2018 Annual Progress Report Number Date September 2018

Total Page:16

File Type:pdf, Size:1020Kb

2018 Annual Progress Report Number Date September 2018 Carmarthenshire County Council Carmarthenshire County Council 2018 Air Quality Progress Report In fulfillment of Part IV of the Environment Act 1995 Local Air Quality Management September 2018 LAQM Annual Progress Report 2018 Carmarthenshire County Council Local Authority Lisa Jones Officer Alun Rees Department Homes and Safer Communities Town Hall, Iscennen Road, Ammanford, Address Carmarthenshire. SA18 3BE 01267 288 910 Telephone 01269 598255 [email protected] E-mail [email protected] Report Reference 2018 Annual Progress Report number Date September 2018 LAQM Annual Progress Report 2018 Carmarthenshire County Council Executive Summary: Air Quality in Our Area Air Quality in Carmarthenshire The main air quality pollutant relevant to Carmarthenshire is Nitrogen Dioxide (NO2) and the main source of NO2 emissions in the County is road traffic. We have developed a monitoring network that follows some of our busiest roads and most congested streets to enable us observe trends in NO2 concentrations and assess the effectiveness of any changes made in attempt to improve air quality in those areas. The trends observed over the last year have slightly decreased in comparison to 2016, however four sites within our Air Quality Management Areas (AQMA’s) (two in Llanelli, one in Carmarthen and one in Llandeilo) have exceeded the Air Quality Objective for 2017 with a number of sites remaining borderline. There has not been a significant reduction identified over the last three years and during 2017, the winter months experienced a warmer climate which may account for this reported trend. Therefore it is too early to predict whether we will continue to see a downward trend at the end of 2018. Carmarthenshire currently has three Air Quality Management Areas in Llandeilo, Carmarthen and Llanelli. Further details can be found on our website: https://www.carmarthenshire.gov.wales/home/council-services/environmental- health/air-quality/#.W46Mg-mQzIU The second year review of phase 1 of the Llandeilo action plan was conducted in 2017 and included in the 2017 Air Quality Progress Report. The outstanding options of the Llandeilo Action plan phase 1 has been assessed and is included in Appendix H of this progress report. The AQMA’s for the towns of Carmarthen and Llanelli were designated and Orders issued in August 2016. Action Plans for both towns were subject to public consultation during 2017. Responses were reviewed and the final draft Action Plans were submitted to Welsh Government late 2017. LAQM Annual Progress Report 2018 i Carmarthenshire County Council No new major sources of uncontrolled pollution or fugitive emissions have been identified within the County during 2017 and although a number of developments are underway, some of which have required air quality impact assessments to be conducted, no significant impacts have been identified. Nevertheless, collaboration work with planners and developers continues and wherever possible further measures are encouraged to mitigate any impact that development may pose on air quality. We continue to work closely with a number partners to manage local air quality in Carmarthenshire, including Natural Resources Wales, the Planning Authority, the Highways Authority, SWTRA, local schools, Swansea University. Actions to Improve Air Quality During 2017 one new process for a mobile plant was granted an Environmental Permit in order to control emissions. However, as it is a mobile plant with the flexibility to move locations, it has the potential to move to other locations outside of the County depending on where it is used. Carmarthenshire also received nine planning applications for new developments that carried out Air Quality Assessments, of which eight stated that any impact would be negligible and one was refused. An additional seven applications were also able to justify no that AQA was necessary. However, in support of the sustainable development principles of the Well-being of Future Generations (Wales) Act 2015 and Welsh Government policy guidance to reduce air pollution as far as possible, every opportunity is taken to implement measures to improve air quality through the development process. For example by promoting the use of sustainable transport methods and the consideration of Electric Vehicle infrastructure. Air quality screening exercises were performed during 2017 at various locations and details of these exercises can be found in Appendix G of this report. Monitoring did not identify any breach of the Objectives. Further monitoring at other locations is being performed through 2018 and the results will be reported in the 2019 Progress Report. LAQM Annual Progress Report 2018 ii Carmarthenshire County Council Three unannounced visits to check on the compliance with restricted steam locomotive idling times for Gwili Railway Company were carried out and identified compliance during two out of three visits. However, no emissions of dark smoke was observed during the time of the visits. No PM10 monitoring was carried out during 2017 because no significant dust issues have been identified within the previous 12 months. Local Priorities and Challenges In Carmarthenshire, the main pollution sources relate to traffic emissions and this is where the air quality work is concentrated. However, industrial sources are kept under review along with the working practices at Gwili Railway Station. Priorities for the coming year in Carmarthenshire will largely be focussed on assessing the feasibility of the proposed actions for the Carmarthen and Llanelli AQMA’s, whilst also trying to progress the measures outlined in the Action Plan for Llandeilo. Screening exercises will also be planned to assess the positive impact that should be brought by the Cross Hands Economic Link Road and further monitoring of NO2 will be carried out in Carmarthen to ensure that any action plan work carried out does not move the problem to another location. Where possible, efforts will be made to engage with schools located within our AQMA’s in order to raise awareness of local air pollution and encourage active travel. By working in partnership with Swansea University, it is planned to monitor levels of Nitrogen Dioxide around the school gates for a couple of schools within the County that are located within our AQMA Towns. How to Get Involved There are many ways that you can help improve their local air quality in your area. Try reducing the use of cars for single person journeys, by car sharing, using other sustainable modes of transport such as electric vehicles and public transport, cycling or walking to work. Travel more actively by getting involved in national walking and cycling LAQM Annual Progress Report 2018 iii Carmarthenshire County Council weeks and make good use of the improved cycle routes across the Carmarthenshire. Improve pollution at the school gates by not idling car engines and improve walking and cycling routes for schools by signing up to schemes such as living streets to encourage children to travel actively. For further information on air quality within Carmarthenshire please visit: https://www.carmarthenshire.gov.wales/home/council-services/environmental- health/air-quality/#.W46Mg-mQzIU or https://www.sirgar.llyw.cymru/cartref/gwasanaethaur-cyngor/iechyd-yr- amgylchedd/ansawdd-aer/#.W46YkumQzIU Or contact 01267 234567 Use of an AQMesh Automatic Use of a diffusion tube to monitor roadside Analyser to monitor road side NO2 levels from the façade of a property. Pollution levels. LAQM Annual Progress Report 2018 iv Carmarthenshire County Council Table of Contents Executive Summary: Air Quality in Our Area .......................................................... i Air Quality in Carmarthenshire ............................................................................................ i Actions to Improve Air Quality ............................................................................................ ii Local Priorities and Challenges ......................................................................................... iii How to Get Involved.......................................................................................................... iii 1. Actions to Improve Air Quality ........................................................................ 1 1.1 Previous Work in Relation to Air Quality ................................................................ 1 1.2 Air Quality Management Areas .............................................................................. 5 1.3 Implementation of Action Plans ............................................................................. 9 2. Air Quality Monitoring Data and Comparison with Air Quality Objectives ............................................................................................................... 24 2.1 Summary of Monitoring Undertaken in 2017 .........................................................24 2.1.1 Automatic Monitoring Sites .......................................................................................... 24 2.1.2 Non-Automatic Monitoring Sites................................................................................... 24 2.2 2017 Air Quality Monitoring Results .....................................................................37 2.3 Comparison of 2017 Monitoring Results with Previous Years and the Air Quality Objectives ............................................................................................................45 2.3.1 Nitrogen Dioxide
Recommended publications
  • Code Compliance Data Pdf 275 Kb
    STANDARDS COMMITTEE 13/09/19 CODE COMPLIANCE DATA Recommendations / key decisions required: To consider the report Reasons: The subject matter of this report falls within the remit of the Committee Scrutiny Committee recommendations / comments: Not applicable Exec Board Decision Required NO Council Decision Required NO EXECUTIVE BOARD MEMBER PORTFOLIO HOLDER:- Cllr E Dole (Leader) Directorate Chief Executives Name of Head of Service: Designations: Linda Rees-Jones Head of Administration & Law Tel Nos. Report Author: 01267 224018 Robert Edgecombe Legal Services Manager E Mail Addresses: [email protected]. uk. EXECUTIVE SUMMARY STANDARDS COMMITTEE 13/0919 CODE COMPLIANCE DATA The Standards Committee receives an annual report (usually at its December meeting) as to the level of code compliance by Town and Community Councillors during the preceding municipal year. The report captures; 1. Number of code complaints to the Ombudsman 2. Number of declarations of interest 3. Number of dispensation applications 4. Whether any councillors have received code training Unfortunately a significant number of Councils do not respond to written requests for this information. At its meeting in March 2019 the committee requested regular updates as to the number of responses received. As at the date of writing this report 53 out of 72 councils had responded. Those who have not responded are; Abernant, Ammanford Town, Bronwydd, Cynwyl Elfed, Dyffryn Cennen, Eglwys Gymyn, Laugharne Township, Llanarthne, Llanfihangel Rhos Y Corn, Llangathen, Llanllwni, Llanpumpsaint, Llansadwrn, Llansteffan & Llanybri, Llanwrda, Meidrim, Pencarreg, Pendine, Pontyberem, and St.Ishmael. Of these, St Ishmael, Meidrim, Llanwrda, Llansteffan & Llanybri, Llansadwrn, Llanpumpsaint, Llanfihangel-Rhos-Y-Corn and Llanarthne have not provided a response for the last 2 years and Eglwys Gymyn, Bronwydd and Abernant have not provided a response for the last 3 years.
    [Show full text]
  • Vebraalto.Com
    0845 094 3024 www.westwalesproperties.co.uk Forge Mill Bronwydd Arms, Carmarthen, Carmarthenshire, SA33 6JG A rare opportunity to purchase this fantastic five bedroom former Mill renovated to retain its original character and believed to date back to 1697. Briefly comprising: reception hall, "Christians" bespoke kitchen, beautiful orangery, cloakroom, sitting room, lounge, dining room, to the first floor: Master bedroom with en suite, four further bedrooms, shower room, dressing room and a fantastic loft conversion on the second floor. Externally: The property is approached via a private sweeping driveway with parking for numerous vehicles and is set in just approximately 2 acres of gardens, separate paddock and 250 metres of fishing rights. • Sympathetically Renovated • 5 Bedroom Character House • Bespoke Christians Kitchen • Beautiful Orangery • Loft Conversion • Vaulted Dining Room • Over 3 Acres Of Land • 250 Metres Fishing Rights • EPC Rating: F O.I.R.O £620,000 Forge Mill Bronwydd Arms, Carmarthen, Carmarthenshire, SA33 6JG LOCATION The hamlet of Bronwydd situated just 6.5 miles from Carmarthen town, has all the tranquillity of a rural village with all the benefits of the County town. The village is most famous for its Gwili Steam railway, transporting you back to another time. The village is accessed by A and B Roads and is regularly served by buses to Carmarthen and on to Cardigan. Carmarthen being the closest county town has everything you could need for modern day living, its market, shopping and restaurants all having undergone modernising and expansion over the last few years increasing desirability in the local area. A LITTLE PIECE OF HISTORY Thought to date back to 1697, this fantastic former mill can be found in many local History books.
    [Show full text]
  • Suzal, Bronwydd Arms, Carmarthen SA33
    Suzal, Bronwydd Arms, Carmarthen SA33 6BD Offers in the region of £220,000 • Spacious Three Double Bedroom Bungalow • Popular Location Four Miles From Carmarthen • Driveway Parking, Double Garage • Viewing Recommended John Francis is a trading name of Countrywide Estate Agents, an appointed representative of Countrywide Principal Services Limited, which is authorised and regulated by the Financial Conduct Authority. We endeavour to make our sales details accurate and reliable but they should not be relied on as statements or representations of fact and they do not constitute any part of an offer or contract. The seller does not make any representation to give any warranty in relation to the property and we have no authority to do so on behalf of the seller. Any information given by us in these details or otherwise is given without responsibility on our part. Services, fittings and equipment referred to in the sales details have not been tested (unless otherwise stated) and no warranty can be given as to their condition. We strongly recommend that all the information which we provide about the property is verified by yourself or your advisers. Please contact us before viewing the property. If there is any point of particular importance to you we will be pleased to provide additional information or to make further enquiries. We will also confirm that the property remains available. This is particularly important if you are contemplating travelling some distance to view the property. CR/RO/65844/060918 integrated dishwasher, 1½ backs onto Bronwydd cricket bowl sink with drainer and club. DESCRIPTION mixer tap, localised wall Situated in the popular tiles, tiled floor, door to; SERVICES village of Bronwydd, on a We have been advised that good sized level plot with REAR HALL the mains electricity and driveway parking and double Door to the side hall, build-in water are connected to the garage.
    [Show full text]
  • Dyfed Final Recommendations News Release
    NEWS RELEASE Issued by the Telephone 02920 395031 Boundary Commission for Wales Caradog House Fax 02920 395250 1-6 St Andrews Place Cardiff CF10 3BE Date 25 August 2004 FINAL RECOMMENDATIONS FOR THE PARLIAMENTARY CONSTITUENCIES IN THE PRESERVED COUNTY OF DYFED The Commission propose to make no change to their provisional recommendations for five constituencies in the preserved county of Dyfed. 1. Provisional recommendations in respect of Dyfed were published on 5 January 2004. The Commission received eleven representations, five of which were in support of their provisional recommendations. Three of the representations objected to the inclusion of the whole of the Cynwyl Elfed electoral division within the Carmarthen West and South Pembrokeshire constituency, one objected to the name of the Carmarthen West and South Pembrokeshire constituency and one suggested the existing arrangements for the area be retained. 2. The Commission noted that, having received no representation of the kind mentioned in section 6 (2) of the Parliamentary Constituencies Act 1986, there was no statutory requirement to hold a local inquiry. The Commission further decided that in all the circumstances they would not exercise their discretion under section 6 (1) to hold an inquiry. Final recommendations 3. The main objection to the provisional recommendations was in respect of the inclusion of the Cynwyl Elfed electoral division in the Carmarthen West and South Pembrokeshire constituency. It was argued that the division should be included in Carmarthen East and Dinefwr on the grounds that the majority of the electorate in the division fell within that constituency and that inclusion in Carmarthen East and Dinefwr rather than Carmarthen West and South Pembrokeshire would reduce the disparity between the electorates of the two constituencies and would bring them closer to the electoral quota.
    [Show full text]
  • Women in the Rural Society of South-West Wales, C.1780-1870
    _________________________________________________________________________Swansea University E-Theses Women in the rural society of south-west Wales, c.1780-1870. Thomas, Wilma R How to cite: _________________________________________________________________________ Thomas, Wilma R (2003) Women in the rural society of south-west Wales, c.1780-1870.. thesis, Swansea University. http://cronfa.swan.ac.uk/Record/cronfa42585 Use policy: _________________________________________________________________________ This item is brought to you by Swansea University. Any person downloading material is agreeing to abide by the terms of the repository licence: copies of full text items may be used or reproduced in any format or medium, without prior permission for personal research or study, educational or non-commercial purposes only. The copyright for any work remains with the original author unless otherwise specified. The full-text must not be sold in any format or medium without the formal permission of the copyright holder. Permission for multiple reproductions should be obtained from the original author. Authors are personally responsible for adhering to copyright and publisher restrictions when uploading content to the repository. Please link to the metadata record in the Swansea University repository, Cronfa (link given in the citation reference above.) http://www.swansea.ac.uk/library/researchsupport/ris-support/ Women in the Rural Society of south-west Wales, c.1780-1870 Wilma R. Thomas Submitted to the University of Wales in fulfillment of the requirements for the Degree of Doctor of Philosophy of History University of Wales Swansea 2003 ProQuest Number: 10805343 All rights reserved INFORMATION TO ALL USERS The quality of this reproduction is dependent upon the quality of the copy submitted. In the unlikely event that the author did not send a com plete manuscript and there are missing pages, these will be noted.
    [Show full text]
  • Rail Station Usage in Wales, 2018-19
    Rail station usage in Wales, 2018-19 19 February 2020 SB 5/2020 About this bulletin Summary This bulletin reports on There was a 9.4 per cent increase in the number of station entries and exits the usage of rail stations in Wales in 2018-19 compared with the previous year, the largest year on in Wales. Information year percentage increase since 2007-08. (Table 1). covers stations in Wales from 2004-05 to 2018-19 A number of factors are likely to have contributed to this increase. During this and the UK for 2018-19. period the Wales and Borders rail franchise changed from Arriva Trains The bulletin is based on Wales to Transport for Wales (TfW), although TfW did not make any the annual station usage significant timetable changes until after 2018-19. report published by the Most of the largest increases in 2018-19 occurred in South East Wales, Office of Rail and Road especially on the City Line in Cardiff, and at stations on the Valleys Line close (ORR). This report to or in Cardiff. Between the year ending March 2018 and March 2019, the includes a spreadsheet level of employment in Cardiff increased by over 13,000 people. which gives estimated The number of station entries and exits in Wales has risen every year since station entries and station 2004-05, and by 75 per cent over that period. exits based on ticket sales for each station on Cardiff Central remains the busiest station in Wales with 25 per cent of all the UK rail network.
    [Show full text]
  • Dafydd Coslett Thomas, Eleanor His Wife and Their Six Children Emigrated to Patagonia on the Thames in 1875
    A number of people from Carmarthenshire, or who had connections with the county, emigrated to the Welsh Colony in Patagonia, and here is a little information about some of them. DAVID BOWEN, TRES CASAS David Bowen is said to have been born in Trelech-a’r-Betws, Carmarthenshire in 1844 but as a young man he moved to Pentre in the Rhondda and married Mary Anne Williams. In 1875 David, Mary and their children sailed for Patagonia on the Olbers and landed near the estuary of the Chubut on 31 October 1875. The family moved soon afterwards from Rawson to Drofa Fresych where they stayed for nearly three years. Early in 1878 the family moved to Gaiman where David Bowen built a house at the foot of the hills. At the beginning of winter 1879 they moved to a smallholding in Dyffryn Uchaf, an area later called Trebowen. When a chapel was built at Trofa Gwen Ellis, David became a member and an officer of the chapel. A new location was found for the chapel and it was named Bethesda. He served as both deacon and Secretary of Bethesda Chapel. He was one of the small band who went up to rocks at the top of Dyffryn Uchaf to search for somewhere to build a canal. His knowledge of the lands of Dyffryn Uchaf was of great advantage to those who were looking to build their homes in that area. David and Mary Anne’s eldest son and a daughter died of Typhoid in 1883. Thomas married Elizabeth Knowles, Marged Ann married Alun Meirion Williams, Mary Jane married Adrian Eusebio López, Hannah married William John Lloyd and Sarah married José Isabel Quiroga.
    [Show full text]
  • A) of Regulation (EU) No 1151/2012 of the European Parliament and of the Council on Quality Schemes for Agricultural Products and Foodstuffs (2016/C 197/09
    3.6.2016 EN Official Journal of the European Union C 197/9 OTHER ACTS EUROPEAN COMMISSION Publication of an application pursuant to Article 50(2)(a) of Regulation (EU) No 1151/2012 of the European Parliament and of the Council on quality schemes for agricultural products and foodstuffs (2016/C 197/09) This publication confers the right to oppose the application pursuant to Article 51 of Regulation (EU) No 1151/2012 of the European Parliament and of the Council (1). SINGLE DOCUMENT ‘Carmarthen Ham’ EU No: UK-PGI-0005-01229-19.05.2014 PGI ( X ) PDO ( ) 1. Name ‘Carmarthen Ham’ 2. Member State or Third Country United Kingdom 3. Description of the agricultural product or foodstuff 3.1. Type of product Class 1.2 Meat products (cooked, salted, smoked etc.) 3.2. Description of product to which the name in (1) applies ‘Carmarthen Ham’ is an air-dried, salt-cured ham made from pork legs. The ham is hung at an ambient tempera­ ture of 16-26 degrees centigrade for a period of 6 to 9 months. The age of ‘Carmarthen Ham’ is counted from the first day of salting The finished ham has a rounded external shape at the base and is tapered to the top. Externally a whole ‘Carmarthen Ham’ is dark beige colour and the skin (or rind) has a hard dry ‘leathery’ feel. When sliced, ‘Carmarthen Ham’ has a uniform rich deep pink to dark red colour, with interspersed cream coloured fat throughout. It has a slight salty, sweet pork taste and a soft springy texture.
    [Show full text]
  • Dev-Plan.Chp:Corel VENTURA
    On Track for the 21st Century A Development Plan for the Railways of Wales and the Borders Tua’r Unfed Ganrif ar Ugain Cynllun Datblygu Rheilffyrdd Cymru a’r Gororau Railfuture Wales 2nd Edition ©September 2004 2 On Track for the 21st Century Section CONTENTS Page 1 Executive summary/ Crynodeb weithredol ......5 2 Preface to the Second Edition .............9 2.1 Some positive developments . 9 2.2 Some developments ‘in the pipeline’ . 10 2.3 Some negative developments . 10 2.4 Future needs . 10 3 Introduction ..................... 11 4 Passenger services .................. 13 4.1 Service levels . 13 4.1.1 General principles .............................13 4.1.2 Service levels for individual routes . ................13 4.2 Links between services: “The seamless journey” . 26 4.2.1 Introduction .................................26 4.2.2 Connectional policies ............................27 4.2.3 Through ticketing ..............................28 4.2.4 Interchanges .................................29 4.3 Station facilities . 30 4.4 On-train standards . 31 4.4.1 General principles .............................31 4.4.2 Better trains for Wales and the Borders . ...............32 4.5 Information for passengers . 35 4.5.1 Introduction .................................35 4.5.2 Ways in which information could be further improved ..........35 4.6 Marketing . 36 4.6.1 Introduction .................................36 4.6.2 General principles .............................36 5 Freight services .................... 38 5.1 Introduction . 38 5.2 Strategies for development . 38 6 Infrastructure ..................... 40 6.1 Introduction . 40 6.2 Resignalling . 40 6.3 New lines and additional tracks / connections . 40 6.3.1 Protection of land for rail use ........................40 6.3.2 Route by route requirements ........................41 6.3.3 New and reopened stations and mini-freight terminals ..........44 On Track for the 21st Century 3 Section CONTENTS Page 7 Political control / planning / funding of rail services 47 7.1 Problems arising from the rail industry structure .
    [Show full text]
  • Constituency – Carmarthen East and Dinefwr: Polling District Polling
    Constituency – Carmarthen East and Dinefwr: Polling District Polling Place Total Electorate(those electors receiving a postal vote) A Gellimanwydd Hall, 1004 (227) Ammanford AA Abergwili Church Hall, 560 (115) Ammanford AB Peniel Community Room, 520 (106) Peniel AC Whitemill Inn, Whitemill 220 (63) AM Cenarth Church, Cenarth 346 (86) AN Capel Iwan Community 464 (106) Centre, Capel Iwan AY Cefneithin/Foelgastell 1276 (271) Welfare Hall AZ Drefach Welfare Hall, 970 (238) Drefach B Ammanford Pensioners’ 886 (289) Hall, Ammanford BA Gorslas Church Hall, 1392 (347) Gorslas BE Llanarthney Village Hall, 642 (169) Llanarthne BH Y Neuadd Fach, 774 (207) Porthyrhyd BI Mynyddcerrig 216 (48) Workingmen’s Club BM St. Anne’s Church Hall, 907 (219) Cwmffrwd BN Llandyfaelog Welfare Hall 238 (54) BO Llanfihangel Ar Arth 540 (126) School Hall BP Pencader Pavilion, 1070 (250) Pencader BQ Neuadd Yr Eglwys, 75 (18) Abergorlech BR Brechfa Church Hall, 191 (42) Brechfa BS Gwernogle Chapel Vestry 133 (49) BU Saron Chapel Vestry 720 (229) BV Pentrecwrt Village Hall 1005 (286) BW Red Dragon Hall, Felindre 971 (199) BX Yr Aelwyd, Tregynnwr 827 (281) BY Yt Aelwyd, Tregynnwr 1262 (337) BZ Carway Welfare Hall 827 (180) C The Hall, Nantlais 1036 (216) CB Llangyndeyrn Church Hall 619 (146) Polling District Polling Place Total Electorate(those electors receiving a postal vote) CC Salem Vestry, Four 228 (66) Roads CD Pontyates Welfare Hall 1148 (309) CG Llanllawddog Church Hall 580 (195) CH Nonni Chapel Vestry, 548 (123) Llanllwni CM Aberduar Chapel Vestry 970 (200) CN
    [Show full text]
  • Lleoliadau Nas Cynhelir Approved Non Maintained Settings in Carmarthenshire Approved Means Settings That Are Registered And
    Lleoliadau Nas Cynhelir Approved Non Maintained Settings in Carmarthenshire Approved means settings that are registered and monitored to offer 10 hours early years education on behalf of the LA. Current Approved Settings (Medi/September 2019) Enw/Name Ardal/Locality Sesiwn / Session 1 Cylch Meithrin Bancyfelin, SA33 5NB Sessional care Bancyfelin 2 Cylch Meithrin Bancffosfelen, SA15 5DR Sessional care Bancffosfelen 3 Cylch Meithrin Bronwydd, SA33 6BL Sessional care Bronwydd 4 Cylch Meithrin Carwe Carwe, SA17 4HE Sessional care Registered as full day care 5 Cylch Meithrin Cross Hands, SA14 6SU Full day care Cefneithin Gorslas 6 Cylch Meithrin Carreg Lampeter, SA48 8EP Full day care Hirfaen 7 Cylch Meithrin Cwrt Cwrt Henri, Sessional care Henri SA32 8RU 8 Cylch Meithrin Drefach Felindre, SA44 Sessional care Drefach Felindre 5UG 9 Cylch Meithrin Felinfoel, SA14 8BE Full day care Felinfoel 10 Cylch Meithrin Ffairfach, Llandeilo, SA19 Sessional care Ffairfach 6SY 11 Cylch Meithrin Whitland, SA34 0TG Sessional care Ffynnonwen 12 Old Road Nursery Hen Old Road, Llanelli, SA15 Sessional care Heol 3HW 13 Cylch Meithrin Pentrecwrt, SA44 5BD Sessional care Alltcafan 14 Cylch Meithrin Hendy Hendy, Llanelli, SA4 0XD Sessional care 15 Cylch Meithrin Llanddarog, SA14 7AB Full Day Care Llanddarog a Drefach 16 Cylch Meithrin Llangadog, SA19 9BR Sessional care Llangadog 17 Cylch Meithrin Llangyndeyrn, SA17 5BW Sessional care Llangyndeyrn 18 Cylch Meithrin Llanybydder, SA40 9RN Sessional care Llanybydder 19 Cylch Meithrin Llandovery, SA20 0YD Sessional care
    [Show full text]
  • Welsh Route Study March 2016 Contents March 2016 Network Rail – Welsh Route Study 02
    Long Term Planning Process Welsh Route Study March 2016 Contents March 2016 Network Rail – Welsh Route Study 02 Foreword 03 Executive summary 04 Chapter 1 – Strategic Planning Process 06 Chapter 2 – The starting point for the Welsh Route Study 10 Chapter 3 - Consultation responses 17 Chapter 4 – Future demand for rail services - capacity and connectivity 22 Chapter 5 – Conditional Outputs - future capacity and connectivity 29 Chapter 6 – Choices for funders to 2024 49 Chapter 7 – Longer term strategy to 2043 69 Appendix A – Appraisal Results 109 Appendix B – Mapping of choices for funders to Conditional Outputs 124 Appendix C – Stakeholder aspirations 127 Appendix D – Rolling Stock characteristics 140 Appendix E – Interoperability requirements 141 Glossary 145 Foreword March 2016 Network Rail – Welsh Route Study 03 We are delighted to present this Route Study which sets out the The opportunity for the Digital Railway to address capacity strategic vision for the railway in Wales between 2019 and 2043. constraints and to improve customer experience is central to the planning approach we have adopted. It is an evidence based study that considers demand entirely within the Wales Route and also between Wales and other parts of Great This Route Study has been developed collaboratively with the Britain. railway industry, with funders and with stakeholders. We would like to thank all those involved in the exercise, which has been extensive, The railway in Wales has seen a decade of unprecedented growth, and which reflects the high level of interest in the railway in Wales. with almost 50 per cent more passenger journeys made to, from We are also grateful to the people and the organisations who took and within Wales since 2006, and our forecasts suggest that the time to respond to the Draft for Consultation published in passenger growth levels will continue to be strong during the next March 2015.
    [Show full text]