N Ross • NW 18th and Hoyt • N Columbia and Argyle • I-5 NB N Holman to Rosa Parks • 3600 N Hayden Island Dr • NE 102nd and Weidler • Behind 9500 NE 92nd • NE
    [Show full text]