World Bank Document

Total Page:16

File Type:pdf, Size:1020Kb

World Bank Document Hunan Integrated Management of Agricultural Land Pollution (P153115) Procurement Plan I. General Public Disclosure Authorized 1. Bank’s approval Date of the procurement Plan Plan [original: June 27, 2017; 1st Revision: August 17, 2017; 2nd Revision: June 8, 2018; 3rd Revision: Aug. 10, 2018; 4th Revision: April 4, 2019; 5th Revision: December 20, 2019; 6th Revision: March 4, 2020; 7th Revision: March 30, 2020; 8th Revision: April 9, 2020; 9th Revision: May 21, 2020; 10th Update: June 5, 2020] 2. Date of General Procurement Notice: August 16, 2017 3. Period covered by this procurement plan: June 2020 to December 2020 II. Goods, Works, non-consulting services and Community participation in procurement under Component 1. Public Disclosure Authorized 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Procurement Method Prior Review Threshold Procurement Method Threshold US$ US$ ICB and LIB (Goods and Non- Greater than or equal to US$ 1. All Consulting Services ) 10 million NCB (Goods and Non-Consulting Greater than or equal to US$ Greater than or equal to 2. Services ) 0.5 million 2 million Greater than or equal to US$ 3. ICB (Works) All 40 million Greater than or equal to US$ Greater than or equal to 4. NCB (Works) 0.5 million 10 million Public Disclosure Authorized Community participation in to be specified in the 5 No Threshold procurement operation manual 2. Prequalification. Bidders for _Not applicable_ shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: Detailed procedures for community participation are specified in operation manual. 4. Reference to (if any) Project Operational/Procurement Manual: Project Implementation Manual for World Bank Loan Project P153115 has been prepared by Hunan PPMO. Public Disclosure Authorized 5. Any Other Special Procurement Arrangements [including advance procurement and retroactive financing, if applicable]: None 6 Summary of the Procurement Packages planned during June 2020 to December 2020 . 1 2 3 4 5 6 7 Ref. Description Estimated Packages Domestic Review Comments No. Cost Preference by Bank US$ (yes/no) (Prior / thousand Post) Summary of the National Competitive Bidding (Works) Summary of the Shopping (Works) Summary of the National Competitive Bidding (Goods) Summary of the Shopping 82.08 2 Post (Goods) Summary of the Shopping (Non- Consultant Services) Cancellation (Works) Cancellation (Goods) III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Threshold Comments 1. Competitive Methods (Firms) Greater than or equal to US$ 1,000,000 2. Single Source (Firms) Greater than or equal to US$ 1,000,000 3. Individual Greater than or equal to US$ 300,000 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_500,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements [including advance procurement and retroactive financing, if applicable or delete if not applicable]: None 4. Consultancy Assignments with Selection Methods and Time Schedule 1 2 3 4 5 6 Estimated Review Description of Ref. No. Cost by Bank Assignment Packages Comments US$ (Prior / thousand Post) Summary of number of contracts that will be let under QCBS Summary of number of contracts that 85,075 1 IC will be let under other methods Cancellation PROCUREMENT China : Hunan Integrated Management of Agricultural Land Pollution Project PLAN General Information Country: China Bank’s Approval Date of the Original Procurement Plan: 2017-09-04 Revised Plan Date(s): (comma delineated, leave blank if none)2020-10-17 Project ID: P153115 GPN Date: 2017-08-16 Project Name: Hunan Integrated Management of Agricultural Land Pollution Project Loan / Credit No: IBRD / 87770, / Executing Agency(ies):Hunan Integrated Management of Agriculture PMO WORKS Bid Evaluation Activity Reference No. / Procurement Estimated Actual Draft Pre- Draft Bidding Loan / Credit Market Procurement Prequalification High SEA/SH Process Prequalification Specific Procurement Bidding Documents Proposal Submission Report and Contract Description Component Review Type Method Document Amount Amount qualification Document / Signed Contract No. Approach Process (Y/N) Risk Status Evaluation Report Notice / Invitation as Issued / Opening / Minutes Recommendation for Completion Type (US$) (US$) Documents Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned HNYDG001 / Construction Component 1: Under of drainage ditches, Demonstration of Risk- Request for Single Stage - One IBRD / 87770 Post Limited 495,870.00 0.00 Implementa 2017-09-15 2019-01-10 2017-11-10 2018-05-09 irrigation ditches, sand and based Agricultural Land Quotations Envelope tion gravel traps. Pollution Management. HNYXG001 / Construction Component 1: of irrigation ditches, sand Demonstration of Risk- Request for Single Stage - One IBRD / 87770 Post Limited 347,610.00 0.00 Canceled 2017-09-15 2017-11-10 2018-05-09 and gravel traps, field based Agricultural Land Quotations Envelope roads. Pollution Management. Component 1: HNYXG002 / Construction Demonstration of Risk- Request for Single Stage - One of drainage ditches, sand IBRD / 87770 Post Limited 171,190.00 0.00 Canceled 2017-09-15 2017-11-10 2018-05-09 based Agricultural Land Quotations Envelope and gravel traps. Pollution Management. HNYXG003 / Construction of irrigation ditches, Component 1: drainage ditches, sand and Demonstration of Risk- Request for Single Stage - One IBRD / 87770 Post Limited 419,250.00 0.00 Canceled 2017-09-15 2017-11-10 2018-05-09 gravel traps, ecological based Agricultural Land Quotations Envelope interception ditches and Pollution Management. pumping stations. Component 1: HNYXG004 / Construction Demonstration of Risk- Request for Single Stage - One of irrigation ditches, sand IBRD / 87770 Post Limited 60,150.00 0.00 Canceled 2017-09-15 2017-11-10 2018-05-09 based Agricultural Land Quotations Envelope and gravel traps. Pollution Management. Component 1: HNYXG005 / Construction Demonstration of Risk- Request for Single Stage - One of irrigation ditches and IBRD / 87770 Post Limited 224,030.00 0.00 Canceled 2017-09-15 2017-11-10 2018-05-09 based Agricultural Land Quotations Envelope drainage ditches. Pollution Management. Component 1: HNHYG001 / Construction Demonstration of Risk- Request for Single Stage - One of irrigation canals and IBRD / 87770 Post Limited 310,700.00 0.00 Canceled 2017-10-10 2017-12-05 2018-06-03 based Agricultural Land Quotations Envelope ditches Pollution Management. Component 1: HNHYG002 / Construction Demonstration of Risk- Request for Single Stage - One of irrigation canals and IBRD / 87770 Post Limited 105,100.00 0.00 Canceled 2017-10-10 2017-12-05 2018-06-03 based Agricultural Land Quotations Envelope ditches. Pollution Management. Component 1: HNHYG003 / Construction Demonstration of Risk- Request for Single Stage - One of irrigation canals and IBRD / 87770 Post Limited 154,210.00 0.00 Canceled 2017-10-10 2017-12-05 2018-06-03 based Agricultural Land Quotations Envelope ditches. Pollution Management. Component 1: HNHYG004 / Construction Demonstration of Risk- Request for Single Stage - One of Sand and gravel traps IBRD / 87770 Post Limited 118,340.00 0.00 Canceled 2017-10-10 2017-12-05 2018-06-03 based Agricultural Land Quotations Envelope &Field roads. Pollution Management. HNHNG001 / Construction Component 1: of irrigation system, gravel Demonstration of Risk- Single Stage - One or dirt road, Sediment IBRD / 87770 Post Request for Bids Open - National 1,048,810.00 0.00 Canceled 2019-03-01 2019-03-06 2019-04-17 2019-05-17 2019-06-21 2020-06-21 based Agricultural Land Envelope desilting and landfill in Pollution Management. Hengnan county. Page 1 HNZFG001 / Construction Component 1: of irrigation system, gravel Under Demonstration of Risk- Request for Single Stage - One or dirt road, Sediment IBRD / 87770 Post Open - National 302,990.00 0.00 Implementa 2019-03-06 2019-05-01 2019-12-27 based Agricultural Land Quotations Envelope desilting and landfill in tion Pollution Management. Zhongfang county. HNZFG002 / Construction Component 1: of irrigation system, gravel Under Demonstration of Risk- Request for Single Stage - One or dirt road, Sediment IBRD / 87770 Post Open - National 320,930.00 0.00 Implementa 2019-03-06 2019-05-01 2019-12-27 based Agricultural Land Quotations Envelope desilting and landfill in tion Pollution Management. Zhongfang county. HNLSTG001 / Construction Component 1: of irrigation system, gravel Demonstration of Risk- Single Stage - One or dirt road, Sediment IBRD / 87770 Post Request for Bids Open - National 888,370.00 0.00 Canceled 2019-03-01 2019-03-06 2019-04-17 2019-05-17 2019-06-21 2020-06-21 based Agricultural Land Envelope desilting and landfill in Pollution Management. Leng Shuitan county. HNYSG001 / Construction Component 1: of irrigation system ,gravel Under Demonstration of Risk- Request for Single Stage - One or dirt road, sediment IBRD / 87770 Post Open - National 452,330.00
Recommended publications
  • Study on the Evolution of Spatial Forms of Rural Settlements in Xiangjiang River Basin
    2019 International Conference on Informatics, Control and Robotics (ICICR 2019) ISBN: 978-1-60595-633-6 Study on the Evolution of Spatial Forms of Rural Settlements in Xiangjiang River Basin Fang LI and Shao-yao HE* School of Architecture, Hunan University, China *Corresponding author Keywords: Xiangjiang River Basin, Rural settlement, Space Form, Evolution. Abstract. The spatial pattern of rural settlements in the Xiangjiang River Basin has changed greatly in both boundary and internal spatial forms. The spatial form of rural settlements has expanded or abruptly evolved, and the internal pattern has changed to varying degrees. This is the natural environment at that time. The economic environment and the social environment are closely related. This paper summarizes the rural settlements and takes the Xiangjiang River Basin as an example. Through the literature analysis and case analysis method, the general situation of the Xiangjiang River Basin and the spatial form of rural settlements are studied. At the same time, the evolution of the settlement form of the Xiangjiang River Basin is quantified. The analysis shows the diversified settlement evolution mechanism. Finally, it discusses the future of the rural settlements in the Xiangjiang River Basin and hopes to promote the sustainable development of the village. Preface Compared with foreign countries, the domestic eye corners of rural settlements and their spatial forms are relatively late. Since the introduction of the relationship between rural settlements and the natural environment in China in the 1930s, Lin Chao studied the classification of rural settlements in 1938 and pointed out that land is closely related to the development of rural settlements.
    [Show full text]
  • Supplemental Information
    Supplemental information Table S1 Sample information for the 36 Bactrocera minax populations and 8 Bactrocera tsuneonis populations used in this study Species Collection site Code Latitude Longitude Accession number B. minax Shimen County, Changde SM 29.6536°N 111.0646°E MK121987 - City, Hunan Province MK122016 Hongjiang County, HJ 27.2104°N 109.7884°E MK122052 - Huaihua City, Hunan MK122111 Province 27.2208°N 109.7694°E MK122112 - MK122144 Jingzhou Miao and Dong JZ 26.6774°N 109.7341°E MK122145 - Autonomous County, MK122174 Huaihua City, Hunan Province Mayang Miao MY 27.8036°N 109.8247°E MK122175 - Autonomous County, MK122204 Huaihua City, Hunan Province Luodian county, Qiannan LD 25.3426°N 106.6638°E MK124218 - Buyi and Miao MK124245 Autonomous Prefecture, Guizhou Province Dongkou County, DK 27.0806°N 110.7209°E MK122205 - Shaoyang City, Hunan MK122234 Province Shaodong County, SD 27.2478°N 111.8964°E MK122235 - Shaoyang City, Hunan MK122264 Province 27.2056°N 111.8245°E MK122265 - MK122284 Xinning County, XN 26.4652°N 110.7256°E MK122022 - Shaoyang City,Hunan MK122051 Province 26.5387°N 110.7586°E MK122285 - MK122298 Baojing County, Xiangxi BJ 28.6154°N 109.4081°E MK122299 - Tujia and Miao MK122328 Autonomous Prefecture, Hunan Province 28.2802°N 109.4581°E MK122329 - MK122358 Guzhang County, GZ 28.6171°N 109.9508°E MK122359 - Xiangxi Tujia and Miao MK122388 Autonomous Prefecture, Hunan Province Luxi County, Xiangxi LX 28.2341°N 110.0571°E MK122389 - Tujia and Miao MK122407 Autonomous Prefecture, Hunan Province Yongshun County, YS 29.0023°N
    [Show full text]
  • World Bank Document
    Name of Subproject: Nuisance Free Vegetable, Changsha County Unit:Thousand Cost estimate Contract Value Actural Procurement Review by Issuing Contract Contract No. Contract Description Issuing Remarks USD method Bank of BD signing USD RMB of BD RMB Public Disclosure Authorized Public Disclosure Authorized Equivalent Equivalent Civil Works 2005 2006 Completed, with the scale Hn-1-1 GJP 80 type plastic sheds 52000m 2 4888.00 605.70 CP N 2006.9 2006.12 5516.70 incresed to 60,000 m2 U-shape canal lining 13000 m, Field roads Hn-1-2 1300.00 161.09 NCB N 2006.2 4000m. 2006.4 2006.6 3801.52 Completed Public Disclosure Authorized Public Disclosure Authorized Hn-1-3 Garden construction 2000 mu 1668.00 206.69 NCB N 2006.3 2007 Vegetable processing workshop 800 , Hn-1-1 880.00 112.82 NCB N 2007.4 2008.5 Under bidding Vegetable quality test room 300 Hn-1-2 GJP 80 type plastic sheds 42979 4039.20 517.85 NCB N 2007.7 2007.11 2008.2 3922.74 Under construction 2008 Public Disclosure Authorized Public Disclosure Authorized 2008Subtotal Goods 2005 ÃÃ ÃÃ Public Disclosure Authorized Public Disclosure Authorized Name of Subproject: Nuisance Free Vegetable, Changsha County Unit:Thousand Cost estimate Contract Value Actural Procurement Review by Issuing Contract Contract No. Contract Description Issuing Remarks USD method Bank of BD signing USD RMB of BD RMB Equivalent Equivalent 2006 Training Equipment projector 1 set,computer 1 Hn-1-4 set, printer 1 set, video camera 1 set, digital 62.00 7.68 NCB Completed copier 1 set.
    [Show full text]
  • Report on Domestic Animal Genetic Resources in China
    Country Report for the Preparation of the First Report on the State of the World’s Animal Genetic Resources Report on Domestic Animal Genetic Resources in China June 2003 Beijing CONTENTS Executive Summary Biological diversity is the basis for the existence and development of human society and has aroused the increasing great attention of international society. In June 1992, more than 150 countries including China had jointly signed the "Pact of Biological Diversity". Domestic animal genetic resources are an important component of biological diversity, precious resources formed through long-term evolution, and also the closest and most direct part of relation with human beings. Therefore, in order to realize a sustainable, stable and high-efficient animal production, it is of great significance to meet even higher demand for animal and poultry product varieties and quality by human society, strengthen conservation, and effective, rational and sustainable utilization of animal and poultry genetic resources. The "Report on Domestic Animal Genetic Resources in China" (hereinafter referred to as the "Report") was compiled in accordance with the requirements of the "World Status of Animal Genetic Resource " compiled by the FAO. The Ministry of Agriculture" (MOA) has attached great importance to the compilation of the Report, organized nearly 20 experts from administrative, technical extension, research institutes and universities to participate in the compilation team. In 1999, the first meeting of the compilation staff members had been held in the National Animal Husbandry and Veterinary Service, discussed on the compilation outline and division of labor in the Report compilation, and smoothly fulfilled the tasks to each of the compilers.
    [Show full text]
  • Chinacoalchem
    ChinaCoalChem Monthly Report Issue May. 2019 Copyright 2019 All Rights Reserved. ChinaCoalChem Issue May. 2019 Table of Contents Insight China ................................................................................................................... 4 To analyze the competitive advantages of various material routes for fuel ethanol from six dimensions .............................................................................................................. 4 Could fuel ethanol meet the demand of 10MT in 2020? 6MTA total capacity is closely promoted ....................................................................................................................... 6 Development of China's polybutene industry ............................................................... 7 Policies & Markets ......................................................................................................... 9 Comprehensive Analysis of the Latest Policy Trends in Fuel Ethanol and Ethanol Gasoline ........................................................................................................................ 9 Companies & Projects ................................................................................................... 9 Baofeng Energy Succeeded in SEC A-Stock Listing ................................................... 9 BG Ordos Started Field Construction of 4bnm3/a SNG Project ................................ 10 Datang Duolun Project Created New Monthly Methanol Output Record in Apr ........ 10 Danhua to Acquire &
    [Show full text]
  • World Bank Document
    Hunan Integrated Management of Agricultural Land Pollution (P153115) Procurement Plan I. General Public Disclosure Authorized 1. Bank’s approval Date of the procurement Plan [original: June 27, 2017; 1st Revision: August 17, 2017; 2nd Revision: June 8, 2018; 3rd Revision: Aug. 10, 2018; 4th Revision: April 4, 2019; 5th Revision: December 20, 2019; 6th Revision: March 4, 2020; 7th Revision: March 30, 2020] 2. Date of General Procurement Notice: August 16, 2017 3. Period covered by this procurement plan: March 2020 to December 2020 II. Goods, Works, non-consulting services and Community participation in procurement under Component 1. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as Public Disclosure Authorized stated in Appendix 1 to the Guidelines for Procurement: Procurement Method Prior Review Threshold Procurement Method Threshold US$ US$ ICB and LIB (Goods and Non- Greater than or equal to US$ 1. All Consulting Services ) 10 million NCB (Goods and Non-Consulting Greater than or equal to US$ Greater than or equal to 2. Services ) 0.5 million 2 million Greater than or equal to US$ 3. ICB (Works) All 40 million Greater than or equal to US$ Greater than or equal to 4. NCB (Works) 0.5 million 10 million Community participation in to be specified in the 5 No Threshold procurement Public Disclosure Authorized operation manual 2. Prequalification. Bidders for _Not applicable_ shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: Detailed procedures for community participation are specified in operation manual.
    [Show full text]
  • Composition of Garnet from the Xianghualing Skarn Sn Deposit, South China: Its Petrogenetic Significance and Exploration Potential
    minerals Article Composition of Garnet from the Xianghualing Skarn Sn Deposit, South China: Its Petrogenetic Significance and Exploration Potential Fan Yu 1, Qihai Shu 1,2,* , Xudong Niu 1, Kai Xing 1,3, Linlong Li 1,4, David R. Lentz 3 , Qingwen Zeng 1 and Wenjie Yang 1 1 State Key Laboratory of Geological Processes and Mineral Resources, School of Earth Sciences and Resources, China University of Geosciences, Beijing 100083, China; [email protected] (F.Y.); [email protected] (X.N.); [email protected] (K.X.); [email protected] (L.L.); [email protected] (Q.Z.); [email protected] (W.Y.) 2 Key Laboratory of Deep-Earth Dynamics of Ministry of Natural Resources, Chinese Academy of Geological Sciences, Beijing 100037, China 3 Department of Earth Sciences, University of New Brunswick, Fredericton, NB E3B 5A3, Canada; [email protected] 4 School of Earth and Space Sciences, Peking University, Beijing 100871, China * Correspondence: [email protected]; Tel.: +86-10-82322750 Received: 11 April 2020; Accepted: 15 May 2020; Published: 18 May 2020 Abstract: The Xianghualing skarn Sn deposit in the southwestern part of the southern Hunan Metallogenic Belt is a large Sn deposit in the Nanling area. In this paper, the garnet has been analyzed by laser ablation-inductively coupled plasma-mass spectrometry (LA-ICP-MS) to obtain the concentrations of the major and trace elements. The results reveal that the garnets from the Xianghualing deposit mainly belong to andradite-grossular (grandite) solid solution and are typically richer in Al than in Fe. They show enrichment in heavy rare earth elements (HREEs) and notably lower light rare earth elements (LREEs), and commonly negative Eu anomalies, indicative of a relatively reduced formation environment.
    [Show full text]
  • World Bank Document
    Hunan Integrated Management of Agricultural Land Pollution (P153115) Procurement Plan I. General Public Disclosure Authorized 1. Bank’s approval Date of the procurement Plan [original: June 27, 2017; 1st Revision: August 17, 2017; 2nd Revision: June 8, 2018; 3rd Revision: Aug. 10, 2018] 2. Date of General Procurement Notice: August 16, 2017 3. Period covered by this procurement plan: August 2017 to February 2019 II. Goods, Works, non-consulting services and Community participation in procurement under Component 1. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Procurement Method Prior Review Threshold Procurement Method Threshold US$ US$ Public Disclosure Authorized ICB and LIB (Goods and Non- Greater than or equal to US$ 1. All Consulting Services ) 10 million NCB (Goods and Non-Consulting Greater than or equal to US$ Greater than or equal to 2. Services ) 0.5 million 2 million Greater than or equal to US$ 3. ICB (Works) All 40 million Greater than or equal to US$ Greater than or equal to 4. NCB (Works) 0.5 million 10 million Community participation in to be specified in the 5 No Threshold procurement operation manual Public Disclosure Authorized 2. Prequalification. Bidders for _Not applicable_ shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: Detailed procedures for community participation are specified in operation manual. 4. Reference to (if any) Project Operational/Procurement Manual: Project Implementation Manual for World Bank Loan Project P153115 has been prepared by Hunan PPMO.
    [Show full text]
  • Table of Codes for Each Court of Each Level
    Table of Codes for Each Court of Each Level Corresponding Type Chinese Court Region Court Name Administrative Name Code Code Area Supreme People’s Court 最高人民法院 最高法 Higher People's Court of 北京市高级人民 Beijing 京 110000 1 Beijing Municipality 法院 Municipality No. 1 Intermediate People's 北京市第一中级 京 01 2 Court of Beijing Municipality 人民法院 Shijingshan Shijingshan District People’s 北京市石景山区 京 0107 110107 District of Beijing 1 Court of Beijing Municipality 人民法院 Municipality Haidian District of Haidian District People’s 北京市海淀区人 京 0108 110108 Beijing 1 Court of Beijing Municipality 民法院 Municipality Mentougou Mentougou District People’s 北京市门头沟区 京 0109 110109 District of Beijing 1 Court of Beijing Municipality 人民法院 Municipality Changping Changping District People’s 北京市昌平区人 京 0114 110114 District of Beijing 1 Court of Beijing Municipality 民法院 Municipality Yanqing County People’s 延庆县人民法院 京 0229 110229 Yanqing County 1 Court No. 2 Intermediate People's 北京市第二中级 京 02 2 Court of Beijing Municipality 人民法院 Dongcheng Dongcheng District People’s 北京市东城区人 京 0101 110101 District of Beijing 1 Court of Beijing Municipality 民法院 Municipality Xicheng District Xicheng District People’s 北京市西城区人 京 0102 110102 of Beijing 1 Court of Beijing Municipality 民法院 Municipality Fengtai District of Fengtai District People’s 北京市丰台区人 京 0106 110106 Beijing 1 Court of Beijing Municipality 民法院 Municipality 1 Fangshan District Fangshan District People’s 北京市房山区人 京 0111 110111 of Beijing 1 Court of Beijing Municipality 民法院 Municipality Daxing District of Daxing District People’s 北京市大兴区人 京 0115
    [Show full text]
  • World Bank Document
    Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Attached Figure 1-1 Diagrammatic Sketch of Location of Demonstration Area and Distribution of Environmental Sensitive Points and Scope of Evaluation in Baojing County 1 Public Disclosure Authorized Attached Figure 1-2 Diagrammatic Sketch of Location of Demonstration Area and Distribution of Environmental Sensitive Points and Scope of Evaluation in Jishou City 2 Attached Figure 1-3 Diagrammatic Sketch of Location of Demonstration Area and Distribution of Environmental Sensitive Points and Scope of Evaluation in Yongshun County 3 Diagrammatic Sketch of Location of Demonstration Area of Integrated Management of Agricultural Land Pollution Project with World Bank Loan in Huayuan County Attached Figure 1-4 Diagrammatic Sketch of Location of Demonstration Area and Distribution of Environmental Sensitive Points and Scope of Evaluation in Huayuan County 4 Attached Figure 1-5 Diagrammatic Sketch of Location of Demonstration Area and Distribution of Environmental Sensitive Points and Scope of Evaluation in Cili County 5 Attached Figure 1-6 Diagrammatic Sketch of Location of Demonstration Area and Distribution of Environmental Sensitive Points and Scope of Evaluation in Huayuan County 6 Attached Figure 1-7 Diagrammatic Sketch of Location of Demonstration Area and Distribution of Environmental Sensitive Points and Scope of Evaluation in Anhua County 7 Schematic Diagram for Demonstration Areas of Integrated Management of Agricultural Land Pollution in Hengnan County
    [Show full text]
  • Annual Report 2011 Zijin Mining Group Co., Ltd
    Contents Corporate Information 2 Financial Highlights 4 Chairman’s Statement 7 Management Discussion and Analysis 26 Directors, Supervisors and Senior Management 38 Report of the Directors 43 Report of the Supervisory Committee 78 Corporate Governance Report 85 Independent Auditors’ Report 95 Consolidated Balance Sheet 97 Consolidated Income Statement 99 Consolidated Statement of Changes in Equity 100 Consolidated Statement of Cash Flows 102 Balance Sheet 104 Income Statement 106 Statement of Changes in Equity 107 Statement of Cash Flows 109 Notes to Financial Statements 111 Supplementary Information 345 Zijin Mining Group Co., Ltd. Corporate Information EXECUTIVE DIRECTORS PRINCIPAL PLACE OF BUSINESS IN HONG KONG Chen Jinghe (Chairman) Luo Yingnan (President) Suites 3712-15, 37/F., Tower 2, Times Square, Liu Xiaochu (Resigned on 28 March 2012) 1 Matheson Street, Causeway Bay, Lan Fusheng Hong Kong Huang Xiaodong Zou Laichang LEGAL ADDRESS AND PRINCIPAL PLACE OF BUSINESS IN THE PRC NON-EXECUTIVE DIRECTOR 1 Zijin Road, Shanghang County, Peng Jiaqing Fujian Province, The PRC INDEPENDENT NON-EXECUTIVE DIRECTORS LEGAL CONSULTANT OF THE COMPANY Su Congfu (HONG KONG LAWS) Chen Yuchuan Lin Yongjing Li & Partners Wang Xiaojun AUDITORS SUPERVISORS PRC Auditors: Lin Shuiqing Ernst & Young Hua Ming Xu Qiang Lin Xinxi HONG KONG H SHARE REGISTRAR AND Zhang Yumin TRANSFER OFFICE Liu Xianhua Computershare Hong Kong Investor Services Limited COMPANY SECRETARY Shops 1712-1716, 17th Floor, Hopewell Centre, 183 Queen’s Road East, Wanchai, Fan Cheung Man Hong Kong AUDIT AND INTERNAL CONTROL WEBSITE COMMITTEE www.zjky.cn Lin Yongjing Su Congfu STOCK CODE Chen Yuchuan Wang Xiaojun 2899 Peng Jiaqing Chen Jinghe (Chairman) (Appointed on 27 April 2011) Luo Yingnan (President) (Appointed on 27 April 2011) Liu Xiaochu (Resigned on 27 April 2011) AUTHORISED REPRESENTATIVES Chen Jinghe Liu Xiaochu (Resigned on 28 March 2012) Lan Fusheng (Appointed on 28 March 2012) 2 Annual Report 2011 Zijin Mining Group Co., Ltd.
    [Show full text]
  • Tea-Picking Women in Imperial China
    Beyond the Paradigm: Tea-Picking Women in Imperial China Lu, Weijing. Journal of Women's History, Volume 15, Number 4, Winter 2004, pp. 19-46 (Article) Published by The Johns Hopkins University Press DOI: 10.1353/jowh.2004.0015 For additional information about this article http://muse.jhu.edu/journals/jowh/summary/v015/15.4lu.html Access provided by Scarsdale High School (3 Apr 2013 11:11 GMT) 2004 WEIJING LU 19 BEYOND THE PARADIGM Tea-picking Women in Imperial China Weijing Lu This article explores the tension between women’s labor and tea-pick- ing through the Confucian norm of “womanly work.” Using local gaz- etteer and poetry as major sources, it examines the economic roles and the lives of women tea-pickers over the course of China’s imperial his- tory. It argues that women’s work in imperial China took on different meanings as ecological settings, economic resources, and social class shifted. The very commodity—tea—that these women produced also shaped portrayals of their labor, turning them into romantic objects and targets of gossip. But women tea-pickers also appeared as good women with moral dignity, suggesting the fundamental importance of industry and diligence as female virtues in imperial China. n imperial China, “men plow and women weave” (nangeng nüzhi) stood I as a canonical gender division of labor. Under this model, a man’s work place was in the fields: he cultivated the land and tended the crops, grow- ing food; a woman labored at home, where she sat at her spindle and loom, making cloth.
    [Show full text]