Government of Nepal
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Food Insecurity and Undernutrition in Nepal
SMALL AREA ESTIMATION OF FOOD INSECURITY AND UNDERNUTRITION IN NEPAL GOVERNMENT OF NEPAL National Planning Commission Secretariat Central Bureau of Statistics SMALL AREA ESTIMATION OF FOOD INSECURITY AND UNDERNUTRITION IN NEPAL GOVERNMENT OF NEPAL National Planning Commission Secretariat Central Bureau of Statistics Acknowledgements The completion of both this and the earlier feasibility report follows extensive consultation with the National Planning Commission, Central Bureau of Statistics (CBS), World Food Programme (WFP), UNICEF, World Bank, and New ERA, together with members of the Statistics and Evidence for Policy, Planning and Results (SEPPR) working group from the International Development Partners Group (IDPG) and made up of people from Asian Development Bank (ADB), Department for International Development (DFID), United Nations Development Programme (UNDP), UNICEF and United States Agency for International Development (USAID), WFP, and the World Bank. WFP, UNICEF and the World Bank commissioned this research. The statistical analysis has been undertaken by Professor Stephen Haslett, Systemetrics Research Associates and Institute of Fundamental Sciences, Massey University, New Zealand and Associate Prof Geoffrey Jones, Dr. Maris Isidro and Alison Sefton of the Institute of Fundamental Sciences - Statistics, Massey University, New Zealand. We gratefully acknowledge the considerable assistance provided at all stages by the Central Bureau of Statistics. Special thanks to Bikash Bista, Rudra Suwal, Dilli Raj Joshi, Devendra Karanjit, Bed Dhakal, Lok Khatri and Pushpa Raj Paudel. See Appendix E for the full list of people consulted. First published: December 2014 Design and processed by: Print Communication, 4241355 ISBN: 978-9937-3000-976 Suggested citation: Haslett, S., Jones, G., Isidro, M., and Sefton, A. (2014) Small Area Estimation of Food Insecurity and Undernutrition in Nepal, Central Bureau of Statistics, National Planning Commissions Secretariat, World Food Programme, UNICEF and World Bank, Kathmandu, Nepal, December 2014. -
Early Recovery Cluster | Dolakha District
EARLY RECOVERY CLUSTER | DOLAKHA DISTRICT Damage public buildings with ongoing and completed activities Early Recovery cluster, 2 September 2015 Lamabagar Alambu Gaurishankar Bigu Khare Chilangkha Khopachagu Worang Marbu Kalinchok Bulung Babare Laduk Lapilang Changkhu Sundrawati Lamidanda Jhyanku Suri Syama Boch Sunkhani Lakuridanda Suspa Kshyamawati Jungu Bhimeswor Municipality VDC/ Organisation Chhetrapa Municipality with completed/ Magapauwa Kabre ongoing activities Bhusaphedi Katakuti Namdru Japhe CWV/RRN JIRI MUNICIPALITY Phasku Mirge Jhule CWV/RRN Dodhapokhari Gairimudi Jiri Municipality CWV/RRN, PI Bhirkot Sailungeshwar Pawati Kalinchok ACTED VDC/ Organisation Katakuti PI Ghyangsukathokar Jhule Hawa Municipality with completed/ongoing activities Japhe Laduk Caritas, CWV/RRN Babare ACTED Bhedpu Chyama Lakuridanda PI, RI/ANSAB Bhedpu Plan International Dandakharka Melung Malu Lamidanda ACTED Shahare Bhimeswor Concern Worldwide (CWV)/ Municipality RRN. IOM, Relief International Lapilang PI (RI)/ANSAB, UNDP Magapauwa PI Legend Bhirkot CWV/RRN Malu CWV/RRN # of completely damaged # of ongoing/completed public buildings activities by pillar Bhusaphedi Plan International (PI) Mirge CWV/RRN Boch PI, RI/ANSAB 21-28 1. Debris management Pawati PI Bulung Carita 11-20 2. Community infrastructure Phasku PI & livelihood 6-10 Chilangkha CWV/RRN Sailungeshwar PI 3. Restoration local services 3-5 Dandakharka PI Sundrawati PI Dodhapokhari PI 4% 1-2 Sunkhani PI Gairimudi CWV/RRN 12% Suspa Kshy- PI, RI/ANSAB Ghyangsu- PI amawati % of type of public buildngs 7% kathokar 14% Worang Caritas Hawa CWV/RRN Government building Planning Save the Children, Japhe CWV/RRN Government building Health facility UNDP/UNV Health facility School 79% Map Sources: Nepal Survey Department, Report on damaged government buildings, DoE, MoH, MoFALD and MoUD, 84% School August 2015. -
Thangmi Time for a True Population Census: the Case of the Miscounted
‘imfl’i” (CITIZEN) Voi.I4No.4 Aug.OO-Qct.OO 0 g,q/* (CITIZEN) VoLII,Na4 Aug.OO-OcI.OO C in fact nearly double the official the months of Kartik and one another. The number of Time for a True Population Census: figure. Phagun 2054, by Mr. Meghraj Thangmi houses in each village. Simi Rishmi Thami. editor and and the breakdown of men. The Case of the Miscounted Thangmi Disparity in Figures publisher of Dolakhareng women and children, is - Mark Turin According to the 1991 (pages 38-44). (See Fig.l) common knowledge to all who (Mark Turin is a linguistic the Thangmi (Nep. Thami) workers involved in the census, the total Thangmi live n the area. According to the anthropologist and has been population of Nepal and of demanding process of statistical population is 19.103 (1999, As can be seen from the above figures then, there are working on the Thangmi Northeast India I would support recording. Having said this, the page 52) and there are 14.440 above figures. there is a great almost three times more language since 1996. He was these criticisms. disparity between the total people who spoke Thangmi as disparity between the official Thangmi people living the trained in Social Thangmi population a mother tongue (1999, page statistics and those provided by eastern districts of Nepal than Anthropology at the figure provided by the 22). Ofequal interest, however. thej ournal Dolakhareng. Some the official census suggests. University of government and the is the official breakdown of the of this difference may ofcourse Cambridge, UK, and more realistic figures Thangmi population by district. -
Provincial Summary Report Province 3 GOVERNMENT of NEPAL
National Economic Census 2018 GOVERNMENT OF NEPAL National Economic Census 2018 Provincial Summary Report Province 3 Provincial Summary Report Provincial National Planning Commission Province 3 Province Central Bureau of Statistics Kathmandu, Nepal August 2019 GOVERNMENT OF NEPAL National Economic Census 2018 Provincial Summary Report Province 3 National Planning Commission Central Bureau of Statistics Kathmandu, Nepal August 2019 Published by: Central Bureau of Statistics Address: Ramshahpath, Thapathali, Kathmandu, Nepal. Phone: +977-1-4100524, 4245947 Fax: +977-1-4227720 P.O. Box No: 11031 E-mail: [email protected] ISBN: 978-9937-0-6360-9 Contents Page Map of Administrative Area in Nepal by Province and District……………….………1 Figures at a Glance......…………………………………….............................................3 Number of Establishments and Persons Engaged by Province and District....................5 Brief Outline of National Economic Census 2018 (NEC2018) of Nepal........................7 Concepts and Definitions of NEC2018...........................................................................11 Map of Administrative Area in Province 3 by District and Municipality…...................17 Table 1. Number of Establishments and Persons Engaged by Sex and Local Unit……19 Table 2. Number of Establishments by Size of Persons Engaged and Local Unit….….27 Table 3. Number of Establishments by Section of Industrial Classification and Local Unit………………………………………………………………...34 Table 4. Number of Person Engaged by Section of Industrial Classification and Local Unit………………………………………………………………...48 Table 5. Number of Establishments and Person Engaged by Whether Registered or not at any Ministries or Agencies and Local Unit……………..………..…62 Table 6. Number of establishments by Working Hours per Day and Local Unit……...69 Table 7. Number of Establishments by Year of Starting the Business and Local Unit………………………………………………………………...77 Table 8. -
Three Years of Reconstruction Special You Can Obtain the Previous Editions of ‘Rebuilding Nepal’ from NRA Office at Singha Durbar
Three years of reconstruction special You can obtain the previous editions of ‘Rebuilding Nepal’ from NRA office at Singha Durbar. Cover: Jagat Bahadur Khatri and Chitra Kumari Khatri of Singati, Dolakha. Khatri is the first beneficiary to sign and receive the government’s private housing reconstruction grant. Photo: Chandra Shekhar Karki THREE YEARS OF RECONSTRUCTION NRA Chief Executive Officer of the National Reconstruction Authority Sushil Gyewali addressing a press meet to mark the completion of the NRA’s three years of establishment on December 25, 2018. 77% in private housing, 80% in schools and 95% progress in public buildings The National Reconstruction Author- with 742,135 beneficiaries, out of which in the rebuilding of health institutions, 95 ity (NRA) has publicized the progress 337,319 have completed rebuilding their percent in government buildings, 54 per- made in the post-earthquake reconstruc- houses while 233,343 houses are currently cent in security sector buildings and 68 tion and rehabilitation during three years under construction. percent in the cultural heritage sites. of its establishment and also unveiled the Similarly, 80 percent progress has been “We are on the right track to complete plans for the next two years of its tenure made in the reconstruction of the educa- the reconstruction of private housing during a press conference organized in tional institutions. As per the available within this fiscal year,” said Sushil Gyewa- Kathmandu on December 25. data, 55 percent of the schools have al- li, Chief Executive Officer of the NRA. The NRA has informed that there has ready been reconstructed while 25 percent “As many structures are currently under been 77 percent progress in the recon- of them are currently under construction. -
Gaurishankar Conservation Area - a Prime Habitat for Red Panda (Ailurus Fulgens) in Central Nepal
The Initiation Gaurishankar Conservation Area - A Prime Habitat for Red Panda (Ailurus fulgens) in Central Nepal Arjun Thapa1 Sunil Thapa1 and Shambu Poudel2 Corresponding email: [email protected] Abstract: Globally threatened Red Panda is found in isolated high mountain’s bamboo- forest patches in Nepal, India, Bhutan, China and Burma. This study was focused in Gaurishankar Conservation Area, one of the newly declared protected areas of Nepal, with aim to glean baseline information regarding existence of Red Panda, its habitat status and conservation issues. Methods like altitudinal line intercept, key informant survey and consultation (with local people, herders, conservation stakeholder) were used to address the objectives. Marbu, Kalinchok, Gaurishankar (Dolkha District), Chuchure, Gumdel (Ramechhap District) and Fulpingkatti (Sindupalchok District) area were surveyed in first phase of study and presence of Red Panda distribution was recorded from Marbu, Kalinchok, Chuchure and Fulpingkatti forests areas through sign evidence (fecal pellets). A total of 24 transects were established randomly in the whole area and only 16 transects were worked effectively because of topographical barrier. Distribution of Red Panda was found as clumped pattern ( ). Among these sites, frequent sign encounter was recorded in Marbu (5.45/km) area followed by Fulpingkatti (5.06/km), Kalinchok (3.73/km) and Chuchre (1.67/km). Like in other areas, conservation issues like habitat destruction, livestock pressure, fire wood collection and illegal poaching were rampant in Gaurishankar also. This study recommended for detail survey on population status and conservation activities should be elaborated in current identified habitat as well as further survey should be focused on other possible habitats within conservation area. -
Download 3.58 MB
Due Diligence Report – Social Safeguards Project Number: 51190-001 February 2020 Nepal: Disaster Resilience of Schools Project Construction of Schools in Dolakha District (Reconstruction Phase II) Prepared by Central Level Project Implementation Unit (Education) of National Reconstruction Authority for the Asian Development Bank. This Due Diligence Report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. TABLE OF CONTENTS ABBREVIATIONS .................................................................................................................................. III I. INTRODUCTION ..............................................................................................................................1 II. APPROACH AND METHODOLOGY IN DUE DILIGENCE .....................................................2 III. SCOPE OF LIKELY IMPACTS OF THE PROJECTS ............................................................2 A. INVOLUNTARY RESETTLEMENT .......................................................................................................2 B. INDIGENOUS PEOPLES ........................................................... -
Ttamak Koshi 3 Hyd Droel Ectric C Pro Oject
TAMAKOSHI 3 HYDROELECTRIC PROJECT EXECUTIVE SUMMARY - VOLUME XI Document for Disclosure Final Report – November 30, 2009 SWECO Norge AS Lysaker, P O Box 400 Oslo, NORWAY Telephone +47 67 12 80 00 www.sweco.no Abbreviations and Acronyms ACBP Awareness and Capacity Building Plan ADB Asian Development Bank CF Community Forest CFUG Community Forest User Group CITES Convention of International Trade in Endangered Species CSR Corporate Social Responsibility DFO District Forest Office DOED Department of Electricity Development EHSP Environment, Health and Safety Plan EIA Environmental Impact Assessment EMP Environmental Management Plan EMU Environmental Management Unit EPA Environmental Protection Agency EPR Environmental Protection Rules GLOF Glacial Lake Outburst Floods GON Government of Nepal GRU Grievance Redressal Unit GW Giga-watt GWh Giga-watt per hour HEP Hydroelectric Project HH/hh Household ICAMDP Immediate Catchment Area Management and Development Plan IFC International Financial Corporation IUCN International Union for the Conservation of Nature LSEP Livelihood Support and Enhancement Program m asl meters above sea level MOE Ministry of Energy MoEn Ministry of Environment MoWR Ministry of Water Resources MT Million Tons MW Mega Watt NEA National Electricity Authority PAF Project Affected Families PAP Project Affected Persons PCDP Public Consultation and Disclosure Plan PS Performance Standards RAP Resettlement Action Plan RRP Resettlement and Rehabilitation Plan SBA Safeguard Buffer Area SchEMS School of Environmental Management and Sustainable Development SEMD Social and Environmental Management Division SNP SN Power SPAF Severely Project Affected Families SPS Safeguard Policy Statement TA3HEP Tamakoshi 3 Hydroelectric Project TOR Terms of Reference VDC Village Development Committee WBG World Bank Group WHO World Health Organization Table of Content Page nos 1 Project Proponent and Organization Responsible for Preparing the EIA Report ......................................................... -
S.N Local Government Bodies EN स्थानीय तहको नाम NP District
S.N Local Government Bodies_EN थानीय तहको नाम_NP District LGB_Type Province Website 1 Fungling Municipality फु ङलिङ नगरपालिका Taplejung Municipality 1 phunglingmun.gov.np 2 Aathrai Triveni Rural Municipality आठराई त्रिवेणी गाउँपालिका Taplejung Rural municipality 1 aathraitribenimun.gov.np 3 Sidingwa Rural Municipality लिदिङ्वा गाउँपालिका Taplejung Rural municipality 1 sidingbamun.gov.np 4 Faktanglung Rural Municipality फक्ताङिुङ गाउँपालिका Taplejung Rural municipality 1 phaktanglungmun.gov.np 5 Mikhwakhola Rural Municipality लि啍वाखोिा गाउँपालिका Taplejung Rural municipality 1 mikwakholamun.gov.np 6 Meringden Rural Municipality िेररङिेन गाउँपालिका Taplejung Rural municipality 1 meringdenmun.gov.np 7 Maiwakhola Rural Municipality िैवाखोिा गाउँपालिका Taplejung Rural municipality 1 maiwakholamun.gov.np 8 Yangworak Rural Municipality याङवरक गाउँपालिका Taplejung Rural municipality 1 yangwarakmuntaplejung.gov.np 9 Sirijunga Rural Municipality लिरीजङ्घा गाउँपालिका Taplejung Rural municipality 1 sirijanghamun.gov.np 10 Fidhim Municipality दफदिि नगरपालिका Panchthar Municipality 1 phidimmun.gov.np 11 Falelung Rural Municipality फािेिुुंग गाउँपालिका Panchthar Rural municipality 1 phalelungmun.gov.np 12 Falgunanda Rural Municipality फा쥍गुनन्ि गाउँपालिका Panchthar Rural municipality 1 phalgunandamun.gov.np 13 Hilihang Rural Municipality दिलििाङ गाउँपालिका Panchthar Rural municipality 1 hilihangmun.gov.np 14 Kumyayek Rural Municipality कु म्िायक गाउँपालिका Panchthar Rural municipality 1 kummayakmun.gov.np 15 Miklajung Rural Municipality लि啍िाजुङ गाउँपालिका -
Initial Environmental Examination
Initial Environmental Examination Sunkhani – Lamidanda - Kalinchok Section of Sunkhani - Sangwa Road Rehabilitation and Reconstruction Sub- project June 2017 NEP: Earthquake Emergency Assistance Project Prepared by District Coordination Committee (Dolakha)- Central Level Project Implementation Unit – Ministry of Federals Affairs and Local Development for the Asian Development Bank. This initial environmental examination is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “terms of use” section on ADB’s website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. Environmental Assessment Document Initial Environmental Examination (IEE) Sunkhani – Lamidanda - Kalinchok Section of Sunkhani - Sangwa Road Rehabilitation and Reconstruction Sub-project June 2017 NEP: Earthquake Emergency Assistance Project Loan: 3260 Project Number: 49215-001 Prepared by the Government of Nepal for the Asian Development Bank (ADB). This Report is a document of the borrower. The views expressed herein do not necessarilyThe views expressed represent herein those are those of ADB's of the consultantBoard of and Directors, do not necessarily Management, represent or thosestaff ,of and ADB’s may bemembers, preliminary Board ofin Directors,nature. Management, or staff, and may be preliminary in nature. The views expressed herein are those of the consultant and do not necessarily represent those of ADB’s members, Board of Directors, Management, or staff, and may be preliminary in nature. -
Annual Report
ANNUAL REPORT National Trust for Nature Conservation ANNUAL REPORT 2018 © NTNC 2018 (FY 2017/18) Published by: National Trust for Nature Conservation (NTNC) Khumaltar, Lalitpur, Nepal PO Box 3712, Kathmandu, Nepal Tel: +977-1-5526571, 5526573, Fax: +977-1-5526570 E-mail: [email protected], URL: www.ntnc.org.np Photo credits: ACAP, BCC, BCP, Central Zoo, MCAP, SCP, GCAP Cover Photo: Chitwan © Sagar Giri Back cover photo: Ghorepani © Nicolas Cegalerba & Joanna Szwemberg Perhaps in recent memory, nature has never been under so much stress. Human being’s modern advancement are unfortunately taking a heavy toll on nature. Exponential population growth, aggravating poverty, expanding industrialization and unwarranted interference with nature’s indivisible elements – species, ecosystems and climate has put today’s global society out of harmony with nature. Nature as we know it is all giving, yet hardly immune from overexploitation. Therefore, sustenance and conservation of nature in delivering our developmental needs must be at the center of today’s aspiration for prosperity. Thence, increased commitment for sustainability and a collective action to secure our material progress in harmony with nature is imperative. In the midst of surmounting environmental problems both globally and locally, the National Trust for Nature Conservation continues to move forward to do its best in balancing the needs of people to that of nature’s sustainability. With a sense of concern FOREWORD and responsiveness from all spheres of society, we believe that a harmonious relationship between people and nature is attainable. Being guided in our mission to secure biodiversity for posterity, we understand the irreplaceable value that natural systems bring to life, and what it would mean if these are not secured. -
Environmental and Social Management Plan of Amdol Drinking Water Maintenance Sub-Project Bigu Rural Municipality-7
Government of Nepal National Reconstruction Authority Central Level Project Implementation Unit District Level Project Implementation Unit (Grant Management and Local Infrastructure) Dolakha Environmental and Social Management Plan of Amdol Drinking Water Maintenance Sub-Project Bigu Rural Municipality-7 March, 2019 Silent Features (Additional Information) of the Sub Project SN Particulars Description 1 Name of Project Amdol Drinking Water Maintenance Sub- Project 2 Type of Project Rehabilitation / Maintenance/ Reconstruction 3 Location Bigu RM, Ward Number- 7, Amadol Tole 4 District Dolakha 5 No. of Beneficiary HHs with in sub- 21 project area 6 No. of Earthquake Beneficiary 21 7 Major Works Intake and reserve tank maintenance, public tap construction & maintenance, distribution and supply from HDPE pipe 8 Existing Structures with Capacity Cracked intake, 50% HDPE pipe damaged 9 Total Estimated Cost (NRs.) 9,98,011.05 Project Contribution 8,90,000.00 User Contribution 1,08,011.05 Other Contribution 0 10 Rationality (a) Source Damage Intake, reserve tank and distribution pipeline (b) Increased Demand damaged which had increased the shortage of (c) New Scheme water and no earthquake beneficiaries house (d) Extension could start the construction. (e) Others (………………) 11 How does the Proposed Project Fulfill Before Gorkha earthquake, the drinking water the Provision of EHRP-ESMF ? system was working properly. After the earthquake, intake, reserve tank and distribution pipelines have damaged and thus local people, especially Brahmin Chhetri,