PRIME DESCRIPTION ESTIMATE BUREAU BUYER AWARD AMT CONTRACTOR

PIONEER TOWER FIBER STANDARD UTILITY OPTIC CONSTRUCTION $24,000 BTS NJM $37,775 CONTRACTORS INC

HEARING OFFICE SECURITY SBS IMPROVEMENTS $23,500 FAC KED $32,315 CONSTRUCTION LLC

1900 BLDG CARPET & INTERIOR PAINT GREENLIFE PROJECT $93,000 FAC KED $48,242 CONSTRUCTION INC

REPAIR & RECOAT PIONEER CONCRETE DRIVES AT WATERPROOFING SMARTPARKS $2,500,000 FAC MP $1,234,100 CO INC

JC/CENTRAL PRECINCT LOCKER ROOM HOOD TO COAST IMPROVMENTS $45,000 FAC KED $40,800 RESTORATION TPB COMPUTER SERVER ROOM GREENLIFE INSTALLATION $24,000 FAC KED $18,938 CONSTRUCTION INC CITY HALL SECURITY ENHANCEMENTS, SUITE SBS 230 $56,000 FAC KED $46,850 CONSTRUCTION LLC

PORTLAND BUILDING DOMESTIC WATER RELIANT PLUMBING PUMP UPGRADE $46,800 FAC NJM $69,072 & MECHANICAL, INC.

EMERGENCY SEWER REPAIR AT YAMHILL RELIANT PLUMBING GARAGE $6,419 FAC MP $13,498 & MECHANICAL, INC. STREETCAR LOOP CM/GC - WATER MAIN WERBIN WEST WORK $6,700,000 PDOT MP $5,498,765 CONTRACTING INC

ROOF MEMBRANE WATERPROOFING & SNYDER ROOFING REPAIR - REBID $375,000 FAC MP $461,051 OF LLC

SEWER LEVEL REMOTE TRIAD MECHANICAL TELEMETRY PHASE 4 $80,000 BES KED $54,216.22 INC

RESOURCE ACCESS WALSH CENTER $28,000,000 PHB $28,750,000 CONSTRUCTION

REDSIDE RIVERPLACE DOCKS $300,700 PKS MP $278,827.11 CONSTRUCTION LLC GROUNDWATER PUMP STATION LIGHTENING ARRESTERS $22,000 WTR KED $17,066 EC COMPANY

CBWTP DIGESTER EXPANSION PROJECT $22,500,000 BES KBM $15,703,918 STELLAR J CORP

CBWTP SLUDGE GRINDER TRIAD MECHANICAL INSTALLATION $150,000 BES KED $135,826 INC

CBWTP SLUDGE PROCESSING BOILER TRIAD MECHANICAL STACK RPLMT $100,000 BES KED $29,120 INC

BULL RUN DAM 1 OUTLET WORKS GLOBAL DIVING & IMPROVEMENTS PH 2 $620,000 WTR KBM $786,506 SALVAGE

911 CALL CENTER HVAC COLLINS UPGRADE $150,000 FAC KED $93,045 MECHANICAL INC

BALCH CONSOLIDATED CONDUIT JAMES W FOWLER CONSTRUCTION PH $50,000,000 BES DNJ $57,314,607 CO

VACUUM RELIEF VALVE MOORE PROJECT AT BULL RUN $1,000,000 WTR KED $782,000 EXCAVATION INC PORTSMOUTH FORCEMAIN SEGMENT MICHELS 2 $35,000,000 BES DNJ $19,353,144 CORPORATION

PORTSMOUTH FORCE MOUNTAIN MAIN SEGMENT 1 $34,000,000 BES KBM $28,149,491 CASCADE INC

WET WEATHER TRIAD MECHANICAL SCREENING FACILITY $9,500,000 BES KBM $6,401,667 INC SWAN ISLAND PUMP STATION $10,000,000 BES KBM $6,889,945 STELLAR J CORP

PORTSMOUTH FORCE MAIN TEMPORARY KEVIN COOPER PARKING LOT $10,000 BES KED $8,549 EXCAVATING INC

BALCH PROJECT OFFICE FIBER OPTIC NORTH SKY INSTALLATION $13,500 BTS NJM $10,498 COMMUNICATIONS NE 112TH AVE AND NE DUKE HOLMAN ST STORM CONSTRUCTION & SEWER $210,000 BES KBM $86,712 EXCAVATION

MARINE DRIVE PUMP STETTLER SUPPLY STATION UPGRADE $600,000 BES JVN $507,400 CO INC

REMOVAL OF UNIVERSAL STRUCTURES AT 3733 & EXCAVATION 3741 SE 100TH $80,000 FAC KED $36,000 CONTRACTORS INC

NE 122ND ST AT AIRPORT WAY STREET DIRT & AGGREGATE IMPROVEMENT $480,000 PDOT KBM $479,641.16 INTERCHANGE INC

GILBERT HEIGHTS SILCO COMMERCIAL PARK IMPROVEMENTS $466,000 PKS MP $387,900 CONSTRUCTION SILCO COMMERCIAL TERRACE TRAILS PARK $395,250 PKS MP $374,000 CONSTRUCTION

LEACH BOTANICAL HOOD TO COAST GARDEN ANNEX ROOF $10,000 PKS KED $8,875 RESTORATION M&M MAINTENANCE - CONSTRUCTION STORMWATER $220,000 WTR KBM $125,842 SERVICES INC

POWELL BUTTE RESERVOIR NO 2 SITE NUTTER DEVELOPMENT $13,200,000 WTR KBM $3,707,777 CORPORATION

FENWICK BASIN SEWER REHABILITATION $750,000 BES KBM $404,220 CIVILWORKS NW

LINE EXTENSION MOVEMENT OF SVCS PORTLAND BASINAVE/MOCK $7,200 BES KED $7,200.12 GENERAL ELECTRIC

COLUMBIA SLOUGH CONFLUENCE HABITAT NUTTER ENHANCEMEN $250,000 BES KBM $262,262 CORPORATION

EMERGENCY PORTSMOUTH LATERAL UNITED PARCEL AT UPS PROPERTY $24,100 BES MP $24,100 SERVICE EMERSON DRIVE STEP SYSTEM DENALI IMPROVEMENTS $35,000 BES KED $26,100 STONEWORKS, INC. N FOWLER SEWER UNIVERSAL REPLACEMENT EXCAVATION PROJECT $140,000 BES NJM $138,797 CONTRACTORS INC N FOWLER SEWER UNIVERSAL REPLACEMENT EXCAVATION PROJECT $23,870 BES NJM $138,797 CONTRACTORS INC EMERGENCY NORTHWEST STRUCTURAL REPAIRS DEMOLITION & AT TERMINAL ONE $75,000 FAC MP $72,500 DISMANTLING KERBY GARAGE EXTERIOR PRECISION 1 WATERPROOFING $230,000 FAC MP $148,327 COATINGS OREGON STATE N LEADBETTER BRIDGE EXTENSION CONSTRUCTION, OVERCROSSING -FED $8,645,000 TRN KBM $5,441,721.25 INC. N. DENVER AVE R&R GENERAL IMPROVEMENTS $1,800,000 TRN KBM $1,195,629.10 CONTRACTORS INC

NE SUMNER ST & NE KILLINGSWORTH ST NW KODIAK SWR REPLAC $450,000 BES KBM $220,928 CONSTRUCTION LLC

NE 32ND AVE AT WEIDLER ST SEWER NUTTER REPLACEMENT $400,000 BES LP $261,914.22 CORPORATION

NE PRECINCT - MEN'S LOCKER ROOM FLOOR SBS UPGRADE $14,000 FAC KED $10,200 CONSTRUCTION LLC

STREET IMPROVEMENTS NE 87TH AVE AND TRI STATE COLUMBIA BOULEVARD $1,200,000 PBOT KBM $671,641 CONSTRUCTION INC

NE 92ND DRIVE ROADWAY EXENSION FROM COLUMBIA SLOUGH TO NE TRI STATE ALDERWOOD ROAD $1,200,000 PBOT KBM $671,641 CONSTRUCTION INC

NE 87TH AND COLUMBIA BOULVARD INTERSECTION TRI STATE IMPROVEMENT $1,200,000 TRN KBM $671,641 CONSTRUCTION INC

E BURNSIDE/NE COUCH NUTTER - FED $11,000,000 PDOT KBM $6,800,300.22 CORPORATION PARKER NE ALDERWOOD ROAD NORTHWEST SIGNALS $3,000,000 TRAN KBM $2,017,733.71 PAVING CO UNIVERSAL EAST EXCAVATION IMPROVMENTS $70,500 PKS KED $36,800 CONTRACTORS INC

S AIRPORT SANITARY SEWER SYSTEM PHASE CANBY EXCAVATING 5 $1,650,000 BES DNJ $1,288,900 INC NE SANDY BLVD TRAFFIC SAFETY IMPROVMTS - FED $460,000 TRN KBM $399,138.60 TICE ELECTRIC CO NW IRVING ST & I-405 NUTTER SEWER REPLACEMENT $1,000,000 BES KBM $505,000 CORPORATION PITTOCK MANSION WEST ENTRY & SBS TERRACE REPAIR $45,000 PKS KED $37,732 CONSTRUCTION LLC

TANNER SPRINGS PAYNE RAINWATER PAVILION $125,000 PKS MP $145,947 CONSTRUCTION INC OAK B BASIN SEWER RELIEF & JOHN L JERSEY & RECONSTRUCTION $12,300,000 BES KBM $6,377,221 SON INC FOSTER SEWER WESTECH REPLACEMENT $2,000,000 BES KBM $1,098,945 CONSTRUCTION INC

ERROL CREEK D&T CONFLUENCE PROJECT $310,000 BES KBM $217,682.03 EXCAVATION,INC

SELLWOOD MOORE INTERCEPTOR SEWER $3,330,000 BES KBM $1,973,370 EXCAVATION INC UNIVERSAL SUMP REHABILITATION EXCAVATION PROJECT, PHASE 1 $140,000 BES KED $85,075 CONTRACTORS INC

SE CLAY-TAYLOR RECONSTRUCTION & EMERY & SONS GREEN STREETS $4,000,000 BES KED $2,391,886.50 CONSTRUCTION INC

SE BYBEE SEWER DUNN REHABILITATION $2,600,000 BES KED $1,678,400 CONSTRUCTION INC REMOVAL OF UNIVERSAL STRUCTURES AT 6631 EXCAVATION SE 110th DRIVE $30,000 FAC JAB $9,963 CONTRACTORS INC

REMOVAL OF STRUCTURES & DENNIS SNYDER IMPROVEMENTS $30,000 FAC NJM $25,350 CONTRACTORS EMERGENCY HOUSE DEMOLITION 4923 SE DENNIS SNYDER 174TH AVE $25,000 FAC KED $23,000 CONTRACTORS REMOVAL OF STRUCTURES AT 6645 & 6725 SE 106TH $40,000 FAC KED $25,915 INTERLAKEN INC REPLACE ROOF @ 1300 ARELLANOS SE GIDEON $80,000 FIR KED $68,450 CONSTRUCTION LLC

LENTS PARK ELECTRICAL SERVICE PORTLAND EXTENSION $5,200 PKS KED $5,181.16 GENERAL ELECTRIC CIRCLE AVE BRIDGE PARTIAL REPLACEMENT& ALL CONCRETE REPAIR $195,000 PKS MP $236,150 SPECIALTIES INC POWELL PARK FENCE ARELLANOS REPLACEMENT $18,000 PKS NJM $18,750 CONSTRUCTION LLC FOUR WAY BEACON AT BARBARA WELCH @ SE 52ND AV $15,000 TRN KED $26,365 EC COMPANY K&R PLUMBING EMERGENCY SW PARK CONSTRUCTION CO SEWER REPLACEMENT $218,449 BES MP $150,020 INC EMERGENCY SW CORBETT SEWER KEVIN COOPER REPLACEMENT $102,000 BES MP $88,286 EXCAVATING INC THOMAS & WOODS UNIVERSAL WASTEWATER PUMP EXCAVATION STATION DECOMM $90,000 BES NJM $424,450 CONTRACTORS INC

ARROWOOD TOWER AC SCHOMMER & IMPROVEMENTS $15,000 BTS KED $7,993 SONS INC SUNSTONE MONTESSORI SCH ROBERT LLOYD HVAC UPGRADE $205,000 PKS MP $198,000 SHEET METAL INC

SOUTH WATERFRONT NUTTER PARK IMPROVMNTS $2,600,000 PKS MP $2,166,610 CORPORATION

EXTERIOR PAINTING PPCC & MULT ART CTR BOANERGES GROUP ANNEX $95,000 PKS KED $48,000 LLC METRO AREA MARSHALL PARK CONSTRUCTION PEDESTRIAN BRIDGE $56,000 PKS KED $44,980 SERVICES

SWCC POOL ANDERSON REPLASTERING $170,000 PKS LP $110,884 POOLWORKS

SW CARDINELL DRIVE WATER WORK $550,000 WTR KBM $291,210 CIVILWORKS NW

WEST SIDE HEADER MOORE RELOCATION - PHASE 1 $4,272,000 WTR LP $1,963,045 EXCAVATION INC BURLINGAME TANKS IMPROVEMENTS SHEARER & ASSOC PROJECT $450,000 WTR JVN $638,045 INC BERTHA TANK NO. 1 POLYUREA LINER INSTALLATION $130,000 WTR NJM $138,000 LONG PAINTING CO

TOTAL $284,867,48 $218,154,375