MEMORANDUM

DATE December 16, 2019

TO Jeanne Suyeishi, City of Fremont FROM Bruce Brubaker and Janet Chang

SUBJECT Centerville Complete Streets Opportunities & Constraints

Introduction

BACKGROUND

This memo is part of an initial task for the Centerville Complete Streets project in identifying key issues within the project site. The Centerville Complete Streets project will improve segments of Fremont Boulevard, Thornton Avenue, and Peralta Boulevard in the area near the heart of the historic community of Centerville. For many years, these streets were designated as part of State Route (SR) 84 and under California Department of Transportation (Caltrans)’s jurisdiction. The recent relinquishment of SR 84 allows the City to have local control over this street right-of-way to repave the streets and implement “complete streets” improvements to enhance safety and mobility for all users, including drivers, pedestrians, bicyclists, school children, and businesses.

As part of the project, the City is engaging the community for feedback on design alternatives in a focused area around the Centerville’s business district. The City will improve remaining segments of the relinquished SR 84 in one or more separate processes.

SITE AND CONTEXT

The Centerville Complete Streets project boundary, which is the community engagement focus area (focus area), includes the following street segments: » Fremont Boulevard between Alder Avenue and Eggers Drive » Thornton Avenue between Fremont Boulevard and Maple Street » Peralta Boulevard between Fremont Boulevard and Sequoia Road

Figure 1 shows the focus area for the Centerville Complete Streets project. The focus area is located within the City’s Centerville Community Plan Area (designated by the City’s General Plan), which is oriented around Centerville, one of Fremont’s five original towns. The Centerville Community Plan is described more in the next section of this memo.

The focus area is also located primarily within the Centerville Priority Development Area (PDA), one of the City’s four PDAs. PDAs are designated by the Metropolitan Transportation Commission (MTC) and defined as an area identified and approved for future growth. PDAs are usually located in areas rich in transit options to promote development with minimal automobile usage and greenhouse gas impacts.

The focus area is centered around the Altamont Corridor Express (ACE)/ Fremont Station, which is located at the intersection of Fremont Boulevard and Peralta ACE/Amtrak Fremont Station entrance and UPRR Boulevard. The Union Pacific Railroad (UPRR) railway runs crossing along Fremont Boulevard through the city and crosses Fremont Boulevard in the east- west direction. The Centerville Transit-Oriented Development (TOD) Overlay, designated by the City of Fremont, centers on this station and extends a half-mile radius, covering a majority of the focus area.

Four schools are located within or adjacent to the focus area: » Centerville Junior High School » Washington High School » American High School » Holy Spirit School (private) American High School at Alder Avenue on Fremont Boulevard Additionally, several other schools are located in the vicinity of the focus area and may use portions of focus area streets for access: » Cabrillo Elementary School » Oliveira Elementary School » Brookvale Elementary School » Thornton Junior High School » Prince of Peace Christian School (private) » Stratford School (private)

Holy Spirit Church and School at Central Avenue on Fremont Boulevard

December 16, 2019 | Page 2 CITY OF FREMONT CENTERVILLE COMPLETE STREETS

BART Ra e v Brookvale A t e ¾Ù l Elementary o ic N School American il High School D Overlay / Ha ¾Ù TO lf-m ille ile rv ra te d n iu e s C Patterson Thornton Ave

Elementary N er-mile ra i t d c ar iu o u s l Q School e

t

A

v ¾Ù e ACE/Amtrak Alder Ave Peralta Blvd ¾ Oliveira Fremont CITY OFCITY FREMONT OF FREMONT Ù ¾ Elementary CENTERVILLECENTERVILLE COMPLETE COMPLETE STREETS STREETS Ù Station Paseo Padre Pkwy Parkmont

School BART Ra Elementary e v Coronado D Brookvale A t School e ¾Ù ! l à Elementary o Cabrilloic Dr N School Holy Spirit American r Thornton il High School D Overlay / Ha ¾Ù Junio TrO High lf-m Fremont School ille ile ¾ v r Ù er School a t di Blvd Centerville en ¾ u Ù s C Patterson Thornton Ave ¾Ù Junior High Elementary N er-mile ra i t d c ar iu o u s School l Q School e t D A Portola Dr us v t ¾Ù e er Alder Ave ACE/Amtrak be rry Peralta Blvd Oliveira Fremont Way ¾Ù ¾ Elementary Washington Ù Station Paseo Padre Pkwy Parkmont School Elementary Coronado D Cabrillo High School Ã! School Cabrillo Dr r ElementaryThornton Holy Spirit ¾Ù ve Junior High Fremont School ScSchoolhool ¾Ù y A ¾ Blvd Centerville Ù d 880 ¾ Juniorv High Mowr ¾ Ù Bl Ù School D Portola Dr us ter be eralta Prince of Peace rry P Way ¾ Washington Ù Thornton Ave G Christian School ¾Ù le High School Cabrillo n Elementary T m o o ¾ ve Stratford wers o Ù School r y A W D School d 880 v a r Mowr ¾Ù Bl y Eggers Dr Mattos Dr eralta Prince of Peace P ¾Ù Thornton Ave G Christian School ¾Ù Maloney le n Blacowm Rd To o Stratford wers o UPRR Rail Elementary r L W D o r School g ay Eggers Dr an Walnut Ave Mattos Dr D School Hansen Ave Central Ave r Maloney Blacow Rd UPRR Rail L Elementary ¾Ù o ga n D School Walnut Ave Hansen Ave Central Ave r ¾Ù Glenmoor 0 250 500 1,000 Glenmoor ¾Ù Elementary r 0 250 500 1,000 ¾Ù Elementary le D School r Feet School le D Feet nda Sunda Su Source:Source: Google Google Earth, 2019; Earth, Esri, 2019; 2019; City of Esri,Fremont; 2019; PlaceWorks City of Fremont; PlaceWorks Context Map Complete Streets Centerville Priority Figure 1 Context Map PLACEWORKS Project Boundary Development Area PLACEWORKS Context Map Centerville Community Relinquished SR 84 Plan Area

PLACEWORKS

City’s Vision for Centerville

The City of Fremont General Plan 2030 (General Plan) envisions the Centerville area to become a transit-oriented community with future retail and multi-family residential development that capitalizes on the existing ACE/Amtrak Station. The General Plan’s Land Use Element establishes mostly mixed-use land uses along Fremont Boulevard around the ACE/Amtrak Station with some low- to medium-residential, public facility, commercial, and public uses in surrounding areas including Thornton Avenue and Peralta Boulevard. Following are additional goals, policies, and implementation actions from the General Plan.

CENTERVILLE COMMUNITY PLAN

The General Plan’s Community Plans Element identifies several goals and policies for the Centerville area, including transforming Fremont Boulevard into a corridor for pedestrians, bicyclists, and transit that is lined with ground-floor shops and restaurants, upper floor residential and office, and parks and plazas; preserving Centerville historic resources; creating a connected grid of streets; promoting TOD around the ACE/Amtrak Station; developing parking management strategies; and making Centerville a destination in Fremont with a stronger sense of place. The General Plan references the 2010 Centerville Framework Plan as an action framework for the community, which is described later in this memo. Specific policies and implementation actions from the Centerville Community Plan related to complete streets improvements, include: » Policy 11-3.1: Fremont Boulevard as Centerville’s “Main Street.” Redesign Fremont Boulevard through the Centerville Planning Area to: (a) enhance the street’s visual appearance and better define gateways into the Centerville District; (b) create a more urban character that supports higher densities, more street life, and additional transit use; and (c) achieve a better balance between the needs of motor vehicles, pedestrians, bicyclists, and transit users. • Implementation 11-3.1.A: Reconfiguring Fremont Blvd. Reconfigure Fremont Boulevard through the Centerville Town Center, including narrowing travel lanes, a continuous bicycle lane, and on- street parking and a landscaped median where road width and safety concerns allow. • Implementation 11-3.1.B: Pedestrian and Bicycle Safety Improvements. Improve pedestrian safety and security on the Centerville segment of Fremont Boulevard through traffic calming measures such as raised crosswalks, medians, curb extensions or “bulbouts,” signage, reduced speed limits, landscaping, and similar measures. • Implementation 11-3.1.C: Streetscape Improvements. Enhance the Fremont Boulevard streetscape to reinforce the identity of the Centerville area, particularly the Town Center between Thornton and Central, and the Fremont – Decoto Gateway area. Design improvements could include tree planting, landscaping, public art, street lighting, street furniture, banners, signage, pavement, and other elements of the street environment. As feasible and appropriate, such improvements should be extended along side streets to create stronger linkages to nearby areas and improve aesthetic conditions.

December 16, 2019 | Page 4

• Implementation 11-3.1.D: Consolidating Curb Cuts and Driveways. To the extent feasible, consolidate driveways and curb cuts on Fremont Boulevard in the Centerville Planning Area in order to concentrate turning movements, improve traffic flow, and enhance safety along sidewalks and bike routes. • Implementation 11-3.1.E: Thornton / Fremont Blvd intersection. Consider changes to the Thornton / Fremont Boulevard intersection, such as the elimination of the free right turn lane, to make the intersection easier to cross for pedestrians. • Implementation 3-2.1.A: Streetcar Service (from Mobility Element). Plan for the eventual development of a streetcar or equivalent transit system serving the Fremont Boulevard corridor. The feasibility of such a system should be studied over the coming years, and land use planning should anticipate its eventual development. » Policy 11-3.6: Centerville’s Public Realm. Improve sidewalks, intersections, landscaping, lighting, plazas, and other features of Centerville’s “public realm” to create a stronger sense of identity in Centerville. These improvements should contribute to the goal of improving Centerville’s visual quality, vitality, and walkability. Streetscape improvements should highlight the district’s historic character and landmark buildings, create or enhance places for social interaction, and establish new focal points which make Centerville a memorable place. • Implementation 11-3.6.A: Pedestrian-Oriented Improvements. Undertake improvements to make Centerville a more comfortable environment for pedestrians. As noted in Implementing Action 11-11-3.1.B, this could include bicycle, sidewalk, and rail crossing improvements; consolidation of parking lots; reconfiguration of Fremont Boulevard; landscaping; “bulbouts” and textured pavement in crosswalks; and similar measures.

COMMUNITY CHARACTER

As shown on Figure 2, the General Plan establishes Center Place Types and Corridor Place Types for areas and roads/ streets within the city, respectively, through the Community Character Element. Center Place Types identify key activity centers in Fremont that can provide centralized shopping, working, and/or living opportunities. Corridor Place Types organize Fremont’s circulation grid across four major functions with the goal of identifying key corridors that can promote more pedestrian-friendly and less auto-oriented communities. Each place type establishes Urban Form and Mobility Standards for developments and corridors within each area.

Focus Area Center Place Types

A large portion of the focus area is designated a Town Center type along Fremont Boulevard. Urban form standards of Town Centers include one- to three-story mixed-use buildings, smaller blocks, and active street frontages. Mobility standards aim to establish a connected street grid integrated with pedestrian, bicycle, and transit use.

December 16, 2019 | Page 5

The focus area also contains pockets of smaller-scale Neighborhood Centers, including along Fremont Boulevard at Alder Avenue and Eggers Drive and along Peralta Boulevard at Rose Court. Neighborhood Centers are smaller shopping areas that the General Plan indicates may transition to new uses or become more compact and walkable as Fremont matures, potentially accomplished with streetscape improvements.

Focus Area Corridor Place Types

Fremont Boulevard within the focus area is designated as a Main Street corridor place type from Thornton Avenue to Central Avenue. Main Street corridors are special to Town Centers and aim to enhance the historic character of these place types through architecture, granular neighborhood fabric, active street frontages, and a circulation corridor with pedestrian, bicycle, transit, and on- street parking facilities. Main Street corridors typically have two travel lanes, bicycle lanes or routes, on-street parking, and wide sidewalks.

Fremont Boulevard north of Thornton Avenue and south of Central Avenue is designated as a Suburban corridor place type. Suburban corridors are more vehicle-oriented and have uses that connect the city’s neighborhoods and centers. Suburban corridors typically have more travel lanes, bicycle lanes, streetscape amenities, and limited on-street parking.

Thornton Avenue within the focus area is designated as a Landscape corridor place type, which acts as gateways to the city and is characterized by a high degree of landscaping, street trees, wide medians, large setbacks, and ability to carry large volumes of traffic through the city.

Peralta Boulevard within the focus area is designated as an Urban corridor place type, which is a complete street accommodating a variety of travel modes and uses, seeking compact and dense multi-story developments. Urban corridors typically have bicycle lanes on-street parking, and wide sidewalks with streetscape amenities.

December 16, 2019 | Page 6 CITY OF FREMONT CENTERVILLE COMPLETE STREETS

Arlene Paseo PadreR Pkwy eynol Paseo Padre Pkwy Ct ds er UPRR Rail Bright Cmn Dr Ter ke T rly Wave Lavender Cmn Lubbock Pl yc Ashford Way Kipling Pl Puttenham Wy

Mackenzie Pl er Camden St Nicolet Ave Hastings Street Southw Lanyard T Kemper Rd er Surry Pl d Greenwood Dr v dcedar T Hereford Spruce Tere er Bl St Aspenwood R Sequoia t l T ¾ Cmn i Loop ta eralta Ù Rd P ox F Canterbury St Brookvale Sutton |ÿ84 Atwater Ct urner C Elementary T Parish CITY OFCITY FREMONT OF FREMONT School Moraine St Birchwood Ter Cir Meadowbrook CENTERVILLECENTERVILLE COMPLETE COMPLETE STREETS STREETS Centerville Cmn Junior High

Marlowe St Arlene ve AmericanPaseo PadreR Pkwy ACE/Amtrak eynol Paseo Padre Pkwy School

Ct

t t C C High er Bright Cmn ds UPRR Rail Chauntry Cmn Dr Fremont er T ¾ er Ù r Pl T ke T rly School ave er W arish A a Lavender Cmn Lubbock Pl yc Ashford Way Kipling Pl Puttenham Wy ¾

P Ù

t t r r u u o Mackenzie Pl Post St Station Holy o Fabian Cmn er Washington ¾ Camden St ge T

Nicolet Ave Ù Hastings Street a Southw c c n n e e t Lanyard T t Kemper Rd Dunb er Spirit Surry Pl d ve High School Greenwood Dr v ill Burton Cmn

alton ¾Ù

t t e dcedar T e Bl A Heritage

Hereford V

Aspenwood Spruce Tere er Sequoia School B St R B t l T W ¾ Cmn i Loop Ã! ta eralta Ù Rd P ox F Canterbury St Brookvale Sutton |ÿ84 Atwater Ct urner C Fremont Blvd Elementary T Parish School Moraine St Birchwood Ter Cir

Meadowbrook y e

e Centerville W

v v Cmn e ¾ Junior High Dr Ù

Marlowe St ve

American Av

ACE/Amtrak Maple St School Maple St ¾Ù Stratford

t t C High C

Chauntry Cmn

onde al Oliveira Fremont er

T ¾Ù r r Pl

B School er arish A Prince of

a

A A r r e e d d l l A A ¾ School

P Ù

t t r r u u o Alder Cmn Post St o Fabian Cmn Station Holy Eggers Dr

Elementary Mattos Dr Washington Norris Rd ¾ ge T Argyle Rd a

Ù Elm St Corrigan Peace

c c n n e e t Dunb Spirit t

Cent Peralta Blvd ve High School

ill Burton Cmn

alton ¾Ù

t t e e A School Heritage

School V

Gibraltar Dr Dr Gibraltar Gibraltar

B B W Ã! Christian

Perkins St Fremont Blvd Joseph St School Baine Ave Baine ¾Ù Oak St Ave Baine

y

e e

W

v v e ¾

Dr Ù Thornton Ave Thornton Thornton Ave Thornton Gillett Rd

Laredo Dr Av Maple St ¾Ù St Blue Ridge St Maple St Stratford

Oliveira onde al r Palmer Dr

B Holly St Prince of

A A r r e e d d l l A Alder Cmn A School Patricia

Eggers Dr

Hansen Ave Ave Hansen Hansen

Elementary Mattos Dr Dauphine Ave Argyle Rd Norris Rd Elm St Corrigan Peace

Cent

Peralta Blvd Canfield Dr Canfield

School Dr Canfield Gibraltar Dr Gibraltar Gibraltar Dr Gibraltar Christian

Perkins St Joseph St School Baine Ave Baine ¾Ù Oak St Ave Baine T Kimbro St

orres A Thornton Junior Thornton Ave Thornton Laredo Dr Ave Thornton Gillett Rd St Blue Ridge St

Holly St Palmer Dr Lombard Ave

High School Patricia Hansen Ave Hansen

Dauphine Ave Ave Hansen

Canfield Dr Dr Canfield Canfield Nagle Wy Nagle Fanshawe St Wy Nagle

ve

T Dusterberry Way Kimbro St

orres A ¾

Thornton Junior Ù

San Juan Ave Ave Juan Juan San San

es A Lombard Ave

High School Dorsey Ave Maloney Nagle Wy Nagle Fanshawe St Lassen St Wy Nagle

Grover Dr

Faulkner Dr

ve ¾Ù Dusterberry Way Elementary ¾Ù

San Juan Ave Ave Juan Juan San San

Dorsey Ave Maloney Lassen St

Grover Dr Faulkner Dr Elementary ¾Ù School 0 200 400 800 Coronado Dr Contra Costa Ave School 0 200 400 800 Coronado Dr Contra Costa Ave Feet Feet Source:Source: Google Google Earth, 2019; Earth, Esri, 2019; 2019; City of Esri,Fremont; 2019; PlaceWorks City of Fremont; PlaceWorks Community Character Figure 2 PLACEWORKS¾Ù Schools Corridor Place Types Center Place Types Community Character Main Street Urban Town Center PLACEWORKS Community Community Character Map Engagement Landscape Suburban Neighborhood Center Focus Area

PLACEWORKS

Existing Conditions

EXISTING LAND USE

The focus area contains a variety of existing land uses along each of the three corridors. Development along Fremont Boulevard primarily features one- to two-story commercial and retail uses with occasional pockets of residential and office uses. Artist Walk, a recent development, features connected two- to three-story mixed-use buildings along Fremont Boulevard between Thornton Avenue and Bonde Way.

As previously mentioned, there are a number of schools along Fremont Boulevard, with American High School located at the northern end and Washington High School at the southern end of the focus area. Holy Spirit School is located at the intersection of Parish Avenue and Fremont Boulevard, and Centerville Junior High School is located between Central Avenue and Norris Road. The ACE/Amtrak Station is located along Fremont Boulevard by Bonde Way.

The section of Thornton Avenue within the focus area features existing single-story vehicle- oriented commercial uses at the Fremont Boulevard intersection. Single-family residential, Thornton Junior High School, and several churches are located west of Fremont Boulevard.

The section of Peralta Boulevard within the focus area features existing single-story small commercial buildings near Fremont Boulevard, which transition into newer, three-story medium- density residential between Parish Avenue and Sequoia Road.

The focus area is within walking distance to several existing parks and open space, including Westridge Park and Centerville Park.

EXISTING STREET WIDTHS AND CHARACTERISTICS

Streets in the focus area have various existing bicycle facilities and pedestrian facilities, including sidewalks, street trees, and crosswalks. Street conditions and amenities range on Fremont Boulevard, Peralta Boulevard, and Thornton Avenue. This section includes a summary of street widths and characteristics in the focus area by different segments with opportunities for improvement. Figure 3 shows a map of existing street and intersection conditions.

December 16, 2019 | Page 8 CITY OFCITY FREMONT OF FREMONT Existing Class 2 CENTERVILLECENTERVILLE COMPLETE COMPLETE STREETS STREETS

! erlay Arlene ! Paseo PadreR Pkwy OD Ov / Half- ! eynol le T mil ! ! ! vil e r Paseo Padre Pkwy ! ! ! ter ad Ct ! ds n ius UPRR Rail Bright Cmn Dr Ce ke rly Ter ! yc Wave ! Lavender Cmn Puttenham Wy r Lubbock Pl ! Ashford Way Kipling Pl er Mackenzie Pl T er Camden St Nicolet Ave Southw Lanyard T Hastings Street Kemper Rd er Surry Pl ! vd dcedar T e er Greenwood Dr Bl Hereford Aspenwood Spruce R Sequoia t Cmn il T ¾ St Ter Loop ta eralta Ù Rd P ox F Canterbury St Brookvale Sutton Atwater Ct urner C -mile Elementary T rter radi ua us Parish School Q Birchwood Ter Moraine St Cir ! ! Meadowbrook Cmn Centerville ! Junior High Marlowe St American ve School

Chauntry Cmn

t t C High ACE/Amtrak C

er

T ¾Ù

School er r Pl ve Fremont arish A ¾ Fabian Cmn

a Ù

t t r r u u o Post St o P Holy Washington ¾ Station ge T

Ù a Burton Cmn

c c n n e e t Spirit t Dunb High School

ill

alton A ¾Ù

t t e e

Heritage

! School V

B B W Ã! ! ! ! ! ! ! ! ! ! ! ! ! ! Fremont Blvd! ! ! ! ! ! ! ! ! ! ! ! ! ! !

y !

e e

W

v v e ¾ Dr Ù ! Maple St Maple St Av ¾Ù Stratford Oliveira onde ! al

r

B Prince of

A A r r e e d d l l A Alder Cmn A School

Eggers Dr

Elementary Mattos Dr Argyle Rd Norris Rd Elm St Corrigan Peace

Cent

School Peralta Blvd Gibraltar Dr Gibraltar Gibraltar Dr Gibraltar Christian

Perkins St ! Joseph St School Baine Ave Baine

¾Ù Oak St Ave Baine Thornton Ave Thornton Laredo Dr Ave Thornton Gillett Rd St Blue Ridge St Holly St Palmer Dr

Patricia Hansen Ave Hansen

Dauphine Ave Ave Hansen Canfield Dr Canfield ! Dr Canfield

T Kimbro St orres A Thornton Junior

High School ! ! Lombard Ave ! ! ! !

Fanshawe St

Nagle Wy Wy Nagle Nagle

ve ¾Ù ! Dusterberry Way San Juan Ave Juan San San Juan Ave Juan San !

Dorsey Ave Maloney Lassen St

Grover Dr Faulkner Dr Elementary ¾Ù ! School 0 200 400 800 Coronado Dr ! Contra Costa Ave

Feet Source: Google Earth, 2019; Esri, 2019; Alameda-Contra Costa Transit District, 2019; City of Fremont; PlaceWorks !

! Existing Conditions Existing Class 2 City-designated Community Engagement Schools Figure 3 PLACEORS¾Ù Bicycle Lane Truck Route Focus Area ! AC Transit Existing Class 2 ! Existing Traffic Signals Relinquished SR 84 ! ! Existing Conditions Map Bus Stops Buffered Bicycle Lane ! AC Transit Existing Class 3 Collision Hot Spots Bus Routes Bicycle Route

PLACEWORKS

Fremont Boulevard

Between Alder Avenue and Thornton Avenue

Fremont Boulevard between Alder Avenue and Thornton Avenue is approximately 82 to 87 feet wide (the widest right-of-way along Fremont Boulevard), comprising of two travel lanes in the southbound direction, three travel lanes in the northbound direction, 6-foot wide Class II bicycle lanes in each direction, and a 10- to 19- foot median. Sidewalks typically range between 4 to 10 feet wide with a landscaped buffer. Figure 4 shows an existing typical street section. Students walking home along Fremont Boulevard near American High School This segment of Fremont Boulevard has a single-story, vehicle-oriented commercial character. American High School is located at intersection of Fremont Boulevard and Alder Avenue. There is landscaping, street trees, and a landscaped median in the section of the street near American High School, but this is less visible when approaching intersection of Thornton Avenue. There is no on-street parking in this segment of Fremont Boulevard.

Figure 4. Fremont Blvd. Between Alder Ave. and Thornton Ave. Typical Cross Section

Source: City of Fremont SR 84 Relinquishment Measure BB Scoping Study (2016)

December 16, 2019 | Page 10

Between Thornton Avenue and Peralta Boulevard

Fremont Boulevard between Thornton Avenue and Peralta Boulevard narrows to 60 feet wide, comprising of two travel lanes in each direction with a two-way turn lane. Sidewalks are typically 10 feet wide on the north side and 14 feet wide on the south side. Figure 5 shows an existing typical street section. Fremont Boulevard experiences a pinch point when crossing the UPRR tracks, where the roadway width narrows slightly. There are advanced yield and “Pedestrian Xing Ahead” pavement markings in both directions at the Bonde Fremont Boulevard with limited bicycle facilities and a Way crossing. mix of uses near Artist Walk

This segment of Fremont Boulevard has a mixed-use character with close-knit development of housing and ground-floor, pedestrian-oriented retail because of the new Artist Walk mixed-use development located between Thornton Avenue and Bonde Way. Development on the opposite side of Artist Walk is less pedestrian oriented and smaller in scale. There is little on-street parking and there are many driveways accessing retail uses. Street trees and pedestrian-scaled street lighting with banners line both sides of the street. The ACE/Amtrak Fremont Station and UPRR tracks are also within this segment.

Figure 5. Fremont Blvd. Between Thornton Ave. and Peralta Blvd. Typical Cross Section

Source: City of Fremont SR 84 Relinquishment Measure BB Scoping Study (2016)

December 16, 2019 | Page 11

Between Peralta Boulevard and Eggers Drive

Fremont Boulevard between Peralta Boulevard and Eggers Drive is between 60 to 82 feet wide, comprising of on- street parallel parking on one or both sides, 7-foot wide Class II bicycle lanes in each direction, two travel lanes in each direction, and a raised landscaped median. Sidewalk widths range between 4 to 10 feet on either side with a landscaped buffer. Figure 6 shows an existing street section.

There are advanced yield pavement markings in the Fremont Boulevard with Class II bicycle lanes and bus southbound direction at the Norris Road and Mattos Drive amenities crossings. Additionally, there is striping with flexible posts between vehicle travel lanes, which narrow the overall travel lane widths, between Burton Common to Village Terrace/Norris Road in the northbound direction and between Abbey Terrace to Heritage Terrace in the southbound direction.

This segment of Fremont Boulevard has more of a commercial, public facility, and residential character. Holy Spirit School, Centerville Junior High School, and Washington High School are located along this segment. Medium-scale residential exist in between with commercial uses at key intersections. Street trees and pedestrian-scaled lighting line both sides of the street. This segment also contains many T-intersections, such as at Central Avenue, Norris Road, and Mattos Drive.

Figure 6. Fremont Blvd. Between Peralta Blvd. and Eggers Dr. Typical Cross Section

Source: City of Fremont SR 84 Relinquishment Measure BB Scoping Study (2016)

December 16, 2019 | Page 12

Thornton Avenue

Thornton Avenue south of Fremont Boulevard is between 84 to 90 feet wide, comprising of Class II bicycle lanes in each direction, two travel lanes in each direction, a left turn lane, and a raised landscaped median with some planted bushes and trees.

Sidewalk widths are typically 4 feet wide with a 6- foot landscape buffer from the street. Figure 7 shows an existing street section. Thornton Avenue with bicycle lanes and vehicle- Thornton Avenue within the focus area transitions oriented uses in character from residential to vehicle-oriented near the Fremont Boulevard intersection. This brief segment of Thornton Avenue has a landscaped median with bushes, narrow sidewalks, no crosswalks, and limited on-street parking. Note that sidewalks are not drawn to scale on Figure 7.

Figure 7. Thornton Ave. Typical Cross Section

Source: City of Fremont SR 84 Relinquishment Measure BB Scoping Study (2016)

December 16, 2019 | Page 13

Peralta Boulevard

Peralta Boulevard north of Fremont Boulevard features an existing typical width of 64 feet with a varying cross section comprising a total of three to four travel lanes. Sidewalks are typically 8 feet wide on the west side and 10 feet wide on the east side with a landscape buffer on the east side. Peralta Boulevard experiences a pinch point at Sequoia Road, where travel lanes reduce from three to two due to the sidewalk widening. There are no visible bicycle facilities. Figure 8 shows an Peralta Boulevard with no bicycle facilities and a mix existing street section. Although the street section of uses does not show parking, on-street parallel parking is typically available on Peralta Boulevard as well as some diagonal parking.

Peralta Boulevard near Fremont Boulevard within the focus area has the character of large lot commercial land uses, setback from the street, that transitions to medium-density, three- to four- story residential uses approaching Sequoia Road. A recent three- to four-story residential development (Centerville Junction) with widened sidewalks is located between Parish Avenue and Sequoia Road.

Street trees and landscaping are less regular on Peralta Boulevard between Fremont Boulevard and Parish Avenue but become more consistent between Parish Avenue and Sequoia Road. There are no pedestrian-scaled streetlights in this segment of the focus area, and multiple curb cuts interrupt the sidewalk. There is a gap in the sidewalk on the east side of Peralta Boulevard at 3754 Peralta Boulevard as well as between 3686 Peralta Boulevard to the Parish Avenue intersection.

Figure 8. Peralta Blvd. Typical Cross Section

Source: City of Fremont SR 84 Relinquishment Measure BB Scoping Study (2016)

December 16, 2019 | Page 14

EXISTING PEDESTRIAN FACILITIES

Many of the intersections in the focus area are signalized and have existing pedestrian facilities. Existing pedestrian facilities at all intersections typically include at least one striped crosswalk in each crossing direction and curb ramps. Occasionally, there are pedestrian crossing warning signs. Not all existing curb ramps are ADA compliant.

The four major intersections (Fremont Boulevard at Alder Avenue, at Thornton Avenue, at Peralta Boulevard, and at Eggers Drive) are signalized and HAWK beacon along Fremont Boulevard at Mattos Drive with lane narrowing striping and bollards have crosswalks on each side. Out of those four, only the intersections at Alder Avenue and at Eggers Drive have ADA-compliant curb ramps. There is an existing High Intensity Activated Crosswalk (HAWK) beacon at intersection of Fremont Boulevard and Norris Road, which is adjacent to Centerville Junior High School.

EXISTING BICYCLE FACILITIES

Fremont Boulevard has discontinuous Class II bicycle lanes. There are Class II bicycle lanes between Alder Avenue and Thornton Avenue and between Peralta Boulevard and Eggers Drive. There are small stretches of buffered bicycle lanes located approximately between Bettencourt Court and Central Avenue in the northern direction and between Norris Road and Mattos Drive in the southern direction. Between Thornton Avenue and Peralta Boulevard, there are no dedicated bicycle facilities—instead, there are Class III bicycle facilities (signage only). Buffered bicycle lane along Fremont Boulevard

Thornton Avenue has existing Class II bicycle lanes on both sides of the street within the focus area.

Peralta Boulevard is designated as a Class III bicycle route within the focus area, but there appears to be no signage or “sharrow” pavement markings, which indicate shared use of the travel lane by bicycles and vehicles. Figure 3 shows a map of existing bicycle facilities.

December 16, 2019 | Page 15

EXISTING TRANSIT

The focus area is served by both public rail transit and buses. Both ACE and Amtrak trains stop at the ACE/Amtrak Fremont Station at Fremont Boulevard and Walton Avenue. The surface parking lot for the station can be accessed via Fremont Boulevard and Peralta Boulevard.

AC Transit runs several bus lines through the focus area and has bus stops along Fremont Boulevard and Thornton Avenue. Most of the transit lines have bicycle accommodations. AC AC Transit Line 99 bus picking up students from Transit also provides supplemental bus service American High School (600 series) that specifically serves schools and operates a “Flex” service on Fremont Boulevard that connects to Union City BART. AC Transit Routes within the focus area include: » 99 – along Fremont Boulevard, stops at Centerville ACE/Amtrak and Fremont BART » 210 – along Fremont Boulevard, stops at Centerville ACE/Amtrak » 251 – along Thornton Avenue, turns south at Paseo Padre Parkway » 801 – along Fremont Boulevard, stops at Centerville ACE/Amtrak and Fremont BART » U – along Fremont Boulevard, stops at Centerville ACE/Amtrak and Fremont BART » 621 – serves American High School and Thornton Junior High School » 625 – serves Centerville Junior High School and Washington High School

Private shuttle buses for tech. companies also utilize the ACE/Amtrak Station and AC Transit bus stops, particularly for the U line, which creates conflict with AC Transit buses and adds to traffic congestion.1

Figure 3 shows existing AC Transit bus lines and the ACE/Amtrak Fremont Station location, which includes a quarter- and half-mile radius, representing a five-minute and ten-minute walk, respectively, from the station.

1 Centerville Complete Streets Stakeholder Mobility Interviews, October 18, 2019.

December 16, 2019 | Page 16

VISION ZERO

Fremont Boulevard is a Vision Zero safety priority corridor, given that it has experienced a number of vehicle collisions involving both pedestrians and bicyclists.2 Notable unsafe, high collision intersections include the following: » Fremont Boulevard at Central Avenue » Fremont Boulevard at Bonde Way » Fremont Boulevard at Parish Avenue » Fremont Boulevard at Mattos Drive » Fremont Boulevard at Alder Avenue » Fremont Boulevard at Thornton Avenue

Figure 3 also shows these collision hotspots. Safety improvements such as high visibility crosswalks, rapid flashing beacons, HAWK beacons, and protected bicycle facilities can help improve visibility of pedestrians and bicyclists. This project provides the opportunity to make safety improvements to reduce vehicle speeds and enhance bicycle facilities and pedestrian crossings, some of which are various stages of being planned, designed, or even completed.

TRUCK ROUTES

The City’s General Plan designates several truck routes that run through the focus area, which are also shown on Figure 3: » Thornton Avenue for full extent » Fremont Boulevard between Thornton Avenue and Peralta Boulevard » Peralta Boulevard from Fremont Boulevard and north to Mowry Avenue

It is the City’s intent to protect residential neighborhoods from intrusion by truck traffic and its noise and emissions impacts (General Plan Policy 3-6.2). The City intends to Signage indicating designated truck routes on Fremont Boulevard and Thornton Avenue remove truck route designations on Fremont Boulevard and Peralta Boulevard through the Fremont Boulevard town center.

2 City of Fremont Pedestrian Master Plan, 2016 and City of Fremont Bicycle Master Plan, 2018.

December 16, 2019 | Page 17

Planned Mobility Improvements

BICYCLE MASTER PLAN AND PEDESTRIAN MASTER PLAN

Two existing plans provide existing policy guidance for mobility improvements within the focus area, which are shown on Figure 9. The 2018 Bicycle Master Plan proposes upgrading the existing Class II bicycle lane, Class II buffered bicycle lane, and Class III bicycle path facilities on Fremont Boulevard, Thornton Avenue, and Peralta Boulevard to Class IV separated bikeways. Class IV separated bikeways provide a physical separation between the bikeway and travel lanes. Physical separation can be provided in various forms, including concrete curbs, landscaping, planters, an on-street parking lane, bollards, grade separation, etc. Depending on the segment, this proposal to upgrade existing bikeways to Class IV is aspirational as it requires moving curb lines and/or removing on- street parking for portions of Fremont Boulevard.

The focus area received high scores/marks under the 2016 Pedestrian Master Plan Suitability Analysis due to the close clustering of different land uses and proximity to a transit station and identifies the following recommended improvements within the focus area: » Close the sidewalk gap along Peralta Boulevard north of Parish Avenue » Intersection improvements at three challenging crossings within the focus area: • Fremont Boulevard and Bonde Way – improvements at this intersection will be implemented as part of this project • Fremont Boulevard and Norris Road – improvements at this intersection area already complete • Fremont Boulevard and Mattos Drive

CENTERVILLE FRAMEWORK PLAN AND FREMONT BOULEVARD CONCEPT PLAN

The Centerville Framework Plan provides an action framework to help realize the vision of the Centerville area as a transit-oriented, walkable, neighborhood-serving, commercial and mixed-use district with Fremont Boulevard as a complete street. The goal of the Framework Plan is to revitalize Centerville by “strengthening the interconnections between land uses, Fremont Boulevard, and buildings that collectively influence the identity of the district" and provides design guidelines to promote future pedestrian-friendly development in the area. The plan provides the following complete streets recommendations for improvements within the focus area:

Pedestrian Connections » Mid-block pedestrian links to connect Maple Street to Fremont Boulevard. » Pedestrian link from Centerville Pioneer Cemetery to Fremont Boulevard.

December 16, 2019 | Page 18 CITY OF FREMONT

Arlene Paseo PadreR Pkwy D Overlay / Ha e e TO lf-mil ynol rvill e ra Paseo Padre Pkwy Wy te d Ct ds n ius UPRR Rail Bright Cmn Dr Ce Puttenham er ke T Waverly

yc Lavender Cmn Lubbock Pl Ashford Way Kipling Pl

Mackenzie Pl Nicolet Ave er T er Camden St

Southw Lanyard T Hastings Street Kemper Rd er Surry Pl vd dcedar T Sequoia Rd Hereford Spruce e er Greenwood Dr Bl St Aspenwood R t l T ¾ Cmn Ter i Loop ta eralta Ù P ox F Canterbury St Brookvale Sutton |ÿ84 Atwater Ct urner C -mile Elementary T arter radiu Qu s Parish School Birchwood Ter CITY OFCITY FREMONT OF FREMONT Moraine St Cir Meadowbrook Cmn CENTERVILLE COMPLETE STREETS2 Centerville

Marlowe St Arlene Junior High AmericanPaseo PadreR Pkwy D Overlay / Ha O lf- Cmn eynol le T mile Paseo Padre Pkwy rvil ra ve School Wy e d Ct

Chauntry

t t C t i Bright Cmn C High ds en us UPRR Rail ACE/Amtrak Dr C er Puttenham er ke T T ¾ rly Ù Waver Pl School er ve yc FremontLavender Cmn a Fabian Cmn Lubbock Pl 1 Ashford Way

Kipling Pl ¾Ù

t t r r u u o Mackenzie Pl Post St o Nicolet Ave er T 6 arish A Washington er P ¾ StationCamden St 3 Holy ge T Ù a

Southw 5 Hastings Street Burton Cmn

c c n n e e t Lanyard T t Kemper Rd Dunb er Surry Pl d High School v ill

Sequoia Rd alton A

t t e dcedar T Bl Spirit e Greenwood Dr Heritage Hereford Spruce e er ¾ V

Aspenwood Ù B St R B t l T W Ter i Loop ! ¾ Cmn à School ta eralta Ù P 13 ox F Canterbury St Brookvale Sutton Atwater Ct urner C -mile Fremont Blvd Elementary T rter radi ua us Parish School Q Birchwood Ter y Moraine St Cir 7 12

W 8 e

e 10 Meadowbrook Cmn v v 11 Centerville e ¾Ù Marlowe St Junior High

American Av Cmn ¾Ù onde ve School Stratford

Chauntry

t t C High ACE/Amtrak C B Maple St

al Oliveira 9 er T ¾Ù r r Pl

School er ve Fremont Prince of a

Fabian Cmn Dr

A A r r e e d d l l A

A ¾Ù School

t t r r u u o Alder Cmn Post St o

Eggers Dr

arish A

Elementary Washington Mattos Dr

P ge T ¾ Station Holy Argyle Rd Norris Rd

Ù Elm St a Burton Cmn Peace

c c n n e e t Dunb t

Cent Peralta Blvd High School

ill

alton A

t t e

Spirit e School Heritage

¾Ù V

Gibraltar Dr Dr Gibraltar Gibraltar

B B W Ã! School Christian Perkins St Fremont Blvd Joseph St School

¾ Corrigan Baine Ave Baine Ù Oak St Ave Baine

y

W

e e

v v

e ¾Ù Thornton Ave Thornton Thornton Ave Thornton Gillett Rd

St Laredo Dr Av ¾Ù onde Stratford Blue Ridge St B Maple St Oliveira al ly Sr t Palmer Dr Hol Prince of Patricia

Dr

A A r r e e d d l l A Alder Cmn A School

Eggers Dr

Hansen Ave Ave Hansen Hansen Elementary Dauphine Ave Mattos Dr Elm St Argyle Rd Norris Rd Peace

Cent

School Peralta Blvd

Canfield Dr Dr Canfield Canfield Gibraltar Dr Gibraltar Gibraltar Dr Gibraltar Christian Perkins St Joseph St 4 School

¾ Corrigan Baine Ave Baine Ù Oak St Ave Baine T Kimbro St

orres A Thornton Ave Thornton Thornton Ave Thornton Gillett Rd Laredo Dr Thornton St Blue Ridge St

ly St Palmer Dr Lombard Ave

Hol Patricia Hansen Ave Hansen

Dauphine AveJunior High Ave Hansen

Canfield Dr Dr Canfield Canfield Nagle Wy Nagle Fanshawe St Wy Nagle

ve T School Dusterberry Way Kimbro St

orres A ¾Ù San Juan Ave Juan San San Juan Ave Juan San Thornton

Lombard Ave Dorsey Ave Maloney

Junior High Nagle Wy Nagle Fanshawe St Lassen St Wy Nagle

Grover Dr

Faulkner Dr

ve School ¾Ù Dusterberry Way Elementary ¾Ù

San Juan Ave Ave Juan Juan San San

Dorsey Ave Maloney Lassen St

Grover Dr Faulkner Dr Elementary ¾Ù School 0 200 400 800 Coronado Dr Contra Costa Ave School 0 200 400 800 Coronado Dr Contra Costa Ave Feet Feet Source:Source: Google Google Earth, 2019; Earth, Esri, 2019; 2019; City of Esri,Fremont; 2019; PlaceWorks City of Fremont; PlaceWorks Planned Mobility Improvements ¾Ù Schools Safe Routes to Schools Recommended Routes Planned Bikeways from the City's 2018 Bicycle Master Plan Figure 9 Planned Mobility Improvements PLACEORS School Drop-off Location American High School Proposed Class II Proposed Class III Bicycle Lane Neighborhood Bikeway PLACEORS Washington High School Planned Mobility Community Proposed Class II Proposed Class IV Engagement Centerville Junior High School Buffered Bicycle Lane Separated Bikeway Improvements and Focus Area Thorton Junior High School Proposed Class III Bicycle Route Safe Routes to Schools PLACEWORKS Oliveira Elementary School

Reconfiguration of Fremont Boulevard

The Centerville Framework Plan includes four design options reconfiguring Fremont Boulevard (from Thornton Avenue to Central Avenue) to improve travel for pedestrians and bicyclists. Each alternative includes additional crosswalk and intersection improvements. This memo’s appendix contains excerpts from the Centerville Framework Plan that show plan and street section drawings illustrating the different options as well as listed pros and cons. In all options, travel lanes are either reduced in width or number. Parallel on-street parking is maintained in all options, but most options propose reducing the number of spaces. The four options are the following: » Option 1: Two lanes in each direction with no median, shared bicycle lanes, and parallel parking where possible. » Option 2: Two lanes in each direction with a median, shared bicycle lanes, and parallel parking where possible. » Option 3: Two travel lanes northbound, one travel lane southbound, turn lanes at intersections, dedicated bicycle lanes, and some on-street parallel parking. » Option 4: Two narrower travel lanes in each direction with dedicated bicycle lanes and some on- street parallel parking, studied without medians (Alternative A) and with medians (Alternative B).

As part of the Centerville Framework Plan project, a traffic study was conducted to analyze the potential traffic impacts for roadway segments and intersections along Fremont Boulevard and on the adjacent roadway network due to proposed Fremont Boulevard roadway configuration options. The study identified the following streets as alternative routes for cross-town travel: Paseo Padre Parkway, Dusterberry Way, Blacow Road, and I-880. The study identified the following streets as alternative routes for circulating around the Centerville district: Maple Street, Bonde Way, and Parish Street.

The study also identified the intersections of Fremont Boulevard/Thornton Avenue and Maple Street/Central Avenue for traffic mitigation measures, including traffic calming devices such as speed bumps to discourage cut-through traffic while allowing some vehicles through at slower speeds at Maple Street. At the Fremont Boulevard/Thornton Avenue intersection, mitigation measures need further study.

Streetscape Improvements » On-street parking along Fremont Boulevard for short term visits. » Outdoor eating, and other uses along Fremont Boulevard, to occupy some of the parking spaces and activate the street.

December 16, 2019 | Page 20

» Landscaped bulbouts, tall trees, and textured pavement in crosswalks and on sidewalks help make traffic-heavy streets like Fremont Boulevard feel more pedestrian friendly and improve visibility and safety at pedestrian crossings. » Street trees help define the identity of a street making it more memorable to visitors.

SCHOOL IMPROVEMENTS

The City has conducted School Safety Assessments for all its public schools, which include an audit of walking and bicycling safety conditions, infrastructure recommendations to improve safety, and recommended walking and bicycling routes. Figure 9 shows documented drop-off/pickup locations and recommended routes from the assessments for the public schools. The following improvements from assessments are within the focus area, some of which have been completed:

American High School » Widen sidewalk along Fremont Boulevard school frontage from four to six feet minimum as the school district develops on the northeast corner. » Fremont Boulevard/Alder Avenue intersection • Check pedestrian signal timing at intersection to ensure 3.5 feet per second and complies with ADA requirements. • Install high visibility crosswalks and advance stop lines.

Centerville Junior High School » Central Avenue/Fremont Boulevard intersection • Install high visibility crosswalk across Fremont Boulevard at the south approach with advance stop markings (will require partial median removal). • Upgrade the existing transverse crosswalks at the west and north approaches to high visibility. • Install a curb extension at the southwest corner. • Consider reconfiguring signal to add leading pedestrian interval. » Install proposed Class IV separated bikeways along Fremont Boulevard. » Fremont Boulevard/Norris Road intersection • Install “Keep Clear” and advance yield pavement markings around crosswalk across Fremont Boulevard. • Refresh high visibility crossing across Fremont Boulevard. • Install high visibility crosswalk across northern approach of Norris Road. • Install curb extensions at the northwest and northeast corners. • Install a HAWK beacon (pedestrian hybrid signal). » Refresh red paint in “No Stopping” zone on Fremont Boulevard along school frontage.

December 16, 2019 | Page 21

Washington High School » Fremont Boulevard/Eggers Drive intersection • Install high visibility crosswalks at all four legs. • Install curb extension at southwest corner. • Consider leading pedestrian interval. • Install red curb on of east side of Eggers Drive (two car lengths) and north side of Fremont Boulevard where shown. • Consider ways to utilize area in front of school such as widening sidewalk to accommodate pedestrian volumes

TRANSIT

By summer 2020, AC Transit plans to increase headways on Line 210, which travels through Fremont Boulevard.3 The City’s Fremont Boulevard Smart and Safe Corridor project is also proposing various sensor/signal improvements, which include transit priority signals for key intersections.

Planned Development

Centerville is experiencing a high amount of growth and development that will contribute to the use of services such as businesses and schools as well as use of the corridor by pedestrians, bicyclists, transit riders, and vehicles. Several developments including mixed-use and housing projects have recently been built, are under construction, or are proposed within the focus area, as shown on the City’s September 30, 2019 development activity map. Figure 10 shows the following development projects with the associated key numbers:

3 Centerville Complete Streets Mobility Stakeholder Interview, October 18, 2019.

December 16, 2019 | Page 22

1. Artist Walk Centerville (3888 Artist Walk Common) – Completed • 185 multi-family units • 30,300 commercial sf • Housing Element site 2. Centerville Junction (3550 Peralta Boulevard) – Under Construction • 52 multi-family units (replacing 11 single-family units) 3. Silicon Sage Centerville Mixed-Use Project (37358 Fremont Blvd) – Under Building Permit Review Completed Artist Walk development with ground- • 165 multi-family units floor retail and residential above along Fremont • 25,000 commercial sf (net decrease of 15,000 Boulevard commercial sf) 4. Dusterberry Park (within vicinity at corner of Dusterberry Way and Peralta Boulevard) – Concept Approved • 4-acre neighborhood park with play structures, play areas, sports court, and picnic areas 5. 3900 Thornton Avenue (3900 Thornton Avenue) – Under Building Permit Review • 54 multi-family units • 7,124 commercial sf 6. Centerville Pioneer (3858 Bonde Way) – Under Building Permit Review • 8 multi-family units Centerville Junction partially completed/under 7. Maple Commons (Maple St) – Under Building construction on Peralta Boulevard Permit Review • 11 multi-family units • 2,820 commercial sf 8. Universal Dragon (38239 Fremont Blvd) – Under Building Permit Review • 5 multi-family units (replacing two single-family units) • 3,028 commercial sf 9. Centerville Plaza (37177 Fremont Blvd) – Open for Public Comment • 18 multi-family units • 10,585 commercial sf 10. Fremont Habitat (36551 Fremont Blvd) – Open for Public Comment • 18 multi-family units • Removing 4,501 commercial sf

December 16, 2019 | Page 23 CITY OF FREMONT

Arlene Paseo PadreR Pkwy D Overlay / Ha e e TO lf-mil ynol rvill e ra Paseo Padre Pkwy Wy te d Ct ds n ius UPRR Rail Bright Cmn Dr Ce Puttenham er ke T Waverly

yc Lavender Cmn Lubbock Pl Ashford Way Kipling Pl

Mackenzie Pl Nicolet Ave er T er Camden St

Southw Lanyard T Hastings Street Kemper Rd er Surry Pl vd dcedar T Sequoia Rd Hereford Spruce e er Greenwood Dr Bl St Aspenwood R t l T ¾ Cmn Ter i Loop ta eralta Ù P ox F Canterbury St Brookvale Sutton |ÿ84 Atwater Ct urner C -mile Elementary T arter radiu Qu s Parish School Birchwood Ter CITY OFCITY FREMONT OF FREMONT Moraine St Cir Meadowbrook Cmn CENTERVILLE COMPLETE STREETS2 Centerville

Marlowe St Arlene Junior High AmericanPaseo PadreR Pkwy D Overlay / Ha O lf- Cmn eynol le T mile Paseo Padre Pkwy rvil ra ve School Wy e d Ct

Chauntry

t t C t i Bright Cmn C High ds en us UPRR Rail ACE/Amtrak Dr C er Puttenham er ke T T ¾ rly Ù Waver Pl School er ve yc FremontLavender Cmn a Fabian Cmn Lubbock Pl 1 Ashford Way

Kipling Pl ¾Ù

t t r r u u o Mackenzie Pl Post St o Nicolet Ave er T 6 arish A Washington er P ¾ StationCamden St 3 Holy ge T Ù a

Southw 5 Hastings Street Burton Cmn

c c n n e e t Lanyard T t Kemper Rd Dunb er Surry Pl d High School v ill

Sequoia Rd alton A

t t e dcedar T Bl Spirit e Greenwood Dr Heritage Hereford Spruce e er ¾ V

Aspenwood Ù B St R B t l T W Ter i Loop ! ¾ Cmn à School ta eralta Ù P 13 ox F Canterbury St Brookvale Sutton Atwater Ct urner C -mile Fremont Blvd Elementary T rter radi ua us Parish School Q Birchwood Ter y Moraine St Cir 7 12

2 W 8 e

e 10 Meadowbrook Cmn v v 11 Centerville e ¾Ù Marlowe St Junior High

American Av Cmn ¾Ù onde ve School Stratford

Chauntry

t t C High ACE/Amtrak C B Maple St

al Oliveira 9 er T ¾Ù r r Pl

School er ve Fremont Prince of a

Fabian Cmn Dr

A A r r e e d d l l A

A 1 ¾Ù School

t t r r u u o Alder Cmn Post St o

Eggers Dr

arish A

Elementary 6 Washington Mattos Dr

P ge T ¾ Station 3 Holy Argyle Rd Norris Rd

Ù 5 Elm St a Burton Cmn Peace

c c n n e e t Dunb t

Cent Peralta Blvd High School

ill

alton A

t t e

Spirit e School Heritage

¾Ù V

Gibraltar Dr Dr Gibraltar Gibraltar

B B W ! Christian 13 Ã School Perkins St Fremont Blvd Joseph St School

¾ Corrigan Baine Ave Baine Ù Oak St Ave Baine 7 y 12

W 8 e

e 10 v v 11

e ¾Ù Thornton Ave Thornton Thornton Ave Thornton Gillett Rd

St Laredo Dr Av ¾Ù onde Stratford Blue Ridge St B Maple St Oliveira 9 al ly Sr t Palmer Dr Hol Prince of Patricia

Dr

A A r r e e d d l l A Alder Cmn A School

Eggers Dr

Hansen Ave Ave Hansen Hansen Elementary Dauphine Ave Mattos Dr Elm St Argyle Rd Norris Rd Peace

Cent

School Peralta Blvd

Canfield Dr Dr Canfield Canfield Gibraltar Dr Gibraltar Gibraltar Dr Gibraltar Christian Perkins St Joseph St 4 School

¾ Corrigan Baine Ave Baine Ù Oak St Ave Baine T Kimbro St

orres A Thornton Ave Thornton Thornton Ave Thornton Gillett Rd Laredo Dr Thornton St Blue Ridge St

ly St Palmer Dr Lombard Ave

Hol Patricia Hansen Ave Hansen

Dauphine AveJunior High Ave Hansen

Canfield Dr Dr Canfield Canfield Nagle Wy Nagle Fanshawe St Wy Nagle

ve 4 T School Dusterberry Way Kimbro St

orres A ¾Ù San Juan Ave Juan San San Juan Ave Juan San Thornton

Lombard Ave Dorsey Ave Maloney

Junior High Nagle Wy Nagle Fanshawe St Lassen St Wy Nagle

Grover Dr

Faulkner Dr

ve School ¾Ù Dusterberry Way Elementary ¾Ù

San Juan Ave Ave Juan Juan San San

Dorsey Ave Maloney Lassen St

Grover Dr Faulkner Dr Elementary ¾Ù School 0 200 400 800 Coronado Dr Contra Costa Ave School 0 200 400 800 Coronado Dr Contra Costa Ave Feet Feet Source:Source: Google Google Earth, 2019; Earth, Esri, 2019; 2019; City of Esri,Fremont; 2019; PlaceWorks City of Fremont; PlaceWorks Development Activity ¾Ù Schools Development Activity Figure 10 Planned Mobility Improvements PLACEORS Completed Under Building Note: Development activity shown is limited Permit Review PLACEORSCommunity Engagement to development projects fronting onto the Development Activity Focus Area Under Open for corridor within the focus area, and future Construction Public Comment Dusterberry Park. Relinquished SR 84 Preliminary Review Approved Procedure PLACEWORKS

11. Fremont Multi-family Residential (37447 Fremont Blvd) – Preliminary Review Procedure (no entitlement) • 202 multi-family units • 8,420 commercial sf 12. Old Town Lux Homes (4064 Bonde Way) – Preliminary Review Procedure (no entitlement) • 46 multi-family units • 9,500 commercial sf 13. Fremont Lofts – Preliminary Review Procedure (no entitlement) • 10 multi-family units • 2,141 commercial sf

Through the approval process for any new development, the City should work with the developer/applicant to incorporate any public improvements to the street frontage of the development, including crosswalks, flashing beacons, new and/or widened sidewalks, bulbouts, street trees, gateways, etc.

Next Steps As part of the project, the City is conducting an extensive community engagement process to hear from stakeholders, including residents, schools, businesses, transit providers, and pedestrian and bicycle groups, on the project’s design. The community will be engaged throughout the project.

This memo’s findings will be presented at the project’s first community meeting on December 9th, and feedback collected from stakeholders and the broader community will help inform the development of three design alternatives for the project. The design alternatives will be presented to the community at a subsequent community meeting anticipated to be held in Spring 2020.

Attachment

Appendix A: Centerville Framework Plan Fremont Boulevard Design Options

December 16, 2019 | Page 25 CITY OF FREMONT ATTACHMENT A CENTERVILLE COMPLETE STREETS

CHAPTER 3: FREMONT BOULEVARD

Figure 3-3: fremont boulevard - option 1

add Parallel Parking with landscaped

Bulb-outs y a where possible thornton avenue ne w road i nto un i f ed s te bonde w add new crosswalks at new intersection

fremont boulevard y a • remove maintain possible new add new dedicated existing LEFT- road or crosswalk turn lanes on turn lane pedestrian on fourth three sides of route through bonde w side of intersection to maple intersection • rearrange street crosswalks to create smaller intersection • land saved to be used for the additional sidewalk and landscape ENHANCEMENTS

12’± 8’ 14’ 10’ 10’ 14’ 8’ 12’± Sidewalk p p Sidewalk

centerville framework plan 50 c i t y of fremont CITY OF FREMONT ATTACHMENT A CENTERVILLE COMPLETE STREETS

CHAPTER 3: FREMONT BOULEVARD

add new crosswalk on third side of intersection tra i n trac k s i sh ave par blvd peralta

fremont boulevard

baine avenue remove add new add new converted dedicated mid-block crosswalk on to one-way left-turn lanes crosswalk third side of with parallel on fremont intersection central ave blvd peralta ba i ne avenue parking boulevard

500 100 200 ft

Option 1

Keep Fremont Boulevard two lanes in each direction to maintain capacity, but narrow the lanes. The outer travel lanes are kept wider to share with bicycles on a bicycle route. Create parallel on-street parking on both sides of the street (approximately 92 spaces).

Pro: • Maintains number of current vehicle travel lanes • Reduces the distance to cross the street • Provides the most on-street parking spaces of all the options

Con: • Allows only enough space for a shared bicycle lane, rather than a dedicated bicycle lane but allows most cars to pass • Bicycles will need to negotiate parking cars and traffic flow

centerville framework plan c i t y of fremont 51 CITY OF FREMONT ATTACHMENT A CENTERVILLE COMPLETE STREETS

CHAPTER 3: FREMONT BOULEVARD

Figure 3-4: fremont boulevard - option 2

add Parallel add new Parking with CROSSWALKS landscaped at new

Bulb-outs intersection y a where possible thornton avenue ne w road i nto un i f ed s te bonde w

fremont boulevard y a

• remove add new possible add new add new add new dedicated landscaped new mid-block break in crosswalk turn lanes on median with road or crosswalk median for on FOURTH bonde w three sides of break for pedestrian left turn side of intersection left turn into route into new/ intersection • rearrange new/existing through existing crosswalks to driveways to maple driveways create smaller street intersection • land saved to be used for the additional sidewalk and landscape ENHANCEMENTS

12’± 8’ 14’ 10’ 8’ 10’ 14’ 12’± Sidewalk p b m B Sidewalk

centerville framework plan 52 c i t y of fremont CITY OF FREMONT ATTACHMENT A CENTERVILLE COMPLETE STREETS

CHAPTER 3: FREMONT BOULEVARD

add add new landscaped crosswalk on median with third side of breaks for intersection left turn into new/existing driveways tra i n trac k s blvd peralta i sh ave par

baine avenue REMOVE add new remove add new converted dedicated mid-block dedicated left- crosswalk on to one-way left-turn crosswalk turn lane third side of central ave with parallel blvd peralta lanes intersection ba i ne avenue parking 500 100 200 ft

Option 2

Keeps Fremont Boulevard two lanes in each direction to maintain capacity, but narrow the lanes. Provide a median that can also be a dedicated left turn lane at the intersections. Create parallel on- street parking on one or both sides of the street where possible (approximately 71 spaces).

Pro: • Maintains number of current vehicle travel lanes • Adds landscaping to the street • Medians provide a refuge for crossing the street midway

Con: • Allows only enough space for a shared bicycle lane, rather than a dedicated bicycle lane • Bicycles will need to negotiate parking cars and traffic flow • Eliminates some of the possible on-street parking at the

centerville framework plan c i t y of fremont 53 CITY OF FREMONT ATTACHMENT A CENTERVILLE COMPLETE STREETS

CHAPTER 3: FREMONT BOULEVARD

Figure 3-5: fremont boulevard - option 3

add Parallel add CROSSWALKS Parking with AND SOUTHBOUND landscaped DEDICATED LEFT-

Bulb-outs TURN LANE AT NEW y a where possible INTERSECTION thornton avenue ne w road i nto un i f ed s te bonde w

fremont boulevard y a

• remove REDUCE TO possible new add new dedicated ONE DEDICATED road or crosswalk turn lanes on LEFT-TURN pedestrian on FOURTH bonde w three sides of LANE, WIDEN route through side of intersection LANDSCAPED to maple intersection • rearrange MEDIAN street crosswalks to create smaller intersection • land saved to be used for the additional sidewalk and landscape ENHANCEMENTS

12’± 8’ 5’ 10’ 8’ 10’ 10’ 5’ 8’ 12’± Sidewalk p B m B p Sidewalk

centerville framework plan 54 c i t y of fremont CITY OF FREMONT ATTACHMENT A CENTERVILLE COMPLETE STREETS

CHAPTER 3: FREMONT BOULEVARD

add add new landscaped crosswalk on median third side of intersection tra i n trac k s blvd peralta i sh ave par

fremont boulevard

baine avenue REMOVE add new ADD add new converted NORTHBOUND mid-block SOUTHBOUND crosswalk on to one-way dedicated crosswalk dedicated left- third side of central ave with parallel blvd peralta left-turn turn lane at intersection ba i ne avenue parking lane intersections 500 100 200 ft

Option 3

Maintains two lanes in the northbound direction, but reduces to one lane in the southbound direction to reflect the way the street is utilized from traffic count data. Provides a median that can also be a dedicated left turn lane at the intersections. Adds dedicated bicycle lanes and creates parallel parking where possible (approximately 75 spaces).

Pro: • Reduces the number of vehicle travel lanes to slow traffic for pedestrians • Provides a dedicated bicycle lane • Adds landscaping in the median • Median provides a refuge for pedestrians

Con: • Will not be sufficient for transit requiring a dedicated lane in the future • Greatly reduces street capacity in the southbound direction

centerville framework plan c i t y of fremont 55 CITY OF FREMONT ATTACHMENT A CENTERVILLE COMPLETE STREETS

CHAPTER 3: FREMONT BOULEVARD

Figure 3-6: fremont boulevard - option 4

add Parallel add CROSSWALKS Parking one at new side only intersection

street to be y a straightened to accommodate on- A

street parking per ne w road i nto un i f ed s te

thornton avenue unified site plan bonde w

fremont boulevard y a

• remove one maintain possible new new mid-block add new left turn lane existing right- road or crosswalk crosswalk southbound turn lane pedestrian on FOURTH this portion bonde w • remove one route through side of of fremont left turn lane to maple intersection blvd can be northbound street widened to • remove accommodate dedicated parallel right turn lane parking eastbound on thornton • thornton westbound to remain as is

centerville framework plan 56 c i t y of fremont CITY OF FREMONT ATTACHMENT A CENTERVILLE COMPLETE STREETS

CHAPTER 3: FREMONT BOULEVARD

parallel add new parking one crosswalk on side only with third side of landscaped intersection bulb-outs add new B C crosswalk on

tra i n trac k s third side of

blvd peralta i sh ave par intersection

fremont boulevard

baine avenue REMOVE add new dedicated converted NORTHBOUND mid-block left-turn lanes to one-way dedicated crosswalk removed

with parallel left-turn central ave ba i ne avenue parking lane 500 100 200 ft

Option 4

Keeps Fremont Boulevard two lanes in each direction to maintain capacity, but narrows the lanes (to 11’) (Alternative A). Lanes are narrowed further (to 10’) to accommodate a small median (Alternative B). Adds dedicated bicycle lanes. Creates parallel parking where possible (approximately 62 spaces).

Pro: • Maintains the number of current vehicle travel lanes • Provides a dedicated bicycle lane

Con: • Fewer parallel parking spaces than the other options

centerville framework plan c i t y of fremont 57 CITY OF FREMONT ATTACHMENT A CENTERVILLE COMPLETE STREETS

CHAPTER 3: FREMONT BOULEVARD

Option 4: ALTERNATIVE A

sECTION A 12’± 8’ 5’ 11’ 11’ 11’ 11’ 5’ 8’ 12’±

Sidewalk p b b p Sidewalk

sECTION B 12’± 5’ 11’ 11’ 4’ 11’ 11’ 5’ 12’±

Sidewalk b m b Sidewalk

sECTION C 12’± 5’ 12’ 11’ 11’ 12’ 5’ 8’ 12’±

Sidewalk b b p Sidewalk

centerville framework plan 58 c i t y of fremont CITY OF FREMONT ATTACHMENT A CENTERVILLE COMPLETE STREETS

CHAPTER 3: FREMONT BOULEVARD

Option 4: ALTERNATIVE b

sECTION A 12’± 8’ 5’ 10’ 10’ 6’ 10’ 10’ 5’ 8’ 12’±

Sidewalk p b m b p Sidewalk

sECTION B 12’± 5’ 10’ 10’ 8’ 10’ 10’ 5’ 12’±

Sidewalk b m b Sidewalk

sECTION C 12’± 5’ 10’ 10’ 6’ 10’ 10’ 5’ 8’ 12’±

Sidewalk b m b p Sidewalk

centerville framework plan c i t y of fremont 59