Bulli Creek Solar Farm Gore Highway, Bulli Creek

Total Page:16

File Type:pdf, Size:1020Kb

Bulli Creek Solar Farm Gore Highway, Bulli Creek Town Planning Report Bulli Creek Solar Farm Gore Highway, Bulli Creek Prepared for: Solar Choice Pty Ltd Date: Jan-14 RPS Ref: PR119938-3 rpsgroup.com.au Town Planning Report Bulli Creek Solar Farm Gore Highway, Bulli Creek Important Note Apart from fair dealing for the purposes of private study, research, criticism, or review as permitted under the Copyright Act, no part of this report, its attachments or appendices may be reproduced by any process without the written consent of RPS Australia East Pty Ltd. All enquiries should be directed to RPS Australia East Pty Ltd. We have prepared this report for the sole purposes of Solar Choice Pty Ltd (“ Client ”) for the specific purpose of making a Development Application (“ Purpose ”). This report is strictly limited to the purpose and the facts and matters stated in it and does not apply directly or indirectly and will not be used for any other application, purpose, use or matter. In preparing this report we have made certain assumptions. We have assumed that all information and documents provided to us by the Client or as a result of a specific request or enquiry were complete, accurate and up-to-date. Where we have obtained information from a government register or database, we have assumed that the information is accurate. Where an assumption has been made, we have not made any independent investigations with respect to the matters the subject of that assumption. We are not aware of any reason why any of the assumptions are incorrect. This report is presented without the assumption of a duty of care to any other person (other than the Client) (“ Third Party ”). The report may not contain sufficient information for the purposes of a Third Party or for other uses. Without the prior written consent of RPS Australia East Pty Ltd: this report may not be relied on by a Third Party; and RPS Australia East Pty Ltd will not be liable to a Third Party for any loss, damage, liability or claim arising out of or incidental to a Third Party publishing, using or relying on the facts, content, opinions or subject matter contained in this report. If a Third Party uses or relies on the facts, content, opinions or subject matter contained in this report with or without the consent of RPS Australia East Pty Ltd, RPS Australia East Pty Ltd disclaims all risk and the Third Party assumes all risk and releases and indemnifies and agrees to keep indemnified RPS Australia East Pty Ltd from any loss, damage, claim or liability arising directly or indirectly from the use of or reliance on this report. In this note, a reference to loss and damage includes past and prospective economic loss, loss of profits, damage to property, injury to any person (including death) costs and expenses incurred in taking measures to prevent, mitigate or rectify any harm, loss of opportunity, legal costs, compensation, interest and any other direct, indirect, consequential or financial or other loss. RPS Project Team Contact Information RPS Reference: PR119938-3 RPS Office: RPS Job Name: Gore Highway, Bulli Creek T: 07 4632 2511 Document Title: Bulli Creek Solar Farm W www.rpsgroup.com.au Document Type: Town Planning Report ACN: 44 140 292 762 RPS Contact: James Juhasz Revision History Version Date Purpose Author Reviewer Issue Date 0 - SPA Template v2.1 - - - 1 Jan-14 RPS Initial Draft Kathleen Hunter James Juhasz - A Jan-14 RPS Initial Draft Kathleen Hunter Brad Jones - Page ii Town Planning Report Bulli Creek Solar Farm Gore Highway, Bulli Creek Contents 1. SUMMARY ............................................................................................................................................... 1 2. SITE DESCRIPTION ................................................................................................................................ 9 2.1 Site Analysis ................................................................................................................................... 9 2.2 Surrounding Land Uses ...............................................................................................................10 3. DEVELOPMENT DESCRIPTION ..........................................................................................................11 3.1 General Description......................................................................................................................11 3.2 Site Layout ...................................................................................................................................11 3.3 Development Parameters ............................................................................................................13 4. KEY PLANNING ISSUES ......................................................................................................................20 4.1 State Planning Issues...................................................................................................................20 4.2 Local Planning Issues ..................................................................................................................20 5. PLANNING ASSESSMENT ...................................................................................................................22 5.1 State Planning Requirements ......................................................................................................22 5.2 Local Planning Requirements ......................................................................................................25 6. CONCLUSION .......................................................................................................................................31 Page iii Town Planning Report Bulli Creek Solar Farm Gore Highway, Bulli Creek Figures Figure 1: Locality Plan .................................................................................................................................. 5 Figure 2: Cadastral Plan ............................................................................................................................... 6 Figure 3: Zoning Plan ................................................................................................................................... 7 Figure 4: Aerial Photograph .......................................................................................................................... 8 Figure 5 Proposed Development Area ....................................................................................................... 13 Figure 6: Indicative sketch of Battery Storage Buildings ............................................................................ 14 Figure 7: Indicative sketch of solar frame ................................................................................................... 15 Figure 8: 330kV line crossing over Gore Hwy and heading north. ............................................................. 17 Figure 9: 330kV transmission line heading north to Bulli Creek substation, joined by 132kV line from Goondiwindi approx 3km south of substation ............................................................................. 17 Figure 10: the Bulli Creek substation showing entrance of both the 330kV transmission line from the east, and the 132kV line from Goondiwindi to the right. ............................................................. 18 Figure 11: showing indicative distribution of inverter houses in a solar farm. ............................................ 18 Figure 12: Indicative image of Inverter House Dimensions. ....................................................................... 19 Appendices Appendix A IDAS Forms and Owner’s Consent Appendix B Searches Appendix C Ecological Assessment Appendix D Proposal Plans Appendix E Council’s Prelodgement Meeting Minutes Appendix F SDAP Code Responses Appendix G Code Responses Page iv 1. Summary Solar Choice Pty Ltd (‘the Applicant’) has lodged a development application that seeks approval to establish a solar farm at Bulli Creek, located approximately 35 kilometres west of Millmerran. The Toowoomba Regional Council (‘Council) subsequently issued a Not Properly Made Notice to the Applicant on 21 November, 2013. The Applicant has engaged RPS to prepare a response to the matters raised in the Not Properly Made Notice. The following town planning report and supporting material represents a complete response to the Not Properly Made Notice. To this end, it is requested that Council now proceeds to accept the development application and issue an Acknowledgement Notice. As stated above, the development application seeks development approval to establish a solar farm at Bulli Creek, located approximately 35 kilometres west of Millmerran. Particularly, the development application seeks approval for a Development Permit for Material Change of Use for Utility Installation (Solar Farm). The development application is made over land which consists of three (3) adjoining cattle grazing properties totalling 5,382.75 hectares. The land is described in the table below and depicted at Figure 1: Locality Plan and Figure 2: Cadastral Plan. Land Holding Lot and Plan Description Area (hectares) Karriba Lot 5 on DY 1025 & Lot 37 on DY 1103 1,963.19 Minnaminane Lot 4 on DY 1024 1,977.766 Balinga Lot 39 on DY 916 1,441.7938 TOTAL 5,382.7498 The Applicant proposes to establish a solar farm that will, at ultimate capacity, use solar energy to generate up to 2.5 Giga Watts of electricity that will be sold directly and/or stored for later sale into the national electricity market.
Recommended publications
  • Darling Downs 79,530 Km2 Area Covered by Location1
    Darling Downs 79,530 km2 Area covered by location1 5.72% Population of Queensland1 3,846 km Other state-controlled road network 687 km National Land Transport Network2 See references section (notes for map pages) for further details on footnotes. Toowoomba Office 1-5 Phillip Street | Toowoomba | Qld 4350 Locked Bag 1 | Warwick | Qld 4370 (07) 4639 0777 | [email protected] Warwick Office 306 Wood Street | Warwick | Qld 4370 Locked Bag 1 | Warwick | Qld 4370 (07) 4661 6333| [email protected] • continue pavement rehabilitation on the Gore Highway • continue planning for bikeways in Central Toowoomba Darling Downs between Toowoomba and Millmerran, jointly funded and the Warwick principal cycle network by the Australian Government and Queensland Government • commence planning to improve Toowoomba In 2020–21 we completed: Connection Road and Hursley Road intersection • continue bridge replacement on the Rocky Creek • upgrading of the Emu Creek bridge on the New England Bridge on Murphy’s Creek Road, as part of the • continue planning to identify a Toowoomba North Highway, jointly funded by the Australian Government Queensland Government’s COVID-19 economic South Transport Corridor. and Queensland Government recovery response Link for TMR Project Page: • construction of Stage 1 of the New England Highway • continue pavement strengthening and widening on https://www.tmr.qld.gov.au/Projects Cycleway between Highfields and Toowoomba CBD the New England Highway between Yarraman and Toowoomba, as part of the Queensland Government’s
    [Show full text]
  • RACQ Unroadworthy Roads Technical Appendix
    RACQ Unroadworthy Roads Technical Appendix Author Public Policy Date March 2016 Title: RACQ Unroadworthy Roads Technical Appendix Issued Date: March 2016 Page: 1 of 104 List of roads with number of responses to identified problems cont’d IDENTIFIED PROBLEMS Tight Vegetation Poor or Slippery / curves / Narrow Narrow Poor Hazardous Poor or or objects Lack of inadequate Rough Loose blind road / bridge / road Poor Poor roadside no guard block overtaking Flood Poor road Steep Road Name # Responses Surface surface crests lanes culvert markings signing shoulders objects rails visibility opportunities prone drainage lighting grade Bruce Highway 67 38 9 10 27 17 14 8 27 8 11 8 30 22 15 11 1 Pacific Motorway 32 8 1 1 6 1 3 - 4 - - 1 4 - 2 - - Mount Lindesay Highway 21 5 - - 5 - 1 2 4 1 1 - 14 4 2 3 1 Captain Cook Highway 19 5 2 2 2 1 2 - 2 2 1 1 1 4 5 - - Rickertt Road 19 18 3 - 8 3 6 1 13 3 2 - 6 16 9 10 - D'Aguilar Highway 16 12 5 4 6 1 4 1 6 2 1 3 12 2 5 1 1 Kennedy Highway 15 2 5 7 6 1 - - 6 1 5 2 13 1 - 1 1 Warrego Highway 14 11 3 3 5 2 3 2 6 2 - 2 3 3 3 2 - New England Highway 11 9 2 2 4 2 1 1 4 2 2 1 5 2 1 - - Telegraph Road 11 4 - - - - - - 2 - - - - 1 1 - - Kingsford Smith Drive 10 8 2 - 4 - 3 - 2 - - - - - 1 - - Maleny-Kenilworth Road 10 10 2 4 10 4 2 1 8 4 - 1 5 - 2 - - Gore Highway 9 8 1 - 5 - - - 5 1 2 - 2 2 - - - Samford Road 9 7 2 3 6 - 1 1 1 2 - - 2 - 2 - - Tinaburra Drive 9 7 3 5 9 2 4 2 6 2 - 1 3 - - 4 - Burnett Highway 8 8 - 3 4 4 2 2 7 2 1 2 5 3 4 1 - Beachmere Road 7 6 1 2 7 6 1 2 7 - 1 2 2 6 3 3 - Beechmont Road 7 1 2 7 7
    [Show full text]
  • TOOWOOMBA SECOND RANGE CROSSING Scheduled Activities for the Eastern Interchange
    Helidon Spa How will acess be maintained? Single lane closures are effective in both directions on the Warrego Highway at Helidon Spa to complete • Nexus has installed a temporary u-turn facility TOOWOOMBA SECOND RANGE CROSSING scheduled activities for the eastern interchange. 600m west of the intersection for vehicles (up to B-doubles) to maintain access to Postmans Ridge These works involve: Road while right turns across the centre median of the Warrego Highway are restricted. Construction Update September 2018 • switching traffic from the right hand (fast lane) to • Eastbound traffic exiting Twidales Road will turn left the left-hand lane (slow lane) onto the Warrego Highway and turn around at the This month, Nexus is connecting the east and central sections of the Toowoomba Second Range • single lane closures to allow for works in the centre u-turn to proceed eastbound. median between carriageways. Crossing (TSRC), finishing works on the Nass Road truck stop at Charlton as well as the Operations and • Coming from the west, access to Twidales Road will Management building, and continuing its landscaping along the alignment. be maintained through the use of the u-turn facility For safety reasons, these works require a temporary at the Kellys Road intersection with the Warrego closure of the centre median on the Warrego Highway Highway, 1.4km east of the intersection closure. between Postmans Ridge Road and Twidales Road for up to three months. - Light vehicles will u-turn at the Kellys Road intersection with the Warrego Highway, head west The temporary closure of the median will require and turn left into Twidales Road.
    [Show full text]
  • Darling Downs Rest Area Upgrades Encouraging Motorists to Stop, Revive and Survive on the Darling Downs
    April 202 1 Darling Downs rest area upgrades Encouraging motorists to stop, revive and survive on the Darling Downs Rest areas across the Darling Downs are being upgraded over the next few months to improve facilities and encourage people to stop and rest. The Southern Queensland Regional Director, Kym Murphy, said the Department of Transport and Main Roads is starting work to improve motorist and heavy vehicle rest areas across the Darling Downs. “Rest areas are important to encourage motorists to stop and take a break, which helps reduce driver fatigue and the risk of crashes on our roads," she said. "We will be upgrading facilities such as toilets, shelters, picnic areas, parking and pedestrian pathways, to improve amenity and accessibility for all travellers. "The program is scheduled to upgrade 18 rest areas across the Darling Downs by the end of June 2021. "Starting with the Mary Park rest area on the Cunningham Highway at Tregony, which started works this week," Ms Murphy said. Below is a list of the sites being upgraded across the Darling Downs: • Mary Park rest area at Tregony, Cunningham Highway • Gladfield Driver Reviver rest area, Cunningham Highway • Cunningham rest areas at Thane (2 facilities), Cunningham Highway • The Glen rest area, New England Highway • Lions Park at Stanthorpe, Stanthorpe Connection Road • Federation Park at Ravensbourne, Esk-Hampton Road • Biddeston township facilities, Toowoomba-Cecil Plains Road • Munda Reserve at Woomera (2 facilities), Cunningham Highway • Millmerran rest area, Gore Highway • Wyaga Road intersection rest area at Wyaga, Gore Highway • Wyaga Creek rest area at Kilbronae, Gore Highway • Gatton Bypass truck stop, Warrego Highway • Richard Best Memorial Park at Warra, Warrego Highway • Monte Cristo at Condamine, Leichhardt Highway • Moonie Arts and Craft Centre Information Centre, Leichhardt Highway • Brigalow Creek north of Goondiwindi, Leichhardt Highway The impacts from the rest area upgrades will vary between sites.
    [Show full text]
  • Toowoomba Bypass
    TOOWOOMBA BYPASS TOOWOOMBA, Location Toowoomba, Australia Client Queensland Department of QUEENSLAND, Transport and Main Roads AUSTRALIA Project Value A$1.6 billion Builder Ferrovial and ACCIONA joint Financial adviser venture Project investor Architects Parsons Brinkerhoff and Aurecon joint venture Services Broadspectrum Financial Close August 2015 Completion Date September 2019 Awards Best Road/Highway Project, 2020 Engineering News-Record Global Best Projects Awards Most Innovative National Road Infrastructure Project, 2019 BUILD Infrastructure Awards Silver, Best Transport Project, 2017 PPP Awards Best Road Project, 2016 Partnerships Awards Road Deal of the Year, 2015 PFI Awards Asia Pacific Deal of the Year, 2015 IJGlobal The Toowoomba Bypass is a 41-kilometre bypass which runs to the north of Toowoomba from the Warrego Highway to the Gore Highway via Charlton and was one of Queensland’s highest priority road infrastructure projects. The project will assist in reducing travel time across the Toowoomba range by up to 40 minutes. It will redirect trucks from local roads in Toowoomba’s central business district and enhance freight efficiencies. Plenary is part of the Nexus Infrastructure consortium contracted by the Queensland Government to finance, operate and maintain the project for 25 years. The road partially opened to traffic in December 2018 and was fully completed and operational by September 2019. © Plenary Group 2021 TOOWOOMBA BYPASS Contract terms Design, build, finance and TOOWOOMBA, maintain for 25 years QUEENSLAND, Project
    [Show full text]
  • Toowoomba Second Range Crossing
    Toowoomba Second Range Crossing A safer, faster link in the National Land Transport Network Excavation underway near Morleys Road underpass at Ballard, north-east of Toowoomba. Works update (from September 2016): Gas, communications, electrical, and water services relocations or protection works, until December 2016, requiring changed traffic conditions on Goombungee Eastern section – Start of bulk earthworks. Start of Road, Boundary Street, Hermitage Road, Mort Street, foundations, formwork and concreting in preparation for Baillie Henderson Hospital access road, off Mort Street, construction of piers for the viaduct, near Mount Kynoch and Tor Street in Toowoomba. on the eastern slopes of the Toowoomba Range. Commencing piling work on the Gatton Creek (Rocky Creek) bridge. Start of construction of underpasses at Western section – Establishing storage facilities within Morleys, Gittens, McNamaras and Paynter roads. the project corridor, removing existing structures near Ganzer Road, Warrego Highway and Gore Highway, vegetation clearing, installing site access gates and Central section – Bulk earthworks between New access roads, relocating utility services at Ganzer Road, England Highway and Goombungee Road at Mount Gowrie Junction Road and Toowoomba-Cecil Plains Kynoch with the excavation of large quantities of soil and Road. rock, followed by the start of construction of the New England Highway realignment and twin arch bridges on the highway over the TSRC where it cuts through the Toowoomba Range. Project overview: Toowoomba Range, a significant decrease from the existing range crossing, which is up to 10% in parts • The Department of Transport and Main Roads is accommodate regional growth and increase delivering the Toowoomba Second Range Crossing productivity on the Darling Downs (TSRC), a 41km–long toll road that will pass Toowoomba • safer and less congested route than the existing range on its northern side, linking the Warrego Highway at crossing.
    [Show full text]
  • TOOWOOMBA SECOND RANGE CROSSING Technical Paper
    TOOWOOMBA SECOND RANGE CROSSING Technical Paper Contents ORGANISATION .................................................................................................................................. 1 SCOPE OF WORK .............................................................................................................................. 2 OUTCOMES ACHIEVED AGAINST PLANNED TARGETS FOR KEY PROJECT PARAMETERS ..................................................................................................................................... 4 COMPLEXITY, DIFFICULTY AND OPTIMISATION OF THE CONSTRUCTION TASK ......... 5 EXCELLENCE AND LEADERSHIP ............................................................................................... 12 IMAGES ............................................................................................................................................... 19 Australian Construction Achievement Awards 2019 Toowoomba Second Range Crossing ORGANISATION Organisational profile The Toowoomba Second Range Crossing (TSRC) project is a Public Private Partnership (PPP) between Queensland Government and Nexus Infrastructure (Nexus). Nexus is a Special Purpose Vehicle (SPV) comprising ACCIONA Concesiones, CINTRA and Plenary. Nexus awarded the design and construction (D&C) contract to Nexus Delivery (ND), a joint venture between ACCIONA Infrastructure Pty Ltd (ACCIONA) and Ferrovial Agroman (Australia) Pty Ltd (Ferrovial) and the operations and maintenance (O&M) contract to Nexus Operations and Maintenance (NOM),
    [Show full text]
  • Southern Queensland Region 2020–21 Project Pipeline Industry Briefing
    Southern Queensland Region 2020–21 Project Pipeline Industry Briefing Ms Kym Murphy Southern Queensland Regional Director 1 | Our region Southern Queensland Region Ms Kym Murphy Regional Director Mr Dereck Sanderson District Director Darling Downs Mr Roger Hacquoil District Director South West Mr Hendrik Roux District Director Wide Bay/Burnett 2 | *Stanthorpe Connection Road Roundabout Construction Southern Queensland Region 2020–21 Project Pipeline Industry Briefing Our program – focus areas of investment • Bruce Highway Upgrade Program • Warrego Highway East Masterplan • Targeted Road Safety Program • Roads of Strategic Importance (ROSI) Program • Stimulus Works Program. 3 | SouthernSouthern QueenslandQueensland RegionRegion 20202020–-21 Project Pipeline Industry Briefing Our program approach – associated challenges Top challenges Description PUP investigations • Services found during construction phase not identified in design. inadequate People • Internal TMR capacity – Planning and Contract Administration • Availability of suitable external resources (via ECS*) to assist in the delivery of the Planning Program • Infrastructure projects in the market concurrently (including infrastructure projects in other states) – high demand for quality human resources • Contract resourcing – a limited pool of contract resources with the necessary skills and experience. High demand of specialised skills in Delivery and Operations, Materials Lab and Survey Resources. *ECS – Engineering Consultancy Scheme 4 | Southern Queensland Region 2020–21 Project
    [Show full text]
  • Gore Highway Pavement Rehabilitation
    MEDIA STATEMENT 9 April 2021 Trial tests innovative repairs A trial is underway using innovative engineering techniques to determine the best way to repair the Gore Highway between Pittsworth and Millmerran. Transport and Main Roads Southern Queensland Regional Director Kym Murphy said the works would add value to how roads on flood-prone, highly reactive soils were repaired into the future. "The first stage of this $17 million project will involve a trial of sustainable road systems and products to determine the optimum treatment in this environment," Ms Murphy said. "Subsequent stages will be able to use the trial results to determine the best road treatment which ultimately results in the best outcome for motorists and taxpayers. "The Condamine River floodplain, south-west of Toowoomba, is a challenging road-building environment due to soils that rapidly expand and contract under changing weather conditions." Ms Murphy said the project would repair sections of the highway between Pittsworth and Millmerran. “The stage one trials will be done on a 1.5km section of the Gore Highway between Brookstead and Pampas," she said. “We will look closely at the trial results to see what we can apply to subsequent works being undertaken between Pittsworth and Millmerran by mid-2023. “This section of the Gore Highway is particularly susceptible to flooding so we are optimistic the trial results will lead to a more robust road over time.” Department representatives will soon talk to local property owners and community members who could be affected by the works. This project is being delivered under the Roads of Strategic Importance early works program.
    [Show full text]
  • Australia Pacific LNG Project Volume 2: Gas Fields Chapter 17: Traffic and Transport
    Australia Pacific LNG Project Volume 2: Gas Fields Chapter 17: Traffic and Transport Volume 2: Gas Fields Chapter 17: Traffic and Transport Contents 17. Traffic and transport.................................................................................................................. 1 17.1 Introduction........................................................................................................................... 1 17.1.1 Purpose ........................................................................................................................ 1 17.1.2 Scope of work............................................................................................................... 1 17.1.3 Legislative framework................................................................................................... 4 17.2 Methodology ......................................................................................................................... 6 17.2.1 Road network ............................................................................................................... 7 17.2.2 Rail network................................................................................................................ 11 17.2.3 Shipping network........................................................................................................ 12 17.2.4 Air services................................................................................................................. 12 17.2.5 Cumulative analysis ..................................................................................................
    [Show full text]
  • Warrego Highway Upgrade Strategy 2012 05 Figure 1
    Warrego Highway at Charlton, west of Toowoomba The Warrego Highway Functions providing access to communities and the gas and connecting towns and rural/remote communities oilfields of south-west Queensland. to essential services, including health, education, As Queensland’s principal east-west freight route, employment and commerce extending west 714km from Brisbane to Charleville, the The highway supports a range of interstate, intrastate, Warrego Highway (M2/A2) is an important strategic link inter-regional and local functions, including: providing improved access for industry and the community to domestic and international airport in Queensland’s national and state road networks. connecting primary producers and industries in facilities in Brisbane The highway connects Brisbane to Toowoomba and southern Queensland and central New South Wales southern Queensland, central and western New South to the Port of Brisbane serving as a strategic interstate tourist route, it represents one of the key linkages for drive-based Wales and Victoria (via the A39 Gore Highway) and the serving as the east-west spine of southern tourism to Queensland’s outback regions, which Northern Territory (via the A2 Landsborough and Queensland’s road network, providing connections are important to the economy of many towns on Barkly highways). (Refer Figure 1, page 6). to key north-south interstate routes to Sydney, the Warrego Highway and beyond West of Brisbane, between Ipswich and Morven, the Melbourne and Darwin, and intrastate routes to highway forms part of the Australian Government’s Rockhampton and Townsville serving as a strategic military route between southern Queensland and the Northern Territory National Land Transport Network Brisbane – Darwin serving as the principal freight route to the and as a link between key military installations in national corridor.
    [Show full text]
  • Warrego Highway Upgrade Strategy Brisbane to Charleville Investments
    Brisbane to Charleville – 20 year planned and proposed investments Inset 11 8 7 6 2 1 Helidon Dinmore 14 Withcott Gatton 13 12 10 9 5 4 3 Toowoomba Ipswich Landsborough Highway Carnarvon Highway Leichhardt Highway Charleville Morven Mitchell 40 Roma Yuleba 37 34 Dulacca Miles 41 Chinchila Wallumbilla 39 Jackson Briglow 38 Drillham 36 35 Warra 33 31 32 Macalister 27 30 Dalby See inset 29 24 23 22 2 1 28 26 21 14 13 8 7 3 Oakey 25 11 10 5 4 20 Brisbane 19 Helidon Dinmore 18 17 16 15 12 9 6 Surat Basin Legend N Toowoomba Ipswich Energy Province Gore Highway State controlled roads Warrego Highway Time Period Cunningham Highway 1–4 years. Refer to Notes on page 17. New England Highway 5–10 years strategy 11–20 years strategy New South Wales 16 This Strategy identifies short, medium and long-term Also identified are unfunded projects subject PINK – long-term proposals which are planned over project priorities: to federal funding approval, with construction an 11–20 year timeframe. proposed over a four-year period to meet current YELLOW – short-term projects with committed Medium and long-term projects are dependent on demand funding, which have either commenced or are federal and state funding availability. As such, the state currently in the detailed project planning phase, and GREEN – medium-term investment proposals which will work closely with the Australian Government to are scheduled to commence between 2012 and 2015 have a longer horizon of 5–10 years deliver this Strategy. Number Project Number Project Number Project Warrego Highway
    [Show full text]