Prime Description Estimate Bureau Buyer Award Amt Contractor

Prime Description Estimate Bureau Buyer Award Amt Contractor

PRIME DESCRIPTION ESTIMATE BUREAU BUYER AWARD AMT CONTRACTOR PIONEER TOWER FIBER STANDARD UTILITY OPTIC CONSTRUCTION $24,000 BTS NJM $37,775 CONTRACTORS INC HEARING OFFICE SECURITY SBS IMPROVEMENTS $23,500 FAC KED $32,315 CONSTRUCTION LLC 1900 BLDG CARPET & INTERIOR PAINT GREENLIFE PROJECT $93,000 FAC KED $48,242 CONSTRUCTION INC REPAIR & RECOAT PIONEER CONCRETE DRIVES AT WATERPROOFING SMARTPARKS $2,500,000 FAC MP $1,234,100 CO INC JC/CENTRAL PRECINCT LOCKER ROOM HOOD TO COAST IMPROVMENTS $45,000 FAC KED $40,800 RESTORATION TPB COMPUTER SERVER ROOM GREENLIFE INSTALLATION $24,000 FAC KED $18,938 CONSTRUCTION INC CITY HALL SECURITY ENHANCEMENTS, SUITE SBS 230 $56,000 FAC KED $46,850 CONSTRUCTION LLC PORTLAND BUILDING DOMESTIC WATER RELIANT PLUMBING PUMP UPGRADE $46,800 FAC NJM $69,072 & MECHANICAL, INC. EMERGENCY SEWER REPAIR AT YAMHILL RELIANT PLUMBING GARAGE $6,419 FAC MP $13,498 & MECHANICAL, INC. STREETCAR LOOP CM/GC - WATER MAIN WERBIN WEST WORK $6,700,000 PDOT MP $5,498,765 CONTRACTING INC ROOF MEMBRANE WATERPROOFING & SNYDER ROOFING REPAIR - REBID $375,000 FAC MP $461,051 OF OREGON LLC SEWER LEVEL REMOTE TRIAD MECHANICAL TELEMETRY PHASE 4 $80,000 BES KED $54,216.22 INC RESOURCE ACCESS WALSH CENTER $28,000,000 PHB $28,750,000 CONSTRUCTION REDSIDE RIVERPLACE DOCKS $300,700 PKS MP $278,827.11 CONSTRUCTION LLC GROUNDWATER PUMP STATION LIGHTENING ARRESTERS $22,000 WTR KED $17,066 EC COMPANY CBWTP DIGESTER EXPANSION PROJECT $22,500,000 BES KBM $15,703,918 STELLAR J CORP CBWTP SLUDGE GRINDER TRIAD MECHANICAL INSTALLATION $150,000 BES KED $135,826 INC CBWTP SLUDGE PROCESSING BOILER TRIAD MECHANICAL STACK RPLMT $100,000 BES KED $29,120 INC BULL RUN DAM 1 OUTLET WORKS GLOBAL DIVING & IMPROVEMENTS PH 2 $620,000 WTR KBM $786,506 SALVAGE 911 CALL CENTER HVAC COLLINS UPGRADE $150,000 FAC KED $93,045 MECHANICAL INC BALCH CONSOLIDATED CONDUIT JAMES W FOWLER CONSTRUCTION PH $50,000,000 BES DNJ $57,314,607 CO VACUUM RELIEF VALVE MOORE PROJECT AT BULL RUN $1,000,000 WTR KED $782,000 EXCAVATION INC PORTSMOUTH FORCEMAIN SEGMENT MICHELS 2 $35,000,000 BES DNJ $19,353,144 CORPORATION PORTSMOUTH FORCE MOUNTAIN MAIN SEGMENT 1 $34,000,000 BES KBM $28,149,491 CASCADE INC WET WEATHER TRIAD MECHANICAL SCREENING FACILITY $9,500,000 BES KBM $6,401,667 INC SWAN ISLAND PUMP STATION $10,000,000 BES KBM $6,889,945 STELLAR J CORP PORTSMOUTH FORCE MAIN TEMPORARY KEVIN COOPER PARKING LOT $10,000 BES KED $8,549 EXCAVATING INC BALCH PROJECT OFFICE FIBER OPTIC NORTH SKY INSTALLATION $13,500 BTS NJM $10,498 COMMUNICATIONS NE 112TH AVE AND NE DUKE HOLMAN ST STORM CONSTRUCTION & SEWER $210,000 BES KBM $86,712 EXCAVATION MARINE DRIVE PUMP STETTLER SUPPLY STATION UPGRADE $600,000 BES JVN $507,400 CO INC REMOVAL OF UNIVERSAL STRUCTURES AT 3733 & EXCAVATION 3741 SE 100TH $80,000 FAC KED $36,000 CONTRACTORS INC NE 122ND ST AT AIRPORT WAY STREET DIRT & AGGREGATE IMPROVEMENT $480,000 PDOT KBM $479,641.16 INTERCHANGE INC GILBERT HEIGHTS SILCO COMMERCIAL PARK IMPROVEMENTS $466,000 PKS MP $387,900 CONSTRUCTION SILCO COMMERCIAL TERRACE TRAILS PARK $395,250 PKS MP $374,000 CONSTRUCTION LEACH BOTANICAL HOOD TO COAST GARDEN ANNEX ROOF $10,000 PKS KED $8,875 RESTORATION POWELL BUTTE M&M MAINTENANCE - CONSTRUCTION STORMWATER $220,000 WTR KBM $125,842 SERVICES INC POWELL BUTTE RESERVOIR NO 2 SITE NUTTER DEVELOPMENT $13,200,000 WTR KBM $3,707,777 CORPORATION FENWICK BASIN SEWER REHABILITATION $750,000 BES KBM $404,220 CIVILWORKS NW LINE EXTENSION MOVEMENT OF SVCS PORTLAND BASINAVE/MOCK $7,200 BES KED $7,200.12 GENERAL ELECTRIC COLUMBIA SLOUGH CONFLUENCE HABITAT NUTTER ENHANCEMEN $250,000 BES KBM $262,262 CORPORATION EMERGENCY PORTSMOUTH LATERAL UNITED PARCEL AT UPS PROPERTY $24,100 BES MP $24,100 SERVICE EMERSON DRIVE STEP SYSTEM DENALI IMPROVEMENTS $35,000 BES KED $26,100 STONEWORKS, INC. N FOWLER SEWER UNIVERSAL REPLACEMENT EXCAVATION PROJECT $140,000 BES NJM $138,797 CONTRACTORS INC N FOWLER SEWER UNIVERSAL REPLACEMENT EXCAVATION PROJECT $23,870 BES NJM $138,797 CONTRACTORS INC EMERGENCY NORTHWEST STRUCTURAL REPAIRS DEMOLITION & AT TERMINAL ONE $75,000 FAC MP $72,500 DISMANTLING KERBY GARAGE EXTERIOR PRECISION 1 WATERPROOFING $230,000 FAC MP $148,327 COATINGS OREGON STATE N LEADBETTER BRIDGE EXTENSION CONSTRUCTION, OVERCROSSING -FED $8,645,000 TRN KBM $5,441,721.25 INC. N. DENVER AVE R&R GENERAL IMPROVEMENTS $1,800,000 TRN KBM $1,195,629.10 CONTRACTORS INC NE SUMNER ST & NE KILLINGSWORTH ST NW KODIAK SWR REPLAC $450,000 BES KBM $220,928 CONSTRUCTION LLC NE 32ND AVE AT WEIDLER ST SEWER NUTTER REPLACEMENT $400,000 BES LP $261,914.22 CORPORATION NE PRECINCT - MEN'S LOCKER ROOM FLOOR SBS UPGRADE $14,000 FAC KED $10,200 CONSTRUCTION LLC STREET IMPROVEMENTS NE 87TH AVE AND TRI STATE COLUMBIA BOULEVARD $1,200,000 PBOT KBM $671,641 CONSTRUCTION INC NE 92ND DRIVE ROADWAY EXENSION FROM COLUMBIA SLOUGH TO NE TRI STATE ALDERWOOD ROAD $1,200,000 PBOT KBM $671,641 CONSTRUCTION INC NE 87TH AND COLUMBIA BOULVARD INTERSECTION TRI STATE IMPROVEMENT $1,200,000 TRN KBM $671,641 CONSTRUCTION INC E BURNSIDE/NE COUCH NUTTER - FED $11,000,000 PDOT KBM $6,800,300.22 CORPORATION PARKER NE ALDERWOOD ROAD NORTHWEST SIGNALS $3,000,000 TRAN KBM $2,017,733.71 PAVING CO UNIVERSAL EAST HOLLADAY PARK EXCAVATION IMPROVMENTS $70,500 PKS KED $36,800 CONTRACTORS INC S AIRPORT SANITARY SEWER SYSTEM PHASE CANBY EXCAVATING 5 $1,650,000 BES DNJ $1,288,900 INC NE SANDY BLVD TRAFFIC SAFETY IMPROVMTS - FED $460,000 TRN KBM $399,138.60 TICE ELECTRIC CO NW IRVING ST & I-405 NUTTER SEWER REPLACEMENT $1,000,000 BES KBM $505,000 CORPORATION PITTOCK MANSION WEST ENTRY & SBS TERRACE REPAIR $45,000 PKS KED $37,732 CONSTRUCTION LLC TANNER SPRINGS PAYNE RAINWATER PAVILION $125,000 PKS MP $145,947 CONSTRUCTION INC OAK B BASIN SEWER RELIEF & JOHN L JERSEY & RECONSTRUCTION $12,300,000 BES KBM $6,377,221 SON INC FOSTER SEWER WESTECH REPLACEMENT $2,000,000 BES KBM $1,098,945 CONSTRUCTION INC ERROL CREEK D&T CONFLUENCE PROJECT $310,000 BES KBM $217,682.03 EXCAVATION,INC SELLWOOD MOORE INTERCEPTOR SEWER $3,330,000 BES KBM $1,973,370 EXCAVATION INC UNIVERSAL SUMP REHABILITATION EXCAVATION PROJECT, PHASE 1 $140,000 BES KED $85,075 CONTRACTORS INC SE CLAY-TAYLOR RECONSTRUCTION & EMERY & SONS GREEN STREETS $4,000,000 BES KED $2,391,886.50 CONSTRUCTION INC SE BYBEE SEWER DUNN REHABILITATION $2,600,000 BES KED $1,678,400 CONSTRUCTION INC REMOVAL OF UNIVERSAL STRUCTURES AT 6631 EXCAVATION SE 110th DRIVE $30,000 FAC JAB $9,963 CONTRACTORS INC REMOVAL OF STRUCTURES & DENNIS SNYDER IMPROVEMENTS $30,000 FAC NJM $25,350 CONTRACTORS EMERGENCY HOUSE DEMOLITION 4923 SE DENNIS SNYDER 174TH AVE $25,000 FAC KED $23,000 CONTRACTORS REMOVAL OF STRUCTURES AT 6645 & 6725 SE 106TH $40,000 FAC KED $25,915 INTERLAKEN INC REPLACE ROOF @ 1300 ARELLANOS SE GIDEON $80,000 FIR KED $68,450 CONSTRUCTION LLC LENTS PARK ELECTRICAL SERVICE PORTLAND EXTENSION $5,200 PKS KED $5,181.16 GENERAL ELECTRIC CIRCLE AVE BRIDGE PARTIAL REPLACEMENT& ALL CONCRETE REPAIR $195,000 PKS MP $236,150 SPECIALTIES INC POWELL PARK FENCE ARELLANOS REPLACEMENT $18,000 PKS NJM $18,750 CONSTRUCTION LLC FOUR WAY BEACON AT BARBARA WELCH @ SE 52ND AV $15,000 TRN KED $26,365 EC COMPANY K&R PLUMBING EMERGENCY SW PARK CONSTRUCTION CO SEWER REPLACEMENT $218,449 BES MP $150,020 INC EMERGENCY SW CORBETT SEWER KEVIN COOPER REPLACEMENT $102,000 BES MP $88,286 EXCAVATING INC THOMAS & WOODS UNIVERSAL WASTEWATER PUMP EXCAVATION STATION DECOMM $90,000 BES NJM $424,450 CONTRACTORS INC ARROWOOD TOWER AC SCHOMMER & IMPROVEMENTS $15,000 BTS KED $7,993 SONS INC SUNSTONE MONTESSORI SCH ROBERT LLOYD HVAC UPGRADE $205,000 PKS MP $198,000 SHEET METAL INC SOUTH WATERFRONT NUTTER PARK IMPROVMNTS $2,600,000 PKS MP $2,166,610 CORPORATION EXTERIOR PAINTING PPCC & MULT ART CTR BOANERGES GROUP ANNEX $95,000 PKS KED $48,000 LLC METRO AREA MARSHALL PARK CONSTRUCTION PEDESTRIAN BRIDGE $56,000 PKS KED $44,980 SERVICES SWCC POOL ANDERSON REPLASTERING $170,000 PKS LP $110,884 POOLWORKS SW CARDINELL DRIVE WATER WORK $550,000 WTR KBM $291,210 CIVILWORKS NW WEST SIDE HEADER MOORE RELOCATION - PHASE 1 $4,272,000 WTR LP $1,963,045 EXCAVATION INC BURLINGAME TANKS IMPROVEMENTS SHEARER & ASSOC PROJECT $450,000 WTR JVN $638,045 INC BERTHA TANK NO. 1 POLYUREA LINER INSTALLATION $130,000 WTR NJM $138,000 LONG PAINTING CO TOTAL $284,867,48 $218,154,375 .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    6 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us