Government of India Ministry of Environment & Forests IA-I Division
Total Page:16
File Type:pdf, Size:1020Kb
Government of India Ministry of Environment & Forests IA-I Division ............ AGENDA FOR 66th MEETING OF EXPERT APPRAISAL COMMITTEE FOR RIVER VALLEY AND HYDROELECTRIC POWER PROJECTS Date : 3rd - 4th May, 2013 Venue: Annexee Conference Room Time : 10.00 a.m. SCOPE Complex Opp. Jawahar Lal Nehru Stadium Lodhi Road, New Delhi -110 003 1st Day – (3rd May, 2013) 1. Welcome by Chairman and Confirmation of Minutes of 65th Meeting held on 22-23rd March, 2013. 2. Consideration of Project Proposals for Scoping and Environment Clearance 2.1 Lower Orr Project in Shivpuri District of Madhya Pradesh by M/s. National Water Development Agency (NWDA) – For Reconsideration of TOR. 2.2 Nabha ( 4 x 250 MW) HEP in Upper Subansiri District, Arunachal Pradesh by M/s. Abir Infrastructure Pvt. Ltd – For consideration of TOR. 2.3 Teesta Low Dam-V HEP (80 MW) of WBSEDCL in District Darjeeling, West Bengal – For consideration of TOR 2.4 Panan HEP (300 MW) in North Sikkim District of Sikkim by Himagiri Hydro Energy Pvt. Ltd – For consideration of Environmental Clearance for revised capacity from 280 MW to 300 MW. 2.5 Environment Impact Assessment of and Environment Management Plan of Jeera irrigation Project – Odisha – For EC 2.6 Kalai HEP (1450 MW) project in Anjaw District of Arunachal Pradesh by M/s. Mountainfall India Pvt. Ltd – For consideration of downward revision of capacity from 1450 MW to 1304 MW & extension of validity of TOR 2.7 Hutong Stage-II HEP (1250 MW) project in Anjaw District of Arunachal Pradesh by M/s. Mountainfall India Pvt. Ltd – For consideration of downward revision of the capacity from 1250 MW to 1200 MW & Extension of validity of TOR 2nd Day – (4th May, 2013) 2.8 Lower Dnyanganga-II Minor Irrigation Project in Buldana District of Maharashtra by M/s. Minor Irrigation Division, Buldana, Water Resources Department, Government of Maharashtra – For consideration of TOR. 2.9 Pemashelpu HEP (90 MW) in West Siang District of Arunachal Pradesh by M/s. Mechuka Hydro Power Pvt. Ltd – For extension of Validity of TOR 2.10 Raigam HEP (96 MW) in Anjaw District of Arunachal Pradesh by M/s. Sai Krishnodaya Industries (P) Ltd. For consideration of TOR. 2.11 Gimliang HEP (99 MW) in Anjaw District of Arunachal Pradesh by M/s. Sai Krishnodaya Industries (P) Ltd. For consideration of TOR. 2.12 Naying HEP (1000 MW) project in West Siang District of Arunachal Pradesh by M/s. Naying DSC Power Ltd – For consideration of Environmental Clearance. 3. Any other Item with the permission of Chair Note: 1. Project Proponents are requested to attend the meeting and give a detailed presentation on their proposal(s). For Non Government Organisations, Director or above level and for proposals from the Government, the concerned Chief Engineer or above level should lead the team. 2. The project proponent may kindly treat this as official communication and may not wait for separate letter from MoEF. Although letters have been issued separately. For any clarification please contact to Mr. B. B. Barman at 24363007 and / or Dr. P. V. Subba Rao 24361669/Extn-555. 3. A short duration of Video of the project area is to be also presented before the EAC. The proponents may therefore, ensure that they carry out videography and carry with them Mobile Phone should be kept on switched off/ silent mode during the meeting. Distribution of writing pads, pens, plastic folders and unnecessary stationery items during the meeting is not permitted Please use both sides of papers, to the extent possible, for presentation material. .