Terms of Reference for Envirnmetal Impact
Total Page:16
File Type:pdf, Size:1020Kb
FORM-I FORM- I APPENDIX I (See paragraph - 6) FORM 1 (I) Basic Information SN Contents 1 Name of Project : Homi Bhabha Cancer Hospital and Research Centre at Plot No. 01, Medicity, Mullanpur Village, Mohali District, Punjab. 2 S No. in Schedule : 8a 3 Proposed capacity/ area/ length/ tonnage to : Total Plot Area–202343.00Sq.Meter(m2)/50 Acre be handled/ command area/ lease area/ Proposed Built-up area–43000.00 m2 number of wells to be drilled 4 New/ Expansion/ Area etc. : New - Total Plot Area–202343.00 m2 5 Existing Capacity/ Area etc. : Total Plot Area–202343.00 m2 6 Category of Project i.e. „A‟ or „B‟ : „B2‟ 7 Does it attract the general condition? If yes, : No please specify 8 Does it attract the specific condition? If yes, : No please specify 9 Location : Homi Bhabha Cancer Hospital and Research Plot/ Survey/ Khasra No. Centre Village Plot No. 01, Medicity Tehsil Mullanpur Village District Mohali District State Punjab. Latitude 30°49'15.09"N Longitude 76° 44'26.68"E 10 Nearest Railway station/ airport along with : Railway Station: Chandigarh Rly.Stn., 16 Km. distance in KM Sahibzada Ajitsingh Nagar Rly. Stn. 17 Km Airport: Chandigarh International Airport, 18 km 11 Nearest Town, city, District Headquarters : Mohali along with distance in Kms. 12 Village Panchayats, Zilla Parishad, : Municipal Corporation SAS Nagar - Mohali Municipal Corporation, Local body (complete Zilla Parishad- SAS Nagar – Mohali, Punjab postal addresses with telephone nos. to be given) 13 Name of the Applicant : Dr. Rajendra Badwe 14 Registered Address : TATA Memorial Centre, TATA Memorial Hospital, Dr. E. Borges Marg, Parel, Mumbai- 400012, Maharashtra. Ph.No.022-24146631 15 Address for correspondence : Dr. Rajendra Badwe Name Director, Tata Memorial Centre Designation (Owner/Partner/CEO) TATA Memorial Hospital, Dr. E. Borges Marg, Address Parel, Mumbai Pin Code 400012, Maharashtra. E-mail [email protected] Telephone No. Ph.No.022-24146631 Fax No. 16 Details of Alternative sites examined, if any : None Location of these sites should be shown on a toposheet 17 Interlinked Projects : None 1 FORM- I 18 Whether separate application of interlinked : Not Applicable project has been submitted? 19 If yes, date of submission : Not Applicable 20 If no, reason : Not Applicable 21 Whether the proposal involves approval/ : clearance under: If yes, details of their status to be given No a) The Forest (Conservation) Act, 1980? No b) The Wildlife (Protection) Act, 1972? No c) The CRZ Notification, 1991? 22 Whether there is any Govt. order / Policy : NA relevant/ relating to the site? 23 Forest land involved (hectares) : No 24 Whether there is any litigation pending : None against project and / or land in which the project is proposed to be set up? a) Name of Court b) Case No. c) Orders/ directions of the Court, if any and its relevance with the proposed project. 25 Location /site under consideration : Geographically location of area is Latitude 30°49'15.09"N & 76° 44'26.68"E Longitude. 26 Size of the Project : 202343.00 Sq. meter (m2) 27 Expected cost of the project : Rs. 218 Cr. (approx.) 28 Contact Information : Dr. Rajendra Badwe Director, Tata Memorial Centre TATA Memorial Hospital, Dr. E. Borges Marg, Parel, Mumbai 400012, Maharashtra. [email protected] Ph.No.022-24146631 29 Screening Category : Category „B2‟ Capacity corresponding to sectoral activity (such as production capacity for manufacturing, mining lease area and production capacity for mineral production, area for mineral exploration, length for linear transport infrastructure, generation capacity for power generation etc.,) (II) Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) SN Information/Checklist confirmation Yes Details thereof (with approximate / No quantities / rates, wherever possible) with source of information data 1.1 Permanent or temporary change in No No major landuse change is land use, land cover or topography envisaged. (Land allotment and including increase in intensity of land transfer of possession letter enclosed use (with respect to local land use as Annexure- I 2 FORM- I plan) 1.2 Clearance of existing land, vegetation No Not Applicable and buildings? 1.3 Creation of new land uses? Yes Land was earmarked for the development of Homi Bhabha Cancer Hospital and Research Centre by Greater Mohali Area Development Authority (GMADA) at Plot No. 01, Medicity, Mullanpur Village, Mohali District, Punjab. Development of 300 bedded Hospital including Nurses Hostel, Resident Doctors Hostel, Dharamshala, Canteen, Service Block, Recreational Facilities and Site infrastructure development work which include road, sewer line, Drainage work, parking Area, Landscaping, electrification, water supply, waste disposal system etc. as per standard laid down by Medical Council of India (MCI) 1.4 Pre-construction investigations e.g. Yes Sub Soil investigations have been bore houses, soil testing? carried out enclosed as Annexure-II 1.5 Construction works? Yes Construction work involved 300 bedded Hospital including Nurses Hostel, Resident Doctors Hostel, Dharamshala, Canteen, Service Block, Recreational Facilities and Site infrastructure development work which include road, sewer line, Drainage work, parking Area, Landscaping, electrification, water supply, waste disposal system etc. as per standard laid down by Medical Council of India (MCI) 1.6 Demolition works? No There is no demolition work involved/ No site clearing is required. 1.7 Temporary sites used for construction Yes Temporary accommodation for works or Housing of construction construction workers will have to be workers? provided during construction of Homi Bhabha Cancer Hospital and Research Centre. Temporary construction camp and other facilities will be provided like Equipment yards, Labour camp, storage of Raw Materials etc. within the project site only. The basic amenities like safe drinking water, sanitation, toilets, medical facilities, and clean fuel will be provided to labours. 3 FORM- I 1.8 Above ground buildings, structures or Yes The project includes construction of earthworks including linear structures, site infrastructure development work cut and fill or excavations drainage work, parking area, landscaping area etc. It is estimated that approx. 20,000 m3 of soil has to be excavated for foundations and structures. 1.9 Underground works including mining No No mining or tunneling will be done or tunneling. for the project work. 1.10 Reclamation works. No No reclamation work required. 1.11 Dredging? No No Dredging required 1.12 Offshore structures? No Not Applicable. 1.13 Production and manufacturing No No production / manufacturing processes? process involved. 1.14 Facilities for storage of goods or Yes Temporary sheds and open yards will materials? be made for the storage of construction material during project construction. Separate raw material handling yard will be made. Cement will be separately stored under cover in bales. Sand will be stacked neatly under Tarpaulin cover. Bricks and steel will be laid in open 1.15 Facilities for treatment or disposal of Yes Facilities for solid waste segregation, solid waste or liquid effluents? collection and treatment will be provided. STP will be provided for treatment of sewage, biomedical waste will be sent to authorize vendor for incineration / disposal. (STP capacity -206 KLD) Adequate number of collection bins separate for biodegradable and non- biodegradable waste shall be provided as per The MSW Rule, 2000. Separate colored bins will be placed for biodegradable and non- biodegradable waste. Final segregation of solid waste into biodegradable, non-biodegradable, and inert fraction will take place in centralized collection facility. The non-biodegradable fraction will be recycled to the maximum extent possible. The rest will be handed over to Municipality. Out of this solid waste, approx. 20 to 25 % will be Bio-Medical waste. Thus appropriate measures will be 4 FORM- I undertaken to segregate, handle, and manage the biomedical waste management. Please refer to Annexure- III for the details of the biomedical waste management plan. The proposed STP for treating the waste water will be constructed with the design capacity of 206 KLD. 1.16 Facilities for long term housing of No No Facilities for long term housing of operational workers? operational workers. 1.17 New road, rail or sea traffic during No Not Applicable construction or operation? 1.18 New road, rail, air, waterborne or No Not Required. other transport infrastructure including new or altered routes and stations, ports, airports. etc.? 1.19 Closure or diversion of existing No Not Required. transport routes or infrastructure leading to changes in traffic movements? 1.20 New or diverted transmission lines or No Not Required. pipelines? 1.21 Impoundment, damming, culverting, No No Impoundment, damming, realignment or other changes to the culverting, realignment or other hydrology or watercourses or changes to the hydrology or aquifers? watercourses or aquifers is proposed. 1.22 Stream crossings? No Not Applicable. 1.23 Abstraction or transfers of water from Yes Abstraction of groundwater is ground or surface waters? envisaged. NOC of Ground water clearance from CGWB is applied). Also, the mainly water supply will be taken from Local water supply. (Municipal Supply/Tanker supply) 1.24 Changes in water bodies or the land No No changes in the water bodies due surface