N

Notes 1. Do not scale from this drawing. 2. All dimensions are metres U.N.O. 3. All levels are in metres above Ordnance datum U.N.O. 4. This drawing is to be read in conjunction with all relevant Engineers drawings and specifications. 5. Exact position and location of all bollards and marking to be confirmed with the engineer on site prior to installation.

Existing pedestrian Legend: and cycle track to Cycle track / Lane Slang River Greenway and Wicklow Way be used Hatched protected space STOP Safety Bollard Wayfinding for Sea to Mountains route Wayfinding for Park to Park route Wayfinding for Mountains to Metals

Mountains to Metals Route

Existing signal crossing

MOUNTAINS TO METALS ROUTE

RVGD C0 For Consultation 2020-09-28 CMK LRT By Rev Description Date App Chk CONSULTATION

Dun Laoghaire & Rathdown Active School Travel Mountains to Metals

Hannemanns Allé 53 DK-2300 København S Tlf. +45 51 61 10 00 Fax +45 51 61 10 01 www.ramboll.dk

General Arrangement Sheet 1 of 5

Project No: Scale (@A1): Drawn: Date: 1620010428 1:2500 RS 2020-09-25

Drawing No: Rev: CMCEK © 2020 Microsoft Corporation © 2020 Maxar ©CNES (2020) Distribution Airbus DS © 2020 HERE 1620010428-RAM-XX-XX-DR-C-309 C0 2020-09-29 16:55:09 c:\pwwork\ramdk\han\d0188815\NRam_A_right.dwg

© 2020 Microsoft Corporation © 2020 Maxar ©CNES (2020) Distribution Airbus DS © 2020 HERE

Notes D n sale m hs an 2 All mensns ae mees 3 All levels ae n mees abve nane am hs an s be ea n nnn h all elevan nnees ans an seans 5 a sn an lan all bllas an man be nme h he ennee n se nsallan

Legend:

le a ane

Hahe ee sae

Sae lla ann Sea nans e ann a a e ann nans eals

Existing pedestrian and cycle track to be used

MOUNTAINS TO METALS ROUTE

1 The route will start at the Kilmacud Luas stop, linking to the Sea to Mountains Route and the Cycle Route.

The route will turn north to Leopardstown Park. It will follow this quiet residential street up to Leopardstown Avenue and continue on to Leopardstown Grove. Here there is an existing walking and cycling route to Rocwood. At the end of Rocwood the route will use the safe Leopardstown Drive crossing across the N11.

STILLORGAN LUAS STOP Leopardstown Park 1 RVGD C0 For Consultation 2020-09-28 CMK LRT By Rev Description Date App Chk

Quiet CONSULTATION residential Existing walking street and cycle path Dun Laoghaire & Rathdown Active School Travel Mountains to Metals

Hannemanns Allé 53 DK-2300 København S l 5 5 0 00 © 2020 Microsoft Corporation © 2020 Maxar ©CNES (2020) Distribution Airbus DS © 2020 HERE a 5 5 0 0 Existing ambll signal crossing General Arrangement Sheet 2 of 5

Project No: Scale (@A1): Drawn: Date: 1620010428 1:2500 RS 2020-09-25

Drawing No: Rev: K 1620010428-RAM-XX-XX-DR-C-310 C0 2020-0-2 52 amhan05amAh © 2020 Microsoft Corporation © 2020 Maxar ©CNES (2020) Distribution Airbus DS © 2020 HERE Park to Park Route

Notes D n sale m hs an 2 All mensns ae mees 3 All levels ae n mees abve nane am hs an s be ea n nnn h all elevan nnees ans an seans 5 a sn an lan all bllas an man be nme h he ennee n se nsallan

New crossing Dean’s Grnage Road INSERT A: BELMOUNT TERRACE CYCLE LANE

Meadow Close 3 Quiet residential Ardagh Park Road Springhill Avenue street 4 Legend: Quiet le a ane residential Hahe ee sae streets Sae lla Protected two-way ann Sea nans e Ardagh Drive cycle track ann a a e (see Park to Park route ann nans eals 2 drawing 1620010428-RAM- INSERT B XX-XX-DR-C-304/5)

Ardagh Crescent New connection Newtownpark Avenue between Belmont Lawn and Ardagh Crescent

Belmont Terrace MOUNTAINS TO METALS ROUTE Belmont Lawn 1 The route will start at the Kilmacud Luas stop, linking to the Sea to Mountains Route and the Sandyford Cycle Route. Potential for The route will turn north to Leopardstown Park. It will follow this placemaking quiet residential street up to Leopardstown Avenue and continue on to Leopardstown Grove. Here there is an existing walking and cycling route to Rocwood. At the end of Rocwood the route will use the safe crossing across the N11. INSERT A 2 From this safe crossing the route will follow Belmont Terrace (alongside the N11) to Belmont Green. The route will follow this quiet residential street and cross Belmont Lawn where it will link into Ardagh Crescent. This link would require an opening in the wall in Ardagh Crescent.

From here the route will link to Newtownpark Avenue via Ardagh Drive, Park Road, Close then along the pathway to Meadow Close.

3 At Newtownpark Avenue a new safe crossing is proposed this would also improve access to the existing bus stop. From this crossing the route will continue on to Pine Lawn and Crescent which are quiet residential streets.

The route will follow the edge of Springhill Park and along Springhill Avenue. The route will continue along these quiet residential streets to Brookville Park where it will join the Park to Park Route. Existing signal crossing Road (N11)

RVGD C0 For Consultation 2020-09-28 CMK LRT By Rev Description Date App 1 Chk CONSULTATION

Dun Laoghaire & Rathdown Active School Travel Mountains to Metals

Hannemanns Allé 53 DK-2300 København S l 5 5 0 00 a 5 5 0 0 ambll

General Arrangement Sheet 3 of 5

Project No: Scale (@A1): Drawn: Date: 1620010428 1:2500 RS 2020-09-25

Drawing No: Rev: K INSERT B: BELMOUNT LAWN / ARDAGH CRESCENT 1620010428-RAM-XX-XX-DR-C-311 C0 2020-0-2 555 amhan05amAh © 2020 Microsoft Corporation © 2020 Maxar ©CNES (2020) Distribution Airbus DS © 2020 HERE N

Notes 1. Do not scale from this drawing. 2. All dimensions are metres U.N.O. 3. All levels are in metres above Ordnance datum U.N.O. 4. This drawing is to be read in conjunction with all Protected two-way relevant Engineers drawings and specifications. Dean’s Grange Road 5. Exact position and location of all bollards and cycle track Potential for placemaking at marking to be confirmed with the engineer on site (see Park to Park route Deansgrange prior to installation. drawing 1620010428-RAM- XX-XX-DR-C-304/5)

4

Legend:

Cycle track / Lane

Hatched protected space

Safety Bollard INSERT A Wayfinding for Sea to Mountains route Wayfinding for Park to Park route Kill Lane Wayfinding for Mountains to Metals Short section of two-way protected cycle track Quiet residential streets

Existing signal New connection via MOUNTAINS TO METALS ROUTE crossings National Rehabiltation 4 Both routes will run on to Dean’s Grange Road. It will continue south into Clonkeen Park using the same proposed cycling and Hospital grounds walking infrastructure, please see Park to Park Route for details.

5 The route will separate and leave the Park to Park Route at McIntosh Park. It will continue to Pottery Road. The route will use the existing cycle track and then link though the National Rehabilitation Hospital.

At the other side of the hospital grounds on Rochestown Avenue a protected two way cycle track is proposed to Sefton. Rochestown Avenue Pottery Road 6 6 The route will run along Sefton to the pedestrian and cycle track which links to Sallynoggin Park. The route will continue along Path Sallynoggin Park to O’Rourke Park. through park 5

NATIONAL REHABILTATION HOSPITAL

RVGD C0 For Consultation 2020-09-28 CMK LRT By Rev Description Date App Chk CLONKEEN PARK CONSULTATION

Existing McIntosh Park © 2020 Microsoft Corporation © 2020 Maxar ©CNES (2020) Distribution Airbussignal DS © 2020 HERE Dun Laoghaire & Rathdown crossing Active School Travel Mountains to Metals Short section of Hannemanns Allé 53 two-way protected DK-2300 København S Tlf. +45 51 61 10 00 cycle track Fax +45 51 61 10 01 www.ramboll.dk

Existing General Arrangement signal Sheet 4 of 5 crossing Project No: Scale (@A1): Drawn: Date: 1620010428 1:2500 RS 2020-09-25

Drawing No: Rev: CMCEK INSERT A: DEANSGRANGE ROAD/KILL LANE CYCLELANE © 2020 Microsoft Corporation © 2020 Maxar ©CNES (2020) Distribution Airbus DS © 2020 HERE 1620010428-RAM-XX-XX-DR-C-312 C0 2020-09-29 17:03:32 c:\pwwork\ramdk\han\d0188815\NRam_A_right.dwg

Notes D n sale m hs an 2 All mensns ae mees 3 All levels ae n mees abve nane am hs an s be ea n nnn h all elevan nnees ans an seans 5 a sn an lan all bllas an man be nme h he ennee n se nsallan

Short section of two-way protected cycle track

Quiet residential streets

INSERT A: SILCHESTER ROAD CYCLELANE Legend:

le a ane

Hahe ee sae

Sae lla ann Sea nans e Existing ann a a e signal ann nans eals Holmston Avenue crossing Silchester Road Metals INSERT A cycle route 7 Silchester Park MOUNTAINS TO METALS ROUTE

Glenageary Road Upper 6 The route will run along Sefton to the pedestrian and cycle Glenageary Woods track which links to Sallynoggin Park. The route will continue along Sallynoggin Park to O’Rourke Park.

7 From O’Rourke Park the route will run north along Rollins Villas 8 Short section of and St Kevin’s Villas where it comes to Glenageary Road Upper. Here the existing crossing will be used to cross to Glenageary two-way protected Woods. cycle track 8 From Glenageary Woods the route will run north to Holmston Avenue. At the end of Holmston Avenue the route will cross Glenageary Road Lower using the existing crossing. From here it will continue onto Silchester Park and Crescent where there is an existing walking and cycling link to Silchester Road. Quiet On Silchester Road a short section of two way cycle track is residential proposed which will link to the Metals. street Existing Glenageary Road Lower signal crossing

RVGD C0 For Consultation 2020-09-28 CMK LRT St Kevin’s Villas By Rev Description Date App Chk CONSULTATION

Dun Laoghaire & Rathdown Active School Travel Mountains to Metals Quiet residential Hannemanns Allé 53 DK-2300 København S streets l 5 5 0 00 a 5 5 0 0 ambll 6 General Arrangement Sheet 5 of 5

Project No: Scale (@A1): Drawn: Date: 1620010428 1:2500 RS 2020-09-25

Drawing No: Rev: K © 2020 Microsoft Corporation © 2020 Maxar ©CNES (2020) Distribution Airbus DS © 2020 HERE 1620010428-RAM-XX-XX-DR-C-313 C0 2020-0-2 05 amhan05amAh