List of Eligible Candidates Apply for the Post of Chowkidar in Traffic Hqrs
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Crop Damage Assessment Along the Indus River
0 1 0 2 K t A 0 s -P . u 1 2 g 4 n 1 u 0 io A 0 rs 0 -0 e 2 0 V 1 0 -2 L F " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " "" " " " " " " " " " " " " " " " " " " " " " " " " !( " " " " " " " " " " " " " " " " " " " !(" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " "" " " " " " " " " " " " " " " " " " " " " " " " p " " " " " " " p " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " "" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " : " " " " " " " !( " " " " " " " " " " " y " " " " " " " " " " " " " " " " " " " " " " " " " b " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " d " " " " " " " " " " " " " !( " " e " " " " " " " " " " t " "" " "p " " " " " " " " " " r " !( " " " " !( " " " " !( " " " p " " " " " " " o " " " " " " " " " " " " " " " " " " " " " " " " " p " " " " " " " " " " " " " " " " " " " " p " " " " " "" " " " " " " " " " " " " " " " " " " u " " " " " " " " " " t " " " !( " " " S " " " . " " " " " " " " " " o " " " " " " n " " " " " " " " " " " " " " D" " p " " " nn " " " " " " " " " !( " " " " e " " " " " " " " " " " " r O " " " " " " " " " " " " " " " " " " a M " " " " " " " " " " I " " " " " " " " " " " " " " " " " " " e " " " " " " " " " aa " " " !( !(r C " " " " " " " " I " " " " " " " " " " " " " " " e " " " " " " " " " e L " " " p" " " " " " " " h I " " " " " " " " " tt "" -
Spatio-Temporal Flood Analysis Along the Indus River, Sindh, Punjab
p !( !( 23 August 2010 !( FL-2010-000141-PAK S p a t i o - Te m p o r a l F!( lo o d A n a l y s i s a l o n g t h e I n d u s R i v e r, S i n d h , P u n j a b , K P K a n d B a l o c h i s t a n P r o v i n c e s , P a k i s t a n p Version 1.0 !( This map shows daily variation in flo!(od water extent along the Indus rivers in Sindph, Punjab, Balochistan and KPK Index map CHINA p Crisis Satellite data : MODIS Terra / Aqua Map Scale for 1:1,000,000 Map prepared by: Supported by: provinces based on time-series MODIS Terra and Aqua datasets from August 17 to August 21, 2010. Resolution : 250m Legend 0 25 50 100 AFGHANISTAN !( Image date : August 18-22, 2010 Result show that the flood extent isq® continously increasing during the last 5 days as observed in Shahdad Kot Tehsil p Source : NASA Pre-Flood River Line (2009) Kilometres of Sindh and Balochistan provinces covering villages of Shahdad, Jamali, Rahoja, Silra. In the Punjab provinces flood has q® Airport p Pre-flood Image : MODIS Terra / Aqua Map layout designed for A1 Printing (36 x 24 inch) !( partially increased further in Shujabad Tehsil villages of Bajuwala Ti!(bba, Faizpur, Isanwali, Mulana)as. Over 1000 villages !( ® Resolution : 250m Flood Water extent (Aug 18) p and 100 towns were identified as severly affepcted by flood waters and vanalysis was performed using geospatial database ® Heliport !( Image date : September 19, 2009 !( v !( Flood Water extent (Aug 19) ! received from University of Georgia, google earth and GIS data of NIMA (USGS). -
Reference Map
Attock ‐ Reference Map Attock Tehsil Hasan Abdal Tehsil Punjab Fateh Jang Tehsil Jand Tehsil Pindi Gheb Tehsil Disclaimers: The designations employed and the presentation of material on this map do not imply the expression of any opinion whatsoever on the part of the Secretariat of the United Nations concerning the legal status of any country, territory, city or area or of its authorities, or concerning the delimitation of its frontiers or boundaries. Dotted line represents approximately the Line of Control in Jammu and Kashmir agreed upon by India and Pakistan. The final status of Jammu and Kashmir has not yet been agreed upon by the parties. Bahawalnagar‐ Reference Map Minchinabad Tehsil Bahawalnagar Tehsil Chishtian Tehsil Punjab Haroonabad Tehsil Fortabbas Tehsil Disclaimers: The designations employed and the presentation of material on this map do not imply the expression of any opinion whatsoever on the part of the Secretariat of the United Nations concerning the legal status of any country, territory, city or area or of its authorities, or concerning the delimitation of its frontiers or boundaries. Dotted line represents approximately the Line of Control in Jammu and Kashmir agreed upon by India and Pakistan. The final status of Jammu and Kashmir has not yet been agreed upon by the parties. p Bahawalpur‐ Reference Map Hasilpur Tehsil Khairpur Tamewali Tehsil Bahawalpur Tehsil Ahmadpur East Tehsil Punjab Yazman Tehsil Disclaimers: The designations employed and the presentation of material on this map do not imply the expression of any opinion whatsoever on the part of the Secretariat of the United Nations concerning the legal status of any country, territory, city or area or of its authorities, or concerning the delimitation of its frontiers or boundaries. -
1951-81 Population Administrative . Units
1951- 81 POPULATION OF ADMINISTRATIVE . UNITS (AS ON 4th FEBRUARY. 1986 ) - POPULATION CENSUS ORGANISATION ST ATIS TICS DIVISION GOVERNMENT OF PAKISTAN PREFACE The census data is presented in publica tions of each census according to the boundaries of districts, sub-divisions and tehsils/talukas at the t ime of the respective census. But when the data over a period of time is to be examined and analysed it requires to be adjusted fo r the present boundaries, in case of changes in these. It ha s been observed that over the period of last censuses there have been certain c hanges in the boundaries of so me administrative units. It was, therefore, considered advisable that the ce nsus data may be presented according to the boundary position of these areas of some recent date. The census data of all the four censuses of Pakistan have, therefore, been adjusted according to the administ rative units as on 4th February, 1986. The details of these changes have been given at Annexu re- A. Though it would have been preferable to tabulate the whole census data, i.e., population by age , sex, etc., accordingly, yet in view of the very huge work involved even for the 1981 Census and in the absence of availability of source data from the previous three ce nsuses, only population figures have been adjusted. 2. The population of some of the district s and tehsils could no t be worked out clue to non-availability of comparable data of mauzas/dehs/villages comprising these areas. Consequently, their population has been shown against t he district out of which new districts or rehsils were created. -
Population and Household Detail from Block to District Level
POPULATION AND HOUSEHOLD DETAIL FROM BLOCK TO DISTRICT LEVEL PUNJAB (KHANEWAL DISTRICT) ADMIN UNIT POPULATION NO OF HH KHANEWAL DISTRICT 2,921,986 466,390 JAHANIAN TEHSIL 343,361 52,613 JAHANIAN MC 43,598 7010 CHARGE NO 03 43,598 7010 CIRCLE NO 01 10,417 1640 221030101 2,403 388 221030102 614 84 221030103 250 47 221030104 1,065 170 221030105 2,135 304 221030106 1,596 275 221030107 697 106 221030108 1,657 266 CIRCLE NO 02 4,001 655 221030201 751 113 221030202 480 86 221030203 781 116 221030204 658 121 221030205 613 94 221030206 718 125 CIRCLE NO 03 7,583 1226 221030301 2,625 432 221030302 237 43 221030303 521 105 221030304 776 126 221030305 503 84 221030306 2,921 436 CIRCLE NO 04 3,947 657 221030401 440 66 221030402 727 104 221030403 295 52 221030404 1,600 272 221030405 885 163 CIRCLE NO 05 9,034 1485 221030501 990 187 221030502 898 156 221030503 262 38 221030504 3,844 583 221030505 810 135 221030506 1,360 226 221030507 870 160 CIRCLE NO 06 8,616 1347 221030601 1,111 170 221030602 2,812 425 221030603 2,621 424 221030604 156 23 221030605 1,144 188 221030606 772 117 Page 1 of 74 POPULATION AND HOUSEHOLD DETAIL FROM BLOCK TO DISTRICT LEVEL PUNJAB (KHANEWAL DISTRICT) ADMIN UNIT POPULATION NO OF HH JAHANIAN QH 169,785 25814 055/10-R PC 5,480 875 CHAK NO 053/10-R 1,932 337 221011403 1,124 197 221011404 700 124 221011405 108 16 CHAK NO 054/10-R 2,037 318 221011402 1,133 188 221011406 904 130 CHAK NO 055/10-R 1,511 220 221011401 1,511 220 056/10-R PC 6,093 890 CHAK NO 056/10-R 2,028 307 221011501 1,059 157 221011502 969 150 CHAK NO 057/10-R 2,786 -
S.R.O. No.---/2011.In Exercise Of
PART II] THE GAZETTE OF PAKISTAN, EXTRA., JANUARY 9, 2021 39 S.R.O. No.-----------/2011.In exercise of powers conferred under sub-section (3) of Section 4 of the PEMRA Ordinance 2002 (Xlll of 2002), the Pakistan Electronic Media Regulatory Authority is pleased to make and promulgate the following service regulations for appointment, promotion, termination and other terms and conditions of employment of its staff, experts, consultants, advisors etc. ISLAMABAD SATURDAY, JANUARY 9, 2021 PART II Statutory Notifications (S. R. O.) GOVERNMENT OF PAKISTAN MINISTRY OF NATIONAL FOOD SECURITY AND RESEARCH NOTIFICATION Islamabad, the 6th January, 2021 S. R. O. (17) (I)/2021.—In exercise of the powers conferred by section 15 of the Agricultural Pesticides Ordinance, 1971 (II of 1971), and in supersession of its Notifications No. S.R.O. 947(I)/2002, dated the 23rd December, 2002, S.R.O. 1251 (I)2005, dated the 15th December, 2005, S.R.O. 697(I)/2005, dated the 28th June, 2006, S.R.O. 604(I)/2007, dated the 12th June, 2007, S.R.O. 84(I)/2008, dated the 21st January, 2008, S.R.O. 02(I)/2009, dated the 1st January, 2009, S.R.O. 125(I)/2010, dated the 1st March, 2010 and S.R.O. 1096(I), dated the 2nd November, 2010. The Federal Government is pleased to appoint the following officers specified in column (2) of the Table below of Agriculture Department, Government of the Punjab, to be inspectors within the local limits specified against each in column (3) of the said Table, namely:— (39) Price: Rs. -
List of Selected Operational Branches
List of Selected Operational Branches Office S. No. Bank Name Name Tehsil District Province Address License No. Type* BRL-20115 dt: 19.02.2013 1 Soneri Bank Limited Branch Main Br. Lahore-0001 Lahore City Tehsil Lahore Punjab 87, Shahrah-E-Quaid-E-Azam, Lahore (Duplicate) Plot No: Sr-2/11/2/1, Office No: 105-108, Al-Rahim Tower, I.I. Chundrigar Road, BRL-20114 dt: 19.02.2013 2 Soneri Bank Limited Branch Main Br. Karachi-0002 Karachi South District Karachi Sindh Karachi (Duplicate) BRL-20116 dt: 19.02.2013 3 Soneri Bank Limited Branch Main Branch Peshawar Peshawar Tehsil Peshawar KPK Property No: Ca/457/3/2/87, Saddar Road, Peshawar Cantt., (Duplicate) BRL-20117 dt: 19.02.2013 4 Soneri Bank Limited Branch Main Br. Quetta-0004 Quetta City Tehsil Quetta Balochistan Ground Floor, Al-Shams Hotel, M.A. Jinnah Road, Quetta. (Duplicate) BRL-17606 dt: 03.03.2009 5 Soneri Bank Limited Branch Main Branch Mirpur Mirpur Mirpur AJK Plot No: 35/A, Munshi Sher Plaza, Allama Iqbal Road, New Mirpur Town, Mirpur (Ak) (Duplicate) 6 Soneri Bank Limited Branch Main Branch, Hyderabad.-0006 Hyderabad City Taluka Hyderabad Sindh Shop No: 6, 7 & 8, Plot No: 475, Dr. Ziauddin Road, Hyderabad BRL-13188 dt: 04.04.1993 7 Soneri Bank Limited Branch Main Guj-0007 Gujranwala City Tehsil Gujranwala Punjab Khewat & Khatooni: 78 Khasra No: 393 Near Din Plaza G. T. Road Gujranwala BRL-13192 dt: 14.07.1993 8 Soneri Bank Limited Branch Main Fsd-0008 Faisalabad City Tehsil Faisalabad Punjab Chiniot Bazar, Faisalabad BRL-13196 dt: 30.09.1993 9 Soneri Bank Limited Branch Sie Br. -
Unclaimed Deposits
Format for Reporting of Unclaimed Deposits. Instruments Surrendered to SBP Period of Surrendered (2017): Bank Code: 1279 Bank Name : THE PUNJAB PROVINCIAL COOPERATIVE BANK LIMITED DETAIL OF THE BRANCH NAME DETAIL OF THE DEPOSTOER BENEFICIARY OF THE INSTRUMENT DETAIL OF THE ACCOUNT DETAIL OF THE INSTRUMENT TRANSACTION OF THE ACCOUNT Federal. Curren NATURE PROVIN TYPE ( e.g Provincial cy Last date of OF THE INSTRUMEN CE IN CURRENT NAME OF THE (FED.PRO) (USD, Amount deposit or S.NO CNIC NO./PASSPORT DEPOSI T TYPE (DD, INSTRUME DATE OF Eqr. PKR Remarks CODE NAME WHICH NAME ADDRESS ACCOUNT NUMBER , SAVING APPICANT. In case of EUR, Outstandin withdrawal (DD- NO. T PO, FDD, NT NO. ISSUE surrendered ACCOU , FIXED PURCHASER instrument GBP, g MON-YYYY) (LCY,UF TDR, CO) NT OR ANY favoring AED, Z, FZ) OPENED OTHER) the JPY, 1 2 3 4 6 7 8 9 10 11 12 13 14 15 16 21 22 23 24 1 303 QADIR PUR RAWAN PB 36303-7334691-5 ATTA ULLAH S/O MUHAMMAD SAMREEN CHA ALI WALA, JANGAL ABDULLAH LCY 13300100008101 CURR PKR 1,000.00 1,000.00 24/10/2001 2 303 QADIR PUR RAWAN PB 32372-8106218-0 NILAM ZAFAR D/O SAMEEN AKHTER CHAH SAFO WALA MUZA LOHAR LCY 13300500012501 PLS PKR 246.06 246.06 01/01/1996 3 303 QADIR PUR RAWAN PB 36985-2147789-6 ALLAH DITTA S/O ALLAH WADAYA MUZA BALOCHAN LCY 13300500018101 PLS PKR 366.00 366.00 28/09/2002 4 216 KHANEWAL PB 36103-3091019-7 RIAZ AHMAD S/O MAHMOOD AHMAD CHAH SANDRAN WALA SHAMKOT TEHSIL KABIRWALA DISTRICT KHANEWAL. -
(Primary & Backup) for PLRA Arazi Record Centers (Arcs) in Punjab
Prequalification Document for WAN Connectivity Services (Primary & Backup) for PLRA Arazi Record Centers (ARCs) in Punjab Procurement ID: PLRA/PROC/WAN/2020 Punjab Land Records Authority, Board of Revenue, Govt of the Punjab Sep 2020 The Punjab Land Records Authority (PLRA) intends to pre-qualify reputed firms in accordance with Rule 16 of PPR-2014 for the WAN Connectivity Services (Primary & Backup) for 151 PLRA ARCs, 115 Qanungoi Sites & 145 ROD Sites, Aggregation and Services Links and Software Defined WAN (SD-WAN) Solution. Interested bidders may obtain Pre-qualification document from this office during office working hours against submission of application along with bank deposit receipt of PKR 1000/- in PLRA CPA Account 6580036040700018, Branch Code 0330 of Bank of Punjab, immediately after publication of advertisement. The response, complete in all respect, must reach this office on or before 18.09.2020 at 11:00 a.m. which shall be opened on the same day at 11:30 a.m. in the presence of authorized representatives of applicant firms, who choose to attend. Any response received after the scheduled time shall not be entertained and would be returned unopened. The Pre-qualification notice and document are available on the PPRA & PLRA websites. Bidders may obtain further information by sending email to ‘[email protected]’ or by contacting at below mentioned address. Dy. Director (Procurement), PLRA 2 km, Thokar Niaz Baig Bypass, Main Multan Road, Lahore 042-99330125-26 (Ext 212), Fax 042-99330127 Web: www.punjab-zameen.gov.pk Terms of Reference 1. Background Punjab Land Records Authority (PLRA) has established 152x Arazi Record Centers across the province for Mutation and Fard issuance. -
Roads: Summary
ROADS: SUMMARY (PKR Million) Provision for 2020-21 No. of Projection for Projection Type / Sub Sector G. Total Schemes Capital Revenue Foreign Aid 2021-22 for 2022-23 (Cap + Rev) ON-GOING SCHEMES Regular 364 13,551.619 0.000 0.000 13,551.619 35,550.000 35,889.072 Local Development 518 4,318.381 0.000 0.000 4,318.381 10,685.000 10,977.142 Programme Total: ON-GOING SCHEMES 882 17,870.000 0.000 0.000 17,870.000 46,235.000 46,866.214 NEW SCHEMES C&W 6 11,125.000 0.000 825.000 11,950.000 3,600.000 2,400.000 Total: NEW SCHEMES 6 11,125.000 0.000 825.000 11,950.000 3,600.000 2,400.000 Grand Total 888 28,995.000 0.000 825.000 29,820.000 49,835.000 49,266.214 261 Roads (PKR Million) Accum. Provision for 2020-21 MTDF Projections Throw fwd GS Scheme Information Est. Cost Exp. G.Total Beyond No Scheme ID / Approval Date / Location Cap. Rev. 2021-22 2022-23 June, 20 (Cap.+Rev.) June, 2023 1 2 3 4 5 6 7 8 9 10 ON-GOING SCHEMES Regular 2070 Rehabilitation of road from Bansra Gali 528.091 438.940 5.000 0.000 5.000 42.000 42.151 0.000 to Lawrance collage to Jhika Gali, L- 9.35 kms 01291300207 / 01-07-2013 / Rawalpindi 2071 Widening / Improvement of road from 96.764 61.826 3.000 0.000 3.000 16.000 15.938 0.000 Kotli Sattian milad Chowk to Bhan, L= 8.43 KM Tehsil Kotli Sattian 01291501812 / 01-07-2015 / Rawalpindi 2072 Construction of road Kahuti to Kulyari, 364.111 66.062 70.000 0.000 70.000 134.000 134.049 0.000 Length 31.00 Km. -
Latest Trends in Enrolment June 2015
Latest Trends in Enrolment June 2015 August 12, 2015 Agenda Detailed Nielsen analysis Observations from the field 1 Agenda Detailed Nielsen analysis Observations from the field 2 Enrolment for 5-9 year olds has increased by 1.1% School participation rate 5-9 year olds (%) 90.4% 89.3% 1.1% 88.2% 86.8% 86.1% 85.9% 84.8% Nov-11 Jun-12Nov-12 Jun-13 Nov-13 Nov-14 Jun-15 SOURCE: Nielsen Household Survey– November 2011 to June 2015 3 Enrolment ( Nov 2011 - Jun 2015) School participation rate – Urban Areas 5-9 year olds (%) 94.7% 92.9% 93.1% 93.1% 92.7% 92.6% 92.2% Nov-11 Jun-12 Nov-12 Jun-13 Nov-13 Nov-14 Jun-15 School participation rate – Rural Areas 5-9 year olds (%) 88.7% 87.8% 86.5% 84.4% 83.5% 83.2% 81.9% Nov-11 Jun-12 Nov-12 Jun-13 Nov-13 Nov-14 Jun-15 SOURCE: Nielsen Household Survey– November 2011 to June 2015 Margin of Error < 4% with a 95 % confidence interval 4 Enrolment has increased significantly over the last 4 years, with a proportionate increase observed for across all age groups Enrolment Percent Jun 2015 100% Nov 2011 90% 80% 70% 60% 50% 40% 30% 20% 10% 0% 0 4 5 6 7 8 9 10 11 12 13 14 15 16 Age No. of years SOURCE: Nielsen Household Survey November 2011; June 2015 Margin of Error < 3.1% with a 95 % confidence interval 5 35 districts in Punjab show improvement since November 2011 District % Change since November 2011 Rahim Yar Khan 15.4% Lodhran 13.1% Bahawalnagar 13.0% Bahawalpur 12.1% Pakpattan 10.9% Sheikhupura 9.9% <3.1 % Layyah 9.7% >3.1% Sahiwal 9.2% Mianwali 9.1% Sargodha 9.0% 25 districts show a % Khushab 8.2% change -
Pakistan: Southern Punjab Basic Urban Services Project
Completion Report Project Number: 23213 Loan Numbers: 2060(SF)/2061 March 2012 Pakistan: Southern Punjab Basic Urban Services Project CURRENCY EQUIVALENTS Currency Unit – Pakistan rupee/s (PRe/PRs) At Appraisal At Project Completion 14 October 2001 15 November 2011 PRs1.00 = $0.01210 $0.01166 $1.00 = PRs62.6255 PRs85.8001 ABBREVIATIONS ADB – Asian Development Bank EIRR – economic internal rate of return FIRR – financial internal rate of return ICB – international competitive bidding LGRDD – Local Government and Rural Development Department NGO – nongovernment organization PCO – project coordination office SDR – special drawing rights TMA – tehsil municipal administration UIPT – urban immovable property tax NOTES (i) The fiscal year (FY) of the government and its agencies ends on 30 June. FY before a calendar year denotes the year in which the fiscal year ends, e.g., FY2010 ends on 30 June 2010. (ii) In this report, “$” refers to US dollars. Vice-President X. Zhao, Operations 1 Director General J. Miranda, Central and West Asia Department (CWRD) Director W. Liepach, Pakistan Resident Mission, CWRD Team leader M. Shafi, Senior Project Officer, Pakistan Resident Mission, CWRD Team member N. Islam, Project Analyst, Pakistan Resident Mission, CWRD In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. CONTENTS Page BASIC DATA ii I. PROJECT DESCRIPTION 1 II. EVALUATION OF DESIGN AND IMPLEMENTATION 1 A. Relevance of Design and Formulation 1 B.