World Bank Document

Total Page:16

File Type:pdf, Size:1020Kb

World Bank Document Hunan Integrated Management of Agricultural Land Pollution (P153115) Procurement Plan I. General Public Disclosure Authorized 1. Bank’s approval Date of the procurement Plan [original: June 27, 2017; 1st Revision: August 17, 2017; 2nd Revision: June 8, 2018; 3rd Revision: Aug. 10, 2018; 4th Revision: April 4, 2019; 5th Revision: December 20, 2019; 6th Revision: March 4, 2020] 2. Date of General Procurement Notice: August 16, 2017 3. Period covered by this procurement plan: March 2020 to December 2020 II. Goods, Works, non-consulting services and Community participation in procurement under Component 1. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Public Disclosure Authorized Procurement Method Prior Review Threshold Procurement Method Threshold US$ US$ ICB and LIB (Goods and Non- Greater than or equal to US$ 1. All Consulting Services ) 10 million NCB (Goods and Non-Consulting Greater than or equal to US$ Greater than or equal to 2. Services ) 0.5 million 2 million Greater than or equal to US$ 3. ICB (Works) All 40 million Greater than or equal to US$ Greater than or equal to 4. NCB (Works) 0.5 million 10 million Community participation in to be specified in the 5 No Threshold procurement operation manual Public Disclosure Authorized 2. Prequalification. Bidders for _Not applicable_ shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: Detailed procedures for community participation are specified in operation manual. 4. Reference to (if any) Project Operational/Procurement Manual: Project Implementation Manual for World Bank Loan Project P153115 has been prepared by Hunan PPMO. 5. Any Other Special Procurement Arrangements [including advance procurement and Public Disclosure Authorized retroactive financing, if applicable]: None 6 Summary of the Procurement Packages planned during March 2020 to December 2020 . 1 2 3 4 5 6 7 Ref. Description Estimated Packages Domestic Review Comments No. Cost Preference by Bank US$ (yes/no) (Prior / thousand Post) Summary of the National Competitive Bidding (Works) Summary of the Shopping 1433.28 3 Post (Works) Summary of the Shopping 149.25 2 Post (Goods) Summary of the Shopping (Non- 504.47 3 Post Consultant Services) Cancellation (Works) Cancellation (Goods) III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Threshold Comments 1. Competitive Methods (Firms) Greater than or equal to US$ 1,000,000 2. Single Source (Firms) Greater than or equal to US$ 1,000,000 3. Individual Greater than or equal to US$ 300,000 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_500,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements [including advance procurement and retroactive financing, if applicable or delete if not applicable]: None 4. Consultancy Assignments with Selection Methods and Time Schedule 1 2 3 4 5 6 Estimated Review Description of Ref. No. Cost by Bank Assignment Packages Comments US$ (Prior / thousand Post) Summary of number of contracts that will be let under QCBS Summary of number of contracts that 416.43 5 Post will be let under other methods Cancellation PROCUREMENT China : Hunan Integrated Management of Agricultural Land Pollution Project PLAN General Information Country: China Bank’s Approval Date of the Original Procurement Plan: 2017-09-04 Revised Plan Date(s): (comma delineated, leave blank if none)2020-03-17 Project ID: P153115 GPN Date: 2017-08-16 Project Name: Hunan Integrated Management of Agricultural Land Pollution Project Loan / Credit No: IBRD / 87770, / Executing Agency(ies):Hunan Integrated Management of Agriculture PMO WORKS Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual HNYDG001 / Construction Component 1: Demonstration Under of drainage ditches, Request for Single Stage - One IBRD / 87770 of Risk-based Agricultural Post Limited 495,870.00 0.00 Implementati 2017-09-15 2019-01-10 2017-11-10 2018-05-09 irrigation ditches, sand and Quotations Envelope Land Pollution Management. on gravel traps. HNYXG001 / Construction Component 1: Demonstration Request for Single Stage - One of irrigation ditches, sand IBRD / 87770 of Risk-based Agricultural Post Limited 347,610.00 0.00 Canceled 2017-09-15 2017-11-10 2018-05-09 Quotations Envelope and gravel traps, field roads. Land Pollution Management. HNYXG002 / Construction Component 1: Demonstration Request for Single Stage - One of drainage ditches, sand IBRD / 87770 of Risk-based Agricultural Post Limited 171,190.00 0.00 Canceled 2017-09-15 2017-11-10 2018-05-09 Quotations Envelope and gravel traps. Land Pollution Management. HNYXG003 / Construction of irrigation ditches, Component 1: Demonstration drainage ditches, sand and Request for Single Stage - One IBRD / 87770 of Risk-based Agricultural Post Limited 419,250.00 0.00 Canceled 2017-09-15 2017-11-10 2018-05-09 gravel traps, ecological Quotations Envelope Land Pollution Management. interception ditches and pumping stations. HNYXG004 / Construction Component 1: Demonstration Request for Single Stage - One of irrigation ditches, sand IBRD / 87770 of Risk-based Agricultural Post Limited 60,150.00 0.00 Canceled 2017-09-15 2017-11-10 2018-05-09 Quotations Envelope and gravel traps. Land Pollution Management. HNYXG005 / Construction Component 1: Demonstration Request for Single Stage - One of irrigation ditches and IBRD / 87770 of Risk-based Agricultural Post Limited 224,030.00 0.00 Canceled 2017-09-15 2017-11-10 2018-05-09 Quotations Envelope drainage ditches. Land Pollution Management. HNHYG001 / Construction Component 1: Demonstration Request for Single Stage - One of irrigation canals and IBRD / 87770 of Risk-based Agricultural Post Limited 310,700.00 0.00 Canceled 2017-10-10 2017-12-05 2018-06-03 Quotations Envelope ditches Land Pollution Management. HNHYG002 / Construction Component 1: Demonstration Request for Single Stage - One of irrigation canals and IBRD / 87770 of Risk-based Agricultural Post Limited 105,100.00 0.00 Canceled 2017-10-10 2017-12-05 2018-06-03 Quotations Envelope ditches. Land Pollution Management. HNHYG003 / Construction Component 1: Demonstration Request for Single Stage - One of irrigation canals and IBRD / 87770 of Risk-based Agricultural Post Limited 154,210.00 0.00 Canceled 2017-10-10 2017-12-05 2018-06-03 Quotations Envelope ditches. Land Pollution Management. HNHYG004 / Construction Component 1: Demonstration Request for Single Stage - One of Sand and gravel traps IBRD / 87770 of Risk-based Agricultural Post Limited 118,340.00 0.00 Canceled 2017-10-10 2017-12-05 2018-06-03 Quotations Envelope &Field roads. Land Pollution Management. Page 1 HNXXHYG001 / Construction of irrigation Component 1: Demonstration Pending Request for Single Stage - One system, gravel or dirt road, IBRD / 87770 of Risk-based Agricultural Post Open - National 316,190.00 0.00 Implementati 2019-03-06 2019-05-01 2019-10-28 Quotations Envelope Sediment desilting and Land Pollution Management. on landfill in Huayuan county. HNXXHYG002 / Construction of irrigation Component 1: Demonstration Pending Request for Single Stage - One system, gravel or dirt road, IBRD / 87770 of Risk-based Agricultural Post Open - National 218,810.00 0.00 Implementati 2019-03-06 2019-05-01 2019-10-28 Quotations Envelope Sediment desilting and Land Pollution Management. on landfill in Huayuan county. HNHNG001 / Construction of irrigation system, gravel Component 1: Demonstration Single Stage - One or dirt road, Sediment IBRD / 87770 of Risk-based Agricultural Post Request for Bids Open - National 1,048,810.00 0.00 Canceled 2019-03-01 2019-03-06 2019-04-17 2019-05-17 2019-06-21 2020-06-21 Envelope desilting and landfill in Land Pollution Management. Hengnan county. HNZFG001 / Construction of irrigation system, gravel Component 1: Demonstration Pending Request for Single Stage - One or dirt road, Sediment IBRD / 87770 of Risk-based Agricultural Post Open - National 302,990.00 0.00 Implementati 2019-03-06 2019-05-01 2019-12-27 Quotations Envelope desilting and landfill in Land Pollution Management. on Zhongfang county. HNZFG002 / Construction of irrigation system, gravel Component 1: Demonstration Pending Request for Single Stage - One or dirt road, Sediment IBRD / 87770 of Risk-based Agricultural Post Open - National 320,930.00 0.00 Implementati 2019-03-06 2019-05-01 2019-12-27 Quotations Envelope desilting and landfill in Land Pollution Management. on Zhongfang county. HNLSTG001 / Construction of irrigation
Recommended publications
  • World Bank Document
    INTEGRATED SAFEGUARDS DATA SHEET IMPLEMENTATION STAGE . Public Disclosure Authorized Report No.: 135491 . Date ISDS Prepared/Updated: 18-Dec-2018 I. BASIC INFORMATION 1. Basic Project Data Country: China Project ID: P153115 Project Name: Hunan Integrated Management of Agricultural Land Pollution Project (P153115) Task Team Leader(s): Wendao Cao Board Approval Date: 22-Aug-2017 Public Disclosure Authorized Managing Unit: GEN2A Is this project processed under OP 8.50 (Emergency Recovery) or OP No 8.00 (Rapid Response to Crises and Emergencies)? Project Financing Data (in USD Million) Total Bank Total Project Cost: 111.94 100.00 Financing: Financing Gap: 0.00 Financing Source Amount Borrower 11.94 International Bank for Reconstruction and Development 100.00 Public Disclosure Authorized Total 111.94 Environmental Category: A - Full Assessment Is this a Repeater project? No Is this a Transferred No project? . 2. Project Development Objective(s) The project development objective is to demonstrate a risk-based integrated approach to managing heavy metal pollution in agricultural lands for safety of agricultural production areas in selected Public Disclosure Authorized counties in Hunan. 3. Project Description Component 1: Demonstration of Risk-based Agricultural Land Pollution Management. This component aims to demonstrate the risk-based approach to reducing heavy metal levels, notably Cd, in crops and soil at demonstration areas. It will finance implementation of site-specific demonstration plans (to be approved by local agricultural bureaus)
    [Show full text]
  • Study on the Evolution of Spatial Forms of Rural Settlements in Xiangjiang River Basin
    2019 International Conference on Informatics, Control and Robotics (ICICR 2019) ISBN: 978-1-60595-633-6 Study on the Evolution of Spatial Forms of Rural Settlements in Xiangjiang River Basin Fang LI and Shao-yao HE* School of Architecture, Hunan University, China *Corresponding author Keywords: Xiangjiang River Basin, Rural settlement, Space Form, Evolution. Abstract. The spatial pattern of rural settlements in the Xiangjiang River Basin has changed greatly in both boundary and internal spatial forms. The spatial form of rural settlements has expanded or abruptly evolved, and the internal pattern has changed to varying degrees. This is the natural environment at that time. The economic environment and the social environment are closely related. This paper summarizes the rural settlements and takes the Xiangjiang River Basin as an example. Through the literature analysis and case analysis method, the general situation of the Xiangjiang River Basin and the spatial form of rural settlements are studied. At the same time, the evolution of the settlement form of the Xiangjiang River Basin is quantified. The analysis shows the diversified settlement evolution mechanism. Finally, it discusses the future of the rural settlements in the Xiangjiang River Basin and hopes to promote the sustainable development of the village. Preface Compared with foreign countries, the domestic eye corners of rural settlements and their spatial forms are relatively late. Since the introduction of the relationship between rural settlements and the natural environment in China in the 1930s, Lin Chao studied the classification of rural settlements in 1938 and pointed out that land is closely related to the development of rural settlements.
    [Show full text]
  • World Bank Document
    Name of Subproject: Nuisance Free Vegetable, Changsha County Unit:Thousand Cost estimate Contract Value Actural Procurement Review by Issuing Contract Contract No. Contract Description Issuing Remarks USD method Bank of BD signing USD RMB of BD RMB Public Disclosure Authorized Public Disclosure Authorized Equivalent Equivalent Civil Works 2005 2006 Completed, with the scale Hn-1-1 GJP 80 type plastic sheds 52000m 2 4888.00 605.70 CP N 2006.9 2006.12 5516.70 incresed to 60,000 m2 U-shape canal lining 13000 m, Field roads Hn-1-2 1300.00 161.09 NCB N 2006.2 4000m. 2006.4 2006.6 3801.52 Completed Public Disclosure Authorized Public Disclosure Authorized Hn-1-3 Garden construction 2000 mu 1668.00 206.69 NCB N 2006.3 2007 Vegetable processing workshop 800 , Hn-1-1 880.00 112.82 NCB N 2007.4 2008.5 Under bidding Vegetable quality test room 300 Hn-1-2 GJP 80 type plastic sheds 42979 4039.20 517.85 NCB N 2007.7 2007.11 2008.2 3922.74 Under construction 2008 Public Disclosure Authorized Public Disclosure Authorized 2008Subtotal Goods 2005 ÃÃ ÃÃ Public Disclosure Authorized Public Disclosure Authorized Name of Subproject: Nuisance Free Vegetable, Changsha County Unit:Thousand Cost estimate Contract Value Actural Procurement Review by Issuing Contract Contract No. Contract Description Issuing Remarks USD method Bank of BD signing USD RMB of BD RMB Equivalent Equivalent 2006 Training Equipment projector 1 set,computer 1 Hn-1-4 set, printer 1 set, video camera 1 set, digital 62.00 7.68 NCB Completed copier 1 set.
    [Show full text]
  • Report on Domestic Animal Genetic Resources in China
    Country Report for the Preparation of the First Report on the State of the World’s Animal Genetic Resources Report on Domestic Animal Genetic Resources in China June 2003 Beijing CONTENTS Executive Summary Biological diversity is the basis for the existence and development of human society and has aroused the increasing great attention of international society. In June 1992, more than 150 countries including China had jointly signed the "Pact of Biological Diversity". Domestic animal genetic resources are an important component of biological diversity, precious resources formed through long-term evolution, and also the closest and most direct part of relation with human beings. Therefore, in order to realize a sustainable, stable and high-efficient animal production, it is of great significance to meet even higher demand for animal and poultry product varieties and quality by human society, strengthen conservation, and effective, rational and sustainable utilization of animal and poultry genetic resources. The "Report on Domestic Animal Genetic Resources in China" (hereinafter referred to as the "Report") was compiled in accordance with the requirements of the "World Status of Animal Genetic Resource " compiled by the FAO. The Ministry of Agriculture" (MOA) has attached great importance to the compilation of the Report, organized nearly 20 experts from administrative, technical extension, research institutes and universities to participate in the compilation team. In 1999, the first meeting of the compilation staff members had been held in the National Animal Husbandry and Veterinary Service, discussed on the compilation outline and division of labor in the Report compilation, and smoothly fulfilled the tasks to each of the compilers.
    [Show full text]
  • Composition of Garnet from the Xianghualing Skarn Sn Deposit, South China: Its Petrogenetic Significance and Exploration Potential
    minerals Article Composition of Garnet from the Xianghualing Skarn Sn Deposit, South China: Its Petrogenetic Significance and Exploration Potential Fan Yu 1, Qihai Shu 1,2,* , Xudong Niu 1, Kai Xing 1,3, Linlong Li 1,4, David R. Lentz 3 , Qingwen Zeng 1 and Wenjie Yang 1 1 State Key Laboratory of Geological Processes and Mineral Resources, School of Earth Sciences and Resources, China University of Geosciences, Beijing 100083, China; [email protected] (F.Y.); [email protected] (X.N.); [email protected] (K.X.); [email protected] (L.L.); [email protected] (Q.Z.); [email protected] (W.Y.) 2 Key Laboratory of Deep-Earth Dynamics of Ministry of Natural Resources, Chinese Academy of Geological Sciences, Beijing 100037, China 3 Department of Earth Sciences, University of New Brunswick, Fredericton, NB E3B 5A3, Canada; [email protected] 4 School of Earth and Space Sciences, Peking University, Beijing 100871, China * Correspondence: [email protected]; Tel.: +86-10-82322750 Received: 11 April 2020; Accepted: 15 May 2020; Published: 18 May 2020 Abstract: The Xianghualing skarn Sn deposit in the southwestern part of the southern Hunan Metallogenic Belt is a large Sn deposit in the Nanling area. In this paper, the garnet has been analyzed by laser ablation-inductively coupled plasma-mass spectrometry (LA-ICP-MS) to obtain the concentrations of the major and trace elements. The results reveal that the garnets from the Xianghualing deposit mainly belong to andradite-grossular (grandite) solid solution and are typically richer in Al than in Fe. They show enrichment in heavy rare earth elements (HREEs) and notably lower light rare earth elements (LREEs), and commonly negative Eu anomalies, indicative of a relatively reduced formation environment.
    [Show full text]
  • World Bank Document
    Hunan Integrated Management of Agricultural Land Pollution (P153115) Procurement Plan I. General Public Disclosure Authorized 1. Bank’s approval Date of the procurement Plan [original: June 27, 2017; 1st Revision: August 17, 2017; 2nd Revision: June 8, 2018; 3rd Revision: Aug. 10, 2018] 2. Date of General Procurement Notice: August 16, 2017 3. Period covered by this procurement plan: August 2017 to February 2019 II. Goods, Works, non-consulting services and Community participation in procurement under Component 1. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Procurement Method Prior Review Threshold Procurement Method Threshold US$ US$ Public Disclosure Authorized ICB and LIB (Goods and Non- Greater than or equal to US$ 1. All Consulting Services ) 10 million NCB (Goods and Non-Consulting Greater than or equal to US$ Greater than or equal to 2. Services ) 0.5 million 2 million Greater than or equal to US$ 3. ICB (Works) All 40 million Greater than or equal to US$ Greater than or equal to 4. NCB (Works) 0.5 million 10 million Community participation in to be specified in the 5 No Threshold procurement operation manual Public Disclosure Authorized 2. Prequalification. Bidders for _Not applicable_ shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: Detailed procedures for community participation are specified in operation manual. 4. Reference to (if any) Project Operational/Procurement Manual: Project Implementation Manual for World Bank Loan Project P153115 has been prepared by Hunan PPMO.
    [Show full text]
  • Table of Codes for Each Court of Each Level
    Table of Codes for Each Court of Each Level Corresponding Type Chinese Court Region Court Name Administrative Name Code Code Area Supreme People’s Court 最高人民法院 最高法 Higher People's Court of 北京市高级人民 Beijing 京 110000 1 Beijing Municipality 法院 Municipality No. 1 Intermediate People's 北京市第一中级 京 01 2 Court of Beijing Municipality 人民法院 Shijingshan Shijingshan District People’s 北京市石景山区 京 0107 110107 District of Beijing 1 Court of Beijing Municipality 人民法院 Municipality Haidian District of Haidian District People’s 北京市海淀区人 京 0108 110108 Beijing 1 Court of Beijing Municipality 民法院 Municipality Mentougou Mentougou District People’s 北京市门头沟区 京 0109 110109 District of Beijing 1 Court of Beijing Municipality 人民法院 Municipality Changping Changping District People’s 北京市昌平区人 京 0114 110114 District of Beijing 1 Court of Beijing Municipality 民法院 Municipality Yanqing County People’s 延庆县人民法院 京 0229 110229 Yanqing County 1 Court No. 2 Intermediate People's 北京市第二中级 京 02 2 Court of Beijing Municipality 人民法院 Dongcheng Dongcheng District People’s 北京市东城区人 京 0101 110101 District of Beijing 1 Court of Beijing Municipality 民法院 Municipality Xicheng District Xicheng District People’s 北京市西城区人 京 0102 110102 of Beijing 1 Court of Beijing Municipality 民法院 Municipality Fengtai District of Fengtai District People’s 北京市丰台区人 京 0106 110106 Beijing 1 Court of Beijing Municipality 民法院 Municipality 1 Fangshan District Fangshan District People’s 北京市房山区人 京 0111 110111 of Beijing 1 Court of Beijing Municipality 民法院 Municipality Daxing District of Daxing District People’s 北京市大兴区人 京 0115
    [Show full text]
  • World Bank Document
    Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Attached Figure 1-1 Diagrammatic Sketch of Location of Demonstration Area and Distribution of Environmental Sensitive Points and Scope of Evaluation in Baojing County 1 Public Disclosure Authorized Attached Figure 1-2 Diagrammatic Sketch of Location of Demonstration Area and Distribution of Environmental Sensitive Points and Scope of Evaluation in Jishou City 2 Attached Figure 1-3 Diagrammatic Sketch of Location of Demonstration Area and Distribution of Environmental Sensitive Points and Scope of Evaluation in Yongshun County 3 Diagrammatic Sketch of Location of Demonstration Area of Integrated Management of Agricultural Land Pollution Project with World Bank Loan in Huayuan County Attached Figure 1-4 Diagrammatic Sketch of Location of Demonstration Area and Distribution of Environmental Sensitive Points and Scope of Evaluation in Huayuan County 4 Attached Figure 1-5 Diagrammatic Sketch of Location of Demonstration Area and Distribution of Environmental Sensitive Points and Scope of Evaluation in Cili County 5 Attached Figure 1-6 Diagrammatic Sketch of Location of Demonstration Area and Distribution of Environmental Sensitive Points and Scope of Evaluation in Huayuan County 6 Attached Figure 1-7 Diagrammatic Sketch of Location of Demonstration Area and Distribution of Environmental Sensitive Points and Scope of Evaluation in Anhua County 7 Schematic Diagram for Demonstration Areas of Integrated Management of Agricultural Land Pollution in Hengnan County
    [Show full text]
  • Hunan Integrated Management of Contaminated Agricultural Land in Yongxing County with World Bank Loan
    SFG2651 V2 The People’s Republic of China World Bank Public Disclosure Authorized Public Disclosure Authorized Hunan Integrated Management of Contaminated Agricultural Land in Yongxing County with World Bank Loan Environmental and Social Impact Public Disclosure Authorized Assessment (ESIA) Public Disclosure Authorized Foreign Economic and Technical Cooperation Center of Hunan Agricultural Commission Hunan Research Institute for Nonferrous Metals January 2017 Project name: Hunan Integrated Management of Contaminated Agricultural Land in Yongxing County with World Bank Loan Client: Foreign Economic and Technical Cooperation Center of Hunan Agricultural Commission Assessment unit: Hunan Research Institute for Nonferrous Metals Institute Qualification certificate No.: G.H.P.Z.Y.Zi No. 2711 Institute Director: Chen Wei Project director: Ouyang Kun Project technical directors: Wang Wei and Wang Ying Project compilers: Xiang Qiulai, Liu Jun, Yao Hui, Yuan Cuiyu, Xun Zhou, Wu Huan and Tang Jinyao Contents Chapter 1 Project Overview ............................................................................................................. 1 1.1 Project background .................................................................................................................... 1 1.2 Lessons learned from similar projects ....................................................................................... 2 1.3 Category and characteristics of the project ............................................................................... 3 1.4
    [Show full text]
  • World Bank Document
    Name of Subproject: Nuisance Free Vegetable, Changsha County Unit:Thousand Cost estimate Contract Value Actural Procurement Review by Issuing Contract Contract No. Contract Description Issuing Remarks USD method Bank of BD signing USD RMB of BD RMB Public Disclosure Authorized Public Disclosure Authorized Equivalent Equivalent Civil Works 2005 2006 Completed, with the scale Hn-1-1 GJP 80 type plastic sheds 52000m 2 4888.00 605.70 CP N 2006.9 2006.12 5516.70 incresed to 60,000 m2 U-shape canal lining 13000 m, Field roads Hn-1-2 1300.00 161.09 NCB N 2006.2 4000m. 2006.4 2006.6 3801.52 Completed Public Disclosure Authorized Public Disclosure Authorized Hn-1-3 Garden construction 2000 mu 1668.00 206.69 NCB N 2006.3 2007 Vegetable processing workshop 800 , Hn-1-1 880.00 112.82 NCB N 2007.4 2008.5 Under bidding Vegetable quality test room 300 Hn-1-2 GJP 80 type plastic sheds 42979 4039.20 517.85 NCB N 2007.7 2007.11 2008.2 3922.74 Under construction 2008 Public Disclosure Authorized Public Disclosure Authorized 2008Subtotal Goods 2005 ÃÃ ÃÃ Public Disclosure Authorized Public Disclosure Authorized Name of Subproject: Nuisance Free Vegetable, Changsha County Unit:Thousand Cost estimate Contract Value Actural Procurement Review by Issuing Contract Contract No. Contract Description Issuing Remarks USD method Bank of BD signing USD RMB of BD RMB Equivalent Equivalent 2006 Training Equipment projector 1 set,computer 1 Hn-1-4 set, printer 1 set, video camera 1 set, digital 62.00 7.68 NCB Completed copier 1 set.
    [Show full text]
  • Analysis for Enterprise Financial Distress in Southern
    Advances in Intelligent Systems Research, volume 156 7th International Conference on Management, Education and Information (MEICI 2017) Analysis for Enterprise Financial Distress in Southern Hunan Province and Its Countermeasures ---Case Study on Jingui Silver Industry and Hunan Chendian International Yuan Xiao, Likun Zhou and Hui Zeng Xiangnan University Chenzhou,China [email protected] Keywords: Southern Hunan Province; financial distress; Jingui Silver Industry; Hunan Chendian International Abstract. Since the outbreak of global financial crisis caused by the sub-prime crisis in the United States, the world economy is still at the recovery phase. China has also been deeply influenced. In recent years, China's GDP is growing up slowly, while the general economy is falling down. Under such big market environment, many listed companies are facing with the ST circumstances in terms of finance. Of course, the financial distress of a company may not only be influenced by external environment, but also many other internal reasons. Therefore, in order to help companies get out of the distress, it is extremely important to analyze the financial distress. Taking Jingui Silver Industry and Hunan Chendian International as objects, this paper analyzes the enterprise financial distress in Southern Hunan Province and its countermeasures through extracting the financial statement data analysis in 2015-2016. Introduction From Beaver's[1] first use of single variable financial distress prediction model in the 1960s to Altman's[2] multivariable financial distress prediction model, and from Martin's[3] establishment of Logistic model for the first time to frequent application of artificial neural nets and genetic algorithm, people's effectiveness and accuracy for analyzing financial distress has been continuously improved.
    [Show full text]
  • Content ICMS 9-1-MS
    50 Send Orders for Reprints to [email protected] Innovations in Corrosion and Materials Science, 2019, 9, 50-59 RESEARCH ARTICLE ISSN: 2352-0949 eISSN: 2352-0957 Formation of Corrosion Resistant Hard Coating of LiTaO3 by Anodizing in Molten LiNO3 Likun Hu1, Sicheng Yuan1, Panping Xie1, Dengfeng Xu2, Zhi Peng2, Axi Xie3 and Feng Zheng1,2,* 1School of Materials Science and Engineering, Central South University, Hunan Changsha, 410083, P.R. China; 2Changsha South Tantalum Niobium Co., Ltd, Hunan Changsha, 410083, P.R. China; 3No.75 East Renmin Road, Chengguan town, Yongxing County, Hunan Chenzhou, 423301, P.R. China. Abstract: Background: Lithium tantalate (LiTaO3) thin film was synthesized and in situ coated on tantalum substrate via anodic oxidation. Methods: The effects of temperature, voltage and time on composition, morphology and hardness of film were investigated by X-ray diffraction (XRD), scanning electron microscopy (SEM) and Vick- ers hardness, respectively. A R T I C L E H I S T O R Y Results: Our results showed that surface hardness of all coated samples has been increased compared with that of pure tantalum. The value of hardness was found to gradually increase with temperature, Received: June 28, 2018 Revised: December 3, 2018 voltage and reaction time of the coating process. Selected specimens, after coating, were immersed Accepted: January 30, 2019 into 10 wt% NaOH solution at 50oC for 96h to explore their anti-corrosion performance. Immersing DOI: results indicated that LiTaO3 coated samples have a smaller mass loss and corrosion rate compared 10.2174/2352094909666190211125527 to those of pure Ta substrate.
    [Show full text]