DETAIL POSITION FOR PENDING CASES OF TRACK CROSSING AS ON 11/05/2015 Sl. Divn. State Block section Location in Km. Crossing Size of crossing Purpose of crossing Sponsoring Date of Present status Crucial Target date Remarks No. Authority/Organisation receipt of dates for request finalisation of the case

1 2 3 4 5 6 7 8 9 10 11 12 13 14 1 DNR Nalanda & Deepnagar Halt. 40/8-40/9 under RGD-BKP 400KV Twin Moose Size of conductor Power Grid Biharsharif is Chief Manager, 04.06.14 cleared on 19.02.2015. Sec. Transmission line. = 31.77mm dia connected a 400KV D/C Biharsharif. Al-54/3.53mm Transmission line for steel - 7/3.53mm swapping of Kahalgaon bay 1 rail level - 23.86 with Sarasam bag 1 under Mtrs. split bus scheme at Power grid.

2 DNR Bihar Stn. & Patliputra Stn. Near Rukanmpura ROB 56 mtrs ROW Optical Fiber cable dsuet Reliance Jio infocomm 27.5.14 Associate finance vetted on level crossing adopting metodologies like Ltd, Exhibition Road , 07.5.15. Directional Drilling, clamping . and other suitable method

3 DNR Bihar Between ARA Stn. & Jamira Pole No. L-5A Near Puvari Gumati level 160 mtrs ROW Optical Fiber cable dsuet Reliance Jio infocomm 7.4.14 -do- Halt crossing adopting metodologies like Ltd, Exhibition Road , Directional Drilling, clamping Patna. and other suitable method

4 DNR Bihar Between LKR Stn. & Kiul Stn. Pole No.421/19-20 to Near Lakhisrai Bazar RUB 45mtrs ROW Optical Fiber cable dsuet Reliance Jio infocomm 7.4.14 -do- 421/21-22 crossing adopting metodologies like Ltd, Exhibition Road , Directional Drilling, clamping Patna. and other suitable method

5 DNR Bihar Between Mankatha Stn. & Pole No.422/25-26 to Near Ashok Dham Road 45 mtrs ROW Optical Fiber cable dsuet Reliance Jio infocomm 7.4.14 -do- Lakhisarai Stn. 422/27-28 RUB crossing adopting metodologies like Ltd, Exhibition Road , Directional Drilling, clamping Patna. and other suitable method

6 DNR Bihar Between MKA Stn. & Near TAL Jn. Rly cabin 80 mtrs ROW Optical Fiber cable dsuet Reliance Jio infocomm 01.5.14 -do- Begusarai Road. (50m) level crossing RUB. adopting metodologies like Ltd, Exhibition Road , Directional Drilling, clamping Patna. and other suitable method

7 DNR Bihar Near Mokama Jn. Cabin level Pole No.50B near Sahid Near MKA Stn. Cabin level 130 mtrs ROW Optical Fiber cable dsuet Reliance Jio infocomm 01.5.14 -do- crossing MKAStn.-MKA TAL Gate MKA Rly Crossing crossing. adopting metodologies like Ltd, Exhibition Road , Stn. Directional Drilling, clamping Patna. and other suitable method

8 DNR Bihar Between ARA Jn. Stn. Pole NoL-22A Under Jain College, ROB 133mtrs ROW Optical Fiber cable dsuet Reliance Jio infocomm 01.5.14 -do- &Jagjiwan Stn. level crossing. adopting metodologies like Ltd, Exhibition Road , Directional Drilling, clamping Patna. and other suitable method

9 DNR Bihar Near Ashok Dham Rd RUB Mile Stone - 2/5 & 2/6 Near Ashok Dham Road 45mtrs ROW Optical Fiber cable dsuet Reliance Jio infocomm 01.5.14 -do- Crossing in between LKR Stn. RUB crossing adopting metodologies like Ltd, Exhibition Road , & Karauta Halt. Directional Drilling, clamping Patna. and other suitable method

10 DNR Bihar Gaya Jn. & Chakand Pole No. 89/27-28 Near Chhoti Nawada level 42mtrs ROW Optical Fiber cable dsuet Reliance Jio infocomm 01.5.14 -do- 89/29-30 crossing. adopting metodologies like Ltd, Exhibition Road , Directional Drilling, clamping Patna. and other suitable method

11 DNR Bihar Nawada Stn. & Gaya Stn. Chainage - 71/7 to 71/8 Near Gumti No. 35A level 25 mtrs ROW Optical Fiber cable dsuet Reliance Jio infocomm 03.5.14 -do- crossing adopting metodologies like Ltd, Exhibition Road , Directional Drilling, clamping Patna. and other suitable method 12 DNR Bihar Nawada Stn. & Gaya Stn. Chainage - 72/3 to 72/5 Near NH-31 over bridge 26mtrs ROW Optical Fiber cable dsuet Reliance Jio infocomm 03.05.14 -do- level crossing adopting metodologies like Ltd, Exhibition Road , Directional Drilling, clamping Patna. and other suitable method

13 DNR Bihar Secretariat Halt & Pole No. 550/2-2A Under Air Port 67mtrs ROW Optical Fiber cable dsuet Reliance Jio infocomm 07.4.14 -do- Phulwarisharif Stn. Patna. 550/3-4 Phulwarisharif Back side adopting metodologies like Ltd, Exhibition Road , level crossing. Directional Drilling, clamping Patna. and other suitable method

14 DNR Bihar Phulwarisharif &and Danapur Pole No. 550/27-24 Under Sahai nagar Rly. 45 mtrs ROW Optical Fiber cable dsuet Reliance Jio infocomm 07.4.14 -do- Stn, Patna 550/25-26 crossing. adopting metodologies like Ltd, Exhibition Road , Directional Drilling, clamping Patna. and other suitable method

15 DNR Bihar Secretariat Halt & Pole No. 547/7-8 Under Chitkohara Rly. Over 30mtrs ROW Optical Fiber cable dsuet Reliance Jio infocomm 07.4.14 -do- Phulwarisharif Stn. Patna. 547/9-10 Bridge level crossing. adopting metodologies like Ltd, Exhibition Road , Directional Drilling, clamping Patna. and other suitable method

16 DNR Bihar Patna Jn & Secetariate Halt , Pole No. 552/10-11 Under level 83 mtrs ROW Optical Fiber cable dsuet Reliance Jio infocomm 07.4.14 -do- Patna. 552/12-13 crossing near Jajivan adopting metodologies like Ltd, Exhibition Road , Stadium St.. Directional Drilling, clamping Patna. and other suitable method

17 DNR Bihar Patna Jn & Secetariate Halt , Pole No. 543/44 & Under New Mithapur ROB 95 mtrs ROW Optical Fiber cable dsuet Reliance Jio infocomm 07.4.14 -do- Patna. 543/48 adopting metodologies like Ltd, Exhibition Road , Directional Drilling, clamping Patna. and other suitable method

18 DNR Bihar Patna Jn & Secetariate Halt , Pole No. 544/38 & Under Old Mithapur ROB 25 mtrs ROW Optical Fiber cable dsuet Reliance Jio infocomm 07.4.14 -do- Patna. 544/40 adopting metodologies like Ltd, Exhibition Road , Directional Drilling, clamping Patna. and other suitable method

19 DNR Bihar Near Etwarpur village, Patna- Pole No.3/11-12 & 3/13-14 Near Etwarpur village, 24 Mtrs. ROW Optical Fiber cable dsuet Reliance Jio infocomm 06.04.14 -do- Gaya line (Patna Jn. & Patna- Gaya line (Patna Jn. adopting metodologies like Ltd, Exhibition Road , Parsabazar) & Parsabazar) Directional Drilling, clamping Patna. and other suitable method

20 DNR Bihar Gulzarbagh Stn. & Pole No.534/8-9 & Near Patna City Rly. Stn. 71 Mtrs. ROW Optical Fiber cable dsuet Reliance Jio infocomm 06.04.14 -do- Stn. Patna. 534/10-11 adopting metodologies like Ltd, Exhibition Road , Directional Drilling, clamping Patna. and other suitable method

21 DNR Bihar Patna Jn. & Parsabazar Pole No.2/25-26 & 2/27-28 Near IOC, Sipara level 58 Mtrs. ROW Optical Fiber cable dsuet Reliance Jio infocomm 06.04.14 -do- crossing. adopting metodologies like Ltd, Exhibition Road , Directional Drilling, clamping Patna. and other suitable method

22 DNR Bihar Patna Jn. & Parsabazar Pole No.2/5-6 & 2/7-8 Near IOC, Sipara level 22 Mtrs. ROW Optical Fiber cable dsuet Reliance Jio infocomm 06.04.14 -do- crossing. adopting metodologies like Ltd, Exhibition Road , Directional Drilling, clamping Patna. and other suitable method

23 DNR Bihar Patna City Stn. & Didarganj Pole No.531/15-16 & Near Katra village. 28 Mtrs. ROW Optical Fiber cable dsuet Reliance Jio infocomm 06.04.14 -do- Halt. 531/17-18 adopting metodologies like Ltd, Exhibition Road , Directional Drilling, clamping Patna. and other suitable method 24 DNR Bihar Patna Ghat & Patna City Stn. Pole No. - Patna Ghat Rly. Near Bihari Mills Patna 41 Mtrs. ROW Optical Fiber cable dsuet Reliance Jio infocomm 06.04.14 -do- Stn. Ghat Rly. Stn. adopting metodologies like Ltd, Exhibition Road , Directional Drilling, clamping Patna. and other suitable method

25 DNR Bihar Didarganj Halt & Bankaghat Pole No.530/31-32 & Near Didarganj. 25 Mtrs. ROW Optical Fiber cable dsuet Reliance Jio infocomm 06.04.14 -do- Patna. 531/1-2 adopting metodologies like Ltd, Exhibition Road , Directional Drilling, clamping Patna. and other suitable method

26 DNR Bihar Patna City Stn. & Didarganj Pole No.532/17 & Near Chhoti Nagla. 30 Mtrs. ROW Optical Fiber cable dsuet Reliance Jio infocomm 06.04.14 -do- Halt, Patna. 532/19-20 adopting metodologies like Ltd, Exhibition Road , Directional Drilling, clamping Patna. and other suitable method

27 DNR Bihar Patna City Stn. & Didarganj Pole No.533/14-15 & Near Begumpur. 24 Mtrs. ROW Optical Fiber cable dsuet Reliance Jio infocomm 07.04.14 -do- Halt, Patna. 533/16-17 adopting metodologies like Ltd, Exhibition Road , Directional Drilling, clamping Patna. and other suitable method

28 DNR Bihar Rajendranagar Stn. & Pole No.538/13-14 & Under level 30 Mtrs. ROW Optical Fiber cable dsuet Reliance Jio infocomm 06.04.14 -do- Gulzarbagh Stn. 538/15-16 crossing. adopting metodologies like Ltd, Exhibition Road , Directional Drilling, clamping Patna. and other suitable method

29 DNR Bihar Patna Jn. & Sectariate Halt, Pole No.545/13-14 & Under Sachiwalaya level 42 Mtrs. ROW Optical Fiber cable dsuet Reliance Jio infocomm 06.04.14 -do- Patna. 545/15-16 crossing. adopting metodologies like Ltd, Exhibition Road , Directional Drilling, clamping Patna. and other suitable method

30 DNR Bihar Rajendranagar Stn. & Pole No.537/17-18 & Under Agamkuwan ROB 32 Mtrs. ROW Optical Fiber cable dsuet Reliance Jio infocomm 06.04.14 -do- Gulzarbagh Stn. 537/19-20 level crossing. adopting metodologies like Ltd, Exhibition Road , Directional Drilling, clamping Patna. and other suitable method

31 DNR Bihar R' Block Hlat & Sectariate Halt Pole No.2C/E HUT & LC & Near Old Sectariate level 42 Mtrs. ROW Optical Fiber cable dsuet Reliance Jio infocomm 06.04.14 -do- OH/1/12 crossing. adopting metodologies like Ltd, Exhibition Road , Directional Drilling, clamping Patna. and other suitable method

32 DNR Bihar Rajendranagar Stn. & Pole No.540/13-14 & Under Bahadurpur ROB 78 Mtrs. ROW Optical Fiber cable dsuet Reliance Jio infocomm 06.04.14 -do- Gulzarbagh Stn. 540/15-16 level crossing. adopting metodologies like Ltd, Exhibition Road , Directional Drilling, clamping Patna. and other suitable method

33 DNR Bihar Sectariate Halt & Punaichack. Pole No.- Adjacent to Near Punaichak sump 82 Mtrs. ROW Optical Fiber cable dsuet Reliance Jio infocomm 06.04.14 -do- Punaichack Halt (LC/4 to house level crossing. adopting metodologies like Ltd, Exhibition Road , Punaichak Halt) Directional Drilling, clamping Patna. and other suitable method

34 DNR Bihar Sectariate Halt & Punaichack. Pole No. LC/4 Near Mohanpur Punaichak 68 Mtrs. ROW Optical Fiber cable dsuet Reliance Jio infocomm 06.04.14 -do- level crossing. adopting metodologies like Ltd, Exhibition Road , Directional Drilling, clamping Patna. and other suitable method

35 DNR Bihar Rajiv Nagar Halt & Digha Halt, Pole No.-Digha ITI & MP 20 Near Digha Halt level 52 Mtrs. ROW Optical Fiber cable dsuet Reliance Jio infocomm 06.04.14 -do- Patna. level crossing. crossing. adopting metodologies like Ltd, Exhibition Road , Directional Drilling, clamping Patna. and other suitable method 36 DNR Bihar Rajiv Nagar Halt & Digha Halt, Pole No. - Between Digha Near MICA Colony level 71 Mtrs. ROW Optical Fiber cable dsuet Reliance Jio infocomm 06.04.14 -do- Patna. Road level crossing & crossing. adopting metodologies like Ltd, Exhibition Road , Digha MICA Colony. Directional Drilling, clamping Patna. and other suitable method

37 DNR Bihar Patna Jn. & 'R' Block Halt. Pole No.1/Spl./E HUT & Near 'R' Block 32 Mtrs. Optical Fiber cable dsuet Reliance Jio infocomm 07.04.14 -do- 1/Spl. EO/H/10/13/11 adopting metodologies like Ltd, Exhibition Road , Directional Drilling, clamping Patna. and other suitable method

38 DNR Bihar Near Mai Halt. Near Br.No.49/18 to 49/19 underground cable crossing 11KVx LPE 400 To supply the electric to town Electrical executive 18.06.14 Questionnaire, estimate & Sqm. Double area of Jehanabad. Engineer/JHD. tracing plan not submitted circuit. letter issued on 18,06.14. Reminder issued on 10.7.14, 10.9.14 & by Spl. massenger on 31.10.14, again letter issued on 15.1.15. Again reminder issued on 20.3.15.

39 DNR Bihar Hathidah - Lakhisarai. LOC No.70-71, 7-8 & 1-2 Reconditioning work of G.M. cum Chief Engineer/ 12.03.14 Questionnaire, estimate & existing 132KV transmission Transmission Zone, tracing plan not submitted line. Patna. letter issued on 01.04.14

40 DNR Bihar Zamania Rly. crossing. Rly. crossing No.88A. 33KV overhead wire. Laying 300 To change the old wire due to vf/k'kklh vfHk;Urk@fo|qr 05.04.14 Questionnaire, estimate & Sq.mm x 33KV heavy load. fojr.k [k.M & f}fr; m0izz0 tracing plan not submitted grade two cable. ikoj dkjiksjs'ku letter issued on 27.5.14. fyfeVsM@eqxyljk;A Again letter issued on 20.11.14, again letter issued on 19.1.15. Again reminder issued on 19.3.15.

41 DNR Bihar Rly. bridge end Kiul Rly. Stn. Kiul Rly. Stn. & its Land line telephone Not available Land line telephone SDE/G/Lakhisarai. 07.06.14 Questionnaire, estimate & Area. srounding. connection. connection. tracing plan not submitted letter issued on 16.06.14.

42 DNR Bihar Patna,Gaya & Patna -Danapur 544/92 - 593/95 U/G crossing at CH for Not available U/G crossing at CH. Electrical Superintending 29.01.14 Letter issued for some (Bandar Bagaicha) Bandar Bagaicha fidder. Engineer, Transmission observation against Circle, Patna. Questionnaire, drawing & estimate letter issued on 16.6.14. Again letter issued on 03.11.14. Again reminder issued on 16.3.15.

43 DNR Bihar Rly. T.P. No.519/11 - 519/18 Near Budhudeo chak Halt Replacement of condvetors Not available 220KV D D/C Biharsharif - Electrical Superintending 10.03.14 Scale plan not submitted of MGS - ASN main line. of high tension line. & 132 KV SC Badi Engineer, Transmission reminder letter issued on Pahari - Fatuha transmission Circle, Patna. 23.5.14. line are crossing over Rly. Track.

44 DNR Bihar Karhiya Halt & Jhama Stn. Underground cannal Under cannal crossing. 2x2 Mtrs. Construction of RCC box Jt. Magistrate/Dy.DM, 03.04.11 Correspondance with party. crossing. bridge under earth the Rly. Zamania. line for taking a minor irrigation cannal under earth Rly. track. 45 DNR Bihar Rajendranagar Goomti to 541/13 -541/15 Crossing for laying of 33 KV 3C x 400 Sqmt. Upgrading as well as Executive Engineer, 14.6.14 cleared on 16.02.2015 Kumhrar Road. HT cable. XLPE. 0.150 Km strengthening of electric Rajendra Nagar Division. & 0.6 Km infrastructure under R-APDRP project in order to reduce the AT & C losses below 15%.

46 DNR Bihar Near Sahri Station, Barh. Km.478/13-16 Underground proposed 3 x 300 Sqmt. U/G cable crossing of Rly. Electricl Executive 09.6.14/ Cleared on 12.3.15. 33/11 KV SLPE cable. XLPE (33KV) track for Jamalpur - Engineer, Electric Supply 06.8.14 Chakradharpur UG 33 KV Division, Barh. Electric sub-station.

47 DNR Bihar Digha - Patna B.G. Rail line. Between T. Pole Crossing for laying of 33 KV 46m Upgrading as well as Executive Engineer, 14.07.14 Questionnaire submitted on No.PNBE-9 land T.Pole HT cable through HDD strengthening of electric Patliputra Division. 26.12.14. No.PNBE No.S92(C). method. infrastructure under R-APDRP project in which two nos. of 33KV HT cable 400 Sqm.

48 DNR Bihar Digha - Patna B.G. Rail line. Between T. Pole No. SL - 2 Crossing for laying of 33 KV 30m Upgrading as well as Executive Engineer, 15.07.14 cleared on 16.02.2015 DN/G/H SIG and T. Pole HT cable through HDD strengthening of electric Patliputra Division. No. SL-3 UP/G/HE SIG method. infrastructure under T.Pole No.PNBE R-APDRP project in which No.S92(C). two nos. of 33KV HT cable 400 Sqm.

49 DNR Bihar Schiwalaya Halt - Nahar par Schiwalaya Halt Gate Crossing for laying of 33 KV U/G cable crossing of Rly. Electrical Executive 03.7.14 Questioner, estimate & Bailey Road. No.30'A' and Nahar par optical fiber cable. track for 33 KV cable work Engineer, Electric Supply scale plan not submitted. Bailey Road, Patna. distributon net work. Division, New Capital Letter issued dt.20.8.14. PESU (W), Patna.

50 DNR Bihar Patna - Delhi B.G Rail line & 1) Between T. Pole No. Crossing for laying of 33 KV 100 Mtrs. and Upgrading as well as Electrical Executive 17.7.14. Correspondance with party. Patna - Gaya B.G Rail line PNB 5031 & PNB 5032. 2) HT cable. 46 Mtrs. strengthening of electrical Engineer, Electric Supply Plan asked letter issued to Between 544/G7-G9. infrastructure under Division, Bankipur, Patna. party. R-APDRP project in which 33KV HT cable.

51 DNR Bihar Kunder Halt and Bhalui Halt Km.400/7-400/9 Crossing for stringing of 132 30 + 7/3 132 KV double circuit 50 HZ, Electrical executive 16.08.14 Cable crossing not pertain KV D/C Line 3 Phase Transmission-line Engineer Electrical superit to the jurisdiction of DNR using ACSR panther ending engineer Divn. conductor neutral earthed Transmission division using pipe Type carthing. Hathidah Bihar Sharif

52 DNR Bihar Bansipur-Lakhochak Halt Km. 414/27-415/01 Crossing for stringing of 132 30 + 7/3 132 KV double circuit 50 HZ, Electrical executive 16.08.14 Letter issued for Rly. traffic KV D/C Line 3 Phase Transmission-line Engineer Electrical block charges to Sr.DOM/ using ACSR panther superitending engineer DNR for 02 Hrs. on conductor neutral earthed Transmission division 16.3.15. using pipe Type carthing. Hathidah Bihar Sharif 53 DNR Bihar - Sipara 14/7-9 under PNBE-Gaya 220/132/33 KV D/C 45.52 Mtr. The work of construction of Electrical Superintending 23.8.14 Registration fee deposited Sec. Transmission Line. 220/132/33KV D/C Engineer/Patna. on 23.9.14. Questionair, transmission line Bihta - estimate & plan is under Sipara Linking line BSPTCL verification with SSE/ Department. Drg./DNR. Again file with SSE/Drg./DNR with revised drawing on 17.3.15 & returned. Correspondence with party. Letter issued on 20.3.15. 54 DNR Bihar Biharsharif- Hathidah Line TP No.446/03-05 & 132KV SC The work of reconductoring Electrical Superintending 10.9.14 cleared on 28.01.2015 446/04-06 MKA-KEU BSPTCL Department with Engineer/Patna. existing. 55 DNR Bihar Biharsharif- Hathidah Line 02/19 & 20 132 KV DC The work of reconductoring Electrical Superintending 10.9.14 cleared on 28.01.2016 BSPTCL Department. Engineer/Patna.

56 DNR Bihar Biharsharif- Hathidah Line 33/6-33/7 132 KV DC The work of reconductoring Electrical Superintending 10.9.14 cleared on 28.01.2017 BSPTCL Department. Engineer/Patna.

57 DNR Bihar Hathidah - Lakhisarai. 446/01 & 03, 446/02 & 04 132KV SC The work of reconductoring Electrical Superintending 10.9.14 cleared on 28.01.2018 BSPTCL Department. Engineer/Patna.

58 DNR Bihar Hathidah - Lakhisarai. 02/03 & 04 132KV SC The work of reconductoring Electrical Superintending 10.9.14 cleared on 28.01.2019 BSPTCL Department. Engineer/Patna.

59 DNR Bihar Hathidah - Lakhisarai. 429/14-16, 429/13-15 132KV SC The work of reconductoring Electrical Superintending 10.9.14 cleared on 28.01.2020 BSPTCL Department. Engineer/Patna.

60 DNR Bihar Fatuha - Biharsharif Line 519/15-17, 519/16-18 220KV DC The work of reconductoring Electrical Superintending 10.9.14 cleared on 28.01.2021 BSPTCL Department. Engineer/Patna.

61 DNR Bihar Biharsharif - Badi Pahari 519/13-15, 519/14-16 132KV SC The work of reconductoring Electrical Superintending 10.9.14 cleared on 28.01.2022 BSPTCL Department. Engineer/Patna.

62 DNR Bihar Nawada - Gaya TP No.76/03-76/04 33KV DC 71.8 Mtr. 33KV cable crossing General Manager, M/S 09.10.14 Cleared on 26.02.15. under-ground Rly. Track. Response Renewable Energy Ltd. 13 63 DNR Bihar Nawada - Gaya TP No.76/03-76/04 33KV DC 71.8 Mtr. 33KV cable crossing M/s. Glatt Solution Pvt. 09.10.14 Cleared on 26.02.15. under-ground Rly. Track. Ltd. 76, Panditpur, Pursottam Roy Street, 3rd Floor, Kolkata-01.

64 DNR Bihar Zamania - Chandel 711/18-20 33KV Underground 100 Mtrs. 33KV cable crossing Executive Engineer/MGS Cleared. under-ground Rly. Track.

65 DNR Bihar Fatuha - Islampur Near Rambhawan Halt. Water Pipe Line 300 Mtrs. Kosiyawa C.I. Pipe Executive Engineer Public 28.10.14 Questionaire asked from (Hilsa - Ekangarsarai) (TYTONE) Health Sub-Division, Executive Hilsa. Engineer/PHD/Hilsa on 14.11.14. Registration fee deposited on 19.11.14. Questionaire not yet been submitted letter issued on 05/1/2015. Again reminder issued on 20.3.15.

66 DNR Bihar Ara East gumti Near East Gumati Ara 33KV Elect. Line. 3C x 300 Sqmt. Under package-D R-APDRP Electrical Executive 08.11.14 WLF charges under vetting Mm Engineer (Project) with Sr.DFM/DNR. SBPDCL, ARA

67 DNR Bihar Ramanand Tiwari Halt- Bihiya 612/3-4, 612/5-6 33KV/11KV/UG Cable 600mm Under BRGF (Phase-I Electrical Superintending 22.12.14 Now 2% estimated cost for Stn.. crossing. scheme) Engineer, SBPDCL, ARA plan is required. Letter (Bhojpur). issued to Agency on 01.4.15. 68 DNR Bihar Chousa Stn Gate no 78/AB 672/37, 38 - 672/55, 56 33KV/11KV/UG Cable 600mm Under BRGF (Phase-I -do- 22.12.14 -do- crossing. scheme) 69 DNR Bihar ARA - Jamira stn. 588/9-10 & 588/7-8 33KV/11KV/UG Cable 600mm Under BRGF (Phase-I -do- 22.12.14 -do- crossing. scheme) 70 DNR Bihar BXR - Nadawan 659/9-10 & 659/7-8 33KV/11KV/UG Cable 600mm Under BRGF (Phase-I -do- 22.12.14 -do- crossing. scheme) 71 DNR Bihar Bailey Road 'H' - Punaichack Near L-Xing No.3 Spl/E on 33KV/11KV/UG Cable 49mm Under R- APDRP Scheme Electrical Executive 26.12.14 cleared on 16.02.2015 PNBE-DDG Sec. crossing. Engineer, Electric Supply Division, Patliputra, PESU(W). 72 DNR Bihar RJPB - GZH 539/21 to km.539/23 GZH- 33KV 3 Core x 300mm2 25 Mtrs. Under R- APDRP Scheme Electrical Executive 26.12.14 cleared on 16.02.2016 RJPB on Main Line XLPE U/G cable crossing. Engineer, Electric Supply Division, Rajendranagar, PESU, Patna.

73 DNR Bihar Ramgovind & Punpun. T.P. No. 11/13-11/15 11KV. H.T. Line Crossing Constructed under BRGF- 1 Electrical Executive 23.01.15 Questionaire & estimate Scheme & is under progress Engineer(Project) Electric Plan are not complete Supply Circle Patna. technically. Letter issued on 29.01.15. Again reminder issued on 20.3.15. Case peinding on party account.

74 DNR Bihar Punpun & Punpun Bandh T.P. No. 12/35-12/33 11KV. H.T. Line Crossing -do- Electrical Executive 23.01.15 Questionaire & estimate Engineer(Project) Electric Plan are not complete Supply Circle Patna. technically. Letter issued on 29.01.15. Again reminder issued on 20.3.15. Case peinding on party account.

75 DNR Bihar Ramgovind Singh Holt - T.P. No. 11/15-11/17 11KV. H.T. Line Crossing -do- Electrical Executive 23.01.15 Questionaire & estimate Punpun Bandh. Engineer(Project) Electric Plan are not complete Supply Circle Patna. technically. Letter issued on 29.01.15. Again reminder issued on 20.3.15. Case peinding on party account.

76 DNR Bihar RamgovindSingh Halt - T.P. No. 11/13-11/15 11KV. H.T. Line Crossing -do- Electrical Executive 23.01.15 Questionaire & estimate Punpun Bandh. Engineer(Project) Electric Plan are not complete Supply Circle Patna. technically. Letter issued on 29.01.15. Again reminder issued on 20.3.15. Case peinding on party account.

Pending x-ing on 24.3.15.